Power control system and method for fuel cell test laboratory

The power control system for fuel cell test laboratories addresses power consumption imbalances by using hot air blowers and cooling air conditioners to manage excess electricity and temperature, ensuring safe and stable operations.

CN114335605BActive Publication Date: 2024-12-06BEIJING SINOHYTEC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210147622.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-17
Publication Date
2024-12-06
Estimated Expiration
2042-02-17

AI Technical Summary

Technical Problem

Fuel cell test laboratories face issues with unreasonable power consumption, leading to excess power generation in winter that can damage transformers and unsuitable laboratory temperatures due to low winter temperatures.

Method used

A power control system that includes a fuel cell stack, DC-DC converter, feedback electronic load, single cooling air conditioner, hot air blower, and controller, which adjusts power consumption by using hot air blowers in winter to dissipate excess electricity as heat and cooling air conditioners in summer to regulate temperature and prevent transformer overload.

Benefits of technology

The system ensures safe, continuous, and stable operation of fuel cell tests by managing power consumption, maintaining suitable laboratory temperatures, and preventing transformer damage, while reducing energy waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114335605B_ABST
    Figure CN114335605B_ABST
Patent Text Reader

Abstract

The present invention provides a power control system for a fuel cell test laboratory, belongs to the field of fuel cell test technology, and solves the problem of unreasonable power consumption of existing fuel cell test systems. The system includes a battery stack, a DC-DC converter, a feedback electronic load, a single cold air conditioner, a hot air blower, an internal and external circulation water pump, a plate temperature control device, a chiller, and a controller. The power supply end of the battery stack is connected to the power supply grid through the DC-DC converter and the feedback electronic load in turn; the output end of the power supply grid is connected to the single cold air conditioner in one way, and the other is connected to the AC resistor in the hot air blower. The controller is used to determine whether the difference between the power generation and the required power exceeds the power storage capacity of the grid transformer. If so, the hot air blower is started to push hot air to the laboratory when the room temperature is lower than the set value, and the single cold air conditioner is started to push cold air to the laboratory when the room temperature is higher than the set value, otherwise, the energy saving mode is entered. The feedback power of each test bench is inconsistent. By increasing the load, the excess power is dissipated to avoid damage to the upstream transformer, and at the same time, this part of the energy is reasonably used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of fuel cells, and in particular to a power control system and method for a fuel cell testing laboratory. Background Art

[0002] At present, fuel cell tests in laboratories are mostly used for feedback loads. The electric energy generated by the fuel cell converts direct current into alternating current through the feedback load and feeds it back to the power grid. In summer, it can be used to power auxiliary equipment chillers and single-cold air conditioners to save factory electricity. However, in winter, the power consumption of auxiliary equipment decreases, and the power generation of the fuel cell is greater than the power consumption, which will cause part of the power to be fed back to the upper-level power grid. If the fed-in power is greater than the transformer capacity, it will cause certain dangers. In addition, the current laboratory environment temperature in winter is relatively low, which is not suitable for long-term work of testers.

[0003] Patent CN209803302U mainly utilizes the feedback of fuel cell power generation to store the electric energy generated during the electrochemical test of the fuel cell in the energy storage battery, avoiding the energy waste of conventional resistive loads that consumes the electric energy generated by the fuel cell system through heat energy. However, due to different test conditions, the laboratory's power grid transformer capacity test has a large deviation, which may result in excessive or no margin. Summary of the invention

[0004] In view of the above analysis, an embodiment of the present invention aims to provide a power consumption control system for a fuel cell test laboratory, so as to solve the problem of unreasonable power consumption of existing fuel cell test systems.

[0005] On the one hand, an embodiment of the present invention provides a power control system for a fuel cell test laboratory, including a fuel cell stack, a DC-DC converter, a feedback electronic load, a single cooling air conditioner, a hot air blower, an internal and external circulation water pump, a plate temperature control device, a chiller, and a controller; wherein,

[0006] The coolant outlet of the stack is connected to its coolant inlet via the internal circulation water pump and the branch one of the plate-changing temperature control device in sequence; the water outlet of the chiller is connected to its water inlet via the external circulation water pump and the branch two of the plate-changing temperature control device in sequence; the power supply end of the stack is connected to the power supply grid via the DC-DC converter and the feedback electronic load in sequence, and the output end of the power supply grid is connected to the single-cold air conditioner on one path, and connected to the AC resistor in the hot air blower on the other path;

[0007] The controller is used to monitor the indoor temperature T and obtain the power demand Q of the electrical equipment at the next moment. 消耗,t+1 , the total power generation of the stack at the current moment is Q 发电,t ; and, judge Q 发电,t With Q 消耗,t+1 Does the difference exceed the power storage capacity of the grid transformer (capacity - available power)?变压器 If yes, start the hot air blower to push hot air to the laboratory when T is lower than the set value, and start the single cooling air conditioner to push cold air to the laboratory when T is higher than the set value until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the blower or cooling-only air conditioner, otherwise, enter energy-saving mode.

