Category 2 Listen Before Talk (LBT) Option for License-Unlicensed New Radio (NR-U)
By segmenting the measurement period during the link switching interval and applying cyclic extension technology to dynamically adjust the LBT type, the channel conflict problem caused by the change in link switching duration is solved, and the efficiency of the wireless communication system is improved.
Patent Information
- Application Number
- CN201980085133.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-12-17
- Filing Date
- 2019-12-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2039-12-18
AI Technical Summary
In wireless communication systems, due to the variation in the duration of link switching, existing technologies struggle to effectively determine the appropriate Listen-Before-Speak (LBT) type and measurement period, leading to channel conflicts and inefficiency.
By dividing the measurement period into segments within the link switching interval and performing LBT measurements within specific time segments, combined with cyclic expansion technology, the LBT type and measurement window are dynamically adjusted to adapt to different link switching durations, ensuring uninterrupted channel operation.
It improves channel utilization efficiency during link switching, reduces channel conflicts, and enhances the overall performance of the wireless communication system.
Smart Images

Figure CN113196859B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to and the benefit of U.S. Non-Provisional Patent Application No. 16 / 717,254, filed on December 17, 2019, and Indian Provisional Patent Application No. 201841048655, filed on December 21, 2018, and Indian Provisional Patent Application No. 201941010290, filed on March 16, 2019, each of which is hereby incorporated by reference in its entirety as if fully set forth below and for all applicable purposes. Technical Field
[0003] The present application relates to wireless communication systems, and more particularly, to communications before and / or after link switching in a spectrum shared by multiple network operation entities. Background Art
[0004] Wireless communication systems are widely deployed to provide various types of communication content, such as voice, video, packet data, messaging, broadcast, etc. These systems are capable of supporting communication with multiple users by sharing available system resources (e.g., time, frequency, and power). A wireless multiple-access communication system may include several base stations (BSs), each of which simultaneously supports communication for multiple communication devices (also referred to as user equipment (UE)).
[0005] In order to meet the growing demand for expanded mobile broadband connectivity, wireless communication technology is evolving from LTE technology to next-generation New Radio (NR) technology. For example, compared to LTE, NR is designed to provide lower latency, higher bandwidth or throughput, and higher reliability. NR is designed to operate on a wide range of spectrum bands, for example, from low bands below about 1 gigahertz (GHz) to high bands and mid-bands from about 1 GHz to about 6 GHz to high bands (such as millimeter wave (mm wave) bands). NR is also designed to operate across different spectrum types, from licensed spectrum to unlicensed and shared spectrum. Spectrum sharing enables operators to have the opportunity to aggregate spectrum to dynamically support high-bandwidth services. Spectrum sharing can extend the advantages of NR technology to operating entities that may not have access to licensed spectrum.
[0006] When communicating in a shared spectrum or an unlicensed spectrum, one way to avoid conflicts is to use a listen-before-talk (LBT) process to ensure that the shared channel is clear before sending a signal in the shared channel. The operation or deployment of NR in an unlicensed spectrum is referred to as NR-U. In NR-U, a wireless node (e.g., a BS or UE) may perform Category 1 (CAT1) LBT (e.g., no LBT measurement), Category 2 (CAT2) LBT, or Category 4 (CAT4) LBT before sending in a shared channel. In some examples, the wireless node may determine which type or category of LBT to perform after a link switch (e.g., from uplink (UL) to downlink (DL) or from downlink (DL) to uplink (UL)) and before sending based on the duration of the link switch. In some examples, a network such as a Long Term Evolution Licensed Assisted Access (LTE-LAA) network or a Long Term Evolution Enhanced Licensed Assisted Access (LTE-eLAA) network may define certain fixed measurement windows for LBT measurements within the link switching duration. However, the link switch duration may vary in the network, for example, due to propagation delays, processing delays at the transmitter and / or at the receiver, switching delays at the transmitter and / or at the receiver, and therefore may not necessarily fit within the fixed measurement window. Specifically, for example, due to improved overall system efficiency and faster processing timelines in NR compared to LTE, the link switch duration in NR-U may be shorter than the link switch duration in LTE-eLAA. Summary of the invention
[0007] The following summarizes some aspects of the disclosure to provide a basic understanding of the technology discussed. This summary is not an extensive overview of all expected features of the disclosure, and is neither intended to identify key or important elements of all aspects of the disclosure, nor to outline the scope of any or all aspects of the disclosure. Its sole purpose is to present some concepts of one or more aspects of the disclosure in summary form as a preface to a more detailed description presented later.
[0008] For example, in one aspect of the present disclosure, a method of wireless communication includes: receiving, by a first wireless communication device, a first communication signal from a second wireless communication device; determining, by the first wireless communication device, a first measurement period in a first part of a gap duration between the first communication signal and the second communication signal, the first part being adjacent to a start time of the second communication signal; performing, by the first wireless communication device, listen before talk (LBT) based at least in part on a first channel measurement value in the first measurement period; and sending, by the first wireless communication device, a second communication signal to the second wireless communication device based on the LBT.
[0009] In an additional aspect of the present disclosure, an apparatus includes: a component for receiving a first communication signal from a second wireless communication device; a component for determining a first measurement period in a first part of a gap duration between the first communication signal and the second communication signal, the first part being adjacent to a start time of the second communication signal; a component for performing listen-before-talk (LBT) based at least in part on a first channel measurement value in the first measurement period; and a component for sending a second communication signal to the second wireless communication device based on the LBT.
[0010] In an additional aspect of the present disclosure, a non-transitory computer-readable medium having program code recorded thereon, the program code comprising: code for causing a first wireless communication device to receive a first communication signal from a second wireless communication device; code for causing the first wireless communication device to determine a first measurement period in a first portion of a gap duration between the first communication signal and the second communication signal, the first portion being adjacent to a start time of the second communication signal; code for causing the first wireless communication device to perform listen-before-talk (LBT) based at least in part on a first channel measurement value in the first measurement period; and code for causing the first wireless communication device to send a second communication signal to the second wireless communication device based on the LBT.
[0011] When reviewing the following description of specific exemplary embodiments of the present invention in conjunction with the accompanying drawings, other aspects, features, and embodiments of the present invention will become apparent to those of ordinary skill in the art. Although features of the present invention may be discussed with respect to certain embodiments and drawings below, all embodiments of the present invention may include one or more of the advantageous features discussed herein. In other words, although one or more embodiments may be discussed as having certain advantageous features, one or more of such features may also be used according to the various embodiments of the present invention discussed herein. In a similar manner, although exemplary embodiments may be discussed below as device, system, or method embodiments, it should be understood that such exemplary embodiments may be implemented in various devices, systems, and methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A wireless communication network according to some embodiments of the present disclosure is illustrated.
[0013] Figure 2 is a timing diagram illustrating a listen-before-talk (LBT) measurement scheme according to some embodiments of the present disclosure.
[0014] Figure 3 is a timing diagram illustrating transmit / receive timing in a wireless communication network according to some embodiments of the present disclosure.
[0015] Figure 4is a block diagram of a user equipment (UE) according to some embodiments of the present disclosure.
[0016] Figure 5 is a block diagram of an exemplary base station (BS) according to some embodiments of the present disclosure.
[0017] Figure 6 is a timing diagram illustrating a link switching gap determination scheme according to some embodiments of the present disclosure.
[0018] Figure 7 is a timing diagram illustrating a link switching gap determination scheme according to some embodiments of the present disclosure.
[0019] Figure 8 is a timing diagram illustrating a link switching gap determination scheme according to some embodiments of the present disclosure.
[0020] Fig. 9 is a timing diagram illustrating a link switching gap determination scheme according to some embodiments of the present disclosure.
[0021] Fig.10 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0022] Fig.11 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0023] Fig.12 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0024] Fig.13 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0025] Fig.14 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0026] Fig.15 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0027] Fig.16 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0028] Fig.17is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0029] Fig.18 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0030] Fig.19 is a timing diagram illustrating an LBT measurement scheme for variable link switching gap duration according to some embodiments of the present disclosure.
[0031] Fig. 20 is a timing diagram illustrating a transmission scheme for controlling a downlink-to-uplink (DL-to-UL) switching gap duration for LBT measurement according to some embodiments of the present disclosure.
[0032] Fig.21 is a timing diagram illustrating a transmission scheme for controlling a DL-to-UL switching gap duration for LBT measurement according to some embodiments of the present disclosure.
[0033] Fig. 22 is a timing diagram illustrating a transmission scheme for controlling an uplink-to-downlink (UL-to-DL) switching gap duration for LBT measurement according to some embodiments of the present disclosure.
[0034] Fig.23 is a timing diagram illustrating a transmission scheme for controlling a UL-to-DL switching gap duration for LBT measurement according to some embodiments of the present disclosure.
[0035] Fig.24 is a flow chart of a communication method according to some embodiments of the present disclosure. DETAILED DESCRIPTION
[0036] The specific embodiments described below in conjunction with the accompanying drawings are intended as descriptions of various configurations and are not intended to represent the only configuration in which the concepts described herein can be practiced. For the purpose of providing a thorough understanding of the various concepts, the specific embodiments include specific details. However, it is apparent to those skilled in the art that these concepts can be practiced without these specific details. In some instances, well-known structures and components are shown in block diagram form to avoid obscuring such concepts.
[0037] The present disclosure generally relates to wireless communication systems, also referred to as wireless communication networks. In various embodiments, the techniques and apparatus may be used in wireless communication networks, such as code division multiple access (CDMA) networks, time division multiple access (TDMA) networks, frequency division multiple access (FDMA) networks, orthogonal FDMA (OFDMA) networks, single carrier FDMA (SC-FDMA) networks, LTE networks, GSM networks, fifth generation (5G) or new radio (NR) networks, and other communication networks. As described herein, the terms "network" and "system" may be used interchangeably.
[0038] OFDMA network can implement radio technology, such as evolved UTRA (E-UTRA), Institute of Electrical and Electronics Engineers (IEEE) 404.11, IEEE 404.16, IEEE 404.20, flash OFDM and similar technologies. UTRA, E-UTRA and Global System for Mobile Communications (GSM) are parts of Universal Mobile Telecommunication System (UMTS). Specifically, Long Term Evolution (LTE) is a version of UMTS using E-UTRA. UTRA, E-UTRA, GSM, UMTS and LTE are described in the files provided by the organization named "3rd Generation Partnership Project" (3GPP), and cdma2000 is described in the files from the organization named "3rd Generation Partnership Project 2" (3GPP2). These different radio technologies and standards are known or under development. For example, the 3rd Generation Partnership Project (3GPP) is a collaboration between telecommunication association groups, with the purpose of defining the third generation (3G) mobile phone specifications applicable to the world. 3GPP Long Term Evolution (LTE) is a 3GPP project aimed at improving the Universal Mobile Telecommunications System (UMTS) mobile phone standard. 3GPP may define specifications for the next generation of mobile networks, mobile systems, and mobile devices. The present disclosure relates to the evolution of wireless technology from LTE, 4G, 5G, NR, and other technologies that utilize shared access to wireless spectrum between networks that use a collection of new and different radio access technologies or radio air interfaces.
[0039] Specifically, 5G networks consider different deployments, different spectrums, and different services and devices implemented using a unified air interface based on OFDM. To achieve these goals, in addition to the development of new radio technologies for 5G NR networks, further enhancements to LTE and LTE-A are also considered. 5GNR will be able to scale to provide coverage for the following: (1) Massive Internet of Things (IoT), which has ultra-high density (e.g., about 1M nodes / km 2), ultra-low complexity (e.g., about 10 bits / second), ultra-low energy (e.g., about 10+ years of battery life), and deep coverage (capable of reaching challenging locations); (2) including mission-critical control with strong security (to protect sensitive personal, financial, or confidential information), ultra-high reliability (e.g., about 99.9999% reliability), ultra-low latency (e.g., about 1 ms), and users with wide range of mobility or lack of mobility; and (3) with enhanced mobile broadband, including extremely high capacity (e.g., about 10 Tbps / km 2 ), extremely high data rates (e.g., multi-Gbps rates, 100+Mbps user experience rates), and deep perception with advanced exploration and optimization.
[0040] 5G NR can be implemented to use an optimized OFDM-based waveform that: utilizes scalable numerology and transmission time intervals (TTIs); has a common flexible architecture to efficiently multiplex services and features with dynamic, low-latency time division duplex (TDD) / frequency division duplex (FDD) designs; and utilizes advanced wireless technologies such as massive multiple-input multiple-output (MIMO), robust millimeter wave (mm wave) transmission, advanced channel coding, and device-centric mobility. The scalability of numerology in 5G NR, as well as the scaling of subcarrier spacing, can effectively solve the problem of operating different services across different spectrums and different deployments. For example, in various outdoor and macro coverage deployments of FDD / TDD implementations less than 3GHz, the subcarrier spacing can appear at 15kHz on, for example, 5, 10, 20MHz and similar bandwidths (BW). For other various outdoor and small cell coverage deployments of TDD greater than 3GHz, the subcarrier spacing can appear at 30kHz on 80 / 100Mhz BW. For various other indoor broadband implementations, using TDD on the unlicensed portion of the 5 GHz band, subcarrier spacing may occur at 60 kHz over 160 MHz BW. Finally, for various deployments transmitting with a mmWave component at 28 GHz TDD, subcarrier spacing may occur at 120 kHz over 500 MHz BW.
[0041] 5G NR's scalable parameter sets facilitate scalable TTIs for different latency and quality of service (QoS) requirements. For example, shorter TTIs can be used for low latency and high reliability, while longer TTIs can be used for higher spectral efficiency. Efficient multiplexing of long and short TTIs allows transmissions to start on symbol boundaries. 5G NR also considers a self-contained integrated subframe design with uplink / downlink scheduling information, data, and acknowledgement in the same subframe. The self-contained integrated subframe supports communications in unlicensed or contention-based shared spectrum, adaptive uplink / downlink, which can be flexibly configured on a per-cell basis to dynamically switch between uplink and downlink to meet current traffic needs.
[0042] Various other aspects and features of the present disclosure will be further described below. It should be apparent that the teachings herein can be embodied in a variety of forms, and any specific structure, function, or both disclosed herein are merely representative and non-restrictive. Based on the teachings herein, it should be appreciated by those of ordinary skill in the art that the aspects disclosed herein can be implemented independently of any other aspects, and two or more of these aspects can be combined in various ways. For example, any number of aspects set forth herein can be used to implement a device or practice a method. In addition, in addition to or different from one or more of the aspects set forth herein, other structures, other functions, or other structures and functions can be used to implement such a device or practice such a method. For example, the method can be implemented as a part of a system, device, or device, and / or as an instruction stored on a computer-readable medium for running on a processor or computer. In addition, an aspect can include at least one element in a claim.
[0043] The present application describes a mechanism for communication before and / or after a link switch in a spectrum shared by multiple network operating entities (e.g., an unlicensed spectrum or a shared spectrum). For example, a first wireless communication device receives a first communication signal from a second wireless communication device in a first link direction, and then sends a second communication signal to the second wireless communication device in a second link direction different from the first link direction. The first wireless communication device may determine whether to perform LBT and / or which type of LBT to perform (e.g., no LBT, CAT2 LBT of different durations, and / or CAT4 LBT) before sending the second communication signal. The determination may be based in part on the duration of the link switch. The first wireless communication device may determine one or more measurement windows within the link switch duration for LBT measurement or energy detection. In one example, the first wireless communication device may be a BS and the second wireless communication device may be a UE, so the first link direction is UL and the second link direction is DL. In another example, the first wireless communication device may be a UE and the second wireless communication device may be a BS, so the first link direction is DL and the second link direction is UL.
[0044] In one embodiment, the BS or UE may determine the link switching duration based on the timeline of the BS. In one embodiment, the BS or UE may determine the link switching duration based on the timeline of the UE. In one embodiment, the BS or UE may determine the link switching duration based on the absolute transmission end time of the first communication signal and / or the absolute transmission start time of the second communication signal. In one embodiment, the BS or UE may consider the channel delay spread parameter, multipath channel parameter and / or timing advance parameter associated with the communication between the BS and the UE when determining the link switching gap duration. In one embodiment, the BS or UE may apply different configurations for determining the link switching gap duration. For example, the BS may determine the link switching gap duration based on the timeline for CAT2 LBT maintained by the BS, and the UE may determine the link switching gap duration based on the absolute time for CAT2 LBT.
[0045] In one embodiment, the BS or UE may divide the link switching gap duration into about three time slots in time. The BS or UE may perform energy detection in a measurement period within the beginning portion of the link switching gap duration and in a measurement period within the ending portion of the link switching gap duration. The BS or UE may avoid performing channel energy measurement in the middle portion between the beginning portion and the ending portion of the link switching gap duration. When the link switching gap duration is short (e.g., less than about 25 μs), the BS or UE may use a predetermined duration of one or more of these portions and allow one or more other portions of the link switching gap duration to vary according to the link switching gap duration. Optionally, the BS or UE may exclude any of these portions to fit the measurement period into the available link switching gap duration.
