A power plant energy storage black start system and control method
By designing a black energy storage startup system in a power plant, using energy storage coordination controller and concurrent devices to achieve black start-up and power switching of generators in a power plant, the problem of failure of energy storage switching in a power plant is solved and the system is improved Stability and design capacity required.
Patent Information
- Application Number
- CN202010398520.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-12
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-05-12
AI Technical Summary
When the energy storage in a power plant switches back to the generator after black starts, the power supply power may fail, resulting in the factory's power loss, and the existing system design is unreasonable, resulting in the failure of black start.
Design a black start-up system for energy storage in power plants, including energy storage system, energy storage coordination controller and concurrent device. The energy storage system is adjusted through the energy storage coordination controller to keep track of the low-voltage side voltage of the high-plant change and meet the requirements of When conditions are in the same period, the factory busbar inlet switch is closed to achieve seamless switching.
It realizes black start of generators and auxiliary equipment in power plants, and seamlessly switches back to generator voltage after black start is completed, reducing the design capacity of energy storage system and avoiding stability problems caused by impact loads. , providing dual concurrent guarantees.
Smart Images

Figure CN111478367B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of electrical engineering technology, and in particular relates to a power plant energy storage black start system and a control method. Background Art
[0002] Energy storage is an important component and key supporting technology for smart grids, energy internet, microgrids, and renewable energy grid connection. In power plant applications, energy storage can be used to assist generator frequency regulation, and can also be used as a black start power source to assist the black start of generator sets. On February 26, 2020, GE of the United States used 7.4MW energy storage with a 150MW 7F.03 heavy-duty gas turbine single-cycle unit at the Perryville Power Plant in Louisiana to complete the world's first heavy-duty gas turbine black start. When energy storage participates in the black start in a power plant, the power supply of the plant power bus needs to be switched from the energy storage back to the generator after the black start is completed. If the system design is unreasonable, the switching may fail, resulting in power loss to the plant power supply, thereby causing a black start failure.
[0003] In view of this, a power plant energy storage black start system and control method are proposed, which can realize the smooth switching of the power supply of the plant power bus from the energy storage back to the generator and reduce the impact during switching, which has important practical value and significance. Summary of the invention
[0004] The technical problem to be solved by the present application is to overcome the defects of the above-mentioned prior art and provide a power plant energy storage black start system and control method to enable the power plant to complete the black start through energy storage.
[0005] To achieve the above object, according to one aspect of the present application, a power plant energy storage black start system is provided, characterized in that the black start system includes an energy storage system, an energy storage coordination controller, and a synchronization device; the generator of the power plant is connected to the high-voltage transformer of the power plant, and the high-voltage transformer is connected to the plant bus of the power plant through a plant bus incoming switch;
[0006] The energy storage system is used to access the plant bus to achieve a black start;
[0007] The energy storage coordination controller is respectively connected to the energy storage system and the synchronization device, and is used to adjust the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer and achieves synchronization. The energy storage coordination controller is also used to start the synchronization device to perform synchronization detection. When it is detected that the low-voltage side voltage of the high-voltage plant transformer and the voltage of the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronous closing.
[0008] According to some embodiments, the black start system further includes a voltage sampling device, which is respectively connected to both sides of the plant bus incoming line switch, for collecting voltages on both sides and transmitting them to the energy storage coordination controller and the synchronization device.
[0009] According to some embodiments, the generator is connected to the high-voltage transformer via a grid-connected switch.
[0010] According to some embodiments, the generator is a gas-fired generator or a coal-fired generator.
[0011] According to some embodiments, the energy storage system is composed of at least one energy storage unit, and the energy storage unit includes a battery, an energy storage converter, a transformer, and an energy storage unit grid-connected switch.
[0012] According to some embodiments, the energy storage system is composed of two energy storage units, each of which includes four groups of batteries, four energy storage converters, one transformer, and one energy storage unit grid-connected switch.
[0013] According to some embodiments, the energy storage converter operates in a voltage source working mode, using a droop control or a virtual synchronous machine control strategy.
[0014] According to some embodiments, the energy storage coordination controller is connected to the energy storage system via an optical fiber or a network cable, and the energy storage coordination controller is used to adjust the frequency, voltage, and phase of the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer and achieves synchronization.
[0015] According to some embodiments, the energy storage coordination controller adjusts the frequency, voltage, and phase of the energy storage system by regulating the energy storage converter.
[0016] According to some embodiments, the energy storage coordination controller is connected to the synchronization device via a cable.
