A method and device for rounding off land area

Through occupation analysis and grouping processing, the problem of low accuracy of plot area revision is solved, and the logical consistency and accuracy are improved, ensuring the accuracy of plot area revision.

CN115147070BActive Publication Date: 2024-12-03广东省国土资源技术中心(广东省基础地理信息中心) +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210687884.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-17
Publication Date
2024-12-03
Estimated Expiration
2042-06-17

Smart Images

  • Figure CN115147070B_ABST
    Figure CN115147070B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for rounding off a plot area, the method comprising: obtaining plot data to be rounded off, performing occupancy analysis based on the plot data to be rounded off, and generating occupancy analysis results; grouping the occupancy analysis results according to the land category code to generate grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group, and a fifth group; and rounding off the grouped occupancy analysis results in sequence according to the grouping results. The embodiment of the present invention groups and sorts the output land categories, groups the returned data according to the land categories, and corrects each group of plot data after sorting them according to the priority of the land categories and the priority of the services. Since the error caused by the numerical rounding off is corrected, the problem of logical errors caused by the numerical rounding off of each group of data is solved, and the rounding off accuracy of the plot area is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a method and device for rounding off a plot area. Background Art

[0002] With the gradual advancement of natural resources informatization, in order to comprehensively integrate data from different historical periods and sources, spatial analysis services for various businesses have been established based on the "one map" database.

[0003] The above-mentioned spatial analysis service is used in the construction of the land approval business system. The spatial analysis service can be abstractly understood as inputting a plot of land and returning the various spots of the plot in this spatial analysis. Logically, the sum of the input plot area and the output spot area should be equal. However, since the accuracy and unit of the land area in the "One Picture" database are inconsistent with the accuracy and unit used in the land approval business, the process of unit conversion and numerical rounding is required when reading the area data of the output plot and displaying it in the business system, and numerical rounding will produce rounding errors. For businesses involving the accumulation of multiple plot areas, the accumulation of rounding errors will cause the rounded cumulative value of the output plot area to be inconsistent with the rounded value of the input plot area, which does not conform to the data logic, resulting in low accuracy of the rounded cumulative value of the output plot area.

[0004] From the above, it can be seen that the method for rounding off the area of ​​a plot of land in the prior art has the problem of low accuracy. Summary of the invention

[0005] The embodiment of the present invention provides a method and device for rounding off a plot area, which can improve the rounding off accuracy of a plot area.

[0006] A first aspect of an embodiment of the present application provides a method for rounding off a plot area, comprising:

[0007] Obtain the data of the land parcels to be revised, conduct occupation analysis based on the data of the land parcels to be revised, and generate occupation analysis results;

[0008] The occupancy analysis results are grouped according to the land type code to generate grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group and a fifth group;

[0009] Performing adjustment processing on the occupation analysis results of the first group to generate a first adjustment result;

[0010] The occupancy analysis result of the first group and the occupancy analysis result of the second group are added together and rounded off to generate a first rounding result;

[0011] Calculate according to the first rounding result and the first adjustment result to generate a first calculation result;

[0012] Perform adjustment processing according to the first calculation result and the rounded value of the occupancy analysis result of the second group to generate a fifth adjustment processing result;

[0013] According to the occupancy analysis result of the third group and the occupancy analysis result of the fourth group, and in combination with the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, a sixth adjustment processing result and a seventh adjustment processing result are generated accordingly;

[0014] After adjustment processing is performed based on the occupancy analysis results of the fifth group, the fifth adjustment processing results, the sixth adjustment processing results and the seventh adjustment processing results, the adjustment processing of the land parcel data to be adjusted is completed.

[0015] In a possible implementation manner of the first aspect, generating a sixth adjustment processing result is specifically:

[0016] The occupancy analysis result of the first group, the occupancy analysis result of the second group, and the occupancy analysis result of the third group are added together and rounded off to generate a second rounded off result;

[0017] Perform calculation according to the second rounding result and the first rounding result to generate a second calculation result;

[0018] Adjustment processing is performed based on the second calculation result and the rounded value of the occupancy analysis result of the third group to generate a sixth adjustment processing result.