[0046] In one embodiment, the BS may configure the UE with a specific link switching gap configuration (e.g., timing with reference to a timeline for the BS, a timeline for the UE, or an absolute time), and the UE may determine the LBT type based on the configuration. In one embodiment, the BS may configure the UE with the LBT type. In this case, the BS may determine the LBT type for the UE based at least in part on the gap configuration / duration. The BS may signal the link switching gap configuration and / or the LBT configuration via an RRC message, a medium access control (MAC) control element (CE) message, and / or a PDCCH downlink control information (DCI) message (e.g., a scheduling grant).
[0047] In one embodiment, the BS may apply a cyclic suffix to the DL transmission before the DL to UL switching to provide the desired or required duration for the DL to UL switching. Optionally, the BS may configure the UE to apply an extended cyclic prefix (ECP) to the UL transmission after the DL to UL switching. In one embodiment, the BS may apply the ECP to the DL transmission after the UL to DL switching to provide the desired or required duration for the UL to DL switching. Optionally, the BS may configure the UE to apply the cyclic suffix to the UL transmission before the UL to DL switching. The length of the cyclic extension (e.g., ECP or cyclic suffix) may be determined based on the following: the number of symbols between the UL scheduling and the DL scheduling, the desired link switching gap duration, the timing advance parameter associated with the BS and the UE, the propagation delay parameter associated with the BS and the UE, and / or the channel delay spread parameter associated with the BS and the UE. The cyclic extension using the ECP may also be referred to as a CP extension (CPE). As discussed, the CPE is used to provide the desired link switching gap duration. Accordingly, CPE is an extension of a cyclic prefix that exceeds a normal duration or an extended duration, which the BS and UE may use for transmission (e.g., for symbols other than the first symbol in a UL / DL transmission burst) to mitigate inter-symbol interference (ISI). The BS may signal the cyclic extension configuration via an RRC message and / or a DCI message (e.g., a UE-specific DCI message, a group common DCI message for multiple UEs). Although the disclosed embodiments are described in the context of NR-U, the disclosed embodiments are suitable for use in any wireless network and / or with any wireless communication protocol.
[0048] Figure 1 A wireless communication network 100 according to some embodiments of the present disclosure is illustrated. The network 100 may be a 5G network. The network 100 includes several base stations (BSs) 105 (labeled as 105a, 105b, 105c, 105d, 105e, and 105f, respectively) and other network entities. The BS 105 may be a station that communicates with the UE 115, and may also be referred to as an evolved Node B (eNB), a next generation eNB (gNB), an access point, and similar names. Each BS 105 may provide communication coverage for a specific geographic area. In 3GPP, the term "cell", depending on the context in which the term is used, may refer to such a specific geographic coverage area of the BS 105 and / or a BS subsystem serving the coverage area.
[0049] BS 105 may provide communication coverage for macro cells, small cells (such as pico cells, femto cells), and / or other types of cells. Macro cells typically cover a relatively large geographic area (e.g., a geographic area of several kilometers in radius) and may allow unrestricted access to UEs with service subscriptions with a network provider. Small cells (such as pico cells) typically cover a relatively small geographic area and may allow unrestricted access to UEs with service subscriptions with a network provider. Small cells (such as femto cells) also typically cover a relatively small geographic area (e.g., a home) and, in addition to unrestricted access, may also provide restricted access to UEs associated with the femto cells (e.g., UEs in a closed subscriber group (CSG), UEs of home users, and similar UEs). A BS for a macro cell may be referred to as a macro BS. A BS for a small cell may be referred to as a small cell BS, a pico BS, a femto BS, or a home BS. In Figure 1 In the example shown in , BS 105d and BS 105e may be conventional macro BSs, while BS 105a to BS 105c may be macro BSs enabled with one of three-dimensional (3D), full-dimensional (FD), or massive MIMO. BS 105a to BS 105c may utilize their higher-dimensional MIMO capabilities to increase coverage and capacity using 3D beamforming in both elevation beamforming and azimuth beamforming. BS 105f may be a small cell BS, which may be a home node or a portable access point. BS 105 may support one or more (e.g., two, three, four, and the like) cells.
[0050] Network 100 may support synchronous operation or asynchronous operation. For synchronous operation, the BSs may have similar frame timing, and transmissions from different BSs may be approximately aligned in time. For asynchronous operation, the BSs may have different frame timing, and transmissions from different BSs may not be aligned in time.
[0051] UE 115 can be distributed throughout the wireless network 100, and each UE 115 can be static or mobile. UE 115 can also be referred to as a terminal, a mobile station, a subscriber unit, a station or a similar name. UE 115 can be a cellular phone, a personal digital assistant (PDA), a wireless modem, a wireless communication device, a handheld device, a tablet computer, a laptop computer, a cordless phone, a wireless local loop (WLL) station or a similar device. In one aspect, UE 115 can be a device including a universal integrated circuit card (UICC). In another aspect, UE can be a device that does not include UICC. In some aspects, UE 115 that does not include UICC can also be referred to as IoT device or Internet of Everything (IoE) device. UE 115a to UE 115d are examples of mobile smart phone type devices that access network 100. UE 115 can also be a machine specially configured for connection communication, including machine type communication (MTC), enhanced MTC (eMTC), narrowband IoT (NB-IoT) and similar connection communication. UE 115e to UE 115h are examples of various machines configured for communication that access network 100. UE 115 is capable of communicating with any type of BS, whether a macro BS, a small cell, or the like. Figure 1 In the figure, a Lightning Bolt (eg, a communication link) indicates a wireless transmission between the UE 115 and the serving BS 105, which is a BS designated to serve the UE 115 on a downlink and / or uplink, or a desired transmission between BSs, and a backhaul transmission between BSs.
[0052] In operation, BS 105a to BS 105c may use 3D beamforming and coordinated spatial techniques such as coordinated multipoint (CoMP) or multi-connectivity to serve UE 115a and UE 115b. Macro BS 105d may perform backhaul communications with BS 105a to BS 105c and small cell BS 105f. Macro BS 105d may also transmit multicast services that are subscribed to and received by UE 115c and UE 115d. Such multicast services may include mobile TV or streaming video, or may include other services for providing community information, such as weather emergencies or alerts, such as Amber Alerts or Gray Alerts.
[0053] The BS 105 may also communicate with a core network. The core network may provide user authentication, access rights, tracking, Internet Protocol (IP) connectivity, and other access, routing, or mobility functions. At least some of the BSs 105 (e.g., which may be examples of evolved Node Bs (eNBs) or access node controllers (ANCs)) may interface with the core network via a backhaul link (e.g., S1, S2, etc.) and may perform radio configuration and scheduling for communicating with the UE 115. In various examples, the BSs 105 may communicate with each other directly or indirectly (e.g., through a core network) over a backhaul link (e.g., X1, X2, etc.), which may be a wired or wireless communication link.
[0054] The network 100 may also support mission-critical communications with ultra-reliable and redundant links for mission-critical devices, such as UE 115e, which may be a drone. The redundant communication links with UE 115e may include links from macro BS 105d and macro BS 105e, and links from small cell BS 105f. Other machine-type devices, such as UE 115f (e.g., a thermometer), UE 115g (e.g., a smart meter), and UE 115h (e.g., a wearable device), may communicate directly with a BS (such as small cell BS 105f and macro BS 105e) through the network 100, or may communicate in a multi-hop configuration by communicating with another user device that relays its information to the network, such as UE 115f transmitting temperature measurement information to a smart meter (i.e., UE 115g), which is then reported to the network through the small cell BS 105f. The network 100 may also provide additional network efficiency through dynamic, low-latency TDD / FDD communications, such as V2V, V2X, C-V2X communications between UE 115i, UE 115j, or UE 115k and other UEs 115, and / or vehicle-to-infrastructure (V2I) communications between UE 115i, UE 115j, or UE 115k and BS 105.
[0055] In some embodiments, network 100 utilizes OFDM-based waveforms for communication. OFDM-based systems can divide the system BW into multiple (K) orthogonal subcarriers, which are also commonly referred to as subcarriers, tones, bins, or similar names. Each subcarrier can be modulated with data. In some instances, the subcarrier spacing between adjacent subcarriers can be fixed, and the total number of subcarriers (K) can depend on the system BW. The system BW can also be divided into subbands. In other instances, the subcarrier spacing and / or the duration of the TTI can be scalable.
[0056] In one embodiment, BS 105 may allocate or schedule transmission resources (e.g., in the form of time-frequency resource blocks (RBs)) for downlink (DL) and uplink (UL) transmissions in network 100. DL refers to the transmission direction from BS 105 to UE 115, and UL refers to the transmission direction from UE 115 to BS 105. Communication may be in the form of radio frames. A radio frame may be divided into a plurality of subframes, e.g., about 10 subframes. Each subframe may be divided into time slots, e.g., about 2 time slots. Each time slot may also be divided into mini time slots. In FDD mode, simultaneous UL transmission and DL transmission may occur in different frequency bands. For example, each subframe includes a UL subframe in a UL frequency band and a DL subframe in a DL frequency band. In TDD mode, UL transmission and DL transmission occur in different time periods using the same frequency band. For example, a subset of subframes (e.g., DL subframes) in a radio frame may be used for DL transmission, and another subset of subframes (e.g., UL subframes) in a radio frame may be used for UL transmission.
[0057] DL subframes and UL subframes may also be divided into several regions. For example, each DL subframe or each UL subframe may have a predefined region for sending reference signals, control information, and data. A reference signal is a predetermined signal that facilitates communication between BS 105 and UE 115. For example, a reference signal may have a specific pilot pattern or structure, wherein the pilot signal tone may span an operating BW or frequency band, each positioned at a predefined time and a predefined frequency. For example, BS 105 may send a cell-specific reference signal (CRS) and / or a channel state information reference signal (CSI-RS) to enable UE 115 to estimate a DL channel. Similarly, UE 115 may send a sounding reference signal (SRS) to enable BS 105 to estimate an UL channel. Control information may include resource allocation and protocol control. Data may include protocol data and / or operational data. In some embodiments, BS 105 and UE 115 may communicate using a self-contained subframe. A self-contained subframe may include a portion for DL communication and a portion for UL communication. A self-contained subframe may be DL-centric or UL-centric. A DL-centric subframe may include a duration for DL communication that is longer than a duration for UL communication. A UL-centric subframe may include a duration for UL communication that is longer than a duration for UL communication.
[0058] In one embodiment, network 100 may be an NR network deployed on a licensed spectrum. BS 105 may send synchronization signals (e.g., including a primary synchronization signal (PSS) and a secondary synchronization signal (SSS)) in network 100 to facilitate synchronization. BS 105 may broadcast system information associated with network 100 (e.g., including a master information block (MIB), remaining minimum system information (RMSI), and other system information (OSI)) to facilitate initial network access. In some instances, BS 105 may broadcast PSS, SSS, and / or MIB in the form of a synchronization signal block (SSB) on a physical broadcast channel (PBCH), and may broadcast RMSI and / or OSI on a physical downlink shared channel (PDSCH).
[0059] In one embodiment, a UE 115 attempting to access the network 100 may perform an initial cell search by detecting the PSS from the BS 105. The PSS may enable synchronization of period timing and may indicate a physical layer identification value. The UE 115 may then receive the SSS. The SSS may enable radio frame synchronization and may provide a cell identification value that may be combined with the physical layer identification value to identify the cell. The SSS may also enable detection of duplex mode and cyclic prefix length. The PSS and SSS may be located in the center portion of the carrier or in any suitable frequency within the carrier.
[0060] After receiving the PSS and SSS, the UE 115 may receive the MIB. The MIB may include system information for initial network access and scheduling information for RMSI and / or OSI. After decoding the MIB, the UE 115 may receive the RMSI and / or OSI. The RMSI and / or OSI may include radio resource control (RRC) information related to the following: random access channel (RACH) procedures, paging, control resource set (CORESET) for physical downlink control channel (PDCCH) monitoring, physical uplink control channel (PUCCH), physical uplink shared channel (PUSCH), power control, SRS, and cell barring.
[0061] After obtaining the MIB, RMSI, and / or OSI, the UE 115 may perform a random access procedure to establish a connection with the BS 105. For the random access procedure, the UE 115 may send a random access preamble, and the BS 105 may respond with a random access response. Upon receiving the random access response, the UE 115 may send a connection request to the BS 105, and the BS 105 may respond with a connection response (e.g., a contention resolution message).
[0062] After the connection is established, the UE 115 and the BS 105 may enter a normal operation phase, in which operation data may be exchanged. For example, the BS 105 may schedule UL communications and / or DL communications for the UE 115. The BS 105 may send UL and / or DL scheduling grants to the UE 115 via the PDCCH. The BS 105 may send DL communication signals to the UE 115 via the PDSCH according to the DL scheduling grant. The UE 115 may send UL communication signals to the BS 105 via the PUSCH and / or PUCCH according to the UL scheduling grant.
[0063] In one embodiment, the network 100 may operate on a system BW or a component carrier (CC) BW. The network 100 may divide the system BW into multiple BWPs (e.g., parts). The BS 105 may dynamically allocate the UE 115 to operate on a specific BWP (e.g., a specific part of the system BW). The allocated BWP may be referred to as an active BWP. The UE 115 may monitor the active BWP for signaling information from the BS 105. The BS 105 may schedule the UE 115 to perform UL communication or DL communication in the active BWP. In some embodiments, the BS 105 may allocate a pair of BWPs to the UE 115 within the CC for UL communication and DL communication. For example, the BWP pair may include a BWP for UL communication and a BWP for DL communication.
[0064] In one embodiment, the network 100 may operate on a shared channel, which may include a shared frequency band or an unlicensed frequency band. For example, the network 100 may be an NR-U network. In this embodiment, the BS 105 and the UE 115 may be operated by multiple network operation entities. In order to avoid conflicts, the BS 105 and the UE 115 may use a listen-before-talk (LBT) process to monitor the transmit opportunity (TXOP) in the shared channel. For example, the BS 105 may acquire or reserve a TXOP or channel occupancy time (COT) period in the shared channel by performing CAT4 LBT. CAT4 LBT refers to an LBT with a random backoff window and a variable contention window. When the LBT is successful, the BS 105 may transmit DL traffic to the UE 115 during the acquired COT period. The BS 105 may additionally share the acquired COT period with the UE 115 so that the UE 115 may send UL traffic to the BS 105 during the acquired COT period. Sharing the COT period with the UE 115 may benefit time-sensitive UL traffic, such as channel state information (CSI) feedback and / or hybrid automatic repeat request (HARQ) acknowledgement / negative acknowledgement (ACK / NACK) feedback. After the UE 115 completes the UL transmission, the BS 105 may transmit another DL traffic to the UE 115 or another UE 115. In other words, multiple communication link direction switches may occur within the acquired COT period.
[0065] After each link direction switch, the interference around the sending node (e.g., BS 105 or UE 115) may be different from the time of the COT period initially acquired, or different from the time when the sending node last sent. A method to ensure that the channel is unblocked after the link direction switch is for the sending node to perform LBT after the link direction switch and before sending. In some instances, the sending node determines whether LBT is required based on the duration of the link switch. For example, when the link switch duration is short enough (e.g., less than a threshold of about 16 microseconds (μs)), the sending node may not be required to perform LBT after the link switch and before sending. However, when the link switch duration is long (e.g., greater than a threshold of about 16 μs), the sending node is required to perform LBT, and can send in the channel when LBT is successful.
[0066] In some embodiments, the decision to perform LBT may additionally depend on the duration of transmission after the link switch. For example, when the transmission subsequent to the link switch is longer than a specific duration threshold, the node may be required to perform LBT even when the gap duration of the link switch is lower than the link switch gap threshold (e.g., less than 16 μs). In the case of DL to UL switching, the UE 115 may not know the total UL duration because different UEs 115 may be assigned different parts of the total UL duration, and each UE 115 may know the part allocated to the UE 115. Thus, the serving BS 105 can make a more informed decision about the LBT type than the UE 115. Therefore, the BS 105 can transmit the LBT type to the UE 115. In other words, the BS 105 can request the UE to perform LBT even if the link switch gap duration may be less than the threshold for no LBT. This article describes in more detail the mechanism for defining the link switch duration, determining the LBT type or mode, and / or performing LBT measurements within the link switch duration.
