Map management method, device and computer readable storage medium
By determining the area to be updated in map management and deleting the corresponding original map construction data, the problems of low map update efficiency and data correlation in the prior art are solved, and the reliability and efficiency of map management are improved.
Patent Information
- Application Number
- CN202111183933.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-11
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-10-11
AI Technical Summary
The existing map management methods are inefficient when updated and affect the coherence of maps. They cannot effectively handle the correlation between the data to be deleted and the data not deleted, resulting in low reliability and management efficiency.
By determining the area to be updated in the target map, finding the trajectory to be deleted in the pose database, and deleting the original map construction data corresponding to the trajectory, thereby updating the map, improving the accuracy and efficiency of data deletion.
It realizes accurate and efficient update of map data, improves the reliability and management efficiency of map management methods, and avoids the impact of data deletion on map coherence.
Smart Images

Figure CN114090706B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data management technology, and in particular to a map management method, device and computer-readable storage medium. Background Art
[0002] In the prior art, when updating a map, the map area data that needs to be updated is usually obtained, and then the data that needs to be deleted at the corresponding position is searched in the map data, and the data that needs to be deleted at the corresponding position is deleted to update the map.
[0003] The defect of the prior art is that when searching for data to be deleted at the corresponding position in the map data, the data to be deleted can only be determined based on the map area data to be updated, and part of the data to be deleted may have a certain correlation with the undeleted data, so that after the data to be deleted is deleted, the consistency of the map is affected. In addition, the process of determining the data to be deleted based on the map area data to be updated requires a large amount of calculation and is inefficient. Therefore, the reliability and management efficiency of the existing map management method are both low. Summary of the invention
[0004] The main technical problem solved by this application is how to improve the reliability and management efficiency of the map management method.
[0005] In order to solve the above technical problems, the first technical solution adopted in the present application is: a map management method, comprising: determining an area to be updated in a target map; determining at least one trajectory to be deleted corresponding to the area to be updated in a pose database; based on at least one trajectory to be deleted, determining at least one data to be deleted, wherein the data to be deleted is the original mapping data corresponding to the trajectory to be deleted; deleting the mapping data corresponding to each data to be deleted in the target map to update the target map.
[0006] In order to solve the above technical problems, the second technical solution adopted in this application is: a map management device, including: a memory and a processor; the memory is used to store program instructions, and the processor is used to execute program instructions to implement the above map management method.
[0007] In order to solve the above technical problems, the third technical solution adopted in this application is: a computer-readable storage medium, which stores program instructions, and the program instructions implement the above map management method when executed by a processor.
[0008] The beneficial effect of the present application is that, different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0010] Figure 1 This is one of the flowcharts of the first embodiment of the map management method of the present application;
[0011] Figure 2 This is the second flowchart of the first embodiment of the map management method of the present application;
[0012] Figure 3 This is the third flowchart of the first embodiment of the map management method of the present application;
[0013] Figure 4 This is the fourth flowchart of the first embodiment of the map management method of the present application;
[0014] Figure 5 It is a flowchart of the second embodiment of the map management method of the present application;
[0015] Figure 6 is a flowchart of the third embodiment of the map management method of the present application;
[0016] Figure 7 is a flowchart of the fourth embodiment of the map management method of the present application;
[0017] Figure 8 It is a structural diagram of an embodiment of the map management device of the present application;
[0018] Fig. 9 It is a structural diagram of an embodiment of the computer-readable storage medium of the present application. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0020] The terms "first" and "second" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically limited. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.
[0021] This application first proposes a map management method, such as Figure 1 As shown, Figure 1 This is one of the flowcharts of the first embodiment of the map management method of the present application. The map management method may specifically include:
[0022] Step S11: Determine the area to be updated in the target map.
[0023] The server may determine the area to be updated in the target map based on the update instruction received from the client.
[0024] The client can be any type of electronic device, such as: a car-mounted map navigation device, a mobile phone, a computer, etc., which is not limited here. The update operation instruction may include: basic map information, map update information and other information required for the update. The basic map information includes information such as the version number of the map to be modified based on the update instruction, and the map update information includes relevant information of the area to be updated.
[0025] Step S12: Determine at least one to-be-deleted trajectory in the pose database corresponding to the area to be updated.
