A day-ahead market clearing method and system that takes into account both economy and fairness

By building a power market transaction clearing model that considers backup fairness, the problems of insufficient backup and fairness in power system scheduling under the incomplete market model are solved, and both economic and fairness are taken into account, and technical support for market deepening reform is provided. .

CN114119095BActive Publication Date: 2024-11-01POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111442551.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-30
Publication Date
2024-11-01
Estimated Expiration
2041-11-30

AI Technical Summary

Technical Problem

Under the incomplete market model, the abundance of system backup and the fairness of backup auxiliary services cannot be guaranteed in the power system scheduling, and the production costs of power generation companies cannot be fully quantified, which will affect the deepening of market reform.

Method used

By building a power market transaction clearing model that considers backup fairness, obtain external data, build grid operation, backup fairness and power operation characteristics constraints, use branch bounding planning or third-party software packages for solution, optimize power purchase costs to achieve Take into account both economics and fairness.

Benefits of technology

In the incomplete market model, the scheduling decision-making results take into account both economic and fairness, provide technical support for deepening market reform, ensure the abundant system backup and fairness of backup auxiliary services, and quantify the production costs of power generation enterprises. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114119095B_ABST
    Figure CN114119095B_ABST
Patent Text Reader

Abstract

The present application relates to a day-ahead market clearing method and system that takes into account both economy and fairness, and belongs to the technical field of power system dispatching. The method of the present application includes obtaining external data required for market clearing processing; considering the transaction requirements of the electric energy market, with the lowest electricity purchase cost as the optimization goal, and at the same time, based on the external data, constructing constraints, the constraints include: power grid operation constraints, reserve fairness constraints, and power supply operation characteristic constraints; according to the optimization goals and constraints, constructing an electricity market transaction clearing model that takes into account reserve fairness, solving the electricity market transaction clearing model, and obtaining a clearing result. The technical solution of the present application, by considering the reserve fairness factor in the construction and processing of the electricity market transaction clearing model, the dispatching decision result obtained takes into account both economy and fairness. The technical solution can effectively provide technical support for the deepening of market reforms.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of power system dispatching, and specifically relates to a day-ahead market clearing method and system that takes into account both economy and fairness. Background Art

[0002] At present, my country is in the stage of deepening the reform of the power market. The pilot construction of the power spot market is gradually accelerating, and ancillary service markets such as peak load regulation and frequency regulation have been successfully implemented in some provinces and regions. However, due to the differences in the progress of market construction in different provinces and regions, the construction of the power energy market and the ancillary service market is not completely synchronized, which leads to the problem of market mechanism design under the incomplete market model.

[0003] The so-called incomplete market model refers to the fact that some of the power generation resources with strong coupling have been introduced into the market mechanism and a market transaction clearing mechanism with economic efficiency as the goal has been established, while some power generation resources have not yet established a market mechanism. In principle, they should follow the principle of "three public dispatches" and be fairly called by the dispatching agency according to actual needs. The above problems are most prominent in the field of power spot market. For power generation units, electric energy and standby auxiliary services are tightly coupled power generation resources, and there is a mutually exclusive relationship. That is, when a certain power generation unit provides electric energy services, the winning part of the capacity does not have the ability to provide standby auxiliary services; similarly, when it provides standby auxiliary services, it cannot provide electric energy auxiliary services.

[0004] Judging from the current market mechanisms in various pilot areas of the electricity spot market, the electric energy market trading mechanism has generally been established, while the market mechanism corresponding to the backup ancillary service has yet to be established. The pilot areas often adopt the solution of market transaction clearing priority. The basic idea is to build an electric energy spot market clearing model with economic efficiency as the goal; according to the market clearing results, the system operation backup requirements are comprehensively considered to determine the backup ancillary services undertaken by each generator in the system.