[0019] In a possible implementation of the first aspect, generating the seventh adjustment processing result is specifically:

[0020] The occupancy analysis result of the first group, the occupancy analysis result of the second group, the occupancy analysis result of the third group, and the occupancy analysis result of the fourth group are added together and rounded off to generate a third rounded-off result;

[0021] Perform calculation according to the third rounding result and the second rounding result to generate a third calculation result;

[0022] Adjustment processing is performed based on the third calculation result and the rounded value of the occupancy analysis result of the fourth group to generate a seventh adjustment processing result.

[0023] In a possible implementation of the first aspect, adjustment processing is performed according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result, and the seventh adjustment processing result, specifically:

[0024] Adding up the occupancy analysis results of the first group, the second group, the third group, the fourth group, and the fifth group to generate a first summation result;

[0025] The fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result are added together to generate a second addition result;

[0026] Subtracting the first addition result from the second addition result to generate a first subtraction result;

[0027] Adjustment is performed based on the first subtraction result and the occupancy analysis result of the fifth group.

[0028] In a possible implementation of the first aspect, the first group includes the occupancy analysis results of paddy fields, the second group includes the occupancy analysis results of irrigated land and dry land, the third group includes the occupancy analysis results of adjustable land types, the fourth group includes the occupancy analysis results of construction land, and the fifth group includes the occupancy analysis results of other land types.

[0029] A second aspect of the embodiment of the present application provides a device for rounding off the area of ​​a plot of land, including: an occupation analysis module, a grouping module, a first adjustment module, a first rounding off module, a first calculation module, a second adjustment module, a second calculation module, and a second rounding off module;

[0030] The occupation analysis module is used to obtain the data of the land parcels to be revised, perform occupation analysis based on the data of the land parcels to be revised, and generate occupation analysis results;

[0031] The analysis module is used to group the occupancy analysis results according to the land type code to generate grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group and a fifth group;

[0032] The first adjustment module is used to perform adjustment processing on the occupancy analysis result of the first group to generate a first adjustment result;

[0033] The first rounding module is used for performing rounding processing after adding the occupancy analysis result of the first group and the occupancy analysis result of the second group to generate a first rounding result;

[0034] The first calculation module is used to perform calculation according to the first rounding result and the first adjustment result to generate a first calculation result;

[0035] The second adjustment module is used to perform adjustment processing according to the first calculation result and the rounded value of the occupancy analysis result of the second group, and generate a fifth adjustment processing result;

[0036] The second calculation module is used to calculate according to the occupancy analysis result of the third group and the occupancy analysis result of the fourth group, and in combination with the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, and correspondingly generate the sixth adjustment processing result and the seventh adjustment processing result;

[0037] The second rounding module is used for completing the rounding of the land parcel data to be rounded off after performing the rounding according to the occupancy analysis result of the fifth group, the fifth adjustment result, the sixth adjustment result and the seventh adjustment result.

[0038] In a possible implementation manner of the second aspect, generating a sixth adjustment processing result is specifically:

[0039] The occupancy analysis result of the first group, the occupancy analysis result of the second group, and the occupancy analysis result of the third group are added together and rounded off to generate a second rounded off result;

[0040] Perform calculation according to the second rounding result and the first rounding result to generate a second calculation result;

[0041] Adjustment processing is performed based on the second calculation result and the rounded value of the occupancy analysis result of the third group to generate a sixth adjustment processing result.