[0008] The beneficial effects of the above technical solution are as follows: in winter cold weather, the above power control system uses the hot air blower to consume excess electricity, avoids the generated electricity exceeding the storage capacity of the grid transformer, and converts electricity into waste heat to improve the winter temperature of the laboratory plant; in summer hot weather, it supplies power to the single cooling air conditioner to consume excess energy. The coordinated use of the above structure makes the power supply control system safer and suitable for long-term work of test personnel.

[0009] Based on the further improvement of the above system, the controller is also used to monitor the total power consumption Q of the electrical equipment at the current moment. 消耗,t ; and, according to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 (- indicates the minus operator) If the load exceeds the maximum load of the laboratory, the electrical equipment is controlled to shift the peak load. Otherwise, all electrical equipment is controlled to enter the preset operating state at the next moment. If it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the electrical equipment will be controlled to shift the peak load; otherwise, all electrical equipment will be controlled to maintain the current operating status.

[0010] The beneficial effects of the above further scheme are as follows: through the above scheme, the electricity cost can be effectively controlled, the fuel cell test system is guaranteed to be safe, continuous and stable during operation, and the test results are guaranteed to be reliable and accurate.

[0011] Furthermore, the power control system also includes an electrically controlled three-way valve; wherein,

[0012] The input end of the electric-controlled three-way valve is connected to the air outlet of the hot air blower, its output end 1 leads to the outside of the laboratory, its output end 2 leads to the corresponding post air supply outlet through the post air supply duct in the laboratory, and its control end is connected to the output end of the controller.

[0013] The beneficial effects of the above further scheme are as follows: by setting an electrically controlled three-way valve, the three-way valve switch on the pipeline is opened to the exhaust side (output end one) to dissipate heat when the temperature is high in summer. In winter, the three-way valve switch is opened to the post air supply duct (output end two), and the opening of the three-way valve is automatically adjusted according to the indoor temperature to adjust the indoor temperature.

[0014] Furthermore, the power control system also includes a filter, a deionization tank and a compensation water tank; wherein,

[0015] The filter is arranged between the output end of the internal circulation water pump and the condensate inlet of the plate exchange temperature control device, or between the condensate outlet of the plate exchange temperature control device and the coolant inlet of the fuel cell stack;

[0016] The coolant inlet of the battery stack is also connected to the compensation water tank through the deionization tank; a liquid level sensor is provided in the compensation water tank;

[0017] The hot air blower is composed of a fan of a cooling air conditioner and a heating resistor on a transmission pipeline.

[0018] The beneficial effects of the above further solution are as follows: the coolant entering the stack is purified by the filter, thereby increasing the service life of the stack. The deionization tank and the compensation water tank replenish the coolant lost during the operation of the stack. The above measures can improve the accuracy of the test results of the fuel cell.

[0019] Further, the controller comprises:

[0020] The data acquisition module is used to obtain the temperature T in the laboratory, the outdoor temperature T^, and the power demand Q of the electrical equipment at the next moment 消耗,t+1 , and the output current I of each fuel cell starting test bench in the laboratory are sent to the data analysis and control module;

[0021] The data analysis and control module is used to determine the total power generation Q of the fuel cell stack at the current moment based on the output current I received from each fuel cell engine test bench in the laboratory. 发电,t ; and, obtain the current moment power grid transformer can store power Q 变压器 , judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set value, the single cooling air conditioner is started to push cold air into the laboratory, and until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the blower or cooling-only air conditioner, otherwise, enter energy-saving mode.

[0022] The beneficial effects of the above further scheme are as follows: when the difference between the power generation and the power demand exceeds the power storage capacity of the grid transformer, the hot air blower is started to push hot air to the laboratory when the room temperature is lower than the set value, and the single cooling air conditioner is started to push cold air to the laboratory when the room temperature is higher than the set value, otherwise, the energy-saving mode is entered. The feedback power of each test bench is inconsistent. By increasing the load, the excess power is dissipated to avoid damage to the upstream grid transformer.