[0005] This kind of market-based trading mechanism is established first for some power service varieties, while the administrative model is still continued for some trading varieties. It is an inevitable process of my country's power market reform. Judging from the current progress of market construction, the above situation will continue for a long time, which means that the market decision-making method of the above incomplete market model needs to be established urgently to effectively achieve the market clearing of power service varieties that have been included in market transactions and the fair call of power service varieties that have not been included in market transactions. Electric energy and backup auxiliary services are two types of resources necessary for the dispatching and operation of power systems. The current decision-making method for calling electric energy and backup auxiliary services has the following three problems:

[0006] (1) The adequacy of system reserve cannot be guaranteed, and there is a potential safety risk of insufficient reserve. Due to the priority of conducting bidding and clearing in the electricity market, the remaining power generation capacity of the generator sets is used to arrange backup auxiliary services, and the adequacy of the remaining power generation capacity cannot be guaranteed. If the overall power supply capacity is tight, there may be a risk of insufficient reserve, which will affect the operation of the system;

[0007] (2) The fairness of the preparation of the reserve ancillary service plan cannot be guaranteed, and there are problems that affect the "three public dispatches" of the power system. Since there is a mutual exclusion between the power of the generator set and the reserve ancillary service, if the remaining power generation capacity after the completion of the economic clearing of the power market is unevenly distributed among the power generation enterprises, it is impossible to ensure that the reserve ancillary service is arranged according to the "three public dispatches" principle;

[0008] (3) The inability to fully quantify the production costs of power generation companies is not conducive to the subsequent deepening of market reforms. For power generation companies, both electricity and backup ancillary services have certain production and operation costs. Since the market trading mechanism for backup ancillary services has not yet been established under the incomplete market model, the corresponding production and operation costs are difficult to quantify, which distorts the price declaration of market members and is inconsistent with the direction of deepening market reforms.

[0009] To this end, it is urgently necessary to construct a market dispatch decision-making method that takes into account both economy and fairness under the incomplete market model of electricity and reserve ancillary services, and provide technical support for deepening market reforms.

[0010] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0011] In order to overcome the problems existing in the related technologies at least to a certain extent, the present application provides a day-ahead market clearing method and system that takes into account both economy and fairness, which helps to achieve day-ahead market clearing processing that takes into account both economy and fairness under the current incomplete market model.

[0012] To achieve the above objectives, this application adopts the following technical solutions:

[0013] First,

[0014] The present application provides a day-ahead market clearing method that takes into account both economy and fairness, and the method comprises:

[0015] Obtain external data required for market clearing processing;

[0016] Considering the transaction requirements of the electric energy market, the optimization goal is to meet the lowest power purchase cost. At the same time, based on the external data, the constraint conditions are constructed, and the constraint conditions include: power grid operation constraints, reserve fairness constraints and power supply operation characteristic constraints;

[0017] According to the optimization objectives and constraints, a power market transaction clearing model considering reserve fairness is constructed, the power market transaction clearing model is solved, and a clearing result is obtained.

[0018] Optionally, the obtaining of external data required for market clearing processing includes:

[0019] Obtain dispatching operation data from the dispatching energy management system, and obtain market declaration data from the power market trading system;

[0020] The dispatching operation data includes: information on the number of optimization periods, corresponding time intervals, the number of generator sets in the system, the number of load nodes in the system, the load demand information of each load node in each period, the transmission capacity limit information of each operation section, the power transfer distribution factor information of the generator sets, load nodes and operation sections, the operation standby demand information, the maximum technical output of each generator set and the maximum and minimum climbing capacity information;

[0021] The market declaration data includes: market declaration price information of electric energy of power generator sets.

[0022] Optionally, the optimization objective is expressed based on the following expression:

[0023]

[0024] Among them, Min means that the optimization is a minimization optimization problem, NT means the number of optimization periods, ΔT means the corresponding time interval, NG means the number of generator sets, represents the market price of electricity energy of generator g, represents the electric energy generation plan of the generator group g during period t, represents the electricity market purchase cost of the generator set g during period t, It represents the electricity purchase cost of all generators in the whole network during the entire optimization period.

