A method and device for calculating optimized parameters of fault ride-through in a wind farm

By optimizing the parameter calculation method for wind farm fault crossing, the problem of transient synchronization instability after wind farm fault recovery is solved. By calculating the voltage and current of the connection point, the optimization parameters are determined, and the transient stability and active power of the wind turbine are improved. Output.

CN114865708BActive Publication Date: 2024-11-29ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210704013.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-21
Publication Date
2024-11-29
Estimated Expiration
2042-06-21

AI Technical Summary

Technical Problem

The transient synchronization instability and insufficient stability margin during wind farm failure are mainly due to improper design of fault crossing control parameters, which leads to the unstable synchronization of the wind turbine after recovery in the weak grid.

Method used

A method for calculating the optimization parameters of wind farm fault crossing is proposed. By obtaining fault analysis parameters, calculating the voltage and voltage division parameters of the grid-connected point, creating a reactive injection proportional coefficient test array and a grid-connected point voltage test array, and performing reactive and active current calculations. The terminal voltage calculation is performed based on the terminal voltage calculation parameters, and the network connection point voltage calculation value that meets the preset error standard is determined. The output active power is calculated based on the internal parameters of the wind turbine, and the optimization parameters corresponding to the maximum active power are determined.

Benefits of technology

It improves the transient synchronization stability of the wind farm after the fault recovery, ensures the active power output of the wind turbine during the fault, and enhances the transient stability margin of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114865708B_ABST
    Figure CN114865708B_ABST
Patent Text Reader

Abstract

The present application discloses a method and device for calculating optimized parameters for wind farm fault crossing, the method comprising: obtaining fault analysis parameters of the wind farm, calculating the voltage division parameters of the grid connection point of the wind farm, creating a reactive injection proportional coefficient test array and a grid connection point voltage test array, calculating the reactive / active current and terminal voltage of the wind farm, determining the output active power of each test value in the reactive injection proportional coefficient test array, and determining the reactive injection proportional coefficient test value corresponding to the maximum output active power as the optimized parameter for wind farm fault crossing. It can be seen that the reactive injection proportional coefficient test value corresponding to the maximum active power output by the wind farm is used as a parameter for optimizing the wind farm, which can take into account the active power accumulated by the wind turbine during the fault period, so that the wind farm retains the maximum transient stability margin under the premise of providing reactive power in accordance with the grid connection standard, and improves the transient synchronization stability of the wind farm after fault recovery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power system control, and more specifically, to a method and device for calculating optimized parameters of wind farm fault ride-through. Background Art

[0002] With the continuous increase in electricity consumption and the proposal of the goals of "carbon peak" and "carbon neutrality", wind power generation has been vigorously developed, and wind turbines have gradually become the main power source in the power system. When a wind farm fails, the transient behavior during the fault is completely determined by the fault ride-through control. In a weak power grid, if the wind farm fault ride-through control parameters are improperly designed, it will seriously affect the stability of transient synchronization after fault recovery.

[0003] At present, when a wind farm fails, the fault ride-through control parameters of the wind farm are generally set manually or set to fixed values ​​according to the requirements of the local power grid. There is no clear design basis, which causes the wind turbines in the weak power grid to accumulate excessive active power during the fault, causing transient synchronization instability or insufficient stability margin after the fault. Therefore, a method for calculating the optimized parameters of wind farm fault ride-through is needed to optimize the design of wind farm fault ride-through control parameters to improve the stability of transient synchronization after the wind farm fault is restored. Summary of the invention

[0004] In view of the above problems, the present application is proposed to provide a method for calculating optimized parameters of wind farm fault ride-through, so as to improve the stability of transient synchronization of the wind farm after fault recovery.

[0005] In order to achieve the above objectives, the specific plan is proposed as follows:

[0006] A method for calculating optimized parameters of wind farm fault ride-through, comprising:

[0007] Acquiring fault analysis parameters of the wind farm, and calculating grid connection point voltage division parameters of the wind farm according to the fault analysis parameters;

[0008] Creating a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range and at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range and at the preset interval;

[0009] For each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, the reactive current of the wind farm is calculated to obtain a rotor reactive current command test array;

[0010] By using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array, the active current of the wind farm is calculated to obtain a rotor active current command test array;

[0011] According to the terminal voltage calculation parameters, terminal voltage calculation is performed on the wind farm to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter;

[0012] Comparing the grid connection point voltage calculation value array with the grid connection point voltage test array, and determining a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array;

[0013] Locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array respectively, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set;

[0014] The test value in the reactive injection proportionality coefficient test array corresponding to the maximum output active power among the output active powers is determined as the optimization parameter of the wind farm fault ride-through.

[0015] Optionally, the fault analysis parameters include:

[0016] The preset measuring points measure the first equivalent impedance between the grid-connected point of the wind farm and the fault point of the wind farm, the second equivalent impedance between the fault point and the measuring point, the short-circuit impedance of the fault point and the voltage amplitude of the measuring point, the mutual reactance of the doubly-fed motors of the wind turbines in the wind farm, the stator reactance of the doubly-fed motors of the wind turbines, the steady-state value of the rotor reactive current of the wind turbines in normal mode, and the upper limit of the rotor-side converter current of the wind turbines in normal mode.

[0017] Optionally, calculating the grid connection point voltage division parameters of the wind farm according to the fault analysis parameters includes:

[0018] According to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine generator set, a first voltage division coefficient of the grid connection point voltage of the wind farm and a second voltage division coefficient of the grid connection point voltage of the wind farm are calculated using the following formula:

[0019]

[0020]

[0021] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage division coefficient of the grid connection point voltage of the wind farm;

[0022] The first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm are combined to form the grid connection point voltage division parameter of the wind farm.

[0023] Optionally, for each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, reactive current calculation is performed on the wind farm to obtain a rotor reactive current command test array, including:

[0024] For each test value in the reactive injection proportional coefficient test array, the rotor reactive current increment test array is calculated using the following formula according to the preset adjustment dead zone value, the test value and the grid connection point voltage test array:

[0025]

[0026] Among them, I rq_inj_test [] is the rotor reactive current increment test array, K qv_test [M] is the test value in the reactive injection proportional coefficient test array, U A_test [] is the grid-connected point voltage test array, U inj_db is the adjustment dead zone value;

[0027] For each rotor reactive current increment test value in the rotor reactive current increment test array, subtract the rotor reactive current increment test value from the rotor reactive current steady-state value to obtain a rotor reactive injection current command test value of the wind farm during the fault ride-through period;

[0028] For each of the rotor reactive current instruction test values, determine the minimum value of the rotor reactive current instruction test value compared with the rotor side converter current upper limit as a comparison result, and use the opposite of the comparison result as the rotor reactive current instruction test value. Each rotor reactive current instruction test value constitutes a rotor reactive current instruction test array.

