A pile driver
By designing a pile driver including platform, pile driving device, walking device and clamping device, the problem of inconvenience in construction of the static pressure pile planter is solved, and a rapid and convenient dike breach sealing construction is achieved on the shore and on the water.
Patent Information
- Application Number
- CN202210520014.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-13
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2042-05-13
AI Technical Summary
During construction, static pressure pile planters need to rely on the cooperation of construction personnel and the base to provide reaction force, resulting in limited walking and inconvenient construction.
A pile driver is designed, including a platform, a pile driving device, a walking device and a clamping device. The pile driving device is used for installation and pile driving, and the walking device is used for walking on the ground. The clamping device includes a fixed clamp, a sliding clamp and a clamp driving component, which is used to clamp the pile wall and slide along the platform to realize the walking and fixed construction of the pile driver.
The pile driver can be constructed on the shore and on the water. The pile driving process does not rely on completed piles, which significantly improves the convenience and efficiency of construction, and can quickly complete the dike breach sealing operation, ensure construction safety, and reduce losses.
Smart Images

Figure CN114808969B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering machinery, and more particularly to a pile driver. Background Art
[0002] The static pressure pile driver is a mechanized breach plugging construction equipment that can replace manual construction. When plugging a breach, it uses a unique static pressure principle (grasping several piles that have been pressed into the ground, using the resistance of the pull-out as a reaction force to push in the next pile) to complete the pile driving.
[0003] However, the static pile driver can only move on piles, so it needs to be placed in the designated position by a crane with the cooperation of construction workers during construction. In addition, since there are no completed piles available at the beginning of the project, it is usually necessary to equip a base that provides reaction force to complete the initial pressing of reaction piles. After several piles are pressed in, the static pile driver can be detached from the base and move on the piles. Therefore, the movement of the static pile driver is restricted by the reaction piles, making construction inconvenient.
[0004] In summary, how to effectively solve the inconvenience of dike breach sealing construction and other problems is a problem that technical personnel in this field need to solve. Summary of the invention
[0005] In view of this, an object of the present invention is to provide a pile driver, the structural design of which can effectively solve the problem of inconvenience in the construction of dike breach sealing.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A pile driver comprises a platform, a pile driving device connected above the platform, and a walking device and a clamping device respectively connected below the platform;
[0008] The piling device comprises a pile driver for installing a pile and a pressure device connected to the pile driver, the pressure device being used to provide a force to the pile driver for piling;
[0009] The walking device is used for walking on the ground;
[0010] The clamping device comprises a fixed clamp, a sliding clamp and a clamping drive component, wherein the fixed clamp and the sliding clamp are both used for clamping the pile wall, the fixed clamp is fixedly connected to the platform, the sliding clamp is slidably connected to the platform, and the clamping drive component is connected to the sliding clamp to drive the sliding clamp to slide along the platform.
[0011] Optionally, in the above-mentioned pile driver, the pile driving device also includes a drill mast and a drill mast telescopic cylinder, the drill mast is rotatably connected to the platform, the pile driver is connected to the drill mast, one end of the drill mast telescopic cylinder is rotatably connected to the platform, and the other end is rotatably connected to the drill mast to adjust the angle between the drill mast and the platform.
[0012] Optionally, in the above-mentioned pile driver, when the drill mast telescopic cylinder pushes the drill mast to rotate until the end surface of the drill mast is in contact with the platform, the drill mast is perpendicular to the platform.
[0013] Optionally, in the above-mentioned pile driver, the fixed clamp includes two relatively arranged fixed telescopic cylinders, the opposite ends of the two fixed telescopic cylinders are respectively fixedly connected to the platform, and the opposite ends are respectively connected to first clamps, and the fixed telescopic cylinders are used to drive the two first clamps to move toward each other to clamp the pile wall or move away from each other to loosen the pile wall.
