A method and device used in a node for wireless communication

By optimizing the monitoring and configuration of control resource elements in wireless communication systems, the limitations of cross-carrier scheduling in multi-carrier transmission are solved, transmission performance and equipment capability utilization are improved, and effective data transmission in multi-carrier scenarios are realized.

CN115603883BActive Publication Date: 2024-11-26SHANGHAI LANGBO COMM TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211188499.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-02-14
Publication Date
2024-11-26
Estimated Expiration
2040-02-14

AI Technical Summary

Technical Problem

The existing wireless communication systems have limitations in multi-carrier transmission scenarios, especially cross-carrier scheduling, and cannot effectively support the cross-carrier scheduling of the main carrier by the auxiliary carrier, resulting in insufficient utilization of transmission performance and equipment capabilities.

Method used

By receiving and sending specific information to determine the target cell and the scheduling feature cell in the first node device and the second node device, monitoring and occupying multiple control resource elements, adjusting subbands and subcarrier intervals to achieve non-overlapping control channel elements The optimized configuration and scheduling ensures that the user equipment can correctly receive and transmit data and reduces the probability of blocking PDCCH.

Benefits of technology

It is realized that in multi-carrier transmission scenarios, user equipment can effectively monitor and receive non-overlapping control channel elements, reduce the probability of blocking PDCCH, improve transmission performance, and simplify device design, which is suitable for a variety of application scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115603883B_ABST
    Figure CN115603883B_ABST
Patent Text Reader

Abstract

The present application discloses a method and apparatus in a node for wireless communication. The node receives first information, the first information is used to determine a target cell, and the target cell schedules a characteristic cell; monitors M control resource elements in a first time window, and the M control resource elements are alternatively occupied by a control channel; the subband to which the M control resource elements belong in the frequency domain belongs to a first subband set; the service cell to which a subband in the first subband set belongs belongs to a scheduling cell set; the subcarrier spacing of the subcarriers included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold. The present application ensures the reception of scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the following original application:

[0002] -- Filing date of original application: February 14, 2020

[0003] --Application number of the original application: 202010092986.5

[0004] --Title of the invention of the original application: A method and device used in a node for wireless communication Technical Field

[0005] The present application relates to a transmission method and device in a wireless communication system, and in particular to a multi-carrier transmission scheme and device in wireless communication. Background Art

[0006] In the future, the application scenarios of wireless communication systems will become more and more diversified, and different application scenarios will put forward different performance requirements for the system. In order to meet the different performance requirements of various application scenarios, the 3GPP (3rd Generation Partner Project) RAN (Radio Access Network) #72 plenary meeting decided to study the new radio (NR) (or 5G), and the WI (Work Item) of the new radio (NR) was passed at the 3GPP RAN #75 plenary meeting, and the standardization work on NR began.

[0007] In order to adapt to various application scenarios and meet different needs, the 3GPP RAN#85 plenary meeting also passed the WI of dynamic spectrum sharing (DSS) under NR and the enhanced WI of multi-radio dual-connectivity (MR-DC) to support more flexible and efficient multi-carrier communications. Summary of the invention

[0008] In multi-carrier communication processes, such as carrier aggregation (CA), cross-carrier scheduling (Cross Carrier Scheduling) is supported. In networks supported by existing standards, such as LTE (Long Term Evolution) and NR (New Radio) of R16 and earlier versions, for data transmission in the primary carrier (PCC) or primary cell (Pcell), only self-scheduling of the carrier is supported, and cross-carrier scheduling with the secondary carrier (SCC) or secondary cell (Scell) as the scheduling carrier is not supported. In the WI of dynamic spectrum sharing in the R17 version, it is decided to support cross-carrier scheduling of the secondary carrier to the main carrier.

[0009] The present application discloses a solution to the problem of scheduling in a network supporting multi-carrier transmission. It should be noted that in the description of the present application, dynamic spectrum sharing is only used as a typical application scenario or example; the present application is also applicable to other scenarios other than dynamic spectrum sharing facing similar problems (such as other multi-carrier transmission or multi-channel transmission, or other networks with specific requirements for data scheduling), and can also achieve technical effects similar to those in dynamic spectrum sharing scenarios. In addition, the use of a unified solution for different scenarios (including but not limited to scenarios of dynamic spectrum sharing and multi-carrier transmission) also helps to reduce hardware complexity and cost. In the absence of conflict, the embodiments and features in the first node device of the present application can be applied to the second node device, and vice versa. In particular, the interpretation of the terms (Terminology), nouns, functions, and variables in the present application (if not otherwise specified) can refer to the definitions in the 3GPP specification protocols TS36 series, TS38 series, and TS37 series.

[0010] The present application discloses a method in a first node in wireless communication, characterized by comprising:

[0011] receiving first information, where the first information is used to determine a target cell, where the target cell is used to schedule a characteristic cell;

[0012] Monitoring M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is optionally occupied by a control channel;

[0013] Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0014] As an embodiment, at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, thereby ensuring that when there are multiple service cells that can schedule one service cell, the number of monitored non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)) does not exceed the maximum channel estimation capability of the user equipment, thereby ensuring the correct reception of the PDCCH by the user equipment.

[0015] As an embodiment, at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, so as to set the maximum number of non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)) monitored by the user equipment according to whether there are multiple service cells scheduling one service cell. When the number of non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)) monitored by the user equipment does not exceed the capability of the user equipment, the channel estimation of the user equipment in the process of monitoring PDCCH candidates (Candidate) will not be excessively restricted. While ensuring the channel estimation performance of the user equipment in the process of monitoring PDCCH candidates, the blocking probability (Blocking Probability) of the PDCCH is minimized, thereby improving the transmission performance of the PDCCH.

[0016] According to one aspect of the present application, the above method is characterized in that the first control resource element is one of the M control resource elements, and the second control resource element is a control resource element other than the first control resource element among the M control resource elements; the first control resource element and the second control resource element belong to different control resource sets respectively, or the control channel options occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

[0017] According to one aspect of the present application, the above method is characterized in that it also includes:

[0018] receiving second information;

[0019] Among them, the second information is used to determine the configuration cell group, the configuration cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configuration cell group, the feature cell belongs to the configuration cell group, and the feature cell is the main cell in the configuration cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configuration cell group, and any one of the service cells included in the scheduled cell set belongs to the configuration cell group.

[0020] According to one aspect of the present application, the above method is characterized in that a target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0021] According to one aspect of the present application, the above method is characterized in that it also includes:

[0022] receiving third information;

[0023] wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum and the number of service cells included in the first cell subset are linearly related; the first sum and the second number are linearly related to the product of the first factor, and the first sum and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

[0024] As an embodiment, the service cells included in the scheduled cell set are divided into service cells included in the first cell subset and service cells included in the second cell subset, so that when there are multiple service cells scheduling one service cell, the capabilities of multiple transmission points (TRP, Transmit Receive Point) or multiple panels (Panel) of each service cell are considered when setting the maximum number of non-overlapping control channel elements monitored by the user equipment, thereby ensuring the channel estimation performance when monitoring (Monitor) PDCCH candidates (Candidate) when there is a service cell that supports multiple transmission points (TRP, Transmit Receive Point) or multiple panels (Pannel).

[0025] According to one aspect of the present application, the above method is characterized in that the second sum value is equal to the first sum value, and the first characteristic sum value is not equal to the second characteristic sum value; the difference between the second characteristic sum value and the first characteristic sum value is predefined, or the difference between the second characteristic sum value and the first characteristic sum value is configurable.

[0026] As an embodiment, the second sum value is equal to the first sum value and the difference between the second characteristic sum value and the first characteristic sum value is predefined or configurable, so that the distribution of non-overlapping control channel elements monitored by the user equipment can change according to whether there are multiple service cells scheduling one service cell. While ensuring the channel estimation performance of the user equipment when monitoring PDCCH alternatives, the design of PDCCH is simplified and the same design can be reused in different application scenarios.

[0027] According to one aspect of the present application, the above method is characterized in that it also includes:

[0028] receiving fourth information;

[0029] The fourth information is used to determine a second factor, the second factor is a positive number less than 1, the second factor is used to determine the second sum value, the second sum value is not equal to the first sum value, and the second characteristic sum value is equal to the first characteristic sum value.

[0030] According to one aspect of the present application, the above-mentioned method is characterized in that the fourth information is used to determine a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell used for scheduling the characteristic cell, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor is linearly related to the ratio between the third number and the fourth number.

[0031] As an embodiment, the second factor and the ratio between the third number and the fourth number are linearly correlated, ensuring that the distribution of the monitored non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)) matches the required number of non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)), while ensuring the channel estimation performance when monitoring PDCCH alternatives, achieving PDCCH load matching, further reducing the blocking probability of PDCCH, and improving the transmission performance of PDCCH.

[0032] According to one aspect of the present application, the above method is characterized in that the first subcarrier spacing is an alternative subcarrier spacing among X alternative subcarrier spacings, and X is a positive integer greater than 1; the X alternative subcarrier spacings correspond one by one to X alternative parameters, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

[0033] According to one aspect of the present application, the above method is characterized in that the characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of subcarriers, the subcarrier spacing of any subcarrier included in the characteristic sub-frequency band is equal to the second subcarrier spacing, and the first subcarrier spacing and the second subcarrier spacing are not equal.

[0034] According to one aspect of the present application, the above method is characterized in that it also includes:

[0035] Send the fifth message;

[0036] The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

[0037] The present application discloses a method in a second node in wireless communication, characterized by comprising:

[0038] Sending first information, where the first information is used to indicate a target cell, and the target cell is used to schedule a characteristic cell;

[0039] Determine M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is optionally occupied by a control channel;

[0040] Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0041] According to one aspect of the present application, the above method is characterized in that the first control resource element is one of the M control resource elements, and the second control resource element is a control resource element other than the first control resource element among the M control resource elements; the first control resource element and the second control resource element belong to different control resource sets respectively, or the control channel options occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

[0042] According to one aspect of the present application, the above method is characterized in that it also includes:

[0043] sending a second message;

[0044] Among them, the second information is used to indicate a configured cell group, the configured cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configured cell group, the feature cell belongs to the configured cell group, and the feature cell is the main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

[0045] According to one aspect of the present application, the above method is characterized in that a target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0046] According to one aspect of the present application, the above method is characterized in that it also includes:

[0047] Sending a third message;

[0048] The third information is used to indicate a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum and the number of service cells included in the first cell subset are linearly related; the first sum and the second number are linearly related to the product of the first factor, and the first sum and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

[0049] According to one aspect of the present application, the above method is characterized in that the second sum value is equal to the first sum value, and the first characteristic sum value is not equal to the second characteristic sum value; the difference between the second characteristic sum value and the first characteristic sum value is predefined, or the difference between the second characteristic sum value and the first characteristic sum value is configurable.

[0050] According to one aspect of the present application, the above method is characterized in that it also includes:

[0051] Sending the fourth message;

[0052] The fourth information is used to indicate a second factor, the second factor is a positive number less than 1, the second factor is used to determine the second sum value, the second sum value is not equal to the first sum value, and the second characteristic sum value is equal to the first characteristic sum value.

[0053] According to one aspect of the present application, the above method is characterized in that the fourth information is used to indicate a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell used for scheduling the characteristic cell, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor is linearly related to the ratio between the third number and the fourth number.

[0054] According to one aspect of the present application, the above method is characterized in that the first subcarrier spacing is an alternative subcarrier spacing among X alternative subcarrier spacings, and X is a positive integer greater than 1; the X alternative subcarrier spacings correspond one by one to X alternative parameters, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

[0055] According to one aspect of the present application, the above method is characterized in that the characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of subcarriers, the subcarrier spacing of any subcarrier included in the characteristic sub-frequency band is equal to the second subcarrier spacing, and the first subcarrier spacing and the second subcarrier spacing are not equal.

[0056] According to one aspect of the present application, the above method is characterized in that it also includes:

[0057] receiving a fifth message;

[0058] The fifth information is used to determine a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

[0059] The present application discloses a first node device for wireless communication, characterized in that it includes:

[0060] A first transceiver receives first information, where the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell;

[0061] A first receiver monitors M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is optionally occupied by a control channel;

[0062] Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0063] The present application discloses a second node device for wireless communication, characterized in that it includes:

[0064] A second transceiver sends first information, where the first information is used to indicate a target cell, and the target cell is used to schedule a characteristic cell;

[0065] A first transmitter determines M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is optionally occupied by a control channel;

[0066] Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0067] As an embodiment, the method in this application has the following advantages:

[0068] -. The method in the present application ensures that when there are multiple service cells that can schedule one service cell, the number of monitored non-overlapping control channel elements (Non-Overlapped CCE (Control Channel Element)) does not exceed the maximum channel estimation capability of the user equipment, thereby ensuring that the user equipment correctly receives the PDCCH.

[0069] -. The method in the present application sets the maximum number of non-overlapped control channel elements (Non-Overlapped CCE (Control Channel Element)) monitored by the user equipment according to whether there are multiple serving cells scheduling one serving cell. When the number of non-overlapped control channel elements (Non-Overlapped CCE (Control Channel Element)) monitored by the user equipment does not exceed the capability of the user equipment, the channel estimation of the user equipment in the process of monitoring the PDCCH candidate (Candidate) is not excessively restricted. While ensuring the channel estimation performance of the user equipment in the process of monitoring the PDCCH candidate, the blocking probability of the PDCCH is minimized, thereby improving the transmission performance of the PDCCH.

[0070] -. Using the method in the present application, when there are multiple service cells scheduling one service cell, the capabilities of multiple transmission transmission points (TRP, Transmit Receive Point) or multiple panels (Panel) of each service cell are considered when setting the maximum value of the number of non-overlapping control channel elements monitored by the user equipment, thereby ensuring the channel estimation performance when monitoring (Monitor) PDCCH candidates (Candidate) when there is a service cell that supports multiple transmission transmission points (TRP, Transmit Receive Point) or multiple panels (Pannel).

[0071] -. The method in the present application allows the distribution of non-overlapping control channel elements monitored by the user equipment to change depending on whether there are multiple service cells scheduling one service cell, thereby simplifying the design of the PDCCH while ensuring the channel estimation performance of the user equipment when monitoring PDCCH candidates, and ensuring that the same design can be reused in different application scenarios.

[0072] -.The method in the present application ensures that the distribution of the monitored non-overlapped control channel elements (Non-Overlapped CCE (Control Channel Element)) matches the number of required non-overlapped control channel elements (Non-Overlapped CCE (Control Channel Element)), while ensuring the channel estimation performance when monitoring PDCCH alternatives, the load matching of PDCCH is achieved, further reducing the blocking probability of PDCCH and improving the transmission performance of PDCCH. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0074] Figure 1 A flowchart showing first information and M control resource elements according to an embodiment of the present application is shown;

[0075] Figure 2 A schematic diagram of a network architecture according to an embodiment of the present application is shown;

[0076] Figure 3 A schematic diagram showing a wireless protocol architecture of a user plane and a control plane according to an embodiment of the present application is shown;

[0077] Figure 4 A schematic diagram showing a first node device and a second node device according to an embodiment of the present application is shown;

[0078] Figure 5 A wireless signal transmission flow chart according to an embodiment of the present application is shown;

[0079] Figure 6 A wireless signal transmission flow chart according to another embodiment of the present application is shown;

[0080] Figure 7 A wireless signal transmission flow chart according to another embodiment of the present application is shown;

[0081] Figure 8 A schematic diagram showing a relationship between a first control resource element and a second control resource element according to an embodiment of the present application;

[0082] Fig. 9 A schematic diagram showing the relationship between a scheduling cell set and a scheduled cell set according to an embodiment of the present application;

[0083] Fig.10 A schematic diagram showing a target ratio value according to an embodiment of the present application;

[0084] Fig.11 A schematic diagram showing a relationship between a first cell subset and a second cell subset according to an embodiment of the present application;

[0085] Fig.12 A schematic diagram showing a relationship between a first feature and a value and a second feature and a value according to an embodiment of the present application;

[0086] Fig.13 A schematic diagram showing the relationship between the second factor and the second sum value according to an embodiment of the present application;

[0087] Fig.14 A schematic diagram showing a second factor according to an embodiment of the present application is shown;

[0088] Fig.15 A schematic diagram showing a relationship between a first parameter and a first subcarrier spacing according to an embodiment of the present application;

[0089] Fig.16 A schematic diagram showing a relationship between a first subcarrier spacing and a second subcarrier spacing according to an embodiment of the present application;

[0090] Fig.17 A structural block diagram of a processing device in a first node device according to an embodiment of the present application is shown;

[0091] Fig.18 A structural block diagram of a processing device in a second node device according to an embodiment of the present application is shown. DETAILED DESCRIPTION

[0092] The technical solution of the present application will be further described in detail below in conjunction with the accompanying drawings. It should be noted that, in the absence of conflict, the embodiments of the present application and the features in the embodiments can be arbitrarily combined with each other.

[0093] Example 1

[0094] Embodiment 1 illustrates a flowchart of first information and M control resource elements according to an embodiment of the present application, as shown in the attached figure. Figure 1 As shown in the attached Figure 1 In the figure, each box represents a step. It should be emphasized that the order of the boxes in the figure does not represent the temporal relationship between the steps represented.

[0095] In Example 1, the first node device in the present application receives first information in step 101, and the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; the first node device in the present application monitors M control resource elements in a first time window in step 102, where M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by a control channel; wherein a subband to which any one of the M control resource elements belongs in the frequency domain belongs to a first subband set, and the first subband set includes a positive integer number of subbands; a scheduling cell set includes a positive integer number of service cells, and a service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; a subcarrier spacing of a subcarrier included in any one of the subbands included in the first subband set is equal to a first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0096] As an embodiment, the first information is transmitted via an air interface.

[0097] As an embodiment, the first information is transmitted via a wireless interface.

[0098] As an embodiment, the first information includes all or part of a high-layer signaling.

[0099] As an embodiment, the first information includes all or part of a physical layer signaling.

[0100] As an embodiment, the first information includes all or part of an RRC (Radio Resource Control) signaling.

[0101] As an embodiment, the first information includes all or part of a MAC (Medium Access Control) layer signaling.

[0102] As an embodiment, the first information includes all or part of a system information block (SIB, System Information Block).

[0103] As an embodiment, the first information is transmitted via a DL-SCH (Downlink Shared Channel).

[0104] As an embodiment, the first information is transmitted via a PDSCH (Physical Downlink Shared Channel).

[0105] As an embodiment, the first information is user equipment-specific (UE-specific).

[0106] As an embodiment, the first information is carrier specific (Carrier Specific).

[0107] As an embodiment, the first information is configured per carrier.

[0108] As an embodiment, the first information is specific to a serving cell (Serving Cell Specific).

[0109] As an embodiment, the first information is configured per serving cell (Per Serving Cell).

[0110] As an embodiment, the first information includes all or part of a field (Field) of a DCI (Downlink Control Information) signaling.

[0111] As an embodiment, the first information includes an IE (Information Element) "CrossCarrierSchedulingConfig" in RRC signaling.

[0112] As an embodiment, the first information includes an IE (Information Element) "ServingCellConfig" in RRC signaling.

[0113] As an embodiment, the first information includes an IE (Information Element) "CrossCarrierSchedulingConfig" in RRC signaling used to configure a primary cell (Primary Cell, Pcell).

[0114] As an embodiment, the first information includes an IE (Information Element) "ServingCellConfig" in RRC signaling used to configure a primary cell (Primary Cell, Pcell).

[0115] As an embodiment, the first information includes a field "schedulingCellId" in an IE (Information Element) "CrossCarrierSchedulingConfig" in an RRC signaling.

[0116] As an embodiment, the first information includes a field “schedulingCellId” in an IE (Information Element) “CrossCarrierSchedulingConfig” in an RRC signaling for configuring a primary cell (Primary Cell, Pcell).

[0117] As an embodiment, the first information includes a choice (CHOICE) "own" or "other" in a field (Field) "schedulingCellInfo" in an IE (Information Element) "CrossCarrierSchedulingConfig" in an RRC signaling.

[0118] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used by the first node device in the present application to determine the target cell.

[0119] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to explicitly indicate the target cell.

[0120] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to implicitly indicate the target cell.

[0121] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to indirectly indicate the target cell.

[0122] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to indicate the serving cell index (Serving Cell Index, ServCellIndex) of the target cell.

[0123] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to indicate whether the target cell and the characteristic cell are the same.

