Correlation modeling method for underground cables in multiple regions

By establishing related underground cable models for each region in the related blockchain, the problem of no connection between underground cable models in multiple regions is solved, the reliability of information exchange is improved, and the stable operation of the power grid is ensured.

CN114445553BActive Publication Date: 2025-04-08INST OF ECONOMIC & TECH STATE GRID HEBEI ELECTRIC POWER +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111563978.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-20
Publication Date
2025-04-08
Estimated Expiration
2041-12-20

AI Technical Summary

Technical Problem

In the prior art, the three-dimensional models of underground cables in multiple regions have different models and no connection between the models, resulting in errors that may occur when calling the model, affecting the normal power supply of the power grid.

Method used

By obtaining and uploading underground cable information from each region in the associated blockchain, establishing an associated underground cable model, and binding it through a unique identity identification, ensuring that the model information of each region can be related and updated.

Benefits of technology

It improves the reliability of underground cable information exchange between multiple regions, ensures normal power supply to the power grid, and improves the reliability of users' power use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114445553B_ABST
    Figure CN114445553B_ABST
Patent Text Reader

Abstract

The present invention provides a method for associating underground cables in multiple regions. The method comprises: obtaining target underground cable information of a target region, and uploading the target underground cable information to an associated blockchain; the target region is one of M regions, and M is a positive integer; establishing an associated underground cable model of the target region according to a target identifier and target underground cable information of the target region; the target identifier is a unique identity identifier of the target region in the associated blockchain; and establishing associated underground cable models of other regions in the associated blockchain in the same manner as establishing an associated underground cable model of the target region. The present invention can improve the stability of power grid operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of cable technology, and in particular to a correlation modeling method for underground cables in multiple regions. Background Art

[0002] As the scope of underground cable laying becomes wider and wider, in order to improve the monitoring efficiency of underground cables, the status of underground cables can be monitored in real time through 3D modeling of underground cables to ensure reliable power supply in the region. Most of the existing 3D models of underground cables are established for the region. The 3D models of underground cables in multiple regions are modeled differently and there is no connection between the models. Once the underground cable model in a certain region changes, other regions will not receive relevant change information. When the cable information of the region needs to be called, errors may occur due to failure to update the model in time, affecting the normal power supply of the power grid. Summary of the invention

[0003] The present invention provides a method for associating modeling of underground cables in multiple regions to solve the problem that the three-dimensional models of underground cables in multiple regions are modeled in different ways and have no connection with each other, which may cause errors when calling the models and affect the normal power supply of the power grid.

[0004] In a first aspect, the present invention provides a method for associating modeling of underground cables in multiple regions, comprising:

[0005] Obtain target underground cable information in a target area, and upload the target underground cable information to a related blockchain; the target area is one of M areas, where M is a positive integer;

[0006] Establishing an associated underground cable model of the target area according to the target identification and target underground cable information of the target area; the target identification is a unique identification of the target area in the associated blockchain;

[0007] In the same manner as establishing the associated underground cable model for the target area, the associated underground cable models for other areas are established in the associated blockchain.

[0008] In a possible implementation, uploading target underground cable information to a related blockchain includes:

[0009] The target cable information is encapsulated into a modeling database, and the modeling database is uploaded to the associated blockchain.

[0010] In a possible implementation, the target underground cable information includes underground cable paths and inflection point topology information; and establishing an associated underground cable model of the target area according to the target identifier of the target area and the target underground cable information includes:

[0011] Perform three-dimensional modeling based on the cable path and inflection point topology information of the target area to obtain a three-dimensional model of the target area;

[0012] The target identifier is bound to the three-dimensional model of the target area to obtain the associated underground cable model of the target area.

[0013] In a possible implementation, after establishing the associated underground cable models of other areas to be associated in the associated blockchain in the same manner as establishing the associated underground cable model of the target area, the method further includes:

[0014] After the associated underground cable model of the target area is updated, the updated associated underground cable model of the target area is broadcasted to other areas of the associated blockchain through the target identifier.

[0015] In a possible implementation, the method further includes:

[0016] When a new region joins the associated blockchain, control the new region to send a network access application to the associated blockchain, and control the M regions in the associated blockchain to vote for network access; when the result of the network access vote is approval, control the new region to join the network;

[0017] In the same manner as the associated underground cable model of the target area is established, an associated underground cable model of the new area is established in the associated blockchain.

[0018] In one possible implementation, before controlling the M regions in the associated blockchain to vote for network access, the method further includes: empowering the M regions according to their area.