[0067] Figure 2 2 is a timing diagram illustrating an LBT measurement scheme 200 according to some embodiments of the present disclosure. The scheme 200 may be employed by a BS such as BS 105 and a UE such as UE 115 in a network such as network 100. Specifically, the BS or UE may employ the scheme 200 to determine a measurement period for LBT measurement within a link switching duration. Figure 2In , the X-axis represents time in some constant units. As an example, a wireless communication device (eg, a BS or a UE) receives a communication signal 210 (shown as Rx signal 210) and completes reception in a specific link direction (eg, UL or DL) at time T0. After receiving the communication signal 210, the wireless communication device switches to another link direction (e.g., UL to DL or DL to UL), and transmits a communication signal 220 (shown as a Tx signal) starting at time T1. In one example, the wireless communication device corresponds to a BS, the communication signal 210 is a UL communication signal (e.g., including PUSCH data and / or PUCCH control information sent by a UE), and the communication signal 220 corresponds to a discovery reference signal (DRS) (e.g., including an SSB), or corresponds to any DL communication signal including PDSCH data and / or PDCCH control information. In another example, the wireless communication device corresponds to a UE, the communication signal 210 is a DL communication signal (e.g., including PDSCH data and / or PDCCH control information sent by a BS), and the communication signal 220 corresponds to a scheduled UL transmission (e.g., including PUSCH data and / or PUCCH control information) in a COT acquired or reserved by the BS. The wireless communication device may perform LBT (e.g., CAT2 LBT) before transmitting the communication signal 220.
[0068] It should be noted that in some instances, the switching gap may be longer than the duration of the measurement period considered for LBT. For example, the time or gap between sending the UL PUSCH transmission grant and the UL PUSCH transmission start time in the DL direction may be as long as several milliseconds (ms), but LBT may be performed just before the PUSCH transmission for a fixed duration (e.g., about 25 μs). It should be noted that in some instances, such a fixed duration LBT procedure (CAT2 LBT) may be used without any switching in any direction. For example, for DRS transmission, the BS may use a fixed duration (e.g., about 25 μs) of LBT just before the DRS transmission.
[0069] The scheme 200 divides the link switching gap duration 202 between the received communication signal 210 and the scheduled or upcoming transmitted communication signal 220, or more generally, the CAT2 LBT duration, into approximately three time slots 204 (shown as 204). S(1) , 204 S(2) and 204 S(3) In one example, the link switching gap duration 202 may be approximately 25 μs, and the time slot 204 may be approximately 25 μs. S(1) may have a duration of approximately 9 μs, time slot 204 S(2)may have a duration of approximately 7 μs, and time slot 204 S(3) The scheme 200 allows for a time slot 204 to have a duration of approximately 9 μs. S(1) and 204 S(3) LBT measurements are performed during this period, but not during time slot 204 S(2) During this time, LBT measurement is performed. Additionally, the scheme 200 requires an LBT measurement duration of at least 4 μs. LBT measurement may refer to energy detection or energy measurement.
[0070] In one example, the wireless communication device may S(1) During the measurement period 206a and the time slot 204 S(3) The wireless communication device performs energy detection during the measurement period 206b within the time slot 206a to determine whether the channel is available. The wireless communication device measures the channel energy for a duration of at least 4 μs to determine the channel state (e.g., idle or occupied). In other words, each of the measurement periods 206a and 206b may have a duration of at least 4 μs. The wireless communication device may select the time slot 204 S(1) and 204 S(3) Any 4 μs within the time slot is used for channel energy measurement, and avoid using the channel energy measurement in time slot 204. S(2) In some examples, the wireless communication device may perform energy detection during time slot 204. S(1) or time slot 204 S(3) The LBT performs energy detection in the beginning of the time slot 204 and uses the remaining time of the corresponding time slot 204 to process energy measurements. When the measured values in the measurement periods 206a and 206b are lower than a certain energy detection threshold, the LBT succeeds. Conversely, when the measured value in the measurement period 206a or the measured value in the measurement period 206b is equal to or greater than the energy detection threshold, the LBT fails.
[0071] Figure 3 is a timing diagram illustrating transmission / reception timing in a wireless communication network 300 according to some embodiments of the present disclosure. The network 300 may correspond to a portion of the network 100. Figure 3 In , the x-axis represents time in some constant units. For the purpose of simple discussion, Figure 3 One BS 305 and two UEs 315 (shown as UE 315a and UE 315b) are illustrated, but it will be appreciated that embodiments of the present disclosure may be scaled to more UEs 315 and / or BSs 305. BS 305 and UE 315 may be similar to BS 105 and UE 115, respectively. BS 305 may serve UEs 315a and 315b in network 300. UE 315a may be located closer to BS 305 than UE 315b.
[0072] BS 305 may start transmitting DL signal 310 (e.g., including PDSCH data and / or PDCCH control information) at time T0. DL signal 310 may arrive at UE 315a at time T1 and arrive at UE 315b at time T2. The time difference 302a between the transmission start time T0 at BS 305 and the reception start time T1 at UE 315a may be referred to as propagation delay. Similarly, the time difference 302b between the transmission start time T0 at BS 305 and the reception start time T2 at UE 315b may be referred to as propagation delay. Because UE 315b is further away from BE 305 than UE 315a, the propagation delay 302b for UE 315b is longer than the propagation delay 302a for UE 315a.
[0073] In one example, BS 305 may schedule UE 315a to perform UL transmission at time T5 based on a timeline maintained by BS 305. UE 315a may start transmitting UL signal 320a (e.g., including PUSCH data and / or PUCCH control information) at time T4 earlier than the scheduled time T5 to compensate for propagation delay 302a. The time difference 304a between the transmission time T4 at UE 315a and the scheduled time T5 at BS 305 is referred to as timing advance. In another example, BS 305 may schedule UE 315b to perform UL transmission at time T5 based on a timeline maintained by BS 305. Similarly, UE 315b may start transmitting UL signal 320b at time T3 earlier than the scheduled time T5 to compensate for propagation delay 302b. The time difference 304b between the transmission time T3 at the UE 315b and the scheduled time T5 at the BS 305 is the timing advance for the UL transmission of the UE 315b.
[0074] In one example, UE 315a or UE 315b may perform initial network access to establish a connection with BS 305. UE 315a or UE 315b may initiate network access by performing a random access procedure. During the random access procedure, UE 315a or UE 315b may determine timing advance 304a or 304b, respectively, based on the random access preamble and messages exchanged with BS 305. Accordingly, in some instances, BS 305 may also determine timing advance 304a or 304b based on random access preambles and / or other UL transmissions received by the BS from UE 315a, UE 315b, and then transmit the determined timing advance to UE 315a, UE 315b in subsequent messages.
[0075] As can be observed, the link switching gap (e.g., gap duration 306a, 306b, 306c) may be different at different nodes due to different propagation delays and / or different timing advances at the nodes. Additionally, the gap duration for UL to DL switching at BS 305 may be different from the gap duration for DL to UL switching at UE 315. Thus, the link switching duration in the network may not always meet the 25μs duration as required by scheme 200. Accordingly, the present disclosure provides techniques for defining a link switching gap duration for LBT measurement and / or techniques for determining the type of LBT after a link switch (e.g., CAT1 LBT, CAT2 LBT of different durations, or CAT4 LBT). Additionally, the present disclosure provides techniques for performing LBT measurements (e.g., CAT2 LBT of less than 25μs duration) when the link switching gap is relatively short (e.g., less than about 25μs).
[0076] Figure 4 4 is a block diagram of an exemplary UE 400 according to an embodiment of the present disclosure. UE 400 may be UE 115 in network 100 or UE 315 in network 300 as discussed above. As shown, UE 400 may include a processor 402, a memory 404, an LBT and measurement module 408, a communication module 409, a transceiver 410 including a modem subsystem 412 and a radio frequency (RF) unit 414, and one or more antennas 416. These elements may communicate with each other directly or indirectly, for example, via one or more buses.
[0077] The processor 402 may include a central processing unit (CPU), a digital signal processor (DSP), an application specific integrated circuit (ASIC), a controller, a field programmable gate array (FPGA) device, another hardware device, a firmware device, or any combination thereof configured to perform the operations described herein. The processor 402 may also be implemented as a combination of computing devices, for example, a combination of a DSP and a microprocessor, multiple microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration.
[0078] The memory 404 may include a cache memory (e.g., a cache memory of the processor 402), a random access memory (RAM), a magnetoresistive RAM (MRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), flash memory, a solid-state storage device, a hard drive, other forms of volatile and non-volatile memory, or a combination of different types of memory. In one embodiment, the memory 404 includes a non-transitory computer-readable medium. The memory 404 may store instructions 406. The instructions 406 may include instructions that, when executed by the processor 402, cause the processor 402 to perform the embodiments described herein with reference to the UE 115 and in conjunction with the present disclosure (e.g., Figures 6 to 24 Instructions 406 may also be referred to as code. The terms "instructions" and "code" should be broadly interpreted to include any type of (multiple) computer-readable statements. For example, the terms "instructions" and "code" may refer to one or more programs, routines, subroutines, functions, processes, etc. "Instructions" and "code" may include a single computer-readable statement or many computer-readable statements.
[0079] Each of the LBT and measurement module 408 and the communication module 409 can be implemented via hardware, software, or a combination thereof. For example, each of the LBT and measurement module 408 and the communication module 409 can be implemented as a processor, a circuit, and / or an instruction 406 stored in the memory 404 and executed by the processor 402. In some examples, the LBT and measurement module 408 and / or the communication module 409 can be integrated in the modem subsystem 412. For example, the LBT and measurement module 408 and / or the communication module 409 can be implemented by a combination of software components (e.g., executed by a DSP or a general processor) and hardware components (e.g., logic gates and circuits) within the modem subsystem 412. In some examples, the UE can include the LBT and measurement module 408 or the communication module 409. In other examples, the UE can include the LBT and measurement module 408 and the communication module 409.
[0080] The LBT and measurement module 408 and the communication module 409 may be used in various aspects of the present disclosure, for example, Figures 6 to 24For example, the LBT and measurement module 408 is configured to determine a link switching gap duration after a link switch, determine an LBT type or mode based on the link switching gap duration, determine an LBT measurement value (e.g., energy detection) based on the link switching gap duration, and / or perform LBT based on the determined LBT type and / or LBT measurement value. In an example, the LBT and measurement module 408 may determine the link switching gap duration based on timing maintained at a serving BS (e.g., BS 105 and BS 305).
[0081] In one example, LBT and measurement module 408 can determine the link switching gap duration based on the absolute transmission end time before switching and the absolute transmission start time after switching. It should be noted that the transmission start time refers to the planned, scheduled or expected start time of the transmission after the link switching. Transmission may or may not occur, depending on the LBT result. For example, in the case of LBT failure, UE 400 may not be able to continue to transmit. In one example, LBT and measurement module 408 can determine the link switching gap duration based on the timing maintained at UE 400. In one example, LBT and measurement module 408 can consider channel delay spread, multipath channel parameters, timing advance and / or propagation delay in the channel when determining the link switching gap duration. This article describes the mechanism for determining the link switching gap duration in more detail.
[0082] In one example, the LBT and measurement module 408 may divide the link switching gap duration into approximately three time slots (eg, time slot 204) in time, and may detect the link switching gap duration at the beginning of the link switching gap duration (eg, time slot 204). S(1) ) and at the end of the link switching gap duration (e.g., time slot 204 S(3) ) within a measurement period (e.g., measurement period 206b) and avoid performing energy detection in an intermediate portion (e.g., time slot 204) between the beginning and end of the link switching gap duration. S(2) ). When the link switching gap duration is short (e.g., less than about 25 μs), the LBT and measurement module 408 can use a predetermined duration for one or more of these portions and allow one or more other portions of the link switching gap duration to vary depending on the link switching gap duration. Optionally, the LBT and measurement module 408 can exclude any of these portions to fit the measurement period into the available link switching gap duration. Mechanisms for performing LBT measurements are described in more detail herein.
[0083] The communication module 409 is configured to receive an LBT configuration and / or a cyclic extension configuration from a BS (e.g., BS 105 and BS 305), coordinate with the LBT and measurement module 408 for link switching, LBT, signal reception and / or transmission, apply a cyclic extension (e.g., ECP or cyclic suffix) to UL transmissions, and / or determine a length or duration for a cyclic extension to provide a desired or required link switching gap duration, as described in more detail herein.
[0084] As shown, the transceiver 410 may include a modem subsystem 412 and an RF unit 414. The transceiver 410 may be configured to communicate bidirectionally with other devices such as the BS 105 and the BS 305. The modem subsystem 412 may be configured to modulate and / or encode data from the memory 404, the LBT and measurement module 408, and / or the communication module 409 according to a modulation and coding scheme (MCS), such as a low-density parity check (LDPC) coding scheme, a turbo coding scheme, a convolutional coding scheme, a digital beamforming scheme, etc. The RF unit 414 may be configured to process (e.g., perform analog-to-digital conversion or digital-to-analog conversion, etc.) the modulated / encoded data from the modem subsystem 412 (on outbound transmissions), or process transmissions originating from another source such as the UE 115 or the BS 105. The RF unit 414 may also be configured to perform analog beamforming in conjunction with digital beamforming. Although shown as being integrated together in the transceiver 410, the modem subsystem 412 and the RF unit 414 may be separate devices coupled together at the UE 115 to enable the UE 115 to communicate with other devices.
[0085] RF unit 414 can provide modulated and / or processed data, such as a data packet (or more generally, a data message that can include one or more data packets and other information) to antenna 416 for transmission to one or more other devices. Antenna 416 can also receive data messages sent from other devices. Antenna 416 can provide received data messages for processing and / or demodulation at transceiver 410. Antenna 416 can include multiple antennas of similar or different designs to maintain multiple transmission links. RF unit 414 can configure antenna 416.
[0086] Figure 5is a block diagram of an exemplary BS 500 according to an embodiment of the present disclosure. BS 500 may be BS 105 in network 100 or BS 305 in network 300 as discussed above. As shown, BS 500 may include a processor 502, a memory 504, an LBT and measurement module 508, a communication module 509, a transceiver 510 including a modem subsystem 512 and an RF unit 514, and one or more antennas 516. These elements may communicate with each other directly or indirectly, for example, via one or more buses.
[0087] The processor 502 may have various features as a particular type of processor. For example, these features may include a CPU, a DSP, an ASIC, a controller, an FPGA device, another hardware device, a firmware device, or any combination thereof configured to perform the operations described herein. The processor 502 may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, multiple microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration.
[0088] Memory 504 may include cache memory (e.g., cache memory of processor 502), RAM, MRAM, ROM, PROM, EPROM, EEPROM, flash memory, solid-state storage devices, one or more hard disk drives, memristor-based arrays, other forms of volatile and non-volatile memory, or a combination of different types of memory. In some embodiments, memory 504 may include non-transitory computer-readable media. Memory 504 may store instructions 506. Instructions 506 may include instructions that, when executed by processor 502, cause processor 502 to perform the present invention (e.g., Figures 6 to 24 Instructions 506 may also be referred to as code, which may be broadly interpreted to include any type of (multiple) computer-readable statements, such as those described above with reference to Figure 4 discussed.
[0089] Each of the LBT and measurement module 508 and the communication module 509 can be implemented via hardware, software, or a combination thereof. For example, each of the LBT and measurement module 508 and the communication module 509 can be implemented as a processor, a circuit, and / or an instruction 506 stored in the memory 504 and executed by the processor 502. In some examples, the LBT and measurement module 508 and / or the communication module 509 can be integrated within the modem subsystem 512. For example, the LBT and measurement module 508 and / or the communication module 509 can be implemented by a combination of software components (e.g., executed by a DSP or a general processor) and hardware components (e.g., logic gates and circuits) within the modem subsystem 512. In some examples, the UE may include the LBT and measurement module 508 or the communication module 509. In other examples, the UE may include the LBT and measurement module 508 and the communication module 509.
[0090] The LBT and measurement module 508 and the communication module 509 may be used in various aspects of the present disclosure, for example, Figures 6 to 24 For example, the LBT and measurement module 508 is configured to determine a link switching gap duration after a link switch, determine an LBT type or mode based on the link switching gap duration, determine an LBT measurement value (e.g., energy detection) based on the link switching gap duration, and / or perform LBT based on the determined LBT type and / or LBT measurement value.
[0091] In one example, the LBT and measurement module 508 can determine the link switching gap duration based on the timing maintained at the UE (e.g., UE 115 and UE 315). In one example, the LBT and measurement module 508 can determine the link switching gap duration based on the absolute transmission end time of the signal before the switch in the channel and the transmission start time of the signal after the switch. In one example, the LBT and measurement module 508 can determine the link switching gap duration based on the timing maintained at the BS 500. In one example, the LBT and measurement module 508 can consider channel delay spread, multipath channel parameters, timing advance and / or propagation delay in the channel when determining the link switching gap duration. The mechanism for determining the link switching gap duration is described in more detail herein.
[0092] In one example, the LBT and measurement module 508 may divide the link switching gap duration into approximately three time slots (eg, time slot 204) in time, and may detect the link switching gap duration at the beginning of the link switching gap duration (eg, time slot 204). S(1) ) and at the end of the link switching gap duration (e.g., time slot 204 S(3)) within a measurement period (e.g., measurement period 206b) and avoid performing energy detection in an intermediate portion (e.g., time slot 204) between the beginning and end of the link switching gap duration. S(2) ). When the link switching gap duration is short (e.g., less than about 25 μs), the LBT and measurement module 508 can use a predetermined duration for one or more of these portions and allow one or more other portions of the link switching gap duration to vary depending on the link switching gap duration. Optionally, the LBT and measurement module 508 can exclude any of these portions to fit the measurement period into the available link switching gap duration. Mechanisms for performing LBT measurements are described in more detail herein.