[0014] Optionally, the above-mentioned pile driver further includes a telescopic traveling cylinder, one end of which is rotatably connected to the traveling device, and the other end of which is rotatably connected to the platform to push the traveling device to rotate and lift it off the ground.
[0015] Optionally, in the above-mentioned pile driver, the clamping drive component includes a clamping telescopic cylinder, one end of the clamping telescopic cylinder is fixedly connected to the platform, and the other end of the clamping telescopic cylinder is fixedly connected to the sliding clamp.
[0016] Optionally, in the above-mentioned pile driver, the traveling device includes a plurality of wheels and a traveling driving component connected to the wheels to drive the wheels to rotate.
[0017] Optionally, the above-mentioned pile driver further includes a crane connected to the top of the platform, and the crane is used to take the pile and transfer it to the pile driver.
[0018] Optionally, in the above-mentioned pile driver, the crane includes a retractable boom, and the end of the boom is connected to a pile clamp for clamping the pile.
[0019] Optionally, the above-mentioned pile driver further includes a tilting and telescopic cylinder, the pile clamp is rotatably connected to the boom, one end of the tilting and telescopic cylinder is rotatably connected to the boom, and the other end is rotatably connected to the pile clamp to adjust the angle between the pile clamp and the boom.
[0020] The pile driver provided by the present invention comprises a platform, a pile driving device, a walking device and a clamping device. The pile driving device is connected to the top of the platform, and comprises a pile driver for installing piles and a pressure device connected to the pile driver, and the pressure device is used to provide a vertical force to the pile driver for pile driving; the walking device is connected to the bottom of the platform, and is used to walk on the ground; the clamping device is connected to the bottom of the platform, and comprises a fixed clamp, a sliding clamp and a clamping drive component, and the fixed clamp and the sliding clamp are both used to clamp the pile wall, the fixed clamp is fixedly connected to the platform, the sliding clamp is slidably connected to the platform, and the clamping drive component is connected to the sliding clamp to drive the sliding clamp to slide along the platform.
[0021] By using the pile driver provided by the present invention, when a breach occurs in the dike, the sealing of the breach is divided into two stages: onshore construction and on-water construction. During onshore construction, the pile driver automatically moves to the breach position through the traveling device. To prevent the breach from expanding, piles are first driven into the dam body adjacent to the breach. The traveling device moves to a preset position, and the piles are installed on the pile driver. Then, pressure is applied to the piles through a pressure-increasing device, so that the piles are quickly formed. Repeat the aforementioned steps to drive a number of piles into the dike in turn to form a pile wall, so that the dike is reinforced, and a basic platform for the pile driver to construct on the water is also provided. When a sufficiently long pile wall is formed on the shore, on-water construction can be carried out. Through the cooperation of the fixed clamp and the sliding clamp, the pile driver can be fixed on the pile wall for construction and move back and forth. When walking, the fixed clamp is released, the sliding clamp clamps the pile wall, and the clamping drive component drives the sliding clamp to slide relatively along the platform, so that the platform moves relatively to the next piling position, and then the sliding clamp can be released, the fixed clamp clamps the end wall, and the clamping drive component drives the sliding clamp to reset. After the platform moves to the piling position, the piling device can piling through the above steps.
[0022] In summary, the pile driver provided in this application can be used for construction both on the ground and on the water, and the pile driving process does not rely on the completed piles, which is convenient for the construction of dike breach sealing. The dike breach sealing operation can be completed quickly, thereby ensuring the safety of the lives of construction and rescue personnel and reducing the loss of life and property of people in the flood discharge area. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 A schematic structural diagram of a pile driver according to a specific embodiment of the present invention;
[0025] Figure 2 for Figure 1 A schematic diagram of the structure of the clamping device;
[0026] Figure 3 for Figure 1 Schematic diagram of the pile driver in transportation status;
[0027] Figure 4 for Figure 1 Schematic diagram of the structure of the fixed clamp.
