Financial budget reporting method, system, equipment and medium based on big data

Through the fiscal budget filling method based on big data, the prediction data comparison between trend attributes and project attributes is solved, and the accuracy and efficiency of the filling is improved.

CN113724057BActive Publication Date: 2024-11-22PINGAN INT SMART CITY TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202111014407.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-31
Publication Date
2024-11-22
Estimated Expiration
2041-08-31

AI Technical Summary

Technical Problem

There are prone to missed and incorrect filling problems during the filling process of existing fiscal budgets, and the lack of intelligent auxiliary methods will affect the accuracy and efficiency of filling.

Method used

Using a big data-based method, the word units in the financial disclosure documents are obtained and processed, and the prediction data is obtained based on trend attributes and project attributes, and the differences between the reported data and the predicted data are compared during the filling process, and a mismatch is issued. Tips to improve the accuracy of filling out the report.

Benefits of technology

Effectively prevent missed and incorrect filling in the fiscal budget, improve the accuracy of filling out the report, remind the filler to re-calculate items with excessive differences, and improve the accuracy and efficiency of filling out the report.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113724057B_ABST
    Figure CN113724057B_ABST
Patent Text Reader

Abstract

The embodiments of the present application provide a method, system, device and medium for filling in a fiscal budget based on big data, which belongs to the field of big data technology. The fiscal budget forecasting method based on big data includes: obtaining multiple fiscal budget items within the budget period; discretizing multiple public fiscal documents to obtain word units corresponding to each public fiscal document, wherein the public fiscal documents are obtained based on big data; obtaining forecast data for each fiscal budget item based on trend attribute units and project attribute units; filling in the fiscal budget based on the forecast data, and issuing a mismatch prompt when the difference between the reported data of any fiscal budget item and the forecast data corresponding to the fiscal budget item is greater than a preset difference. The technical solution of the embodiments of the present application can improve the accuracy of fiscal budget reporting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of big data, and more specifically, to a method, system, computer-readable storage medium and electronic device for filling out a fiscal budget based on big data. Background Art

[0002] With the continuous advancement of e-government construction, in order to better adapt to the objective needs of modern economic and social development, various government departments urgently need to use information technology to quickly and accurately obtain and share business, financial revenue and expenditure information related to their departments, so as to enhance government supervision and service capabilities, improve administrative quality and efficiency, and drive the development of various industries and fields.

[0003] The fiscal budget is the government's basic fiscal revenue and expenditure plan for a fiscal year, which is approved through legal procedures. The fiscal budget should reflect all budget funds allocated to the department and its subordinate units from the general public budget, government fund budget, and state-owned capital operation budget. The fiscal budget regulates and arranges fiscal activities, directly reflects the government's policy intentions, and is directly related to the quality of social and economic operations. In other words, the accuracy of the fiscal budget reporting is very important, which affects whether the expenditure can be balanced throughout the fiscal year. The fiscal budget also affects whether the item can achieve the expected goals set by the state. However, there is currently no intelligent assistance method for fiscal budget reporting in the industry. The current fiscal budget reporting is usually completed by government departments at all levels to collect information and report it by themselves, which is prone to errors and omissions.

[0004] Therefore, how to improve the accuracy of fiscal budget reporting has become an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0005] The embodiments of the present application provide a method for filling out a fiscal budget based on big data, thereby at least to a certain extent improving the accuracy of filling out the fiscal budget.

[0006] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by the practice of the present application.

[0007] According to one aspect of an embodiment of the present application, a method for filling in a fiscal budget based on big data is provided, comprising: obtaining multiple fiscal budget items within a budget period, the fiscal budget items comprising major fiscal budget items, and fiscal budget sub-items respectively contained in each major fiscal budget item; discretizing multiple public fiscal documents to obtain word units corresponding to each public fiscal document, the word units comprising trend attribute units and project attribute units, wherein the public fiscal documents are obtained based on big data; obtaining forecast data for each fiscal budget item based on the trend attribute units and the project attribute units; filling in the fiscal budget based on the forecast data, and issuing a mismatch prompt when the difference between the reported data of any fiscal budget item and the forecast data corresponding to the fiscal budget item is greater than a preset difference, wherein the filling in of the fiscal budget includes the filling in of several fiscal budget items.