[0093] The communication module 509 is configured to send an LBT configuration and / or a cyclic extension configuration to a UE (e.g., UE 115 and UE 315), coordinate with the LBT and measurement module 508 for link switching, LBT, signal reception and / or transmission, apply a cyclic extension (e.g., ECP or cyclic suffix) to DL transmissions, and / or determine a length or duration for a cyclic extension to provide a desired or required link switching gap duration, as described in more detail herein.
[0094] As shown, the transceiver 510 may include a modem subsystem 512 and an RF unit 514. The transceiver 510 may be configured to communicate bidirectionally with other devices such as the UE 115 and / or another core network element. The modem subsystem 512 may be configured to modulate and / or encode data according to an MCS, such as an LDPC coding scheme, a turbo coding scheme, a convolutional coding scheme, a digital beamforming scheme, etc. The RF unit 514 may be configured to process (e.g., perform analog-to-digital conversion or digital-to-analog conversion, etc.) the modulated / encoded data from the modem subsystem 512 (on an outbound transmission), or process a transmission originating from another source such as the UE 115, the UE 315, or the UE 400. The RF unit 514 may also be configured to perform analog beamforming in conjunction with digital beamforming. Although shown as being integrated together in transceiver 510, modem subsystem 512 and / or RF unit 514 may be separate devices coupled together at BS 500 to enable BS 500 to communicate with other devices.
[0095] The RF unit 514 may provide modulated and / or processed data, such as a data packet (or more generally, a data message that may include one or more data packets and other information), to the antenna 516 for transmission to one or more other devices. According to an embodiment of the present disclosure, such transmission may include, for example, transmitting information to complete attachment to a network and communication with a resident UE 115 or UE 400. The antenna 516 may also receive data messages sent from other devices and provide the received data messages for processing and / or demodulation at the transceiver 510. The antenna 516 may include multiple antennas of similar or different designs to maintain multiple transmission links.
[0096] Figures 6 to 9 Various mechanisms for determining the duration of a link switching gap are illustrated. Figures 6 to 9 In the schemes 600-900, wireless communication devices such as BS 105 and BS 500 and UE 115 and UE 400 in a network such as network 100 may be employed. Specifically, the wireless communication device may employ the schemes 600, 700, 800 and / or 900 to determine the link switching gap duration for LBT measurement and / or the LBT type after link switching. Additionally, the X-axis represents time in some constant units.
[0097] Figure 6 6 is a timing diagram illustrating a link switching gap determination scheme 600 according to some embodiments of the present disclosure. In scheme 600, the BS starts sending a DL signal 610a (shown as DL Tx) to the UE at time T0 and completes the transmission of the DL signal 610a at time T2. After a propagation delay 602, the DL signal 610a arrives at the UE at time T1 (shown as DL Rx). The UE completes reception of at least a first path (the earliest received path in time) of the DL signal 610a at time T3. The BS schedules the UE to start UL transmission at time T5. Times T0, T2, and T5 are defined with reference to the BS's timeline or slot timing (maintained at the base station).
[0098] At time T4, the UE starts sending an UL signal 620 (shown as UL Tx) according to the scheduling and timing advance 604 for communication with the BS. The UE completes the transmission of the UL signal 620 at time T6. After the propagation delay, the UL signal 620 arrives at the BS at time T5 as scheduled by the BS (shown as UL Rx). The BS completes the reception of at least the first path of the UL signal 620 at time T7. After receiving the UL signal 620, the BS sends another DL signal 610b (shown as DL Tx) to the UE starting at time T8. After the propagation delay 602, the DL signal 610b arrives at the UE (shown as DL Rx) at time T9. The DL signal 610 is similar to the DL signal 310. The UL signal 620 is similar to the UL signal 320.
[0099] The scheme 600 defines the link switching gap duration based on the timeline or slot timing definition of the BS. As shown, the DL to UL switching duration 630 is defined as the duration between the transmission end time of the DL signal 610a at the BS (e.g., time T2) and the expected reception start time of the UL signal 620 at the BS (e.g., time T5). The UL to DL switching duration 640 is defined as the duration between the expected reception end time of the UL signal 620 at the BS (e.g., time T7) and the scheduled transmission start time of the DL signal 610b at the BS (e.g., time T8).
[0100] Figure 7 700 is a timing diagram illustrating a link switching gap determination scheme 700 according to some embodiments of the present disclosure. The scheme 700 is illustrated using the same DL and UL transmission timelines as in the scheme 600, and for simplicity, the same Figure 6 However, scheme 700 defines the link switching gap duration based on the absolute time gap between the end of transmission in one link direction and the start of transmission in the other link direction. In other words, scheme 700 takes timing advance into account when determining the link switching gap duration.
[0101] As shown, the DL to UL switching duration 730 is defined as the duration between the end time of transmission of the DL signal 610a at the BS (e.g., time T2) and the start time of transmission of the UL signal 620 at the UE (e.g., time T4). The UL to DL switching duration 740 is defined as the duration between the end time of transmission of the UL signal 620 at the UE (e.g., time T6) and the start time of transmission of the DL signal 610b at the BS (e.g., time T8). Therefore, the UE can determine the DL to UL switching duration 730 by determining the DL to UL switching duration 630 (e.g., determined using the scheme 600) and subtracting the timing advance 604 from the DL to UL switching duration 630. The BS can determine the UL to DL switching duration 740 by determining the UL to DL switching duration 640 (e.g., determined using the scheme 600) and adding the timing advance 604 to the UL to DL switching duration 640. In some instances, the BS may not know the exact timing advance 604 and may use a maximum timing advance parameter for determining the UL to DL switching duration 740.
[0102] Figure 8 800 is a timing diagram illustrating a link switching gap determination scheme 800 according to some embodiments of the present disclosure. The scheme 800 is illustrated using the same DL and UL transmission timelines as in the scheme 600, and for simplicity, the same Figure 6 800 defines the link switching gap duration based on the reception end time and the transmission start time at the transmitting node. As shown, the DL to UL switching duration 830 is defined as the duration between the reception end time of the DL signal 610a at the UE (e.g., time T3) and the transmission start time of the UL signal 620 at the UE (e.g., time T4). The UL to DL switching duration 840 is defined as the duration between the reception end time of the UL signal 620 at the BS (e.g., time T7) and the transmission start time of the DL signal 610b at the BS (e.g., time T8). As can be observed, the UL to DL switching duration 840 is the same as the UL to DL switching duration 640 in the scheme 600.
[0103] In some examples, the BS and the UE may communicate on a multipath channel on which a signal may be received via multiple paths with different path delays. In other words, the UE may receive multiple DL signals 610a via different paths at different times. Similarly, the BS may receive multiple UL signals 620 via different paths at different times. Thus, the UE may determine the DL to UL switching duration 830 based on the DL signal 610a with the earliest arrival time via the first path, the DL signal 610a with the latest arrival time via the last path, or the DL signal 610a with a reception path that meets a specific threshold (e.g., a received DL signal with a signal strength above a threshold), or the DL signal 610a with the strongest reception path (e.g., a received DL signal with the maximum signal strength). Similarly, the BS may determine the UL to DL switching duration 840 based on the first reception path (e.g., providing the earliest reception time), the last reception path, the reception path that meets a specific threshold, or the strongest reception path. In some examples, the UE may determine the DL to UL switching duration 830 based on the transmission time of the DL signal 610a at the BS and the timing advance 604 .
[0104] Fig. 9 900 is a timing diagram illustrating a link switching gap determination scheme 900 according to some embodiments of the present disclosure. The scheme 900 is illustrated using the same DL and UL transmission timelines as in the scheme 600, and for simplicity, the same Figure 6 . However, scheme 900 defines the link switching gap duration based on the timeline of the UE. As shown, the DL to UL switching duration 930 is defined as the duration between the end time of reception of the DL signal 610a at the UE (e.g., time T3) and the start time of transmission of the UL signal 620 at the UE (e.g., time T4). The UL to DL switching duration 840 is defined as the duration between the end time of transmission of the UL signal 620 at the UE (e.g., time T7) and the start time of reception of the DL signal 610b at the UE (e.g., time T9). As can be observed, the DL to UL switching duration 930 is the same as the DL to UL switching duration 830 in scheme 800.
[0105] In one embodiment, when the above schemes 600, 700, 800 and / or 900 are applied, the UE or BS may include a channel delay margin in the DL to UL switching duration (e.g., DL to UL switching duration 630, 730, 830 or 930) or in the UL to DL switching duration (e.g., UL to DL switching duration 640, 740, 840 or 940). As an example, when the UE adopts the scheme 700, the UE may determine the DL to UL switching duration 730 by further subtracting the channel delay spread parameter or margin from the DL to UL switching duration 730. In some instances, the channel delay spread delay may be configurable (e.g., by the BS).
[0106] In one embodiment, different link switching gap determination schemes may be selected for different nodes. For example, a BS may implement scheme 600 to determine whether CAT2 LBT is required and / or to perform CAT2 LBT measurements, and a UE may implement scheme 800 to determine whether CAT2 LBT is required and / or to perform CAT2 LBT measurements. The mechanism for LBT measurement is described in more detail herein.
[0107] In some embodiments, the BS may select a link switching gap determination scheme for the UE. For example, the BS may signal a link switching gap determination configuration in an RRC message, a MAC CE message, and / or a PDCCH DCI message (e.g., carried in a scheduling grant). In response, the UE may determine whether LBT is required after a link switch, or which type of LBT is performed after a link switch, based on a gap duration determined according to a configuration received from the BS. In some embodiments, the BS may also configure the UE with an LBT type via an RRC message, a MAC CE message, and / or a PDCCH DCI message.
[0108] In some embodiments, the BS or UE may use different link switching gap definitions or different schemes (e.g., schemes 600, 700, 800 and / or 900) for determining the LBT type and for determining the LBT measurement window. For example, the UE may apply scheme 700 to determine the link switching gap duration for LBT measurement window determination, and may apply scheme 600 to determine the link switching gap duration for LBT type determination. In general, a node may use the link switching gap duration, which may result in a shorter duration for LBT measurement window determination than the duration for LBT type determination. In some embodiments, the BS or UE may also include different channel delay spread margins for LBT type determination and LBT measurement window determination.
[0109] In one embodiment, a transmitting node (e.g., a BS or a UE) may determine a link switching gap duration for LBT measurement such that the link switching gap duration is adjacent to a transmission start time at the transmitting node. In one example, the DL to UL switching gap duration may end just before the next transmission start at the transmitting UE (e.g., time T4 in schemes 600, 700, 800, and 900). In another example, with reference to the timeline of the BS, the DL to UL switching gap duration may end just before an expected reception time at the BS (e.g., time T5 in schemes 600, 700, 800, and 900), where the gap duration may overlap with a timing advance of the UE (e.g., timing advance 604). It should be noted that when the timing advance time overlaps with the measurement time, the UE may have less time for processing.
[0110] In an embodiment, when the measurement gap duration is equal to about 25 μs, the transmitting node may apply the scheme 200 to the LBT measurement. When the measurement gap duration is greater than 25 μs, the transmitting node may limit the measurement gap duration to about 25 μs and apply the scheme 200 to the LBT measurement.
[0111] Figures 10 to 19 Various mechanisms for determining the LBT measurement window when the link switching gap duration (e.g., duration 630, 640, 730, 740, 830, 840, 930, or 940) is less than about 25 μs are illustrated. Figures 10 to 19 In the schemes 1000-1900, wireless communication devices such as BS 105 and BS 500 and UE 115 and UE 400 in a network such as network 100 may be adopted. Specifically, the wireless communication device may adopt the schemes 1000, 1100, 1200, 1300, 1400, 1500, 1600, 1700, 1800 and / or 1900 to determine an LBT measurement window within the link switching gap duration for LBT measurement. Additionally, the X-axis represents time in some constant units. Further, the schemes 1000, 1100, 1200, 1300, 1400, 1500, 1600, 1700, 1800 and / or 1900 are illustrated using a link switching scenario similar to that in scheme 200, and for simplicity, the same schemes may be used. Figure 2 However, the schemes 1000, 1100, 1200, 1300, 1400, 1500, 1600, 1700, 1800 and / or 1900 have a link switching gap duration shorter than about 25 μs.
[0112] Fig.101 is a timing diagram illustrating an LBT measurement scheme 1000 for a variable link switching gap duration according to some embodiments of the present disclosure. In scheme 1000, when the link switching gap duration is shorter than a predetermined period, the transmitting node may perform a single LBT measurement toward the end of the link switching gap duration. For example, a node (e.g., a BS or a UE) receives a communication signal 210 in one direction at time T0. The node switches to transmitting a communication signal 220 in the other direction at time T1. The node may perform a single LBT measurement by adopting the above-mentioned references to Figure 6 , Figure 7 , Figure 8 and / or Fig. 9 The described schemes 600, 700, 800 and / or 900 are used to determine the link switching gap duration 1002. The node may be in the time slot 204 towards the end of the link switching gap duration 1002. S(3) A single LBT measurement (e.g., channel energy detection) is performed in a measurement period 206 (e.g., having a minimum duration of about 4 μs) within a time period (e.g., having a duration of about 9 μs). The node may determine that LBT is successful when the detected energy is below a certain threshold. The node may determine that LBT has failed when the detected energy is above a certain threshold.
[0113] Fig.11 1 is a timing diagram illustrating an LBT measurement scheme 1100 for a variable link switching gap duration according to some embodiments of the present disclosure. Similar to scheme 200, scheme 1100 divides the link switching gap duration 1102 into three time slots 204 in time. S(1) , 204 S(2) and 204 S(3) , and LBT measurements can be made in time slots 204 S(1) and 204 S(3) To accommodate the shorter link switching gap duration 1102, the scheme 1100 shifts the time slot 204 at the beginning of the link switching gap duration 1102 (e.g., after or adjacent to the communication signal 210). S(1) and a time slot 204 toward the end of the link switching gap duration 1102 (eg, immediately before or adjacent to the communication signal 220). S(3) The duration remains at about 9 μs, but allows time slot 204 S(1) With time slot 204 S(3) Time slot 204 S(2)The link switching gap duration 1102 has a variable duration 1104 that depends on the length of the link switching gap duration 1102. For example, the duration 1104 can be between about 0 μs and about 7 μs, where LBT measurements are not allowed. The node can determine that LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node can determine that LBT has failed when the energy detected in any of the measurement periods 206a and / or 206b is above a certain threshold.
[0114] Fig.12 1 is a timing diagram illustrating an LBT measurement scheme 1200 for variable link switching gap duration according to some embodiments of the present disclosure. Scheme 1200 is similar to scheme 1100 and illustrates that when slot 204 S(2) In other words, for example, when the link switching gap duration 1202 between the communication signal 210 and the communication signal 220 in the scheme 1200 is shorter than about 18 μs, the time slot 204 S(1) and time slot 204 S(3) Although time slot 204 may partially overlap in time. S(1) and 204 S(3) Partial overlap is possible, but scheme 1200 requires LBT measurements to be performed in time slot 204. S(1) During a measurement period 206a (eg, at least 4 μs long) within the time slot 204 S(3) 1100, the node may determine that LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node may determine that LBT has failed when the energy detected in any one of measurement periods 206a and / or 206b is above a certain threshold.
[0115] In one example, nodes executing LBT may select time slots 204 respectively. S(1) and 204 S(3) In one example, the nodes performing LBT may select time slots 204 and 206a, respectively, so that the measurement periods 206a and 206b do not overlap in time. S(1) and 204 S(3) The measurement periods 206a and 206b within the time slot 204 are such that the measurement period 206a is within the time slot 204 S(3) or so that the measurement period 206b is within the time slot 204 S(1) After the end of.
[0116] Fig.131 is a timing diagram illustrating an LBT measurement scheme 1300 for a variable link switching gap duration according to some embodiments of the present disclosure. Similar to scheme 200, scheme 1300 divides the link switching gap duration 1302 into three time slots 204 in time. S(1) , 204 S(2) and 204 S(3) , and LBT measurements can be made in time slots 204 S(1) and 204 S(3) To accommodate the shorter link switching gap duration 1302, the scheme 1300 will move the time slot 204 towards the end of the link switching gap duration 1302. S(3) The duration of time slot 204 is kept at about 9 μs, and S(2) The duration of the link switching gap 1302 is maintained at about 7 μs, but the time slot 204 at the beginning of the link switching gap duration 1302 is allowed to S(1) There is a variable duration 1304 that depends on the length of the link switching gap duration 1302. For example, the duration 1304 may be between about 4 μs and about 9 μs.
[0117] In one embodiment, a node may S(1) The LBT measurement is performed for a measurement period 206a of at least 4 μs in the time slot 204. S(3) The node may determine that the LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node may determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a certain threshold.
[0118] In one embodiment, when the duration 1304 is less than 4 μs, the scheme 1300 may allow LBT measurements to be less than about 4 μs.