[0029] Optionally, the active current of the wind farm is calculated by using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain a rotor active current command test array, including:

[0030] The first test array of rotor active current limit value is obtained by calculating the following formula through the preset active current limit coefficient, the adjustment dead zone value and the grid connection point voltage test array:

[0031]

[0032] Among them, I rdmax1_test [] is the first test array of rotor active current limit value, k d is the active current limiting coefficient, U A_test [] is the grid-connected point voltage test array, U zr is the voltage threshold, and the expression of the voltage threshold is U zr =1-U inj_db -1 / k d , U inj_db is the adjustment dead zone value;

[0033] For each rotor reactive current command test value in the rotor reactive current command test array, taking the square root of the square difference between the rotor reactive current command test value and the upper limit of the rotor-side converter current, a rotor active current amplitude limit value test value is obtained, and each rotor active current amplitude limit value test value constitutes a rotor active current amplitude limit value second test array;

[0034] For each rotor active current limit value first test value in the rotor active current limit value first test array, and each rotor active current limit value second test value in the rotor active current limit value second test array corresponding to the array position of the rotor active current limit value first test value in its array, determine the minimum value of the rotor active current limit value first test value compared with the rotor active current limit value second test value, which is the rotor active current command test value, and each rotor active current command test value constitutes a rotor active current command test array.

[0035] Optionally, the terminal voltage calculation is performed on the wind farm according to the terminal voltage calculation parameters to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, including:

[0036] According to the mutual reactance of the doubly-fed generator of the wind turbine generator set, the rotor reactive current command test array and the rotor active current command test array, the virtual internal potential amplitude test array is calculated using the following formula:

[0037]

[0038] Among them, E test [] is the virtual internal potential amplitude test array, X m is the mutual reactance of the doubly-fed generator of the wind turbine, I rd_test [] is the rotor active current instruction test array, I rq_test [] is the rotor reactive current instruction test array;

[0039] According to the rotor reactive current command test array, the rotor active current command test array, the virtual internal potential amplitude test array, the first grid-connected point voltage division coefficient, the second grid-connected point voltage division coefficient and the voltage amplitude of the measuring point, the virtual internal potential phase test array is calculated using the following formula:

[0040]

[0041]

[0042]

[0043] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage, k2 is the second voltage division coefficient of the grid connection point voltage, U C is the voltage amplitude at the measuring point, δ e_test [] is the virtual internal potential phase test array, is the internal potential phase array in the phase-locked coordinate system, δ t_test [] is the grid connection point voltage phase test array;

[0044] The grid connection point voltage calculation value array is calculated based on the virtual internal potential amplitude test array, the internal potential phase array in the phase-locked coordinate system, the grid connection point voltage phase test array, the first grid connection point voltage division coefficient, the second grid connection point voltage division coefficient and the voltage amplitude of the measurement point:

[0045]

[0046] Among them, U A_cal [] is the grid point voltage calculation value array.

[0047] Optionally, comparing the grid connection point voltage calculation value array with the grid connection point voltage test array to determine a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array includes:

[0048] For each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate the error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array;

[0049] The array position corresponding to the error value having the smallest error value and less than a preset error threshold value among the calculated grid-connected point voltage values ​​in the calculated grid-connected point voltage value array is used as the target array position.

[0050] Optionally, the respectively locating the values ​​of the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, and calculating the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator system, includes:

[0051] Determine the value of the target array position in the grid connection point voltage calculation value array as the grid connection point voltage amplitude of the wind farm;

[0052] Determine the value of the target array position in the virtual internal potential amplitude test array as the virtual internal potential amplitude of the wind farm;

[0053] Determine the value of the target array position in the virtual internal potential phase test array as the virtual internal potential phase of the wind farm;

[0054] The grid connection point voltage amplitude of the wind farm, the virtual internal potential amplitude of the wind farm and the virtual internal potential phase of the wind farm are multiplied, and the ratio of the product obtained and the stator reactance of the doubly-fed generator of the wind turbine group is the output active power of the test value.

[0055] An optimized parameter calculation device for wind farm fault ride-through, comprising:

[0056] A fault analysis parameter acquisition unit, used to acquire fault analysis parameters of a wind farm;

[0057] A voltage division parameter calculation unit, used to calculate the voltage division parameter of the grid connection point of the wind farm according to the fault analysis parameter;

[0058] A test array creation unit, used to create a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range at the preset interval;

[0059] A reactive current calculation unit, configured to calculate reactive current of the wind farm for each test value in the reactive injection proportional coefficient test array based on the test value, the fault analysis parameter and the grid connection point voltage test array, and obtain a rotor reactive current command test array;

[0060] An active current calculation unit, used to calculate the active current of the wind farm through the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain a rotor active current command test array;

[0061] a terminal voltage calculation unit, configured to calculate the terminal voltage of the wind farm according to terminal voltage calculation parameters, and obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array, and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter, and the fault analysis parameter;

[0062] a target array position determination unit, configured to compare the grid connection point voltage calculation value array with the grid connection point voltage test array, and determine a target array position where a grid connection point voltage calculation value that meets a preset error standard is located in the grid connection point voltage calculation value array;

[0063] An output active power determination unit, used to respectively locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set;

[0064] The optimization parameter determination unit is used to determine the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault ride-through.

[0065] Optionally, the fault analysis parameters acquired by the fault analysis parameter acquisition unit include: a first equivalent impedance measured at a preset measurement point between the grid-connected point of the wind farm and the fault point of the wind farm, a second equivalent impedance between the fault point and the measurement point, the short-circuit impedance of the fault point and the voltage amplitude of the measurement point, the mutual reactance of the doubly-fed motor of the wind turbine set in the wind farm, the stator reactance of the doubly-fed motor of the wind turbine set, the steady-state value of the rotor reactive current of the wind turbine set in normal mode, and the upper limit of the rotor-side converter current of the wind turbine set in normal mode.

[0066] Optionally, the voltage division parameter calculation unit includes:

[0067] The first voltage division parameter calculation subunit is used to calculate the first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm according to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine generator set using the following formula:

[0068]

[0069]

[0070] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage division coefficient of the grid connection point voltage of the wind farm;

[0071] The second voltage division parameter calculation subunit is used to combine the first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm to form the grid connection point voltage division parameter of the wind farm.

[0072] Optionally, the reactive current calculation unit includes:

[0073] The first reactive current calculation subunit is used to calculate the rotor reactive current increment test array for each test value in the reactive injection proportional coefficient test array according to the preset adjustment dead zone value, the test value and the grid connection point voltage test array using the following formula:

[0074]

[0075] Among them, I rq_inj_test [] is the rotor reactive current increment test array, K qv_test[M] is the test value in the reactive injection proportional coefficient test array, U A_test [] is the grid-connected point voltage test array, U inj_db is the adjustment dead zone value;

[0076] A second reactive current calculation subunit is configured to, for each rotor reactive current increment test value in the rotor reactive current increment test array, subtract the rotor reactive current increment test value from the rotor reactive current steady-state value to obtain a rotor reactive current instruction test value of the wind farm during the fault ride-through period;

[0077] The third reactive current calculation subunit is used to determine, for each of the rotor reactive current command test values, a minimum value between the rotor reactive current injection command test value and the rotor-side converter current upper limit as a comparison result, and use the opposite of the comparison result as the rotor reactive current command test value. Each rotor reactive current command test value constitutes a rotor reactive current command test array.