[0023] Furthermore, the data acquisition module further comprises:

[0024] The current detection sensor is installed on the branch where the feedback electronic load is located, and is used to obtain the output current of each fuel cell starting test bench in the laboratory;

[0025] Temperature sensors are located inside and outside the laboratory to obtain indoor temperature T and outdoor temperature T^;

[0026] The power acquisition submodule is used to obtain the power storage capacity Q of the grid transformer 变压器 , and the power demand Q of the electrical equipment at the next moment 消耗,t+1 .

[0027] The beneficial effects of the above further solution are as follows: through the above data acquisition module, a foundation is laid for accurate power consumption control.

[0028] Further, the data analysis and control module executes the following procedures:

[0029] According to the output current I of each fuel cell start-up test bench in the laboratory, the power generation of each fuel cell start-up test bench in a unit time period is obtained, and the results are summarized as the total power generation of the stack Q 发电,t ;

[0030] Get the current power grid transformer storage capacity Q 变压器 , and the total power consumption of the electrical equipment at the current moment Q 消耗,t ;

[0031] According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operating state unchanged, and other power consumption equipment enters the next operating state to stagger the peak. Otherwise, all power consumption equipment is controlled to enter the next operating state and execute the next step; if it increases, and Q 消耗,t+1 -Q 消耗,tIf the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating status and execute the next step;

[0032] Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding blower or cooling-only air conditioner; otherwise, enter energy-saving mode.

[0033] The beneficial effects of the above further scheme are as follows: it avoids excessive load on electrical equipment, and in the case of insufficient energy storage in the power grid, it can automatically consume energy for temperature regulation, thereby improving the environmental comfort of the test personnel.

[0034] On the other hand, the present invention also discloses a method for controlling power consumption of a fuel cell test laboratory, comprising the following steps:

[0035] A current detection sensor is added to the branch where the feedback electronic load of the fuel cell test system is located, and connected to the AC resistor in the hot air blower; and the single-cold air conditioner in the laboratory is connected to the power supply end of the fuel cell stack in the fuel cell test system;

[0036] Monitor the current indoor temperature T and obtain the power demand Q of the electrical equipment at the next moment 消耗,t+1 , and the total power generation of the battery stack Q 发电,t ;

[0037] Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed the power storage capacity Q of the grid transformer? 变压器 If yes, start the hot air blower to push hot air to the laboratory when T is lower than the set value, and start the single cooling air conditioner to push cold air to the laboratory when T is higher than the set value until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding hot air blower or cooling air conditioner, otherwise, enter energy-saving mode.

[0038] The beneficial effects of the above technical solution are as follows: in cold winter weather, the hot air blower is used to consume excess electricity to avoid the amount of electricity generated exceeding the storage capacity of the grid transformer, and the electricity is converted into waste heat to improve the winter temperature of the laboratory plant; in hot summer weather, the single-cooling air conditioner is powered to consume excess energy.

[0039] Furthermore, the total power generation of the stack is Q 发电,t Obtained through the following steps:

[0040] The output current I of each fuel cell starting test bench in the laboratory is obtained through the current detection sensor, and then the power generation of each fuel cell starting test bench in a unit time period is obtained;

[0041] The power generation of each fuel cell engine test bench is summarized, and the summary result is used as the total power generation of the fuel cell stack Q 发电,t .

[0042] The beneficial effects of the above further solution are as follows: the method is relatively simple, and accurate electrical control can be achieved by simply using the current on the feedback electronic load circuit as a reference for measuring power generation.

[0043] Further, the judgment Q 发电,t With Q 消耗,t+1 Does the difference exceed the power storage capacity Q of the grid transformer? 变压器 If yes, start the hot air blower to push hot air to the laboratory when T is lower than the set value, and start the single cooling air conditioner to push cold air to the laboratory when T is higher than the set value until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 The steps to shut down the blower or cooling-only air conditioner include:

[0044] Get the current power grid transformer storage capacity Q 变压器 , and the total power consumption of the electrical equipment at the current moment Q 消耗,t ;

[0045] According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operating state unchanged, and other power consumption equipment enters the next operating state to stagger the peak. Otherwise, all power consumption equipment is controlled to enter the next operating state and execute the next step; if it increases, and Q 消耗,t+1 -Q 消耗,tIf the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating status and execute the next step;

[0046] Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding blower or cooling-only air conditioner.