[0028] The following are marked in the accompanying drawings:
[0029] Pile 01, platform 1, piling device 2, clamping device 3, walking device 4, leveling telescopic cylinder 5, crane 6, pile clamp 7, flip telescopic cylinder 8, power system 9;
[0030] Platform body 11, boss 12;
[0031] Pile driver 21, pressurizing device 22, drill mast 23, drill mast telescopic cylinder 24;
[0032] A fixed clamp 31, a sliding clamp 32, and a clamping driving component 33;
[0033] The telescopic cylinder 311 and the first clamping head 312 are fixed.
[0034] Boom 61. DETAILED DESCRIPTION
[0035] The embodiment of the invention discloses a pile driver, which can drive piles on shore and on water and can quickly complete the sealing operation of dike breach.
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] See also Figure 1 and Figure 2 , Figure 1 A schematic structural diagram of a pile driver according to a specific embodiment of the present invention; Figure 2 for Figure 1 Schematic diagram of the structure of the clamping device.
[0038] In one embodiment, the pile driver provided by the present invention includes a platform 1, a pile driving device 2, a walking device 4 and a clamping device 3. The platform 1 is used to install the pile driving device 2, the walking device 4 and the clamping device 3. The pile driving device 2 is connected to the top of the platform 1, and the walking device 4 and the clamping device 3 are respectively connected to the bottom of the platform 1. The pile driving device 2 includes a pile driver 21 and a pressure device 22. The pile driver 21 is used to install the pile 01. The pressure device 22 is connected to the pile driver 21 to provide a force to the pile driver 21 for pile driving. The walking device 4 is used to walk on the ground. The clamping device 3 includes a fixed clamp 31, a sliding clamp 32 and a clamping drive component 33. The fixed clamp 31 and the sliding clamp 32 are both used to clamp the pile wall. The fixed clamp 31 is fixedly connected to the platform 1, the sliding clamp 32 is slidably connected to the platform 1, and the clamping drive component 33 is connected to the sliding clamp 32 to drive the sliding clamp 32 to slide along the platform 1. Of course, the sliding movement between the sliding clamp 32 and the platform 1 is a relative movement. When the sliding clamp 32 and the pile wall are fixed, the relative sliding movement between the sliding clamp 32 and the platform 1 is manifested as the walking of the platform 1.
[0039] By using the pile driver provided by the present invention, when a breach occurs in the dike, the sealing of the breach is divided into two stages: onshore construction and on-water construction. During onshore construction, the pile driver moves to the breach position by itself through the walking device 4. To prevent the breach from expanding, piles are first driven into the dam body adjacent to the breach. The walking device 4 moves to a preset position, and the pile 01 is installed on the pile driver 21, and then a pressure is applied to the pile 01 through the pressure device 22, so that the pile is quickly formed. Repeat the above steps to drive several piles 01 into the dike in turn to form a pile wall, so that the dike is reinforced, and at the same time, a basic platform for the pile driver to construct on the water is provided. When a sufficiently long pile wall is formed on the shore, on-water construction can be carried out. Through the cooperation of the fixed clamp 31 and the sliding clamp 32, the pile driver is fixed on the pile wall for construction and moves back and forth. When walking, the fixed clamp 31 is released, the sliding clamp 32 clamps the pile wall, and the clamping driving component 33 drives the sliding clamp 32 to slide along the platform 1, so that the platform 1 moves relatively to the next piling position, and then the sliding clamp 32 can be released, the fixed clamp 31 clamps the end wall, and the clamping driving component 33 drives the sliding clamp 32 to reset. After the platform 1 moves to the piling position, the piling device 2 can piling through the above steps.
[0040] In summary, the pile driver provided in this application can be used for construction both on the ground and on the water, and is therefore convenient for dike breach sealing construction. It can quickly complete the dike breach sealing operation, ensure the life safety of construction and rescue personnel, and reduce the loss of life and property of people in the flood discharge area.