[0078] Optionally, the active current calculation unit includes:

[0079] The first active current calculation subunit is used to calculate the rotor active current limit value first test array by using the following formula through the preset active current limit coefficient, the adjustment dead zone value and the grid connection point voltage test array:

[0080]

[0081] Among them, I rdmax1_test [] is the first test array of rotor active current limit value, k d is the active current limiting coefficient, U A_test [] is the grid-connected point voltage test array, U zr is the voltage threshold, and the expression of the voltage threshold is U zr =1-U inj_db -1 / k d , U inj_db is the adjustment dead zone value;

[0082] a second active current calculation subunit, for obtaining a rotor active current amplitude limit value test value by taking a square root of a square difference between the rotor reactive current amplitude limit value test value and the rotor-side converter current upper limit value for each rotor reactive current amplitude limit value test value in the rotor reactive current amplitude limit value test array, wherein each rotor active current amplitude limit value test value constitutes a rotor active current amplitude limit value second test array;

[0083] The third active current calculation subunit is used to determine the minimum value of the first rotor active current limit value in the first test array of the rotor active current limit value, and each rotor active current limit value in the second test array of the rotor active current limit value corresponding to the array position of the first rotor active current limit value in its array, by comparing the first test value of the rotor active current limit value with the second test value of the rotor active current limit value, as the rotor active current command test value, and each rotor active current limit value second test value in the second test array of the rotor active current limit value corresponds to the array position of the first test value of the rotor active current limit value in its array, and each rotor active current command test value constitutes a rotor active current command test array.

[0084] Optionally, the terminal voltage calculation unit includes:

[0085] The first terminal voltage calculation subunit is used to calculate the virtual internal potential amplitude test array according to the mutual reactance of the double-fed generator of the wind turbine group, the rotor reactive current command test array and the rotor active current command test array using the following formula:

[0086]

[0087] Among them, E test [] is the virtual internal potential amplitude test array, X m is the mutual reactance of the doubly-fed generator of the wind turbine, I rd_test [] is the rotor active current instruction test array, I rq_test [] is the rotor reactive current instruction test array;

[0088] The second terminal voltage calculation subunit is used to calculate the virtual internal potential phase test array according to the rotor reactive current command test array, the rotor active current command test array, the virtual internal potential amplitude test array, the first grid-connected point voltage division coefficient, the second grid-connected point voltage division coefficient and the voltage amplitude of the measuring point using the following formula:

[0089]

[0090]

[0091]

[0092] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage, k2 is the second voltage division coefficient of the grid connection point voltage, U C is the voltage amplitude at the measuring point, δ e_test [] is the virtual internal potential phase test array, is the internal potential phase array in the phase-locked coordinate system, δ t_test [] is the grid connection point voltage phase test array;

[0093] The third terminal voltage calculation subunit is used to calculate the grid connection point voltage calculation value array according to the virtual internal potential amplitude test array, the internal potential phase array in the phase-locked coordinate system, the grid connection point voltage phase test array, the first grid connection point voltage division coefficient, the second grid connection point voltage division coefficient and the voltage amplitude of the measurement point:

[0094]

[0095] Among them, U A_cal [] is the grid point voltage calculation value array.

[0096] Optionally, the target array position determination unit includes:

[0097] A first target array position determination subunit is used to calculate, for each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate an error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array;

[0098] The second target array position determination subunit is used to use the array position corresponding to the error value with the smallest error value and less than a preset error threshold among the grid-connected point voltage calculation values ​​in the grid-connected point voltage calculation value array as the target array position.

[0099] Optionally, the output active power determination unit includes:

[0100] A first output active power determination subunit, configured to determine the value of the target array position in the grid connection point voltage calculation value array as the grid connection point voltage amplitude of the wind farm;

[0101] a second output active power determination subunit, configured to determine the value of the target array position in the virtual internal potential amplitude test array as the virtual internal potential amplitude of the wind farm;

[0102] a third output active power determination subunit, configured to determine the value of the target array position in the virtual internal potential phase test array as the virtual internal potential phase of the wind farm;

[0103] The fourth output active power determination subunit is used to multiply the grid connection point voltage amplitude of the wind farm, the virtual internal potential amplitude of the wind farm and the virtual internal potential phase of the wind farm, and the ratio of the obtained product to the stator reactance of the doubly fed motor of the wind turbine group is the output active power of the test value.

[0104] By means of the above technical scheme, the present application obtains the fault analysis parameters of the wind farm, and calculates the grid connection point voltage division parameters of the wind farm according to the fault analysis parameters, creates a reactive injection proportional coefficient test array and a grid connection point voltage test array, calculates the reactive current and active current of the wind farm, and calculates the terminal voltage of the wind farm according to the terminal voltage calculation parameters, obtains a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, compares the grid connection point voltage calculation value array with the grid connection point voltage test array, determines the target array position of the calculated value that meets the preset error standard in the grid connection point voltage calculation value array, locates the values ​​of the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array respectively, and calculates the output active power of the test value in combination with the internal parameters of the wind turbine group, and determines the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault crossing. It can be seen that by obtaining the fault analysis parameters of the wind farm when a fault occurs, the voltage distribution of the wind farm grid connection point can be analyzed, so as to further analyze the rotor reactive current and active current of the wind turbine, effectively troubleshoot the grid connection point voltage of the wind farm, and thus obtain the active power output of the wind farm. The test data corresponding to the maximum active power is used as the parameter for optimizing the wind farm. Taking into account the active power accumulated by the wind turbine during the fault, the wind farm retains the maximum transient stability margin while providing reactive power to meet the grid connection standards, thereby improving the transient synchronization stability of the wind farm after fault recovery. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0106] Figure 1 A schematic diagram of a flow chart of wind farm fault ride-through optimization parameter calculation provided in an embodiment of the present application;

[0107] Figure 2 A schematic diagram of a scenario of fault ride-through measurement of a wind farm provided in an embodiment of the present application;

[0108] Figure 3 A schematic diagram of the structure of normal active / reactive current control for wind farm fault ride-through provided in an embodiment of the present application;

[0109] Figure 4 A schematic diagram of an implementation method of normal active / reactive current control for wind farm fault ride-through provided in an embodiment of the present application;

[0110] Figure 5 A schematic diagram of the effect of optimizing the fault ride-through parameters of a wind farm provided in an embodiment of the present application;

[0111] Figure 6 A schematic diagram of the structure of a device for calculating wind farm fault ride-through optimization parameters provided in an embodiment of the present application;

[0112] Figure 7 A schematic diagram of the structure of a device for calculating wind farm fault ride-through optimization parameters provided in an embodiment of the present application. DETAILED DESCRIPTION

[0113] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0114] The present application solution can be implemented based on a terminal with data processing capabilities, which can be a computer, server, cloud, etc.

[0115] Next, combine Figure 1 The method for calculating the optimized parameters of the wind farm fault ride-through of the present application may include the following steps:

[0116] Step S110: Obtain fault analysis parameters of the wind farm, and calculate grid connection point voltage division parameters of the wind farm according to the fault analysis parameters.

[0117] Specifically, the fault analysis parameters of the wind farm may include measurement quantities of the wind farm grid connection point and the fault point, and internal parameters of the wind turbine generator set.

[0118] Among them, the measurement quantities of the wind farm grid connection point and the fault point are composed of the first equivalent impedance between the grid connection point of the wind farm and the fault point of the wind farm, the second equivalent impedance between the fault point and the measurement point, the short-circuit impedance of the fault point and the voltage amplitude of the measurement point measured by the preset measurement point, and the preset measurement point is a measurement point far away from the wind farm and the fault point. The internal parameters of the wind turbine are composed of the mutual reactance of the doubly fed generator of the wind turbine in the wind farm, the stator reactance of the doubly fed generator of the wind turbine, the steady-state value of the rotor reactive current of the wind turbine in normal mode, and the upper limit of the rotor-side converter current of the wind turbine in normal mode.

