An online traffic impact assessment system
The traffic cloud scheduling center obtains edge computing data and uses big data technology to evaluate traffic impacts, which solves the problems of accurate and efficient traffic impact assessment in the existing technology, and realizes intelligent comprehensive evaluation and efficient optimization decisions in traffic impacts.
Patent Information
- Application Number
- CN202311764144.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-12-21
AI Technical Summary
The existing technology has insufficient accuracy and low efficiency in traffic impact assessment, which affects urban planning and traffic management.
The edge computing data is obtained through the transportation cloud scheduling center, and the traffic impact feature calculation task database is built using big data technology, and parallel processing is carried out to generate traffic impact evaluation information and optimize traffic planning decisions.
It has achieved intelligent comprehensive evaluation of traffic impact, improved evaluation accuracy and efficiency, reduced traffic evaluation costs, and ensured efficient optimization decision-making in traffic planning.
Smart Images

Figure CN117558131B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of data processing, and in particular to an online traffic impact assessment system. Background Art
[0002] With the acceleration of urbanization and the diversification of transportation, problems such as traffic congestion and environmental pollution are becoming increasingly serious, which has a serious impact on the quality of life and health of urban residents. Therefore, accurate and rapid assessment of traffic impact is helpful for urban planning and traffic management. However, the existing technology of traffic impact relies on manual evaluation by experts, which is not accurate enough and has low evaluation efficiency. Summary of the invention
[0003] This application solves the technical problems of insufficient accuracy and low evaluation efficiency of traffic impact assessment in the prior art by providing an online traffic impact assessment system, thereby achieving the technical effect of realizing intelligent and comprehensive evaluation of traffic impact, improving evaluation accuracy and efficiency, reducing traffic evaluation costs, and thereby ensuring efficient optimization of traffic planning decisions.
[0004] In view of the above problems, the present invention provides an online traffic impact assessment system.
[0005] In a first aspect, the present application provides an online traffic impact assessment method, the method comprising: obtaining a set of traffic edge computing terminals through a traffic cloud dispatching center; collecting multi-point data on the traffic operation status according to a preset time period threshold based on the traffic edge computing terminal set, and obtaining a set of traffic endpoint operation data streams; using big data technology to construct a traffic impact feature calculation task library, and configuring the traffic edge computing terminal set and the calculation task based on the traffic impact feature calculation task library to generate an edge end traffic feature calculation task set; based on the edge end traffic feature calculation task set, parallel processing is performed on the traffic endpoint operation data stream set to determine a traffic edge end impact assessment information set; the traffic edge end impact assessment information set is integrated and transmitted to the traffic cloud dispatching center for traffic impact assessment to obtain traffic impact assessment information results; based on the traffic impact assessment information results, traffic planning optimization is performed, traffic collaborative planning parameters are determined, and traffic optimization decisions are made based on the traffic collaborative planning parameters.
[0006] On the other hand, the present application also provides an online traffic impact assessment system, which includes: obtaining a set of traffic edge computing terminals through a traffic cloud dispatching center; collecting multi-point data on the traffic operation status according to a preset time period threshold based on the traffic edge computing terminal set, and obtaining a set of traffic endpoint operation data streams; using big data technology to construct a traffic impact feature calculation task library, and configuring the traffic edge computing terminal set and the calculation task based on the traffic impact feature calculation task library to generate an edge end traffic feature calculation task set; based on the edge end traffic feature calculation task set, parallel processing is performed on the traffic endpoint operation data stream set to determine a traffic edge end impact assessment information set; the traffic edge end impact assessment information set is integrated and transmitted to the traffic cloud dispatching center for traffic impact assessment to obtain traffic impact assessment information results; based on the traffic impact assessment information results, traffic planning optimization is performed, traffic collaborative planning parameters are determined, and traffic optimization decisions are made based on the traffic collaborative planning parameters.
[0007] In a third aspect, the present application provides an electronic device, comprising a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the transceiver, the memory, and the processor are connected via the bus, and the computer program, when executed by the processor, implements the steps of any one of the above methods.
[0008] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps in any one of the above-mentioned methods when executed by a processor.
[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0010] The traffic cloud dispatch center obtains the traffic edge computing terminal set to collect and obtain the traffic endpoint operation data flow set, and then uses big data technology to build a traffic impact feature calculation task library to configure the traffic edge computing terminal set and perform calculation tasks, and generate an edge end traffic feature calculation task set, so as to parallel process the traffic endpoint operation data flow set, determine the traffic edge end impact evaluation information set, integrate and transmit it to the traffic cloud dispatch center for traffic impact evaluation, obtain traffic impact evaluation information results, optimize traffic planning based on the traffic impact evaluation information results, and determine traffic collaborative planning parameters for traffic optimization decision-making. The technical solution achieves the intelligent and comprehensive evaluation of traffic impact, improves the evaluation accuracy and efficiency, reduces the cost of traffic evaluation, and ensures the technical effect of efficient optimization of traffic planning decisions.
[0011] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A flowchart of an online traffic impact assessment method for this application is shown in FIG.
[0013] Figure 2 A flowchart of generating a set of edge traffic feature calculation tasks in an online traffic impact assessment method of this application.
[0014] Figure 3 This is a structural diagram of an online traffic impact assessment system for this application.
[0015] Figure 4 This is a schematic diagram of the structure of an exemplary electronic device of the present application.
