A subsidy application and review method and system based on full-link data supervision
Through full-link data supervision technology, self-driven management of new energy subsidy application projects has been realized, the problem of inefficient review of traditional subsidy application has been solved, the review efficiency and transparency have been improved, and the comprehensiveness of data security and management has been ensured.
Patent Information
- Application Number
- CN202011624563.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-30
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-12-30
AI Technical Summary
The application and review process of traditional new energy subsidy is inefficient, and the application certificate materials do not meet the policy requirements, resulting in inefficient management and inability to achieve online one-stop service.
The subsidy declaration and review method based on full-link data supervision is adopted. The steps performed by the server include starting the daemon process, notifying the user information to confirm, obtaining and saving user input information, verifying project information, recording operation traces, and starting a timing program. Identify project status tags, promote project process nodes, and realize self-driven and self-checking of project data.
It effectively improves the efficiency of subsidy declaration and review, realizes openness and transparency of subsidy declaration work, eliminates the situation where the supporting materials do not meet policy requirements, provides efficient, reliable and transparent subsidy declaration services, and improves the social service level of State Grid Corporation.
Smart Images

Figure CN112734363B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a subsidy declaration and review method and system based on full-link data supervision, belonging to the field of Internet application technology. Background Art
[0002] With the rapid development of renewable energy power generation, the scale of power generation from renewable energy sources such as wind power, solar power and biomass is increasing day by day, the requirements for new energy consumption are becoming higher and higher, and the contradictions and shortcomings in planning and construction, grid connection services, technical support and market transactions are becoming increasingly prominent.
[0003] Traditionally, the application and review of new energy subsidies is conducted offline, and there are problems such as low efficiency in the application of subsidies and the application materials not meeting the requirements of relevant policies. In order to cooperate with the management of the new energy subsidy catalog, implement the work deployment on requiring power grid enterprises to carry out renewable energy subsidy project management, do a good job in new energy subsidy management, realize online application and review of new energy subsidies, realize the deep integration of new generation information technology and traditional subsidy management business, better serve new energy power generation enterprises, promote the healthy and orderly development of new energy business, and help achieve the strategic goal of large-scale circular economy, we have developed the online filling, review and release functions of subsidy projects, and provide online one-stop subsidy project list application and review services for power users, energy authorities and information management centers. Summary of the invention
[0004] The purpose of the present invention is to overcome the technical defects of the prior art, solve the above technical problems, and propose a self-driven management mechanism for subsidy application project data - a subsidy application and review method and system based on full-link data supervision, and put it into practice in the construction process of the subsidy application module, track and audit the subsidy application projects, so as to realize the data-driven subsidy application review. Judging from the results of the online operation of the State Grid New Energy Cloud Subsidy Application Module, this method can effectively improve the efficiency of subsidy application review and solve the pain points in previous subsidy application work.
[0005] The present invention specifically adopts the following technical solution: a subsidy declaration and review method based on full-link data supervision, executed by a server, comprising the following steps:
[0006] Step SS1: Start the daemon process and start monitoring;
[0007] Step SS2: notify the user to confirm the information and supplement the project information; the step SS2 specifically includes: the daemon sends information to the relevant users during the stages of the owner filling in the information, the preliminary review by the power grid enterprise, the review and examination by the provincial energy bureau, and the final confirmation by the information center, reminding the users to supplement or confirm the information; the daemon automatically makes judgments according to preset business rules by identifying the current business stage and various status tags of the project, and triggers the mechanism for projects that meet the conditions, and notifies the users in various forms such as SMS or website in-site messages;
[0008] Step SS3: Get and save user input information and update the project status label;
[0009] Step SS4: Verify project information to ensure correctness and completeness;
[0010] Step SS5: Record user operation traces to facilitate subsequent auditing;
[0011] Step SS6: Start the timing program and update the project status label;
[0012] Step SS7: Identify the project status tag and push the project to the appropriate process node;
[0013] Step SS8: Guarding ends, the process goes into sleep mode, and the hot standby can be awakened at any time.