[0008] In some embodiments, multiple public financial documents are discretized to obtain word units corresponding to each public financial document, including: establishing a financial dictionary; segmenting multiple public financial documents based on the financial dictionary to obtain a number of word units; classifying the number of word units to obtain trend attribute units and project attribute units in the word units.

[0009] In some embodiments, multiple public financial documents are discretized to obtain word units corresponding to each public financial document, including: extracting target information from the multiple public financial documents, the target information including specific project information and project expenditure limits; based on the project information and project expenditure limits, generating word units corresponding to each public financial document.

[0010] In some embodiments, based on the trend attribute unit and the project attribute unit, the forecast data of each fiscal budget item is obtained, including: matching the project attribute unit with each fiscal budget item; based on the trend attribute unit, forecasting the matched fiscal budget item to obtain the forecast data.

[0011] In some embodiments, the method also includes: collecting actual reported data corresponding to several fiscal budget items; identifying the government department corresponding to each fiscal budget item; obtaining the expenditure data corresponding to the fiscal budget items of the government department; supervising the expenditure data corresponding to the fiscal budget items of the government department according to preset supervision rules, and issuing a prompt when the difference between the expenditure data corresponding to any fiscal budget item and the actual reported data corresponding to the fiscal budget item is greater than the warning value.

[0012] In some embodiments, according to preset supervision rules, the expenditure data of the fiscal budget items of each government department is supervised, including: collecting the current expenditure data of the corresponding fiscal budget items of each government department; constructing a trend analysis data model based on the current expenditure data; and performing supervision of the expenditure data of each government department based on the trend analysis data model.

[0013] In some embodiments, the budget supervision data center adopts a big data storage module. After collecting the current expenditure data of the fiscal budget items corresponding to each government department, the method also includes: storing the current expenditure data of the fiscal budget items corresponding to each government department in the big data storage module to build a trend analysis data model based on the stored expenditure data. The current expenditure data includes the expenditure information of each expenditure that has been generated, and the expenditure information includes the expenditure time, expenditure content and expenditure amount.

[0014] According to another aspect of the present application, a financial budget reporting system based on big data is also provided, which is characterized by comprising:

[0015] The prediction module is used to obtain multiple fiscal budget items within the budget period, and the fiscal budget items include major fiscal budget items and fiscal budget sub-items respectively included in each major fiscal budget item; discretize multiple public fiscal documents to obtain word units corresponding to each public fiscal document, and the word units include trend attribute units and project attribute units; based on the trend attribute units and project attribute units, obtain the prediction data of each fiscal budget item;

[0016] The early warning module is used to issue a mismatch prompt when the difference between the reported data and the forecast data of any fiscal budget item is greater than a preset difference during the process of reporting the fiscal budget based on the forecast data.

[0017] According to another aspect of the present application, there is also provided an electronic device, comprising: a processor; and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, any of the financial budget reporting methods described above is implemented.

[0018] According to another aspect of the present application, a computer-readable storage medium is provided, on which a computer program is stored, characterized in that when the computer program is executed by a processor, it implements any of the big data-based fiscal budget reporting methods described above.

[0019] In the technical solutions provided by some embodiments of the present application, the public financial text is obtained through big data. During or after the reporting of the financial budget items, the data filled in is compared with the forecast data corresponding to each financial budget item, and prompts are given according to the comparison results. The generated prompts can effectively prevent the omission and wrong filling of budget items in the financial budget reporting. The reporting personnel can also be reminded to recalculate the items with too large differences, so as to improve the accuracy of the reporting.

[0020] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0022] Figure 1 A schematic diagram showing an exemplary system architecture to which the technical solution of the embodiments of the present application can be applied;

[0023] Figure 2 A flowchart of a method for filling in a financial budget based on big data according to an embodiment of the present application is shown;

[0024] Figure 3 is a flow chart of a financial budget filling method based on big data provided in another embodiment of the present application;

[0025] Figure 4 It is a structural diagram of a financial budget reporting system based on big data provided according to an embodiment of the present application;

[0026] Figure 5 A schematic diagram of a computer system 500 applied to the electronic device of the present application is shown. DETAILED DESCRIPTION

[0027] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that this application will be more comprehensive and complete and fully convey the concept of the example embodiments to those skilled in the art.