[0016] Explanation of the accompanying drawings: edge computing acquisition module 11, multi-point data acquisition module 12, computing task configuration module 13, data parallel processing module 14, traffic impact assessment module 15, traffic optimization decision module 16, bus 1110, processor 1120, transceiver 1130, bus interface 1140, memory 1150, operating system 1151, application 1152 and user interface 1160. DETAILED DESCRIPTION
[0017] In the description of this application, those skilled in the art should know that this application can be implemented as a method, an apparatus, an electronic device, and a computer-readable storage medium. Therefore, this application can be specifically implemented in the following forms: complete hardware, complete software (including firmware, resident software, microcode, etc.), a combination of hardware and software. In addition, in some embodiments, this application can also be implemented in the form of a computer program product in one or more computer-readable storage media, and the computer-readable storage medium contains computer program code.
[0018] The above-mentioned computer-readable storage medium may adopt any combination of one or more computer-readable storage media. Computer-readable storage media include: electrical, magnetic, optical, electromagnetic, infrared or semiconductor systems, devices or devices, or any combination of the above. More specific examples of computer-readable storage media include: portable computer disks, hard disks, random access memories, read-only memories, erasable programmable read-only memories, flash memories, optical fibers, optical disc read-only memories, optical storage devices, magnetic storage devices, or any combination of the above. In the present application, computer-readable storage media can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, device, or device.
[0019] The acquisition, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of national laws.
[0020] The present application describes the provided methods, devices, and electronic devices through flowcharts and / or block diagrams.
[0021] It should be understood that each box in the flowchart and / or block diagram and the combination of boxes in the flowchart and / or block diagram can be implemented by computer-readable program instructions. These computer-readable program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine, and these computer-readable program instructions are executed by a computer or other programmable data processing device to produce a device that implements the functions / operations specified by the boxes in the flowchart and / or block diagram.
[0022] These computer-readable program instructions may also be stored in a computer-readable storage medium that enables a computer or other programmable data processing device to work in a specific manner. In this way, the instructions stored in the computer-readable storage medium produce an instruction device product including functions / operations specified in the blocks in the flowchart and / or block diagram.
[0023] Computer-readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device, so that a series of operational steps are performed on the computer, other programmable data processing apparatus, or other device to produce a computer-implemented process, thereby enabling the instructions executed on the computer or other programmable data processing apparatus to provide a process for implementing the functions / operations specified in the blocks in the flowchart and / or block diagram.
[0024] The present application is described below in conjunction with the drawings in the present application.
[0025] Embodiment 1
[0026] like Figure 1As shown, the present application provides an online traffic impact assessment method, which is applied to an online traffic impact assessment system, and the method includes:
[0027] Step S1: Obtain a set of traffic edge computing terminals through the traffic cloud dispatch center.
[0028] Step S2: Based on the traffic edge computing terminal set, multi-point data collection is performed on the traffic operation status according to the preset time period threshold to obtain a set of traffic endpoint operation data flows.
[0029] Specifically, in order to realize the intelligent and comprehensive evaluation of traffic impact, the traffic edge computing terminal set is obtained through the traffic cloud dispatch center, wherein the traffic cloud dispatch center is a cloud control center for comprehensive dispatch of traffic resources, which is used for traffic data response processing and operation management. The traffic edge computing terminal set connected to it is obtained by calling the traffic cloud dispatch center, which is an edge-side terminal processing device with computing resources in the traffic system. It does not need to be sent to the cloud for processing, and can provide traffic computing services nearby, with the advantages of low latency, high data processing security, and faster response speed.
[0030] Based on the set of traffic edge computing terminals, multi-point data collection of traffic operation status is performed according to the preset time period threshold, wherein the preset time period threshold can be set according to the traffic data collection requirements, and the traffic operation data is collected in real time in multiple time periods and in all directions through each edge computing terminal, so as to obtain a set of traffic endpoint operation data streams, which is the traffic operation status data of the area where each edge computing terminal is located, including traffic volume, vehicle speed, traffic meteorological data, signal light control, traffic signs, traffic events and other data. Improve the amount and comprehensiveness of traffic status data collection, provide a data basis for online evaluation of traffic impact, and thus ensure the accuracy of traffic impact evaluation.
[0031] Step S3: Use big data technology to build a traffic impact feature calculation task library, configure the traffic edge computing terminal set and the calculation task based on the traffic impact feature calculation task library, and generate an edge terminal traffic feature calculation task set.
[0032] like Figure 2 As shown, further, the step of generating the edge end traffic feature calculation task set in this application also includes:
[0033] Task factors are extracted from the traffic impact characteristic calculation task library to obtain calculation characteristic task factor information, wherein the calculation characteristic task factor information includes data preprocessing factors and traffic impact calculation characteristic factors.
[0034] The traffic impact factor characteristic calculation task library is sorted and integrated according to the calculation characteristic task factor information to obtain a traffic impact factor characteristic calculation task library.
[0035] Based on the computing feature task factor information, computing feature demand analysis is performed on the traffic edge computing terminal set to obtain edge terminal preprocessing demand feature information and edge terminal demand impact feature information.
[0036] Task matching is performed based on the edge preprocessing demand feature information and the edge demand impact feature information with the traffic impact factor feature calculation task library to configure the edge traffic feature calculation task set.
[0037] Specifically, a large amount of historical data on traffic impact processing is collected using big data technology, and then traffic impact calculation features are extracted through the massive historical data, including calculation feature tasks such as vehicle flow calculation, road use demand calculation, traffic congestion degree calculation, and traffic event feature analysis, so as to construct a traffic impact feature calculation task library. The traffic impact feature calculation task library is a set of calculation tasks for traffic impact evaluation-related features, including traffic impact evaluation-related calculation task features and calculation algorithms or analysis models for each related calculation task feature. Based on the traffic impact feature calculation task library, the traffic edge computing terminal set is configured with calculation tasks. First, the traffic impact feature calculation task library is extracted for task factors to obtain calculation feature task factor information. The calculation feature task factor information is a traffic data processing task feature type, including data preprocessing factors, i.e., the step of standardizing and preprocessing the data stream; and traffic impact calculation feature factors, i.e., the processing algorithm or model for traffic impact-related features. The traffic impact characteristic calculation task library is sorted and integrated according to the calculation characteristic task factor information, and the calculation task library is classified and arranged according to the data preprocessing factors and the traffic impact calculation characteristic factors to obtain an integrated traffic impact factor characteristic calculation task library.