[0119] Examples include Figure 2 , Figure 2 The figure shows a scenario of a fault event. The scenario shown is a single-machine infinite grid-connected system dominated by a doubly fed wind turbine, which consists of a doubly fed wind farm, an infinite grid, transmission lines and transformers. Wind power is transmitted to bus No. 6 in the direction of the infinite grid via the tie line (the tie line between bus No. 1 and bus No. 6), where the tie line between bus No. 3 and bus No. 4 is a double-circuit line. The fault point is located on a tie line at bus No. 3. The fault point is marked as B, the grid connection point is marked as A, and the measurement point is C, which is far away from the doubly fed wind farm and the fault point. The first equivalent impedance between the grid connection point A and the fault point B is X AB , the second equivalent impedance between the fault point B and the measurement point C is X BC , the short-circuit impedance of fault point B is X f , the voltage amplitude at the measuring point C is U C .

[0120] Step S120: Create a reactive injection proportional coefficient test array and a grid connection point voltage test array.

[0121] Specifically, the reactive injection proportional coefficient test array includes a number of test values, each test value is obtained at a preset interval within a first preset value range, and the grid connection point voltage test array includes a number of grid connection point voltage test values, each grid connection point voltage test value is obtained at the preset interval within a second preset value range.

[0122] The upper limit of the value of the grid connection point voltage test array may be a preset regulation dead zone value, and the preset regulation dead zone value may be user-defined.

[0123] For example, the first preset value range may be [0.5, 6], and the second preset value range may be [0.2, 1-U inj_db ], the preset interval can be 0.01, so the reactive injection proportional coefficient test array created is an array with a starting value of 0.5, a step size of 0.01, and an end value of 6. The grid connection point voltage test array is an array with a starting value of 0.2, a step size of 0.01, and an end value of 1-U inj_db Array of .

[0124] Step S130: for each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, perform reactive current calculation on the wind farm to obtain a rotor reactive current command test array.

[0125] It can be understood that since it is necessary to find a test value that meets the optimization conditions from the reactive injection proportional coefficient test array, it is necessary to test all test values ​​in the reactive injection proportional coefficient test array, such as starting from 0.5, with a step size of 0.01, and testing each test array up to 6. Therefore, for each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameters and the grid connection point voltage test array, the reactive current calculation of the wind farm can be performed to obtain the rotor reactive current command test array for subsequent analysis.

[0126] Step S140: Calculate the active current of the wind farm through the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain a rotor active current command test array.

[0127] Specifically, for the control of active / reactive current during wind farm fault ride-through, the following methods can be used: Figure 3 The control structure shown is introduced.

[0128] The control structure includes a normal active power control module, a normal reactive power control module, a reactive power injection ratio control module, a low voltage power logic limit module and a maximum current limit module. The normal reactive power control module is frozen, and the output maintains the initial value of the fault and serves as the q-axis current at the initial fault. The reactive power injection ratio control provides an additional q-axis current during the fault, and the q-axis current output by the normal reactive power control is used together as the q-axis rotor current instruction. The reactive power injection ratio control module can obtain dynamically changing control parameters. The normal active power control module is frozen, and the output maintains the initial value of the fault and serves as the d-axis current. The low voltage power logic limit module provides the first limit value for the d-axis current output by the normal active power control module. The maximum current limit module limits the d-axis and q-axis rotor current instructions again to obtain the current instruction I that is finally output to the rotor converter. rq and I rd .

[0129] Furthermore, an optional implementation method for controlling active / reactive current during fault ride-through of a wind farm is introduced.

[0130] Examples include Figure 4 , normal reactive branch controls the output rotor current I rd0 The reactive injection ratio control module is based on the wind farm terminal voltage U t The additional injected q-axis current I rq_inj The difference between the two is the q-axis current command value input to the maximum current limit module. The normal active branch controls the output rotor current command I rd0 The low voltage power logic limit module is based on the wind farm terminal voltage U tGet the d-axis current limit value I rdmax1 , I rd0 with I rdmax1 The minimum value of is used as the d-axis current command value input to the maximum current limit module. The maximum current limit module obtains the corresponding d-axis current limit value I according to the input q-axis current command value. rdmax2 , respectively limit the input d-axis and q-axis rotor current commands, and obtain the final d-axis and q-axis current commands I output to the rotor converter. rq and I rd .

[0131] Step S150: performing terminal voltage calculation on the wind farm according to the terminal voltage calculation parameters to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array.

[0132] Specifically, the terminal voltage calculation parameter is a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter.

[0133] Step S160: Compare the grid connection point voltage calculation value array with the grid connection point voltage test array to determine the target array position of the grid connection point voltage calculation value that meets the preset error standard in the grid connection point voltage calculation value array.

[0134] Step S170, respectively locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine.

[0135] Step S180: Determine the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault ride-through.

[0136] The optimized parameter calculation method for wind farm fault ride-through provided in this embodiment obtains the fault analysis parameters of the wind farm, and calculates the grid connection point voltage division parameters of the wind farm according to the fault analysis parameters, creates a reactive injection proportional coefficient test array and a grid connection point voltage test array, calculates reactive current and active current of the wind farm, and calculates the terminal voltage of the wind farm according to the terminal voltage calculation parameters, obtains a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, and compares the grid connection point voltage calculation value array with the grid connection point voltage calculation value array. The grid voltage test array is compared to determine the target array position of the calculated value that meets the preset error standard in the grid connection point voltage calculation value array, and the values ​​of the target array position in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array are located respectively, and the output active power of the test value is calculated in combination with the internal parameters of the wind turbine generator set, and the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers is determined as the optimization parameter of the wind farm fault crossing. It can be seen that by obtaining the fault analysis parameters of the wind farm when a fault occurs, the voltage division of the wind farm grid connection point can be analyzed, so as to further analyze the rotor reactive current and active current of the wind turbine generator set, effectively find out the grid connection point voltage of the wind farm, and thus obtain the active power output by the wind farm, and take the test data corresponding to the maximum active power as the parameter for optimizing the wind farm, which can take into account the active power accumulated by the wind turbine generator set during the fault. After applying the optimization parameter calculation method proposed in this application to wind farm fault ride-through, the response waveform of the potential phase in the wind farm can be obtained as follows: Figure 5 As shown, the reactive proportional injection coefficient is too large (k qv =4) or smaller (k qv =1) both lead to the phenomenon that the equivalent potential phase of the wind farm increases monotonically and loses stability. From the perspective of the power grid, more reactive power should be output as much as possible. When the reactive power proportional injection coefficient takes the optimized value obtained by the method of the present application, the wind farm can output more reactive power and avoid the situation that the equivalent potential phase loses stability, so that the wind farm retains the maximum transient stability margin and improves the transient synchronization stability of the wind farm after fault recovery.

[0137] In some embodiments of the present application, the process of calculating the grid connection point voltage division parameters of the wind farm according to the fault analysis parameters mentioned in the above embodiment is introduced, and the process may include:

[0138] S1. Calculate a first voltage division coefficient of the grid connection point of the wind farm and a second voltage division coefficient of the grid connection point of the wind farm using the following formula according to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine group:

[0139]

[0140]

[0141] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage-dividing coefficient of the grid-connected point voltage of the wind farm, and the operator “||” can be specifically expressed as a||b=(a*b) / (a+b).