[0017] According to some embodiments, the plant bus incoming line switch is configured to be in a disconnected state before synchronization begins.
[0018] According to another aspect of the present application, a power plant energy storage black start control method is provided, characterized in that the control method comprises:
[0019] Starting the energy storage system and connecting it to the power plant busbar to achieve a black start;
[0020] The energy storage coordination controller controls the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer of the power plant and achieves synchronization;
[0021] The energy storage coordination controller starts the synchronization device to perform synchronization detection. When it is detected that the low-voltage side voltage of the high-voltage plant transformer and the voltage on the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronization closing.
[0022] According to some embodiments, the energy storage coordination controller controls the energy storage system further including collecting voltages on both sides of the plant bus incoming line switch, and the energy storage coordination controller controls the energy storage system according to the collected voltages on both sides.
[0023] According to some embodiments, the synchronization detection further includes that the synchronization device performs detection based on the collected voltages on both sides of the plant bus incoming line switch, and when it is detected that the low-voltage side voltage of the high-voltage plant transformer and the voltage on the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronization closing.
[0024] According to some embodiments, the energy storage coordination controller controls the energy storage system further including that the energy storage coordination controller adjusts the frequency, voltage and phase of the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage transformer of the power plant and achieves synchronization.
[0025] This application has the following beneficial effects:
[0026] 1) By configuring an energy storage system on the power plant's power bus, the energy storage system is used to supply power to the power plant, thus achieving a black start of the generator and related auxiliary equipment in the power plant. After the black start is completed, the power bus is seamlessly returned to the generator through synchronous control, and the generator terminal voltage is used to supply power.
[0027] 2) Select the factory bus incoming switch as the synchronization point to switch the power supply of the factory power bus from the energy storage system back to the generator. Compared with synchronization through the grid-connected switch at the generator end, it can reduce the load borne by the energy storage during the black start process, which not only helps to reduce the design required capacity of the energy storage system, but also avoids the problem of poor operation control stability caused by large impact loads such as high-voltage power transformers brought by the energy storage system.
[0028] 3) The energy storage coordination controller and the synchronization device are configured in parallel to provide dual guarantees for synchronization through different logics and means. The energy storage coordination controller actively adjusts the working point of each PCS in the energy storage system, controls the plant bus voltage to track the voltage on the low-voltage side of the high-power plant transformer, and actively and quickly completes the synchronization adjustment. If only the synchronization device passively waits to capture the synchronization point, it may take a long time or even be impossible to find a stable synchronization point due to the low inertia of the energy storage system. After the synchronization conditions of the energy storage coordination controller are met, the synchronization device is started, and the synchronization judgment and export closing operation are completed through the commonly used and recognized relay protection equipment in the power system to meet the power system operation specifications. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The present application is further described below in conjunction with the accompanying drawings and embodiments.
[0030] Figure 1 It is an embodiment of a power plant energy storage black start system of the present application;
[0031] Figure 2 It is an embodiment of an energy storage system in a power plant energy storage black start system of the present application;
[0032] In the figure: 1-generator; 2-grid-connected switch; 3-high-voltage transformer; 4-factory bus incoming switch; 5-factory bus; 6-energy storage system; 7-voltage sampling device; 8-energy storage coordination controller; 9-synchronization device; PCS-energy storage converter; PMS-energy storage coordination controller. DETAILED DESCRIPTION
[0033] The present application is described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0034] The present application provides a power plant energy storage black start system, which enables the power plant to complete a black start through the energy storage system.
[0035] like Figure 1 As shown, the power plant includes a generator 1, a grid-connected switch 2, a high-voltage transformer 3, a plant bus incoming switch 4, a plant bus 5, etc., wherein the generator 1 is connected to the high-voltage transformer 3, and the high-voltage transformer 3 is connected to the plant bus 5 through the plant bus incoming switch 4. In some embodiments, the generator 1 is a gas-fired generator or a coal-fired generator.
[0036] The black start system includes an energy storage system 6, an energy storage coordination controller 8, a synchronization device 9, etc.
[0037] The energy storage system 6 is connected to the power plant's plant bus 5 during black start. In some embodiments, the energy storage system 6 is composed of at least one energy storage unit, which includes: a battery, an energy storage converter, a transformer, and an energy storage unit grid-connected switch. Figure 2This is an example of an energy storage system 6, which includes 2 units, each of which is composed of 4 groups of batteries, 4 energy storage converters, 1 transformer, and 1 energy storage unit grid-connected switch. The energy storage converter operates in a voltage source working mode and adopts a virtual synchronous machine control strategy.