[0041] In one embodiment, the pile driver 21 of the pile driving device 2 can adopt a clamping structure, that is, the pile 01 is clamped by relative clamping plates. The pile driver 21 can also adopt other structures in the prior art that can fix the pile 01 as needed. In one embodiment, the pressure device 22 includes a winch and a steel wire rope matched with the winch. The winch drives the steel wire rope to rise or fall. The pile driver 21 is fixedly connected to the steel wire rope. The winch drives the steel wire rope to move, and the steel wire rope drives the pile driver 21 to move and form a downward impact force, thereby forming a pile.
[0042] In one embodiment, the pile driving device 2 also includes a drill mast 23 and a drill mast telescopic cylinder 24. The drill mast 23 is rotatably connected to the platform 1, and the pile driver 21 is connected to the drill mast 23. One end of the drill mast telescopic cylinder 24 is rotatably connected to the platform 1, and the other end is rotatably connected to the drill mast 23 to adjust the angle between the drill mast 23 and the platform 1. The arrangement of the drill mast 23 facilitates the installation of the pile driver 21. As needed, the pressurizing device 22 may also be arranged on the drill mast 23. Specifically, the two ends of the drill mast telescopic cylinder 24 may be hinged to the platform 1 and the drill mast 23, respectively. The drill mast telescopic cylinder 24 may be a hydraulic cylinder, and may also be an air cylinder or other telescopic drive structure as needed. With the above arrangement, during the pile driving operation, the drill mast telescopic cylinder 24 pushes the drill mast 23 to rotate relative to the platform 1 until the drill mast 23 is perpendicular to the platform 1, so that the pressurizing device 22 can better exert the pressurizing effect and form piles. When the pile driver is in the transportation state, such as Figure 3 As shown, the drill mast 23 can be driven by the drill mast telescopic cylinder 24 to rotate to a certain angle relative to the platform 1, specifically parallel to the platform 1. For example, if it is rotated to a horizontal state, the vertical height of the pile driver is reduced, thereby facilitating the transportation of the pile driver. As required, the drill mast 23 can also be fixedly connected to the platform 1, and the transportation state of the pile driving device 2 is the same as the pile driving operation state.
[0043] Further, the drill mast telescopic cylinder 24 pushes the drill mast 23 to rotate until the end face of the drill mast 23 contacts the platform 1, and the drill mast 23 is perpendicular to the platform 1. That is, when the drill mast 23 is perpendicular to the platform 1, the end face of the drill mast 23 close to the platform 1 abuts against the platform 1, and the drill mast 23 is supported by the platform 1, and the vertical state is more stable. Specifically, the platform 1 includes a platform body 11 and a boss 12 connected to the platform body 11, and one end of the bottom surface of the drill mast 23 is rotatably connected to one end corresponding to the top surface of the platform body 11. When the drill mast 23 rotates to the bottom surface abuts against the top surface of the boss 12 under the drive of the drill mast telescopic cylinder 24, the drill mast 23 is perpendicular to the platform body 11.
[0044] In one embodiment, the pile driver also includes a leveling telescopic cylinder 5, one end of which is used to support the ground, and the other end is fixedly connected to the platform 1 to lift the whole machine off the ground. By setting up the leveling telescopic cylinder 5, during construction on the shore, after the traveling device 4 moves to a preset position, the leveling telescopic cylinder 5 is extended to lift the whole machine off the ground, and then the pile driving operation is carried out under the support of the leveling telescopic cylinder 5. With such a setting, the pile driving operation process is more stable. Specifically, at least four leveling telescopic cylinders 5 are set at the bottom end of the platform 1, which can not only play the role of lifting the traveling device 4 off the ground, but also can adjust the angle between the platform 1 and the ground by controlling the respective telescopic amounts, so that the platform 1 remains horizontal.
[0045] In one embodiment, the walking device 4 includes a plurality of wheels 41 and a walking drive component connected to the wheels 41 to drive the wheels 41 to rotate. The walking drive component may specifically include an engine. The wheeled walking structure is adopted, and the walking freedom on the shore is high, and the direction adjustment is convenient. According to needs, in other embodiments, the walking device 4 may also include a crawler walking structure, and walking on the shore may also be realized. The walking drive component may specifically be arranged on the platform 1.