[0026] Among them, the pose database stores all the trajectories used to build each version of the map.
[0027] The server may determine all tracks corresponding to the version number of the target map in the posture database based on the target map, and further select at least one to-be-deleted track corresponding to the area to be updated from all tracks corresponding to the target map.
[0028] Step S13: Based on at least one track to be deleted, determine at least one data to be deleted.
[0029] The data to be deleted is the original mapping data corresponding to the trajectory to be deleted.
[0030] The server can search for the corresponding original mapping data in the mapping database based on the correspondence between the trajectory to be deleted and the trajectory to be deleted.
[0031] Specifically, if one of the at least one trajectory to be deleted is a partial trajectory in the complete trajectory, when determining the corresponding data to be deleted based on the trajectory to be deleted, a portion of the original mapping data corresponding to the partial trajectory is determined as the data to be deleted.
[0032] Step S14: deleting the mapping data corresponding to each to-be-deleted data in the target map to update the target map.
[0033] Among them, the server can determine the mapping data constructed by each data to be deleted in the target map based on the at least one data to be deleted, and then delete all the mapping data corresponding to each data to be deleted in the target map to complete the update of the target map.
[0034] It should be noted that each original mapping data is radar data obtained based on a mobile measurement device. Taking a vehicle-mounted radar installed on a vehicle as an example, an example is given as follows:
[0035] The vehicle is driven from location A to location B. During the driving process, the on-board laser radar on the vehicle is turned on to record the radar data detected from location A to location B, which is recorded as the original mapping data from location A to location B.
[0036] Based on the original mapping data, the position information and direction information of the vehicle at each time when it is traveling from location A to location B can be determined, and recorded as the trajectory from location A to location B.
[0037] The original mapping data from location A to location B is stored in the corresponding mapping database, the trajectory from location A to location B is stored in the corresponding posture database, and the corresponding relationship between the two is recorded.
[0038] To further illustrate the construction of the map, an example is given below:
[0039] When constructing a map of an area, all tracks involved in the area can be determined first, then the original mapping data corresponding to all tracks involved in the area can be called, and finally the map of the area can be constructed based on each track and the corresponding original mapping data. The specific method of constructing the map may include data splicing, superposition or one or more of other mapping algorithms, which are not limited here.
[0040] Among all the tracks corresponding to different versions of maps, there may be the same track or there may not be the same track, which depends on the update history between the different versions of maps and is not limited here.
[0041] The map can be a point cloud map. Figure 1 It is generally composed of several three-dimensional space points, each of which includes its three-dimensional position information in UTM (Universal Transverse Mercator Grid System) coordinates and some other auxiliary information.
[0042] Specifically, the pose database can be a hot data area, and the mapping database can be a cold data area. The pose database is usually accessed more frequently, while the mapping database is usually accessed only when the map needs to be built, deleted, added, updated, etc., and the frequency is lower. Therefore, dividing the pose database and the mapping database into corresponding data areas can improve the rationality of storage resource utilization.
[0043] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0044] Optional, such as Figure 2 As shown, Figure 2 This is the second flow chart of the first embodiment of the map management method of the present application, steps S11-14 and Figure 1 The process shown is the same. After step S14, the map management method further includes:
[0045] Step S15: Acquire the trajectory to be updated corresponding to the area to be updated, and the original mapping data corresponding to the trajectory to be updated.
[0046] The server may determine, based on the received update instruction, the area to be updated indicated by the update instruction, the trajectory to be updated corresponding to the area to be updated, and the corresponding original mapping data, for use in subsequent steps.
[0047] Step S16: storing the trajectory to be updated and the correspondence between the trajectory to be updated and the corresponding original mapping data in the pose database.
[0048] Among them, the server can store the corresponding relationship between the trajectory to be updated and the corresponding original mapping data in the pose database, and store the corresponding relationship between the original mapping data, the trajectory to be updated and the corresponding original mapping data in the mapping database.
[0049] Step S17: Mapping the original mapping data corresponding to the trajectory to be updated to the area to be updated, so as to add corresponding mapping data in the area to be updated.
[0050] The server may construct the regional data of the area to be updated based on the trajectory to be updated and the corresponding original map building data, and map the regional data to the target map, so that the target map is updated to a newer version of the map.