[0038] The energy storage coordination controller 8 is respectively connected to the energy storage system 6 and the synchronization device 9. The energy storage coordination controller 8 can adjust the energy storage system 6 so that the plant bus 5 connected to the energy storage system 6 can track the low-voltage side voltage of the high-voltage plant transformer 3 and achieve synchronization.
[0039] The synchronization device 9 can be started under the control of the energy storage coordination controller 8 to perform synchronization detection. When the synchronization device 9 detects that the low-voltage side voltage of the high-voltage transformer 3 and the voltage of the plant bus 5 meet the synchronization conditions, the plant bus incoming line switch 4 between the high-voltage transformer 3 and the plant bus 5 is closed to complete the synchronization closing.
[0040] In some embodiments, a voltage sampling device 7 is used to collect the voltage on both sides of the factory bus incoming switch 4 as a basis for the energy storage coordination controller 8 to adjust the energy storage system 6, and also as a basis for the synchronization device 9 to determine whether the synchronization conditions are met.
[0041] Specifically, the voltage sampling device 7 is connected to the energy storage coordination controller 8 and the energy storage system 6 respectively. The voltage sampling device 7 collects the voltages on both sides of the plant bus incoming switch 4 and transmits them to the synchronization device 9 and the energy storage coordination controller 8 respectively. The energy storage coordination controller 8 and the energy storage system 6 can be connected through optical fiber. Based on the frequency, voltage, and phase of the low-voltage side voltage of the high-voltage plant transformer 3 and the voltage on the plant bus 5 obtained from the voltage sampling device 7, the energy storage coordination controller 8 sends adjustment instructions to each energy storage converter of the energy storage system 6 through the optical fiber channel to adjust the frequency, voltage, and phase of the energy storage system 6, thereby adjusting the frequency, voltage, and phase of the plant bus 5, so that it tracks the low-voltage side voltage of the high-voltage plant transformer 3, and finally synchronizes with the low-voltage side of the high-voltage plant transformer 3.
[0042] The energy storage coordination controller 8 and the synchronization device 9 can be connected through node hard wiring (such as cables). After controlling the energy storage system 6 to perform synchronization tracking, the energy storage coordination controller 8 sends a start signal through the node to start the synchronization device 9 to start synchronization detection. The plant bus incoming line switch 4 is in a disconnected state before the synchronization starts. The synchronization device 9 determines whether the low-voltage side voltage of the high-voltage plant transformer 3 and the voltage of the plant bus 5 meet the synchronization conditions based on the voltage on both sides of the bus incoming line switch 4 collected by the voltage sampling device 7. Once the synchronization conditions are met, the plant bus incoming line switch 4 is closed to complete the synchronization closing.
[0043] In this application, the plant bus incoming switch is selected as the synchronization point to switch the power supply of the plant power bus from the energy storage back to the generator. Compared with synchronization through the grid-connected switch at the generator end, the plant bus incoming switch is selected as the synchronization point, which can reduce the load borne by the energy storage system during the black start process, which not only helps to reduce the design required capacity of the energy storage system, but also avoids the problem of poor operation control stability caused by large impact loads such as high-voltage plant transformers in the energy storage system.
[0044] In addition, configuring the energy storage coordination controller and the synchronization device at the same time can provide double protection for synchronization through different logics and means, and realize active and rapid synchronization adjustment.
[0045] The present application also provides a control method for a power plant energy storage black start system, comprising:
[0046] Start the energy storage system 6 and connect it to the power plant's plant bus 5 to achieve a black start;
[0047] The energy storage coordination controller 8 controls the energy storage system 6 so that the plant bus 5 connected to the energy storage system 6 tracks the low-voltage side voltage of the high-voltage plant transformer 3 of the power plant and achieves synchronization;
[0048] The energy storage coordination controller 8 starts the synchronization device 9 to perform synchronization detection. When it is detected that the low-voltage side voltage of the high-voltage transformer 3 and the voltage on the plant bus 5 meet the synchronization conditions, the plant bus incoming line switch 4 between the high-voltage transformer 3 and the plant bus 5 is closed to complete the synchronization closing.
[0049] In one embodiment, the voltages on both sides of the utility bus incoming switch 4 are collected, and the energy storage coordination controller 8 controls the energy storage system 6 according to the collected voltages on both sides, and the energy storage system 6 operates in a voltage source mode.
[0050] In one embodiment, the synchronization device 9 performs detection based on the collected voltages on both sides of the plant bus incoming line switch 4. When it is detected that the low-voltage side voltage of the high-voltage plant transformer 3 and the voltage on the plant bus 5 meet the synchronization conditions, the plant bus incoming line switch 4 is closed to complete the synchronization closing.
