PC track beam rapid turnover system and construction method thereof

A turnover system and construction method technology, applied in the direction of track, track laying, track maintenance, etc., can solve the problems of high input cost, low turnover efficiency, and high safety risk, and achieve low input cost, easy transshipment, and improved safety. Effect

CN113564972APending Publication Date: 2021-10-29CCFEB CIVIL ENG
10 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2021-10-29

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a PC track beam rapid turnover system and a construction method thereof. According to the PC track beam rapid turnover system, a track system is laid between a beam storage area and an installation beam taking area, then a walking system is installed on the track system, the walking system is used for carrying a PC track beam, and the PC track beam is moved to the installation beam taking area from the beam storage area along the track system; track transfer of the PC track beam is achieved, the whole transfer process is convenient and fast, the safety risk is small, and the investment cost is low. And a hydraulic lifting system is installed on the walking system, so that the PC track beam can move up and down in the transferring process, and transferring is facilitated. And moreover, a PC track beam fixing device is mounted on the hydraulic lifting system, so that the PC track beam can be fixed in the transferring process, the PC track beam is prevented from rolling over or toppling over, and the transferring safety is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of PC track beam transfer, in particular to a PC track beam fast turnover system and a construction method thereof. Background technique

[0002] With the rapid development of my country's economic construction, underground rail transit has been further popularized. During the construction of the underground section of the light rail, the PC track beam installation in the tunnel needs to set up a PC track beam storage area at the junction where the elevated road enters the underground to meet the requirements of the underground tunnel. Erection requirements for PC track beams. Aiming at the problem of how to transport PC track girders from the beam storage area to the installation beam extraction area, the current existing technologies are mainly gantry cranes and double-vehicle lifting methods, but these two transportation methods have high investment costs, low turnover efficiency, and high safety risks Th...

Examples

Embodiment Construction

[0037] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered below.

[0038] Such as Figure 1 to Figure 5 As shown, the preferred embodiment of the present invention provides a PC track beam rapid turnover system, including:

[0039] The track system is laid between the beam storage area and the installation and removal area to provide walking tracks;

[0040] The walking system 2 is installed on the track system and can move along the track system, and is used to transfer the PC track beam from the beam storage area to the installation and removal area;

[0041] The hydraulic lifting system 3 is installed on the walking system 2 and is used to carry the PC track beam and realize the up and down movement of the PC track beam;

[0042] The PC track beam fixing device 4 is installed on the hydraulic lifting system 3 and used for fi...