[0051] Specifically, based on the above method, not only can the target map data be updated, but the correspondence between the trajectory used for the update and the corresponding original mapping data can also be recorded for subsequent use when the relevant trajectory and the corresponding map data need to be deleted, making the management of map data more organized and further improving the reliability and efficiency of the map management method.
[0052] Optional, such as Figure 3 As shown, Figure 3 This is the third flow chart of the first embodiment of the map management method of the present application. The map management method further includes:
[0053] Step S21: Determine the target original mapping data.
[0054] The server may determine the target original mapping data indicated by the first download instruction based on the received first download instruction sent by the client.
[0055] Step S22: Based on the target original mapping data, determine and send to the client at least one to-be-downloaded trajectory in the pose database corresponding to the target original mapping data.
[0056] Among them, a target original mapping data may include multiple original mapping data, so the server can determine at least one to-be-downloaded trajectory corresponding to the target original mapping data based on the target original mapping data, and finally send the at least one to-be-downloaded trajectory to the client to complete the download process.
[0057] Based on the above method, the track to be downloaded can be quickly determined, thereby improving the efficiency of map management.
[0058] Optional, such as Figure 4 As shown, Figure 4 This is the fourth flow chart of the first embodiment of the map management method of the present application. The map management method further includes:
[0059] Step S31: Determine the target area in the target map.
[0060] The server may determine the target area indicated by the second download instruction based on the received second download instruction sent by the client.
[0061] Step S32: Based on the target area, determine and send to the client position database at least one to-be-downloaded trajectory corresponding to the target area and original mapping data corresponding to each to-be-downloaded trajectory.
[0062] Among them, the server can determine at least one to-be-downloaded trajectory involved in the target area based on the target area, and then determine the original mapping data corresponding to each to-be-downloaded trajectory based on the at least one to-be-downloaded trajectory, and finally send the at least one to-be-downloaded trajectory and the corresponding original mapping data to the client to complete the download process.
[0063] Based on the above method, the trajectory and original mapping data to be downloaded can be quickly determined, thereby improving the efficiency of map management.
[0064] This application also proposes a map management method, steps S11-14 and Figure 1 The process shown is the same and will not be repeated here. Figure 5 As shown, Figure 5 : is a flowchart of the second embodiment of the map management method of the present application, and the map management method further includes:
[0065] Step S41: Determine all mapping trajectories in the pose database that correspond to the target map.
[0066] Among them, the server can determine all mapping trajectories corresponding to the version of the map based on the version number of the target map.
[0067] Step S42: Determine the update time corresponding to each mapping trajectory.
[0068] The server may obtain the update time corresponding to each mapping trajectory, and the update time may refer to a generation timestamp, which records the generation time of the corresponding mapping trajectory.
[0069] Step S43: Based on the update time corresponding to each mapping trajectory, the target map is divided into a low freshness area, a medium freshness area and a high freshness area.
[0070] Among them, the server can divide all mapping trajectories according to the update time, determine the mapping trajectories with an update time within the first time period as the first type of trajectories, determine the mapping trajectories with an update time within the second time period as the second type of trajectories, and determine the mapping trajectories with an update time within the third time period as the third type of trajectories. The first time period is before the second time period, and the second time period is before the third time period.
[0071] Then, the server determines the area corresponding to the first type of track in the target map as a low freshness area, the area corresponding to the second type of track in the target map as a medium freshness area, and the area corresponding to the third type of track in the target map as a high freshness area.
[0072] Finally, the server may send the low-freshness area, medium-freshness area and high-freshness area in the target map to the client for the user to refer to when using or updating the map, so as to help the user determine the credibility of the map.
[0073] Based on the above method, the user experience when using the map can be effectively improved.
[0074] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0075] This application also proposes a map management method, steps S11-14 and Figure 1 The process shown is the same and will not be repeated here. Figure 6 As shown, Figure 6 : is a flowchart of the third embodiment of the map management method of the present application, and the map management method further includes:
[0076] Step S51: Determine the feature area to be added in the target map.
[0077] Among them, the server can determine the feature area to be added in the target map where new feature information needs to be added. The feature information may include one or more of lane line information, traffic light information, traffic sign information, bus stop information, parking lot information and other types of feature information.
[0078] Step S52: Determine at least one feature trajectory to be added corresponding to the feature area to be added in the pose database.