[0014] As a preferred embodiment, step SS1 specifically includes: the server configures a daemon process for each project that starts a business process. The daemon process assumes the role of an "auditor" and is responsible for monitoring the project status throughout the project life cycle and promoting the project to complete the entire declaration business process.
[0015] As a preferred embodiment, the step SS3 specifically includes: the daemon process obtains and saves the project information filled in by the project owner, the uploaded attachments, and the audit information filled in by the auditor during the stages of owner filling in, preliminary review by the power grid company, review by the provincial energy bureau, and final confirmation by the information center, and associates this information with the project and saves it in the database, and at the same time updates the corresponding project status value according to preset business rules, the project status value including the declaration status value and the audit status value; the subsequent daemon process will make judgments based on these project status tags and trigger the corresponding mechanism to arrange the project progress.
[0016] As a preferred embodiment, step SS4 specifically includes: during the stages of the owner filling in the form, the grid company making a preliminary review, the provincial energy bureau reviewing and examining, the information center making the final confirmation, the project being publicized, the project being included in the subsidy list and being announced, the daemon will compare and verify the current data of the project with the historical data of the previous stage at the beginning of each stage to see if there is any deviation, so as to prevent data tampering or data loss during the project circulation process; at the end of each stage, a "snapshot" of the current project data will be saved like a slice specimen for data verification.
[0017] As a preferred embodiment, step SS5 specifically includes: during the stages of owner filling in the form, preliminary review by the power grid company, review and examination by the provincial energy bureau, and final confirmation by the information center, the daemon process will record a series of operations of creating, submitting, modifying, and reviewing the project when the user is using the system.
[0018] As a preferred embodiment, step SS6 specifically includes: in the project publicity phase, the daemon process starts a multi-day timer for the project. After the timer ends, the project is removed from the project publicity related page and the project publicity status label value is updated.
[0019] As a preferred embodiment, step SS7 specifically includes: during the stages of owner filling out the form, preliminary review by the power grid company, review and examination by the provincial energy bureau, final confirmation by the information center, project announcement, inclusion of the project in the subsidy list and announcement, the daemon process monitors the status labels of the project in real time, and determines whether the project should proceed to the next stage, remain in the current stage or roll back to the previous stage based on the rules preset in combination with the business logic, thereby realizing data self-driven project management.
[0020] As a preferred embodiment, step SS8 specifically includes: when the project is included in the subsidy list and announced, the daemon process temporarily completes the project supervision task, stops real-time monitoring of the project and enters a dormant state; when the project restarts the business process, the trigger mechanism re-awakens the daemon process and continues to supervise the project data status.
[0021] The present invention also proposes a subsidy declaration and review system based on full-link data supervision, including:
[0022] The process startup module is used to execute: start the daemon process and start supervision;
[0023] The information confirmation module is used to execute: notifying users to confirm information and supplement project information; the information confirmation module specifically includes: the daemon sends information to relevant users during the stages of owner filling, preliminary review by the power grid company, review and examination by the provincial energy bureau, and final confirmation by the information center, reminding users to supplement or confirm information; the daemon automatically makes judgments based on preset business rules by identifying the current business stage of the project and various status tags, and triggers the mechanism for projects that meet the conditions, notifying users in various forms such as text messages or website in-site messages;
[0024] The status label update module is used to perform the following operations: obtaining and saving user input information and updating the project status label;
[0025] The verification module is used to perform: verifying project information to ensure correctness and completeness;
[0026] The trace recording module is used to perform: recording user operation traces for subsequent auditing;
[0027] The timing module is used to execute: start the timing program and update the project status label;
[0028] The status tag identification module is used to perform the following: identify the project status tags and push the project to the appropriate process node;
[0029] The wake-up module is used to execute: daemon ends, process sleeps, and hot standby can be woken up at any time.
[0030] The present invention also proposes a device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the steps of the method are implemented when the processor executes the program.
[0031] The present invention also proposes a medium on which a computer program is stored, characterized in that the steps of the method are implemented when the computer program is executed by a processor.