[0124] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meaning: the first information is used to indicate whether the target cell and the serving cell to which the frequency domain resources occupied by the signal carrying the first information belong are the same.

[0125] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meanings: the first information is used to indicate whether the target cell and the characteristic cell are the same; when the target cell and the characteristic cell are not the same, the first information is also used to indicate the serving cell index (ServingCell Index) of the target cell.

[0126] As an embodiment, the above sentence "the first information is used to determine the target cell" includes the following meanings: the first information is used to indicate whether the target cell and the serving cell to which the frequency domain resources occupied by the signal carrying the first information belong are the same; when the target cell and the serving cell to which the frequency domain resources occupied by the signal carrying the first information belong are not the same, the first information is also used to indicate the serving cell index (Serving Cell Index) of the target cell.

[0127] As an embodiment, the signal carrying the first information is transmitted on the characteristic cell.

[0128] As an embodiment, the signal carrying the first information is transmitted on a cell other than the characteristic cell.

[0129] As an embodiment, in the present application, one serving cell scheduling another serving cell means that a PDCCH (Physical Downlink Control Channel) transmitted on one serving cell schedules a signal on another serving cell.

[0130] As an embodiment, in the present application, one serving cell scheduling another serving cell means that a PDCCH (Physical Downlink Control Channel) transmitted on one serving cell schedules another serving cell.

[0131] As an embodiment, the target cell is a serving cell (Serving Cell).

[0132] As an embodiment, the target cell corresponds to a component carrier (CC).

[0133] As an embodiment, the target cell is a serving cell (Serving Cell) in an MCG (Master Cell Group).

[0134] As an embodiment, the target cell is a serving cell (Serving Cell) in a SCG (Secondary Cell Group).

[0135] As an embodiment, the target cell is a serving cell (Serving Cell) corresponding to a primary component carrier (PCC).

[0136] As an embodiment, the target cell is a primary cell (Pcell).

[0137] As an embodiment, the target cell is a special cell (Special Cell, Spcell).

[0138] As an embodiment, the target cell is a serving cell (Serving Cell) corresponding to a secondary carrier (Secondary Component Carrier, SCC).

[0139] As an embodiment, the target cell is a secondary cell (Scell).

[0140] As an embodiment, the characteristic cell is a serving cell (Serving Cell).

[0141] As an embodiment, the characteristic cell corresponds to a component carrier (CC).

[0142] As an embodiment, the characteristic cell is a serving cell (Serving Cell) in an MCG (Master Cell Group).

[0143] As an embodiment, the characteristic cell is a serving cell (Serving Cell) in a SCG (Secondary Cell Group).

[0144] As an embodiment, the characteristic cell is a serving cell (Serving Cell) corresponding to a primary component carrier (PCC).

[0145] As an embodiment, the characteristic cell is a primary cell (Primary Cell, Pcell).

[0146] As an embodiment, the characteristic cell is a special cell (Special Cell, Spcell).

[0147] As an embodiment, the characteristic cell is a primary cell in an MCG, or the characteristic cell is a primary cell in an SCG.

[0148] As an embodiment, the target cell and the characteristic cell are the same.

[0149] As an embodiment, the target cell and the characteristic cell are different.

[0150] As an embodiment, the characteristic cell and the target cell belong to the same cell group (CellGroup).

[0151] As an embodiment, the characteristic cell and the target cell belong to the same MCG.

[0152] As an embodiment, the characteristic cell and the target cell belong to the same SCG.

[0153] As an embodiment, the above sentence "the target cell is used to schedule the characteristic cell" includes the following meaning: the PDCCH transmitted on the target cell is used to schedule the signal transmitted on the characteristic cell.

[0154] As an embodiment, the above sentence "the target cell is used to schedule the characteristic cell" includes the following meanings: when the target cell and the characteristic are the same, the PDCCH transmitted on the target cell is used for self-scheduling (Self-Schedule) the signal transmitted on the characteristic cell; when the target cell and the characteristic are not the same, the PDCCH transmitted on the target cell is used for cross-carrier scheduling (Cross-Schedule) the signal transmitted on the characteristic cell.

[0155] As an embodiment, the above sentence "the target cell is used to schedule the characteristic cell" includes the following meaning: the target cell is the scheduling cell (Scheduling Cell) of the characteristic cell.

[0156] As an embodiment, the above sentence "the target cell is used to schedule a characteristic cell" includes the following meaning: the characteristic cell is a scheduled cell (Scheduled Cell) of the target cell.

[0157] As an embodiment, the first time window is a time slot.

[0158] As an embodiment, the first time window is a time slot corresponding to the first subcarrier spacing.

[0159] As an embodiment, the first time window includes a positive integer number of continuous OFDM (Orthogonal Frequency Division Multiplexing) symbols in the time domain.

[0160] As an embodiment, the first time window includes a positive integer number of time-domain continuous OFDM (Orthogonal Frequency Division Multiplexing) symbols corresponding to the first subcarrier spacing.

[0161] As an embodiment, the first time window is a span.

[0162] As an embodiment, the first time window is a span corresponding to the first subcarrier spacing.

[0163] As an embodiment, the first time window is a time interval with a shortest time interval length between the earliest OFDM symbols in two PDCCH occasions (Occasions).

[0164] As an embodiment, the time domain resources occupied by any one of the M control resource elements belong to the first time window.

[0165] As an embodiment, the time domain resources occupied by any one of the M control resource elements are part of the first time window.

[0166] As an embodiment, any one of the M control resource elements is occupied by at least one control channel candidate (PDCCH Candidate).

[0167] As an embodiment, any one of M1 control channel candidates (PDCCH Candidate) occupies one or more control resource elements among the M control resource elements, and M1 is a positive integer.

[0168] As an embodiment, the M control resource elements only include control resource elements occupied by at least one control channel candidate (PDCCH Candidate).

[0169] As an embodiment, there is no control resource element that is not occupied by a control channel candidate (PDCCHCandidate) among the M control resource elements.

[0170] As an embodiment, each control channel candidate occupying at least one control resource element among the M control resource elements is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate).

[0171] As an embodiment, each control channel candidate occupying at least one control resource element among the M control resource elements is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate) using a DCI format (Format).

[0172] As an embodiment, each control channel candidate occupying at least one control resource element among the M control resource elements is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate) using one or more given DCI formats (Format).

[0173] As an embodiment, each control channel candidate occupying at least one control resource element among the M control resource elements is a time-frequency resource set that may carry a DCI of a specific format.

[0174] As an embodiment, each control channel alternative occupying at least one of the M control resource elements is an air interface resource set that may carry a DCI of a specific format (Format), and the air interface resources include at least time-frequency resources among time-frequency resources, code domain resources, and space resources.

[0175] As an embodiment, each control channel candidate occupying at least one control resource element among the M control resource elements is a monitored physical downlink control channel candidate (MonitoredPDCCH Candidate).

[0176] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved through channel estimation (Channel Estimation) for the M control resource elements.

[0177] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved through channel equalization (Channel Equalization) for the M control resource elements.

[0178] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by determining whether independent channel estimation (Channel Estimation) is required for each of the M control resource elements.

[0179] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by monitoring (Monitoring) the control channel candidates (PDCCH Candidate) occupying the M control resource elements.

[0180] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by monitoring (Monitoring) all control channel alternatives occupying one or more control resource elements among the M control resource elements.

[0181] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by decoding (Decoding) the control channel alternatives occupying the M control resource elements.

[0182] As an embodiment, the M control resource elements are occupied by M1 control channel candidates, where M1 is a positive integer; the monitoring of the M control resource elements is achieved by decoding the M1 control channel candidates.

[0183] As an embodiment, any one of the M1 control channel candidates (PDCCH Candidate) occupies one or more control resource elements among the M control resource elements, and M1 is a positive integer; the monitoring (Monitoring) of the M control resource elements is achieved by decoding (Decoding) the M1 control channel candidates.

[0184] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by alternative blind decoding (Blind Decoding) of the control channel occupying the M control resource elements.

[0185] As an embodiment, the monitoring of the M control resource elements is achieved by alternatively decoding and CRC checking of the control channels occupying the M control resource elements.

[0186] As an embodiment, the monitoring (Monitoring) of the M control resource elements is achieved by decoding (Decoding) the control channel alternatives occupying the M control resource elements based on the monitored one or more DCI (Downlink Control Information) formats (Format(s)).

[0187] As an embodiment, two independent channel estimates (Channel Estimation) are required for any two control resource elements among the M control resource elements.

[0188] As an embodiment, channel estimation (Channel Estimation) of any two control resource elements among the M control resource elements cannot be reused (Reuse) with each other.

[0189] As an embodiment, two independent channel equalizations are required for any two control resource elements among the M control resource elements.

[0190] As an embodiment, any one of the M control resource elements is a CCE (Control Channel Element).

[0191] As an embodiment, any one of the M control resource elements is a non-overlapped control channel element (Non-Overlapped CCE, Non-Overlapped Control Channel Element).

[0192] As an embodiment, any two control resource elements among the M control resource elements are non-overlapping (Non-Overlapped).

[0193] As an embodiment, the number of time-frequency resource units included in any two control resource elements among the M control resource elements is equal.

[0194] As an embodiment, any two control resource elements among the M control resource elements include an equal number of REs (Resource Element).

[0195] As an embodiment, any one of the M control resource elements includes 6 resource element groups (REGs).

[0196] As an embodiment, any one of the M control resource elements includes 6 resource element groups (REGs), each REG includes 9 resource elements (REs) used to transmit data modulation symbols and 3 resource elements used to transmit reference channels (RSs).

[0197] As an embodiment, the time-frequency resources occupied by any two control resource elements among the M control resource elements are orthogonal.

[0198] As an embodiment, time-frequency resources occupied by two control resource elements among the M control resource elements are non-orthogonal.

[0199] As an embodiment, there are two control resource elements among the M control resource elements and the time-frequency resources occupied by them are the same.

[0200] As an embodiment, the time-frequency resources occupied by any two control resource elements among the M control resource elements are different.

[0201] As an embodiment, the first sub-frequency band set includes only one sub-frequency band.

[0202] As an embodiment, the first sub-frequency band set includes more than one sub-frequency band.

[0203] As an embodiment, any sub-band included in the first sub-band set is a bandwidth part (BWP, Bandwidth Part).

[0204] As an embodiment, any sub-band included in the first sub-band set is an active downlink bandwidth part (Active DL BWP, Active Downlink Bandwidth Part).

[0205] As an embodiment, any sub-band included in the first sub-band set is a continuous frequency domain resource with the same mathematical structure (Numerology) in a carrier bandwidth (Carrier).

[0206] As an embodiment, any sub-band included in the first sub-band set is a frequency-domain continuous sub-carrier with the same numerical structure in a carrier bandwidth.

[0207] As an embodiment, any sub-band included in the first sub-band set is a common resource block subset (Subset) including continuous common resource blocks (CRB, Common Resource Blocks) for a given numerical structure (Numerology) on a given carrier (Carrier).

[0208] As an embodiment, the service cell to which any sub-band included in the first sub-band set belongs is a service cell corresponding to a carrier to which any sub-band included in the first sub-band set belongs.

[0209] As an embodiment, when the first sub-frequency band set includes more than one sub-frequency band, any two sub-frequency bands included in the first sub-frequency band set belong to two different carriers respectively.

[0210] As an embodiment, when the first sub-frequency band set includes more than one sub-frequency band, any two sub-frequency bands included in the first sub-frequency band set belong to two different serving cells respectively.

[0211] As an embodiment, when the first sub-frequency band set includes more than one sub-frequency band, there are two sub-frequency bands in the first sub-frequency band set that respectively belong to the same carrier.

[0212] As an embodiment, when the first sub-frequency band set includes more than one sub-frequency band, there are two sub-frequency bands in the first sub-frequency band set that respectively belong to the same serving cell.

[0213] As an embodiment, when the first sub-band set includes more than one sub-band, there are two control resource elements in the M control resource elements that belong to two different sub-bands in the first sub-band set.

[0214] As an embodiment, the frequency domain resources occupied by any one of the M control resource elements belong to a sub-band.

[0215] As an embodiment, any two control resource elements among the M control resource elements belong to the same sub-band in the first sub-band set in the frequency domain.

[0216] As an embodiment, the first sub-band set includes a sub-band that does not include any control resource element of the M control resource elements in the frequency domain.

[0217] As an embodiment, each sub-band included in the first sub-band set includes at least one control resource element among the M control resource elements in the frequency domain.

[0218] As an embodiment, any sub-frequency band included in the first sub-frequency band set is configurable.

[0219] As an embodiment, any sub-band included in the first sub-band set is configured through IE (Information Element) "BWP-Downlink".

[0220] As an embodiment, any one of the sub-bands included in the first sub-band set is a BWP indicated by the IE (Information Element) "downlinkBWP-ToAddModList".

[0221] As an embodiment, the time-frequency resources occupied by each of the M control resource elements are configured through signaling "SearchSpace" and signaling "ControlResourceSet".

[0222] As an embodiment, it also includes:

[0223] receiving sixth information;

[0224] The sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

[0225] As an embodiment, it also includes:

[0226] Receive the seventh message;

[0227] The seventh information is used to determine the time-frequency resources occupied by each of the M control resource elements.

[0228] As an embodiment, it also includes:

[0229] Receive the seventh message;

[0230] Among them, the seventh information is used to determine Q control resource elements, any one of the M control resource elements is one of the Q control resource elements, and Q is a positive integer not less than the M; the M is equal to the first threshold, and the first threshold is used to determine the M control resource elements from the Q control resource elements.

[0231] As an embodiment, it also includes:

[0232] Receive the seventh message;

[0233] The seventh information is used to determine the sub-band in the first sub-band set to which the time-frequency resources occupied by each of the M control resource elements belong.

[0234] As an embodiment, the scheduling cell set includes only one serving cell (Serving Cell).

[0235] As an embodiment, the scheduling cell set includes more than one serving cell (Serving Cell).

[0236] As an embodiment, any serving cell included in the scheduling cell set is an activated cell.

[0237] As an embodiment, the scheduling cell set includes a serving cell which is a deactivated cell.

[0238] As an embodiment, any serving cell included in the scheduling cell set includes an active BWP.

[0239] As an embodiment, the scheduling cell set includes a serving cell including a non-active BWP.

[0240] As an embodiment, the number of service cells included in the scheduling cell set is equal to the number of sub-bands included in the first sub-band set.

[0241] As an embodiment, the number of service cells included in the scheduling cell set is not equal to the number of sub-bands included in the first sub-band set.

[0242] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the scheduling cell set includes the service cell to which any sub-band included in the first sub-band set belongs.

[0243] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the scheduling cell set only includes the service cells to which the sub-bands included in the first sub-band set belong.

[0244] As an embodiment, the scheduling cell set also includes service cells other than the service cells to which the sub-bands included in the first sub-band set belong.

[0245] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the first sub-band set includes W sub-bands, the scheduling cell set includes W service cells, the W service cells respectively include the W sub-bands, and W is a positive integer.

[0246] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the first sub-band set includes W sub-bands, the scheduling cell set includes W service cells, the W sub-bands are respectively the BWPs of the W service cells, and W is a positive integer.

[0247] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the first sub-band set includes W sub-bands, the scheduling cell set includes W service cells, the W sub-bands belong to the W service cells respectively, and W is a positive integer.

[0248] As an embodiment, the above sentence "the service cell to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set" includes the following meaning: the service cell corresponding to the carrier (Carrier) to which any sub-band included in the first sub-band set belongs belongs to the scheduling cell set.

[0249] As an embodiment, when the first sub-band set includes more than one sub-band, any two sub-bands in the first sub-band set include sub-carriers with equal sub-carrier spacing (SCS).

[0250] As an embodiment, the subcarrier spacing of any subcarrier included in any subband included in the first subband set is equal to the first subcarrier spacing.

[0251] As an embodiment, the first sub-band set includes more than one sub-carrier, and the sub-carrier spacing between any two sub-carriers included in the first sub-band set is equal.

[0252] As an embodiment, any sub-band included in the first sub-band set includes a positive integer number of sub-carriers.

[0253] As an embodiment, any sub-band included in the first sub-band set includes sub-carriers that are a positive integer multiple of 12.

[0254] As an embodiment, the first subcarrier spacing is equal to one of 15kHz, 30kHz, 60kHz, 120kHz, and 240kHz.

[0255] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the first subcarrier spacing is used by the first node device in the present application to determine the time length of the first time window.

[0256] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the first time window is a time slot (Slot), the first subcarrier spacing is used to determine the number of time slots included in a subframe (Subframe), and the time length of the first time window is equal to the ratio of the length of a subframe and the number of time slots included in a subframe.

[0257] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the first subcarrier spacing is used to determine the time length of each OFDM symbol included in the first time window.

[0258] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the configuration (Configuration) index (Index) of the first subcarrier spacing is used to determine the time length of the first time window.

[0259] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the first subcarrier spacing is used to determine the time length of the first time window according to the corresponding relationship.

[0260] As an embodiment, the above sentence "the first subcarrier spacing is used to determine the time length of the first time window" includes the following meaning: the first subcarrier spacing is used to determine the time length of the first time window according to the table correspondence.

[0261] As an embodiment, it also includes:

[0262] receiving a first synchronization signal;

[0263] The first synchronization signal is used to determine the position of the first time window in the time domain.

[0264] As an embodiment, the first threshold may be equal to 0.

[0265] As an embodiment, the first threshold is greater than 0.

[0266] As an embodiment, when the first threshold is equal to 0, the first node device does not monitor the control resource element in the first time window.

[0267] As an embodiment, the M is equal to the first threshold.

[0268] As an embodiment, the M is less than the first threshold.

[0269] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold" includes the following meaning: whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same are used together to determine the first threshold.

[0270] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold" includes the following meaning: whether the scheduling cell set includes the target cell is used to determine the first threshold.

[0271] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold" includes the following meaning: whether the characteristic cell and the target cell are the same is used to determine the first threshold.

[0272] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used by the first node device in this application to determine the first threshold.

[0273] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold according to the decision condition.

[0274] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the calculation formula of the first threshold.

[0275] As an embodiment, when the first node device in the present application detects control channel candidates in the M control resource elements, the detected control channel candidates are used to schedule the characteristic cell.

[0276] As an embodiment, when the first node device in the present application detects control channel candidates in the M control resource elements, the detected control channel candidates are used to schedule cells other than the characteristic cell.

[0277] As an embodiment, "whether the scheduling cell set includes the target cell" includes the following meaning: whether the scheduling cell set is used to schedule the characteristic cell.

[0278] As an embodiment, "whether the scheduling cell set includes the target cell" includes the following meaning: whether the scheduling cell set includes the serving cell used to schedule the characteristic cell.

[0279] As an embodiment, "whether the scheduling cell set includes the target cell" includes the following meaning: whether the scheduling cell set is used for cross-carrier scheduling of the characteristic cell.

[0280] As an embodiment, "whether the characteristic cell and the target cell are the same" includes the following meaning: whether the characteristic cell and the target cell are the same serving cell.

[0281] As an embodiment, "whether the characteristic cell and the target cell are the same" includes the following meaning: whether the first node device supports cross-carrier scheduling of a primary cell (Primary Cell, PCell).

[0282] As an embodiment, "whether the characteristic cell and the target cell are the same" includes the following meaning: whether the first node device supports cross-carrier scheduling of the primary cell (Primary SCG Cell, PSCell) in the secondary cell group.

[0283] As an embodiment, "whether the characteristic cell and the target cell are the same" includes the following meaning: whether the first node device supports cross-carrier scheduling of special cells (Special Cell, Spcell).