[0119] Fig.14 1 is a timing diagram illustrating an LBT measurement scheme 1400 for a variable link switching gap duration according to some embodiments of the present disclosure. The scheme 1400 is substantially similar to the scheme 1300. However, in order to accommodate a shorter link switching gap duration 1402, the scheme 1400 shifts the time slot 204 at the beginning of the link switching gap duration 1402 to the time slot 204 at the beginning of the link switching gap duration 1402. S(1) The duration of the link switching gap 1402 is maintained at about 9 μs, and the time slot 204 is allowed to move toward the end of the link switching gap duration 1402. S(3)The scheme 1400 may have a variable duration 1404 that depends on the length of the link switching gap duration 1402. Similar to the scheme 1300, in one example, the scheme 1400 may require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1400 may allow LBT measurement in the time slot 204 when the duration 1404 is less than 4 μs. S(3) 1100, 1200, and 1300, the node may determine that the LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node may determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a certain threshold.
[0120] Fig.15 1 is a timing diagram illustrating an LBT measurement scheme 1500 for variable link switching gap duration according to some embodiments of the present disclosure. Similar to schemes 1300 and 1400, in order to accommodate a shorter link switching gap duration 1502, scheme 1500 increases the time slot 204 by 1502. S(2) The duration of the link switching gap 1502 is maintained at about 7 μs, and the time slot 204 at the beginning of the link switching gap duration 1502 is allowed to S(1) and time slot 204 towards the end of the link switching gap duration S(3) 1504 and 1506, respectively, which are dependent on the length of the link switching gap duration 1502. In one example, the scheme 1500 may require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1500 may allow LBT measurement in the time slot 204 when the duration 1504 or 1506 is less than 4 μs. S(3) 1100, 1200, 1300, and 1400, the node may determine that the LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node may determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a certain threshold.
[0121] Fig.16 1 is a timing diagram illustrating an LBT measurement scheme 1600 for a variable link switching gap duration according to some embodiments of the present disclosure. Similar to scheme 200, scheme 1600 divides the link switching gap duration 1602 into three time slots 204 in time. S(1) , 204 S(2) and 204 S(3), and LBT measurements can be made in time slots 204 S(1) and 204 S(3) To accommodate the shorter link switching gap duration, the scheme 1600 extends the time slot 204 to the LBT measurement period 206a and 206b. S(1) , 204 S(2) and 204 S(3) Each of the time slots 204 is scaled by a factor (e.g., denoted as a) that depends on the length of the link switching gap duration 1602. S(1) may have a duration 1604 of (a×9) μs, a time slot 204 S(2) may have a duration 1606 of (a×7) μs, and the time slot 204 S(3) The LBT measurement may have a duration 1608 of (a×9) μs. In one example, the scheme 1600 may require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1600 allows LBT measurements with a measurement duration of less than 4 μs by scaling the measurement periods 206a and 206b. Similar to the schemes 1100, 1200, 1300, 1400, and 1500, the node may determine that the LBT is successful when the energy detected in both the measurement periods 206a and 206b is below a specific threshold. The node may determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a specific threshold.
[0122] Fig.17 1 is a timing diagram illustrating an LBT measurement scheme 1700 for variable link switching gap duration according to some embodiments of the present disclosure. Scheme 1700 is substantially similar to scheme 1100. However, in order to accommodate the shorter link switching gap duration 1702, scheme 1700 excludes time slot 204. S(2) In other words, the link switching gap duration 1702 includes two time slots 204 S(1) and 204 S(3) , where LBT measurements are to be performed. The scheme 1700 will be towards the end of the link switching gap duration 1702 time slot 204 S(3) The duration of the link switching gap 1302 is maintained at about 9 μs, and the time slot 204 at the beginning of the link switching gap duration 1302 is allowed to S(1)With a variable duration 1704, the variable duration 1704 depends on the length of the link switching gap duration 1302. For 1700, the duration 1704 can be between about 4 μs and about 9 μs. In one example, the scheme 1600 can require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1700 can allow LBT measurements with a measurement duration of less than 4 μs in the period 206a when the duration 1704 is less than 4 μs. Similar to the schemes 1100, 1200, 1300, 1400, 1500 and 1600, the node can determine that the LBT is successful when the energy detected in both the measurement periods 206a and 206b is below a specific threshold. The node can determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a specific threshold.
[0123] Fig.18 1 is a timing diagram illustrating an LBT measurement scheme 1800 for a variable link switching gap duration according to some embodiments of the present disclosure. Scheme 1800 is similar to scheme 1700. However, in order to accommodate a shorter link switching gap duration 1802, scheme 1800 shifts the time slot 204 at the beginning of the link switching gap duration 1802 to the time slot 204 at the beginning of the link switching gap duration 1802. S(1) The duration of the link switching gap 1802 is maintained at about 9 μs, and the time slot 204 is allowed to move toward the end of the link switching gap duration 1802. S(3) The scheme 1800 may have a variable duration 1804 that depends on the length of the link switching gap duration 1802. In one example, the scheme 1800 may require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1800 may allow LBT measurement in the time slot 204 when the duration 1804 is less than 4 μs. S(3) 1. The LBT measurement of less than about 4 μs in the measurement period 206a. Similar to the schemes 1100, 1200, 1300, 1400, 1500, 1600, and 1700, the node can determine that the LBT is successful when the energy detected in both the measurement period 206a and 206b is below a certain threshold. The node can determine that the LBT fails when the energy detected in any one of the measurement period 206a and / or 206b is above a certain threshold.
[0124] Fig.19 1 is a timing diagram illustrating an LBT measurement scheme 1900 for variable link switching gap duration according to some embodiments of the present disclosure. Scheme 1900 is similar to scheme 1700. However, in order to accommodate the shorter link switching gap duration 1902, scheme 1900 divides two time slots 204 by one. S(1) and 204 S(3)The time slot 204 is divided into S(1) and 204 S(3) Each of the link switching gaps 206a and 206b may have a duration 1904 that is half of the link switching gap duration 1902. In one example, the scheme 1900 may require at least 4 μs of LBT measurement in each of the measurement periods 206a and 206b. In another example, the scheme 1900 may allow LBT measurement in the time slot 204 when the duration 1904 is less than 4 μs. S(1) and 204 S(3) s in each of the LBT measurements. Similar to schemes 1100, 1200, 1300, 1400, 1500, 1600, 1700, and 1800, the node may determine that the LBT is successful when the energy detected in both measurement periods 206a and 206b is below a certain threshold. The node may determine that the LBT fails when the energy detected in any one of the measurement periods 206a and / or 206b is above a certain threshold.
[0125] Although the schemes 1000-1900 are described in the context of one-time LBT or CAT2 LBT, in some embodiments, a node (e.g., a BS or a UE) may use any of the schemes 1000-1900 for CAT4 LBT. For CAT4 LBT, the node may perform multiple LBT measurements in the channel during multiple measurement periods, and may transmit when the channel is idle for multiple measurement periods (e.g., the channel energy measurement value is below a certain threshold). The number of measurements may vary, for example, based on the contention window size and / or the random backoff period.
[0126] In an embodiment, the BS or UE may use any suitable combination of schemes 1000-1900 for LBT measurement. For example, when the link switching gap duration (e.g., duration 630, 640, 730, 740, 830, 840, 930, or 940) is greater than about 18 μs, the BS or UE may adopt scheme 1100. When the link switching gap duration is less than about 18 μs, the BS or UE may adopt schemes 1700, 1800, or 1900.
[0127] In an embodiment, a gap duration (e.g., duration 1002, 1102, 1202, 1302, 1402, 1502, 1602, 1702, 1802, or 1902), a DL to UL switching duration (e.g., DL to UL switching duration 630, 730, 830, and 930), and / or a UL to DL switching duration (e.g., UL to DL switching duration 640, 740, 840, and 940) may be created by blanking out (e.g., not transmitting) one or more symbols (e.g., OFDM symbols). As described above, the gap may have to be controlled to be about 25 μs or less (for CAT2 LBT), or about 16 μs long or less (for CAT1 LBT, i.e., no LBT) for performing LBT. In some instances, the gap duration may not correspond to the duration of a whole symbol or an integer number of symbols. Figure 20 to Figure 23 Various mechanisms are illustrated for providing a specific link switch gap duration by employing a cyclic extension (e.g., in the form of a cyclic suffix or extended cyclic prefix (ECP)) in transmissions prior to or after a link switch. Figure 20 to Figure 23 2000-2300 may be employed by wireless communication devices such as BS 105 and BS 500 and UE 115 and UE 400 in a network such as network 100. Specifically, the wireless communication devices may employ schemes 2000, 2100, 2200, and 2300 to control the link switching gap duration. Additionally, the X-axis represents time in some constant units.
[0128] Fig. 202 is a timing diagram illustrating a transmission scheme 2000 for controlling a DL-to-UL switching gap duration for LBT measurement according to some embodiments of the present disclosure. Scheme 2000 illustrates a timeline 2001 at a BS, where a last DL symbol 2002d of a DL signal (e.g., DL signal 310) transmitted by the BS ends at time T0, and a first UL symbol 2002u of a UL signal (e.g., UL signal 320) transmitted by a UE begins at time T2. Each symbol 2002 includes a cyclic prefix (CP) 2004 and a useful symbol portion 2006. The CP 2004 is generated by repeating an end portion of the useful symbol portion 2006. The DL symbol 2002d may carry DL data in the useful symbol portion 2006, and the UL symbol 2002u may carry UL data in the useful portion 2006. When the gap is created by blanking the transmission in units of symbol 2002, the DL-to-UL switching gap duration 2020 between the last DL symbol 2002d and the first UL symbol 2202u may be longer than the desired or required gap duration 2010 (e.g., a gap duration 2010 of 16 μs or 25 μs) for performing LBT. In the scheme 2000, the BS may extend the last DL symbol 2002d (e.g., to time T1) to provide the desired or required DL-to-UL switching gap duration 2010. For example, the BS may generate the cyclic suffix 2030 by repeating the beginning portion of the DL symbol 2002d and appending the cyclic suffix 2030 to the end portion of the DL symbol 2002d (e.g., at time T0).
[0129] The duration 2020 may include N symbols 2002 between the last symbol 2002d of the DL signal and the first symbol 2002u of the UL signal, where N is a positive integer. In one example, for an SCS of about 60kHz, N may be about 2 for an expected gap duration 2010 of about 25μs. For some other SCSs, N may be about 1. The length or duration of the cyclic suffix 2030 may be calculated as follows:
[0130] The duration of the cyclic suffix 2030 = N×symbol length−gap duration 2010 , (1) where the symbol length corresponds to the duration of the symbol 2002 .
[0131] Fig.21 2 is a timing diagram illustrating a transmission scheme 2100 for controlling a DL to UL switching gap duration for LBT measurement according to some embodiments of the present disclosure. The scheme 2100 is described using the same BS timeline 2001 as the scheme 2000, and for simplicity, the same BS timeline 2101 may be used. Fig. 202002u。 In the scheme 2100, the UE may assume that the DL transmission ends at the symbol boundary before the DL to UL switch (e.g., at time T0), and the CP 2004 of the first UL symbol 2002u may be extended after the DL to UL switch. As shown, the UE adopts ECP 2130 to provide the expected or required DL to UL switching gap duration 2010, where the transmission of ECP 2130 begins at time T3 shown in timeline 2101. The ECP 2130 and CP 2004 of the UL symbol 2002u may be a copy of the end portion of the UL symbol 2002u. The length or duration of ECP 2130 may be represented by "N×symbol length-gap duration 2010", where the symbol length corresponds to the duration of symbol 2002.
[0132] In one embodiment, the UE may consider the timing advance (e.g., timing advance 604) while applying the ECP 2130. For example, in order for the UL signal to arrive at the BS at time T2, the UE may start UL transmission at a time earlier than T2, such as at time T4, based on the timing advance 2104 as shown in the timeline 2102. Therefore, the UE may apply a shorter ECP 2132 while considering the timing advance. The length or duration of the ECP 2132 may be calculated as follows:
[0133] Duration of ECP 2132 = N × symbol length - gap duration 2010 - timing advance 2104, (2)
[0134] The symbol length corresponds to the duration of symbol 2002.
[0135] In one embodiment, the BS may signal the DL to UL switching gap duration information to the UE via a DCI message, for example, together with a UL scheduling grant for UL transmission after the switch. The DCI message may include an indicator indicating whether the UE is required to perform CP extension for UL transmission or to start UL transmission at a specific offset. Accordingly, in some instances, the indicator may indicate the length of the CP extension. In one example, the DCI message may include an indicator jointly encoded with a UE starting offset indication and an LBT type indication (e.g., CAT1 LBT, CAT2 LBT of different durations, CAT4 LBT).
[0136] Fig. 222 is a timing diagram illustrating a transmission scheme 2200 for controlling a UL-to-DL switching gap duration for LBT measurement according to some embodiments of the present disclosure. The scheme 2200 illustrates a timeline 2201 at a BS, where a last UL symbol 2002u of a UL signal (e.g., UL signal 320) transmitted by a UE ends at time T0, and a first DL symbol 2002d of a DL signal (e.g., DL signal 310) transmitted by the BS starts at time T2. Similar to the scheme 2000, when a gap is created by blanking a transmission in units of symbol 2002, a UL-to-DL switching gap duration 2220 between the last UL symbol 2002u and the first DL symbol 2202d may be longer than a required gap duration 2210 (e.g., a gap duration 2210 of 16 μs or 25 μs). In the scheme 2200, the BS may extend the first DL symbol 2002d (e.g., to time T1) to provide the desired or required UL to DL switching gap duration 2210. For example, the BS may extend the CP 2004 of the first DL symbol 2002d after the UL to DL switching. As shown, the BS employs an ECP 2230 to provide the desired or required UL to DL switching gap duration 2210, wherein the transmission of the ECP 2230 begins at time T1. The length or duration of the ECP 2230 may be calculated as follows:
[0137] Duration of ECP 2230 = N × symbol length - gap duration 2210, (3) The symbol length corresponds to the duration of symbol 2002.
[0138] Fig.23 23 is a timing diagram illustrating a transmission scheme 2300 for controlling a UL to DL switching gap duration for LBT measurement according to some embodiments of the present disclosure. The scheme 2300 is described using the same BS timeline 2201 as the scheme 2200. In the scheme 2300, the UE may extend the last UL symbol 2002u (e.g., to time T5) to provide a desired or required gap duration 2210 for UL to DL switching. For example, the BS may generate a cyclic suffix 2330 and append the cyclic suffix 2330 to the end portion of the UL symbol 2002u as shown in the timeline 2301 (e.g., at time T0). The length or duration of the cyclic suffix 2330 may be calculated as follows:
[0139] Duration of cyclic suffix 2330 = N × symbol length - gap duration 2210, (4)
[0140] The symbol length corresponds to the duration of symbol 2002.
[0141] In one example, the UE may consider the timing advance (e.g., timing advance 604 and 2104) while applying the cyclic suffix 2330. For example, in order for the UL signal to arrive at the BS at time T2, the UE may start UL transmission at an earlier time, such as at time T5, based on the timing advance 2304 as shown in the timeline 2302. Therefore, the UE may apply a longer cyclic suffix 2332 while considering the timing advance. The length or duration of the cyclic suffix 2332 may be calculated as follows:
[0142] Cyclic suffix 2332 = N × symbol length - gap duration 2210 + timing advance 2304, (5)
[0143] Where the symbol length corresponds to the duration of symbol 2002. In some examples, the timing advance is used to align the UL transmission sent by the UE with the time slot boundary of the BS. In such examples, the UE may not be required to consider the timing advance when determining the length or duration for the cyclic suffix. In other words, the UE may simply apply the cyclic suffix 2330 as shown in timeline 2301.
[0144] In one embodiment, the BS may signal the UL to DL switching gap duration information to the UE via a DCI message, for example, together with the UL scheduling grant for UL transmission before the switch. The DCI message may include an indicator indicating whether the UE is required to apply a cyclic suffix (e.g., cyclic suffix 2330 or 2332) to the UL transmission. When the UE is granted a multiple transmission time interval (multi-TTI) grant for back-to-back UL transmissions, the UE may apply the cyclic suffix to the transmission in the last TTI before the UL to DL switch. The DCI message may further indicate a required link switching gap duration (e.g., required gap duration 2010 or 2210), and the UE may apply the cyclic suffix accordingly. Optionally, the DCI message may include an indicator indicating an LBT type (e.g., CAT1 LBT or CAT2 LBT), and the UE may determine the required UL to DL switching gap duration based on the LBT type.
[0145] In one embodiment, when the UE is assigned a minimum LBT gap duration for UL to DL switching, the UE may assume that the first possible symbol immediately after the gap is the starting symbol for DL transmission and apply the cyclic suffix accordingly. In other words, the UE may determine the length or duration for the cyclic suffix so that the UL to DL switching gap duration ends at a symbol boundary for DL transmission.