[0038] Based on the computing feature task factor information, the computing feature demand analysis of the traffic edge computing end set is performed, and the edge preprocessing demand feature information is obtained according to the edge computing end collected data type matching, for example, the preprocessing steps of structured data include normalization, data cleaning and other steps; then the edge demand impact feature information is obtained according to the convenience of computing end data processing demand matching, and the edge demand impact feature information is the demand computing feature of the edge collected data, such as vehicle flow calculation, traffic congestion degree calculation, traffic event feature analysis, etc. Task matching is performed based on the edge preprocessing demand feature information and the edge demand impact feature information and the traffic impact factor feature computing task library, and the edge traffic feature computing task set is configured. The edge traffic feature computing task set is a processing algorithm or model for the traffic impact evaluation demand computing feature. Rapid task feature matching of the edge computing end is achieved to improve the accuracy of data edge computing diversion and computing processing efficiency.
[0039] Step S4: Based on the edge traffic feature calculation task set, the traffic endpoint operation data flow set is processed in parallel to determine the traffic edge impact evaluation information set.
[0040] Furthermore, before the parallel processing of the traffic endpoint operation data stream set, the steps of the present application also include:
[0041] The computing feature analysis is performed on the traffic edge computing terminal set to determine the edge terminal computing feature information, wherein the edge terminal computing feature information includes a task processing rate, a task computing space amount, and a task processing accuracy.
[0042] Based on the traffic endpoint operation data flow set, load demand analysis is performed to obtain edge end demand load characteristic information.
[0043] The edge computing feature information and the edge demand load feature information are task matched to obtain computing task feature matching index information.
[0044] The edge end traffic feature calculation task set is collaboratively optimized and corrected based on the calculation task feature matching index information.
[0045] Furthermore, the application steps also include:
[0046] Based on the computing task feature matching index information, computing optimization analysis is performed to determine a target edge computing optimization feature information set.
[0047] The interaction authority of each edge terminal in the traffic edge computing terminal set is identified to form an edge terminal interactive collaboration optimization network.
[0048] According to the target edge computing optimization feature information set, the edge interactive collaborative optimization network is matched with collaborative edge tasks to determine a target collaborative edge optimization computing task set.
[0049] The edge end traffic feature calculation task set is optimized and modified based on the target collaborative edge end optimization calculation task set.
[0050] Specifically, based on the edge end traffic feature calculation task set, the traffic endpoint operation data flow set is processed in parallel, that is, the traffic data of the edge computing end is processed simultaneously, and the data processing efficiency is improved. To ensure timely data processing, before the traffic endpoint operation data flow set is processed in parallel, the computing characteristics of each edge computing end in the traffic edge computing end set are analyzed to determine the edge computing characteristic information. The edge computing characteristic information is the computing power characteristic information of the edge device, including the task processing rate, that is, the data computing processing efficiency; the task computing space, that is, the computing storage capacity of the data; and the task processing accuracy, that is, the data computing processing accuracy. Then, based on the traffic endpoint operation data flow set, the load demand analysis is performed, that is, the computing power load demand of the traffic data collection amount of each edge end is determined to obtain the edge demand load characteristic information. The edge demand load characteristic information is the computing power demand characteristics of the load calculation amount of each edge end, including the processing rate, computing space and processing accuracy requirement information.
[0051] The edge computing feature information and the edge demand load feature information are task matched, that is, the computing power features of each edge are matched with the demand computing features, and the computing power of the edge is judged to be adapted to the demand computing features. The computing task feature matching index information is obtained by comparison and calculation. The computing task feature matching index information is the degree of computing power matching of each edge. If the computing power feature of the edge is large, the matching index is positive. If the computing power feature of the edge is insufficient, the matching index is negative. Then, based on the computing task feature matching index information, the edge traffic feature computing task set is collaboratively optimized and corrected, that is, other edge collaborative calculations are performed on the edge with insufficient computing power to ensure the timeliness of data processing. First, a computing optimization analysis is performed based on the computing task feature matching index information, that is, the edge with insufficient computing power is screened, and the computing power features to be optimized of the screened edge are calculated, so as to determine the target edge computing optimization feature information set.
[0052] Different edge terminals have different data computing permissions, so the interaction permissions of each edge terminal in the traffic edge computing terminal set are identified, that is, the collaborative computing permissions of each edge terminal are identified and determined, and the edge terminals with higher permissions can collaborate with the edge terminals with lower interactive computing permissions, so as to map and form an edge terminal interactive collaborative optimization network, which is used to visualize the collaborative interaction permissions of the edge terminals. The edge terminal interactive collaborative optimization network is matched with collaborative edge terminal tasks based on the target edge terminal computing optimization feature information set, that is, for the edge terminals with insufficient computing power, the collaborative edge terminals with interactive permissions are determined, and the computing power features to be optimized are allocated to the collaborative edge terminals to ensure that the computing power features to be optimized are fully allocated, and then the target collaborative edge terminal optimization computing task set is determined, and the target collaborative edge terminal optimization computing task set is the computing power feature allocation information of the collaborative edge terminals. Based on the target collaborative edge optimization computing task set, the edge traffic feature computing task set is optimized and corrected, and the computing power to be optimized at the edge with insufficient computing power is allocated to other edge with collaborative authority for calculation, ensuring that the edge computing power meets the demand, realizing parallel processing of edge data, and ensuring timeliness of data processing.