[0028] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.

[0029] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.

[0030] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.

[0031] Figure 1 A schematic diagram of an exemplary system architecture to which the technical solution of the embodiments of the present application can be applied is shown.

[0032] like Figure 1 As shown, the system architecture may include terminal devices (such as Figure 1 The embodiment of the present invention is a schematic diagram of a mobile phone 101, a tablet computer 102, a portable computer 103, a desktop computer, etc., a network 104, and a server 105. The network 104 is used to provide a medium for a communication link between the terminal device and the server 105. The network 104 may include various connection types, such as a wired communication link, a wireless communication link, etc.

[0033] The present application can be used in many general or special computer system environments or configurations, such as personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronic devices, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc.

[0034] The present application may be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application may also be practiced in distributed computing environments where tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules may be located in local and remote computer storage media, including storage devices.

[0035] It should be understood that Figure 1 The number of terminal devices, networks and servers in the embodiment is only for illustration. According to the implementation requirements, there may be any number of terminal devices, networks and servers. For example, the server 105 may be a server cluster composed of multiple servers.

[0036] The user can use the terminal device to interact with the server 105 through the network 104 to receive or send messages, etc. The server 105 can be a server that provides various services. For example, the user uses the terminal device 103 (or the terminal device 101 or 102) to upload a message set to be processed to the server 105. The server 105 can obtain multiple messages with an associated relationship from the message set, and then generate a distribution model of the topic label, a distribution model of the function label, and a distribution model of the word category label corresponding to each of the multiple messages. The distribution model of the word category label is used to represent the probability that messages with different function labels contain various types of words. Then, based on the generated distribution model of the topic label, the distribution model of the function label, and the distribution model of the word category label, the word distribution probability of the topic label can be determined, so as to determine the subject of the multiple messages according to the word distribution probability of the topic label.

[0037] It should be noted that the financial budget reporting method provided in the embodiment of the present application is generally executed by the server 105, and accordingly, the financial budget reporting device is generally arranged in the server 105. However, in other embodiments of the present application, the terminal device may also have similar functions as the server, so as to execute the financial budget reporting scheme provided in the embodiment of the present application.

[0038] The implementation details of the technical solution of the embodiment of the present application are described in detail below:

[0039] Figure 2 The flowchart of the financial budget reporting method based on big data according to an embodiment of the present application is shown. The financial budget reporting method based on big data can be executed by a server, which can be Figure 1 Refer to the server shown in Figure 2As shown, the financial budget filling method based on big data at least includes steps S210 to S240, which are described in detail as follows:

[0040] Step S210 , obtaining a plurality of financial budget items within the budget period, wherein the financial budget items include major financial budget items and financial budget sub-items respectively included in each major financial budget item.

[0041] The budget period can be one year or three years, depending on the specific circumstances.

[0042] The fiscal budget items can be obtained directly or indirectly. In one embodiment, the fiscal budget items can be obtained based on the fiscal budget items of previous years and the change information between the reporting date of previous years and the current date. Indicatively, the text related to the fiscal budget items between the reporting date of previous years and the current date is screened and obtained based on big data, and the fiscal budget items are updated based on the obtained text. In another embodiment, the fiscal budget items within the budget period can also be directly obtained from the fiscal budget reporting system. In this embodiment, the fiscal budget items include major fiscal budget items and sub-items contained in each major fiscal budget item. Specifically, the major fiscal budget items include economic construction expenditures, business development expenditures, general transfer payments, etc. Among them, the major fiscal budget items of "business development expenditures" refer to expenditures for education, science, culture, health, sports, industry, transportation, commerce, agriculture, forestry, environmental protection, water conservancy, meteorology and other aspects of the cause, specifically including public welfare capital construction expenditures, equipment purchase expenditures, personnel expenses expenditures, business expenses expenditures and other business development expenditures and other sub-items.