[0042] In a possible implementation manner of the second aspect, generating the seventh adjustment processing result is specifically:

[0043] The occupancy analysis result of the first group, the occupancy analysis result of the second group, the occupancy analysis result of the third group, and the occupancy analysis result of the fourth group are added together and rounded off to generate a third rounded-off result;

[0044] Perform calculation according to the third rounding result and the second rounding result to generate a third calculation result;

[0045] Adjustment processing is performed based on the third calculation result and the rounded value of the occupancy analysis result of the fourth group to generate a seventh adjustment processing result.

[0046] In a possible implementation manner of the second aspect, adjustment processing is performed according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result, and the seventh adjustment processing result, specifically:

[0047] Adding up the occupancy analysis results of the first group, the second group, the third group, the fourth group, and the fifth group to generate a first summation result;

[0048] The fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result are added together to generate a second addition result;

[0049] Subtracting the first addition result from the second addition result to generate a first subtraction result;

[0050] Adjustment is performed based on the first subtraction result and the occupancy analysis result of the fifth group.

[0051] In a possible implementation of the second aspect, the first group includes the occupancy analysis results of paddy fields, the second group includes the occupancy analysis results of irrigated land and dry land, the third group includes the occupancy analysis results of adjustable land types, the fourth group includes the occupancy analysis results of construction land, and the fifth group includes the occupancy analysis results of other land types.

[0052] Compared with the prior art, the embodiment of the present invention provides a method and device for rounding off the area of ​​a plot of land, the method comprising: obtaining data of the plot of land to be rounded off, performing occupation analysis according to the data of the plot of land to be rounded off, and generating an occupation analysis result; grouping the occupation analysis result according to the land type code to generate a grouping result; wherein the grouping result includes: a first group, a second group, a third group, a fourth group, and a fifth group; performing adjustment processing on the occupation analysis result of the first group to generate a first adjustment result; adding the occupation analysis result of the first group and the occupation analysis result of the second group and performing rounding processing to generate a first rounding result; and performing rounding processing according to the first rounding result. The first calculation result is calculated based on the result of the first calculation and the rounded value of the occupancy analysis result of the second group, and the fifth adjustment result is generated; the occupancy analysis result of the third group and the occupancy analysis result of the fourth group are calculated based on the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, and the sixth adjustment result and the seventh adjustment result are generated accordingly; after adjustment based on the occupancy analysis result of the fifth group, the fifth adjustment result, the sixth adjustment result and the seventh adjustment result, the rounding of the data of the land parcel to be adjusted is completed.

[0053] Its beneficial effects are: obtaining the data of the land parcel to be revised, performing occupancy analysis based on the data of the land parcel to be revised, and generating occupancy analysis results; grouping the occupancy analysis results according to the land category code to generate grouping results; wherein the grouping results include: the first group, the second group, the third group, the fourth group, and the fifth group; and performing rounding processing on the grouped occupancy analysis results in turn according to the grouping results. The embodiment of the present invention groups and sorts the output land categories, groups the returned data according to the land categories, and performs data correction on each group of spot data after sorting them according to the priority of the land categories and the priority of the services. Since the errors caused by the numerical rounding are corrected, the logical error problem caused by the numerical rounding of each group of data is solved, and the rounding accuracy of the land parcel area is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 It is a schematic flow chart of a method for rounding off the area of ​​a plot of land provided by one embodiment of the present invention;

[0055] Figure 2 It is a structural schematic diagram of a device for rounding off the area of ​​a plot of land provided in one embodiment of the present invention. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] Reference Figure 1 , is a flow chart of a method for rounding off a plot area provided by an embodiment of the present invention, including S101-S108:

[0058] S101: Acquire data of the land parcel to be revised, perform occupation analysis based on the data of the land parcel to be revised, and generate occupation analysis results.

[0059] In this embodiment, the land parcel submitted for approval by the user (i.e., the data of the land parcel to be revised) is taken as the input land parcel, and is superimposed with multi-dimensional business data layers such as the land type, ownership, and county-level classification units of the land use, and an occupation analysis is performed on the land parcel to obtain basic data for the occupation analysis. This basic data includes two parts: one part is the original land parcel area and land parcel identification of the input land parcel, and the other part is the original land parcel area of ​​the output land parcel as well as land type data, current status data, arable land quality data, ownership nature, whether it can be adjusted, and other related data.