[0053] Step S5: Integrate and transmit the traffic edge impact assessment information set to the traffic cloud dispatch center for traffic impact assessment to obtain traffic impact assessment information results.
[0054] Furthermore, the steps of obtaining the traffic impact assessment information results in this application also include:
[0055] Indicators are extracted according to traffic impact assessment requirements to obtain traffic impact assessment indicator information, wherein the traffic impact assessment indicator information includes traffic flow, traffic congestion, and traffic safety.
[0056] Data association mining is performed based on the traffic impact assessment index information to obtain a traffic impact assessment database.
[0057] A traffic impact assessment network is constructed based on the traffic impact assessment database training. The traffic impact assessment network includes a traffic flow assessment branch network, a traffic congestion index assessment branch network, and a traffic safety factor assessment branch network.
[0058] The traffic impact assessment network is called by the traffic cloud dispatch center to perform traffic impact assessment on the traffic edge impact assessment information set, and the traffic impact assessment information result is output.
[0059] Furthermore, the application steps also include:
[0060] The traffic impact assessment network is verified for effectiveness, and model parameters are extracted based on the verification results to determine model weights and model biases.
[0061] The mean square error loss function is used to perform gradient calculation on the model weight and model bias to obtain the gradient information of the traffic evaluation network parameters.
[0062] The model parameters are iteratively updated based on the traffic evaluation network parameter gradient information through a back propagation algorithm to obtain model update parameter information.
[0063] The traffic impact assessment network is optimized based on the model update parameter information to obtain a traffic impact optimization assessment network.
[0064] Specifically, in order to realize the comprehensive evaluation of traffic impact, the traffic edge impact evaluation information set is integrated and transmitted to the traffic cloud dispatch center for traffic impact evaluation. Specifically, the indicators are first extracted according to the traffic impact evaluation requirements, that is, the main evaluation indicator information of traffic impact is determined according to the relevant specifications of traffic impact evaluation. The traffic impact evaluation indicator information includes traffic flow, including vehicle flow, vehicle speed, vehicle type, etc., which can reflect the use and demand of traffic roads; traffic congestion, including congestion degree, congestion duration, frequently congested sections, etc., which can reflect traffic planning bottlenecks and problems; traffic safety, including traffic accidents, traffic safety facilities, traffic signs, etc., can reflect the safety performance of the traffic environment. Then, data association mining is performed based on the traffic impact evaluation indicator information, and the historical traffic impact evaluation data associated with the traffic impact evaluation indicator information is obtained through data mining, and a traffic impact evaluation database is constructed. The traffic impact evaluation database includes historical traffic impact evaluation associated data and corresponding traffic impact evaluation indicator data.
[0065] The traffic impact assessment database is classified and trained according to the traffic impact assessment index information until the model converges to obtain a traffic impact assessment network. The traffic impact assessment network is a neural network structure, corresponding to the traffic impact assessment index information, and is a three-dimensional traffic impact assessment network used to conduct a comprehensive evaluation of traffic impacts, including a traffic flow evaluation branch network, a traffic congestion index evaluation branch network, and a traffic safety factor evaluation branch network. The traffic impact assessment network is called by the traffic cloud dispatch center, and the traffic impact assessment is performed on the traffic edge impact assessment information set, and the traffic impact assessment information results are output. The traffic impact assessment information results include traffic flow evaluation information, traffic congestion index evaluation information, and traffic safety factor evaluation information. Realize intelligent and comprehensive evaluation of traffic impacts and improve evaluation accuracy and efficiency.
[0066] In order to ensure the output accuracy of the traffic impact assessment network, the traffic impact assessment network is verified, and the evaluation accuracy of the traffic impact assessment network is obtained by comparing the model prediction results with the actual impact results. The model parameters are extracted according to the verification results. When the verification result shows that the model evaluation accuracy is not up to standard, the model needs to be optimized, and the existing training model parameters are extracted and determined, including model weights, that is, the weight values connecting different layers in the neural network; and model bias, that is, the bias value of each neuron in the neural network. The loss function is then defined, and the mean square error loss function is used to perform gradient calculations on the model weights and model biases, that is, the partial derivatives of each model parameter are calculated through the loss function, and the gradient information of the traffic evaluation network parameters can be obtained through chain rule calculation.
[0067] The model parameters are iteratively updated based on the calculated gradient information of the traffic evaluation network parameters through the back propagation algorithm. The model learning rate can be added in the updating process to control the update step of the parameters. The model parameter updating steps are repeatedly performed to gradually optimize the model parameters. The value of the loss function is reduced by iteratively adjusting the model parameters to minimize the value of the loss function, thereby iteratively updating the model update parameter information. The back propagation algorithm can conveniently and quickly calculate the gradient and update the parameters to achieve model optimization. Then, based on the model update parameter information, the traffic impact evaluation network is optimized to obtain the traffic impact optimization evaluation network using the model update parameter information, so that the prediction results of the model are more accurate, the model accuracy and generalization ability are improved, and the accuracy of the traffic impact evaluation is improved.
[0068] Step S6: Optimize traffic planning based on the traffic impact assessment information results, determine traffic collaborative planning parameters, and make traffic optimization decisions based on the traffic collaborative planning parameters.
[0069] Furthermore, the steps of determining the traffic coordination planning parameters in this application also include:
[0070] The difference between the traffic impact assessment information result and the traffic planning balance benchmark is used as a traffic planning incentive parameter.
[0071] According to the traffic planning control strategy, the traffic planning parameter control space is constructed.