[0043] Step S220, discretizing the plurality of public financial documents to obtain word units corresponding to the respective public financial documents, wherein the word units include trend attribute units and project attribute units, wherein the public financial documents are obtained based on big data.

[0044] Multiple public financial documents include budget reporting information of previous years, national guidance documents, and various financial documents issued by the state. Multiple public financial documents are discretized to obtain word units corresponding to each public financial document. Public financial documents can be collected through big data, so that public financial documents before the budget period can be fully obtained through the Internet of Things system and the Web system. Among them, the data of the Internet of Things includes unstructured data and semi-structured data, which can be collected in the form of messages or files according to the formulated strategy. The collection strategy includes the frequency of collection and the collection parameters. Data collection for the Web system can be achieved through web crawlers. The crawler can be written in Python or Java language. By adding some intelligent collection operations to the crawler, the crawler can also simulate manual data crawling. Indicatively, a script for obtaining public financial documents can be written on the government website to automatically obtain the required files.

[0045] In some embodiments, discretization processing is performed on a plurality of public financial documents to obtain word units corresponding to each public financial document, which may specifically include the following steps:

[0046] Establishing a financial dictionary;

[0047] Segment multiple public financial documents based on the financial dictionary to obtain several word units;

[0048] Classify several word units, and obtain trend attribute units and item attribute units in the word units.

[0049] Specifically, a dictionary can be established for finance-related words to form a finance-related word cluster, and then the file can be processed based on the dictionary segmentation to obtain the corresponding word units. A word unit can be a string that semantically expresses an event. Furthermore, part-of-speech tagging, keyword extraction, named entity recognition, semantic role labeling, etc. can be performed on the word units to obtain trend attribute units and project attribute units in the obtained word units. Among them, named entities include special nouns such as names of people, places, names of organizations, numbers, dates, and currencies. Part-of-speech tagging can be done manually or by specific algorithms. Using machine learning methods to implement part-of-speech tagging is the research content of natural language processing. Common part-of-speech tagging algorithms include hidden Markov models, conditional random fields, etc.

[0050] In some embodiments, discretizing a plurality of public financial documents to obtain word units corresponding to each public financial document may further include the following steps:

[0051] Extracting target information from multiple public fiscal documents, including specific project information and project spending limits;

[0052] Based on the project information and project expenditure limits, word units corresponding to each public financial document are generated.

[0053] Specifically, the extracted information includes national guidance documents, budget expenditure limits for specific projects contained in management specifications (such as personnel expenses and business expenses), expenditures for special purposes (such as infrastructure, public welfare, and environmental protection expenditures), actual expenditures and budget expenditures for various budget items in previous years, etc. The extraction methods may include named entities, relationship extraction, event extraction, etc., so as to generate word units corresponding to each public financial document, among which the named entities are each budget item and all other budget items identified by name. Relationship extraction is mainly used to extract relationships between entities. Event extraction can be a summary of important events for each budget item. In another embodiment, semantic recognition can be performed on the public text of the financial document to obtain project attribute units and trend attribute units corresponding to each public financial document section.

[0054] Step S230, based on the trend attribute unit and the item attribute unit, obtain the forecast data of each financial budget item.

[0055] The project attribute unit in the word unit can be matched with the fiscal budget item, so as to obtain the relevant information of each fiscal budget item in each of the multiple public fiscal documents through the items corresponding to the matched project attribute unit. Therefore, in some embodiments, based on the trend attribute unit and the project attribute unit, the forecast data of each fiscal budget item is obtained, which may specifically include the following steps:

[0056] Match project attribute units with various financial budget items;

[0057] Based on the trend attribute unit, the matched fiscal budget items are predicted to obtain the prediction data.

[0058] Specifically, the matching includes the replacement of common words. Schematically, "equipment purchase expenditure" and "equipment procurement expenditure" can be replaced with each other. Then, the matching fiscal budget items are predicted based on the trend attribute unit in the word unit. The trend attribute unit may include "increase investment", "reduce expenditure", "increase revenue and reduce expenditure", etc. The trend unit is used to represent whether the budget value of the corresponding fiscal item has increased or decreased compared with the same period, so that the value of the fiscal budget item can be predicted to obtain forecast data. Schematically, based on the previously reported project budget expenditures and the change trend represented by the trend attribute unit, the forecast data for the current budget period can be obtained.