[0060] S102: performing grouping processing on the occupancy analysis results according to the land type code to generate grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group and a fifth group.

[0061] In this embodiment, the first group includes the occupancy analysis results of paddy fields, the second group includes the occupancy analysis results of irrigated land and dry land, the third group includes the occupancy analysis results of adjustable land types, the fourth group includes the occupancy analysis results of construction land, and the fifth group includes the occupancy analysis results of other land types.

[0062] S103: performing adjustment processing on the occupancy analysis result of the first group to generate a first adjustment result;

[0063] S104: adding the occupancy analysis result of the first group and the occupancy analysis result of the second group, and performing rounding processing to generate a first rounding result.

[0064] S105: Perform calculation according to the first rounding result and the first adjustment result to generate a first calculation result.

[0065] S106: Perform adjustment processing according to the first calculation result and the rounded value of the occupancy analysis result of the second group to generate a fifth adjustment processing result.

[0066] S107: Calculate according to the occupancy analysis results of the third group and the occupancy analysis results of the fourth group, and in combination with the rounded values ​​of the occupancy analysis results of the third group and the rounded values ​​of the occupancy analysis results of the fourth group, and generate a sixth adjustment processing result and a seventh adjustment processing result accordingly.

[0067] In this embodiment, the sixth adjustment processing result is generated as follows:

[0068] Adding the occupancy analysis result of the first group, the occupancy analysis result of the second group, and the occupancy analysis result of the third group, and performing rounding processing to generate a second rounding result;

[0069] Perform calculation according to the second rounding result and the first rounding result to generate a second calculation result;

[0070] Adjustment processing is performed according to the second calculation result and the rounded value of the occupancy analysis result of the third group to generate a sixth adjustment processing result.

[0071] In this embodiment, the seventh adjustment processing result is generated as follows:

[0072] The occupancy analysis result of the first group, the occupancy analysis result of the second group, the occupancy analysis result of the third group, and the occupancy analysis result of the fourth group are added together and rounded off to generate a third rounded-off result;

[0073] Perform calculation according to the third rounding result and the second rounding result to generate a third calculation result;

[0074] An adjustment process is performed based on the third calculation result and the rounded value of the occupancy analysis result of the fourth group to generate a seventh adjustment process result.

[0075] S108: After performing adjustment processing according to the occupation analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result, the adjustment processing of the land parcel data to be adjusted is completed.

[0076] In this embodiment, the adjustment processing is performed according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result, specifically:

[0077] Adding up the occupancy analysis results of the first group, the second group, the third group, the fourth group, and the fifth group to generate a first summation result;

[0078] Adding the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result to generate a second addition result;

[0079] subtracting the first addition result from the second addition result to generate a first subtraction result;

[0080] Adjustment processing is performed based on the first subtraction result and the occupancy analysis result of the fifth group.

[0081] In a specific embodiment, the specific error calculation method is as follows:

[0082] 1) Perform numerical rounding on the input original plot area to obtain the rounded input plot area (rr_in_dkmj).

[0083] 2) Perform numerical rounding on the original occupied area of ​​the output plot to obtain the rounded value, and obtain the sum of the rounded areas of all the output plots (sum_out_zymj) by adding up the values ​​of the rounded areas of each plot.

[0084] 3) Area error value = the rounded value of the original area of ​​the input plot – the sum of the rounded values ​​of the areas of each output plot (dif_mj).

[0085] 4) Adjust the rounded-off values ​​of the output plots so that the original rounded-off values ​​of the input plots = the sum of the rounded-off values ​​of the output plots.

[0086] 5) The area error value is counted into the next cycle calculation.