[0046] In one embodiment, the fixed clamp 31 includes two fixed telescopic cylinders 311 arranged opposite to each other, the opposite ends of the two fixed telescopic cylinders 311 are respectively fixedly connected to the platform 1, and the opposite ends are respectively connected to the first clamps 312, and the fixed telescopic cylinders 311 are used to drive the two first clamps 312 to move toward each other to clamp the pile wall or move away from each other to loosen the pile wall. That is, a telescopic cylinder fixed to the platform 1 is used, and the two fixed telescopic cylinders 311 form a pair, the ends of the two fixed telescopic cylinders 311 that are far away, that is, the ends that are opposite to each other, are respectively fixedly connected to the platform 1, and the other ends, that is, the ends that are close to each other, are respectively connected to the first clamps 312, and the two fixed telescopic cylinders 311 are used to drive the two first clamps 312 to move toward each other or away from each other, and the two move toward each other to clamp the pile wall, and move away from each other to loosen the pile wall. That is, when clamping the pile wall, the fixed telescopic cylinder 311 extends forward to push the first clamp 312 close to the pile row wall, thereby clamping the pile wall; when loosening, the fixed telescopic cylinder 311 retracts so that the distance between the first clamps 312 on both sides exceeds the width of the pile wall. The fixed clamp 31 adopts the above arrangement, has a simple structure, and can clamp the pile wall reliably.
[0047] Furthermore, the end face of the first clamp 312 facing the pile wall is consistent with the shape of the side wall of the corresponding side of the pile wall. The first clamp 312 is in surface contact with the pile wall, so that under the same pressure, it can provide a greater clamping force than point contact and line contact, so that the clamping effect of the first clamp 312 and the pile wall is more reliable and less likely to cause damage to the pile wall.
[0048] In one embodiment, the mobile clamp 32 includes two relatively arranged mobile telescopic cylinders, the opposite ends of the two mobile telescopic cylinders are respectively connected to the platform 1 for sliding connection, and the opposite ends are respectively connected to the second clamps, and the mobile telescopic cylinders are used to drive the two second clamps to move toward each other to clamp the pile wall or move away from each other to loosen the pile wall. That is, a telescopic cylinder slidably connected to the platform 1 is used, and the two mobile telescopic cylinders are a pair, the ends of the two mobile telescopic cylinders that are far away, that is, the ends that are opposite to each other, are respectively connected to the platform 1 for sliding connection, and the other ends, that is, the ends that are close to each other, are respectively connected to the second clamps, and the two mobile telescopic cylinders are used to drive the two second clamps to move toward each other or away from each other, and the two move toward each other to clamp the pile wall, and move away from each other to loosen the pile wall. That is, when clamping the pile wall, the mobile telescopic cylinder extends forward to push the second clamps to the pile row wall, thereby clamping the pile wall; when loosening, the mobile telescopic cylinder retracts so that the distance between the second clamps on both sides exceeds the width of the pile wall, and slides forward to the next clamping position with the platform 1. The mobile clamp 32 adopts the above arrangement, has a simple structure, and is reliable in clamping the pile wall.
[0049] Furthermore, the end face of the second clamp facing the pile wall is consistent with the shape of the side wall of the corresponding side of the pile wall. The second clamp is in surface contact with the pile wall, which can provide a greater clamping force than point contact and line contact under the same pressure, so that the clamping effect of the second clamp and the pile wall is more reliable and less likely to cause damage to the pile wall.