[0284] Example 2

[0285] Embodiment 2 illustrates a schematic diagram of a network architecture according to the present application, as shown in the attached Figure 2 Attached Figure 2A diagram of a network architecture 200 for 5G NR, LTE (Long-Term Evolution) and LTE-A (Long-Term Evolution Advanced) systems is illustrated. The 5G NR or LTE network architecture 200 may be referred to as 5GS (5G System) / EPS (Evolved Packet System) 200 or some other suitable terminology. The 5GS / EPS 200 may include one or more UEs (User Equipment) 201, NG-RAN (Next Generation Radio Access Network) 202, 5GC (5G Core Network) / EPC (Evolved Packet Core) 210, HSS (Home Subscriber Server) / UDM (Unified Data Management) 220, and Internet services 230. The 5GS / EPS may be interconnected with other access networks, but these entities / interfaces are not shown for simplicity. As shown, 5GS / EPS provides packet-switched services, however, those skilled in the art will readily appreciate that the various concepts presented throughout this application can be extended to networks providing circuit-switched services or other cellular networks. NG-RAN includes NR / evolved Node B (gNB / eNB) 203 and other gNBs (eNBs) 204. gNB (eNB) 203 provides user and control plane protocol terminations toward UE 201. gNB (eNB) 203 can be connected to other gNBs (eNBs) 204 via an Xn / X2 interface (e.g., backhaul). gNB (eNB) 203 may also be referred to as a base station, a base transceiver station, a radio base station, a radio transceiver, a transceiver function, a basic service set (BSS), an extended service set (ESS), a TRP (transmitting receiving node), or some other suitable term. gNB (eNB) 203 provides an access point to 5GC / EPC 210 for UE 201. Examples of UE 201 include a cellular phone, a smart phone, a Session Initiation Protocol (SIP) phone, a laptop computer, a personal digital assistant (PDA), a satellite radio, non-terrestrial base station communications, satellite mobile communications, a global positioning system, a multimedia device, a video device, a digital audio player (e.g., an MP3 player), a camera, a game console, a drone, an aircraft, a narrowband Internet of Things device, a machine type communication device, a land vehicle, an automobile, a wearable device, or any other similarly functional device.A person skilled in the art may also refer to UE 201 as a mobile station, a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communication device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handset, a user agent, a mobile client, a client, or some other suitable term. The gNB (eNB) 203 is connected to the 5GC / EPC 210 via an S1 / NG interface. The 5GC / EPC 210 includes an MME (Mobility Management Entity) / AMF (Authentication Management Field) / SMF (Session Management Function) 211, other MME / AMF / SMF 214, an S-GW (Service Gateway) / UPF (User Plane Function) 212, and a P-GW (Packet Data Network Gateway) / UPF 213. MME / AMF / SMF211 is the control node that handles the signaling between UE201 and 5GC / EPC210. ​​In general, MME / AMF / SMF211 provides bearer and connection management. All user IP (Internet Protocal) packets are transmitted through S-GW / UPF212, which itself is connected to P-GW / UPF213. P-GW provides UE IP address allocation and other functions. P-GW / UPF213 is connected to Internet services 230. Internet services 230 include operator-corresponding Internet protocol services, which may specifically include Internet, intranet, IMS (IP Multimedia Subsystem) and packet switching streaming services.

[0286] As an embodiment, the UE201 corresponds to the first node device in the present application.

[0287] As an embodiment, the UE 201 supports multi-carrier transmission.

[0288] As an embodiment, the UE 201 supports the secondary carrier cross-carrier scheduling of the primary carrier transmission.

[0289] As an embodiment, the gNB (eNB) 201 corresponds to the second node device in this application.

[0290] As an embodiment, the gNB (eNB) 201 supports multi-carrier transmission.

[0291] As an embodiment, the gNB (eNB) 201 supports the transmission of the main carrier by scheduling the secondary carrier across the carriers.

[0292] Example 3

[0293] Embodiment 3 shows a schematic diagram of an embodiment of a wireless protocol architecture of a user plane and a control plane according to the present application, as shown in the attached Figure 3 shown. Figure 3 is a schematic diagram illustrating an embodiment of a radio protocol architecture for a user plane 350 and a control plane 300, Figure 3The radio protocol architecture of the control plane 300 for the first node device (UE or gNB) and the second node device (gNB or UE) is shown with three layers: Layer 1, Layer 2, and Layer 3. Layer 1 (L1 layer) is the lowest layer and implements various PHY (physical layer) signal processing functions. The L1 layer will be referred to as PHY301 in this article. Layer 2 (L2 layer) 305 is above PHY301 and is responsible for the link between the first node device and the second node device through PHY301. The L2 layer 305 includes a MAC (Medium Access Control) sublayer 302, an RLC (Radio Link Control) sublayer 303, and a PDCP (Packet Data Convergence Protocol) sublayer 304, which terminate at the second node device. The PDCP sublayer 304 provides multiplexing between different radio bearers and logical channels. The PDCP sublayer 304 also provides security by encrypting data packets, and provides inter-zone mobility support for the first node device between the second node devices. The RLC sublayer 303 provides segmentation and reassembly of upper layer data packets, retransmission of lost data packets, and reordering of data packets to compensate for out-of-order reception due to HARQ. The MAC sublayer 302 provides multiplexing between logical and transport channels. The MAC sublayer 302 is also responsible for allocating various radio resources (e.g., resource blocks) in a cell between first node devices. The MAC sublayer 302 is also responsible for HARQ operations. The RRC (Radio Resource Control) sublayer 306 in layer 3 (L3 layer) in the control plane 300 is responsible for obtaining radio resources (i.e., radio bearers) and configuring the lower layers using RRC signaling between the second node device and the first node device. The radio protocol architecture of the user plane 350 includes layer 1 (L1 layer) and layer 2 (L2 layer). The radio protocol architecture for the first node device and the second node device in the user plane 350 is substantially the same as the corresponding layers and sublayers in the control plane 300 for the physical layer 351, the PDCP sublayer 354 in the L2 layer 355, the RLC sublayer 353 in the L2 layer 355, and the MAC sublayer 352 in the L2 layer 355, but the PDCP sublayer 354 also provides header compression for upper layer data packets to reduce radio transmission overhead. The L2 layer 355 in the user plane 350 also includes a SDAP (Service Data Adaptation Protocol) sublayer 356, which is responsible for mapping between QoS flows and data radio bearers (DRBs) to support the diversity of services.Although not shown, the first node device may have several upper layers above the L2 layer 355, including a network layer (e.g., an IP layer) terminated at the P-GW on the network side and an application layer terminated at the other end of the connection (e.g., a remote UE, a server, etc.).

[0294] As an example, Figure 3 The wireless protocol architecture is applicable to the first node device in this application.

[0295] As an example, Figure 3 The wireless protocol architecture is applicable to the second node device in this application.

[0296] As an embodiment, the first information in the present application is generated in the RRC306.

[0297] As an embodiment, the first information in the present application is generated by the MAC302 or MAC352.

[0298] As an embodiment, the first information in the present application is generated by the PHY301 or PHY351.

[0299] As an embodiment, the second information in the present application is generated in the RRC306.

[0300] As an embodiment, the second information in the present application is generated by the MAC302 or MAC352.

[0301] As an embodiment, the second information in the present application is generated by the PHY301 or PHY351.

[0302] As an embodiment, the third information in the present application is generated in the RRC306.

[0303] As an embodiment, the third information in the present application is generated by the MAC302 or MAC352.

[0304] As an embodiment, the third information in the present application is generated by the PHY301 or PHY351.

[0305] As an embodiment, the fourth information in the present application is generated in the RRC306.

[0306] As an embodiment, the fourth information in the present application is generated by the MAC302 or MAC352.

[0307] As an embodiment, the fourth information in the present application is generated by the PHY301 or PHY351.

[0308] As an embodiment, the fifth information in the present application is generated in the RRC306.

[0309] As an embodiment, the fifth information in the present application is generated by the MAC302 or MAC352.

[0310] Example 4

[0311] Embodiment 4 shows a schematic diagram of a first node device and a second node device according to the present application, as shown in the attached figure. Figure 4 shown.

[0312] The first node device (450) may include a controller / processor 490, a data source / buffer 480, a receiving processor 452, a transmitter / receiver 456 and a transmitting processor 455, and the transmitter / receiver 456 includes an antenna 460.

[0313] The second node device ( 410 ) may include a controller / processor 440 , a data source / buffer 430 , a receiving processor 412 , a transmitter / receiver 416 and a transmitting processor 415 , and the transmitter / receiver 416 includes an antenna 420 .

[0314] In DL (Downlink), upper layer packets, such as the high-layer information included in the first information, the second information, the third information, and the fourth information in the present application, are provided to the controller / processor 440. The controller / processor 440 implements the functions of the L2 layer and above. In DL, the controller / processor 440 provides packet header compression, encryption, packet segmentation and reordering, multiplexing between logical and transport channels, and allocation of radio resources to the first node device 450 based on various priority metrics. The controller / processor 440 is also responsible for HARQ operations, retransmission of lost packets, and signaling to the first node device 450, such as the high-layer information included in the first information, the second information, the third information, and the fourth information in the present application, which are all generated in the controller / processor 440. The transmit processor 415 implements various signal processing functions for the L1 layer (i.e., the physical layer), including coding, interleaving, scrambling, modulation, power control / allocation, precoding, and physical layer control signaling generation, etc. For example, the generation of the physical layer signals of the first information, the second information, the third information, and the fourth information in the present application is completed in the transmit processor 415. When the M control resource elements in the present application exist and the control resource elements are used to transmit control signaling, the generation of the transmitted control signaling is completed in the transmit processor 415. The generated modulated symbols are divided into parallel streams and each stream is mapped to a corresponding multi-carrier subcarrier and / or multi-carrier symbol, and then mapped to the antenna 420 by the transmit processor 415 via the transmitter 416 and transmitted in the form of a radio frequency signal. At the receiving end, each receiver 456 receives the radio frequency signal through its corresponding antenna 460, and each receiver 456 recovers the baseband information modulated on the radio frequency carrier and provides the baseband information to the receive processor 452. The receive processor 452 implements various signal reception processing functions of the L1 layer. The signal reception and processing function includes receiving the physical layer signals of the first information, the second information, the third information and the fourth information in the present application and monitoring the M control resource elements in the present application, demodulating the multi-carrier symbols in the multi-carrier symbol stream based on various modulation schemes (e.g., binary phase shift keying (BPSK), quadrature phase shift keying (QPSK)), then descrambling, decoding and deinterleaving to recover the data or control transmitted by the second node device 410 on the physical channel, and then providing the data and control signals to the controller / processor 490. The controller / processor 490 is responsible for the L2 layer and above, and the controller / processor 490 interprets the first information, the second information, the third information and the fourth information in the present application. The controller / processor may be associated with a memory 480 storing program codes and data. The memory 480 may be referred to as a computer-readable medium.

[0315] In uplink (UL) transmission, the data source / buffer 480 is used to provide high-layer data to the controller / processor 490. The data source / buffer 480 represents the L2 layer and all protocol layers above the L2 layer. The controller / processor 490 implements the L2 layer protocol for the user plane and the control plane by providing header compression, encryption, packet segmentation and reordering, and multiplexing between logical and transport channels based on the radio resource allocation of the second node 410. The controller / processor 490 is also responsible for HARQ operations, retransmission of lost packets, and signaling to the second node 410. The fifth information in this application is generated at the controller / processor 490. The transmission processor 455 implements various signal transmission processing functions for the L1 layer (i.e., the physical layer), and the physical layer signal carrying the fifth information is generated at the transmission processor 455. The signal transmission processing function includes sequence generation (for signals generated by sequences), encoding and interleaving to facilitate forward error correction (FEC) at UE450, and modulation of baseband signals based on various modulation schemes (e.g., binary phase shift keying (BPSK), quadrature phase shift keying (QPSK)) (for signals generated by bit blocks), dividing the sequence-generated signals or modulation symbols into parallel streams and mapping each stream to a corresponding multi-carrier subcarrier and / or multi-carrier symbol, and then mapping to antenna 460 via transmitter 456 by the transmit processor 455 to transmit in the form of RF signals. The receiver 416 receives the RF signal through its corresponding antenna 420, and each receiver 416 recovers the baseband information modulated onto the RF carrier and provides the baseband information to the receive processor 412. The receiving processor 412 implements various signal receiving and processing functions for the L1 layer (i.e., the physical layer), including receiving and processing the physical layer signal carrying the fifth information in the present application, and the signal receiving and processing function includes acquiring a multi-carrier symbol stream, then performing sequence decorrelation or demodulation based on various modulation schemes (e.g., binary phase shift keying (BPSK), quadrature phase shift keying (QPSK)) on the multi-carrier symbols in the multi-carrier symbol stream, and then decoding and deinterleaving to recover the data and / or control signal originally transmitted by the first node device 450 on the physical channel. The data and / or control signal is then provided to the controller / processor 440. The functions of the L2 layer are implemented in the controller / processor 440, including reading the fifth information in the present application. The controller / processor may be associated with a buffer 430 storing program code and data. The buffer 430 may be a computer-readable medium.

[0316] As an embodiment, the first node device 450 apparatus includes: at least one processor and at least one memory, the at least one memory includes computer program code; the at least one memory and the computer program code are configured to be used together with the at least one processor, and the first node device 450 apparatus at least: receives first information, the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; monitors M control resource elements in a first time window, wherein M is a positive integer greater than 1, and any one of the M control resource elements is occupied by a control channel alternative; wherein any one of the M control resource elements The subband to which the frequency domain belongs belongs to a first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any subband included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any subband included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0317] As an embodiment, the first node device 450 apparatus includes: a memory storing a computer-readable instruction program, wherein the computer-readable instruction program generates an action when executed by at least one processor, wherein the action includes: receiving first information, wherein the first information is used to determine a target cell, wherein the target cell is used to schedule a characteristic cell; monitoring M control resource elements in a first time window, wherein M is a positive integer greater than 1, wherein any one of the M control resource elements is occupied by a control channel alternative; wherein the sub-band to which any one of the M control resource elements belongs in the frequency domain belongs to a first sub-band set , the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any subband included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any subband included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0318] As an embodiment, the second node device 410 apparatus includes: at least one processor and at least one memory, the at least one memory including computer program code; the at least one memory and the computer program code are configured to be used together with the at least one processor. The second node device 410 device at least: sends first information, the first information is used to determine the target cell, and the target cell is used to schedule the characteristic cell; determines M control resource elements in a first time window, wherein M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by a control channel; wherein a subband to which any one of the M control resource elements belongs in the frequency domain belongs to a first subband set, and the first subband set includes a positive integer number of subbands; a scheduling cell set includes a positive integer number of service cells, and a service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; a subcarrier spacing of a subcarrier included in any one of the subbands included in the first subband set is equal to a first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0319] As an embodiment, the second node device 410 includes: a memory storing a computer-readable instruction program, wherein the computer-readable instruction program generates an action when executed by at least one processor, wherein the action includes: sending first information, wherein the first information is used to determine a target cell, wherein the target cell is used to schedule a characteristic cell; determining M control resource elements in a first time window, wherein M is a positive integer greater than 1, wherein any one of the M control resource elements is alternatively occupied by a control channel; wherein a sub-band to which any one of the M control resource elements belongs in the frequency domain belongs to a first sub-band set, The first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any subband included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any subband included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0320] As an embodiment, the first node device 450 is a user equipment (UE).

[0321] As an embodiment, the first node device 450 is a user equipment supporting multi-carrier transmission.

[0322] As an embodiment, the first node device 450 is a user equipment supporting cross-carrier scheduling of a primary carrier by a secondary carrier.

[0323] As an embodiment, the second node device 410 is a base station device (gNB / eNB).

[0324] As an embodiment, the second node device 410 is a base station device supporting multi-carrier transmission.

[0325] As an embodiment, the second node device 410 is a base station device that supports cross-carrier scheduling of a primary carrier by a secondary carrier.

[0326] As an embodiment, the receiver 456 (including the antenna 460), the receiving processor 452 and the controller / processor 490 are used to receive the first information in the present application.

[0327] As an embodiment, the receiver 456 (including the antenna 460) and the receiving processor 452 are used to monitor the M control resource elements in the present application.

[0328] As an embodiment, the receiver 456 (including the antenna 460), the receiving processor 452 and the controller / processor 490 are used to receive the second information in the present application.

[0329] As an embodiment, the receiver 456 (including the antenna 460), the receiving processor 452 and the controller / processor 490 are used to receive the third information in the present application.

[0330] As an embodiment, the receiver 456 (including the antenna 460), the receiving processor 452 and the controller / processor 490 are used to receive the fourth information in the present application.

[0331] As an embodiment, the transmitter 456 (including the antenna 460), the transmission processor 455 and the controller / processor 490 are used to send the fifth information in the present application.

[0332] As an embodiment, the transmitter 416 (including the antenna 420), the transmission processor 415 and the controller / processor 440 are used to send the first information in this application.

[0333] As an embodiment, the transmitter 416 (including the antenna 420) and the transmit processor 415 are used to determine the M control resource elements in the present application.

[0334] As an embodiment, the transmitter 416 (including the antenna 420), the transmission processor 415 and the controller / processor 440 are used to send the second information in the present application.

[0335] As an embodiment, the transmitter 416 (including the antenna 420), the transmission processor 415 and the controller / processor 440 are used to send the third information in this application.

[0336] As an embodiment, the transmitter 416 (including the antenna 420), the transmission processor 415 and the controller / processor 440 are used to send the fourth information in this application.

[0337] As an embodiment, the receiver 416 (including the antenna 420), the receiving processor 412 and the controller / processor 440 are used to receive the fifth information in the present application.

[0338] Example 5

[0339] Embodiment 5 illustrates a wireless signal transmission flow chart according to an embodiment of the present application, as shown in the attached Figure 5 As shown in the attached Figure 5 In the example, the second node device N1 is a maintenance base station of the service cell of the first node device U2. It is particularly noted that the order in this example does not limit the signal transmission order and implementation order in this application.

[0340] for Second node device N1 , receiving the fifth information in step S11, sending the second information in step S12, sending the first information in step S13, sending the third information in step S14, sending the fourth information in step S15, and determining M control resource elements in the first time window in step S16.

[0341] for First node device U2 , sending the fifth information in step S21, receiving the second information in step S22, receiving the first information in step S23, receiving the third information in step S24, receiving the fourth information in step S25, and monitoring M control resource elements in the first time window in step S26.

[0342] In embodiment 5, the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by a control channel; a subband to which any one of the M control resource elements belongs in the frequency domain belongs to a first subband set, and the first subband set includes a positive integer number of subbands; a scheduling cell set includes a positive integer number of service cells, and a service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; a subcarrier spacing of a subcarrier included in any one of the subbands included in the first subband set is equal to a first subcarrier spacing; and the first subcarrier spacing is used to determine the time of the first time window. time length; the M is not greater than the first threshold, whether the scheduled cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the first threshold, and the first threshold is a non-negative integer; the second information is used to determine the configuration cell group, and the configuration cell group includes a positive integer number of service cells greater than 1; the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the fourth information is used to determine a second factor, and the second factor is a positive number less than 1; the fifth information is used to indicate a first capability parameter, and the first capability parameter is a positive integer; the first capability parameter is used to determine the first threshold.

[0343] As an embodiment, the second information is transmitted via an air interface.

[0344] As an embodiment, the second information is transmitted via a wireless interface.

[0345] As an embodiment, the second information includes all or part of a high-layer signaling.

[0346] As an embodiment, the second information includes all or part of a physical layer signaling.

[0347] As an embodiment, the second information includes all or part of an RRC (Radio Resource Control) signaling.

[0348] As an embodiment, the second information includes all or part of a MAC (Medium Access Control) layer signaling.

[0349] As an embodiment, the second information includes all or part of a system information block (SIB, System Information Block).

[0350] As an embodiment, the second information is transmitted via a DL-SCH (Downlink Shared Channel).

[0351] As an embodiment, the second information is transmitted via a PDSCH (Physical Downlink Shared Channel).

[0352] As an embodiment, the second information is cell specific (Cell Specific).

[0353] As an embodiment, the second information is user equipment-specific (UE-specific).

[0354] As an embodiment, the second information is configured per serving cell (Per Serving Cell).

[0355] As an embodiment, the second information includes all or part of a field (Field) of a DCI (Downlink Control Information) signaling.

[0356] As an embodiment, the second information and the first information are carried by two different RRC signalings.

[0357] As an embodiment, the second information and the first information are carried by two different IEs in the same RRC signaling.

[0358] As an embodiment, the second information and the first information are carried by two different fields in the same IE in the same RRC signaling.

[0359] As an embodiment, the second information belongs to an IE (Information Element) "CellGroupConfig" in an RRC signaling.

[0360] As an embodiment, the second information belongs to the field "sCellToAddModList" in the IE (Information Element) "CellGroupConfig" in an RRC signaling.

[0361] As an embodiment, the second information belongs to the field "sCellToReleaseList" in the IE (Information Element) "CellGroupConfig" in an RRC signaling.

[0362] As an embodiment, the above sentence "the second information is used to determine the configured cell group" includes the following meaning: the second information is used by the first node device in the present application to determine the configured cell group.

[0363] As an embodiment, the above sentence "the second information is used to determine the configured cell group" includes the following meaning: the second information is used to explicitly indicate the configured cell group.