[0059] It should be noted that the public texts related to the selected fiscal budget items need to be screened. If the overlap rate of the text between any two texts is greater than 80%, they can be determined to be duplicate files of different versions, and any one of them can be deleted to make the trend value corresponding to the trend attribute unit accurate.

[0060] Step S240, reporting the financial budget based on the forecast data, and issuing a mismatch prompt when the difference between the reported data and the forecast data of any financial budget item is greater than a preset difference, wherein the reporting of the financial budget includes reporting of several financial budget items.

[0061] During the reporting process or after the reporting is completed, if the value of the reported fiscal budget item differs too much from the corresponding predicted value of the fiscal budget item, a prompt will be given to remind the reporter to achieve the purpose of intelligent assistance.

[0062] Therefore, during or after the financial budget items are reported, the data entered can be compared with the forecast data corresponding to each financial budget item, and prompts can be given based on the comparison results. The generated prompts can effectively prevent the omission or wrong filling of budget items in the financial budget report. The reporting personnel can also be reminded to recalculate items with large differences, thereby improving the accuracy of the report.

[0063] Figure 3 FIG. 1 is a flowchart of a method for calculating a financial budget project based on big data provided by another embodiment of the present application. Figure 3 As shown, in this embodiment, the financial budget reporting method may further include the following steps S310 to S340.

[0064] Step S310, collecting actual reporting data corresponding to a number of financial budget items;

[0065] Step S320, identifying the government department corresponding to each fiscal budget item;

[0066] Step S330, obtaining expenditure data corresponding to the fiscal budget items of the government departments;

[0067] Step S340, according to the preset supervision rules, the expenditure data corresponding to the fiscal budget items of the government departments are supervised, and a prompt is issued when the difference between the expenditure data corresponding to any fiscal budget item and the corresponding actual reported data is greater than the warning value.

[0068] Budget supervision refers to the supervision of various national economic activities by the state through the collection, allocation and use of budget funds. Since the budget is the main body of the state's finances, budget supervision plays a leading role in the financial supervision system. The government budget can be supervised through the Budget Supervision Data Center. The government budget refers to the government's fiscal revenue and expenditure plan, reflecting the scope, direction and policy of government activities.

[0069] Specifically, the actual reported data of each fiscal item of each government department can be collected, and the actual reported data can be initialized and processed according to a preset data standard format to obtain a first data set. In one embodiment, a budget supervision data center can be constructed with the first data set to supervise expenditure data through the budget supervision data center. The first data set is a database with a preset format that contains the actual reported data of each fiscal budget item of each government department, which is used for comparison with the estimated expenditure data.

[0070] In one embodiment, in step S340, according to the preset supervision rules, the expenditure data of the fiscal budget items of each government department is supervised, which may specifically include the following steps:

[0071] Collect current expenditure data of fiscal budget items corresponding to each government department; build a trend analysis data model based on current expenditure data;

[0072] Based on the trend analysis data model, monitor the expenditure data of various government departments.

[0073] The fiscal budget project data of different government departments can be processed in a hierarchical manner; then the hierarchically processed fiscal budget data can be accessed step by step through the government budget supervision data center. Comparison can be made step by step, and then supervision can be implemented through difference analysis, trend analysis, etc. The results of difference analysis and trend analysis can be visualized through bar charts, pie charts, line charts, rose charts, etc. for easy supervision. In this way, multi-level data associations can be connected, a vertical and horizontally linked government budget supervision system can be established, full-caliber budget supervision can be achieved, and the efficiency of government budget supervision can be improved.