[0079] The server may determine all the feature tracks to be added involved in the feature area to be added.
[0080] Step S53: Determine at least one feature data to be added based on at least one feature trajectory to be added.
[0081] The feature data to be added is the original mapping data corresponding to the feature trajectory to be added.
[0082] The server may obtain original mapping data corresponding to each feature trajectory to be added based on each feature trajectory to be added.
[0083] Step S54: Generate map feature data based on at least one feature data to be added.
[0084] The server may extract the data of the required newly added feature information based on the acquired original mapping data to generate corresponding map feature data.
[0085] Step S55: Add the map feature data to the target map to increase the map features.
[0086] The server may use the generated map feature data as a layer of a new target map and overlay it on the target map, so that the target map can display corresponding feature information on the map.
[0087] Based on the above method, the information completeness of the map can be effectively improved, and the feature information can be quickly improved without affecting the original target map, thereby improving the reliability and management efficiency of the map management method.
[0088] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0089] This application also proposes a map management method, steps S11-14 and Figure 1 The process shown is the same and will not be repeated here. Figure 7 As shown, Figure 7 : is a flowchart of the fourth embodiment of the map management method of the present application, and the map management method further includes:
[0090] Step S61: Obtain a first track and a second track corresponding to the target area to be optimized in the target map.
[0091] The generation time of the first trajectory is earlier than the generation time of the second trajectory.
[0092] Step S62: Optimizing the target area to be optimized based on the original mapping data corresponding to the first trajectory and the original mapping data corresponding to the second trajectory.
[0093] Based on the first trajectory and the corresponding original mapping data used when constructing the target map, and the newly obtained second trajectory and the corresponding original mapping data, the target area to be optimized that is simultaneously involved in the first trajectory and the second trajectory can be optimized to improve the accuracy of the target map.
[0094] Optionally, the original mapping data corresponding to the first trajectory includes first coordinate information corresponding to the target area to be optimized, and the original mapping data corresponding to the second trajectory includes second coordinate information corresponding to the target area to be optimized.
[0095] Step S62 may specifically include:
[0096] Based on the first coordinate information, the second coordinate information, the first weight corresponding to the first coordinate information and the second weight corresponding to the second coordinate information, the sum of the weights of the first coordinate information and the second coordinate information is calculated to obtain the optimized coordinate information corresponding to the target area to be optimized.
[0097] Specifically, a first weight may be configured for the first coordinate information determined based on the first trajectory and the corresponding original mapping data, and a second weight may be configured for the second coordinate information determined based on the second trajectory and the corresponding original mapping data, wherein the first weight may be less than the second weight, may be equal to the second weight, or may be greater than the second weight, and the specific weight may be determined according to actual needs and is not limited here.
[0098] Based on the above method, the coordinate information of the target area to be optimized can be continuously optimized according to the newly obtained trajectory involving the target area to be optimized, so as to continuously improve the accuracy of the target map.
[0099] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0100] This application also proposes a map management device, such as Figure 8 As shown, Figure 8 It is a structural diagram of an embodiment of a map management device of the present application. The map management device 80 includes: a processor 81, a memory 82 and a bus 88.
[0101] The processor 81 and the memory 82 are connected to the bus 88 respectively. The memory 82 stores program instructions. The processor 81 is used to execute the program instructions to implement the map management method in the above embodiment.
[0102] In this embodiment, the processor 81 may also be referred to as a CPU (Central Processing Unit). The processor 81 may be an integrated circuit chip having signal processing capabilities. The processor 81 may also be a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components. A general-purpose processor may be a microprocessor or the processor 81 may also be any conventional processor, etc.
[0103] Specifically, the map management device 80 can be a server or a module in the server, which can communicate with the client to receive the update operation instruction sent by the client or send relevant data to the client. The client can be a vehicle-mounted device, a mobile phone, a computer or other communication device, which is not limited here.
[0104] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0105] The present application also proposes a computer-readable storage medium, such as Fig. 9 As shown, Fig. 9 It is a structural diagram of an embodiment of a computer-readable storage medium of the present application. The computer-readable storage medium 90 stores program instructions 91 thereon. When the program instructions 91 are executed by a processor (not shown in the figure), the map management method in the above embodiment is implemented.