[0364] As an embodiment, the above sentence "the second information is used to determine the configured cell group" includes the following meaning: the second information is used to implicitly indicate the configured cell group.

[0365] As an embodiment, the above sentence "the second information is used to determine the configured cell group" includes the following meaning: the second information is used to indirectly indicate the configured cell group.

[0366] As an embodiment, the third information is transmitted via an air interface.

[0367] As an embodiment, the third information is transmitted via a wireless interface.

[0368] As an embodiment, the third information includes all or part of a high-layer signaling.

[0369] As an embodiment, the third information includes all or part of a physical layer signaling.

[0370] As an embodiment, the third information includes all or part of an RRC (Radio Resource Control) signaling.

[0371] As an embodiment, the third information includes all or part of a MAC (Medium Access Control) layer signaling.

[0372] As an embodiment, the third information includes all or part of a system information block (SIB, System Information Block).

[0373] As an embodiment, the third information is transmitted via a DL-SCH (Downlink Shared Channel).

[0374] As an embodiment, the third information is transmitted via a PDSCH (Physical Downlink Shared Channel).

[0375] As an embodiment, the third information is cell specific (Cell Specific).

[0376] As an embodiment, the third information is user equipment specific (UE-specific).

[0377] As an embodiment, the third information is configured per serving cell (Per Serving Cell).

[0378] As an embodiment, the third information includes all or part of a field (Field) of a DCI (Downlink Control Information) signaling.

[0379] As an embodiment, the third information includes a field “CORESETPoolIndex” in an IE “ControlResourceSet” in an IE (Information Element, information unit) “PDCCH-Config” in an RRC signaling.

[0380] As an embodiment, the third information includes an IE (Information Element) "PDCCH-Config" in RRC signaling.

[0381] As an embodiment, the third information includes an IE "ControlResourceSet" in an IE (Information Element) "PDCCH-Config" in RRC signaling.

[0382] As an embodiment, the third information and the first information are carried by two different RRC signalings.

[0383] As an embodiment, the third information and the first information are carried by two different IEs in the same RRC signaling.

[0384] As an embodiment, the third information and the first information are carried by two different fields in the same IE in the same RRC signaling.

[0385] As an embodiment, the second information and the third information are carried by two different RRC signalings.

[0386] As an embodiment, the second information and the third information are carried by two different IEs in the same RRC signaling.

[0387] As an embodiment, the second information and the third information are carried by two different fields in the same IE in the same RRC signaling.

[0388] As an embodiment, the above sentence "the third information is used to determine the first cell subset and the second cell subset" includes the following meaning: the third information is used by the first node device in the present application to determine the first cell subset and the second cell subset.

[0389] As an embodiment, the above sentence "the third information is used to determine the first cell subset and the second cell subset" includes the following meaning: the third information is used to determine the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided to the service cells included in the first cell subset, and the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided to the service cells included in the first cell subset is equal to the first set index; the third information is used to determine the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided to the service cells included in the second cell subset, and the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided to the service cells included in the second cell subset is equal to the second set index, and the first set index and the second set index are not equal.

[0390] As an embodiment, the above sentence "the third information is used to determine the first cell subset and the second cell subset" includes the following meaning: the third information is used to determine the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the first cell subset, and the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the first cell subset is equal to the number of the first set; the third information is used to determine the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the second cell subset, and the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the second cell subset is equal to the number of the second set, and the first set number and the second set number are not equal.

[0391] As an embodiment, the above sentence "the third information is used to determine the first cell subset and the second cell subset" includes the following meanings: the third information includes P sub-information blocks, and P is equal to the sum of the number of service cells included in the first cell subset and the number of service cells included in the second cell subset; the P sub-information blocks are respectively for the P service cells included in the first cell subset and the second cell subset; any one of the P sub-information blocks is used to determine the control resource set (CORESET, Control Resource Set) provided for the corresponding service cell in the P service cells; the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the first cell subset is equal to the number of the first set, the number of control resource sets (CORESET, Control Resource Set) provided for the service cells included in the second cell subset is equal to the number of the second set, and the first set number and the second set number are not equal.

[0392] As an embodiment, the above sentence "the third information is used to determine the first cell subset and the second cell subset" includes the following meanings: the third information includes P sub-information blocks, and P is equal to the sum of the number of service cells included in the first cell subset and the number of service cells included in the second cell subset; the P sub-information blocks are respectively for the P service cells included in the first cell subset and the second cell subset; any one of the P sub-information blocks is used to determine the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided for the corresponding service cell in the P service cells; the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided for each service cell included in the first cell subset is equal to "0", and the control resource set (CORESET, Control Resource Set) resource pool index (CORESET PoolIndex) provided for each service cell included in the second cell subset is equal to "1".

[0393] As an embodiment, the third information includes P sub-information blocks, where P is equal to the sum of the number of service cells included in the first cell subset and the number of service cells included in the second cell subset; the P sub-information blocks are respectively for the P service cells included in the first cell subset and the second cell subset.

[0394] As an embodiment, the fourth information is transmitted via an air interface.

[0395] As an embodiment, the fourth information is transmitted via a wireless interface.

[0396] As an embodiment, the fourth information includes all or part of a high-layer signaling.

[0397] As an embodiment, the fourth information includes all or part of a physical layer signaling.

[0398] As an embodiment, the fourth information includes all or part of an RRC (Radio Resource Control) signaling.

[0399] As an embodiment, the fourth information includes all or part of a MAC (Medium Access Control) layer signaling.

[0400] As an embodiment, the fourth information is transmitted via a DL-SCH (Downlink Shared Channel).

[0401] As an embodiment, the fourth information is transmitted via a PDSCH (Physical Downlink Shared Channel).

[0402] As an embodiment, the fourth information is user equipment specific (UE-specific).

[0403] As an embodiment, the fourth information is configured per serving cell (Per Serving Cell).

[0404] As an embodiment, the fourth information includes all or part of a field (Field) of a DCI (Downlink Control Information) signaling.

[0405] As an embodiment, the third information and the fourth information are carried by two different RRC signalings.

[0406] As an embodiment, the third information and the fourth information are carried by two different IEs in the same RRC signaling.

[0407] As an embodiment, the third information and the fourth information are carried by two different fields in the same IE in the same RRC signaling.

[0408] As an embodiment, the above sentence "the fourth information is used to determine the second factor" includes the following meaning: the fourth information is used by the first node device in the present application to determine the second factor.

[0409] As an embodiment, the sentence “the fourth information is used to determine the second factor” includes the following meaning: the fourth information is used to explicitly indicate the second factor.

[0410] As an embodiment, the sentence “the fourth information is used to determine the second factor” includes the following meaning: the fourth information is used to implicitly indicate the second factor.

[0411] As an embodiment, the sentence “the fourth information is used to determine the second factor” includes the following meaning: the fourth information is used to indirectly indicate the second factor.

[0412] As an embodiment, "the fourth information is used to determine the second factor" is achieved by "the fourth information in the present application is used to determine a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell used for scheduling the characteristic cell, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor is linearly related to the ratio between the third number and the fourth number."

[0413] Example 6

[0414] Embodiment 6 illustrates a wireless signal transmission flow chart according to another embodiment of the present application, as shown in the attached Figure 6 As shown in the attached Figure 6 In the example, the second node device N3 is a maintenance base station of the service cell of the first node device U4. It should be noted that the order in this example does not limit the signal transmission order and implementation order in this application.

[0415] for Second node device N3 , receive the fifth information in step S31, send the second information in step S32, send the first information in step S33, send the third information in step S34, send the fourth information in step S35, determine M control resource elements in the first time window in step S36, and send control signaling in step S37.

[0416] for First node device U4 , sending the fifth information in step S41, receiving the second information in step S42, receiving the first information in step S43, receiving the third information in step S44, receiving the fourth information in step S45, and monitoring M control resource elements in the first time window in step S46.

[0417] In embodiment 6, the first information is used to determine the target cell, and the target cell is used to schedule the characteristic cell; M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by the control channel; the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; M is not greater than a first threshold value, and the At least one of whether the scheduled cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer; the second information is used to determine the configuration cell group, and the configuration cell group includes a positive integer number of service cells greater than 1; the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the fourth information is used to determine a second factor, and the second factor is a positive number less than 1; the fifth information is used to indicate a first capability parameter, and the first capability parameter is a positive integer; the first capability parameter is used to determine the first threshold; the control signaling occupies one or more control resource elements among the M control resource elements.

[0418] As an embodiment, the fifth information is transmitted via an air interface.

[0419] As an embodiment, the fifth information is transmitted via a wireless interface.

[0420] As an embodiment, the fifth information includes all or part of a high-layer signaling.

[0421] As an embodiment, the fifth information includes all or part of a physical layer signaling.

[0422] As an embodiment, the fifth information includes all or part of an RRC (Radio Resource Control) signaling.

[0423] As an embodiment, the fifth information includes all or part of a MAC (Medium Access Control) layer signaling.

[0424] As an embodiment, the fifth information is transmitted via a UL-SCH (Uplink Shared Channel).

[0425] As an embodiment, the fifth information is transmitted via a PUSCH (Physical Uplink Shared Channel).

[0426] As an embodiment, the fifth information is user equipment-specific (UE-specific).

[0427] As an embodiment, the fifth information is carrier specific (Carrier Specific).

[0428] As an embodiment, the fifth information is used to indicate the capability of the first node device in this application.

[0429] As an embodiment, the fifth information is used to indicate the CA or DC (Dual Connectivity) capability of the first node device in this application.

[0430] As an embodiment, the fifth information is used to indicate the blind detection capability of the first node device in the present application.

[0431] As an embodiment, the fifth information includes IE "Phy-Parameters".

[0432] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionCA-r16" in the IE "Phy-Parameters".

[0433] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionCA-r15" in the IE "Phy-Parameters".

[0434] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionCA-r17" in the IE "Phy-Parameters".

[0435] As an embodiment, the fifth information includes the field “pdcch-BlindDetectionCA” in the IE “Phy-Parameters”.

[0436] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionNRDC" in the IE "Phy-Parameters".

[0437] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionMCG-UE" in the IE "Phy-Parameters".

[0438] As an embodiment, the fifth information includes the field "pdcch-BlindDetectionSCG-UE" in the IE "Phy-Parameters".

[0439] As an embodiment, the above sentence "the fifth information is used to indicate the first capability parameter" includes the following meaning: the fifth information is used by the first node device in the present application to indicate the first capability parameter.

[0440] As an embodiment, the above sentence "the fifth information is used to indicate the first capability parameter" includes the following meaning: the fifth information is used to explicitly indicate the first capability parameter.

[0441] As an embodiment, the above sentence "the fifth information is used to indicate the first capability parameter" includes the following meaning: the fifth information is used to implicitly indicate the first capability parameter.

[0442] As an embodiment, the above sentence "the fifth information is used to indicate the first capability parameter" includes the following meaning: the fifth information is used to indirectly indicate the first capability parameter.

[0443] As an embodiment, the first capability parameter is the number of service cells of the maximum number of blind decoding (BD, Blind Decoding) that the first node device in this application can support.

[0444] As an embodiment, the first capability parameter is the number of service cells with the maximum number of blind decoding (BD, Blind Decoding) that the first node device in this application can support in a cell group (Cell Group).

[0445] As an embodiment, the first capability parameter is the number of service cells with the maximum number of blind decoding (BD) that the first node device in the present application can support in a master cell group (Master Cell Group, MCG).

[0446] As an embodiment, the first capability parameter is the number of service cells with the maximum number of blind decoding (BD) that the first node device in the present application can support in a secondary cell group (SCG).

[0447] As an embodiment, the first capability parameter is the number of service cells.

[0448] As an embodiment, the above sentence "the first capability parameter is used to determine the first threshold" includes the following meaning: the target value in this application is proportional to the first capability parameter.

[0449] As an embodiment, the above sentence "the first capability parameter is used to determine the first threshold" includes the following meaning: the first threshold is proportional to the first capability parameter.

[0450] As an embodiment, the above sentence "the first capability parameter is used to determine the first threshold" includes the following meaning: the first capability parameter, the target ratio value in the present application, and the first parameter in the present application are jointly used to determine the first threshold.

[0451] As an embodiment, the above sentence "the first capability parameter is used to determine the first threshold" includes the following meaning: the first capability parameter, the target ratio value in the present application, and the first parameter in the present application are jointly used to determine the target numerical value in the present application.

[0452] As an embodiment, the above sentence "the first capability parameter is used to determine the first threshold" includes the following meaning: the product of the first capability parameter, the target ratio value in the present application, and the first parameter in the present application is equal to the target value in the present application.

[0453] As an embodiment, the above sentence “the first capability parameter is used to determine the first threshold” is implemented by the following formula:

[0454]

[0455] in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value in this application, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

[0456] As an embodiment, the number of service cells included in the configured cell group in the present application is greater than the first capability parameter.

[0457] As an embodiment, the number of service cells included in the configured cell group in the present application is equal to the first capability parameter.

[0458] As an embodiment, the number of service cells included in the configured cell group in the present application is less than the first capability parameter.

[0459] As an embodiment, the number of service cells included in the scheduled cell set in the present application is greater than the first capability parameter.

[0460] As an embodiment, the number of serving cells included in the scheduled cell set in the present application is equal to the first capability parameter.

[0461] As an embodiment, the number of serving cells included in the scheduled cell set in the present application is less than the first capability parameter.

[0462] As an embodiment, the product of the second number in the present application and the first factor in the present application and the sum of the first number in the present application is greater than the first capability parameter.

[0463] As an embodiment, the product of the second number in the present application and the first factor in the present application and the sum of the first number in the present application are equal to the first capability parameter.

[0464] As an embodiment, the product of the second number in the present application and the first factor in the present application and the sum of the first number in the present application are less than the first capability parameter.

[0465] Example 7

[0466] Embodiment 7 illustrates a wireless signal transmission flow chart according to another embodiment of the present application, as shown in the attached Figure 7 As shown in the attached Figure 7 In the example, the second node device N5 is a maintenance base station of the service cell of the first node device U6. It should be noted that the order in this example does not limit the signal transmission order and implementation order in this application.

[0467] for Second node device N5, receive the fifth information in step S51, receive the ninth information in step S52, send the eighth information in step S53, send the second information in step S54, send the sixth information in step S55, send the third information in step S56, send the seventh information in step S57, send the fourth information in step S58, send the tenth information in step S59, and determine M control resource elements in the first time window in step S5a.

[0468] for First node device U6 , sending the fifth information in step S61, sending the ninth information in step S62, receiving the eighth information in step S63, receiving the second information in step S64, receiving the sixth information in step S65, receiving the third information in step S66, receiving the seventh information in step S67, receiving the fourth information in step S68, receiving the tenth information in step S69, and monitoring M control resource elements in the first time window in step S6a.

[0469] As an embodiment, the sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

[0470] As an embodiment, the seventh information is used to determine the time-frequency resources occupied by each of the M control resource elements.

[0471] As an embodiment, the seventh information is used to determine Q control resource elements, any one of the M control resource elements is one of the Q control resource elements, and Q is a positive integer not less than the M; the M is equal to the first threshold, and the first threshold is used to determine the M control resource elements from the Q control resource elements.

[0472] As an embodiment, the seventh information is used to determine the sub-band in the first sub-band set to which the time-frequency resources occupied by each of the M control resource elements belong.

[0473] As an embodiment, the eighth information is used to determine the first factor in the present application.

[0474] As an embodiment, the ninth information is used to indicate the first factor in this application.

[0475] As an embodiment, the tenth information is used to indicate the difference between the second feature and value in the present application and the first feature and value in the present application.

[0476] Example 8

[0477] Embodiment 8 illustrates a schematic diagram of the relationship between the first control resource element and the second control resource element according to an embodiment of the present application, as shown in the attached figure. Figure 8 As shown in the attached Figure 8 In case A and case B, the horizontal axis represents frequency, the vertical axis represents frequency, each rectangle represents one control resource element among M control resource elements, the rectangle filled with cross lines represents the first control resource element, and the rectangle filled with cross lines represents the second control resource element; in case A, a control resource element circled by a dotted box belongs to a control resource set.

[0478] In Example 8, the first control resource element is one of the M control resource elements in the present application, and the second control resource element is a control resource element other than the first control resource element among the M control resource elements in the present application; the first control resource element and the second control resource element belong to different control resource sets, respectively, or the control channel options occupying the first control resource element and the second control resource element, respectively, have different starting symbols occupied in the time domain.

[0479] As an embodiment, the time-frequency resources occupied by the first control resource element and the time-frequency resources occupied by the second control resource element are different.

[0480] As an embodiment, the time-frequency resources occupied by the first control resource element and the time-frequency resources occupied by the second control resource element are the same.

[0481] As an embodiment, the first control resource element and the second control resource element are non-overlapping (Non-Overlapped).

[0482] As an embodiment, the above sentence "the first control resource element and the second control resource element belong to different control resource sets respectively" includes the following meanings: the first control resource element belongs to a first control resource set, and the second control resource element belongs to a second control resource set; the first control resource set is a CORESET (Control Resource Set), and the second control resource set is a CORESET (ControlResource Set), and the first control resource set and the second control resource set are not the same.

[0483] As an embodiment, the above sentence "the first control resource element and the second control resource element belong to different control resource sets respectively" includes the following meaning: the first control resource element and the second control resource element belong to different control resource sets (CORESET) configured with different indexes respectively.

[0484] As an embodiment, the above sentence "the first control resource element and the second control resource element belong to different control resource sets respectively" includes the following meanings: the first control resource element belongs to a first control resource set, and the second control resource element belongs to a second control resource set; the first control resource set is a CORESET (Control Resource Set), and the second control resource set is a CORESET (ControlResource Set), and the time-frequency resources included in the first control resource set and the second control resource set are different.

[0485] As an embodiment, the above sentence "the first control resource element and the second control resource element belong to different control resource sets respectively" includes the following meanings: the first control resource element belongs to a first control resource set, and the second control resource element belongs to a second control resource set; the first control resource set is a CORESET (Control Resource Set), and the second control resource set is a CORESET (ControlResource Set), and the index of the first control resource set is different from the index of the second control resource set.

[0486] As an embodiment, the above sentence "the first control resource element and the second control resource element belong to different control resource sets respectively" includes the following meanings: the first control resource element belongs to a first control resource set, and the second control resource element belongs to a second control resource set; the first control resource set is a CORESET (Control Resource Set), and the second control resource set is a CORESET (ControlResource Set), the time-frequency resources included in the first control resource set are the same as the time-frequency resources included in the second control resource set, and the index of the first control resource set is different from the index of the second control resource set.

[0487] As an embodiment, the above sentence "the starting symbols occupied by the control channel alternatives occupying the first control resource element and the second control resource element respectively in the time domain are different" includes the following meaning: the first control channel alternative occupies the first control resource element, the second control channel alternative occupies the first control resource element, and the starting symbol occupied by the first control channel alternative in the time domain is different from the starting symbol (Starting Symbol / First Symbol) occupied by the second control channel alternative in the time domain.

[0488] As an embodiment, the above sentence "the starting symbols occupied by the control channel options respectively occupying the first control resource element and the second control resource element in the time domain are different" includes the following meaning: the time domain resources occupied by the control channel options respectively occupying the first control resource element and the second control resource element are different.

[0489] As an embodiment, the above sentence "the starting symbols occupied by the control channel options respectively occupying the first control resource element and the second control resource element in the time domain are different" includes the following meaning: the starting symbols occupied by the control channel options respectively occupying the first control resource element and the second control resource element in the time domain have different indices in the first time window.

[0490] As an embodiment, the above sentence "the starting symbols occupied by the control channel options respectively occupying the first control resource element and the second control resource element in the time domain are different" includes the following meaning: the starting symbols occupied by the control channel options respectively occupying the first control resource element and the second control resource element in the time domain have different indices in the corresponding time slots.

[0491] As an embodiment, the starting symbol of the control channel candidate occupying the first control resource element is an OFDM symbol, and the starting symbol of the control channel candidate occupying the second control resource element is an OFDM symbol.

[0492] Example 9

[0493] Embodiment 9 illustrates a schematic diagram of the relationship between a scheduling cell set and a scheduled cell set according to an embodiment of the present application, as shown in the attached figure. Fig. 9 As shown in the attached Fig. 9In the figure, the horizontal axis represents frequency, each filled block at the top of the arc represents a service cell included in the configured cell group, each filled block at the top of the arc filled with left-facing diagonal lines from top to bottom represents a service cell included in the scheduling cell set, each filled block at the top of the arc filled with right-facing diagonal lines from top to bottom represents a service cell included in the scheduled cell set, each filled block at the top of the arc filled with cross lines represents a service cell that belongs to both the scheduling cell set and the scheduled cell set, and the dotted arc with an arrow represents the scheduling and scheduling relationship between two service cells.