[0050] The fixed clamp 31 and the mobile clamp 32 are not limited to the above structure. In one embodiment, the fixed clamp 31 includes two clamping plates arranged opposite to each other, racks are fixed on the two clamping plates respectively, and gears are arranged to mesh with the racks, and the gears are connected to the clamping motor. The rotation of the clamping motor drives the gears to rotate, and the rotation of the gears drives the racks to move, so that the two clamping plates move closer or farther to clamp the pile wall or release the pile wall. The mobile clamp 32 can also adopt a similar structure, which will not be described here. The specific structures of the fixed clamp 31 and the sliding clamp 32 can refer to the conventional clamping structure in the prior art, and are not specifically limited here.
[0051] In one embodiment, the clamping drive component 33 of the clamping device 3 includes a clamping telescopic cylinder, one end of which is fixedly connected to the platform 1, and the other end is fixedly connected to the sliding clamp 32. That is, the sliding clamp 32 is driven to slide relative to the platform 1 by the extension and retraction of the clamping telescopic cylinder, which has a simple structure and reliable operation. As needed, the clamping drive component 33 may also include a motor, which is connected to the sliding clamp 32 through a chain, a belt or a gear rack, so that the torque output by the motor is converted into a linear movement and transmitted to the sliding clamp 32.
[0052] On the basis of the above embodiments, a crane 6 connected to the platform 1 is further included, and the crane 6 is used to take the pile 01 and transfer it to the pile driver 21. That is, the crane 6 is integrated into the platform 1, so that the pile 01 can be taken, transferred and installed without the need to configure a separate crane during the pile driving operation. The equipment has a higher degree of integration and is more convenient to use, which further facilitates the rapid completion of the dike breach plugging operation.
[0053] Furthermore, the crane 6 includes a telescopic boom 61, and the end of the boom 61 is connected to a pile clamp 7 for clamping the pile 01. The specific structure of the crane 6 can refer to the prior art, which includes a turntable and a telescopic boom 61 connected to the turntable, and the boom 61 is rotatably connected to the turntable. The pile 01 is transported by the rotation of the turntable and the telescopic boom 61. The end of the boom 61 is connected to a pile clamp 7, and the pile 01 is clamped by the pile clamp 7. The structure of the pile clamp 7 can refer to the conventional clamping structure in the prior art, and is not specifically limited here. The pile clamp 7 can specifically include a clamping plate structure arranged opposite to each other, and is driven by a motor, etc., and is clamped and fixed by the clamping plates on both sides of the pile 01. Then, through the action of the crane 6, such as the rotation of the turntable and the telescopic boom 61, the pile clamp 7 is transferred to the position of the pile driver 21, and then the pile driver 21 fixes the pile 01, and the pile clamp 7 can loosen the pile 01, completing the transportation and installation of the pile 01. As required, a structure such as a manipulator may be used to achieve the taking, transportation and installation of the pile 01.
[0054] Furthermore, the pile driver further comprises a tilting telescopic cylinder 8, the pile clamp 7 is rotatably connected to the arm 61, one end of the tilting telescopic cylinder 8 is rotatably connected to the arm 61, and the other end is rotatably connected to the pile clamp 7, so as to adjust the angle between the pile clamp 7 and the arm 61. By extending and retracting the tilting telescopic cylinder 8, the angle between the pile clamp 7 and the arm 61 can be adjusted, so as to facilitate the transportation of the pile 01, and during the transportation of the pile driver, it is also convenient to fold up the pile clamp 7 to reduce the volume of the pile driver.
[0055] In the above embodiments, the drilling mast telescopic cylinder 24, the leveling telescopic cylinder 5, the clamping telescopic cylinder, and the flip telescopic cylinder 8 can be hydraulic cylinders, air cylinders, or other telescopic drive structures. When hydraulic cylinders are used, they can be matched with hydraulic systems accordingly. As needed, the travel drive components and the hydraulic system can be integrated with the power system 9, which can be specifically arranged on the platform 1.