[0146] In one embodiment, the BS may schedule the UE for UL transmission after the DL transmission so that the UL transmission and the DL transmission are separated by a specific DL to UL switching gap (e.g., about 25 μs). However, the BS may not know the timing advance (e.g., timing advance 2104) at the UE. Therefore, the actual gap duration may be shorter. In addition, the propagation delay from the BS to the UE in the DL direction and / or the delay spread of the DL channel may further reduce the actual gap duration at the UE. As an example, the BS may configure the DL to UL switching gap to be about 25 μs. However, the gap at the UE may be reduced to: duration of 25 μs-timing advance-propagation delay-delay spread. When the timing advance is large, the actual gap at the UE may be too short to perform the above-mentioned LBT measurement. In one example, the UE may determine that the actual gap at the UE may be less than about 16 μs and / or meet other conditions of the no-LBT mode, so LBT may not be performed after the link switch and before the UL transmission. In one example, when the actual gap is short, the UE may puncture the beginning of the UL transmission to provide sufficient gap duration for performing LBT measurements.
[0147] In one embodiment, the BS may schedule an UL transmission with a gap larger than the desired or required DL-to-UL switching gap duration after the DL transmission, and configure the UE to apply the extended ECP to the UL transmission so that the gap may include the desired or required DL-to-UL switching gap duration (e.g., duration 2010) as shown in scheme 2100.
[0148] In one embodiment, when the BS controls the gap duration for link switching and notifies the UE of the LBT type without gap duration, the UE may fail to perform LBT in the gap. As an example, when the BS creates a DL to UL gap duration of about 20 μs and notifies the UE of CAT2 LBT, this may take about 25 μs. If the UE performs LBT based on a gap of 25 μs, the UE may end measuring a portion of the DL transmission signal of the BS and cause LBT failure. Therefore, the UE is required to know the link switching gap duration to ensure that the LBT measurement is performed within the gap duration. In one example, the wireless communication standard may predefine the link switching gap duration. In one example, the BS may configure the link switching gap duration to the UE via RRC configuration. The RRC configuration may overwrite the predefined link switching gap duration. In one example, the BS may configure the link switching gap duration to the UE via an UL scheduling grant (e.g., a UE-specific DCI message) and / or a group common PDCCH (GC-PDCCH) message. Then, the BS should ensure through its scheduling that the configured gap duration is provided for the LBT measurement at the UE at least from the perspective or timeline of the BS. The UE may determine an actual gap duration at the UE taking into account timing advance, propagation delay, and / or channel delay spread, and perform LBT based on the actual gap duration.
[0149] Fig.24 2400 according to some embodiments of the present disclosure. The steps of method 2400 may be performed by a computing device (e.g., a processor, a processing circuit, and / or other suitable components) of a wireless communication device or other suitable components for performing the steps. For example, a wireless communication device (such as UE 115 or UE 400) may utilize one or more components to perform the steps of method 2400, such as a processor 402, a memory 404, an LBT and measurement module 408, a communication module 409, a transceiver 410, a modem 412, and one or more antennas 416. In another example, a wireless communication device (such as BS 105 or BS 500) may utilize one or more components to perform the steps of method 2400, such as a processor 502, a memory 504, an LBT and measurement module 508, a communication module 509, a transceiver 510, a modem 512, and one or more antennas 516. Method 2400 may employ mechanisms similar to those of schemes 200, 600, 700, 800, 900, 1000, 1100, 1200, 1300, 1400, 1500, 1600, 1700, 1800, 1900, 2000, 2100, 2200, and 2300, as respectively described in reference Figure 2 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 , Fig.12 , Fig.13 , Fig.14 , Fig.15 , Fig.16 , Fig.17 , Fig.18 , Fig.19 , Fig. 20 , Fig.21 , Fig. 22 and Fig.23 As shown, method 2400 includes several of the steps listed, but embodiments of method 2400 may include additional steps before, after, and between the steps listed. In some embodiments, one or more of the steps listed may be omitted or performed in a different order.
[0150] At step 2410, the method 2400 includes receiving, by a first wireless communication device, a first communication signal from a second wireless communication device.
[0151] At step 2420, the method 2400 includes determining, by the first wireless communication device, a measurement period based on a first gap duration between the first communication signal and the second communication signal.
[0152] At step 2430, the method 2400 includes performing, by the first wireless communication device, LBT based on the channel measurement values in the measurement period.
[0153] At step 2440, the method 2400 includes sending, by the first wireless communication device, a second communication signal to the second wireless communication device based on LBT.
[0154] In an embodiment, the first wireless communication device corresponds to a BS, and the second wireless communication device corresponds to a UE. The first communication signal may be similar to the communication signal 210 and the UL signal 320 and the UL signal 620. The second communication signal may be similar to the communication signal 220 and the DL signal 310 and the DL signal 610. The first gap duration may be similar to the UL to DL switching duration 640, 740, 840, and 940 and the gap duration 1002, 1102, 1202, 1302, 1402, 1502, 1602, 1702, 1802, 1902, 2010, and 2210. The measurement period may be similar to the measurement period 206a and the measurement period 206b.
[0155] In an embodiment, the first wireless communication device corresponds to a UE, and the second wireless communication device corresponds to a BS. The first communication signal may be similar to the communication signal 220 and the DL signal 310 and the DL signal 610. The second communication signal may be similar to the communication signal 210 and the UL signal 320 and the UL signal 620. The first gap duration may be similar to the DL to UL switching duration 630, 730, 830, and 930 and the gap duration 1002, 1102, 1202, 1302, 1402, 1502, 1602, 1702, 1802, or 1902. The measurement period may be similar to the measurement period 206a and the measurement period 206b.
[0156] In one embodiment, the first wireless communication device determines the LBT type based on at least one of the first gap duration or the second gap duration between the first communication signal and the second communication signal. The LBT type may be CAT1 LBT, CAT2 LBT of different duration (e.g., 16μs or 25μs), or CAT4 LBT. In one example, for CAT1 LBT, the first wireless communication device may not perform any related LBT measurements to declare LBT successful. In one example, for CAT2 LBT, the first wireless communication device uses the measurement value obtained during the measurement period and sends the second communication signal when the measurement value indicates that the channel is not occupied during the measurement period. As described above with reference to Figures 10 to 19 As discussed, the measurement period for CAT2 LBT may vary, and thus the LBT type may indicate a CAT2 LBT of a first duration or a CAT2 LBT of a second duration different from the first duration. For example, the first CAT2 LBT duration may be approximately 16 μs, and the second CAT2 LBT duration may be approximately 25 μs. In one example, for CAT4 LBT, the first wireless communication device may send a second communication signal when the channel is idle for a plurality of measurement periods. In other words, a plurality of LBT measurement values obtained during the plurality of measurement periods are below a threshold. The number of measurements may depend on a contention window and / or a random backoff.
[0157] In one embodiment, the first gap duration is the same as the second gap duration. In one embodiment, the first gap duration is different from the second gap duration. In one embodiment, the first gap duration is associated with a first channel delay spread parameter, and the second gap duration is associated with a second channel delay spread parameter different from the first channel delay spread parameter.
[0158] In one embodiment, the first wireless communication device may be a BS, and may send an LBT configuration including the determined LBT type to the second wireless communication device. In one embodiment, the first wireless communication device may be a UE, and may receive an LBT configuration including information associated with at least one of an LBT type or a link switching gap duration from the second wireless communication device, and further determine the LBT type based on the received LBT configuration.
[0159] In one embodiment, the first wireless communication device determines at least one of the first gap duration or the second gap duration based on a timing reference of the second wireless communication device. For example, determining at least one of the first gap duration or the second gap duration is based on an end time of the first communication signal at the second wireless communication device and a start time of the second communication signal at the second wireless communication device. The start time is an expected start time based on the timing maintained at the second wireless communication device. In one embodiment, determining at least one of the first gap duration or the second gap duration is also based on at least one of a channel delay spread parameter, a transmit timing advance parameter, or a multipath channel parameter associated with the communication between the first wireless communication device and the second wireless communication device. In one example, with respect to a multipath channel, the second wireless communication device may receive multiple copies of the second communication signal from the first wireless communication device via different paths at different times. Therefore, the first wireless communication device may also determine one or more expected reception start times at the second wireless communication device for determining at least one of the first gap duration or the second gap duration.
[0160] In one embodiment, the first wireless communication device determines at least one of the first gap duration or the second gap duration based on an absolute time. For example, determining at least one of the first gap duration or the second gap duration is based on an end time of a first communication signal at the first wireless communication device and a start time of a second communication signal at the first wireless communication device. In one embodiment, determining at least one of the first gap duration or the second gap duration is also based on at least one of a channel delay spread parameter or a transmit timing advance parameter associated with communication between the first wireless communication device and the second wireless communication device. In one embodiment, receiving includes receiving the first communication signal via multiple paths by the first wireless communication device. The first wireless communication device also determines the end time of the first communication signal based on one of the multiple paths. In one embodiment, determining the end time of the first communication signal is also based on a received signal threshold comparison (e.g., selecting a signal received from the strongest path).
[0161] In one embodiment, the first gap duration is relative to a start time of the second communication signal at the first wireless communication device. In one embodiment, the first gap duration is relative to a start time of the second communication signal at the second wireless communication device.
[0162] In one embodiment, determining the measurement period includes determining, by the first wireless communication device, a first portion of a first gap duration (eg, time slot 204 S(1) ) and determining a first measurement period (e.g., measurement period 206a) within a second portion of the first gap duration (e.g., time slot 204 S(3) ), wherein the second portion is adjacent to a start time of a second communication signal at the first wireless communication device.
[0163] In an embodiment, performing LBT includes determining, by the first wireless communication device, a channel state based on a comparison of at least one of a first channel measurement value in a first measurement period or a second channel measurement value in a second measurement period with a threshold.
[0164] In an embodiment, the first wireless communication device determines a duration for at least one of the first portion or the second portion based at least in part on the first gap duration (e.g., as shown in schemes 1300, 1400, 1500, 1700, 1800, and 1900).
[0165] In one embodiment, at least the second portion includes a predetermined duration (e.g., a duration of about 9 μs). In one embodiment, the first portion includes a first predetermined duration (e.g., a duration of about 9 μs), the second portion includes a second predetermined duration (e.g., a duration of about 9 μs), and the first portion and the second portion do not overlap. In one embodiment, the first portion includes a first predetermined duration (e.g., a duration of about 9 μs), the second portion includes a second predetermined duration (e.g., a duration of about 9 μs), and the first portion at least partially overlaps with the second portion (e.g., as shown in scheme 1200).
[0166] In an embodiment, the first portion is separated from the second portion. In an embodiment, the first wireless communication device determines a duration between the first portion and the second portion based at least in part on the first gap duration (e.g., as shown in scheme 1100). In an embodiment, the first wireless communication device determines a duration for the first portion, a duration for the second portion, and a duration between the first portion and the second portion based at least in part on the first gap duration and a predetermined measurement gap duration (e.g., by applying a scaling factor as shown in scheme 1600).
[0167] In one embodiment, determining the measurement period includes the first wireless communication device performing a predetermined duration of a first gap duration (e.g., a time slot 204 having a duration of 9 μs) adjacent to the start time of the second communication signal at the first wireless communication device. S(3) ) within a single measurement period (e.g., measurement period 206b). Performing LBT includes determining, by the first wireless communication device, a channel state (e.g., idle or busy) based on a comparison of a single channel measurement value in the measurement period as shown in scheme 1000 with a threshold.
[0168] In one embodiment, a first wireless communication device receives a third communication signal from a second wireless communication device, wherein the second communication signal and the third communication signal are separated by a second gap duration. The second communication signal includes a cyclic extension associated with at least one of the first gap duration or the second gap duration. In one embodiment, the first wireless communication device corresponds to a UE, and the second wireless communication device corresponds to a BS. The UE receives the first communication signal from the BS, sends the second communication signal to the BS after a DL to UL switch with a first gap duration, and receives the third communication signal from the BS after a UL to DL switch with a second gap duration. In another embodiment, the first wireless communication device corresponds to the BS, and the second wireless communication device corresponds to the UE. The BS receives the first communication signal from the UE, sends the second communication signal to the UE after a UL to DL switch with a first gap duration, and receives the third communication signal from the UE after a DL to UL switch with a second gap duration.
[0169] In one embodiment, the second communication signal includes one or more symbols (e.g., symbol 2002), and a start symbol of the one or more symbols is pre-pended with an ECP associated with a first gap duration (e.g., ECP 2130, ECP 2132, and ECP 2230). In one embodiment, the first wireless communication device sends one or more symbols at a symbol boundary between the first and second wireless communication devices. The first wireless communication device determines the length for the ECP, for example, based on the number of symbols between the last symbol of the first communication signal (e.g., symbol 2002d or symbol 2002u) and the start symbol of the second communication signal (e.g., symbol 2002d or symbol 2002u) to provide the first gap duration.
[0170] In one embodiment, the second communication signal includes one or more symbols, and the last symbol of the one or more symbols is added with a cyclic suffix associated with the second gap duration (e.g., cyclic suffixes 2030, 2330, and 2332). In one embodiment, the first wireless communication device sends one or more symbols at the symbol boundary of the first and second wireless communication devices. The first wireless communication device determines the length of the cyclic suffix based on the duration between the last symbol of the second communication signal (e.g., symbol 2002d or symbol 2002u) and the start symbol of the third communication signal (e.g., symbol 2002d or symbol 2002u) to provide the second gap duration. In one embodiment, the first wireless communication device sends the second communication signal by sending the two or more communication signals to the second wireless communication device in two or more transmission time intervals (TTIs), wherein the last communication signal of the two or more communication signals includes the cyclic suffix.
[0171] In one embodiment, the first wireless communication device determines a length for the cyclic extension based on at least one of a timing advance (e.g., timing advance 604, 2104, and 2304), a propagation delay, or a channel delay spread associated with communication between the first wireless communication device and the second wireless communication device. In one embodiment, the first wireless communication device breaks out a beginning portion of the second communication signal based on the first gap duration.
[0172] In one embodiment, the first wireless communication device transmits a configuration indicating at least one of the following with the second wireless communication device: an ECP mode for cyclic extension, a cyclic suffix mode for cyclic extension, a start offset for the second communication signal, a first gap duration, or a second gap duration. In one embodiment, the first wireless communication device transmits the configuration by transmitting at least one of the following: an RRC message including the configuration, a GC-PDCCH message including the configuration, or a scheduling grant including the configuration.
[0173] In one embodiment, a first wireless communication device and a second wireless communication device transmit a configuration indicating an LBT type (including at least one of Category 1 LBT, Category 2 LBT, or Category 4 LBT), and determine a first gap duration based on the LBT type, wherein the LBT is performed based on the LBT type.
[0174] In one embodiment, the first wireless communication device sends a third communication signal to the second wireless communication device before the first communication signal, wherein the first communication signal and the third communication signal are separated by a second gap duration. The first communication signal includes one or more symbols, and at least one of the following is performed: a start symbol in the one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the second gap duration, or a last symbol in the one or more symbols is added with a cyclic suffix associated with the first gap duration. In one embodiment, the first wireless communication device corresponds to a UE, and the second wireless communication device corresponds to a BS. The UE sends the third communication signal to the BS, receives the second communication signal from the BS after a UL to DL switch with a second gap duration, and sends the second communication signal to the BS after a DL to UL switch with a first gap duration. In another embodiment, the first wireless communication device corresponds to a BS, and the second wireless communication device corresponds to a UE. The BS sends the third communication signal to the UE, receives the second communication signal from the UE after a DL to UL switch with a second gap duration, and sends the second communication signal to the UE after a UL to DL switch with a first gap duration.
[0175] Information and signals can be represented using a variety of different technologies and techniques. For example, data, instructions, commands, information, signals, bits, symbols, and chips referenced throughout the above description can be represented by voltage, current, electromagnetic waves, magnetic fields or magnetic particles, optical fields or optical particles, or any combination thereof.
[0176] The various illustrative blocks and modules described in conjunction with the disclosure herein may be implemented or executed with a general purpose processor, a DSP, an ASIC, an FPGA or other programmable logic device, discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions described herein. A general purpose processor may be a microprocessor, but alternatively, the processor may be any conventional processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices (e.g., a combination of a DSP and a microprocessor, a plurality of microprocessors, a combination of one or more microprocessors with a DSP core, or any other such configuration).
[0177] The functions described herein can be implemented in hardware, software executed by a processor, firmware, or any combination thereof. If implemented in software executed by a processor, these functions can be stored or sent to a computer-readable medium as one or more instructions or codes. Other examples and embodiments are within the scope of the present disclosure and the appended claims. For example, due to the nature of software, the functions described above can be implemented using software, hardware, firmware, hard wiring, or any combination thereof executed by a processor. The features implementing these functions can also be physically located in different locations, including being distributed so that the parts of the functions are implemented at different physical locations. Moreover, as used herein, including in the claims, the "or" used in the list of items (e.g., a list of items beginning with a phrase such as "at least one of..." or "one or more of...") indicates an inclusive list, so that, for example, a list of [at least one of A, B, or C] means A or B or C or AB or AC or BC or ABC (i.e., A and B and C).