[0494] In Example 9, the configured cell group in the present application includes a positive integer number of service cells greater than 1; the target cell in the present application belongs to the configured cell group, the feature cell in the present application belongs to the configured cell group, and the feature cell is the main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set in the present application, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

[0495] As an embodiment, the configured cell group is a master cell group (MCG, Master Cell Group).

[0496] As an embodiment, the configured cell group is a secondary cell group (SCG, Secondary Cell Group).

[0497] As an embodiment, the configured cell group includes a MAC entity, a set of logical channels associated with RLC entities, and a set including a primary cell (SpCell) and one or more secondary cells (Scell).

[0498] As an embodiment, the target cell is a primary cell (Primary Cell, Pcell) included in the configured cell group.

[0499] As an embodiment, the target cell is a special cell (SpecialCell, Spcell) included in the configured cell group.

[0500] As an embodiment, the target cell is a secondary cell (SCell) included in the configured cell group.

[0501] As an embodiment, the above sentence "the characteristic cell is the main cell in the configured cell group" includes the following meanings: when the configured cell group is the main cell group (MCG), the characteristic cell is the main cell (Primary Cell, Pcell) in the configured cell group; when the configured cell group is the secondary cell group (SCG), the characteristic cell is the primary and secondary cell group cell (Primary SCG Cell, PSCell) in the configured cell group.

[0502] As an embodiment, the above sentence "the characteristic cell is a main cell in the configured cell group" includes the following meaning: the characteristic cell is a special cell (Special Cell, Spcell) included in the configured cell group.

[0503] As an embodiment, the above sentence "the characteristic cell is the main cell in the configured cell group" includes the following meaning: the characteristic cell is a service cell included in the configured cell group and used by the first node device in this application to perform an initial connection establishment procedure (initial connection establishment procedure) or initiate a connection re-establishment procedure (connection re-establishment procedure).

[0504] As an embodiment, the above sentence "the characteristic cell is the main cell in the configured cell group" includes the following meaning: the characteristic cell is a service cell included in the configured cell group and used by the first node device in the present application for random access (Random Access) when performing a reconfiguration procedure (Reconfiguration with Sync procedure).

[0505] As an embodiment, the above sentence "the scheduled cell set includes service cells scheduled by the service cells included in the scheduling cell set" includes the following meaning: the scheduled cell set includes all service cells scheduled by any service cell included in the scheduling cell set.

[0506] As an embodiment, the above sentence "the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set" includes the following meaning: the scheduled cell set only includes the service cells scheduled by the service cells included in the scheduling cell set.

[0507] As an embodiment, the above sentence "the scheduled cell set includes service cells scheduled by service cells included in the scheduling cell set" includes the following meaning: any service cell scheduled by the service cells included in the scheduling cell set belongs to the scheduled cell set.

[0508] As an embodiment, the above sentence "the scheduled cell set includes service cells scheduled by the service cells included in the scheduling cell set" includes the following meaning: any service cell scheduled by the service cells included in the scheduling cell set constitutes the scheduled cell set.

[0509] As an embodiment, the above sentence "the scheduled cell set includes the service cell scheduled by the service cell included in the scheduling cell set" includes the following meaning: the scheduling cell set includes the scheduling cell of any service cell included in the scheduled cell set.

[0510] As an embodiment, when the scheduling cell set includes the target cell, the scheduled cell set includes the characteristic cell.

[0511] As an embodiment, when the target cell belongs to the scheduling cell set, the characteristic cell belongs to the scheduled cell set.

[0512] Example 10

[0513] Example 10 illustrates a schematic diagram of a target ratio value according to an embodiment of the present application, as shown in the attached figure. Fig.10 As shown in the attached Fig.10 In the figure, the three rectangular boxes represent the first ratio value, the second ratio value and the target ratio value, respectively, and the arrows represent the calculation process.

[0514] In Example 10, a target ratio value is used to determine the first threshold value in the present application, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set in the present application includes the target cell in the present application, the characteristic cell in the present application, and whether the target cell in the present application is the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0515] As an embodiment, the first ratio value may be equal to 1.

[0516] As an embodiment, the first ratio value is greater than 0.

[0517] As an embodiment, the first ratio value is less than 1.

[0518] As an embodiment, the second ratio value may be equal to 1.

[0519] As an embodiment, the second ratio value is greater than 0.

[0520] As an embodiment, the second ratio value is less than 1.

[0521] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold value" includes the following meaning: the target numerical value and the target ratio value in this application are proportional.

[0522] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold" includes the following meaning: the target ratio value is used by the first node device in the present application to determine the first threshold.

[0523] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold value" includes the following meaning: the first threshold value is proportional to the target ratio value.

[0524] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold value" includes the following meaning: the target ratio value is calculated by an operation function to obtain the first threshold value.

[0525] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold value" includes the following meaning: the target ratio value is used to determine an intermediate value, and the first threshold value is a rounded-down value of the intermediate value.

[0526] As an embodiment, the above sentence "the target ratio value is used to determine the first threshold value" includes the following meaning: the target ratio value in the present application is used to determine the target numerical value in the present application.

[0527] As an embodiment, the above sentence "the target ratio value is equal to one of the first ratio value and the second ratio value" includes the following meaning: the target ratio value is equal to the first ratio value, or the target ratio value is equal to the second ratio value.

[0528] As an embodiment, the above sentence "the target ratio value is equal to one of the first ratio value and the second ratio value" includes the following meaning: the target ratio value may be equal to the first ratio value, and the target ratio value may also be equal to the second ratio value.

[0529] As an embodiment, the first sum value and the second sum value are equal.

[0530] As an embodiment, the first sum value and the second sum value are not equal.

[0531] As an embodiment, the first characteristic and value are equal to the second characteristic and value.

[0532] As an embodiment, the first characteristic and value are not equal to the second characteristic and value.

[0533] As an embodiment, the first characteristic sum value is greater than the first sum value.

[0534] As an embodiment, the first characteristic sum value is equal to the first sum value.

[0535] As an embodiment, the second characteristic sum value is greater than the second sum value.

[0536] As an embodiment, the second characteristic sum value is equal to the second sum value.

[0537] As an embodiment, the first ratio value is greater than the second ratio value.

[0538] As an embodiment, the first ratio value is smaller than the second ratio value.

[0539] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from between the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same are used together to determine the target ratio value from between the first ratio value and the second ratio value.

[0540] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from between the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0541] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from between the first ratio value and the second ratio value" includes the following meaning: whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0542] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used by the first node device in this application to determine the target ratio value from the first ratio value and the second ratio value.

[0543] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from the first ratio value and the second ratio value according to the judgment condition.

[0544] As an embodiment, the above sentence "at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the target proportion value from the first proportion value and the second proportion value" includes the following meanings: when the characteristic cell and the target cell are the same, the target proportion value is equal to the first proportion value; when the characteristic cell and the target cell are not the same and the scheduling cell set does not include the target cell, the target proportion value is equal to the first proportion value; when the characteristic cell and the target cell are not the same and the scheduling cell set includes the target cell, the target proportion value is equal to the second proportion value.

[0545] As an embodiment, the above sentence "at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the target ratio value from the first ratio value and the second ratio value" includes the following meaning: when the characteristic cell and the target cell are the same, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same, the target ratio value is equal to the second ratio value.

[0546] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from between the first ratio value and the second ratio value" includes the following meaning: when the scheduling cell set does not include the target cell, the target ratio value is equal to the first ratio value; when the scheduling cell set includes the target cell, the target ratio value is equal to the second ratio value.

[0547] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine whether the first sum value and the second sum value are equal.

[0548] As an embodiment, the above sentence "whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine the target ratio value from the first ratio value and the second ratio value" includes the following meaning: whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same, at least one of which is used to determine whether the first characteristic sum value and the second characteristic sum value are equal.

[0549] As an embodiment, when the characteristic cell and the target cell are not the same, the first characteristic sum value and the second characteristic sum value are not equal.

[0550] As an embodiment, when the scheduled cell set includes the target cell, the first sum value and the second sum value are not equal.

[0551] As an embodiment, the number of service cells included in the configured cell group is equal to the number of service cells included in the scheduled cell set.

[0552] As an embodiment, the number of service cells included in the configured cell group is not equal to the number of service cells included in the scheduled cell set.

[0553] As an embodiment, the number of service cells included in the configured cell group is greater than the number of service cells included in the scheduled cell set.

[0554] As an embodiment, the first characteristic sum value is equal to the number of service cells included in the configured cell group; the first sum value is equal to the number of service cells included in the scheduled cell set.

[0555] Embodiment 11

[0556] Embodiment 11 illustrates a schematic diagram of the relationship between the first cell subset and the second cell subset according to an embodiment of the present application, as shown in the attached figure. Fig.11 As shown in the attached Fig.11 In the figure, the horizontal axis represents frequency, each filled block at the top of the arc represents a service cell, each filled block at the top of the arc filled with cross lines represents a service cell in the first cell subset, and each filled block at the top of the arc filled with cross lines represents a service cell in the second cell subset.

[0557] In embodiment 11, the third information in the present application is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set in the present application is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set in the present application is equal to a second number; the first characteristic sum value in the present application and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum value in the present application and the number of service cells included in the first cell subset are linearly related; the first sum value in the present application and the second number are linearly related to the product of the first factor, and the first sum value in the present application and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

[0558] As an embodiment, the serving cells included in the first cell subset are not provided with a control resource set (CORESET) resource pool index (CORESET Pool Index).

[0559] As an embodiment, the serving cells included in the first cell subset are provided with only one control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index).

[0560] As an embodiment, corresponding to all CORESETs on all BWPs on each serving cell included in the first cell subset, the first node device in the present application is only provided with a control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index).

[0561] As an embodiment, on each BWP on each serving cell included in the first cell subset, the first node device in the present application is only provided with a control resource set (CORESET, Control Resource Set).

[0562] As an embodiment, on any BWP on each serving cell included in the second cell subset, the first node device in the present application is provided with more than one control resource set (CORESET, ControlResource Set).

[0563] As an embodiment, on any BWP on each serving cell included in the second cell subset, the first node device in the present application is provided with more than one control resource set (CORESET, ControlResource Set) resource pool index (CORESET Pool Index).

[0564] As an embodiment, on any BWP on each serving cell included in the second cell subset, the first node device in the present application is provided with two control resource sets (CORESET, ControlResource Set).

[0565] As an embodiment, on any BWP on each serving cell included in the second cell subset, the first node device in the present application is provided with two control resource set (CORESET, ControlResource Set) resource pool indexes (CORESET Pool Index).

[0566] As an embodiment, on any BWP on each service cell included in the second cell subset, the value of the control resource set (CORESET, ControlResource Set) resource pool index (CORESET Pool Index) provided by the first node device in this application for a CORESET is equal to 0, and the value of the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided by the first node device in this application for another CORESET is equal to 1.

[0567] As an embodiment, on any BWP on each service cell included in the second cell subset, the value of the control resource set (CORESET, ControlResource Set) resource pool index (CORESET Pool Index) provided by the first node device in this application for the first CORESET is equal to 0, and the value of the control resource set (CORESET, Control Resource Set) resource pool index (CORESET Pool Index) provided by the first node device in this application for the second CORESET is equal to 1, and the first CORESET and the second CORESET are not the same.

[0568] As an embodiment, the first number is a non-negative integer.

[0569] As an embodiment, the second number is a non-negative integer.

[0570] As an embodiment, the first number may be equal to 0.

[0571] As an embodiment, the second number may be equal to 0.

[0572] As an embodiment, the first number is greater than 0.

[0573] As an embodiment, the second number is greater than 0.

[0574] As an embodiment, any serving cell included in the scheduled cell set belongs to one of the first cell subset and the second cell subset.

[0575] As an embodiment, any serving cell included in the scheduled cell set belongs to either the first cell subset or the second cell subset.

[0576] As an embodiment, the scheduled cell set includes a serving cell that belongs neither to the first cell subset nor to the second cell subset.

[0577] As an embodiment, the first factor is equal to 1.

[0578] As an embodiment, the first factor is not equal to 1.

[0579] As an embodiment, the above sentence “the first factor is configurable” includes the following meaning: the first factor is configured by the second node device in the application.

[0580] As an embodiment, the above sentence “the first factor is configurable” includes the following meaning: the first factor is reported by the first node device in the application.

[0581] As an embodiment, the sentence “the first factor is configurable” includes the following meaning: the first processing machine further receives eighth information, wherein the eighth information is used to indicate the first factor.

[0582] As an embodiment, the sentence “the first factor is configurable” includes the following meaning: the first processing machine further sends ninth information, wherein the ninth information is used to indicate the first factor.

[0583] As an embodiment, the above sentence “the first factor is predefined” includes the following meaning: the first factor is equal to a fixed value.

[0584] As an embodiment, the above sentence “the first factor is predefined” includes the following meaning: the first factor is equal to 1.

[0585] As an embodiment, the sentence “the first factor is predefined” includes the following meaning: the first factor is equal to a default value.

[0586] As an embodiment, the first factor is a blind detection (BD, Blind Decoding) factor.

[0587] As an embodiment, the first factor is used to determine a multiple by which the number of blind detections can be scaled.

[0588] As an embodiment, any service cell included in the first cell subset belongs to the configured cell group, and any service cell included in the second cell subset belongs to the configured cell group.

[0589] As an embodiment, the sentence “the first characteristic and value are linearly related to the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly related to the number of serving cells included in the first cell subset” is implemented by the following formula:

[0590]

[0591] Among them, Sum 1 represents the first feature and value, represents the number of serving cells included in the first cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

[0592] As an embodiment, the sentence “the first characteristic and value are linearly related to the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly related to the number of serving cells included in the first cell subset” is implemented by the following formula:

[0593]

[0594] Among them, Sum 1 represents the first feature and value, represents the number of serving cells configured with a numerical structure index equal to j included in the first cell subset, represents the number of serving cells included in the first cell subset, represents the number of serving cells configured with a numerical structure index equal to j included in the second cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

[0595] As an embodiment, the above sentence "The first characteristic sum value and the product of the number of service cells included in the second cell subset and the first factor are linearly related, and the first characteristic sum value and the number of service cells included in the first cell subset are linearly related" includes the following meaning: the first characteristic sum value is equal to the sum of the product of the number of service cells included in the second cell subset and the first factor and the number of service cells included in the first cell subset.

[0596] As an embodiment, the above sentence "the first characteristic sum value and the number of service cells included in the second cell subset are linearly correlated with the product of the first factor, and the first characteristic sum value and the number of service cells included in the first cell subset are linearly correlated" includes the following meaning: the first characteristic sum value and the number of service cells included in the second cell subset are linearly positively correlated with the product of the first factor, and the first characteristic sum value and the number of service cells included in the first cell subset are linearly positively correlated.

[0597] As an embodiment, the above sentence "the first sum value and the second quantity are linearly related to the product of the first factor, and the first sum value and the first quantity are linearly related" includes the following meaning: the first sum value is equal to the sum of the product of the second quantity and the first factor and the first quantity.

[0598] As an embodiment, the above sentence "the first sum and the second quantity are linearly correlated with the product of the first factor, and the first sum and the first quantity are linearly correlated" includes the following meaning: the first sum and the second quantity are linearly positively correlated with the product of the first factor, and the first sum and the first quantity are linearly positively correlated.

[0599] As an embodiment, the sentence “the first sum value and the second quantity are linearly related to the product of the first factor, and the first sum value and the first quantity are linearly related” is implemented by the following formula:

[0600]

[0601] Among them, Ω 1 represents the first sum value, represents the first quantity, represents the second quantity and γ represents the first factor.

[0602] Example 12

[0603] Embodiment 12 illustrates a schematic diagram of the relationship between the first feature and value and the second feature and value according to an embodiment of the present application, as shown in the attached figure. Fig.12 As shown in the attached Fig.12 In the figure, the two rectangular boxes represent the first proportional value and the second proportional value respectively, and the arrow represents the calculation process.

[0604] In Example 12, the second sum value in the present application is equal to the first sum value in the present application, and the first feature sum value in the present application is not equal to the second feature sum value in the present application; the difference between the second feature sum value and the first feature sum value is predefined, or the difference between the second feature sum value and the first feature sum value is configurable.

[0605] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is predefined, or the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is predefined.

[0606] As an embodiment, the sentence "the difference between the second characteristic and value and the first characteristic and value is predefined, or the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is configurable

[0607] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is predefined, or the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: in some cases, the difference between the second characteristic and value and the first characteristic and value is predefined, and in some other cases, the difference between the second characteristic and value and the first characteristic and value is configurable.

[0608] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is predefined" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is fixed.

[0609] As an embodiment, the above sentence "the difference between the second feature and value and the first feature and value is predefined" includes the following meaning: the difference between the second feature and value and the first feature and value is hardcoded (HardCoded) in the standard protocol.

[0610] As an embodiment, the above sentence “the difference between the second feature and value and the first feature and value is predefined” includes the following meaning: the difference between the second feature and value and the first feature and value is equal to 1.

[0611] As an embodiment, the above sentence "the difference between the second feature and value and the first feature and value is predefined" includes the following meaning: the second feature and value is 1 greater than the first feature and value.

[0612] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is predefined" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is equal to a default value.

[0613] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is configured by the second node device in this application.

[0614] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the difference between the second characteristic and value and the first characteristic and value is reported by the first node device in this application.

[0615] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the first processor in the present application receives tenth information, wherein the tenth information is used to indicate the difference between the second characteristic and value and the first characteristic and value.

[0616] As an embodiment, the above sentence "the difference between the second characteristic and value and the first characteristic and value is configurable" includes the following meaning: the first processor in the present application sends eleventh information, wherein the eleventh information is used to indicate the difference between the second characteristic and value and the first characteristic and value.

[0617] Example 13

[0618] Embodiment 13 illustrates a schematic diagram of the relationship between the second factor and the second sum value according to an embodiment of the present application, as shown in the attached figure. Fig.13 As shown in the attached Fig.13 In the figure, the three rectangular boxes represent the first proportional value, the second proportional value and the second factor respectively, and the arrows represent the calculation process.

[0619] In Example 13, the fourth information in the present application is used to determine a second factor, the second factor is a positive number less than 1, the second factor is used to determine the second sum value in the present application, the second sum value in the present application is not equal to the first sum value in the present application, and the second characteristic sum value in the present application is equal to the first characteristic sum value in the present application.

[0620] As an embodiment, the above sentence "the second factor is used to determine the second sum value" includes the following meaning: the second factor is used by the first node device in the present application to determine the second sum value.

[0621] As an embodiment, the above sentence “the second factor is used to determine the second sum value” includes the following meaning: the second factor is used to calculate the second sum value.

[0622] As an embodiment, the above sentence "the second factor is used to determine the second sum value" includes the following meaning: when the first cell subset in the present application includes the characteristic cell, the second sum value is equal to the difference between the first sum value and the second factor; when the second cell subset in the present application includes the characteristic cell, the second sum value is equal to the difference between the first sum value and the product between the first factor and the second factor in the present application.

[0623] As an embodiment, the sentence “the second factor is used to determine the second sum value” is implemented as follows:

[0624] When the first cell subset in the present application includes the characteristic cell,

[0625]

[0626] When the second cell subset in the present application includes the characteristic cell,

[0627]

[0628] Among them, Ω 2 represents the second sum value, Ω 1 represents the first sum value, γ represents the first factor, represents the second factor.

[0629] As an embodiment, the sentence “the second factor is used to determine the second sum value” includes the following meaning: the second sum value is equal to the difference between the first sum value and the second factor.

[0630] Embodiment 14

[0631] Embodiment 14 illustrates a schematic diagram of a second factor according to an embodiment of the present application, as shown in the attached figure. Fig.14 As shown in the attached Fig.14 In the figure, the horizontal axis represents frequency, each filled block on the top of the arc represents a service cell, the filled block on the top of the arc filled with slashes represents a feature cell, the filled block on the top of the arc filled with cross lines represents a target cell, and the dotted arc with an arrow represents the scheduling and scheduled relationship between two service cells.