[0051] In one embodiment, the energy storage coordination controller 8 adjusts the frequency, voltage and phase of the energy storage system 6 so that the plant bus 5 connected to the energy storage system 6 tracks the low-voltage side voltage of the high-voltage transformer 3 of the power plant and achieves synchronization.
[0052] The above embodiments are only for illustrating the technical concept of the present application and cannot be used to limit the protection scope of the present application. A person skilled in the art should understand that any modification or equivalent replacement of the specific implementation of the present application without departing from the technical concept and scope proposed by the present application should be included in the scope of the claims of the present application.
Claims
1. A power plant energy storage black start system, characterized in that: The black start system includes an energy storage system, an energy storage coordination controller, and a synchronization device; the generator of the power plant is connected to the high-voltage transformer of the power plant, and the high-voltage transformer is connected to the power plant bus of the power plant through the power plant bus incoming switch; The energy storage system is used to access the plant bus to achieve a black start; The energy storage coordination controller is connected to the energy storage system and the synchronization device respectively, and is used to adjust the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer and achieves synchronization. The energy storage coordination controller is also used to start the synchronization device to perform synchronization detection. When it is detected that the low-voltage side voltage of the high-voltage plant transformer and the voltage of the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronization closing; The black start system also includes a voltage sampling device, which is respectively connected to both sides of the plant busbar incoming line switch to collect voltages on both sides and transmit them to the energy storage coordination controller and the synchronization device; wherein the generator is connected to the high-voltage plant transformer through a grid-connected switch; The energy storage system is composed of at least one energy storage unit, and the energy storage unit includes a battery, an energy storage converter, a transformer, and an energy storage unit grid-connected switch.
2. The power plant energy storage black start system according to claim 1, characterized in that: The generator is a gas-fired generator or a coal-fired generator.
3. The power plant energy storage black start system according to claim 1, characterized in that: The energy storage system is composed of two energy storage units, each of which includes four groups of batteries, four energy storage converters, one transformer, and one energy storage unit grid-connected switch.
4. The power plant energy storage black start system according to claim 1, characterized in that: The energy storage converter operates in a voltage source working mode and adopts a droop control or a virtual synchronous machine control strategy.
5. The power plant energy storage black start system according to claim 1, characterized in that: The energy storage coordination controller is connected to the energy storage system via an optical fiber or a network cable. The energy storage coordination controller is used to adjust the frequency, voltage, and phase of the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer and achieves synchronization.
6. The power plant energy storage black start system according to claim 5, characterized in that: The energy storage coordination controller adjusts the frequency, voltage and phase of the energy storage system by regulating the energy storage converter.
7. The power plant energy storage black start system according to claim 1, characterized in that: The energy storage coordination controller is connected to the synchronization device via a cable.
8. The power plant energy storage black start system according to claim 1, characterized in that: The plant bus incoming line switch is configured to be in a disconnected state before synchronization begins.
9. A control method for the power plant energy storage black start system according to claim 1, characterized in that: The control method comprises: Starting the energy storage system and connecting it to the power plant busbar to achieve a black start; The energy storage coordination controller controls the energy storage system so that the plant bus connected to the energy storage system follows Tracking the low voltage side voltage of the high voltage transformer of the power plant and achieving synchronization; The energy storage coordination controller starts the synchronization device to perform synchronization detection. When it detects that the low-voltage side of the high-voltage transformer After the voltage and the voltage on the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronous closing.
10. The control method according to claim 9, characterized in that: The energy storage coordination controller controls the energy storage system further including collecting voltages on both sides of the plant bus incoming line switch, and the energy storage coordination controller controls the energy storage system according to the collected voltages on both sides.
11. The control method according to claim 10, characterized in that: The synchronization detection further includes that the synchronization device performs detection based on the collected voltages on both sides of the plant bus incoming line switch, and when it is detected that the low-voltage side voltage of the high-voltage plant transformer and the voltage on the plant bus meet the synchronization conditions, the plant bus incoming line switch between the high-voltage plant transformer and the plant bus is closed to complete the synchronization closing.
12. The control method according to claim 9, characterized in that: The energy storage coordination controller controls the energy storage system further including that the energy storage coordination controller adjusts the frequency, voltage and phase of the energy storage system so that the plant bus connected to the energy storage system tracks the low-voltage side voltage of the high-voltage plant transformer of the power plant and achieves synchronization.