[0074] In some embodiments, the budget supervision data center may use a big data storage module. After collecting the current expenditure data of the corresponding fiscal budget items of each government department, the fiscal budget filling method may also include the following steps: storing the current expenditure data of the corresponding fiscal budget items of each government department in the big data storage module to construct a trend analysis data model based on the stored expenditure data. Specifically, the expenditure information of each expenditure may be stored in the big data storage module, and the expenditure information includes expenditure time, expenditure amount, expenditure content, etc. Specifically, the expenditure time, expenditure amount, expenditure content, etc. are used as independent variables, and the predicted value of the expenditure data is used as the dependent variable. Schematically, a scatter plot may be first drawn according to information such as expenditure time and expenditure amount, and model parameters may be determined based on the scatter plot, and then the model may be tested and corrected based on the newly generated expenditure data, and then a trend analysis data model may be trained and generated, and then the trend analysis data model may be used to predict the expenditure data. Thus, training may be performed through rich sample data, thereby making the constructed trend analysis data model more accurate.

[0075] Specifically, the budget supervision data center includes a processor, an arithmetic device, a storage device, and an input device. The storage device is constructed to store multiple instructions, and the instructions are executed by the processor; allowing the user to provide multiple inputs reflecting financial-related activities to obtain the current expenditure data of each government department corresponding to the financial budget items. The arithmetic device is configured to selectively perform a single large operation or multiple reduced-precision operations in parallel to generate expenditure data corresponding to several time nodes. The processor generates a prediction model based on the expenditure data corresponding to the time nodes after dimensionality reduction, and corrects the prediction model based on the newly generated data, thereby constructing a trend analysis data model, thereby achieving the purpose of making the constructed trend analysis data model more accurate through rich sample data.

[0076] In one embodiment, it is also possible to determine whether the project corresponding to the expenditure data is correct. In other words, it is possible to determine whether the funds spent on the budget project are used for the original purpose. If not, an early warning notification is issued. Indicatively, a financial information sharing platform can be established. On the one hand, the financial information sharing platform is used to perform operations such as input, review, modification, deletion, query, comparison and statistical analysis of the expenditure information of each financial project. On the other hand, the financial information sharing platform allows the party receiving the funds to enter the details of the purchased materials, etc., and provide evidence such as invoices for auxiliary proof, so as to determine whether the funds spent are used for the original purpose by comparing the information uploaded by the two parties. Furthermore, in one embodiment, users can also be allowed to provide multiple bills for financial-related activities, and store the bills in the blockchain to prevent tampering, while facilitating the monitoring of financial expenditures and budgets.

[0077] Figure 4It is a structural diagram of a financial budget reporting system based on big data provided according to an embodiment of the present application. The financial budget reporting system based on big data includes at least a prediction module 410 and an early warning module 420. Among them, the prediction module 410 is used to obtain multiple financial budget items within the budget period, and the financial budget items include major financial budget items, and financial budget sub-items respectively contained in each major financial budget item; discretize multiple public financial documents to obtain word units corresponding to each public financial document, and the word units include trend attribute units and project attribute units; based on the trend attribute units and the project attribute units, obtain the forecast data of each financial budget project. The early warning module 420 is used to issue a mismatch prompt when the difference between the reported data and the forecast data of any financial budget item is greater than the preset difference during the process of reporting the financial budget with the forecast data.

[0078] Therefore, during or after the financial budget items are reported, the data entered can be compared with the forecast data corresponding to each financial budget item, and prompts can be given based on the comparison results. The generated prompts can effectively prevent the omission or wrong filling of budget items in the financial budget report. The reporting personnel can also be reminded to recalculate items with large differences, thereby improving the accuracy of the report.

[0079] In one embodiment, the prediction module 410 can also be used to: establish a financial dictionary; segment multiple public financial documents based on the financial dictionary to obtain a number of word units; classify the word units to obtain trend attribute units and project attribute units in the word units.

[0080] In one embodiment, the prediction module 410 can also be used to: extract target information from multiple public financial documents, the target information including specific project information and project expenditure limits; and generate word units corresponding to each public financial document based on the project information and project expenditure limits.

[0081] In one embodiment, the prediction module 410 may also be used to: match the project attribute unit with each financial budget item; and predict the matched financial budget item based on the trend attribute unit to obtain prediction data.

[0082] In one embodiment, the early warning module 420 can also be used to: collect the actual reported data corresponding to several fiscal budget items; identify the government department corresponding to each fiscal budget item; obtain the expenditure data corresponding to the fiscal budget items of the government department; supervise the expenditure data corresponding to the fiscal budget items of the government department according to preset supervision rules, and issue a prompt when the difference between the expenditure data corresponding to any fiscal budget item and the actual reported data corresponding to the fiscal budget item is greater than the early warning value.