[0632] In Example 14, the fourth information in the present application is used to determine a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell in the present application used for scheduling the characteristic cell in the present application, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell in the present application; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor in the present application is linearly related to the ratio between the third number and the fourth number.

[0633] As an embodiment, the above sentence "the fourth information is used to determine the first alternative set and the second alternative set" includes the following meaning: the fourth information is used by the first node device in the present application to determine the first alternative set and the second alternative set.

[0634] As an embodiment, the above sentence "the fourth information is used to determine the first candidate set and the second candidate set" includes the following meaning: the fourth information is used to explicitly indicate the first candidate set and the second candidate set.

[0635] As an embodiment, the above sentence “the fourth information is used to determine the first candidate set and the second candidate set” includes the following meaning: the fourth information is used to implicitly indicate the first candidate set and the second candidate set.

[0636] As an embodiment, the above sentence “the fourth information is used to determine the first candidate set and the second candidate set” includes the following meaning: the fourth information is used to indirectly indicate the first candidate set and the second candidate set.

[0637] As an embodiment, the above sentence "the fourth information is used to determine the first alternative set and the second alternative set" includes the following meaning: the fourth information includes Y sub-information blocks, Y is a positive integer greater than 1, and the Y sub-information blocks are respectively used to indicate Y alternative sets, the first alternative set is a subset of an alternative set among the Y alternative sets, and the second alternative set is composed of control channel alternatives used for scheduling the characteristic cell included in Y1 alternative sets among the Y alternative sets, and Y1 is a positive integer not greater than Y.

[0638] As an embodiment, the fourth information includes IE "PDCCH-Config" used for scheduling the characteristic cell.

[0639] As an embodiment, the fourth information includes a field “searchSpace” in the IE “PDCCH-Config” used for scheduling the characteristic cell.

[0640] As an embodiment, the fourth information is used to determine the control channel alternatives for each aggregation level (AL, Aggregation Level) used for scheduling the characteristic cell in the target cell, and the first alternative set includes the control channel alternatives for each aggregation level (AL, Aggregation Level) used for scheduling the characteristic cell in the target cell.

[0641] As an embodiment, the above sentence "the fourth information is used to determine the first alternative set and the second alternative set" includes the following meaning: the fourth information includes Y sub-information blocks, Y is a positive integer greater than 1, and the Y sub-information blocks are respectively used to indicate Y alternative sets, the first alternative set is composed of the control channel alternatives used for scheduling the characteristic cell in the alternative set for the target cell in the Y alternative sets; the second alternative set is composed of the control channel alternatives used for scheduling the characteristic cell included in Y1 alternative sets among the Y alternative sets, and Y1 is a positive integer not greater than Y.

[0642] As an embodiment, the first candidate set includes only one control channel candidate.

[0643] As an embodiment, the first candidate set includes more than one control channel candidate.

[0644] As an embodiment, any control channel candidate included in the first candidate set occupies a positive integer number of CCEs (Control Channel Element).

[0645] As an embodiment, the first alternative set includes one or more control channels that alternatively occupy at least one control resource element among the M control resource elements.

[0646] As an embodiment, each control channel alternative included in the first alternative set belongs to the second alternative set.

[0647] As an embodiment, the second candidate set includes control channel alternatives outside the first candidate set.

[0648] As an embodiment, the second candidate set includes any control channel candidate in the first candidate set.

[0649] As an embodiment, the number of control channel alternatives included in the second alternative set is greater than the number of control channel alternatives included in the first alternative set.

[0650] As an embodiment, the second candidate set includes only one control channel candidate.

[0651] As an embodiment, the second alternative set includes more than one control channel alternative.

[0652] As an embodiment, any control channel candidate included in the second candidate set occupies a positive integer number of CCEs (Control Channel Element).

[0653] As an embodiment, the second alternative set includes one or more control channels that alternatively occupy at least one control resource element among the M control resource elements.

[0654] As an embodiment, the second candidate set includes a control channel candidate that only occupies control resource elements other than the M control resource elements.

[0655] As an embodiment, any control channel candidate included in the first candidate set occupies time-frequency resources in the time-frequency domain.

[0656] As an embodiment, any control channel candidate included in the second candidate set occupies time-frequency resources in the time-frequency domain.

[0657] As an embodiment, any one of the control channel candidates included in the first candidate set is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate).

[0658] As an embodiment, any one of the control channel candidates included in the first candidate set is a monitored physical downlink control channel candidate (MonitoredPDCCH Candidate).

[0659] As an embodiment, any one of the control channel candidates included in the first candidate set is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate) using a DCI format.

[0660] As an embodiment, any one of the control channel candidates included in the first candidate set is a time-frequency resource set that may carry a DCI in a specific format.

[0661] As an embodiment, when the first candidate set includes more than one control channel alternatives, the first candidate set includes two control channel alternatives occupying the same time-frequency resources.

[0662] As an embodiment, when the first candidate set includes more than one control channel candidate, the time-frequency resources occupied by any two control channel candidates included in the first candidate set are different.

[0663] As an embodiment, any one of the control channel candidates included in the second candidate set is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate).

[0664] As an embodiment, any one of the control channel candidates included in the second candidate set is a monitored physical downlink control channel candidate (MonitoredPDCCH Candidate).

[0665] As an embodiment, any one of the control channel candidates included in the second candidate set is a physical downlink control channel (PDCCH, Physical Downlink Control Channel) candidate (Candidate) using a DCI format.

[0666] As an embodiment, any one of the control channel candidates included in the second candidate set is a time-frequency resource set that may carry a DCI in a specific format.

[0667] As an embodiment, when the second candidate set includes more than one control channel alternatives, the second candidate set includes two control channel alternatives occupying the same time-frequency resources.

[0668] As an embodiment, when the second candidate set includes more than one control channel alternative, the time-frequency resources occupied by any two control channel alternatives included in the second candidate set are different.

[0669] As an embodiment, each control channel candidate included in the first candidate set belongs to the target cell.

[0670] As an embodiment, the frequency domain resources occupied by each control channel candidate included in the first candidate set belong to the carrier corresponding to the target cell.

[0671] As an embodiment, each control channel alternative included in the first alternative set is a control channel alternative on the target cell.

[0672] As an embodiment, each control channel candidate included in the first candidate set can be used to transmit a control channel for scheduling the characteristic cell.

[0673] As an embodiment, each control channel candidate included in the first candidate set can be used as a control channel for transmitting a signal scheduled on the characteristic cell.

[0674] As an embodiment, the first candidate set includes all control channels on the target cell that can be used to transmit and schedule signals on the characteristic cell.

[0675] As an embodiment, there is no control channel candidate in the first candidate set that can be used to schedule a serving cell other than the characteristic cell.

[0676] As an embodiment, there are one or more control channel candidates in the second candidate set belonging to cells other than the target cell.

[0677] As an embodiment, any one of the control channel candidates in the second candidate set belongs to one of the target cell and the characteristic cell.

[0678] As an embodiment, the frequency domain resources occupied by any one of the control channel candidates in the second candidate set belong to one of the carrier corresponding to the target cell and the carrier corresponding to the characteristic cell.

[0679] As an embodiment, any one of the control channel candidates in the second candidate set belongs to the target cell or the characteristic cell.

[0680] As an embodiment, the second candidate set includes a control channel candidate belonging to a serving cell other than the target cell and the characteristic cell.

[0681] As an embodiment, each control channel candidate included in the second candidate set can be used to transmit a control channel for scheduling the characteristic cell.

[0682] As an embodiment, the second candidate set includes all control channels that can be used for transmission scheduling of the characteristic cell.

[0683] As an embodiment, each control channel candidate included in the second candidate set can be used as a control channel for transmitting a signal scheduled on the characteristic cell.

[0684] As an embodiment, there is no control channel candidate in the second candidate set that can be used to schedule a serving cell other than the characteristic cell.

[0685] As an embodiment, the time domain resources occupied by each control channel alternative in the first alternative set belong to the first time window.

[0686] As an embodiment, the time domain resources occupied by each control channel alternative in the second alternative set belong to the first time window.

[0687] As an embodiment, the above sentence "Each control channel alternative included in the first alternative set is a control channel alternative on the target cell used for scheduling the characteristic cell" includes the following meaning: the first alternative set includes control channel alternatives of each aggregation level (AL, Aggregation Level) in the target cell used for scheduling the characteristic cell.

[0688] As an embodiment, the above sentence "each control channel alternative included in the first alternative set is a control channel alternative on the target cell used for scheduling the characteristic cell" includes the following meaning: the first alternative set includes control channel alternatives in the target cell used for scheduling the characteristic cell in the first time window.

[0689] As an embodiment, the above sentence "Each control channel alternative included in the second alternative set is a control channel alternative used to schedule the characteristic cell" includes the following meaning: the second alternative set includes control channel alternatives of each aggregation level (AL, Aggregation Level) for scheduling the characteristic cell in the first time window.

[0690] As an embodiment, the above sentence "Each control channel alternative included in the second alternative set is a control channel alternative used to schedule the characteristic cell" includes the following meaning: the second alternative set includes control channel alternatives of each aggregation level (AL, Aggregation Level) for scheduling the characteristic cell.

[0691] As an embodiment, the above sentence "each control channel alternative included in the second alternative set is a control channel alternative used to schedule the characteristic cell" includes the following meaning: the second alternative set is composed of the control channel alternatives included in the first alternative set and the control channel alternatives in the characteristic cell used to schedule the characteristic cell.

[0692] As an embodiment, the above sentence "each control channel alternative included in the second alternative set is a control channel alternative used to schedule the characteristic cell" includes the following meaning: the second alternative set is composed of the control channel alternatives included in the first alternative set in the first time window and the control channel alternatives in the characteristic cell used to schedule the characteristic cell.

[0693] As an embodiment, the fourth quantity is not less than the third quantity.

[0694] As an embodiment, the third number is a positive integer.

[0695] As an embodiment, the fourth number is a positive integer.

[0696] As an embodiment, the non-overlapping control resource element refers to Non-Overlapped CCE.

[0697] As an embodiment, two control resource elements are non-overlapping, which means that the two control resource elements belong to different control resource sets, or the control channel candidates occupying the two control resource elements respectively have different starting symbols occupied in the time domain.

[0698] As an embodiment, the above sentence "the second factor is linearly correlated with the ratio between the third quantity and the fourth quantity" includes the following meaning: the second factor is linearly negatively correlated with the ratio between the third quantity and the fourth quantity.

[0699] As an embodiment, the above sentence "the second factor is linearly correlated with the ratio between the third quantity and the fourth quantity" includes the following meaning: the second factor is linearly positively correlated with the ratio between the third quantity and the fourth quantity.

[0700] As an embodiment, the above sentence "the second factor is linearly related to the ratio between the third quantity and the fourth quantity" includes the following meaning: the second factor is equal to 1 minus the difference between the ratio between the third quantity and the fourth quantity.

[0701] As an embodiment, “the second factor is linearly correlated with the ratio between the third quantity and the fourth quantity” is implemented by the following formula:

[0702]

[0703] in, represents the second factor, G 3 represents the third quantity, G 4 represents the fourth quantity.

[0704] Embodiment 15

[0705] Embodiment 15 illustrates a schematic diagram of the relationship between the first parameter and the first subcarrier spacing according to an embodiment of the present application, as shown in the attached figure. Fig.15 As shown in the attached Fig.15 In the figure, the first column from the left represents the index of the scheduled subcarrier spacing, the second column from the left represents X candidate parameters, the index of the blackened subcarrier spacing is the index of the first subcarrier spacing, and the blackened candidate parameter is the first parameter.

[0706] In embodiment 15, the first subcarrier spacing in the present application is an alternative subcarrier spacing among X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond one by one to X alternative parameters, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, and the first threshold in the present application is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

[0707] As an embodiment, any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz.

[0708] As an embodiment, any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, 120kHz, and 240kHz.

[0709] As an embodiment, any one of the X candidate subcarrier spacings is equal to a non-negative integer power of 2 of 15 kHz.

[0710] As an embodiment, X is equal to 4.

[0711] As an embodiment, X is greater than 4.

[0712] As an embodiment, X is not less than 4.

[0713] As an embodiment, the X candidate subcarrier spacings are predefined.

[0714] As an embodiment, the X candidate subcarriers are spaced at fixed intervals.

[0715] As an embodiment, the X candidate subcarrier spacings are composed of all subcarrier spacings supported by the R17 version.

[0716] As an embodiment, the X candidate subcarrier spacings are composed of all subcarrier spacings supported by the R16 version.

[0717] As an embodiment, any two candidate subcarrier spacings among the X candidate subcarrier spacings are not equal.

[0718] As an embodiment, any one of the X candidate parameters is a maximum number of monitoring times of a PDCCH candidate (Candidate) in a time slot on a serving cell.

[0719] As an embodiment, any two candidate parameters among the X candidate parameters are not equal.

[0720] As an embodiment, two candidate parameters among the X candidate parameters are equal.

[0721] As an embodiment, X is equal to 4, and the X candidate parameters are 56, 56, 48, and 32 respectively.

[0722] As an embodiment, any one of the X candidate parameters is a possible The value of .

[0723] As an embodiment, the target value is an integer.

[0724] As an embodiment, the target value is a score.

[0725] As an embodiment, the target value is a rational number.

[0726] As an embodiment, the target value is a non-integer rational number.

[0727] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the target value is proportional to the first parameter.

[0728] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the first parameter is used by the first node device in the present application to determine the target value.

[0729] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the target value is proportional to the first parameter, and the proportional coefficient between the target value and the first parameter is related to the target proportional value in this application.

[0730] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the target value is proportional to the first parameter, and the proportional coefficient between the target value and the first parameter is related to the first capability parameter in this application.

[0731] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the target value is proportional to the first parameter, and the proportional coefficient between the target value and the first parameter is equal to the product between the target proportional value in the application and the first capability parameter in this application.

[0732] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: for the target ratio value in a given application and the first capability parameter in a given application, the target value and the first parameter are linearly related.

[0733] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the target value is equal to the product of the first parameter, the target ratio value in this application, and the first capability parameter in this application.

[0734] As an embodiment, the above sentence "the first parameter is used to determine the target value" includes the following meaning: the first parameter is used to determine the target value through function operation.

[0735] As an embodiment, the sentence “the first parameter is used to determine the target value” is implemented by the following formula:

[0736]

[0737] in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value in this application, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

[0738] As an embodiment, the first node device in the present application is not required to monitor the M control resource elements included in any sub-band in the first sub-band set in the first time window, and the number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0739] As an embodiment, for each serving cell included in the scheduled cell set in the present application, the first node device in the present application is not required to monitor the M control resource elements included in any sub-band in the first sub-band set in the first time window, and the number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0740] As an embodiment, for each serving cell that belongs to both the scheduled cell set in the present application and the first cell subset in the present application, the first node device in the present application is not required to monitor the M control resource elements on any subband in the first subband set in the first time window when the number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0741] As an embodiment, the first node device in the present application is not required to monitor the M control resource elements included in any sub-band in the first sub-band set in the first time window, and the number of control resource elements exceeds the smaller value compared between the first threshold and the first product, and the first product is equal to the product between the first factor and the first parameter.

[0742] As an embodiment, for each serving cell that belongs to both the scheduled cell set in the present application and the second cell subset in the present application, the first node device in the present application is not required to monitor the M control resource elements on any sub-band in the first sub-band set in the first time window when the number of control resource elements exceeds the smaller value compared between the first threshold and the first product, and the first product is equal to the product between the first factor and the first parameter.

[0743] As an embodiment, for each serving cell that belongs to both the scheduled cell set in the present application and the second cell subset in the present application, the first node device in the present application is not required to monitor the M control resource elements on any subband in the first subband set in the first time window when the number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0744] As an embodiment, for each serving cell included in the scheduled cell set in the present application, the corresponding scheduling cell belongs to the first cell subset in the present application, and the first node device in the present application is not required to monitor the M control resource elements on any sub-band in the first sub-band set in the first time window The number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0745] As an embodiment, for each serving cell included in the scheduled cell set in the present application, the corresponding scheduling cell belongs to the second cell subset in the present application, and the first node device in the present application is not required to monitor the M control resource elements included in any sub-band in the first sub-band set in the first time window. The number of control resource elements exceeds the smaller value compared between the first threshold and the first product, and the first product is equal to the product between the first factor and the first parameter.

[0746] As an embodiment, for each serving cell included in the scheduled cell set in the present application, the corresponding scheduling cell belongs to the second cell subset in the present application, and the first node device in the present application is not required to monitor the M control resource elements on any sub-band in the first sub-band set in the first time window The number of control resource elements exceeds the smaller value compared between the first threshold and the first parameter.

[0747] Example 16

[0748] Embodiment 16 illustrates a schematic diagram of the relationship between the first subcarrier spacing and the second subcarrier spacing according to an embodiment of the present application, as shown in the attached figure. Fig.16 As shown in the attached Fig.16 In the figure, the horizontal axis represents frequency, each block area at the top of the arc represents a service cell, each vertical bar filled with slashes represents a subcarrier in a characteristic subband, and each vertical bar filled with cross lines represents a subcarrier included in a subband included in the first subband set.

[0749] In Example 16, the characteristic cell in the present application includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of subcarriers, the subcarrier spacing of any subcarrier included in the characteristic sub-frequency band is equal to the second subcarrier spacing, and the first subcarrier spacing and the second subcarrier spacing in the present application are not equal.

[0750] As an embodiment, the above sentence "the characteristic cell includes a characteristic sub-frequency band" includes the following meaning: the carrier corresponding to the characteristic cell includes a characteristic sub-frequency band.

[0751] As an embodiment, the above sentence "the characteristic cell includes a characteristic sub-frequency band" includes the following meaning: the characteristic sub-frequency band belongs to the characteristic cell.

[0752] As an embodiment, the above sentence "the characteristic cell includes a characteristic sub-frequency band" includes the following meaning: the characteristic sub-frequency band belongs to the carrier corresponding to the characteristic cell.

[0753] As an embodiment, the above sentence "the characteristic cell includes a characteristic sub-frequency band" includes the following meaning: the characteristic sub-frequency band is used for the characteristic cell.

[0754] As an embodiment, the characteristic sub-frequency band is an active BWP of the characteristic cell.

[0755] As an embodiment, the characteristic sub-frequency band is an inactive BWP of the characteristic cell.

[0756] As an embodiment, the characteristic sub-frequency band is the initial BWP of the characteristic cell.

[0757] As an embodiment, the characteristic sub-frequency band is the default BWP of the characteristic cell.

[0758] As an embodiment, the characteristic sub-band includes a positive integer number of sub-carriers greater than 1.

[0759] As an embodiment, the characteristic sub-band includes a positive integer multiple of 12 sub-carriers.

[0760] As an embodiment, the characteristic sub-frequency band includes more than one sub-carrier, and the sub-carrier spacing (SCS, Subcarrier Spacing) of any two sub-carriers included in the characteristic sub-frequency band is equal.

[0761] As an embodiment, the second subcarrier spacing is equal to a non-negative integer power of 2 of 15 kHz.

[0762] As an embodiment, the second subcarrier spacing is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz.

[0763] As an embodiment, the second subcarrier spacing is greater than the first subcarrier spacing.

[0764] As an embodiment, the second subcarrier spacing is smaller than the first subcarrier spacing.

[0765] Embodiment 17

[0766] Embodiment 17 illustrates a structural block diagram of a processing device in a first node device of an embodiment, as shown in the attached figure. Fig.17 As shown in the attached Fig.17 In the embodiment, the first node device processing device 1700 includes a first transceiver 1701 and a first receiver 1702. The first transceiver 1701 includes the first transceiver 1702 of the present application. Figure 4 The transmitter / receiver 456 (including the antenna 460), the transmission processor 455, the reception processor 452 and the controller / processor 490 in the present application; the first receiver 1702 includes the attached Figure 4 The transmitter / receiver 456 (including antenna 460), receive processor 452 and controller / processor 490 in the embodiment.

[0767] In Example 17, a first transceiver 1701 receives first information, and the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; a first receiver 1702 monitors M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by a control channel; wherein a subband to which any one of the M control resource elements belongs in the frequency domain belongs to a first subband set, and the first subband set includes a positive integer number of subbands; a scheduling cell set includes a positive integer number of service cells, and a service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; a subcarrier spacing of a subcarrier included in any one of the subbands included in the first subband set is equal to a first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0768] As an embodiment, the first control resource element is one of the M control resource elements, and the second control resource element is a control resource element other than the first control resource element among the M control resource elements; the first control resource element and the second control resource element belong to different control resource sets, respectively, or the control channel options occupying the first control resource element and the second control resource element, respectively, have different starting symbols occupied in the time domain.