[0072] An evaluation fitting is performed based on the traffic impact evaluation index information to obtain a planning parameter optimization degree evaluation function.
[0073] The traffic coordination planning parameters are obtained by performing cluster parameter screening in the traffic planning parameter control space based on the traffic planning incentive parameters through the planning parameter optimization evaluation function.
[0074] Specifically, traffic impact assessment has an important impact on traffic construction planning. Traffic impact assessment can be used to determine the rationality and feasibility of road planning, providing a scientific basis for decision makers. Therefore, traffic planning optimization is performed based on the traffic impact assessment information results, and a traffic planning balance benchmark is set according to the traffic planning resource demand. The traffic planning balance benchmark is the qualification standard for the traffic planning scheme. By analyzing the balance relationship between traffic demand and existing resource supply, including the number of vehicles, road capacity, public transportation resources, etc., it is determined whether the traffic planning scheme is reasonable. The difference between the traffic impact assessment information results and the traffic planning balance benchmark is used as a traffic planning incentive parameter. The traffic planning incentive parameter is the parameter to be optimized of the existing traffic planning scheme, such as the parameters that need to be optimized, such as traffic flow, traffic safety, etc.
[0075] According to the traffic planning control strategy, a traffic planning parameter control space is constructed, wherein the traffic planning control strategy is the basis for the optimization control strategy of the traffic planning scheme. For example, when the traffic flow does not meet the standard, a reasonable road network planning strategy needs to be formulated, including road grade, section design, intersection design, etc. The traffic planning parameter control space is constructed through the traffic planning control strategy. The traffic planning parameter control space is the optimization range of the traffic planning scheme parameters, including the historical traffic planning scheme control parameters and the corresponding traffic impact effect data. Then, based on the traffic impact evaluation index information, the traffic impact effect data is evaluated and fitted to obtain the planning parameter optimization degree evaluation function. The planning parameter optimization degree evaluation function is the associated traffic impact evaluation function of the traffic impact evaluation index information, which is used to quantitatively evaluate the optimization degree of the traffic planning control parameters.
[0076] The cluster parameters are screened in the traffic planning parameter control space based on the traffic planning incentive parameters through the planning parameter optimization evaluation function, that is, the traffic planning parameters are searched in the traffic planning parameter control space, and the optimization evaluation function is used to evaluate the searched traffic planning parameters until the preset number of iterations, and the traffic planning parameters with the largest optimization degree are screened as traffic collaborative planning parameters. Traffic optimization decisions are made based on the traffic collaborative planning parameters to improve the rationality of traffic planning decisions, and traffic planning decision plans are optimized and corrected in a timely manner to ensure their effectiveness. The human and time costs of traffic evaluation are reduced, and efficient optimization decisions of traffic planning are ensured, thereby improving the utilization efficiency and planning quality of traffic planning plans.
[0077] Improve the accuracy of power station monitoring and the timeliness of control, reduce monitoring operation costs, and thus ensure the operating efficiency and safety of new energy power stations.
[0078] In summary, the online traffic impact assessment system provided by this application has the following technical effects:
[0079] The traffic cloud dispatch center obtains the traffic edge computing terminal set to collect and obtain the traffic endpoint operation data flow set, and then uses big data technology to build a traffic impact feature calculation task library to configure the traffic edge computing terminal set and perform calculation tasks, and generate an edge end traffic feature calculation task set, so as to parallel process the traffic endpoint operation data flow set, determine the traffic edge end impact evaluation information set, integrate and transmit it to the traffic cloud dispatch center for traffic impact evaluation, obtain traffic impact evaluation information results, optimize traffic planning based on the traffic impact evaluation information results, and determine traffic collaborative planning parameters for traffic optimization decision-making. The technical solution achieves the intelligent and comprehensive evaluation of traffic impact, improves the evaluation accuracy and efficiency, reduces the cost of traffic evaluation, and ensures the technical effect of efficient optimization of traffic planning decisions.
[0080] Embodiment 2
[0081] Based on the same inventive concept as the online traffic impact assessment method in the aforementioned embodiment, the present invention also provides an online traffic impact assessment system, such as Figure 3 As shown, the system comprises:
[0082] The edge computing terminal acquisition module 11 is used to obtain a set of traffic edge computing terminals through a traffic cloud dispatching center.
[0083] The multi-point data collection module 12 is used to collect multi-point data on the traffic operation status based on the traffic edge computing terminal set according to the preset time period threshold, and obtain the traffic endpoint operation data flow set.
[0084] The computing task configuration module 13 is used to use big data technology to build a traffic impact feature computing task library, configure the traffic edge computing terminal set with computing tasks based on the traffic impact feature computing task library, and generate an edge terminal traffic feature computing task set.
[0085] The data parallel processing module 14 is used to perform parallel processing on the traffic endpoint operation data flow set based on the edge end traffic feature calculation task set to determine the traffic edge end impact evaluation information set.
[0086] The traffic impact assessment module 15 is used to integrate and transmit the traffic edge impact assessment information set to the traffic cloud dispatch center for traffic impact assessment and obtain traffic impact assessment information results.
[0087] The traffic optimization decision module 16 is used to optimize traffic planning based on the traffic impact assessment information results, determine traffic coordination planning parameters, and make traffic optimization decisions based on the traffic coordination planning parameters.
[0088] Furthermore, the system also includes:
[0089] The task factor extraction unit is used to extract task factors from the traffic impact characteristic calculation task library to obtain calculation characteristic task factor information, wherein the calculation characteristic task factor information includes data preprocessing factors and traffic impact calculation characteristic factors.
[0090] The task combing and integration unit is used to comb and integrate the traffic impact feature calculation task library according to the calculation feature task factor information to obtain the traffic impact factor feature calculation task library.