[0087] In a preferred embodiment, a specific rounding process of the plot area is provided. Please refer to Table 1. Table 1 is an example table of plot data provided in an embodiment of the present invention.

[0088]

[0089]

[0090]

[0091] Table 1 Example of plot data

[0092] As shown in Table 1, judging the paddy field, the rounded value of the accumulated value of the original occupied land area is the same as the accumulated value of the rounded value of each plot, which is 2849 square meters. In this case, no adjustment is done. The area unit is square meters, the same below.

[0093] Then, the total area of ​​other cultivated land is determined. The rounded value of the accumulated value of the original occupied area of ​​each block is the same as the accumulated value of the rounded value of each block, which is 31138. Although the area is the same at this time and no adjustment is required, the paddy field area must be taken into account. The original occupied area of ​​the paddy field and the original occupied area of ​​other cultivated land are added together, that is, the total cultivated land area is 33987.66, and the rounded area is 33988 (the first rounding result). After subtracting the determined paddy field area after adjustment 2849 (the first adjustment result), the actual result value is 31139 (the first calculation result), which is 1 different from the rounded area of ​​31138 before the adjustment of other cultivated land (the rounded value of the occupation analysis result of the second group), so adjustment is required, and the adjustment value is 1. As shown in Table 1, according to the area from large to small, 1 is added to the plot with the largest area first, and so on; if the smallest plot still has an adjustment value after completing the adjustment of one square, the adjustment starts from the plot with the largest area again, and this cycle is repeated.

[0094] According to the priority sorting, the adjustable area is then judged. (Adjustable is not a type of land type, it is an attribute attached to other land types, and it is judged by whether the "Land Type Remarks" field in the land type map data is "K".) The original occupied total area and the total area after rounding off before adjustment are the same, which is 93523 (the rounded value of the occupation analysis result of the third group), but the above paddy field area and other cultivated land area need to be considered. Similarly, the original occupied area of ​​paddy fields, the original occupied area of ​​other cultivated land and the adjustable area are summed up, and the rounded area is 127510 (the second rounding result), minus the determined paddy field area and other cultivated land area of ​​33988 (the first rounding result). The actual result value is 93522 (the second calculation result), which is 1 different from the rounded area of ​​93523 (the rounded value of the occupation analysis result of the third group) before the adjustable adjustment, so adjustment is required. According to the principle, 1 is subtracted from the largest area of ​​the plot, as shown in Table 1.

[0095] After the adjustable adjustment, the original land type code of the adjustment plot needs to be recorded, such as 021 orchard. When the corresponding orchard is adjusted later, it needs to be excluded from the adjustment calculation.

[0096] The construction land area and other land types can be judged in the same way. Since there is no occupied construction land in the example table, the area adjustment of other land types can be directly judged.

[0097] When judging the situation of the last group area adjustment, directly subtract the total area of ​​the input project plot (the first sum result) from the sum of the areas after the previous groups of adjustments (the second sum result) to generate the first subtraction result. Compare the first subtraction result with the rounded area sum before the last group of adjustment (the occupancy analysis result of the fifth group). If there is a difference, perform adjustment.

[0098] For further explanation of the rounding device for plot area, please refer to Figure 2 , Figure 2 It is a structural schematic diagram of a plot area rounding device provided by an embodiment of the present invention, including: an occupancy analysis module 201, a grouping module 202, a first adjustment module 203, a first rounding module 204, a first calculation module 204, a second adjustment module 205, a second calculation module 206, and a second rounding module 207.