[0769] As an embodiment, the first transceiver 1701 receives second information; wherein the second information is used to determine a configured cell group, the configured cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configured cell group, the characteristic cell belongs to the configured cell group, and the characteristic cell is the main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

[0770] As an embodiment, a target ratio value is used to determine the first threshold, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0771] As an embodiment, the first transceiver 1701 receives third information; wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set in the present application is equal to the first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set in the present application is equal to the second number; the first characteristic sum value in the present application and the number of service cells included in the second cell subset are linearly related to the product of the first factor, and the first characteristic sum value in the present application and the number of service cells included in the first cell subset are linearly related; the first sum value in the present application and the second number are linearly related to the product of the first factor, and the first sum value in the present application and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

[0772] As an embodiment, the second sum value in the present application is equal to the first sum value in the present application, and the first feature sum value in the present application is not equal to the second feature sum value in the present application; the difference between the second feature sum value in the present application and the first feature sum value in the present application is predefined, or the difference between the second feature sum value in the present application and the first feature sum value in the present application is configurable.

[0773] As an embodiment, the first transceiver 1701 receives fourth information; wherein the fourth information is used to determine a second factor, the second factor is a positive number less than 1, the second factor is used to determine the second sum value in the present application, the second sum value in the present application is not equal to the first sum value in the present application, and the second characteristic sum value in the present application is equal to the first characteristic sum value in the present application.

[0774] As an embodiment, the fourth information in the present application is used to determine a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell in the present application used for scheduling the characteristic cell in the present application, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell in the present application; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor in the present application is linearly related to the ratio between the third number and the fourth number.

[0775] As an embodiment, the first subcarrier spacing is an alternative subcarrier spacing among X alternative subcarrier spacings, and X is a positive integer greater than 1; the X alternative subcarrier spacings correspond one by one to X alternative parameters, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

[0776] As an embodiment, the characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

[0777] As an embodiment, the first transceiver 1701 sends fifth information; wherein the fifth information is used to indicate a first capability parameter, and the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

[0778] Embodiment 18

[0779] Embodiment 18 illustrates a structural block diagram of a processing device in a second node device of an embodiment, as shown in the attached figure. Fig.18 As shown in the attached Fig.18 In the embodiment, the second node device processing device 1800 includes a second transceiver 1801 and a first transmitter 1802. The second transceiver 1801 includes the first transmitter 1802 of the present application. Figure 4 The transmitter / receiver 416 (including the antenna 460), the receiving processor 412, the transmitting processor 415 and the controller / processor 440; the first transmitter 1802 includes the attached Figure 4 The transmitter / receiver 416 (including the antenna 460), the transmit processor 415 and the controller / processor 440.

[0780] In Example 18, the second transceiver 1801 sends first information, and the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; the first transmitter 1802 determines M control resource elements in a first time window, where M is a positive integer greater than 1, and any one of the M control resource elements is alternatively occupied by a control channel; wherein the subband to which any one of the M control resource elements belongs in the frequency domain belongs to a first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than a first threshold, and at least one of whether the scheduling cell set includes the target cell, whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer.

[0781] As an embodiment, the first control resource element is one of the M control resource elements, and the second control resource element is a control resource element other than the first control resource element among the M control resource elements; the first control resource element and the second control resource element belong to different control resource sets, respectively, or the control channel options occupying the first control resource element and the second control resource element, respectively, have different starting symbols occupied in the time domain.

[0782] As an embodiment, the second transceiver 1801 sends second information; wherein, the second information is used to indicate a configured cell group, the configured cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configured cell group, the feature cell belongs to the configured cell group, and the feature cell is the main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

[0783] As an embodiment, a target ratio value is used to determine the first threshold, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

[0784] As an embodiment, the second transceiver 1801 sends third information; wherein, the third information is used to indicate a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set in the present application is equal to the first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set in the present application is equal to the second number; the first characteristic sum value in the present application and the number of service cells included in the second cell subset are linearly related to the product of the first factor, and the first characteristic sum value in the present application and the number of service cells included in the first cell subset are linearly related; the first sum value in the present application and the second number are linearly related to the product of the first factor, and the first sum value in the present application and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

[0785] As an embodiment, the second sum value in the present application is equal to the first sum value in the present application, and the first feature sum value in the present application is not equal to the second feature sum value in the present application; the difference between the second feature sum value in the present application and the first feature sum value in the present application is predefined, or the difference between the second feature sum value in the present application and the first feature sum value in the present application is configurable.

[0786] As an embodiment, the second transceiver 1801 sends fourth information; wherein, the fourth information is used to indicate a second factor, the second factor is a positive number less than 1, the second factor is used to determine the second sum value in the present application, the second sum value in the present application is not equal to the first sum value in the present application, and the second characteristic sum value in the present application is equal to the first characteristic sum value in the present application.

[0787] As an embodiment, the fourth information in the present application is used to indicate a first alternative set and a second alternative set, the first alternative set includes a positive integer number of control channel alternatives, and the second alternative set includes a positive integer number of control channel alternatives; each control channel alternative included in the first alternative set is a control channel alternative on the target cell in the present application used for scheduling the characteristic cell in the present application, and each control channel alternative included in the second alternative set is a control channel alternative used for scheduling the characteristic cell in the present application; the number of non-overlapping control resource elements occupied by the control channel alternatives included in the first alternative set is equal to the third number, and the number of non-overlapping control resource elements occupied by the control channel alternatives included in the second alternative set is equal to the fourth number; the second factor in the present application is linearly related to the ratio between the third number and the fourth number.

[0788] As an embodiment, the first subcarrier spacing is an alternative subcarrier spacing among X alternative subcarrier spacings, and X is a positive integer greater than 1; the X alternative subcarrier spacings correspond one by one to X alternative parameters, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

[0789] As an embodiment, the characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

[0790] As an embodiment, the second transceiver 1801 receives fifth information; wherein the fifth information is used to determine a first capability parameter, and the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

[0791] A person of ordinary skill in the art can understand that all or part of the steps in the above method can be completed by instructing the relevant hardware through a program, and the program can be stored in a computer-readable storage medium, such as a read-only memory, a hard disk or an optical disk. Optionally, all or part of the steps in the above embodiment can also be implemented using one or more integrated circuits. Accordingly, each module unit in the above embodiment can be implemented in the form of hardware or in the form of a software function module, and the present application is not limited to any specific form of software and hardware combination. The first node device or the second node device or UE or terminal in the present application includes but is not limited to mobile phones, tablet computers, notebooks, Internet cards, low-power devices, eMTC devices, NB-IoT devices, vehicle-mounted communication equipment, aircraft, airplanes, drones, remote-controlled aircraft and other wireless communication devices. The base station device or base station or network side device in the present application includes but is not limited to macrocellular base stations, microcellular base stations, home base stations, relay base stations, eNBs, gNBs, transmission and receiving nodes TRPs, relay satellites, satellite base stations, aerial base stations and other wireless communication devices.

[0792] The above is only a preferred embodiment of the present application and is not intended to limit the protection scope of the present application. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A first node device for wireless communication, characterized in that: include: A first transceiver receives first information, where the first information is used to determine a target cell, and the target cell is used to schedule a characteristic cell; A first receiver monitors M control resource elements in a first time window, where M is a positive integer greater than 1, any one of the M control resource elements is occupied by a control channel candidate, any one of the M control resource elements is a non-overlapping control channel element, and any one of the M control resource elements includes 6 resource unit groups; Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than the first threshold, and at least one of whether the scheduling cell set is used for cross-carrier scheduling of the characteristic cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer; the characteristic cell is a special cell, and any one of the subbands included in the first subband set is an active downlink bandwidth part, and any one of the subbands included in the first subband set includes subcarriers that are a positive integer multiple of 12.

2. The first node device according to claim 1, characterized in that: The first control resource element is one of the M control resource elements, and the second control resource element is one of the M control resource elements other than the first control resource element; The first control resource element and the second control resource element belong to different control resource sets, or the control channel candidates occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

3. The first node device according to claim 2, characterized in that: The first control resource element and the second control resource element belong to different control resource sets configured with different indexes respectively; or the first control channel alternative occupies the first control resource element, and the second control channel alternative occupies the first control resource element, and the starting symbol occupied by the first control channel alternative in the time domain is different from the starting symbol occupied by the second control channel alternative in the time domain.

4. The first node device according to any one of claims 1 to 3, characterized in that: The first transceiver receives second information; wherein the second information is used to determine a configured cell group, the configured cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configured cell group, the feature cell belongs to the configured cell group, and the feature cell is a main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

5. The first node device according to claim 4, characterized in that: The second information belongs to a field "sCellToReleaseList" in an information unit "CellGroupConfig" in an RRC signaling, and the second information and the first information are carried by two different IEs in the same RRC signaling.

6. The first node device according to claim 4 or 5, characterized in that: The configured cell group includes a MAC entity, a logical channel set associated with an RLC entity, and a set including a primary cell and one or more secondary cells.

7. The first node device according to any one of claims 4 to 6, characterized in that: A target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

8. The first node device according to claim 7, characterized in that: The target ratio value is used to determine an intermediate value, the first threshold value is a floor-rounded value of the intermediate value, and the first feature sum value and the second feature sum value are equal.

9. The first node device according to claim 7 or 8, characterized in that: When the characteristic cell and the target cell are the same, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set does not include the target cell, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set includes the target cell, the target ratio value is equal to the second ratio value.

10. The first node device according to any one of claims 7 to 9, characterized in that: The first transceiver receives third information; wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum value and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum value and the number of service cells included in the first cell subset are linearly related; the first sum value and the second number are linearly related to the product of the first factor, and the first sum value and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

11. The first node device according to claim 10, characterized in that: The third information and the first information are carried by two different fields in the same IE in the same RRC signaling.

12. The first node device according to any one of claims 10 or 11, characterized in that: The service cells included in the first cell subset are not provided with a control resource set resource pool index, or only one control resource set resource pool index is provided for all control resource sets on all BWPs on each service cell included in the first cell subset; two control resource set resource pool indexes are provided on any BWP on each service cell included in the second cell subset; and the first factor is a blind detection factor.

13. The first node device according to any one of claims 10 to 12, characterized in that: "The first characteristic and value are linearly correlated with the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly correlated with the number of serving cells included in the first cell subset" is achieved by the following formula: Among them, Sum1 represents the first feature and value, represents the number of serving cells configured with a numerical structure index equal to j included in the first cell subset, represents the number of serving cells included in the first cell subset, represents the number of serving cells configured with a numerical structure index equal to j included in the second cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

14. The first node device according to any one of claims 1 to 6, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

15. The first node device according to any one of claims 7 to 9, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

16. The first node device according to any one of claims 10 to 13, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

17. The first node device according to any one of claims 14 to 16, characterized in that: Any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz; any one of the X candidate parameters is a possible , any two of the X candidate parameters are not equal; The target value is proportional to the first parameter.

18. The first node device according to claim 16, characterized in that: For each serving cell that belongs to both the scheduled cell set and the first cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and the first parameter; for each serving cell that belongs to both the scheduled cell set and the second cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and a first product, and the first product is equal to the product of the first factor and the first parameter.

19. The first node device according to any one of claims 1 to 18, characterized in that: The characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

20. The first node device according to claim 19, characterized in that: The characteristic sub-frequency band is an active BWP of the characteristic cell, the characteristic sub-frequency band includes more than one sub-carrier, and the sub-carrier spacing of any two sub-carriers included in the characteristic sub-frequency band is equal; the second sub-carrier spacing is smaller than the first sub-carrier spacing.

21. The first node device according to any one of claims 1 to 9, 14, 17, 19 and 20, characterized in that: The first transceiver sends fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

22. The first node device according to any one of claims 10 to 13, 16 and 18, characterized in that: The first transceiver sends fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

23. The first node device according to claim 15, characterized in that: The first transceiver sends fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

24. The first node device according to any one of claims 21 to 23, characterized in that: The fifth information is used to indicate the CA capability of the sender of the fifth information, and the fifth information includes the field "pdcch-BlindDetectionCA" in the IE "Phy-Parameters"; the first capability parameter is the number of serving cells with the maximum number of blind decodings that the sender of the fifth information can support.

25. The first node device according to claim 23, characterized in that: “The first capability parameter is used to determine the first threshold” is implemented by the following formula: in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

26. The first node device according to claim 22, characterized in that: A sum of a product of the second number and the first factor and the first number is greater than the first capability parameter.

27. The first node device according to any one of claims 1 to 26, characterized in that: The first information includes a field "schedulingCellId" in an information unit "CrossCarrierSchedulingConfig" in an RRC signaling for configuring a primary cell.

28. The first node device according to any one of claims 1 to 27, characterized in that: The first information is used to indicate whether the target cell is the same as the characteristic cell; when the target cell is not the same as the characteristic cell, the first information is also used to indicate the serving cell index of the target cell.

29. The first node device according to any one of claims 1 to 28, characterized in that: When the target cell and the characteristic are the same, the PDCCH transmitted on the target cell is used for self-scheduling the signal transmitted on the characteristic cell; when the target cell and the characteristic are different, the PDCCH transmitted on the target cell is used for cross-carrier scheduling of the signal transmitted on the characteristic cell.

30. The first node device according to any one of claims 1 to 29, characterized in that: Any one of the M1 control channel alternatives occupies one or more control resource elements among the M control resource elements, where M1 is a positive integer; the monitoring of the M control resource elements is achieved by decoding the M1 control channel alternatives; the time-frequency resources occupied by each of the M control resource elements are configured through signaling "SearchSpace" and signaling "ControlResourceSet".

31. The first node device according to any one of claims 1 to 30, characterized in that: The first transceiver receives sixth information; wherein the sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

32. The first node device according to any one of claims 1 to 31, characterized in that: The first time window is a time slot, and the time domain resources occupied by any one of the M control resource elements are part of the first time window; the first subcarrier spacing is used to determine the time length of each OFDM symbol included in the first time window.

33. The first node device according to any one of claims 1 to 32, characterized in that: The first subband set includes W subbands, the scheduling cell set includes W service cells, the W subbands are respectively the BWPs of the W service cells, and W is a positive integer; the subcarrier spacing of any subcarrier included in any subband included in the first subband set is equal to the first subcarrier spacing.

34. The first node device according to any one of claims 1 to 33, characterized in that: At least one of whether the scheduled cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the calculation method of the first threshold.

35. A second node device used in wireless communication, characterized in that: include: A second transceiver sends first information, where the first information is used to indicate a target cell, and the target cell is used to schedule a characteristic cell; A first transmitter determines M control resource elements in a first time window, where M is a positive integer greater than 1, any one of the M control resource elements is occupied by a control channel candidate, any one of the M control resource elements is a non-overlapping control channel element, and any one of the M control resource elements includes 6 resource unit groups; Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than the first threshold, and at least one of whether the scheduling cell set is used for cross-carrier scheduling of the characteristic cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer; the characteristic cell is a special cell, and any one of the subbands included in the first subband set is an active downlink bandwidth part, and any one of the subbands included in the first subband set includes subcarriers that are a positive integer multiple of 12.

36. The second node device according to claim 35, characterized in that: The first control resource element is one of the M control resource elements, and the second control resource element is one of the M control resource elements other than the first control resource element; The first control resource element and the second control resource element belong to different control resource sets, or the control channel candidates occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

37. The second node device according to claim 36, characterized in that: The first control resource element and the second control resource element belong to different control resource sets configured with different indexes respectively; or the first control channel alternative occupies the first control resource element, and the second control channel alternative occupies the first control resource element, and the starting symbol occupied by the first control channel alternative in the time domain is different from the starting symbol occupied by the second control channel alternative in the time domain.

38. The second node device according to any one of claims 35 to 37, characterized in that: The second transceiver sends second information; wherein the second information is used to determine a configured cell group, the configured cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configured cell group, the feature cell belongs to the configured cell group, and the feature cell is a main cell in the configured cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configured cell group, and any one of the service cells included in the scheduled cell set belongs to the configured cell group.

39. The second node device according to claim 38, characterized in that: The second information belongs to a field "sCellToReleaseList" in an information unit "CellGroupConfig" in an RRC signaling, and the second information and the first information are carried by two different IEs in the same RRC signaling.

40. The second node device according to claim 38 or 39, characterized in that: The configured cell group includes a MAC entity, a logical channel set associated with an RLC entity, and a set including a primary cell and one or more secondary cells.

41. The second node device according to any one of claims 38 to 40, characterized in that: A target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

42. The second node device according to claim 41, characterized in that: The target ratio value is used to determine an intermediate value, the first threshold value is a floor-rounded value of the intermediate value, and the first feature sum value and the second feature sum value are equal.

43. The second node device according to claim 41 or 42, characterized in that: When the characteristic cell and the target cell are the same, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set does not include the target cell, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set includes the target cell, the target ratio value is equal to the second ratio value.

44. The second node device according to any one of claims 41 to 43, characterized in that: The second transceiver sends third information; wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum and the number of service cells included in the first cell subset are linearly related; the first sum and the second number are linearly related to the product of the first factor, and the first sum and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

45. The second node device according to claim 44, characterized in that: The third information and the first information are carried by two different fields in the same IE in the same RRC signaling.

46. ​​The second node device according to any one of claims 44 or 45, characterized in that: The service cells included in the first cell subset are not provided with a control resource set resource pool index, or only one control resource set resource pool index is provided for all control resource sets on all BWPs on each service cell included in the first cell subset; two control resource set resource pool indexes are provided on any BWP on each service cell included in the second cell subset; and the first factor is a blind detection factor.

47. The second node device according to any one of claims 44 to 46, characterized in that: "The first characteristic and value are linearly correlated with the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly correlated with the number of serving cells included in the first cell subset" is achieved by the following formula: Among them, Sum1 represents the first feature and value, represents the number of serving cells configured with a numerical structure index equal to j included in the first cell subset, represents the number of serving cells included in the first cell subset, represents the number of serving cells configured with a numerical structure index equal to j included in the second cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

48. The second node device according to any one of claims 35 to 40, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

49. The second node device according to any one of claims 41 to 43, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

50. The second node device according to any one of claims 44 to 47, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

51. The second node device according to any one of claims 48 to 50, characterized in that: Any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz; any one of the X candidate parameters is a possible , any two of the X candidate parameters are not equal; The target value is proportional to the first parameter.

52. The second node device according to claim 50, characterized in that: For each serving cell that belongs to both the scheduled cell set and the first cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and the first parameter; for each serving cell that belongs to both the scheduled cell set and the second cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and a first product, and the first product is equal to the product of the first factor and the first parameter.

53. The second node device according to any one of claims 35 to 52, characterized in that: The characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

54. The second node device according to claim 53, characterized in that: The characteristic sub-frequency band is an active BWP of the characteristic cell, the characteristic sub-frequency band includes more than one sub-carrier, and the sub-carrier spacing of any two sub-carriers included in the characteristic sub-frequency band is equal; the second sub-carrier spacing is smaller than the first sub-carrier spacing.

55. The second node device according to any one of claims 35 to 43, 48, 51, 53, and 54, characterized in that: The second transceiver receives fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

56. The second node device according to any one of claims 44 to 47, 50 and 52, characterized in that: The second transceiver receives fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

57. The second node device according to claim 49, characterized in that: The second transceiver receives fifth information; wherein the fifth information is used to indicate a first capability parameter, the first capability parameter is a positive integer; and the first capability parameter is used to determine the first threshold.

58. The second node device according to any one of claims 55 to 57, characterized in that: The fifth information is used to indicate the CA capability of the sender of the fifth information, and the fifth information includes the field "pdcch-BlindDetectionCA" in the IE "Phy-Parameters"; the first capability parameter is the number of serving cells with the maximum number of blind decodings that the sender of the fifth information can support.

59. The second node device according to claim 57, characterized in that: “The first capability parameter is used to determine the first threshold” is implemented by the following formula: in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

60. The second node device according to claim 56, characterized in that: A sum of a product of the second number and the first factor and the first number is greater than the first capability parameter.

61. The second node device according to any one of claims 35 to 60, characterized in that: The first information includes a field "schedulingCellId" in an information unit "CrossCarrierSchedulingConfig" in an RRC signaling for configuring a primary cell.

62. The second node device according to any one of claims 35 to 61, characterized in that: The first information is used to indicate whether the target cell is the same as the characteristic cell; when the target cell is not the same as the characteristic cell, the first information is also used to indicate a serving cell index of the target cell.