[0047] The beneficial effects of the above further scheme are as follows: it avoids excessive load on electrical equipment, and in the case of insufficient energy storage in the power grid, it can automatically consume energy for temperature regulation, thereby improving the environmental comfort of the test personnel.

[0048] This Summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary is not intended to identify key features or essential features of the disclosure, nor is it intended to limit the scope of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0050] Figure 1 A schematic diagram showing the composition of the power control system of the fuel cell test laboratory in Example 1 is shown;

[0051] Figure 2 A schematic diagram of the power control system composition of the fuel cell test laboratory in Example 2 is shown. DETAILED DESCRIPTION

[0052] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present disclosure more thorough and complete, and to fully convey the scope of the present disclosure to those skilled in the art.

[0053] As used herein, the term "including" and its variations mean open inclusion, i.e., "including but not limited to". Unless otherwise stated, the term "or" means "and / or". The term "based on" means "based at least in part on". The terms "an example embodiment" and "an embodiment" mean "at least one example embodiment". The term "another embodiment" means "at least one additional embodiment". The terms "first", "second", etc. may refer to different or the same objects. Other explicit and implicit definitions may also be included below.

[0054] Example 1

[0055] One embodiment of the present invention discloses a power control system for a fuel cell test laboratory, such as Figure 1 As shown, it includes a battery stack, a DC-DC converter, a feedback electronic load, a single-cold air conditioner, a hot air blower, internal and external circulation water pumps, a plate exchanger temperature control device, a chiller, and a controller.

[0056] Among them, the coolant outlet of the fuel cell stack is connected to its coolant inlet via the internal circulation water pump and branch one of the plate exchange temperature control device in sequence; the water outlet of the chiller is connected to its water inlet via the external circulation water pump and branch two of the plate exchange temperature control device in sequence; the power supply end of the fuel cell stack is connected to the power supply grid via the DC-DC converter and the feedback electronic load in sequence, and the output end of the power supply grid is connected to the single cooling air conditioner on one line, and connected to the AC resistor in the hot air blower on the other line.

[0057] The laboratory is equipped with battery stacks, DC-DC converters, internal circulation water pumps, plate temperature control equipment, post air supply ducts and post air supply outlets. Feedback electronic loads, single-cold air conditioners, hot air blowers, external circulation water pumps, and chillers can be installed outside or inside the laboratory.

[0058] The controller is used to monitor the indoor temperature T and obtain the power demand Q of the electrical equipment at the next moment. 消耗,t+1 , the total power generation of the stack at the current moment is Q 发电,t ; and, judge Q 发电,t With Q 消耗,t+1 Does the difference exceed the power storage capacity Q of the grid transformer? 变压器 If yes, start the hot air blower to push hot air to the laboratory when T is lower than the set value, and start the single cooling air conditioner to push cold air to the laboratory when T is higher than the set value until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the blower or single cooling air conditioner, otherwise, enter the energy-saving mode (that is, reasonably turn on the AC electronic load and adjust the air supply at the position).

[0059] There are many types of existing fuel cells, and the above power control system is applicable to all types of existing fuel cells. During the test, the fuel cell needs to be fed with air and fuel gas, which are omitted here and can be understood by those skilled in the art.

[0060] The feedback electronic load has a testing function and is a hardware used to simulate the power consumption environment of other electrical equipment. The simulation state parameters can be changed arbitrarily, so as to test the performance of the fuel cell under various normal and extreme conditions. It is a testing instrument composed of resistors, inductors, capacitors, transistors, and integrated circuits.

[0061] Electrical equipment refers to all electrical equipment used in fuel cell testing, such as air compressors, hydrogen injection equipment, refrigeration and air conditioning, hot air blowers, feedback electronic loads, internal and external circulation water pumps, etc.

[0062] Compared with the existing technology, the above-mentioned power control system uses a hot air blower to consume excess electricity in cold winter weather, avoids the amount of electricity generated exceeding the storage capacity of the grid transformer, and converts electricity into waste heat to improve the winter temperature of the laboratory plant; in hot summer weather, it supplies power to the single-cooling air conditioner to consume excess energy.