[0019] In a second aspect, the present invention provides a correlation modeling device for underground cables in multiple regions, comprising:

[0020] An acquisition module, used to acquire target underground cable information in a target area and upload the target underground cable information to a related blockchain; the target area is one of M areas, where M is a positive integer;

[0021] Establishing a module for establishing an associated underground cable model of a target area according to a target identifier and target underground cable information of the target area; the target identifier is a unique identifier of the target area in the associated blockchain;

[0022] The association module is used to establish the associated underground cable model of other regions in the associated blockchain in the same manner as the associated underground cable model of the target region.

[0023] In one possible implementation, the acquisition module is also used to encapsulate the target cable information into a modeling database and upload the modeling database to an associated blockchain.

[0024] In a third aspect, the present invention provides a controller comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the method for associating modeling of underground cables in multiple regions as described in the first aspect or any possible implementation of the first aspect are implemented.

[0025] In a fourth aspect, the present invention provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps of the method for association modeling of underground cables in multiple regions as described in the first aspect or any possible implementation of the first aspect.

[0026] The present invention provides a method for associating modeling of underground cables in multiple regions. First, the underground cable information of M regions is uploaded to an associated blockchain. Then, for each region, an underground cable model is constructed based on its unique identity in the associated blockchain and the underground cable information of the region. Finally, the M regions are associated through the associated blockchain. By adopting the modeling method of the present invention, the M regions are associated and modeled in the same way, which can improve the reliability of underground cable information exchange between multiple regions, ensure the normal power supply of the power grid, and improve the reliability of power consumption for users. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0028] Figure 1 It is a flow chart for implementing the method for associating modeling of underground cables in multiple regions provided by an embodiment of the present invention;

[0029] Figure 2 It is a structural schematic diagram of a correlation modeling device for underground cables in multiple regions provided by an embodiment of the present invention;

[0030] Figure 3 is a schematic diagram of a controller provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0031] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0032] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0033] In order to improve the digital collaborative design methods of cable engineering, it is a future development trend to adopt more advanced 3D modeling technology to solve the survey data in cable engineering and liberate designers from repetitive work.

[0034] With the gradual rise of 3D Geographic Information System (GIS) technology, 3D modeling technology has the advantages of intuitive design results, high design efficiency, and convenient results management. At present, the field of power transmission and transformation engineering design has carried out exploration of 3D modeling and 3D digital design and achieved certain results. With the development and popularization of information technology such as 3D modeling and GIS, 3D modeling technology provides new technical means for parametric modeling of pipeline network data.

[0035] With the development of informatization, the connection between regions will inevitably become closer in the future. Underground cables are the lifeline to ensure stable power supply in the region, and the exchange of underground cable information between multiple regions is the basis for ensuring stable power supply. However, the modeling methods used by various regions for underground cables are diverse, and it is difficult to exchange underground cable information between regions. There is a hidden danger of unstable power supply due to untimely information exchange. Therefore, a correlation modeling method for underground cables in multiple regions is urgently needed to ensure the stable operation of the power grid.

[0036] See also Figure 1 , which shows a flowchart of the implementation of the multi-region underground cable association modeling method provided by the embodiment of the present invention. Figure 1 As shown, a correlation modeling method for underground cables in multiple regions may include:

[0037] S101, obtain target underground cable information in a target area, and upload the target underground cable information to a related blockchain; the target area is one of M areas, where M is a positive integer.

[0038] Optionally, the region to be associated can be divided into M regions based on cities, and each city can correspond to a node on the associated blockchain.

[0039] For the target area, the target underground cable information of the target area can be uploaded to the target node corresponding to the associated blockchain. The target underground cable information can include the pipe network parameters of the underground cable or the path map of the underground cable and other information used to build the model of the underground cable, such as type, attribute, path point information, and topological information of key inflection points.

[0040] S102, establishing an associated underground cable model of the target area according to the target identifier and target underground cable information of the target area; the target identifier is a unique identity identifier of the target area in the associated blockchain.

[0041] Optionally, in the associated blockchain, each node has a unique identity. Therefore, the target identity is the unique identity of the target area in the associated blockchain. Existing three-dimensional modeling methods can be used to establish a three-dimensional model of underground cables based on the target underground cable information in the target area, and the established three-dimensional model can be bound to the target identity to obtain the associated underground cable model of the target area in the associated blockchain. For example, three-dimensional GIS technology can be used for modeling.

[0042] Optionally, after establishing the associated underground cable model of the target area, the associated underground cable model can be stored in a server in the target area, and the storage identifier can be uploaded to the target node of the associated blockchain. When other areas on the associated blockchain want to obtain the associated underground cable model of the target area, they can obtain the associated underground cable model of the target area by accessing the storage identifier.