[0178] Further embodiments of the present disclosure include a method for wireless communication. The method may also include receiving a first communication signal from a second wireless communication device by a first wireless communication device. The method may also include determining a measurement period by the first wireless communication device based on a first gap duration between the first communication signal and the second communication signal. The method may also include performing listen before talk (LBT) by the first wireless communication device based on a channel measurement value in the measurement period. The method may also include sending a second communication signal to the second wireless communication device based on the LBT by the first wireless communication device.
[0179] In some aspects, the method may also include determining, by the first wireless communication device, an LBT type based on at least one of a first gap duration or a second gap duration between the first communication signal and the second communication signal, the LBT type including at least one of a category 1 LBT, a category 2 LBT, or a category 4 LBT, wherein performing the LBT is also based on the LBT type. The first gap duration is the same as the second gap duration. The first gap duration is different from the second gap duration. The first gap duration is associated with a first channel delay spread parameter, and wherein the second gap duration is associated with a second channel delay spread parameter different from the first channel delay spread parameter. The method may also include sending, by the first wireless communication device, an LBT configuration including at least the determined LBT type to the second wireless communication device. Determining the LBT type is also based on the received LBT configuration. The method may also include determining, by the first wireless communication device, at least one of the first gap duration or the second gap duration based on an end time of the first communication signal at the second wireless communication device and a start time of the second communication signal at the second wireless communication device. Determining at least one of the first gap duration or the second gap duration is also based on at least one of a channel delay spread parameter, a transmit timing advance parameter, or a multipath channel parameter associated with communication between the first wireless communication device and the second wireless communication device. The method may also include determining, by the first wireless communication device, at least one of a first gap duration or a second gap duration based on an end time of a first communication signal at the first wireless communication device and a start time of a second communication signal at the first wireless communication device. Determining at least one of the first gap duration or the second gap duration is also based on at least one of a channel delay spread parameter or a transmit timing advance parameter associated with communication between the first wireless communication device and the second wireless communication device. Receiving includes receiving, by the first wireless communication device, the first communication signal via a plurality of paths, and wherein the method may also include determining, by the first wireless communication device, an end time of the first communication signal based on one of the plurality of paths. Determining the end time of the first communication signal is also based on a received signal threshold comparison. The first gap duration is relative to a start time of the second communication signal at the first wireless communication device. The first gap duration is relative to a start time of the second communication signal at the second wireless communication device. Determining a measurement period includes determining, by the first wireless communication device, a first measurement period within a first portion of the first gap duration and determining a second measurement period within a second portion of the first gap duration, the second portion being adjacent to a start time of the second communication signal at the first wireless communication device. Performing the LBT includes determining, by the first wireless communication device, a channel state based on a comparison of at least one of a first channel measurement value in the first measurement period or a second channel measurement value in the second measurement period with a threshold.The method may also include determining, by the first wireless communication device, a duration for at least one of the first portion or the second portion based at least in part on the first gap duration. At least the second portion includes a predetermined duration. The first portion includes a first predetermined duration, wherein the second portion includes a second predetermined duration, and wherein the first portion and the second portion do not overlap. The first portion includes a first predetermined duration, wherein the second portion includes a second predetermined duration, and wherein the first portion at least partially overlaps the second portion. The first portion is separated from the second portion. The method may also include determining, by the first wireless communication device, a duration between the first portion and the second portion based at least in part on the first gap duration. The method may also include determining, by the first wireless communication device, a duration for the first portion, a duration for the second portion, and a duration between the first portion and the second portion based at least in part on the first gap duration and a predetermined measurement gap duration. Determining the measurement period includes determining, by the first wireless communication device, a single measurement period within a predetermined duration of the first gap duration adjacent to a start time of a second communication signal at the first wireless communication device, and wherein performing LBT includes determining, by the first wireless communication device, a channel state based on a comparison of a signal channel measurement in the measurement period with a threshold. The second communication signal includes a cyclic extension associated with at least one of the first gap duration or the second gap duration. The second communication signal includes one or more symbols, and wherein a start symbol of the one or more symbols is pre-pended with an extended cyclic prefix (ECP) associated with the first gap duration. The sending includes sending one or more symbols to the second wireless communication device based on a symbol boundary by the first wireless communication device, and the method may also include determining, by the first wireless communication device, a length for the ECP to provide the first gap duration. The second communication signal includes one or more symbols, and wherein a cyclic suffix associated with the second gap duration is pre-pended with the last symbol of the one or more symbols. The sending includes sending one or more symbols to the second wireless communication device based on a symbol boundary by the first wireless communication device, and the method may also include determining, by the first wireless communication device, a length for the cyclic suffix to provide the second gap duration. The sending includes sending two or more communication signals to the second wireless communication device by the first wireless communication device in two or more transmit time intervals (TTIs), wherein the last communication signal of the two or more communication signals includes the cyclic suffix. The method may also include determining, by the first wireless communication device, a length for the cyclic extension based on at least one of a timing advance, a propagation delay, or a channel delay extension associated with the communication between the first wireless communication device and the second wireless communication device. The method may also include breaking out of a portion of the second communication signal based on the first gap duration by the first wireless communication device.The method may also include transmitting, by the first wireless communication device and the second wireless communication device, a configuration indicating at least one of the following: an extended cyclic prefix (ECP) mode for cyclic extension, a cyclic suffix mode for cyclic extension, a starting offset for a second communication signal, a first gap duration, or a second gap duration. The transmission includes transmitting, by the first wireless communication device and the second wireless communication device, at least one of the following: a radio resource control (RRC) message including a configuration, a group common physical downlink control channel (GC-PDCCH) message including a configuration, or a scheduling grant including a configuration. Performing LBT is also based on the LBT type. The first communication signal includes one or more symbols, and wherein at least one of the following is performed: a start symbol in one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the second gap duration, or a last symbol in one or more symbols is pre-added with a cyclic suffix associated with the first gap duration. The method may also include transmitting, by the first wireless communication device and the second wireless communication device, a configuration indicating at least one of the following: an ECP mode for the first communication signal, a cyclic suffix mode for the first communication signal, a starting offset for the first communication signal, a first gap duration, or a second gap duration.
[0180] A further embodiment of the present disclosure includes an apparatus, comprising: a transceiver configured to receive a first communication signal from a second wireless communication device; and a processor configured to determine a measurement period based on a first gap duration between the first communication signal and the second communication signal, and perform listen before talk (LBT) based on a channel measurement value in the measurement period. The apparatus may also include, wherein the transceiver is further configured to send a second communication signal to the second wireless communication device based on the LBT.
[0181] In some aspects, the apparatus may also include, wherein the processor is further configured to determine an LBT type based on at least one of a first gap duration or a second gap duration between the first communication signal and the second communication signal, the LBT type including at least one of a category 1 LBT, a category 2 LBT, or a category 4 LBT; and performing the LBT is also based on the LBT type. The first gap duration is the same as the second gap duration. The first gap duration is different from the second gap duration. The first gap duration is associated with a first channel delay spread parameter, and wherein the second gap duration is associated with a second channel delay spread parameter different from the first channel delay spread parameter. The transceiver is further configured to send an LBT configuration including at least the determined LBT type to the second communication device. The transceiver is further configured to receive an LBT configuration including information associated with at least one of the LBT type or the first gap duration from the second wireless communication device, and wherein the processor is further configured to determine the LBT type based on the received LBT configuration. The processor is further configured to determine at least one of the first gap duration or the second gap duration based on an end time of the first communication signal at the second wireless communication device and a start time of the second communication signal at the second wireless communication device. The processor is also configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter, a transmission timing advance parameter, or a multipath channel parameter associated with the communication between the apparatus and the second wireless communication device. The processor is also configured to determine at least one of the first gap duration or the second gap duration based on the end time of the first communication signal at the apparatus and the start time of the second communication signal at the apparatus. The processor is also configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter or a transmission timing advance parameter associated with the communication between the apparatus and the second wireless communication device. The transceiver is also configured to receive the first communication signal via multiple paths, and wherein the processor is also configured to determine the end time of the first communication signal based on one of the multiple paths. The processor is also configured to determine the end time of the first communication signal based on the received signal threshold comparison. The first gap duration is relative to the start time of the second communication signal at the apparatus. The first gap duration is relative to the start time of the second communication signal at the second wireless communication device. The processor is also configured to determine a measurement period by determining a first measurement period within a first portion of the first gap duration and determining a second measurement period within a second portion of the first gap duration, the second portion being adjacent to a start time of a second communication signal at the apparatus.The processor is also configured to perform LBT by determining a channel state based on a comparison of at least one of a first channel measurement value in a first measurement period or a second channel measurement value in a second measurement period with a threshold. The processor is also configured to determine a duration for at least one of the first portion or the second portion based at least in part on the first gap duration. At least the second portion includes a predetermined duration. The first portion includes a first predetermined duration, wherein the second portion includes a second predetermined duration, and wherein the first portion and the second portion do not overlap. The first portion includes a first predetermined duration, wherein the second portion includes a second predetermined duration, and wherein the first portion at least partially overlaps with the second portion. The first portion is separated from the second portion. The processor is also configured to determine a duration between the first portion and the second portion based at least in part on the first gap duration. The processor is also configured to determine a duration for the first portion, a duration for the second portion, and a duration between the first portion and the second portion based at least in part on the first gap duration and a predetermined measurement gap duration. The processor is also configured to determine the measurement period by determining a single measurement period within a predetermined duration of the first gap duration adjacent to the start time of the second communication signal at the device, and to perform LBT by determining the channel state based on the comparison of the single channel measurement value in the measurement period with the threshold. The transceiver is also configured to receive a third communication signal from a second wireless communication device, the second communication signal and the third communication signal are separated by a second gap duration, wherein the second communication signal includes a cyclic extension associated with at least one of the first gap duration or the second gap duration. The second communication signal includes one or more symbols, and wherein the start symbol of the one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the first gap duration. The transceiver is also configured to send the second communication signal by sending one or more symbols based on a symbol boundary, and the processor is also configured to determine the length for the ECP to provide the first gap duration. The second communication signal includes one or more symbols, and wherein the last symbol of the one or more symbols is pre-added with a cyclic suffix associated with the second gap duration. The transceiver is also configured to send a second communication signal by sending one or more symbols based on a symbol boundary, and the processor is further configured to determine a length for a cyclic suffix to provide a second gap duration. The transceiver is also configured to send a second communication signal by sending two or more communication signals to a second wireless communication device in two or more transmit time intervals (TTIs), and wherein a last communication signal of the two or more communication signals includes a cyclic suffix. The processor is also configured to determine a length for a cyclic extension based on at least one of a timing advance, a propagation delay, or a channel delay extension associated with communication between the apparatus and the second wireless communication device.The processor is also configured to break through a portion of the second communication signal based on the first gap duration. The transceiver is also configured to transmit a configuration indicating at least one of the following items with the second wireless communication device: an extended cyclic prefix (ECP) mode for cyclic extension, a cyclic suffix mode for cyclic extension, a starting offset for the second communication signal, a first gap duration, or a second gap duration. The transceiver is also configured to transmit a configuration by transmitting at least one of the following items with the second wireless communication device: a radio resource control (RRC) message including a configuration, a group common physical downlink control channel (GC-PDCCH) message including a configuration, or a scheduling authorization including a configuration. The transceiver is also configured to transmit a configuration indicating an LBT type (including at least one of a category 1 LBT, a category 2 LBT, or a category 4 LBT) with the second wireless communication device, and the processor is also configured to determine the first gap duration based on the LBT type, and wherein the LBT is also performed based on the LBT type. The transceiver is also configured to send a third communication signal to the second wireless communication device before the first communication signal, the first communication signal and the third communication signal being separated by a second gap duration, wherein the first communication signal includes one or more symbols, and wherein at least one of the following is performed: a start symbol of the one or more symbols is pre-pended with an extended cyclic prefix (ECP) associated with the second gap duration; or a last symbol of the one or more symbols is pre-pended with a cyclic suffix associated with the first gap duration. The transceiver is also configured to communicate with the second wireless communication device a configuration indicating at least one of the following: an ECP mode for the first communication signal, a cyclic suffix mode for the first communication signal, a starting offset for the first communication signal, a first gap duration, or a second gap duration.
[0182] A further embodiment of the present disclosure includes a non-transitory computer-readable medium having program code recorded thereon. The non-transitory computer-readable medium includes code for causing a first wireless communication device to receive a first communication signal from a second wireless communication device. The non-transitory computer-readable medium includes code for causing the first wireless communication device to determine a measurement period based on a first gap duration between the first communication signal and the second communication signal. The non-transitory computer-readable medium includes code for causing the first wireless communication device to perform listen-before-talk (LBT) based on a channel measurement value in the measurement period. The non-transitory computer-readable medium includes code for causing the first wireless communication device to send a second communication signal to the second wireless communication device based on LBT.
[0183] In some aspects, the non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine an LBT type based on at least one of a first gap duration or a second gap duration between the first communication signal and the second communication signal, the LBT type including at least one of a Class 1 LBT, a Class 2 LBT, or a Class 4 LBT, wherein the code for causing the first wireless communication device to perform LBT is further configured to perform LBT based on the LBT type. The first gap duration is the same as the second gap duration. The first gap duration is different from the second gap duration. The first gap duration is associated with a first channel delay spread parameter, and wherein the second gap duration is associated with a second channel delay spread parameter different from the first channel delay spread parameter. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to send an LBT configuration including at least the determined LBT type to the second wireless communication device. The code for causing the first wireless communication device to determine the LBT type is further configured to determine the LBT type based on the received LBT configuration. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine at least one of the first gap duration or the second gap duration based on an end time of the first communication signal at the second wireless communication device and a start time of the second communication signal at the second wireless communication device. The code for causing the first wireless communication device to determine at least one of the first gap duration or the second gap duration is further configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter, a transmit timing advance parameter, or a multipath channel parameter associated with communication between the first wireless communication device and the second wireless communication device. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine at least one of the first gap duration or the second gap duration based on an end time of a first communication signal at the first wireless communication device and a start time of a second communication signal at the first wireless communication device. The code for causing the first wireless communication device to determine at least one of the first gap duration or the second gap duration is further configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter or a transmit timing advance parameter associated with communication between the first wireless communication device and the second wireless communication device. Code for causing the first wireless communication device to receive a first communication signal via multiple paths, and wherein the non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine an end time of the first communication signal based on one of the multiple paths. The code for causing the first wireless communication device to determine an end time of the first communication signal is further configured to determine an end time of the first communication signal based on a received signal threshold comparison.The first gap duration is relative to the start time of the second communication signal at the first wireless communication device. The first gap duration is relative to the start time of the second communication signal at the second wireless communication device. The code for causing the first wireless communication device to determine the measurement period is also configured to determine the first measurement period within the first part of the first gap duration and determine the second measurement period within the second part of the first gap duration, and the second part is adjacent to the start time of the second communication signal at the first wireless communication device. The code for causing the first wireless communication device to perform LBT is also configured to determine the channel state based on a comparison of at least one of the first channel measurement value in the first measurement period or the second channel measurement value in the second measurement period with a threshold. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine a duration for at least one of the first part or the second part based at least in part on the first gap duration. At least the second part includes a predetermined duration. The first part includes a first predetermined duration, wherein the second part includes a second predetermined duration, and wherein the first part and the second part do not overlap. The first part includes a first predetermined duration, wherein the second part includes a second predetermined duration, and wherein the first part at least partially overlaps with the second part. The first part is separated from the second part. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine the duration between the first part and the second part based at least in part on the first gap duration. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine the duration for the first part, the duration for the second part, and the duration between the first part and the second part based at least in part on the first gap duration and the predetermined measurement gap duration. The code for causing the first wireless communication device to determine the measurement period is also configured to determine a single measurement period within a predetermined duration of the first gap duration adjacent to the start time of the second communication signal at the first wireless communication device, and wherein the code for causing the first wireless communication device to perform LBT is also configured to determine the channel state based on a comparison of a single channel measurement value in the measurement period with a threshold. The second communication signal includes a cyclic extension associated with at least one of the first gap duration or the second gap duration. The second communication signal includes one or more symbols, and wherein a start symbol in the one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the first gap duration. The code for causing the first wireless communication device to transmit a second communication signal is further configured to transmit one or more symbols based on a symbol boundary, and the non-transitory computer-readable medium may also include code for causing the first wireless communication device to determine a length for the ECP to provide a first gap duration.The second communication signal includes one or more symbols, and wherein the last symbol of the one or more symbols is added with a cyclic suffix associated with the second gap duration. The code for causing the first wireless communication device to send the second communication signal is also configured to send one or more symbols based on a symbol boundary, and the non-transitory computer-readable medium may also include a code for causing the first wireless communication device to determine the length of the cyclic suffix to provide the second gap duration. The non-transitory computer-readable medium may also include a code for causing the first wireless communication device to break through a portion of the second communication signal based in part on the first gap duration. The code for causing the first wireless communication device to send the second communication signal is also configured to send two or more communication signals to the second wireless communication device in two or more transmission time intervals (TTIs), and wherein the last communication signal of the two or more communication signals includes a cyclic suffix. The non-transitory computer-readable medium may also include a code for causing the first wireless communication device to determine the length of the cyclic extension based on at least one of the timing advance, propagation delay, or channel delay extension associated with the communication between the first wireless communication device and the second wireless communication device. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to transmit a configuration indicating at least one of the following with the second wireless communication device: an extended cyclic prefix (ECP) mode for cyclic extension, a cyclic suffix mode for cyclic extension, a starting offset for a second communication signal, a first gap duration, or a second gap duration. The code for causing the first wireless communication device to transmit the configuration is also configured to transmit at least one of the following with the second wireless communication device: a radio resource control (RRC) message including the configuration, a group common physical downlink control channel (GC-PDCCH) message including the configuration, or a scheduling grant including the configuration. The code for causing the first wireless communication device to perform LBT is also configured to perform LBT based on the LBT type. The first communication signal includes one or more symbols, and wherein at least one of the following is performed: a start symbol in the one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the second gap duration, or a last symbol in the one or more symbols is pre-added with a cyclic suffix associated with the first gap duration. The non-transitory computer-readable medium may also include code for causing the first wireless communication device to communicate with the second wireless communication device a configuration indicating at least one of: an ECP mode for the first communication signal, a cyclic suffix mode for the first communication signal, a starting offset for the first communication signal, a first gap duration, or a second gap duration.