[0083] In one embodiment, the early warning module 420 can also be used to: collect current expenditure data of fiscal budget items corresponding to each government department; construct a trend analysis data model based on the current expenditure data; and perform supervision of the expenditure data of each government department based on the trend analysis data model.

[0084] In one embodiment, the early warning module 420 can also be used to store the current expenditure data of each government department's corresponding fiscal budget items in a big data storage module to build a trend analysis data model based on the stored expenditure data. The current expenditure data includes the expenditure information of each expenditure that has been generated, and the expenditure information includes the expenditure time, expenditure content and expenditure amount.

[0085] Figure 5 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown.

[0086] It should be noted that Figure 5 The computer system 500 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0087] like Figure 5 As shown, the computer system 500 includes a central processing unit (CPU) 501, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 502 or the program loaded from the storage part 508 to the random access memory (RAM) 503, such as executing the method described in the above embodiment. In the RAM 503, various programs and data required for system operation are also stored. The CPU 501, ROM 502 and RAM 503 are connected to each other through a bus 504. An input / output (I / O) interface 505 is also connected to the bus 504.

[0088] The following components are connected to the I / O interface 505: an input section 506 including a keyboard, a mouse, etc.; an output section 507 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 508 including a hard disk, etc.; and a communication section 509 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 509 performs communication processing via a network such as the Internet. A drive 510 is also connected to the I / O interface 505 as needed. A removable medium 511, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 510 as needed so that a computer program read therefrom is installed into the storage section 508 as needed.

[0089] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 509, and / or installed from a removable medium 511. When the computer program is executed by a central processing unit (CPU) 501, various functions defined in the system of the present application are executed.

[0090] It should be noted that the computer-readable medium shown in the embodiment of the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, - but not limited to - an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by an instruction execution system, device or device or used in combination with it. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, wherein a computer-readable computer program is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The computer program contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0091] The flowchart and block diagram in the accompanying drawings illustrate the possible architecture, functions and operations of the system, method and computer program product according to various embodiments of the present application. Wherein, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0092] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not, in some cases, constitute limitations on the units themselves.

[0093] As another aspect, the present application also provides a computer-readable medium, which may be included in the electronic device described in the above embodiment; or may exist independently without being assembled into the electronic device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by an electronic device, the electronic device implements the method described in the above embodiment.

[0094] It should be noted that, although several modules or units of the equipment for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present application, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into being embodied by multiple modules or units.

[0095] Through the description of the above implementation methods, it is easy for those skilled in the art to understand that the example implementation methods described here can be implemented by software or by combining software with necessary hardware. Therefore, the technical solution according to the implementation methods of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the implementation methods of the present application.

[0096] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the embodiments disclosed herein. The present application is intended to cover any variations, uses or adaptations of the present application, which follow the general principles of the present application and include common knowledge or customary technical means in the art that are not disclosed in the present application.

[0097] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A method for filling in a fiscal budget based on big data, characterized in that: include: Acquire multiple fiscal budget items within the budget period, wherein the fiscal budget items include major fiscal budget items and fiscal budget sub-items respectively included in each of the major fiscal budget items; Discretization processing is performed on a plurality of public financial documents to obtain word units corresponding to each of the public financial documents, wherein the word units include trend attribute units and project attribute units, wherein the public financial documents are obtained based on big data, the word units are used to semantically express a string of an event, and the trend attribute units and the project attribute units are obtained by performing part-of-speech tagging, keyword extraction, named entity recognition, and semantic role tagging on the word units, or the trend attribute units and the project attribute units are obtained by performing semantic recognition on each of the public financial documents; Based on the trend attribute unit and the project attribute unit, the forecast data of each of the fiscal budget items is obtained, including: matching the project attribute unit with each of the fiscal budget items; based on the trend attribute unit, forecasting the matched fiscal budget items to obtain the forecast data; wherein the forecast data of each of the fiscal budget items is obtained based on the change trend represented by the trend attribute unit on the basis of the previously reported project budget expenditures; The financial budget is reported based on the forecast data, and when the difference between the reported data of any financial budget item and the forecast data corresponding to the financial budget item is greater than a preset difference, a mismatch prompt is issued, wherein the reporting of the financial budget includes the reporting of several financial budget items.