[0142] S2. Combining a first voltage division coefficient of the grid connection point voltage of the wind farm and a second voltage division coefficient of the grid connection point voltage of the wind farm to form a voltage division parameter of the grid connection point voltage of the wind farm.

[0143] In some embodiments of the present application, the process of performing reactive current calculation on the wind farm for each test value in the reactive injection proportional coefficient test array based on the test value, the fault analysis parameter and the grid connection point voltage test array to obtain a rotor reactive current instruction test array is introduced in the above step S130. The process may include:

[0144] S1. For each test value in the reactive injection proportional coefficient test array, the rotor reactive current increment test array is calculated using the following formula according to the preset adjustment dead zone value, the test value and the grid connection point voltage test array:

[0145]

[0146] Among them, I rq_inj_test [] is the rotor reactive current increment test array, K qv_test [M] is the test value in the reactive injection proportional coefficient test array, U A_test [] is the grid-connected point voltage test array, U inj_db is the adjustment dead zone value.

[0147] S2. For each rotor reactive current increment test value in the rotor reactive current increment test array, subtract the rotor reactive current increment test value from the rotor reactive current steady-state value to obtain a rotor reactive injection current command test value of the wind farm during fault ride-through.

[0148] S3. For each of the rotor reactive current instruction test values, determine the minimum value of the rotor reactive current instruction test value compared with the rotor side converter current upper limit as a comparison result, and use the opposite of the comparison result as the rotor reactive current instruction test value. Each rotor reactive current instruction test value constitutes a rotor reactive current instruction test array.

[0149] In some embodiments of the present application, the process of performing active current calculation on the wind farm through the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain the rotor active current command test array in step S140 is introduced, and the process may include:

[0150] S1. The first test array of rotor active current limit value is calculated by the following formula using the preset active current limit coefficient, the adjustment dead zone value and the grid connection point voltage test array:

[0151]

[0152] Among them, I rdmax1_test [] is the first test array of rotor active current limit value, k d is the active current limiting coefficient, U A_test [] is the grid-connected point voltage test array, U zr is the voltage threshold, and the expression of the voltage threshold is U zr =1-U inj_db -1 / k d , U inj_db is the adjustment dead zone value.

[0153] S2. For each rotor reactive current command test value in the rotor reactive current command test array, take the square root of the square difference between the rotor reactive current command test value and the upper limit of the rotor-side converter current to obtain a rotor active current limit value test value, and each rotor active current limit value test value constitutes a second rotor active current limit value test array.

[0154] S3. For each first test value of the rotor active current limit value in the first test array of the rotor active current limit value, and each second test value of the rotor active current limit value in the second test array of the rotor active current limit value corresponding to the array position of the first test value of the rotor active current limit value in its array, determine the minimum value of the first test value of the rotor active current limit value compared with the second test value of the rotor active current limit value, which is the rotor active current command test value, and each rotor active current command test value constitutes a rotor active current command test array.

[0155] In some embodiments of the present application, the process of performing terminal voltage calculation on the wind farm according to the terminal voltage calculation parameters in step S150 to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array is introduced, and the process may include:

[0156] S1. According to the mutual reactance of the doubly-fed generator of the wind turbine generator set, the rotor reactive current command test array and the rotor active current command test array, a virtual internal potential amplitude test array is calculated using the following formula:

[0157]

[0158] Among them, E test [] is the virtual internal potential amplitude test array, X m is the mutual reactance of the doubly-fed generator of the wind turbine, I rd_test [] is the rotor active current instruction test array, I rq_test [] is the rotor reactive current command test array.

[0159] S2. According to the rotor reactive current command test array, the rotor active current command test array, the virtual internal potential amplitude test array, the first voltage division coefficient of the grid connection point voltage, the second voltage division coefficient of the grid connection point voltage and the voltage amplitude of the measuring point, the virtual internal potential phase test array is calculated using the following formula:

[0160]

[0161]

[0162]

[0163] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage, k2 is the second voltage division coefficient of the grid connection point voltage, U C is the voltage amplitude at the measuring point, δ e_test [] is the virtual internal potential phase test array, is the internal potential phase array in the phase-locked coordinate system, δ t_test [] is the grid connection point voltage phase test array.

[0164] S3, according to the virtual internal potential amplitude test array, the internal potential phase array in the phase-locked coordinate system, the grid point voltage phase test array, the first grid point voltage division coefficient, the second grid point voltage division coefficient and the voltage amplitude of the measuring point, calculate the grid point voltage calculation value array:

[0165]

[0166] Among them, U A_cal [] is the grid point voltage calculation value array.

[0167] In some embodiments of the present application, the process of comparing the grid connection point voltage calculation value array with the grid connection point voltage test array in the above step S160 to determine the target array position of the grid connection point voltage calculation value that meets the preset error standard in the grid connection point voltage calculation value array is introduced, and the process may include:

[0168] S1. For each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate the error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array.

[0169] S2. Using, as the target array position, the array position corresponding to the error value with the smallest error value and less than a preset error threshold value among the grid-connected point voltage calculation values ​​in the grid-connected point voltage calculation value array.

[0170] Specifically, the preset error threshold may represent the coarsest accuracy of the matching between the calculated grid connection point voltage value and the tested grid connection point voltage value. The preset error threshold may be customized. For example, the preset error threshold is 0.01.

[0171] In some embodiments of the present application, the above step S170, respectively locating the values ​​of the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, and combining the internal parameters of the wind turbine to calculate the output active power of the test value is introduced. The process may include:

[0172] S1. Determine the value of the target array position in the grid-connected point voltage calculation value array as the grid-connected point voltage amplitude of the wind farm.

[0173] S2. Determine the value of the target array position in the virtual internal potential amplitude test array as the virtual internal potential amplitude of the wind farm.

[0174] S3. Determine the value of the target array position in the virtual internal potential phase test array as the virtual internal potential phase of the wind farm.

[0175] Among them, the execution order of S1-S3 can be in no particular order. After the grid connection point voltage amplitude, the virtual internal potential amplitude and the virtual internal potential phase are all determined, S4 can be executed.

[0176] S4. Multiply the grid connection point voltage amplitude of the wind farm, the virtual internal potential amplitude of the wind farm and the virtual internal potential phase of the wind farm, and the ratio of the obtained product to the stator reactance of the doubly-fed motor of the wind turbine group is the output active power of the test value.

[0177] The following describes an apparatus for implementing wind farm fault ride-through optimization parameter calculation provided in an embodiment of the present application. The apparatus for implementing wind farm fault ride-through optimization parameter calculation described below and the method for implementing wind farm fault ride-through optimization parameter calculation described above can refer to each other.

[0178] See also Figure 6 , Figure 6 A schematic diagram of the structure of a device for realizing wind farm fault ride-through optimization parameter calculation disclosed in an embodiment of the present application.

