Method for improving influence of self-heating of electric energy meter on performance of mutual inductor and electric energy meter
A technology of electric energy meters and transformers, which is applied in the field of three-phase intelligent electric energy meters of the national grid, can solve the problems affecting the measurement accuracy and increase of intelligent electric energy meters, and achieve the effect of eliminating additional errors, ensuring measurement accuracy and reducing investment
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-02-11
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a three-phase intelligent electric energy meter of the State Grid, especially a method for improving the influence of the self-heating of the electric energy meter on the performance of the transformer and the electric energy meter, which can reduce the additional energy generated by the temperature rise of the electronic transformer under operating conditions. Errors are mainly used in power systems. Background technique
[0002] When the electrical load is large and the electric energy meter terminal flows through a large current, it will generate heat (self-heating). The voltage and current signal measurement of the electric energy meter usually requires voltage and current transformers to further transform and reduce the power grid signal before it can be input to the conditioning circuit. The test shows that the output voltage of the electronic current transformer increases with the increase of temperature, which is speci...
Examples
Embodiment Construction
[0023] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0024] The invention compensates based on the characteristic of the output voltage of the electronic current transformer changing with temperature, that is, the characteristic of the error of the electric energy meter changing with the load time. Take 6 three-phase smart meters and run them for 1.5 hours respectively under the conditions of rated maximum current Imax, power factor 1.0L, and rated maximum current Imax, 0.5L. The curve characteristics of the error with time are as follows: figure 1 , figure 2 shown.
[0025] From the data of 6 watches, it can be concluded that under the conditions of power factor 1.0L and 0.5L, the characteristics of the error changing with the load time are the same, and the curves are all linear, and they tend to be stable after 1 hour. Therefore, the first hour can be compensated by adjusting the value of the power gain register ...