[0056] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0057] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A pile driver, characterized in that: It includes a platform, a piling device connected to the top of the platform, and a walking device and a clamping device respectively connected to the bottom of the platform; The piling device comprises a pile driver for installing a pile and a pressure device connected to the pile driver, the pressure device being used to provide a force to the pile driver for piling; The walking device is used for walking on the ground; The clamping device comprises a fixed clamp, a sliding clamp and a clamping driving component, wherein the fixed clamp and the sliding clamp are both used to clamp the pile wall, the fixed clamp is fixedly connected to the platform, the sliding clamp is slidably connected to the platform, and the clamping driving component is connected to the sliding clamp to drive the sliding clamp to slide along the platform; A leveling telescopic cylinder, one end of which is used to be supported on the ground, and the other end is fixedly connected to the platform, so that when the walking device moves to a preset position during construction on the shore, the leveling telescopic cylinder extends to lift the walking device off the ground; The pile driving device further comprises a drill mast and a drill mast telescopic cylinder, wherein the drill mast is rotatably connected to the platform, the pile driver is connected to the drill mast, one end of the drill mast telescopic cylinder is rotatably connected to the platform, and the other end is rotatably connected to the drill mast, so as to adjust the angle between the drill mast and the platform; When a breach occurs in the dike, the sealing of the breach is divided into two stages: onshore construction and on-water construction. During onshore construction, the pile driver moves to the breach position by itself through the traveling device. To prevent the breach from expanding, piles are first driven into the dam body near the breach. The traveling device moves to the preset position and installs the pile on the pile driver. Then, the pressure device applies pressure to the pile, so that the pile is quickly formed. Repeat the above steps to drive several piles into the dike to form a pile wall, so that the dike is reinforced and a basic platform for the pile driver to construct on water is provided; When a sufficiently long pile wall is formed on the shore, water construction can be carried out; the fixed clamp and the sliding clamp are coordinated to enable the pile driver to perform fixed construction on the pile wall and move forward and backward; when moving, the fixed clamp is released, the sliding clamp clamps the pile wall, and the clamping drive component drives the sliding clamp to slide relatively along the platform, so that the platform moves relatively to the next piling position, and then the sliding clamp is released, the fixed clamp clamps the end wall, and the clamping drive component drives the sliding clamp to reset; after the platform moves to the piling position, the piling device can piling through the above steps.
2. The pile driver according to claim 1, characterized in that: The drill mast telescopic cylinder pushes the drill mast to rotate until the end surface of the drill mast contacts the platform, and the drill mast is perpendicular to the platform.
3. The pile driver according to claim 1, characterized in that: The fixed clamp comprises two fixed telescopic cylinders arranged opposite to each other, wherein the opposite ends of the two fixed telescopic cylinders are respectively fixedly connected to the platform, and the opposite ends are respectively connected to first clamps, and the fixed telescopic cylinders are used to drive the two first clamps to move toward each other to clamp the pile wall or move away from each other to loosen the pile wall.
4. The pile driver according to claim 1, characterized in that: The clamping driving component comprises a clamping telescopic cylinder, one end of which is fixedly connected to the platform, and the other end of which is fixedly connected to the sliding clamp.
5. The pile driver according to claim 1, characterized in that: The traveling device comprises a plurality of wheels and a traveling driving component connected with the wheels to drive the wheels to rotate.
6. The pile driver according to any one of claims 1 to 5, characterized in that: The utility model also comprises a crane connected to the platform, wherein the crane is used for taking the pile and transferring the pile to the pile driver.
7. The pile driver according to claim 6, characterized in that: The crane comprises a telescopic boom, and a pile clamp for clamping the pile is connected to an end of the boom.
8. The pile driver according to claim 7, characterized in that: It also includes a flip telescopic cylinder, the pile clamp is rotatably connected to the boom, one end of the flip telescopic cylinder is rotatably connected to the boom, and the other end is rotatably connected to the pile clamp to adjust the angle between the pile clamp and the boom.
Citation Information
Patent Citations
Automatic hydraulic piling device for flood control
CN107326903A
On-pile walking mechanism and auxiliary pile aligning device
CN113338283A
Pile driver
CN217419624U