[0179] like Figure 6 As shown, the device may include:

[0180] A fault analysis parameter acquisition unit 11 is used to acquire fault analysis parameters of a wind farm;

[0181] A voltage division parameter calculation unit 12, configured to calculate a voltage division parameter of a grid connection point of the wind farm according to the fault analysis parameter;

[0182] The test array creation unit 13 is used to create a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range at the preset interval;

[0183] A reactive current calculation unit 14 is used to calculate reactive current of the wind farm for each test value in the reactive injection proportional coefficient test array based on the test value, the fault analysis parameter and the grid connection point voltage test array to obtain a rotor reactive current command test array;

[0184] An active current calculation unit 15, configured to calculate the active current of the wind farm through the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array, and obtain a rotor active current command test array;

[0185] The terminal voltage calculation unit 16 is used to calculate the terminal voltage of the wind farm according to the terminal voltage calculation parameters to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter;

[0186] A target array position determination unit 17, used for comparing the grid connection point voltage calculation value array with the grid connection point voltage test array, and determining a target array position where a grid connection point voltage calculation value that meets a preset error standard is located in the grid connection point voltage calculation value array;

[0187] An output active power determination unit 18 is used to locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, respectively, and calculate the output active power of the test value in combination with the internal parameters of the wind turbine generator set;

[0188] The optimization parameter determination unit 19 is used to determine the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault ride-through.

[0189] Optionally, the fault analysis parameters acquired by the fault analysis parameter acquisition unit 11 include: a first equivalent impedance measured at a preset measurement point between the grid-connected point of the wind farm and the fault point of the wind farm, a second equivalent impedance between the fault point and the measurement point, the short-circuit impedance of the fault point and the voltage amplitude of the measurement point, the mutual reactance of the doubly-fed motor of the wind turbine set in the wind farm, the stator reactance of the doubly-fed motor of the wind turbine set, the steady-state value of the rotor reactive current of the wind turbine set in normal mode, and the upper limit of the rotor-side converter current of the wind turbine set in normal mode.

[0190] Optionally, the voltage division parameter calculation unit 12 includes:

[0191] The first voltage division parameter calculation subunit is used to calculate the first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm according to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine generator set using the following formula:

[0192]

[0193]

[0194] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage division coefficient of the grid connection point voltage of the wind farm;

[0195] The second voltage division parameter calculation subunit is used to combine the first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm to form the grid connection point voltage division parameter of the wind farm.

[0196] Optionally, the reactive current calculation unit 14 includes:

[0197] The first reactive current calculation subunit is used to calculate the rotor reactive current increment test array for each test value in the reactive injection proportional coefficient test array according to the preset adjustment dead zone value, the test value and the grid connection point voltage test array using the following formula:

[0198]

[0199] Among them, I rq_inj_test [] is the rotor reactive current increment test array, K qv_test [M] is the test value in the reactive injection proportional coefficient test array, U A_test [] is the grid-connected point voltage test array, U inj_db is the adjustment dead zone value;

[0200] A second reactive current calculation subunit is configured to, for each rotor reactive current increment test value in the rotor reactive current increment test array, subtract the rotor reactive current increment test value from the rotor reactive current steady-state value to obtain a rotor reactive current instruction test value of the wind farm during the fault ride-through period;

[0201] The third reactive current calculation subunit is used to determine, for each of the rotor reactive current command test values, a minimum value between the rotor reactive current injection command test value and the rotor-side converter current upper limit as a comparison result, and use the opposite of the comparison result as the rotor reactive current command test value. Each rotor reactive current command test value constitutes a rotor reactive current command test array.

[0202] Optionally, the active current calculation unit 15 includes:

[0203] The first active current calculation subunit is used to calculate the rotor active current limit value first test array by using the following formula through the preset active current limit coefficient, the adjustment dead zone value and the grid connection point voltage test array:

[0204]

[0205] Among them, I rdmax1_test [] is the first test array of rotor active current limit value, k d is the active current limiting coefficient, U A_test [] is the grid-connected point voltage test array, U zr is the voltage threshold, and the expression of the voltage threshold is U zr =1-U inj_db -1 / k d , U inj_db is the adjustment dead zone value;

[0206] a second active current calculation subunit, for obtaining a rotor active current amplitude limit value test value by taking a square root of a square difference between the rotor reactive current amplitude limit value test value and the rotor-side converter current upper limit value for each rotor reactive current amplitude limit value test value in the rotor reactive current amplitude limit value test array, wherein each rotor active current amplitude limit value test value constitutes a rotor active current amplitude limit value second test array;

[0207] The third active current calculation subunit is used to determine the minimum value of the first rotor active current limit value in the first test array of the rotor active current limit value, and each rotor active current limit value in the second test array of the rotor active current limit value corresponding to the array position of the first rotor active current limit value in its array, by comparing the first test value of the rotor active current limit value with the second test value of the rotor active current limit value, as the rotor active current command test value, and each rotor active current limit value second test value in the second test array of the rotor active current limit value corresponds to the array position of the first test value of the rotor active current limit value in its array, and each rotor active current command test value constitutes a rotor active current command test array.

[0208] Optionally, the terminal voltage calculation unit 16 includes:

[0209] The first terminal voltage calculation subunit is used to calculate the virtual internal potential amplitude test array according to the mutual reactance of the double-fed generator of the wind turbine group, the rotor reactive current command test array and the rotor active current command test array using the following formula:

[0210]

[0211] Among them, E test [] is the virtual internal potential amplitude test array, X mis the mutual reactance of the doubly-fed generator of the wind turbine, I rd_test [] is the rotor active current instruction test array, I rq_test [] is the rotor reactive current instruction test array;

[0212] The second terminal voltage calculation subunit is used to calculate the virtual internal potential phase test array according to the rotor reactive current command test array, the rotor active current command test array, the virtual internal potential amplitude test array, the first grid-connected point voltage division coefficient, the second grid-connected point voltage division coefficient and the voltage amplitude of the measuring point using the following formula:

[0213]

[0214]

[0215]

[0216] Wherein, k1 is the first voltage division coefficient of the grid connection point voltage, k2 is the second voltage division coefficient of the grid connection point voltage, U C is the voltage amplitude at the measuring point, δ e_test [] is the virtual internal potential phase test array, is the internal potential phase array in the phase-locked coordinate system, δ t_test [] is the grid connection point voltage phase test array;

[0217] The third terminal voltage calculation subunit is used to calculate the grid connection point voltage calculation value array according to the virtual internal potential amplitude test array, the internal potential phase array in the phase-locked coordinate system, the grid connection point voltage phase test array, the first grid connection point voltage division coefficient, the second grid connection point voltage division coefficient and the voltage amplitude of the measurement point:

[0218]

[0219] Among them, U A_cal [] is the grid point voltage calculation value array.

[0220] Optionally, the target array position determination unit 17 includes:

[0221] A first target array position determination subunit is used to calculate, for each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate an error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array;

[0222] The second target array position determination subunit is used to use the array position corresponding to the error value with the smallest error value and less than a preset error threshold among the grid-connected point voltage calculation values ​​in the grid-connected point voltage calculation value array as the target array position.

[0223] Optionally, the output active power determination unit 18 includes:

[0224] A first output active power determination subunit, configured to determine the value of the target array position in the grid connection point voltage calculation value array as the grid connection point voltage amplitude of the wind farm;

[0225] a second output active power determination subunit, configured to determine the value of the target array position in the virtual internal potential amplitude test array as the virtual internal potential amplitude of the wind farm;

[0226] a third output active power determination subunit, configured to determine the value of the target array position in the virtual internal potential phase test array as the virtual internal potential phase of the wind farm;

[0227] The fourth output active power determination subunit is used to multiply the grid connection point voltage amplitude of the wind farm, the virtual internal potential amplitude of the wind farm and the virtual internal potential phase of the wind farm, and the ratio of the obtained product to the stator reactance of the doubly fed motor of the wind turbine group is the output active power of the test value.