[0043] Optionally, to ensure data security, the storage identifier can also be encrypted, and only when the storage identifier is accessed through a node in the associated blockchain, the visitor will obtain the plaintext form of the storage identifier, otherwise the visitor or intruder can only obtain the ciphertext of the storage identifier. The present invention can determine whether the access is a normal access or an illegal access while ensuring data storage security, so as to prevent the leakage of the associated underground cable model in the target area.

[0044] Optionally, it is possible to detect whether the target underground cable information has changed every preset time. If the target underground cable information has changed, the associated underground cable model of the target area is updated. If the target underground cable information has not changed, a target detection identifier is generated, and the target detection identifier is bound to the associated underground cable model of the target area. The target detection identifier is used to represent the number of detections of the associated underground cable model of the target area, which is helpful for staff to query and improve the reliability of maintenance.

[0045] S103, establishing associated underground cable models for other regions in the associated blockchain in the same manner as establishing the associated underground cable model for the target region.

[0046] Optionally, in order to ensure the consistency of information exchange between underground cable models in M ​​regions, the same modeling method needs to be adopted to establish the associated underground cable models corresponding to the M regions. Accordingly, the storage identifier of the associated underground cable model of each region can be encrypted corresponding to the region, and only visitors who access through the associated blockchain can obtain the associated underground cable models of the M regions.

[0047] In addition, the associated underground cable models established in M ​​regions can also be stored in a fixed server, and the nodes of the associated blockchain only store the storage identifiers corresponding to the M regions. Visitors can obtain the associated underground cable model of the visited region by accessing the storage identifier.

[0048] The embodiment of the present invention uploads the underground cable information of M regions to the associated blockchain. Then, for each region, an underground cable model is constructed based on its unique identity in the associated blockchain and the underground cable information of the region. Finally, the M regions are associated through the associated blockchain. By adopting the modeling method of the present invention, the M regions are associated and modeled in the same way, which can improve the reliability of underground cable information exchange between multiple regions, ensure the normal power supply of the power grid, and improve the reliability of power consumption for users.

[0049] In some embodiments of the present invention, uploading target underground cable information to a related blockchain includes:

[0050] The target cable information is encapsulated into a modeling database, and the modeling database is uploaded to the associated blockchain.

[0051] Optionally, the target cable information can be stored in a modeling database to ensure data integrity, and then the modeling database can be uploaded to the associated blockchain. The target cable information can be stored in the modeling database for data detection at preset intervals to determine whether the target cable information is updated.

[0052] In some embodiments of the present invention, the target underground cable information includes underground cable paths and inflection point topology information; establishing an associated underground cable model of the target area according to the target identifier of the target area and the target underground cable information includes:

[0053] Perform three-dimensional modeling based on the cable path and inflection point topology information of the target area to obtain a three-dimensional model of the target area;

[0054] The target identifier is bound to the three-dimensional model of the target area to obtain the associated underground cable model of the target area.

[0055] Optionally, existing 3D modeling software may be used to perform 3D modeling based on the cable path and inflection point topology information of the target area, such as Google Earth, World Wind, GeoGlobe, or EV-Globe.

[0056] For M regions, the unique identity identifiers of the M regions in the associated blockchain can be bound to the established associated underground cable models, so that the associated underground cable models of the M regions are connected through the associated blockchain, thereby improving the reliability of information exchange between the M regions.

[0057] In some embodiments of the present invention, after establishing the associated underground cable models of other areas to be associated in the associated blockchain in the same manner as establishing the associated underground cable model of the target area, the method further includes:

[0058] After the associated underground cable model of the target area is updated, the updated associated underground cable model of the target area is broadcasted to other areas of the associated blockchain through the target identifier.

[0059] Optionally, after the associated underground cable models of M regions are established, when the associated underground cable model of the target region is updated, the update information can be broadcast to other regions of the associated blockchain; or, instead of broadcasting the update information to other regions of the associated blockchain, a new associated underground cable model is established based on the updated target underground cable information, and only the model is updated. Other regions can directly access the new model information when needed.

[0060] In some embodiments of the present invention, the method further comprises:

[0061] When a new region joins the associated blockchain, control the new region to send a network access application to the associated blockchain, and control the M regions in the associated blockchain to vote for network access; when the result of the network access vote is approval, control the new region to join the network;

[0062] In the same manner as the associated underground cable model of the target area is established, an associated underground cable model of the new area is established in the associated blockchain.