[0099] The occupation analysis module 201 is used to obtain the data of the land parcel to be revised, perform occupation analysis according to the data of the land parcel to be revised, and generate occupation analysis results;

[0100] The analysis module 202 is used to group the occupancy analysis results according to the land type code to generate the grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group and a fifth group;

[0101] The first adjustment module 203 is used to perform adjustment processing on the occupancy analysis result of the first group to generate a first adjustment result;

[0102] The first rounding module 204 is used for performing rounding processing after adding the occupancy analysis result of the first group and the occupancy analysis result of the second group to generate a first rounding result;

[0103] The first calculation module 205 is used to perform calculation according to the first rounding result and the first adjustment result to generate a first calculation result;

[0104] The second adjustment module 206 is used to perform adjustment processing according to the first calculation result and the rounded value of the occupancy analysis result of the second group to generate a fifth adjustment processing result;

[0105] The second calculation module 207 is used to calculate according to the occupancy analysis result of the third group and the occupancy analysis result of the fourth group, and in combination with the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, and correspondingly generate a sixth adjustment processing result and a seventh adjustment processing result;

[0106] The second rounding module 208 is used to complete the rounding of the land parcel data to be rounded off after performing adjustment processing according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result.

[0107] In this embodiment, the sixth adjustment processing result is generated as follows:

[0108] Adding the occupancy analysis result of the first group, the occupancy analysis result of the second group, and the occupancy analysis result of the third group, and performing rounding processing to generate a second rounding result;

[0109] Perform calculation according to the second rounding result and the first rounding result to generate a second calculation result;

[0110] Adjustment processing is performed according to the second calculation result and the rounded value of the occupancy analysis result of the third group to generate a sixth adjustment processing result.

[0111] In this embodiment, the seventh adjustment processing result is generated as follows:

[0112] The occupancy analysis result of the first group, the occupancy analysis result of the second group, the occupancy analysis result of the third group, and the occupancy analysis result of the fourth group are added together and rounded off to generate a third rounded-off result;

[0113] Perform calculation according to the third rounding result and the second rounding result to generate a third calculation result;

[0114] An adjustment process is performed based on the third calculation result and the rounded value of the occupancy analysis result of the fourth group to generate a seventh adjustment process result.

[0115] In this embodiment, the adjustment processing is performed according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result, specifically:

[0116] Adding up the occupancy analysis results of the first group, the second group, the third group, the fourth group, and the fifth group to generate a first summation result;

[0117] Adding the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result to generate a second addition result;

[0118] subtracting the first addition result from the second addition result to generate a first subtraction result;

[0119] Adjustment processing is performed based on the first subtraction result and the occupancy analysis result of the fifth group.

[0120] In this embodiment, the first group includes the occupancy analysis results of paddy fields, the second group includes the occupancy analysis results of irrigated land and dry land, the third group includes the occupancy analysis results of adjustable land types, the fourth group includes the occupancy analysis results of construction land, and the fifth group includes the occupancy analysis results of other land types.

[0121] The embodiment of the present invention obtains the data of the land parcel to be revised through the occupation analysis module, performs occupation analysis according to the data of the land parcel to be revised, and generates an occupation analysis result; performs grouping processing on the occupation analysis result according to the land type code through the analysis module, and generates a grouping result; wherein the grouping result includes: a first group, a second group, a third group, a fourth group, and a fifth group; performs adjustment processing on the occupation analysis result of the first group through the first adjustment module, and generates a first adjustment result; performs rounding processing on the occupation analysis result of the first group and the occupation analysis result of the second group after adding them through the first rounding module, and generates a first rounding result; performs calculation based on the first rounding result and the first adjustment result through the first calculation module Calculate to generate a first calculation result; perform adjustment processing through a second adjustment module based on the first calculation result and the rounded value of the occupancy analysis result of the second group to generate a fifth adjustment processing result; perform calculation through a second calculation module based on the occupancy analysis result of the third group and the occupancy analysis result of the fourth group, and combine the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, and generate a sixth adjustment processing result and a seventh adjustment processing result accordingly; perform adjustment processing through a second rounding module based on the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result, and complete the rounding processing of the land plot data to be rounded off.