[0091] The feature requirement analysis unit is used to perform computing feature requirement analysis on the set of traffic edge computing terminals based on the computing feature task factor information, and obtain edge terminal preprocessing requirement feature information and edge terminal requirement impact feature information.
[0092] A computing task matching unit is used to match tasks with the traffic influencing factor feature computing task library based on the edge preprocessing demand feature information and the edge demand impact feature information, and configure the edge traffic feature computing task set.
[0093] Furthermore, the system also includes:
[0094] The computing feature analysis unit is used to perform computing feature analysis on the traffic edge computing terminal set to determine edge terminal computing feature information, wherein the edge terminal computing feature information includes task processing rate, task computing space amount and task processing accuracy.
[0095] The load demand analysis unit is used to perform load demand analysis based on the traffic endpoint operation data flow set to obtain edge end demand load characteristic information.
[0096] The load task matching unit is used to perform task matching on the edge computing feature information and the edge demand load feature information to obtain computing task feature matching index information.
[0097] A collaborative optimization correction unit is used to perform collaborative optimization correction on the edge traffic feature calculation task set based on the calculation task feature matching index information.
[0098] Furthermore, the system also includes:
[0099] The computing optimization analysis unit is used to perform computing optimization analysis based on the computing task feature matching index information to determine a target edge computing optimization feature information set.
[0100] The interaction authority identification unit is used to identify the interaction authority of each edge terminal in the traffic edge computing terminal set to form an edge terminal interactive collaboration optimization network.
[0101] The edge task matching unit is used to match the collaborative edge tasks of the edge interactive collaborative optimization network according to the target edge computing optimization feature information set, and determine the target collaborative edge optimization computing task set.
[0102] The task optimization and correction unit is used to optimize and correct the edge-end traffic feature calculation task set based on the target collaborative edge-end optimization calculation task set.
[0103] Furthermore, the system also includes:
[0104] The impact index extraction unit is used to extract indicators according to traffic impact assessment requirements and obtain traffic impact assessment indicator information, wherein the traffic impact assessment indicator information includes traffic flow, traffic congestion, and traffic safety.
[0105] The data association mining unit is used to perform data association mining based on the traffic impact assessment index information to obtain a traffic impact assessment database.
[0106] The evaluation network forming unit is used to train and construct a traffic impact evaluation network based on the traffic impact evaluation database, wherein the traffic impact evaluation network includes a traffic flow evaluation branch network, a traffic congestion index evaluation branch network, and a traffic safety factor evaluation branch network.
[0107] The evaluation information result output unit is used to call the traffic impact evaluation network through the traffic cloud dispatch center, perform traffic impact evaluation on the traffic edge impact evaluation information set, and output the traffic impact evaluation information result.
[0108] Furthermore, the system also includes:
[0109] The model parameter extraction unit is used to verify the effect of the traffic impact assessment network, extract model parameters according to the verification results, and determine model weights and model biases.
[0110] The parameter gradient calculation unit is used to perform gradient calculation on the model weight and model bias using a mean square error loss function to obtain traffic evaluation network parameter gradient information.
[0111] The parameter iteration updating unit is used to iteratively update the model parameters based on the traffic evaluation network parameter gradient information through a back propagation algorithm to obtain model update parameter information.
[0112] The evaluation network optimization unit is used to optimize the traffic impact evaluation network based on the model update parameter information to obtain a traffic impact optimization evaluation network.
[0113] Furthermore, the system also includes:
[0114] The incentive parameter obtaining unit is used to use the difference between the traffic impact assessment information result and the traffic planning balance benchmark as the traffic planning incentive parameter.
[0115] The control space construction unit is used to construct the traffic planning parameter control space according to the traffic planning control strategy.
[0116] An evaluation function construction unit is used to perform evaluation fitting based on the traffic impact evaluation index information to obtain a planning parameter optimization evaluation function.
[0117] The cluster parameter screening unit is used to perform cluster parameter screening in the traffic planning parameter control space based on the traffic planning incentive parameters through the planning parameter optimization evaluation function to obtain the traffic coordination planning parameters.
[0118] The foregoing Figure 1 The various variations and specific examples of an online traffic impact assessment method in Example 1 are also applicable to an online traffic impact assessment system in this embodiment. Through the above detailed description of an online traffic impact assessment method, those skilled in the art can clearly know the implementation method of an online traffic impact assessment system in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here.
[0119] In addition, the present application also provides an electronic device, including a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and run on the processor. The transceiver, the memory, and the processor are respectively connected via a bus. When the computer program is executed by the processor, each process of the above-mentioned method embodiment for controlling output data is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0120] Exemplary Electronic Devices
[0121] For details, see Figure 4 As shown, the present application also provides an electronic device, which includes a bus 1110 , a processor 1120 , a transceiver 1130 , a bus interface 1140 , a memory 1150 and a user interface 1160 .
[0122] In the present application, the electronic device further includes: a computer program stored in the memory 1150 and executable on the processor 1120, and when the computer program is executed by the processor 1120, each process of the above-mentioned method embodiment for controlling output data is implemented.
[0123] The transceiver 1130 is configured to receive and send data under the control of the processor 1120 .
[0124] In the present application, a bus architecture (represented by bus 1110 ) may include any number of interconnected buses and bridges. Bus 1110 connects various circuits including one or more processors represented by processor 1120 and a memory represented by memory 1150 .
[0125] Bus 1110 represents one or more of any of several types of bus structures, including a memory bus and memory controller, a peripheral bus, an accelerated graphics port, a processor or a local bus using any of a variety of bus architectures. Such architectures include, by way of example and not limitation, an Industry Standard Architecture bus, a Micro Channel Architecture bus, an expansion bus, a Video Electronics Standards Association, a Peripheral Component Interconnect bus.