[0063] Optionally, when a new region needs to join the established associated blockchain (i.e., access the network), the new region can be controlled to send an access application to the associated blockchain, and the M regions in the associated blockchain can be controlled to vote for the new region through M nodes. Only when the number of votes in favor is greater than the preset number of votes, the result of consent to access the network is generated, the new region is allowed to access the network, and a unique identity is assigned to the new region. The new region establishes the associated underground cable model corresponding to the region based on the assigned unique identity and the underground cable information of the region.

[0064] By adopting the network access voting method and setting network access requirements for new regions, it is possible to improve the information security of regions in the associated blockchain and enhance the stability of grid operation.

[0065] In some embodiments of the present invention, before controlling the M regions in the associated blockchain to vote for network entry, the method further includes: empowering the M regions according to their regional areas.

[0066] Alternatively, a larger area indicates a larger underground cable scale in the area, which contributes more to the stable operation of the power grid. Therefore, each area can be weighted according to its area, that is, each area is given a different number of votes. The larger the area, the more votes it has, and the greater the weight it has when voting for the new area to join the network.

[0067] Beneficial effects of the present invention:

[0068] The present invention can associate the three-dimensional models of underground cables in multiple regions, improve the reliability of underground cable information exchange between regions, and contribute to the stable operation of the power grid. The present invention can also improve the security of accessing underground cable model information and reduce the possibility of underground cable information leakage. The present invention can also improve the compatibility between regions, allow new regions to access the network through voting, and enhance the connection between multiple regions under the premise of ensuring safety.

[0069] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0070] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.

[0071] Figure 2 The schematic diagram of the structure of the associated modeling device for underground cables in multiple regions provided by an embodiment of the present invention is shown. For the convenience of explanation, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:

[0072] like Figure 2 As shown, the multi-region underground cable correlation modeling device 20 may include:

[0073] An acquisition module 201 is used to acquire target underground cable information in a target area and upload the target underground cable information to a related blockchain; the target area is one of M areas, where M is a positive integer;

[0074] Establishing module 202, for establishing an associated underground cable model of the target area according to the target identifier and the target underground cable information of the target area; the target identifier is a unique identity identifier of the target area in the associated blockchain;

[0075] The association module 203 is used to establish the associated underground cable models of other regions in the associated blockchain in the same manner as establishing the associated underground cable model of the target region.

[0076] In some embodiments of the present invention, the acquisition module 201 is also used to encapsulate the target cable information into a modeling database and upload the modeling database to the associated blockchain.

[0077] In some embodiments of the present invention, the target underground cable information includes underground cable path and inflection point topology information;

[0078] The establishment module 202 is also used to perform three-dimensional modeling based on the cable path and inflection point topology information of the target area to obtain a three-dimensional model of the target area; bind the target identifier with the three-dimensional model of the target area to obtain an associated underground cable model of the target area.

[0079] In some embodiments of the present invention, the device 20 further includes:

[0080] The update module is used to establish associated underground cable models of other areas to be associated in the associated blockchain in the same manner as the associated underground cable model of the target area. After the associated underground cable model of the target area is updated, the updated associated underground cable model of the target area is broadcast to other areas of the associated blockchain through the target identifier to send update information.

[0081] In some embodiments of the present invention, the device 20 further includes:

[0082] The network access module is used to control the new region to send a network access application to the associated blockchain when the new region joins the associated blockchain, and control the M regions in the associated blockchain to vote for network access; when the result of the network access vote is approval, control the new region to access the network; and establish an associated underground cable model for the new region in the associated blockchain in the same way as establishing an associated underground cable model for the target region.

[0083] In some embodiments of the present invention, the network entry module is also used to empower M regions according to their area before controlling the M regions in the associated blockchain to vote for network entry.

[0084] Figure 3 is a schematic diagram of a controller provided by an embodiment of the present invention. Figure 3As shown, the controller 30 of this embodiment includes: a processor 300, a memory 301, and a computer program 302 stored in the memory 301 and executable on the processor 300. When the processor 300 executes the computer program 302, the steps in the above-mentioned various multi-region underground cable association modeling method embodiments are implemented, such as Figure 1 Alternatively, when the processor 300 executes the computer program 302, the functions of each module / unit in the above-mentioned device embodiments are implemented, for example Figure 2 Functionality of modules / units 201 to 203 shown.

[0085] Exemplarily, the computer program 302 may be divided into one or more modules / units, one or more modules / units are stored in the memory 301 and executed by the processor 300 to implement the present invention. The one or more modules / units may be a series of computer program instruction segments that can implement specific functions, and the instruction segments are used to describe the execution process of the computer program 302 in the controller 30. For example, the computer program 302 may be divided into Figure 2 Modules / units 201 to 203 are shown.