[0122] The embodiment of the present invention obtains the data of the land parcel to be revised, performs occupancy analysis based on the data of the land parcel to be revised, and generates occupancy analysis results; performs grouping processing on the occupancy analysis results according to the land category code, and generates grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group, and a fifth group; and performs rounding processing on the grouped occupancy analysis results in sequence according to the grouping results. The embodiment of the present invention groups and sorts the output land categories, groups the returned data according to the land categories, and performs data correction on each group of image spot data after sorting them according to the priority of the land categories and the priority of the services. Since the errors caused by the numerical rounding are corrected, the logical error problem caused by the numerical rounding of each group of data is solved, and the rounding accuracy of the land parcel area is improved.

[0123] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A device for rounding off the area of ​​a plot of land, characterized in that: include: Occupancy analysis module, grouping module, first adjustment module, first rounding module, first calculation module, second adjustment module, second calculation module, second rounding module; The occupation analysis module is used to obtain the data of the land parcel to be revised, perform occupation analysis based on the data of the land parcel to be revised, and generate occupation analysis results; The analysis module is used to group the occupancy analysis results according to the land type code to generate the grouping results; wherein the grouping results include: a first group, a second group, a third group, a fourth group and a fifth group; The first adjustment module is used to perform adjustment processing on the occupancy analysis result of the first group to generate a first adjustment result; The first rounding module is used for performing rounding processing after adding the occupancy analysis result of the first group and the occupancy analysis result of the second group to generate a first rounding result; The first calculation module is used to perform calculation according to the first rounding result and the first adjustment result to generate a first calculation result; The second adjustment module is used to perform adjustment processing according to the first calculation result and the rounded value of the occupancy analysis result of the second group to generate a fifth adjustment processing result; The second calculation module is used to calculate according to the occupancy analysis result of the third group and the occupancy analysis result of the fourth group, and in combination with the rounded value of the occupancy analysis result of the third group and the rounded value of the occupancy analysis result of the fourth group, and correspondingly generate a sixth adjustment processing result and a seventh adjustment processing result; The second rounding module is used to complete the rounding of the data of the land parcel to be rounded after performing adjustment processing according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result.

2. A device for rounding off the area of ​​a plot of land according to claim 1, characterized in that: The sixth adjustment processing result is generated as follows: Adding the occupancy analysis result of the first group, the occupancy analysis result of the second group, and the occupancy analysis result of the third group, and performing rounding processing to generate a second rounding result; Perform calculation according to the second rounding result and the first rounding result to generate a second calculation result; Adjustment processing is performed according to the second calculation result and the rounded value of the occupancy analysis result of the third group to generate a sixth adjustment processing result.

3. A device for rounding off a plot of land area according to claim 2, characterized in that: The seventh adjustment processing result is generated as follows: The occupancy analysis result of the first group, the occupancy analysis result of the second group, the occupancy analysis result of the third group, and the occupancy analysis result of the fourth group are added together and rounded off to generate a third rounded-off result; Perform calculation according to the third rounding result and the second rounding result to generate a third calculation result; An adjustment process is performed based on the third calculation result and the rounded value of the occupancy analysis result of the fourth group to generate a seventh adjustment process result.

4. A device for rounding off a plot of land area according to claim 3, characterized in that: The adjustment processing is performed according to the occupancy analysis result of the fifth group, the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result, specifically: Adding up the occupancy analysis results of the first group, the second group, the third group, the fourth group, and the fifth group to generate a first summation result; Adding the fifth adjustment processing result, the sixth adjustment processing result and the seventh adjustment processing result to generate a second addition result; subtracting the first addition result from the second addition result to generate a first subtraction result; Adjustment processing is performed based on the first subtraction result and the occupancy analysis result of the fifth group.

5. A device for rounding off a plot of land area according to claim 4, characterized in that: The first group includes the occupancy analysis results of paddy fields, the second group includes the occupancy analysis results of irrigated land and dry land, the third group includes the occupancy analysis results of adjustable land types, the fourth group includes the occupancy analysis results of construction land and the fifth group includes the occupancy analysis results of other land types.