2. The method according to claim 1, characterized in that: The discretization process of the plurality of public financial documents to obtain word units corresponding to the public financial documents includes: Establishing a financial dictionary; Segmenting multiple public financial documents based on the financial dictionary to obtain a number of word units; Classify the word units, and obtain trend attribute units and item attribute units in the word units.

3. The method according to claim 1, characterized in that The discretization process of the plurality of public financial documents to obtain word units corresponding to the public financial documents includes: extracting target information from a plurality of public financial documents, the target information including specific project information and project spending limits; Based on the project information and the project expenditure limit, word units corresponding to each of the public financial documents are generated.

4. The method according to claim 1, characterized in that The method further comprises: Collect the actual reporting data corresponding to the respective financial budget items; Identify the government department corresponding to each of the budget items; Obtaining expenditure data corresponding to the fiscal budget item of the government department; According to preset supervision rules, the expenditure data corresponding to the fiscal budget items of the government department are supervised through the budget supervision data center, and a prompt is issued when the difference between the expenditure data corresponding to any of the fiscal budget items and the corresponding actual reported data is greater than the warning value.

5. The method according to claim 4, characterized in that According to the preset supervision rules, the expenditure data of the fiscal budget items of various government departments are supervised, including: Collect current expenditure data for each government department's corresponding fiscal budget items; Build trend analysis data models based on current spending data; Based on the trend analysis data model, supervision of expenditure data of various government departments is performed.

6. The method according to claim 5, characterized in that The budget supervision data center adopts a big data storage module. After collecting the current expenditure data of the corresponding fiscal budget items of each government department, the method further includes: The current expenditure data of the corresponding fiscal budget items of each government department is stored in the big data storage module to construct a trend analysis data model based on the stored expenditure data. The current expenditure data includes expenditure information of each expenditure that has been incurred, and the expenditure information includes expenditure time, expenditure content and expenditure amount.

7. A financial budget reporting system based on big data, characterized in that: include: A prediction module is used to obtain multiple fiscal budget items within the budget period, wherein the fiscal budget items include major fiscal budget items and fiscal budget sub-items respectively included in each of the major fiscal budget items; discretize multiple public fiscal documents to obtain word units corresponding to each of the public fiscal documents, wherein the word units include trend attribute units and project attribute units, wherein the word units are used to semantically express a string of an event, wherein the trend attribute units and the project attribute units are obtained by performing part-of-speech tagging, keyword extraction, named entity recognition, and semantic role tagging on the word units, or the trend attribute units and the project attribute units are obtained by performing semantic recognition on each of the public fiscal documents; Based on the trend attribute unit and the project attribute unit, the forecast data of each of the fiscal budget items is obtained, including: matching the project attribute unit with each of the fiscal budget items; based on the trend attribute unit, forecasting the matched fiscal budget items to obtain the forecast data; wherein the forecast data of each of the fiscal budget items is obtained based on the change trend represented by the trend attribute unit on the basis of the previously reported project budget expenditures; The early warning module is used to issue a mismatch prompt when the difference between the reported data and the forecast data of each fiscal budget item is greater than a preset difference during the auxiliary reporting of the fiscal budget using the forecast data.

8. An electronic device, characterized in that: include: processor; and A memory having computer-readable instructions stored thereon, wherein the computer-readable instructions, when executed by the processor, implement the big data-based fiscal budget filling method as described in any one of claims 1 to 6.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for filling in a fiscal budget based on big data as described in any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Two-level budget rationality check reminders and automatic optimization methods, equipment and systems

    CN102279963A

  • Financial data prediction management method and system, terminal and storage medium

    CN108053306A

  • Budget execution rate prediction method and apparatus based on intelligent decision, and computer device

    CN109544309A

  • Government budget supervision method and system and storage medium

    CN110490785A

  • Budget prediction method and device based on improved support vector regression machine, and medium

    CN111461397A