[0106] The computer-readable storage medium 90 of this embodiment may be, but is not limited to, a USB flash drive, an SD card, a PD optical drive, a mobile hard disk, a large-capacity floppy drive, a flash memory, a multimedia memory card, a server, a storage unit in an FPGA or an ASIC, etc.
[0107] Different from the prior art, the technical solution of the present application can first determine the area to be updated in the target map, then search for at least one to-be-deleted track corresponding to the area to be updated from the preset posture database, and then determine the original mapping data corresponding to the at least one to-be-deleted track, and finally delete the mapping data corresponding to the original mapping data in the target map to complete the update. Based on the above method, the original mapping data used to construct the corresponding target map can be found through the track corresponding to the area to be updated in the posture database, and then the mapping data in the target map corresponding to the corresponding original mapping data can be deleted, so as to accurately and efficiently complete the deletion of the data in the target map, so as to update the target map, thereby improving the reliability and management efficiency of the map management method.
[0108] The above description is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A map management method, It is characterized in that include: Determine the area to be updated in the target map; Determine at least one to-be-deleted track in the pose database corresponding to the area to be updated; Based on the at least one trajectory to be deleted, determining at least one data to be deleted, wherein the data to be deleted is original mapping data corresponding to the trajectory to be deleted; Deleting mapping data corresponding to each of the to-be-deleted data in the target map; Acquire the trajectory to be updated corresponding to the area to be updated, and the original mapping data corresponding to the trajectory to be updated; Storing the trajectory to be updated and the corresponding relationship between the trajectory to be updated and the corresponding original mapping data in the posture database; The original mapping data corresponding to the trajectory to be updated is mapped to the area to be updated, so as to add corresponding mapping data in the area to be updated.
2. The map management method according to claim 1, It is characterized in that Also includes: Determine the target original mapping data; Based on the target original mapping data, at least one to-be-downloaded trajectory corresponding to the target original mapping data in the pose database is determined and sent to the client.
3. The map management method according to claim 1, It is characterized in that Also includes: Determining a target area in the target map; Based on the target area, at least one to-be-downloaded trajectory corresponding to the target area and original mapping data corresponding to each to-be-downloaded trajectory in the pose database are determined and provided to the client.
4. The map management method according to any one of claims 1 to 3, It is characterized in that Also includes: Determine all mapping trajectories in the pose database corresponding to the target map; Determining an update time corresponding to each of the mapping trajectories; Based on the update time corresponding to each of the mapping trajectories, the target map is divided into a low freshness area, a medium freshness area and a high freshness area.
5. The map management method according to any one of claims 1 to 3, It is characterized in that Also includes: Determine a feature area to be added in the target map; Determine at least one feature track to be added in the pose database corresponding to the feature area to be added; Based on the at least one feature trajectory to be added, determining at least one feature data to be added, wherein the feature data to be added is original mapping data corresponding to the feature trajectory to be added; Generate map feature data based on the at least one feature data to be added; The map feature data is added to the target map to increase the map features.
6. The map management method according to any one of claims 1 to 3, It is characterized in that Also includes: Acquire a first track and a second track corresponding to the target area to be optimized in the target map, wherein the generation time of the first track is earlier than the generation time of the second track; The target area to be optimized is optimized based on the original mapping data corresponding to the first trajectory and the original mapping data corresponding to the second trajectory.
7. The map management method according to claim 6, It is characterized in that The original mapping data corresponding to the first trajectory includes first coordinate information corresponding to the target area to be optimized, and the original mapping data corresponding to the second trajectory includes second coordinate information corresponding to the target area to be optimized; The step of optimizing the target area to be optimized based on the original mapping data corresponding to the first trajectory and the original mapping data corresponding to the second trajectory comprises: Based on the first coordinate information, the second coordinate information, the first weight corresponding to the first coordinate information and the second weight corresponding to the second coordinate information, the sum of the weights of the first coordinate information and the second coordinate information is calculated to obtain the optimized coordinate information corresponding to the target area to be optimized.
8. A map management device, It is characterized in that include: Memory and processor; The memory is used to store program instructions, and the processor is used to execute the program instructions to implement the method according to any one of claims 1 to 7.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores program instructions, and when the program instructions are executed by a processor, the method according to any one of claims 1 to 7 is implemented.