[0063] Example 2

[0064] Based on the optimization of Example 1, the controller is also used to monitor the total power consumption Q of the electrical equipment at the current moment. 消耗,t ; and, according to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load. Otherwise, all power-consuming equipment is controlled to enter the preset operating state at the next moment. If it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the electrical equipment will be controlled to shift the peak load; otherwise, all electrical equipment will be controlled to maintain the current operating status.

[0065] Preferably, a heat-insulating layer is provided on the walls of the laboratory to prevent high temperatures in summer from reducing the effectiveness of the refrigeration and air conditioning, and low temperatures in winter from reducing the effectiveness of the heating fan.

[0066] Upstream transformer capacity Q 变压器 Need to be greater than or equal to Q 发电,t With Q 消耗,t+1 Because the feedback power of each test bench is inconsistent, if the upstream transformer is small, it is necessary to increase the load (refrigeration air conditioner, hot air blower, feedback electronic load) to dissipate the excess power and avoid damage to the transformer.

[0067] Preferably, the hot air blower can be composed of a fan of a single cooling air conditioner and an AC resistor or other heating resistor. The heat generated by the AC resistor load is transmitted to the laboratory through the post air supply duct by the fan of the single cooling air conditioner to increase the temperature of the laboratory and optimize the ambient temperature of the experimenters.

[0068] Preferably, the power control system also includes an electrically controlled three-way valve, such as Figure 2 The input end of the electric-controlled three-way valve is connected to the air outlet of the hot air blower, the output end 1 leads to the outside of the laboratory, the output end 2 leads to the corresponding post air outlet through the post air supply duct in the laboratory, and the control end is connected to the output end of the controller.

[0069] Preferably, the power control system further includes a filter, a deionization tank and a compensation water tank. The filter is arranged between the output end of the internal circulation water pump and the condensate inlet of the plate exchange temperature control device, or between the condensate outlet of the plate exchange temperature control device and the coolant inlet of the stack; the coolant inlet of the stack is also connected to the compensation water tank via the deionization tank; and a liquid level sensor is arranged in the compensation water tank.

[0070] Preferably, the controller further comprises a data acquisition module and a data analysis and control module which are connected in sequence.

[0071] The data acquisition module is used to obtain the temperature T in the laboratory, the outdoor temperature T^, and the power demand Q of the electrical equipment at the next moment 消耗,t+1 , as well as the output current I of each fuel cell engine test bench in the laboratory, are sent to the data analysis and control module.

[0072] The data analysis and control module is used to determine the total power generation Q of the fuel cell stack at the current moment based on the output current I received from each fuel cell engine test bench in the laboratory. 发电,t ; and, obtain the current moment power grid transformer can store power Q 变压器 , judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set value, the single cooling air conditioner is started to push cold air into the laboratory, and until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the blower or cooling-only air conditioner, otherwise, enter energy-saving mode.

[0073] Preferably, the data acquisition module further includes a current detection sensor, a temperature sensor, and a power acquisition submodule.

[0074] The current detection sensor is arranged on the branch where the feedback electronic load is located, and is used to obtain the output current of each fuel cell starting test bench in the laboratory.

[0075] Temperature sensors are installed inside and outside the laboratory to obtain indoor temperature T and outdoor temperature T^.

[0076] The power acquisition submodule is used to obtain the power storage capacity Q of the grid transformer 变压器 , and the power demand Q of the electrical equipment at the next moment 消耗,t+1 . It can adopt the existing vehicle-mounted power acquisition module.

[0077] Preferably, the data analysis and control module executes the following procedures:

[0078] SS1. According to the output current I of each fuel cell start-up test bench in the laboratory, the power generation of each fuel cell start-up test bench in a unit time period is obtained, and the results are summarized as the total power generation of the stack Q 发电,t ;

[0079] SS2. Get the current power storage capacity Q of the grid transformer 变压器 , and the total power consumption of the electrical equipment at the current moment Q 消耗,t ;

[0080] SS3. According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operation state unchanged, and other power consumption equipment enters the next operation state for peak shifting. Otherwise, all power consumption equipment is controlled to enter the next operation state and execute step SS4; if it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating state and step SS4 is executed;

[0081] SS4. Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding blower or cooling-only air conditioner; otherwise, enter energy-saving mode.

[0082] Since the feedback power of each fuel cell test bench is inconsistent, if the upstream transformer is small, it is necessary to increase the load (refrigeration air conditioner, hot air blower, feedback electronic load) to dissipate the excess power and avoid damage to the transformer.