[0086] The controller 30 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The controller 30 may include, but is not limited to, a processor 300 and a memory 301. Those skilled in the art will appreciate that Figure 3 This is only an example of the controller 30 and does not constitute a limitation of the controller 30. The controller 30 may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the controller may also include input and output devices, network access devices, buses, etc.

[0087] The processor 300 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0088] The memory 301 may be an internal storage unit of the controller 30, such as a hard disk or memory of the controller 30. The memory 301 may also be an external storage device of the controller 30, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the controller 30. Further, the memory 301 may also include both an internal storage unit of the controller 30 and an external storage device. The memory 301 is used to store computer programs and other programs and data required by the controller. The memory 301 may also be used to temporarily store data that has been output or is to be output.

[0089] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0090] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0091] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0092] In the embodiments provided by the present invention, it should be understood that the disclosed devices / controllers and methods can be implemented in other ways. For example, the device / controller embodiments described above are only schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0093] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0094] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0095] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned multi-regional underground cable association modeling method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable medium does not include electric carrier signals and telecommunication signals.

[0096] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A method for associating underground cables in multiple regions, characterized in that: include: Obtaining target underground cable information in a target area, and uploading the target underground cable information to a related blockchain; The target region is one of M regions, where M is a positive integer; Establishing an associated underground cable model of the target area according to the target identification of the target area and the target underground cable information; The target identifier is a unique identifier of the target region in the associated blockchain; Establishing associated underground cable models for other regions in the associated blockchain in the same manner as establishing the associated underground cable model for the target region; The target underground cable information includes underground cable path and inflection point topology information; The step of establishing the associated underground cable model of the target area according to the target identification of the target area and the target underground cable information includes: Perform three-dimensional modeling based on the cable path and inflection point topology information of the target area to obtain a three-dimensional model of the target area; Binding the target identifier with the three-dimensional model of the target area to obtain an associated underground cable model of the target area; After establishing associated underground cable models of other areas to be associated in the associated blockchain in the same manner as establishing the associated underground cable model of the target area, the method further includes: After the associated underground cable model of the target area is updated, the updated associated underground cable model of the target area is broadcasted to other areas of the associated blockchain through the target identifier to send update information.

2. The method for associating underground cables in multiple regions according to claim 1 is characterized in that: The uploading of the target underground cable information to the associated blockchain includes: The target underground cable information is encapsulated into a modeling database, and the modeling database is uploaded to an associated blockchain.

3. The method for associating underground cables in multiple regions according to any one of claims 1 to 2, characterized in that: The method further comprises: When a new region joins the associated blockchain, control the new region to send a network access application to the associated blockchain, and control M regions in the associated blockchain to vote for network access; when the result of the network access vote is approval, control the new region to join the network; The associated underground cable model of the new area is established in the associated blockchain in the same manner as the associated underground cable model of the target area.

4. The method for associating modeling of underground cables in multiple regions according to claim 3 is characterized in that: Before controlling the M regions in the associated blockchain to vote for network access, the method further includes: empowering the M regions according to their area.

5. A correlation modeling device for underground cables in multiple regions, characterized in that: include: An acquisition module, used to acquire target underground cable information in a target area and upload the target underground cable information to a related blockchain; The target region is one of M regions, where M is a positive integer; An establishing module, used for establishing a related underground cable model of the target area according to the target identification of the target area and the target underground cable information; The target identifier is a unique identifier of the target region in the associated blockchain; An association module, configured to establish an associated underground cable model for other regions in the associated blockchain in the same manner as the associated underground cable model for the target region; The target underground cable information includes underground cable path and inflection point topology information; The establishment module includes: Perform three-dimensional modeling based on the cable path and inflection point topology information of the target area to obtain a three-dimensional model of the target area; Binding the target identifier with the three-dimensional model of the target area to obtain an associated underground cable model of the target area; The multi-region underground cable correlation modeling device also includes: The update module is used to establish associated underground cable models of other areas to be associated in the associated blockchain in the same manner as that of establishing the associated underground cable model of the target area. After the associated underground cable model of the target area is updated, the updated associated underground cable model of the target area is broadcast to other areas of the associated blockchain through the target identifier to send update information.

6. The device for associating modeling of underground cables in multiple regions according to claim 5, characterized in that: The acquisition module is also used to encapsulate the target underground cable information into a modeling database and upload the modeling database to an associated blockchain.

7. A controller comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the processor implements the steps of the multi-region underground cable association modeling method as described in any one of claims 1 to 4.

8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for associative modeling of underground cables in multiple regions as described in any one of claims 1 to 4 are implemented.

Citation Information

Patent Citations

  • Underground cable data transmission method and device based on block chain

    CN110868292A

  • Power cable management method

    CN110991670A