[0126] The processor 1120 may be an integrated circuit chip having signal processing capabilities. In the implementation process, each step of the above method embodiment may be completed by an integrated logic circuit of hardware in the processor or instructions in the form of software. The above processors include: a general-purpose processor, a central processing unit, a network processor, a digital signal processor, an application-specific integrated circuit, a field programmable gate array, a complex programmable logic device, a programmable logic array, a microcontroller unit or other programmable logic device, a discrete gate, a transistor logic device, and a discrete hardware component. The various methods, steps, and logic block diagrams disclosed in this application may be implemented or executed. For example, the processor may be a single-core processor or a multi-core processor, and the processor may be integrated into a single chip or located on multiple different chips.
[0127] Processor 1120 may be a microprocessor or any conventional processor. The method steps disclosed in the present application may be directly executed by a hardware decoding processor, or by a combination of hardware and software modules in the decoding processor. The software module may be located in a readable storage medium known in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, an erasable programmable read-only memory, a register, etc. The readable storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.
[0128] The bus 1110 may also connect various other circuits such as peripheral devices, voltage regulators or power management circuits, and the bus interface 1140 provides an interface between the bus 1110 and the transceiver 1130, which are well known in the art. Therefore, this application will not further describe them.
[0129] The transceiver 1130 may be one element or multiple elements, such as multiple receivers and transmitters, and provides a unit for communicating with various other devices on a transmission medium. For example, the transceiver 1130 receives external data from other devices, and the transceiver 1130 is used to send data processed by the processor 1120 to other devices. Depending on the nature of the computer device, a user interface 1160 may also be provided, such as a touch screen, a physical keyboard, a display, a mouse, a speaker, a microphone, a trackball, a joystick, or a stylus.
[0130] It should be understood that in the present application, the memory 1150 may further include a memory remotely arranged relative to the processor 1120, and these remotely arranged memories may be connected to the server through a network. One or more parts of the above network may be a self-organizing network, an intranet, an extranet, a virtual private network, a local area network, a wireless local area network, a wide area network, a wireless wide area network, a metropolitan area network, the Internet, a public switched telephone network, a plain old telephone service network, a cellular telephone network, a wireless network, a wireless fidelity network, and a combination of two or more of the above networks. For example, the cellular telephone network and the wireless network may be a global mobile communication device, a code division multiple access device, a global microwave interconnection access device, a general packet radio service device, a wideband code division multiple access device, a long term evolution device, a LTE frequency division duplex device, a LTE time division duplex device, an advanced long term evolution device, a universal mobile communication device, an enhanced mobile broadband device, a massive machine type communication device, an ultra-reliable low latency communication device, and the like.
[0131] It should be understood that the memory 1150 in the present application may be a volatile memory or a non-volatile memory, or may include both a volatile memory and a non-volatile memory. Among them, the non-volatile memory includes: a read-only memory, a programmable read-only memory, an erasable programmable read-only memory, an electrically erasable programmable read-only memory, or a flash memory.
[0132] Volatile memory includes random access memory, which is used as an external cache. By way of example but not limitation, many forms of RAM are available, such as static random access memory, dynamic random access memory, synchronous dynamic random access memory, double data rate synchronous dynamic random access memory, enhanced synchronous dynamic random access memory, synchronously linked dynamic random access memory, and direct memory bus random access memory. The memory 1150 of the electronic device described in the present application includes, but is not limited to, the above and any other suitable types of memory.
[0133] In the present application, the memory 1150 stores the following elements of the operating system 1151 and the application program 1152: executable modules, data structures, or subsets thereof, or extended sets thereof.
[0134] Specifically, the operating system 1151 includes various device programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application 1152 includes various application programs, such as a media player and a browser, which are used to implement various application services. The program implementing the method of the present application may be included in the application 1152. The application 1152 includes applets, objects, components, logic, data structures, and other computer device executable instructions that perform specific tasks or implement specific abstract data types.
[0135] In addition, the present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the various processes of the above-mentioned method embodiment for controlling output data are implemented and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0136] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. An online traffic impact assessment system, characterized in that: The system comprises: The edge computing terminal acquisition module is used to obtain the set of traffic edge computing terminals through the traffic cloud dispatch center; A multi-point data collection module is used to collect multi-point data on the traffic operation status based on the traffic edge computing terminal set according to the preset time period threshold, and obtain a traffic endpoint operation data stream set, which is the traffic operation status data of the area where each edge computing terminal is located, including traffic volume, vehicle speed, traffic meteorological data, signal light control, traffic signs, and traffic events; A computing task configuration module is used to construct a traffic impact feature computing task library using big data technology. The traffic impact feature computing task library is a computing task set of traffic impact assessment related features, including traffic impact assessment related computing task features and computing algorithms or analysis models of each related computing task feature. Based on the traffic impact feature computing task library, computing tasks are configured for the traffic edge computing end set to generate an edge end traffic feature computing task set. The edge end traffic feature computing task set is a processing algorithm or model for computing features of traffic impact assessment requirements. A data parallel processing module, used for performing parallel processing on the traffic endpoint operation data flow set based on the edge end traffic feature calculation task set to determine the traffic edge end impact evaluation information set; A traffic impact assessment module, used to integrate and transmit the traffic edge impact assessment information set to the traffic cloud dispatch center for traffic impact assessment, and obtain traffic impact assessment information results, wherein the traffic impact assessment information results include traffic flow assessment information, traffic congestion index assessment information, and traffic safety factor assessment information; A traffic optimization decision module, used to optimize traffic planning based on the traffic impact assessment information results, determine traffic collaborative planning parameters, and make traffic optimization decisions based on the traffic collaborative