[0025] Optionally, the power grid operation constraints include:

[0026]

[0027]

[0028]

[0029] Among them, NB represents the number of load nodes in the system, represents the load demand of load node b at time period t, They represent the upper and lower limits of the transmission capacity of the operating section s, respectively, GSDF g,s GSDF b,sThey represent the power transfer distribution factors of the generator set g and the load node b and the operating section s, respectively, R g represents the system reserve capacity undertaken by generator set g, R Nee Operational backup requirements are necessary for the safe operation of the system.

[0030] Optionally, the backup fairness constraint includes:

[0031]

[0032]

[0033]

[0034] Among them, Rr g Indicates the reserve rate of generator set g, Rr Ave Indicates the average standby rate of the entire network. Indicates the maximum technical output of generator set g.

[0035] Optionally, the power supply operation characteristic constraint includes:

[0036]

[0037]

[0038] in, They respectively represent the maximum and minimum climbing capabilities of the generator set g.

[0039] Optionally, the electricity market transaction clearing model is solved based on a branch and bound programming method or by calling a third-party software package.

[0040] Optionally, the third-party software package includes a Cplex commercial software package.

[0041] Second,

[0042] The present application provides a day-ahead market clearing system that takes into account both economy and fairness, the system comprising:

[0043] The acquisition module is used to obtain external data required for market clearing processing;

[0044] A modeling module is used to consider the transaction requirements of the electric energy market, to meet the lowest power purchase cost as the optimization goal, and at the same time, to build constraints based on the external data, the constraints include: power grid operation constraints, reserve fairness constraints and power supply operation characteristic constraints;

[0045] The solution processing module is used to construct an electricity market transaction clearing model that takes into account reserve fairness according to the optimization objectives and constraints, solve the electricity market transaction clearing model, and obtain the clearing result.

[0046] This application adopts the above technical solution, which has at least the following beneficial effects:

[0047] The technical solution of the present application takes into account the reserve fairness factor in the construction and processing of the electricity market transaction clearing model, and the obtained dispatch decision results take into account both economy and fairness. This technical solution can effectively provide technical support for the deepening of market reforms.

[0048] Other advantages, objectives, and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description, as well as the structures particularly pointed out in the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The accompanying drawings are used to provide a further understanding of the technical solution of the present application or the prior art, and constitute a part of the specification. Among them, the accompanying drawings expressing the embodiments of the present application are used together with the embodiments of the present application to explain the technical solution of the present application, but do not constitute a limitation on the technical solution of the present application.

[0050] Figure 1 A flow chart of a day-ahead market clearing method that takes into account both economy and fairness in one embodiment of the present application;

[0051] Figure 2 A flow chart of a day-ahead market clearing method that takes into account both economy and fairness in one embodiment of the present application;

[0052] Figure 3 This is a schematic diagram of the structure of a day-ahead market clearing system that takes into account both economy and fairness in one embodiment of the present application. DETAILED DESCRIPTION

[0053] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other implementation methods obtained by ordinary technicians in the field without creative work belong to the scope of protection of the present application.

[0054] As described in the background technology, from the perspective of the current market mechanisms in various pilot areas of the electricity spot market, the electric energy market trading mechanism has generally been established, while the market mechanism corresponding to the backup auxiliary service has yet to be established. The pilot areas often adopt the solution of market transaction clearing priority. The basic idea is to build an electric energy spot market clearing model with economic efficiency as the goal; according to the market clearing results, the system operation backup requirements are comprehensively considered to determine the backup auxiliary services undertaken by each generator set in the system.