[0228] The device for calculating the optimized parameters of a wind farm fault ride-through provided in the embodiment of the present application can be applied to devices for calculating the optimized parameters of a wind farm fault ride-through, such as terminals: mobile phones, computers, etc. Optionally, Figure 7 The hardware structure block diagram of the equipment for calculating the optimized parameters of the wind farm fault ride-through is shown in FIG. Figure 7 , the hardware structure of the device for calculating the optimization parameters of a wind farm fault ride-through may include: at least one processor 101, at least one communication interface 102, at least one memory 103 and at least one communication bus 104;

[0229] In the embodiment of the present application, the number of the processor 101, the communication interface 102, the memory 103, and the communication bus 104 is at least one, and the processor 101, the communication interface 102, and the memory 103 communicate with each other through the communication bus 104;

[0230] The processor 101 may be a central processing unit (CPU), or an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present invention;

[0231] The memory 103 may include a high-speed RAM memory, and may also include a non-volatile memory, such as at least one disk memory;

[0232] The memory stores a program, and the processor can call the program stored in the memory, and the program is used to:

[0233] Acquiring fault analysis parameters of the wind farm, and calculating grid connection point voltage division parameters of the wind farm according to the fault analysis parameters;

[0234] Creating a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range and at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range and at the preset interval;

[0235] For each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, the reactive current of the wind farm is calculated to obtain a rotor reactive current command test array;

[0236] By using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array, the active current of the wind farm is calculated to obtain a rotor active current command test array;

[0237] According to the terminal voltage calculation parameters, terminal voltage calculation is performed on the wind farm to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter;

[0238] Comparing the grid connection point voltage calculation value array with the grid connection point voltage test array, and determining a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array;

[0239] Locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array respectively, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set;

[0240] The test value in the reactive injection proportionality coefficient test array corresponding to the maximum output active power among the output active powers is determined as the optimization parameter of the wind farm fault ride-through.

[0241] Optionally, the detailed functions and extended functions of the program may refer to the above description.

[0242] The embodiment of the present application further provides a storage medium, which may store a program suitable for execution by a processor, wherein the program is used to:

[0243] Acquiring fault analysis parameters of the wind farm, and calculating grid connection point voltage division parameters of the wind farm according to the fault analysis parameters;

[0244] Creating a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range and at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range and at the preset interval;

[0245] For each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, the reactive current of the wind farm is calculated to obtain a rotor reactive current command test array;

[0246] By using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array, the active current of the wind farm is calculated to obtain a rotor active current command test array;

[0247] According to the terminal voltage calculation parameters, terminal voltage calculation is performed on the wind farm to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter;

[0248] Comparing the grid connection point voltage calculation value array with the grid connection point voltage test array, and determining a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array;

[0249] Locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array respectively, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set;

[0250] The test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers is determined as the optimization parameter of the wind farm fault ride-through.

[0251] Optionally, the detailed functions and extended functions of the program may refer to the above description.

[0252] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0253] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can refer to each other.

[0254] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for calculating optimized parameters of wind farm fault ride-through, characterized in that: include: Obtaining fault analysis parameters of the wind farm, and calculating the voltage division parameters of the grid connection point of the wind farm according to the fault analysis parameters, wherein the fault analysis parameters include: a first equivalent impedance between the grid connection point of the wind farm and the fault point of the wind farm, a second equivalent impedance between the fault point and the measuring point, the short-circuit impedance of the fault point, and the voltage amplitude of the measuring point, the mutual reactance of the doubly-fed motor of the wind turbine in the wind farm, the stator reactance of the doubly-fed motor of the wind turbine, the steady-state value of the rotor reactive current of the wind turbine in normal mode, and the upper limit of the rotor-side converter current of the wind turbine in normal mode; Creating a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range and at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range and at the preset interval; For each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, the reactive current of the wind farm is calculated to obtain a rotor reactive current command test array; By using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array, the active current of the wind farm is calculated to obtain a rotor active current command test array; According to the terminal voltage calculation parameters, terminal voltage calculation is performed on the wind farm to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter and the fault analysis parameter; Comparing the grid connection point voltage calculation value array with the grid connection point voltage test array, and determining a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array; Locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array respectively, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set; Determine the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault ride-through; The step of calculating the grid connection point voltage division parameters of the wind farm according to the fault analysis parameters includes: According to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine generator set, a first voltage division coefficient of the grid connection point voltage of the wind farm and a second voltage division coefficient of the grid connection point voltage of the wind farm are calculated using the following formula: Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage division coefficient of the grid connection point voltage of the wind farm; The first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm are combined to form the grid connection point voltage division parameter of the wind farm; The step of comparing the grid connection point voltage calculation value array with the grid connection point voltage test array to determine a target array position of a grid connection point voltage calculation value that meets a preset error standard in the grid connection point voltage calculation value array includes: For each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate the error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array; The array position corresponding to the error value having the smallest error value and less than a preset error threshold value among the calculated grid-connected point voltage values ​​in the calculated grid-connected point voltage value array is used as the target array position.

2. The method according to claim 1, characterized in that For each test value in the reactive injection proportional coefficient test array, based on the test value, the fault analysis parameter and the grid connection point voltage test array, reactive current calculation is performed on the wind farm to obtain a rotor reactive current instruction test array, including: For each test value in the reactive injection proportional coefficient test array, the rotor reactive current increment test array is calculated using the following formula according to the preset adjustment dead zone value, the test value and the grid connection point voltage test array: Among them, I rq_inj_test [] is the rotor reactive current increment test array, K qv_test [] is the reactive injection proportional coefficient test array, U A_test [] is the grid-connected point voltage test array, U inj_db is the adjustment dead zone value; For each rotor reactive current increment test value in the rotor reactive current increment test array, subtract the rotor reactive current increment test value from the rotor reactive current steady-state value to obtain a rotor reactive injection current command test value of the wind farm during the fault ride-through period; For each of the rotor reactive current instruction test values, determine the minimum value of the rotor reactive current instruction test value compared with the rotor side converter current upper limit as a comparison result, and use the opposite of the comparison result as the rotor reactive current instruction test value. Each rotor reactive current instruction test value constitutes a rotor reactive current instruction test array.

3. The method according to claim 1, characterized in that The active current of the wind farm is calculated by using the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain a rotor active current command test array, including: The first test array of rotor active current limit value is obtained by calculating the following formula through the preset active current limit coefficient, the adjustment dead zone value and the grid connection point voltage test array: Among them, I rdmax1_test [] is the first test array of rotor active current limit value, k d is the active current limiting coefficient, U A_test [] is the grid-connected point voltage test array, U zr is the voltage threshold, and the expression of the voltage threshold is U zr =1-U inj_db -1 / k d , U inj_db is the adjustment dead zone value; For each rotor reactive current command test value in the rotor reactive current command test array, taking the square root of the square difference between the rotor reactive current command test value and the upper limit of the rotor-side converter current, a rotor active current amplitude limit value test value is obtained, and each rotor active current amplitude limit value test value constitutes a rotor active current amplitude limit value second test array; For each rotor active current limit value first test value in the rotor active current limit value first test array, and each rotor active current limit value second test value in the rotor active current limit value second test array corresponding to the array position of the rotor active current limit value first test value in its array, determine the minimum value of the rotor active current limit value first test value compared with the rotor active current limit value second test value, which is the rotor active current command test value, and each rotor active current command test value constitutes a rotor active current command test array.