[0032] Beneficial effects achieved by the present invention: A subsidy application and review method based on full-link data supervision proposed in the present invention can realize self-driving of the entire process of subsidy application projects, and by associating with the project data of the previous process node, realize self-verification and backup of project data, statistically analyze the overall situation of subsidy application projects, and comprehensively grasp the progress of subsidy application work. By applying the subsidy application and review method with full-link data supervision proposed in this article, the circulation efficiency of the new energy subsidy application and review process can be effectively improved, the openness and transparency of subsidy application work can be achieved, and undesirable situations such as supporting materials not meeting national policy requirements can be eliminated, providing efficient, reliable, open and transparent subsidy application services for the majority of new energy power generation owners, and improving the social service level of State Grid Corporation. The present invention can effectively improve the efficiency of subsidy application and review, and solve the problem that subsidy management in the past only stays at the data archiving level through the innovative data-driven business model, realize the full process and transparent control of subsidies, ensure that subsidy data cannot be tampered with, and realize the tracking and review of project historical archives. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a topological flow chart of a subsidy declaration and review method based on full-link data supervision of the present invention. DETAILED DESCRIPTION
[0034] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0035] Embodiment 1: The present invention proposes a subsidy declaration and review method based on full-link data supervision, which is executed by a server and includes the following steps:
[0036] Step SS1: Start the daemon process and start monitoring;
[0037] Step SS2: notify the user to confirm the information and supplement the project information; the step SS2 specifically includes: the daemon sends information to the relevant users during the stages of the owner filling in the information, the preliminary review by the power grid enterprise, the review and examination by the provincial energy bureau, and the final confirmation by the information center, reminding the users to supplement or confirm the information; the daemon automatically makes judgments according to preset business rules by identifying the current business stage and various status tags of the project, and triggers the mechanism for projects that meet the conditions, and notifies the users in various forms such as SMS or website in-site messages;
[0038] Step SS3: Get and save user input information and update the project status label;
[0039] Step SS4: Verify project information to ensure correctness and completeness;
[0040] Step SS5: Record user operation traces to facilitate subsequent auditing;
[0041] Step SS6: Start the timing program and update the project status label;
[0042] Step SS7: Identify the project status tag and push the project to the appropriate process node;
[0043] Step SS8: Guarding ends, the process goes into sleep mode, and the hot standby can be awakened at any time.
[0044] As a preferred embodiment, step SS1 specifically includes: the server configures a daemon process for each project that starts a business process. The daemon process assumes the role of an "auditor" and is responsible for monitoring the project status throughout the project life cycle and promoting the project to complete the entire declaration business process.
[0045] As a preferred embodiment, the step SS3 specifically includes: the daemon process obtains and saves the project information filled in by the project owner, the uploaded attachments, and the audit information filled in by the auditor during the stages of owner filling in, preliminary review by the power grid company, review by the provincial energy bureau, and final confirmation by the information center, and associates this information with the project and saves it in the database, and at the same time updates the corresponding project status value according to preset business rules, the project status value including the declaration status value and the audit status value; the subsequent daemon process will make judgments based on these project status tags and trigger the corresponding mechanism to arrange the project progress.
[0046] As a preferred embodiment, step SS4 specifically includes: during the stages of the owner filling in the form, the grid company making a preliminary review, the provincial energy bureau reviewing and examining, the information center making the final confirmation, the project being publicized, the project being included in the subsidy list and being announced, the daemon will compare and verify the current data of the project with the historical data of the previous stage at the beginning of each stage to see if there is any deviation, so as to prevent data tampering or data loss during the project circulation process; at the end of each stage, a "snapshot" of the current project data will be saved like a slice specimen for data verification.
[0047] As a preferred embodiment, step SS5 specifically includes: during the stages of owner filling in the form, preliminary review by the power grid company, review and examination by the provincial energy bureau, and final confirmation by the information center, the daemon process will record a series of operations of creating, submitting, modifying, and reviewing the project when the user is using the system.