63. The second node device according to any one of claims 35 to 62, characterized in that: When the target cell and the characteristic are the same, the PDCCH transmitted on the target cell is used for self-scheduling the signal transmitted on the characteristic cell; when the target cell and the characteristic are different, the PDCCH transmitted on the target cell is used for cross-carrier scheduling of the signal transmitted on the characteristic cell.

64. The second node device according to any one of claims 35 to 63, characterized in that: Any one of the M1 control channel alternatives occupies one or more control resource elements among the M control resource elements, where M1 is a positive integer; the monitoring of the M control resource elements is achieved by decoding the M1 control channel alternatives; the time-frequency resources occupied by each of the M control resource elements are configured through signaling "SearchSpace" and signaling "ControlResourceSet".

65. The second node device according to any one of claims 35 to 64, characterized in that: The second transceiver transmits sixth information; wherein the sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

66. The second node device according to any one of claims 35 to 65, characterized in that: The first time window is a time slot, and the time domain resources occupied by any one of the M control resource elements are part of the first time window; the first subcarrier spacing is used to determine the time length of each OFDM symbol included in the first time window.

67. The second node device according to any one of claims 35 to 66, characterized in that: The first subband set includes W subbands, the scheduling cell set includes W service cells, the W subbands are respectively the BWPs of the W service cells, and W is a positive integer; the subcarrier spacing of any subcarrier included in any subband included in the first subband set is equal to the first subcarrier spacing.

68. The second node device according to any one of claims 35 to 67, characterized in that: At least one of whether the scheduled cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the calculation method of the first threshold.

69. A method in a first node in wireless communication, characterized in that: include: receiving first information, where the first information is used to determine a target cell, where the target cell is used to schedule a characteristic cell; Monitoring M control resource elements in a first time window, where M is a positive integer greater than 1, any one of the M control resource elements being occupied by a control channel candidate, any one of the M control resource elements being a non-overlapping control channel element, and any one of the M control resource elements including 6 resource unit groups; Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than the first threshold, and at least one of whether the scheduling cell set is used for cross-carrier scheduling of the characteristic cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer; the characteristic cell is a special cell, and any one of the subbands included in the first subband set is an active downlink bandwidth part, and any one of the subbands included in the first subband set includes subcarriers that are a positive integer multiple of 12.

70. The method in the first node according to claim 69, characterized in that The first control resource element is one of the M control resource elements, and the second control resource element is one of the M control resource elements other than the first control resource element; The first control resource element and the second control resource element belong to different control resource sets, or the control channel candidates occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

71. The method in the first node according to claim 70, characterized in that The first control resource element and the second control resource element belong to different control resource sets configured with different indexes respectively; or the first control channel alternative occupies the first control resource element, and the second control channel alternative occupies the first control resource element, and the starting symbol occupied by the first control channel alternative in the time domain is different from the starting symbol occupied by the second control channel alternative in the time domain.

72. The method in the first node according to any one of claims 69 to 71, characterized in that include: receiving second information; Among them, the second information is used to determine the configuration cell group, the configuration cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configuration cell group, the feature cell belongs to the configuration cell group, and the feature cell is the main cell in the configuration cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configuration cell group, and any one of the service cells included in the scheduled cell set belongs to the configuration cell group.

73. The method in the first node according to claim 72, characterized in that The second information belongs to a field "sCellToReleaseList" in an information unit "CellGroupConfig" in an RRC signaling, and the second information and the first information are carried by two different IEs in the same RRC signaling.

74. The method in the first node according to claim 72 or 73, characterized in that The configured cell group includes a MAC entity, a logical channel set associated with an RLC entity, and a set including a primary cell and one or more secondary cells.

75. The method in the first node according to any one of claims 72 to 74, characterized in that A target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

76. The method in the first node according to claim 75, characterized in that The target ratio value is used to determine an intermediate value, the first threshold value is a floor-rounded value of the intermediate value, and the first feature sum value and the second feature sum value are equal.

77. The method in the first node according to claim 75 or 76, characterized in that When the characteristic cell and the target cell are the same, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set does not include the target cell, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set includes the target cell, the target ratio value is equal to the second ratio value.

78. The method in the first node according to any one of claims 75 to 77, characterized in that: include: receiving third information; wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum and the number of service cells included in the first cell subset are linearly related; the first sum and the second number are linearly related to the product of the first factor, and the first sum and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

79. The method in the first node according to claim 78, characterized in that The third information and the first information are carried by two different fields in the same IE in the same RRC signaling.

80. The method in the first node according to any one of claims 78 or 79, characterized in that The service cells included in the first cell subset are not provided with a control resource set resource pool index, or only one control resource set resource pool index is provided for all control resource sets on all BWPs on each service cell included in the first cell subset; two control resource set resource pool indexes are provided on any BWP on each service cell included in the second cell subset; and the first factor is a blind detection factor.

81. The method in the first node according to any one of claims 78 to 80, characterized in that: "The first characteristic and value are linearly correlated with the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly correlated with the number of serving cells included in the first cell subset" is achieved by the following formula: Among them, Sum1 represents the first feature and value, represents the number of serving cells configured with a numerical structure index equal to j included in the first cell subset, represents the number of serving cells included in the first cell subset, represents the number of serving cells configured with a numerical structure index equal to j included in the second cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

82. The method in the first node according to any one of claims 69 to 74, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

83. The method in the first node according to any one of claims 75 to 77, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

84. The method in the first node according to any one of claims 78 to 81, characterized in that The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

85. The method in the first node according to any one of claims 82 to 84, characterized in that: Any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz; any one of the X candidate parameters is a possible , any two of the X candidate parameters are not equal; The target value is proportional to the first parameter.

86. The method in the first node according to claim 84, characterized in that For each serving cell that belongs to both the scheduled cell set and the first cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and the first parameter; for each serving cell that belongs to both the scheduled cell set and the second cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and a first product, and the first product is equal to the product of the first factor and the first parameter.

87. The method in the first node according to any one of claims 69 to 86, characterized in that: The characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

88. The method in the first node according to claim 87, characterized in that The characteristic sub-frequency band is an active BWP of the characteristic cell, the characteristic sub-frequency band includes more than one sub-carrier, and the sub-carrier spacing of any two sub-carriers included in the characteristic sub-frequency band is equal; the second sub-carrier spacing is smaller than the first sub-carrier spacing.

89. The method in the first node according to any one of claims 69 to 77, 82, 85, 87, 88, characterized in that: include: Send the fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

90. The method in the first node according to any one of claims 78 to 81, 84, 86, characterized in that: include: Send the fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

91. The method in the first node according to claim 83, characterized in that include: Send the fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

92. The method in the first node according to any one of claims 89 to 91, characterized in that: The fifth information is used to indicate the CA capability of the sender of the fifth information, and the fifth information includes the field "pdcch-BlindDetectionCA" in the IE "Phy-Parameters"; the first capability parameter is the number of serving cells with the maximum number of blind decodings that the sender of the fifth information can support.

93. The method in the first node according to claim 91, characterized in that “The first capability parameter is used to determine the first threshold” is implemented by the following formula: in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value in this application, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

94. The method in the first node according to claim 90, characterized in that A sum of a product of the second number and the first factor and the first number is greater than the first capability parameter.

95. The method in the first node according to any one of claims 69 to 94, characterized in that: The first information includes a field "schedulingCellId" in an information unit "CrossCarrierSchedulingConfig" in an RRC signaling for configuring a primary cell.

96. The method in the first node according to any one of claims 69 to 95, characterized in that The first information is used to indicate whether the target cell is the same as the characteristic cell; when the target cell is not the same as the characteristic cell, the first information is also used to indicate a serving cell index of the target cell.

97. The method in the first node according to any one of claims 69 to 96, characterized in that When the target cell and the characteristic are the same, the PDCCH transmitted on the target cell is used for self-scheduling the signal transmitted on the characteristic cell; when the target cell and the characteristic are different, the PDCCH transmitted on the target cell is used for cross-carrier scheduling of the signal transmitted on the characteristic cell.

98. The method in the first node according to any one of claims 69 to 97, characterized in that: Any one of the M1 control channel alternatives occupies one or more control resource elements among the M control resource elements, where M1 is a positive integer; the monitoring of the M control resource elements is achieved by decoding the M1 control channel alternatives; the time-frequency resources occupied by each of the M control resource elements are configured through signaling "SearchSpace" and signaling "ControlResourceSet".

99. The method in the first node according to any one of claims 69 to 98, characterized in that: include: receiving sixth information; The sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

100. The method in the first node according to any one of claims 69 to 99, characterized in that: The first time window is a time slot, and the time domain resources occupied by any one of the M control resource elements are part of the first time window; the first subcarrier spacing is used to determine the time length of each OFDM symbol included in the first time window.

101. The method in the first node according to any one of claims 69 to 100, characterized in that: The first subband set includes W subbands, the scheduling cell set includes W service cells, the W subbands are respectively the BWPs of the W service cells, and W is a positive integer; the subcarrier spacing of any subcarrier included in any subband included in the first subband set is equal to the first subcarrier spacing.

102. The method in the first node according to any one of claims 69 to 101, characterized in that: At least one of whether the scheduled cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the calculation method of the first threshold.

103. A method in a second node in wireless communication, characterized in that: include: Sending first information, where the first information is used to indicate a target cell, and the target cell is used to schedule a characteristic cell; Determine M control resource elements in a first time window, where M is a positive integer greater than 1, any one of the M control resource elements is occupied by a control channel candidate, any one of the M control resource elements is a non-overlapping control channel element, and any one of the M control resource elements includes 6 resource unit groups; Among them, the subband to which any one of the M control resource elements belongs in the frequency domain belongs to the first subband set, and the first subband set includes a positive integer number of subbands; the scheduling cell set includes a positive integer number of service cells, and the service cell to which any one of the subbands included in the first subband set belongs belongs to the scheduling cell set; the subcarrier spacing of the subcarriers included in any one of the subbands included in the first subband set is equal to the first subcarrier spacing; the first subcarrier spacing is used to determine the time length of the first time window; the M is not greater than the first threshold, and at least one of whether the scheduling cell set is used for cross-carrier scheduling of the characteristic cell and whether the characteristic cell and the target cell are the same is used to determine the first threshold, and the first threshold is a non-negative integer; the characteristic cell is a special cell, and any one of the subbands included in the first subband set is an active downlink bandwidth part, and any one of the subbands included in the first subband set includes subcarriers that are a positive integer multiple of 12.

104. The method in the second node according to claim 103, characterized in that: The first control resource element is one of the M control resource elements, and the second control resource element is one of the M control resource elements other than the first control resource element; The first control resource element and the second control resource element belong to different control resource sets, or the control channel candidates occupying the first control resource element and the second control resource element respectively have different starting symbols occupied in the time domain.

105. The method in the second node according to claim 104, characterized in that: The first control resource element and the second control resource element belong to different control resource sets configured with different indexes respectively; or the first control channel alternative occupies the first control resource element, and the second control channel alternative occupies the first control resource element, and the starting symbol occupied by the first control channel alternative in the time domain is different from the starting symbol occupied by the second control channel alternative in the time domain.

106. The method in the second node according to any one of claims 103 to 105, characterized in that: include: sending a second message; Among them, the second information is used to determine the configuration cell group, the configuration cell group includes a positive integer number of service cells greater than 1; the target cell belongs to the configuration cell group, the feature cell belongs to the configuration cell group, and the feature cell is the main cell in the configuration cell group; the scheduled cell set includes the service cells scheduled by the service cells included in the scheduling cell set, and the scheduled cell set includes a positive integer number of service cells; any one of the service cells included in the scheduling cell set belongs to the configuration cell group, and any one of the service cells included in the scheduled cell set belongs to the configuration cell group.

107. The method in the second node according to claim 106, characterized in that: The second information belongs to a field "sCellToReleaseList" in an information unit "CellGroupConfig" in an RRC signaling, and the second information and the first information are carried by two different IEs in the same RRC signaling.

108. The method in the second node according to claim 106 or 107, characterized in that: The configured cell group includes a MAC entity, a logical channel set associated with an RLC entity, and a set including a primary cell and one or more secondary cells.

109. The method in the second node according to any one of claims 106 to 108, characterized in that: A target ratio value is used to determine the first threshold value, the target ratio value is a positive number not greater than 1, and the target ratio value is equal to one of a first ratio value and a second ratio value; the first ratio value is equal to the ratio between the first sum value and the first characteristic sum value, and the second ratio value is equal to the ratio between the second sum value and the second characteristic sum value; the first sum value is a positive number, the first characteristic sum value is a positive number not less than the first sum value, the second sum value is a positive number, the second characteristic sum value is a positive number not less than the second sum value, and the first ratio value and the second ratio value are not equal; at least one of whether the scheduling cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the target ratio value from between the first ratio value and the second ratio value.

110. The method in the second node according to claim 109, characterized in that: The target ratio value is used to determine an intermediate value, the first threshold value is a floor-rounded value of the intermediate value, and the first feature sum value and the second feature sum value are equal.

111. The method in the second node according to claim 109 or 110, characterized in that: When the characteristic cell and the target cell are the same, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set does not include the target cell, the target ratio value is equal to the first ratio value; when the characteristic cell and the target cell are not the same and the scheduling cell set includes the target cell, the target ratio value is equal to the second ratio value.

112. The method in the second node according to any one of claims 109 to 111, characterized in that: include: Sending a third message; wherein the third information is used to determine a first cell subset and a second cell subset, the first cell subset includes a positive integer number of service cells, and the second cell subset includes a positive integer number of service cells; the number of service cells belonging to the first cell subset included in the scheduled cell set is equal to a first number, and the number of service cells belonging to the second cell subset included in the scheduled cell set is equal to a second number; the first characteristic sum and the number of service cells included in the second cell subset are linearly related to the product of a first factor, and the first characteristic sum and the number of service cells included in the first cell subset are linearly related; the first sum and the second number are linearly related to the product of the first factor, and the first sum and the first number are linearly related; the first factor is configurable, or the first factor is predefined.

113. The method in the second node according to claim 112, characterized in that: The third information and the first information are carried by two different fields in the same IE in the same RRC signaling.

114. The method in the second node according to any one of claims 112 or 113, characterized in that: The service cells included in the first cell subset are not provided with a control resource set resource pool index, or only one control resource set resource pool index is provided for all control resource sets on all BWPs on each service cell included in the first cell subset; two control resource set resource pool indexes are provided on any BWP on each service cell included in the second cell subset; and the first factor is a blind detection factor.

115. The method in the second node according to any one of claims 112 to 114, characterized in that: "The first characteristic and value are linearly correlated with the product of the number of serving cells included in the second cell subset and the first factor, and the first characteristic and value are linearly correlated with the number of serving cells included in the first cell subset" is achieved by the following formula: Among them, Sum1 represents the first feature and value, represents the number of serving cells configured with a numerical structure index equal to j included in the first cell subset, represents the number of serving cells included in the first cell subset, represents the number of serving cells configured with a numerical structure index equal to j included in the second cell subset, represents the number of serving cells included in the second cell subset, and γ represents the first factor.

116. The method in the second node according to any one of claims 103 to 108, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

117. The method in the second node according to any one of claims 109 to 111, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

118. The method in the second node according to any one of claims 112 to 115, characterized in that: The first subcarrier spacing is one of the X alternative subcarrier spacings, where X is a positive integer greater than 1; the X alternative subcarrier spacings correspond to X alternative parameters one by one, respectively, and each of the X alternative parameters is a positive integer; the first parameter is the alternative parameter corresponding to the first subcarrier spacing among the X alternative parameters, the first threshold is equal to the rounded-down value of the target value, and the first parameter is used to determine the target value.

119. The method in the second node according to any one of claims 116 to 118, characterized in that: Any one of the X candidate subcarrier spacings is equal to one of 15kHz, 30kHz, 60kHz, and 120kHz; any one of the X candidate parameters is a possible , any two of the X candidate parameters are not equal; The target value is proportional to the first parameter.

120. The method in the second node according to claim 118, characterized in that For each serving cell that belongs to both the scheduled cell set and the first cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and the first parameter; for each serving cell that belongs to both the scheduled cell set and the second cell subset, the monitor of the M control resource elements is not required to monitor the M control resource elements on any subband in the first subband set in the first time window, including a number of control resource elements that exceeds a smaller value between the first threshold and a first product, and the first product is equal to the product of the first factor and the first parameter.

121. The method in the second node according to any one of claims 103 to 120, characterized in that: The characteristic cell includes a characteristic sub-frequency band, the characteristic sub-frequency band includes a positive integer number of sub-carriers, the sub-carrier spacing of any sub-carrier included in the characteristic sub-frequency band is equal to the second sub-carrier spacing, and the first sub-carrier spacing and the second sub-carrier spacing are not equal.

122. The method in the second node according to claim 121, characterized in that The characteristic sub-frequency band is an active BWP of the characteristic cell, the characteristic sub-frequency band includes more than one sub-carrier, and the sub-carrier spacing of any two sub-carriers included in the characteristic sub-frequency band is equal; the second sub-carrier spacing is smaller than the first sub-carrier spacing.

123. The method in the second node according to any one of claims 103 to 111, 116, 119, 121, 122, characterized in that: include: receiving a fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

124. The method in the second node according to any one of claims 112 to 115, 118, 120, characterized in that: include: receiving a fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

125. The method in the second node according to claim 17, characterized in that: include: receiving a fifth message; The fifth information is used to indicate a first capability parameter, which is a positive integer; and the first capability parameter is used to determine the first threshold.

126. The method in the second node according to any one of claims 123 to 125, characterized in that: The fifth information is used to indicate the CA capability of the sender of the fifth information, and the fifth information includes the field "pdcch-BlindDetectionCA" in the IE "Phy-Parameters"; the first capability parameter is the number of serving cells with the maximum number of blind decodings that the sender of the fifth information can support.

127. The method in the second node according to claim 125, characterized in that “The first capability parameter is used to determine the first threshold” is implemented by the following formula: in, represents the first threshold, represents the target value, represents the first parameter, represents the target ratio value, represents the first capability parameter in the present application, and μ represents the index of the first subcarrier spacing.

128. The method in the second node according to claim 124, characterized in that A sum of a product of the second number and the first factor and the first number is greater than the first capability parameter.

129. The method in the second node according to any one of claims 103 to 128, characterized in that: The first information includes a field "schedulingCellId" in an information unit "CrossCarrierSchedulingConfig" in an RRC signaling for configuring a primary cell.

130. The method in the second node according to any one of claims 103 to 129, characterized in that: The first information is used to indicate whether the target cell is the same as the characteristic cell; when the target cell is not the same as the characteristic cell, the first information is also used to indicate a serving cell index of the target cell.

131. The method in the second node according to any one of claims 103 to 130, characterized in that: When the target cell and the characteristic are the same, the PDCCH transmitted on the target cell is used for self-scheduling the signal transmitted on the characteristic cell; when the target cell and the characteristic are different, the PDCCH transmitted on the target cell is used for cross-carrier scheduling of the signal transmitted on the characteristic cell.

132. The method in the second node according to any one of claims 103 to 131, characterized in that: Any one of the M1 control channel alternatives occupies one or more control resource elements among the M control resource elements, where M1 is a positive integer; the monitoring of the M control resource elements is achieved by decoding the M1 control channel alternatives; the time-frequency resources occupied by each of the M control resource elements are configured through signaling "SearchSpace" and signaling "ControlResourceSet".

133. The method in the second node according to any one of claims 103 to 132, characterized in that: include: Send the sixth message; The sixth information is used to determine each sub-band in the first sub-band set and a sub-carrier spacing of sub-carriers in each sub-band in the first sub-band set.

134. The method in the second node according to any one of claims 103 to 133, characterized in that: The first time window is a time slot, and the time domain resources occupied by any one of the M control resource elements are part of the first time window; the first subcarrier spacing is used to determine the time length of each OFDM symbol included in the first time window.

135. The method in the second node according to any one of claims 103 to 134, characterized in that: The first subband set includes W subbands, the scheduling cell set includes W service cells, the W subbands are respectively the BWPs of the W service cells, and W is a positive integer; the subcarrier spacing of any subcarrier included in any subband included in the first subband set is equal to the first subcarrier spacing.

136. The method in the second node according to any one of claims 103 to 135, characterized in that: At least one of whether the scheduled cell set includes the target cell and whether the characteristic cell and the target cell are the same is used to determine the calculation method of the first threshold.