[0055] This kind of market-based trading mechanism is established first for some power service varieties, while the administrative model is still continued for some trading varieties. It is an inevitable process of my country's power market reform. Judging from the current progress of market construction, the above situation will continue for a long time, which means that the market decision-making method of the above incomplete market model needs to be established urgently to effectively achieve the market clearing of power service varieties that have been included in market transactions and the fair call of power service varieties that have not been included in market transactions. Electric energy and backup auxiliary services are two types of resources necessary for the dispatching and operation of power systems. The current decision-making method for calling electric energy and backup auxiliary services has the following three problems:

[0056] (1) The adequacy of system reserve cannot be guaranteed, and there is a potential safety risk of insufficient reserve. Due to the priority of conducting bidding and clearing in the electricity market, the remaining power generation capacity of the generator sets is used to arrange backup auxiliary services, and the adequacy of the remaining power generation capacity cannot be guaranteed. If the overall power supply capacity is tight, there may be a risk of insufficient reserve, which will affect the operation of the system;

[0057] (2) The fairness of the preparation of the reserve ancillary service plan cannot be guaranteed, and there are problems that affect the "three public dispatches" of the power system. Since there is a mutual exclusion between the power of the generator set and the reserve ancillary service, if the remaining power generation capacity after the completion of the economic clearing of the power market is unevenly distributed among the power generation enterprises, it is impossible to ensure that the reserve ancillary service is arranged according to the "three public dispatches" principle;

[0058] (3) The inability to fully quantify the production costs of power generation companies is not conducive to the subsequent deepening of market reforms. For power generation companies, both electricity and backup ancillary services have certain production and operation costs. Since the market trading mechanism for backup ancillary services has not yet been established under the incomplete market model, the corresponding production and operation costs are difficult to quantify, which distorts the price declaration of market members and is inconsistent with the direction of deepening market reforms.

[0059] To this end, it is urgently necessary to construct a market dispatch decision-making method that takes into account both economy and fairness under the incomplete market model of electricity and reserve ancillary services, and provide technical support for deepening market reforms.

[0060] In view of this, the present application proposes a day-ahead market clearing method that takes into account both economy and fairness, which helps to achieve day-ahead market clearing processing that takes into account both economy and fairness under the current incomplete market model.

[0061] like Figure 1 As shown, in one embodiment, the day-ahead market clearing method proposed in this application that takes into account both economy and fairness includes the following steps:

[0062] Step S110, obtaining external data required for market clearing processing;

[0063] Step S120, considering the electric energy market transaction requirements, taking the lowest power purchase cost as the optimization goal, and at the same time, constructing constraint conditions based on external data, wherein the constraint conditions include: power grid operation constraints, reserve fairness constraints, and power supply operation characteristic constraints;

[0064] Step 130, constructing a power market transaction clearing model that takes reserve fairness into consideration according to the optimization objective and constraints, solving the power market transaction clearing model, and obtaining a clearing result.

[0065] The technical solution of the present application takes into account the reserve fairness factor in the construction and processing of the electricity market transaction clearing model, and the obtained dispatch decision results take into account both economy and fairness. This technical solution can effectively provide technical support for the deepening of market reforms.

[0066] To facilitate understanding of the technical solution of the present application, the technical solution of the present application is introduced and explained with reference to another embodiment below.

[0067] In this embodiment, if Figure 2 As shown, it is also necessary to first obtain the external data required for market clearing processing.

[0068] Specifically, in this embodiment, the dispatching operation data is obtained from the external dispatching energy management system, and the market declaration data is obtained from the power market trading system;

[0069] For example, the dispatching operation data specifically carries: information on the number of optimization time periods, corresponding time intervals, the number of generator sets in the system, the number of load nodes in the system, the load demand information for each load node in each time period, the transmission capacity limit information for each operating section, the power transfer distribution factor information for generator sets, load nodes and operating sections, the operation standby demand information, the maximum technical output of each generator set and the maximum and minimum climbing capacity information;

[0070] Market declaration data includes: market declaration price information of electricity energy of power generators.

[0071] Afterwards Figure 2As shown, considering the transaction requirements of the electric energy market in the incomplete market, the optimization goal is to meet the minimum electricity purchase cost, that is, to construct the optimization goal of the minimum electricity purchase cost. In this embodiment, the optimization goal is expressed based on the following expression:

[0072]

[0073] In expression (1), Min indicates that the optimization is a minimization optimization problem, NT indicates the number of optimization periods, ΔT indicates the corresponding time interval, NG indicates the number of generator sets, represents the market price of electricity energy of generator g, represents the electric energy generation plan of the generator group g during period t, represents the electricity market purchase cost of the generator set g during period t, It represents the electricity purchase cost of all generators in the whole network during the entire optimization period.