[0083] Compared with Example 1, in summer, the electric control three-way valve switch of the power control system provided in this embodiment is opened to the empty side of the output end to dissipate the heat. In winter, the switch is opened to the air supply duct at the output end and the opening of the three-way valve is automatically adjusted according to the indoor temperature to adjust the indoor temperature. Using AC resistance to generate heat and supply air can effectively increase the ambient temperature of the factory area, save laboratory operating costs, save electricity costs, and improve the comfort of the laboratory environment. At the same time, the generated feedback capacitance is prevented from causing damage to the transformer.

[0084] Example 3

[0085] The present invention further discloses a power consumption control method corresponding to the power consumption control system described in the above-mentioned embodiment 1 or 2, comprising the following steps:

[0086] S1. Add a current detection sensor to the branch where the feedback electronic load of the fuel cell test system is located, and connect it to the AC resistor in the hot air blower; and connect the single cold air conditioner in the laboratory to the power supply end of the stack in the fuel cell test system;

[0087] S2. Monitor the current indoor temperature T and obtain the power demand Q of the electrical equipment at the next moment 消耗,t+1 , and the total power generation of the battery stack Q 发电,t ;

[0088] S3. Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed the power storage capacity Q of the grid transformer? 变压器 If yes, start the hot air blower to push hot air to the laboratory when T is lower than the set value, and start the single cooling air conditioner to push cold air to the laboratory when T is higher than the set value until Q 发电,t With Q 消耗,t+1The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding hot air blower or cooling air conditioner, otherwise, enter energy-saving mode.

[0089] Example 4

[0090] Based on the optimization described in Example 3, the total power generation Q of the stack in step S2 is 发电,t Obtained through the following steps:

[0091] S21. The output current I of each fuel cell start-up test bench in the laboratory is obtained through the current detection sensor arranged in step S1, and then the power generation Q of each fuel cell start-up test bench in a unit time period is obtained. 发电,t,i ; Wherein, i represents the i-th fuel cell start-up test bench;

[0092] S22. Summarize the power generation of each fuel cell engine test bench and use the summed result as the total power generation of the stack Q 发电,t .

[0093] Preferably, step S3 is further refined as follows:

[0094] S31. Obtain the current power grid transformer storage capacity Q 变压器 , and the total power consumption of the electrical equipment at the current moment Q 消耗,t ;

[0095] S32. According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operating state unchanged, and other power consumption equipment enters the next operating state to stagger the peak. Otherwise, all power consumption equipment is controlled to enter the next operating state and execute the next step; if it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating status and execute the next step;

[0096] S33. Judgment Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed the power storage capacity Q of the grid transformer. 变压器 Turn off the corresponding blower or cooling-only air conditioner.

[0097] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The terms used herein are selected to best explain the principles of the embodiments, practical applications, or improvements over the prior art, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A power control system for a fuel cell test laboratory. It is characterized in that It includes a battery stack, a DC-DC converter, a feedback electronic load, a single cooling air conditioner, a hot air blower, an internal and external circulation water pump, a plate temperature control device, a chiller, an electronically controlled three-way valve, and a controller; among which, The coolant outlet of the stack is connected to its coolant inlet via the internal circulation water pump and the branch 1 of the plate-changing temperature control device in sequence; the water outlet of the chiller is connected to its water inlet via the external circulation water pump and the branch 2 of the plate-changing temperature control device in sequence; the power supply end of the stack is connected to the power supply grid via the DC-DC converter and the feedback electronic load in sequence; one output end of the power supply grid is connected to the single-cold air conditioner, and the other output end is connected to the AC resistor in the hot air blower; The input end of the electric-controlled three-way valve is connected to the air outlet of the hot air blower, the output end 1 thereof leads to the outside of the laboratory, the output end 2 thereof leads to the corresponding post air outlet through the post air supply duct in the laboratory, and the control end thereof is connected to the output end of the controller; The controller executes the following procedure: According to the output current I of each fuel cell startup test bench in the laboratory, the power generation of each fuel cell startup test bench in a unit time period is obtained, and the results are summarized as the total power generation of the stack at the current moment Q 发电,t ; Get the current power grid transformer storage capacity Q 变压器 , the total power consumption of the current equipment at the current moment Q 消耗,t , and obtain the current indoor temperature T, outdoor temperature T^, and obtain the power demand Q of the electrical equipment at the next moment 消耗,t+1 ; According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; if it decreases, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operating state unchanged, and other power consumption equipment enters the next operating state to stagger the peak. Otherwise, all power consumption equipment is controlled to enter the next operating state and execute the next step; if it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating status and execute the next step; Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed Q 变压器 Then turn off the corresponding blower or cooling-only air conditioner; otherwise, enter energy-saving mode.