[0184] A further embodiment of the present disclosure includes an apparatus comprising a component for receiving a first communication signal from a second communication device. The apparatus may also include a component for determining a measurement period based on a first gap duration between the first communication signal and the second communication signal. The apparatus may also include a component for performing listen-before-talk (LBT) based on a channel measurement value in the measurement period. The apparatus may also include a component for sending a second communication signal to a second wireless communication device based on LBT.
[0185] In some aspects, the apparatus may also include a component for determining an LBT type based on at least one of a first gap duration or a second gap duration between a first communication signal and a second communication signal, the LBT type including at least one of a Category 1 LBT, a Category 2 LBT, or a Category 4 LBT, wherein the component for performing LBT is further configured to perform LBT based on the LBT type. The first gap duration is the same as the second gap duration. The first gap duration is different from the second gap duration. The first gap duration is associated with a first channel delay spread parameter, and wherein the second gap duration is associated with a second channel delay spread parameter different from the first channel delay spread parameter. The apparatus may also include a component for sending an LBT configuration including at least the determined LBT type to a second communication device. The component for determining the LBT type is further configured to determine the LBT type based on the received LBT configuration. The apparatus may also include a component for determining at least one of the first gap duration or the second gap duration based on an end time of the first communication signal at the second wireless communication device and a start time of the second communication signal at the second wireless communication device. The component for determining at least one of the first gap duration or the second gap duration is also configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter, a transmission timing advance parameter, or a multipath channel parameter associated with the communication between the apparatus and the second wireless communication device. The apparatus may also include a component for determining at least one of the first gap duration or the second gap duration based on the end time of the first communication signal at the apparatus and the start time of the second communication signal at the apparatus. The component for determining at least one of the first gap duration or the second gap duration is also configured to determine at least one of the first gap duration or the second gap duration based on at least one of a channel delay spread parameter or a transmission timing advance parameter associated with the communication between the apparatus and the second wireless communication device. The component for receiving the first communication signal is also configured to receive the first communication signal via multiple paths, and wherein the apparatus may also include a component for determining the end time of the first communication signal based on one of the multiple paths. The component for determining the end time of the first communication signal is also configured to determine the end time of the first communication signal based on a received signal threshold comparison. The first gap duration is relative to the start time of the second communication signal at the apparatus. The first gap duration is relative to a start time of a second communication signal at the second wireless communication device. The means for determining a measurement period is further configured to determine a first measurement period within a first portion of the first gap duration and determine a second measurement period within a second portion of the first gap duration, the second portion being adjacent to a start time of the second communication signal at the apparatus.The component for performing LBT is also configured to determine the channel state based on a comparison of at least one of the first channel measurement value in the first measurement period or the second channel measurement value in the second measurement period with a threshold. The device may also include a component for determining a duration for at least one of the first part or the second part based at least in part on the first gap duration. At least the second part includes a predetermined duration. The first part includes a first predetermined duration, wherein the second part includes a second predetermined duration, and wherein the first part and the second part do not overlap. The first part includes a first predetermined duration, wherein the second part includes a second predetermined duration, and wherein the first part at least partially overlaps with the second part. The first part is separated from the second part. The device may also include a component for determining a duration between the first part and the second part based at least in part on the first gap duration. The device may also include a component for determining a duration for the first part, a duration for the second part, and a duration between the first part and the second part based at least in part on the first gap duration and a predetermined measurement gap duration. The component for determining the measurement period is also configured to determine a single measurement period within a predetermined duration of the first gap duration adjacent to the start time of the second communication signal at the device, and the component for performing LBT is also configured to determine the channel state based on the comparison of the single channel measurement value in the measurement period with the threshold. The second communication signal includes a cyclic extension associated with at least one of the first gap duration or the second gap duration. The second communication signal includes one or more symbols, and wherein the start symbol in the one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the first gap duration. The component for sending the second communication signal is also configured to send one or more symbols based on a symbol boundary, and the device may also include a component for determining the length for the ECP to provide a first gap duration. The second communication signal includes one or more symbols, and wherein the last symbol in the one or more symbols is added with a cyclic suffix associated with the second gap duration. The component for sending the second communication signal is also configured to send one or more symbols based on a symbol boundary, and the device may also include a component for determining the length for the cyclic suffix to provide a second gap duration. The means for transmitting the second communication signal is further configured to transmit the two or more communication signals to the second wireless communication device at two or more transmit time intervals (TTIs), and wherein the last communication signal of the two or more communication signals includes a cyclic suffix. The apparatus may also include means for determining a length for the cyclic extension based on at least one of a timing advance, a propagation delay, or a channel delay extension associated with the communication between the apparatus and the second wireless communication device. The apparatus may also include means for breaking through a portion of the second communication signal based on the first gap duration.The apparatus may also include a component for transmitting with a second wireless communication device a configuration indicating at least one of the following: an extended cyclic prefix (ECP) mode for cyclic extension, a cyclic suffix mode for cyclic extension, a starting offset for a second communication signal, a first gap duration, or a second gap duration. The component for transmitting the configuration is also configured to transmit with the second wireless communication device at least one of the following: a radio resource control (RRC) message including a configuration, a group common physical downlink control channel (GC-PDCCH) message including a configuration, or a scheduling grant including a configuration. The component for performing LBT is also configured to perform LBT based on the LBT type. The first communication signal includes one or more symbols, and wherein at least one of the following is performed: a start symbol in one or more symbols is pre-added with an extended cyclic prefix (ECP) associated with the second gap duration, or a last symbol in one or more symbols is pre-added with a cyclic suffix associated with the first gap duration. The apparatus may also include means for communicating with the second wireless communication device a configuration indicating at least one of: an ECP mode for the first communication signal, a cyclic suffix mode for the first communication signal, a starting offset for the first communication signal, a first gap duration, or a second gap duration.
[0186] As will be understood by those skilled in the art at this time, and depending on the specific application at hand, many modifications, substitutions and variations may be made to the materials, devices, configurations and methods of use of the apparatus of the present disclosure without departing from the spirit and scope of the present disclosure. In view of this, the scope of the present disclosure should not be limited to the scope of the specific embodiments illustrated and described herein, as they are merely examples thereof, but should be fully commensurate with the claims appended hereto and their functional equivalents.
Claims
1. A method of wireless communication, comprising: receiving a first communication signal at a first wireless communication device; performing, by the first wireless communication device, a listen-before-talk (LBT) based at least in part on one or more channel measurements in one or more measurement periods of a gap duration between the first communication signal and the second communication signal, wherein timing of the one or more measurement periods is based on temporally segmenting the gap duration into a plurality of gap duration portions, and wherein a number of the plurality of gap duration portions is based on a length of the gap duration; as well as The second communication signal is sent by the first wireless communication device based on the LBT.
2. The method according to claim 1, wherein: A first portion of the gap duration is adjacent to a start time of the second communication signal; A total duration of the one or more measurement periods is based on the gap duration; The one or more channel measurements include a first channel measurement value and a second channel measurement value; The one or more measurement periods include a first measurement period and a second measurement period; the second measurement period is within a second portion of the gap duration; and The performing the LBT is based on a first channel measurement value obtained in the first measurement period, and a second channel measurement value obtained in the second measurement period.
3. The method according to claim 2, wherein: The first portion of the gap duration is longer than the second portion of the gap duration.
4. The method according to claim 2, wherein: The first measurement period is longer than the second measurement period.
5. The method according to claim 2, wherein: The performing of the LBT comprises: A channel state is determined by the first wireless communication device based on a comparison of at least one of the first channel measurement value in the first measurement period or the second channel measurement value in the second measurement period with a threshold.
6. The method according to claim 2, wherein: The performing of the LBT comprises: A channel state is determined by the first wireless communication device based on a comparison of a single channel measurement value in the first measurement period with a threshold, the single channel measurement value corresponding to the first channel measurement value.
7. The method according to claim 1, wherein: A first portion of the gap duration is adjacent to a start time of the second communication signal; A total duration of the one or more measurement periods is based on the gap duration; and The first portion of the gap duration includes a time slot having a predetermined duration.
8. The method according to claim 7, wherein: The predetermined duration of the time slot is 9 microseconds (μs), and wherein the one or more measurement periods include a first measurement period having a duration of at least 4 μs within the time slot.
9. The method according to claim 1, wherein: The second communication signal comprises one or more symbols and a cyclic extension associated with the gap duration, and wherein a starting symbol of the one or more symbols is prepended with the cyclic extension.
10. The method according to claim 9, wherein: The sending includes: transmitting, by the first wireless communication device, the one or more symbols to a second wireless communication device based on a symbol boundary, and The method further comprises: A length for the cyclic extension is determined by the first wireless communication device to provide the gap duration.
11. The method according to claim 10, wherein: The determining of a length for the cyclic extension comprises: A length for the cyclic extension is determined by the first wireless communication device based on a timing advance associated with communications between the first wireless communication device and the second wireless communication device.
12. The method according to claim 9, further comprising: A configuration is received by the first wireless communication device from a second wireless communication device, the configuration comprising at least one of the following: a first indicator comprising at least one of: a length of the cyclic extension, a starting offset for the second communication signal, or a switching gap configuration; or A second indicator of the LBT type is included.
13. The method according to claim 12, wherein: The receiving the configuration comprises: At least one of: a radio resource control, RRC, message including the configuration, a group common physical downlink control channel, GC-PDCCH, message including the configuration, or a scheduling grant including the configuration is received by the first wireless communication device from the second wireless communication device.
14. The method of claim 12, wherein: The receiving the configuration comprises: receiving, by the first wireless communication device from the second wireless communication device, the second indicator including the LBT type jointly encoded with the first indicator; and The performing of the LBT is also based on the LBT type.
15. The method according to claim 14, wherein: The LBT type is a Category 1 LBT, a Category 2 LBT associated with a first duration, a Category 2 LBT associated with a second duration different from the first duration, or a Category 4 LBT.
16. An apparatus comprising: a transceiver configured to receive a first communication signal; as well as a processor configured to perform listen-before-talk (LBT) based at least in part on one or more channel measurements in one or more measurement periods of a gap duration between the first communication signal and the second communication signal, wherein timing of the one or more measurement periods is based on temporally segmenting the gap duration into a plurality of gap duration portions, and wherein a number of the plurality of gap duration portions is based on a length of the gap duration, Wherein, the transceiver is further configured to send the second communication signal based on the LBT.
17. The apparatus of claim 16, wherein the one or more channel measurements include a first channel measurement and a second channel measurement; A first portion of the gap duration is adjacent to a start time of the second communication signal; A total duration of the one or more measurement periods is based on the gap duration; The one or more measurement periods include a first measurement period and a second measurement period; and The LBT is based on a first channel measurement value obtained in the first measurement period and a second channel measurement value obtained in the second measurement period.
18. The device according to claim 17, wherein: The processor configured to perform the LBT is configured to: A channel state is determined based on a comparison of at least one of the first channel measurement value in the first measurement period or the second channel measurement value in the second measurement period with a threshold.
19. The device according to claim 16, wherein: A first portion of the gap duration is adjacent to a start time of the second communication signal; A total duration of the one or more measurement periods is based on the gap duration; The first portion of the gap duration is a time slot having a predetermined time of 9 microseconds (μs); and The one or more measurement periods include a first measurement period having a duration of at least 4 μs within the time slot.
20. The device according to claim 16, wherein: The second communication signal comprises one or more symbols and a cyclic extension associated with the gap duration, and wherein a starting symbol of the one or more symbols is prepended with the cyclic extension.
21. The apparatus of claim 20, wherein: The transceiver configured to send the second communication signal is configured to: transmitting the one or more symbols based on a symbol boundary, and The processor is further configured to: A length for the cyclic extension is determined to provide the gap duration.
22. The device according to claim 21, wherein The processor configured to determine a length for the cyclic extension is configured to: A length for the cyclic extension is also determined based on a timing advance associated with communications between the apparatus and a second wireless communication device.
23. The apparatus of claim 20, wherein: The transceiver is further configured to: receiving a scheduling grant comprising an LBT type jointly encoded with information associated with at least one of: a length of the cyclic extension, a starting offset for the second communication signal, or a switching gap configuration, The processor is configured to perform the LBT based on the LBT type, and The LBT type is a Category 1 LBT, a Category 2 LBT associated with a first duration, a Category 2 LBT associated with a second duration different from the first duration, or a Category 4 LBT.
24. A non-transitory computer readable medium having program code recorded thereon, the program code comprising: code for causing a first wireless communication device to receive a first communication signal from a second wireless communication device; code for causing the first wireless communication device to perform listen-before-talk (LBT) based at least in part on one or more channel measurements in one or more measurement periods of a gap duration between the first communication signal and the second communication signal, wherein timing of the one or more measurement periods is based on temporally segmenting the gap duration into a plurality of gap duration portions, and wherein a number of the plurality of gap duration portions is based on a length of the gap duration; as well as Code for causing the first wireless communication device to transmit the second communication signal based on the LBT.
25. The non-transitory computer readable medium of claim 24, wherein: A first portion of the gap duration is adjacent to a start time of the second communication signal; A total duration of the one or more measurement periods is based on the gap duration; The one or more channel measurements include a first channel measurement value and a second channel measurement value; The one or more measurement periods include a first measurement period and a second measurement period; and The code for causing the first wireless communication device to perform the LBT is configured to: The LBT is performed based on a first channel measurement value obtained in the first measurement period and a second channel measurement value obtained in the second measurement period.
26. The non-transitory computer readable medium of claim 25, wherein: The code for causing the first wireless communication device to perform the LBT is further configured to: A channel state is determined based on a comparison of at least one of the first channel measurement value in the first measurement period or the second channel measurement value in the second measurement period with a threshold.
27. The non-transitory computer readable medium of claim 25, wherein: The first portion of the gap duration is a time slot having a predetermined duration of 9 microseconds (μs), and wherein the one or more measurement periods include a first measurement period having a duration of at least 4 μs within the time slot.
28. The non-transitory computer readable medium of claim 24, wherein: The second communication signal comprises one or more symbols and a cyclic extension associated with the gap duration, and wherein a starting symbol of the one or more symbols is prepended with the cyclic extension; The code for causing the first wireless communication device to transmit the second communication signal is configured to transmit the one or more symbols based on a symbol boundary; and The non-transitory computer readable medium further includes: Code for causing the first wireless communications device to determine a length for the cyclic extension to provide the gap duration.
29. The non-transitory computer readable medium of claim 28, wherein: The code for causing the first wireless communication device to determine a length for the cyclic extension is configured to: A length for the cyclic extension is determined based on a timing advance associated with communications between the first wireless communication device and the second wireless communication device.
30. The non-transitory computer readable medium of claim 28, further comprising: code for causing the first wireless communication device to receive a scheduling grant from the second wireless communication device, the scheduling grant comprising an LBT type jointly encoded with information associated with at least one of: a length of the cyclic extension, a starting offset for the second communication signal, or a switching gap configuration, wherein the code for causing the first wireless communication device to perform the LBT is configured to perform the LBT based on the LBT type, and Wherein the LBT type is a Category 1 LBT, a Category 2 LBT associated with a first duration, a Category 2 LBT associated with a second duration different from the first duration, or a Category 4 LBT.
Citation Information
Cited By
System and method for vehicle communication with portable communication apparatus
US12772315B2
System and Method For Vehicle Communication with Portable Communication Apparatus
US20250301523A1