[0048] As a preferred embodiment, step SS6 specifically includes: in the project publicity phase, the daemon process starts a multi-day timer for the project. After the timer ends, the project is removed from the project publicity related page and the project publicity status label value is updated.
[0049] As a preferred embodiment, step SS7 specifically includes: during the stages of owner filling out the form, preliminary review by the power grid company, review and examination by the provincial energy bureau, final confirmation by the information center, project announcement, inclusion of the project in the subsidy list and announcement, the daemon process monitors the status labels of the project in real time, and determines whether the project should proceed to the next stage, remain in the current stage or roll back to the previous stage based on the rules preset in combination with the business logic, thereby realizing data self-driven project management.
[0050] As a preferred embodiment, step SS8 specifically includes: when the project is included in the subsidy list and announced, the daemon process temporarily completes the project supervision task, stops real-time monitoring of the project and enters a dormant state; when the project restarts the business process, the trigger mechanism re-awakens the daemon process and continues to supervise the project data status.
[0051] Embodiment 2: The present invention also proposes a subsidy declaration and review system based on full-link data supervision, comprising:
[0052] The process startup module is used to execute: start the daemon process and start supervision;
[0053] The information confirmation module is used to execute: notifying users to confirm information and supplement project information; the information confirmation module specifically includes: the daemon sends information to relevant users during the stages of owner filling, preliminary review by the power grid company, review and examination by the provincial energy bureau, and final confirmation by the information center, reminding users to supplement or confirm information; the daemon automatically makes judgments based on preset business rules by identifying the current business stage of the project and various status tags, and triggers the mechanism for projects that meet the conditions, notifying users in various forms such as text messages or website in-site messages;
[0054] The status label update module is used to perform the following operations: obtaining and saving user input information and updating the project status label;
[0055] The verification module is used to perform: verifying project information to ensure correctness and completeness;
[0056] The trace recording module is used to perform: recording user operation traces for subsequent auditing;
[0057] The timing module is used to execute: start the timing program and update the project status label;
[0058] The status tag identification module is used to perform the following: identify the project status tags and push the project to the appropriate process node;
[0059] The wake-up module is used to execute: daemon ends, process sleeps, and hot standby can be woken up at any time.
[0060] Embodiment 3: The present invention also proposes a device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method when executing the program.
[0061] Embodiment 4: The present invention further proposes a medium on which a computer program is stored, characterized in that the computer program implements the steps of the method when executed by a processor.
[0062] The present invention establishes a data-driven mechanism, so that the system can automatically perceive the status of the subsidy application project in real time, so as to determine what treatment to make to the project. When a project is submitted by the owner, the system will label the project as "born" and configure a daemon for it. The responsibilities of this daemon are similar to those of an "auditor". During the entire life cycle of the project, the daemon is responsible for tracking the status of the project and promoting the automatic flow of the project in the audit process. When the project flows to a certain process node and requires the intervention of relevant personnel, the daemon is responsible for sending messages to notify the user to handle the project; the daemon of the process link that does not require manual intervention will automatically push the project into the following links until the project is officially included in the subsidy list and the subsidy is issued, and the life cycle of the project ends. In addition to driving the project through the entire life cycle, the daemon is also responsible for recording the traces of project operations. If the data of the project is accidentally changed or lost, the daemon will restore and reproduce the project data according to the log information to ensure the security of the project data. According to the historical trace data of the project, the daemon can easily display the statistical data of various indicators of the project, analyze valuable information, and provide data support for government departments and power grid companies to make new energy decisions.
[0063] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0064] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0065] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A subsidy declaration and review method based on full-link data supervision, executed by a server, characterized in that: The steps include: Step SS1: Start the daemon process and start monitoring; Step SS2: notify the user to confirm the information and supplement the project information; the step SS2 specifically includes: the daemon sends information to the relevant users during the stages of the owner filling in the information, the preliminary review by the power grid enterprise, the review and examination by the provincial energy bureau, and the final confirmation by the information center, reminding the users to supplement or confirm the information; the daemon automatically makes judgments according to preset business rules by identifying the current business stage and various status tags of the project, and triggers the mechanism for projects that meet the conditions, and notifies the users in various forms such as SMS or website in-site messages; Step SS3: Get and save user input information and update the project status label; Step SS4: Verify project information to ensure correctness and completeness; Step SS5: Record user operation traces to facilitate subsequent auditing; Step SS6: Start the timing program and update the project status label; Step SS7: Identify the project status tag and push the project to the appropriate process node; Step SS8: Guarding ends, the process goes into sleep mode, and the hot standby can be awakened at any time.
2. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS1 specifically includes: the server configures a daemon process for each project that starts a business process. The daemon process assumes the role of an "auditor" and is responsible for supervising the project status throughout the project life cycle and promoting the project to complete the entire declaration business process.
3. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS3 specifically includes: the daemon process obtains and saves the project information filled in by the project owner, the uploaded attachments, and the audit information filled in by the auditor during the stages of owner filling in, preliminary review by the power grid company, review by the provincial energy bureau, and final confirmation by the information center, and associates this information with the project and saves it in the database, and at the same time updates the corresponding project status value according to the preset business rules, and the project status value includes the declaration status value and the audit status value; the subsequent daemon process will make judgments based on these project status tags and trigger the corresponding mechanism to arrange the project progress.
4. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS4 specifically includes: during the stages of the owner filling out the form, the grid company conducting preliminary review, the provincial energy bureau conducting reexamination, the information center conducting final confirmation, the project being publicized, the project being included in the subsidy list and being announced, the daemon will compare and verify the current data of the project with the historical data of the previous stage at the beginning of each stage to see if there is any deviation, so as to prevent data tampering or loss during the project circulation process; at the end of each stage, a "snapshot" of the current project data will be saved like a slice specimen for data verification.
5. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS5 specifically includes: during the stages of the owner filling in the form, the grid company's preliminary review, the provincial energy bureau's review and examination, and the information center's final confirmation, the daemon process will record the user's traces of a series of operations such as creating, submitting, modifying, and reviewing the project when using the system.
6. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS6 specifically includes: in the project publicity phase, the daemon process starts a multi-day timer for the project, and after the timer ends, the project is removed from the project publicity related page and the project publicity status label value is updated.
7. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS7 specifically includes: during the stages of the owner filling out the application, the grid company's preliminary review, the provincial energy bureau's review and examination, the information center's final confirmation, the project announcement, the project's inclusion in the subsidy list and announcement, the daemon process monitors the various status labels of the project in real time, and determines whether the project should proceed to the next stage, remain in the current stage, or roll back to the previous stage based on the rules preset in combination with the business logic, thereby realizing data self-driven project management.
8. According to claim 1, a subsidy declaration and review method based on full-link data supervision is characterized in that: The step SS8 specifically includes: when the project is included in the subsidy list and announced, the daemon process temporarily completes the project supervision task, stops real-time monitoring of the project and enters a dormant state; when the project restarts the business process, the trigger mechanism re-awakens the daemon process and continues to supervise the project data status.
9. A subsidy declaration and review system based on full-link data supervision, characterized in that: include: The process startup module is used to execute: start the daemon process and start supervision; The information confirmation module is used to execute: notifying users to confirm information and supplement project information; the information confirmation module specifically includes: the daemon sends information to relevant users during the stages of owner filling, preliminary review by the power grid company, review and examination by the provincial energy bureau, and final confirmation by the information center, reminding users to supplement or confirm information; the daemon automatically makes judgments based on preset business rules by identifying the current business stage of the project and various status tags, and triggers the mechanism for projects that meet the conditions, notifying users in various forms such as text messages or website in-site messages; The status label update module is used to perform the following operations: obtaining and saving user input information and updating the project status label; The verification module is used to perform: verifying project information to ensure correctness and completeness; The trace recording module is used to perform: recording user operation traces for subsequent auditing; The timing module is used to execute: start the timing program and update the project status label; The status tag identification module is used to perform the following: identify the project status tags and push the project to the appropriate process node; The wake-up module is used to execute: daemon ends, process sleeps, and hot standby can be woken up at any time.