2. The power control system for the fuel cell test laboratory according to claim 1, It is characterized in that It also includes a filter, a deionization tank and a compensation water tank; among which, The filter is arranged between the output end of the internal circulation water pump and the condensate inlet of the plate exchange temperature control device, or between the condensate outlet of the plate exchange temperature control device and the coolant inlet of the fuel cell stack; The coolant inlet of the stack is also connected to the compensation water tank through the deionization tank; a liquid level sensor is provided in the compensation water tank; and, The hot air blower is composed of a fan of a cooling air conditioner and a heating resistor on a transmission pipeline.

3. The power control system for a fuel cell test laboratory according to claim 1 or 2, It is characterized in that The controller includes a data acquisition module and a data analysis and control module; The data acquisition module is used to obtain the current laboratory temperature T, outdoor temperature T^, and the power demand Q of the electrical equipment at the next moment 消耗,t+1 , as well as the output current I of each fuel cell engine test bench in the laboratory, are sent to the data analysis and control module.

4. The power control system for the fuel cell test laboratory according to claim 3, It is characterized in that The data acquisition module further comprises: The current detection sensor is installed on the branch where the feedback electronic load is located, and is used to obtain the output current of each fuel cell starting test bench in the laboratory; Temperature sensors are located inside and outside the laboratory to obtain indoor temperature T and outdoor temperature T^; The power acquisition submodule is used to obtain the power storage capacity Q of the grid transformer at the current moment 变压器 , and the power demand Q of the electrical equipment at the next moment 消耗,t+1 .

5. A method for controlling power consumption in a fuel cell test laboratory. It is characterized in that The steps include: A current detection sensor is added to the branch where the feedback electronic load of the fuel cell test system is located, and connected to the AC resistor in the hot air blower; and the single-cold air conditioner in the laboratory is connected to the power supply end of the fuel cell stack in the fuel cell test system; The output current I of each fuel cell start-up test bench in the laboratory is obtained through the current detection sensor, and then the power generation of each fuel cell start-up test bench in a unit time period is obtained. The power generation of each fuel cell start-up test bench is summarized, and the summary result is used as the total power generation Q of the stack at the current moment. 发电,t ; Get the current power grid transformer storage capacity Q 变压器 , the total power consumption of the electrical equipment at the current moment Q 消耗,t , and obtain the current indoor temperature T and outdoor temperature T^, and obtain the power demand Q of the electrical equipment at the next moment 消耗,t+1 ; According to the Q 消耗,t Determine whether the power consumption of the electrical equipment increases or decreases within the set time; If decreasing, and Q 消耗,t -Q 消耗,t+1 If the maximum load of the laboratory is exceeded, the power consumption equipment whose power change exceeds the preset value is controlled to maintain the current operating state unchanged, and other power consumption equipment enters the next operating state to stagger the peak. Otherwise, all power consumption equipment is controlled to enter the next operating state and execute the next step; if it increases, and Q 消耗,t+1 -Q 消耗,t If the maximum load of the laboratory is exceeded, the power-consuming equipment is controlled to shift the peak load according to the importance of power supply. Otherwise, all power-consuming equipment is controlled to maintain the current operating status and execute the next step; Judge Q 发电,t With Q 消耗,t+1 Does the difference exceed Q 变压器 If so, when T is lower than the set value, the output end 1 of the electric three-way valve is controlled to be closed and the output end 2 is opened, and the hot air blower is started to push hot air into the laboratory. When T is higher than the set value and T^ is lower than the set value, the output end 1 of the electric three-way valve is controlled to be opened and the output end 2 is closed, and the hot air blower is started to push hot air out of the laboratory. When both T and T^ are higher than the set values, the single cooling air conditioner is started to push cold air into the laboratory, and this continues until Q 发电,t With Q 消耗,t+1 The difference does not exceed Q 变压器 Then turn off the corresponding blower or cooling-only air conditioner; otherwise, enter energy-saving mode.