[0074] like Figure 2 As shown, the process of constructing constraint conditions in this embodiment includes three aspects: constructing grid operation constraints, constructing standby fairness constraints, and constructing power supply operation characteristic constraints, which are explained separately below.

[0075] The purpose of constructing grid operation constraints is to present the conditions that must be met for grid operation in the form of operation constraints and use them as constraints for the optimization problem, thereby ensuring that the clearing results meet the basic requirements for grid operation. Generally speaking, grid operation constraints need to consider power balance, section transmission capacity limitations, system backup requirements, etc. In this embodiment, grid operation constraints include:

[0076]

[0077]

[0078]

[0079] In the above expressions (2) to (4), NB represents the number of load nodes in the system. represents the load demand of load node b at time period t, They represent the upper and lower limits of the transmission capacity of the operating section s, respectively, GSDF g,s GSDF b,s They represent the power transfer distribution factors of the generator set g and the load node b and the operating section s, respectively, R g represents the system reserve capacity undertaken by generator set g, R Nee Operational backup requirements are necessary for the safe operation of the system.

[0080] The purpose of constructing the reserve fairness constraint is to construct the reserve fairness constraint condition with the requirement of equal reserve rate, so as to ensure that the reserve capacity arrangement of the generator set in the clearing result can meet the fairness requirements of "three public dispatch". The so-called reserve rate refers to the ratio between the power generation reserve capacity undertaken by the generator set and its maximum technical output. In this embodiment, the reserve fairness constraint includes:

[0081] R g =Rr Ave (5)

[0082]

[0083]

[0084] In expressions (5) to (7), Rr g Indicates the reserve rate of generator set g, Rr Ave Indicates the average standby rate of the entire network. Indicates the maximum technical output of generator set g.

[0085] It is easy to understand that the above expression (6) shows that the reserve rate of a generator set is the ratio of its reserve capacity to its maximum technical output, and the above expression (7) shows that the average reserve rate of the entire network is the ratio of the operating reserve demand to the sum of the maximum technical outputs of all generator sets.

[0086] The purpose of constructing power supply operation characteristic constraints is to incorporate the operation characteristics that must be met by the generator set into the optimization model in the form of constraints. The operation characteristic constraints that need to be considered for the generator set include two aspects: power generation capacity constraints and ramp constraints. In this embodiment, the power supply operation characteristic constraints include:

[0087]

[0088]

[0089] In expressions (8) and (9), They respectively represent the maximum and minimum climbing capabilities of the generator set g.

[0090] Finally, if Figure 2 The modeling and solving steps are shown, that is, according to the optimization objectives and constraints mentioned above, a power market transaction clearing model considering reserve fairness is constructed, the power market transaction clearing model is solved, and the clearing result is obtained.

[0091] In this step, the optimization model required is constructed by taking expression (1) as the optimization target and expressions (2)-(9) as the constraints. This model is essentially a linear programming problem, which will be transformed into a mixed integer programming problem when the segmented quotation mode is adopted.

[0092] In the actual solution process, planning methods such as branch and bound can be used or third-party software (such as commercial software packages such as Cplex) can be called to perform solution processing to obtain clearing results.

[0093] The above method realizes the construction of a market dispatch decision-making method that takes into account both economy and fairness under the incomplete market model of electric energy and reserve ancillary services, which can provide strong technical support for the deepening of market reform.