4. The method according to claim 1, characterized in that: The terminal voltage calculation is performed on the wind farm according to the terminal voltage calculation parameters to obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array and a grid connection point voltage calculation value array, including: According to the mutual reactance of the doubly-fed generator of the wind turbine generator set, the rotor reactive current command test array and the rotor active current command test array, the virtual internal potential amplitude test array is calculated using the following formula: Among them, E test [] is the virtual internal potential amplitude test array, X m is the mutual reactance of the doubly-fed generator of the wind turbine, I rd_test [] is the rotor active current instruction test array, I rq_test [] is the rotor reactive current instruction test array; According to the rotor reactive current command test array, the rotor active current command test array, the virtual internal potential amplitude test array, the first grid-connected point voltage division coefficient, the second grid-connected point voltage division coefficient and the voltage amplitude of the measuring point, the virtual internal potential phase test array is calculated using the following formula: Wherein, k1 is the first voltage division coefficient of the grid connection point voltage, k2 is the second voltage division coefficient of the grid connection point voltage, U C is the voltage amplitude at the measuring point, δ e_test [] is the virtual internal potential phase test array, is the internal potential phase array in the phase-locked coordinate system, δ t_test [] is the grid connection point voltage phase test array; The grid connection point voltage calculation value array is calculated based on the virtual internal potential amplitude test array, the internal potential phase array in the phase-locked coordinate system, the grid connection point voltage phase test array, the first grid connection point voltage division coefficient, the second grid connection point voltage division coefficient and the voltage amplitude of the measurement point: Among them, U A_cal [] is the grid point voltage calculation value array.

5. The method according to claim 1, characterized in that The method of respectively locating the values ​​of the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array, and the grid connection point voltage calculation value array, and calculating the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator system, includes: Determine the value of the target array position in the grid connection point voltage calculation value array as the grid connection point voltage amplitude of the wind farm; Determine the value of the target array position in the virtual internal potential amplitude test array as the virtual internal potential amplitude of the wind farm; Determine the value of the target array position in the virtual internal potential phase test array as the virtual internal potential phase of the wind farm; The grid connection point voltage amplitude of the wind farm, the virtual internal potential amplitude of the wind farm and the virtual internal potential phase of the wind farm are multiplied, and the ratio of the product obtained and the stator reactance of the doubly-fed generator of the wind turbine group is the output active power of the test value.

6. A device for calculating optimization parameters of wind farm fault ride-through, characterized in that: include: a fault analysis parameter acquisition unit, configured to acquire fault analysis parameters of a wind farm, wherein the fault analysis parameters include: a first equivalent impedance between a grid connection point of the wind farm and a fault point of the wind farm, a second equivalent impedance between the fault point and the measurement point, a short-circuit impedance of the fault point, and a voltage amplitude of the measurement point, a mutual reactance of a doubly-fed motor of a wind turbine in the wind farm, a stator reactance of a doubly-fed motor of the wind turbine, a steady-state value of a rotor reactive current of the wind turbine in a normal mode, and an upper limit of a rotor-side converter current of the wind turbine in a normal mode; A voltage division parameter calculation unit, used to calculate the voltage division parameter of the grid connection point of the wind farm according to the fault analysis parameter; A test array creation unit, used to create a reactive injection proportional coefficient test array and a grid connection point voltage test array, wherein the reactive injection proportional coefficient test array includes a plurality of test values, each of which is obtained within a first preset value range at a preset interval, and the grid connection point voltage test array includes a plurality of grid connection point voltage test values, each of which is obtained within a second preset value range at the preset interval; A reactive current calculation unit, configured to calculate reactive current of the wind farm for each test value in the reactive injection proportional coefficient test array based on the test value, the fault analysis parameter and the grid connection point voltage test array, and obtain a rotor reactive current command test array; An active current calculation unit, used to calculate the active current of the wind farm through the rotor reactive current command test array, the fault analysis parameters and the grid connection point voltage test array to obtain a rotor active current command test array; a terminal voltage calculation unit, configured to calculate the terminal voltage of the wind farm according to terminal voltage calculation parameters, and obtain a virtual internal potential amplitude test array, a virtual internal potential phase test array, and a grid connection point voltage calculation value array, wherein the terminal voltage calculation parameters are a combination of the rotor reactive current command test array, the rotor active current command test array, the grid connection point voltage division parameter, and the fault analysis parameter; a target array position determination unit, configured to compare the grid connection point voltage calculation value array with the grid connection point voltage test array, and determine a target array position where a grid connection point voltage calculation value that meets a preset error standard is located in the grid connection point voltage calculation value array; An output active power determination unit, used to respectively locate the values ​​corresponding to the target array positions in the virtual internal potential amplitude test array, the virtual internal potential phase test array and the grid connection point voltage calculation value array, and calculate the output active power of the test values ​​in combination with the internal parameters of the wind turbine generator set; An optimization parameter determination unit, used to determine the test value in the reactive injection proportional coefficient test array corresponding to the maximum output active power among the output active powers as the optimization parameter of the wind farm fault ride-through; The voltage division parameter calculation unit comprises: The first voltage division parameter calculation subunit is used to calculate the first voltage division coefficient of the grid connection point voltage of the wind farm and the second voltage division coefficient of the grid connection point voltage of the wind farm according to the first equivalent impedance, the second equivalent impedance, the short-circuit impedance and the stator reactance of the doubly-fed generator of the wind turbine generator set using the following formula: Wherein, k1 is the first voltage division coefficient of the grid connection point voltage of the wind farm, X s is the stator reactance of the doubly-fed machine, X AB is the first equivalent impedance, X BC The second equivalent impedance, X f is the short-circuit impedance, k2 is the second voltage division coefficient of the grid connection point voltage of the wind farm; A second voltage division parameter calculation subunit is used to combine a first voltage division coefficient of the grid connection point voltage of the wind farm and a second voltage division coefficient of the grid connection point voltage of the wind farm to form a voltage division parameter of the grid connection point voltage of the wind farm; The target array position determination unit comprises: A first target array position determination subunit is used to calculate, for each grid connection point voltage calculation value in the grid connection point voltage calculation value array, and each grid connection point voltage test value in the grid connection point voltage test array corresponding to the array position of the grid connection point voltage calculation value in its array, calculate an error value between the grid connection point voltage calculation value and the grid connection point voltage test value, and use it as the error value corresponding to the array position of the grid connection point voltage calculation value in the grid connection point voltage calculation array; The second target array position determination subunit is used to use the array position corresponding to the error value with the smallest error value and less than a preset error threshold among the grid-connected point voltage calculation values ​​in the grid-connected point voltage calculation value array as the target array position.

Citation Information

Patent Citations

  • LVRT test control device

    CN101882798A

  • Capacity optimal configuration method and system of wind power plant reactive compensation device

    CN107994607A