[0094] Figure 3 A schematic diagram of the structure of a day-ahead market clearing system that takes into account both economy and fairness is provided in one embodiment of the present application, as shown in FIG. Figure 3 As shown, the day-ahead market clearing system 300 that takes into account both economy and fairness includes:

[0095] An acquisition module 301 is used to acquire external data required for market clearing processing;

[0096] The modeling module 302 is used to consider the electric energy market transaction requirements, to meet the lowest power purchase cost as the optimization goal, and at the same time, to construct constraint conditions based on the external data, the constraint conditions including: power grid operation constraint, reserve fairness constraint and power supply operation characteristic constraint;

[0097] The solution processing module 303 is used to construct a power market transaction clearing model considering reserve fairness according to the optimization objectives and constraints, solve the power market transaction clearing model, and obtain the clearing result.

[0098] Regarding the day-ahead market clearing system 300 that takes into account both economy and fairness in the above-mentioned related embodiments, the specific manner in which each module performs operations has been described in detail in the embodiments of the method, and will not be elaborated here.

[0099] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0100] It should be noted that, in the description of this application, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of this application, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0101] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0102] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0103] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0104] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0105] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.

[0106] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0107] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A day-ahead market clearing method that takes into account both economy and fairness, characterized in that: include: Obtain external data required for market clearing processing; Considering the transaction requirements of the electric energy market, the optimization goal is to meet the lowest power purchase cost. At the same time, based on the external data, the constraint conditions are constructed, and the constraint conditions include: power grid operation constraints, reserve fairness constraints and power supply operation characteristic constraints; According to the optimization objectives and constraints, a power market transaction clearing model considering reserve fairness is constructed, and the power market transaction clearing model is solved to obtain a clearing result; Among them, the external data required for market clearing processing includes: obtaining dispatching operation data from the dispatching energy management system, and obtaining market declaration data from the power market trading system; the dispatching operation data carries: information on the number of optimization time periods, corresponding time intervals, the number of generator sets in the system, the number of load nodes in the system, the load demand information of each load node in each time period, the transmission capacity limit information of each operating section, the power transfer distribution factor information of the generator set, load node and operating section, the operation standby demand information, the maximum technical output of each generator set and the maximum and minimum climbing capacity information; the market declaration data carries: the market declaration price information of the electric energy of the generator set; The optimization objective is expressed based on the following expression: Among them, Min indicates that the optimization is a minimization optimization problem, NT indicates the number of optimization periods, ΔT indicates the corresponding time interval, and NG indicates the number of generator sets. represents the market price of electricity from generator g, represents the electric energy generation plan of the generator group g during period t, represents the electricity market purchase cost of the generator set g during period t, It represents the electricity purchase cost of all generators in the whole network during the entire optimization period; The power grid operation constraints include: Among them, NB represents the number of load nodes in the system, represents the load demand of load node b at time period t, They represent the upper and lower limits of the transmission capacity of the operating section s, respectively, GSDF g,s GSDF b,s They represent the power transfer distribution factors of the generator set g and the load node b and the operating section s, respectively, R g represents the system reserve capacity undertaken by generator set g, R Nee Operational standby requirements necessary for safe operation of the system; The backup fairness constraints include: Rr g =Rr Ave , Among them, Rr g Indicates the reserve rate of generator set g, Rr Ave Indicates the average standby rate of the entire network. Indicates the maximum technical output of the generator set g; The power supply operation characteristic constraints include: in, They respectively represent the maximum and minimum climbing capabilities of the generator set g.

2. The method according to claim 1, characterized in that The electricity market transaction clearing model is solved based on a branch and bound programming method or by calling a third-party software package.

3. The method according to claim 2, characterized in that The third-party software package includes the Cplex commercial software package.

4. A day-ahead market clearing system that takes into account both economy and fairness, characterized in that: Used to perform the method according to any one of claims 1 to 3, comprising: The acquisition module is used to obtain external data required for market clearing processing; A modeling module is used to consider the transaction requirements of the electric energy market, to meet the lowest power purchase cost as the optimization goal, and at the same time, to build constraints based on the external data, the constraints include: power grid operation constraints, reserve fairness constraints and power supply operation characteristic constraints; The solution processing module is used to construct an electricity market transaction clearing model that takes into account reserve fairness according to the optimization objectives and constraints, solve the electricity market transaction clearing model, and obtain the clearing result.