planning parameters; Wherein, the computing task configuration module also includes: A task factor extraction unit is used to extract task factors from the traffic impact feature calculation task library to obtain calculation feature task factor information, wherein the calculation feature task factor information includes data preprocessing factors and traffic impact calculation feature factors, that is, steps for standardizing preprocessing of data streams and processing algorithms or models for traffic impact correlation features; A task combing and integration unit, used for combing and integrating the traffic impact feature calculation task library according to the calculation feature task factor information to obtain a traffic impact factor feature calculation task library; A feature demand analysis unit is used to perform a computing feature demand analysis on the set of traffic edge computing terminals based on the computing feature task factor information, obtain edge terminal preprocessing demand feature information according to the data type collected by the edge computing terminal, and then obtain edge terminal demand impact feature information according to the matching of the data processing requirements of the computing terminal, wherein the edge terminal demand impact feature information is the demand computing feature of the data collected by the edge terminal; A computing task matching unit, configured to match tasks with the traffic influencing factor feature computing task library based on the edge end preprocessing demand feature information and the edge end demand impact feature information, and configure the edge end traffic feature computing task set; Wherein, the traffic impact assessment module also includes: An impact index extraction unit, used to extract indicators according to traffic impact assessment requirements and obtain traffic impact assessment indicator information, wherein the traffic impact assessment indicator information includes traffic flow, traffic congestion, and traffic safety; A data association mining unit, used to perform data association mining based on the traffic impact assessment index information to obtain a traffic impact assessment database; An evaluation network forming unit, used for training and constructing a traffic impact evaluation network based on the traffic impact evaluation database, wherein the traffic impact evaluation network includes a traffic flow evaluation branch network, a traffic congestion index evaluation branch network, and a traffic safety factor evaluation branch network; The evaluation information result output unit is used to call the traffic impact evaluation network through the traffic cloud dispatch center, perform traffic impact evaluation on the traffic edge impact evaluation information set, and output the traffic impact evaluation information result.
2. The system according to claim 1, characterized in that The data parallel processing module also includes: A computing feature analysis unit, configured to perform computing feature analysis on the set of traffic edge computing terminals to determine edge computing feature information, wherein the edge computing feature information includes a task processing rate, a task computing space amount, and a task processing accuracy; A load demand analysis unit, configured to perform load demand analysis based on the traffic endpoint operation data flow set to obtain edge end demand load characteristic information, wherein the edge end demand load characteristic information is the computing power demand characteristics of each edge end load calculation amount, including processing rate, computing space amount, and processing accuracy demand information; A load task matching unit, used to perform task matching on the edge computing feature information and the edge demand load feature information to obtain computing task feature matching index information; A collaborative optimization correction unit is used to perform collaborative optimization correction on the edge traffic feature calculation task set based on the calculation task feature matching index information.
3. The system according to claim 2, characterized in that The system comprises: A computing optimization analysis unit, configured to perform computing optimization analysis based on the computing task feature matching index information, and determine a target edge computing optimization feature information set; An interaction authority identification unit, used to identify the interaction authority of each edge terminal in the traffic edge computing terminal set to form an edge terminal interaction and collaboration optimization network; An edge task matching unit, configured to match collaborative edge tasks on the edge interactive collaborative optimization network according to the target edge computing optimization feature information set, and determine a target collaborative edge optimization computing task set; The task optimization and correction unit is used to optimize and correct the edge-end traffic feature calculation task set based on the target collaborative edge-end optimization calculation task set.
4. The system according to claim 1, characterized in that The system comprises: A model parameter extraction unit, used to verify the effect of the traffic impact assessment network, extract model parameters according to the verification results, and determine model weights and model biases; A parameter gradient calculation unit, used to perform gradient calculation on the model weight and model bias using a mean square error loss function to obtain gradient information of traffic evaluation network parameters; A parameter iteration updating unit, used for iteratively updating the model parameters based on the traffic evaluation network parameter gradient information through a back propagation algorithm to obtain model update parameter information; The evaluation network optimization unit is used to optimize the traffic impact evaluation network based on the model update parameter information to obtain a traffic impact optimization evaluation network.
5. The system according to claim 4, characterized in that The traffic optimization decision module also includes: An incentive parameter obtaining unit, used to use the difference between the traffic impact assessment information result and the traffic planning balance benchmark as a traffic planning incentive parameter, wherein the traffic planning balance benchmark is a traffic planning scheme qualification standard; A control space construction unit is used to construct a traffic planning parameter control space according to a traffic planning control strategy, wherein the traffic planning parameter control space is an optimization range of traffic planning scheme parameters, including historical traffic planning scheme control parameters and corresponding traffic impact effect data; An evaluation function construction unit, used to perform evaluation fitting based on the traffic impact evaluation index information to obtain a planning parameter optimization evaluation function; The cluster parameter screening unit is used to perform cluster parameter screening in the traffic planning parameter control space based on the traffic planning incentive parameters through the planning parameter optimization evaluation function to obtain the traffic coordination planning parameters.
6. An online traffic impact assessment method, characterized in that: The method is implemented by an online traffic impact assessment system according to any one of claims 1 to 5, and the method comprises: Obtain a collection of traffic edge computing terminals through the traffic cloud dispatch center; Based on the traffic edge computing terminal set, multi-point data collection of the traffic operation status is performed according to the preset time period threshold to obtain a traffic endpoint operation data flow set; Using big data technology to build a traffic impact feature calculation task library, and based on the traffic impact feature calculation task library, perform calculation task configuration on the traffic edge computing end set to generate an edge end traffic feature calculation task set; Based on the edge end traffic feature calculation task set, the traffic endpoint operation data stream set is processed in parallel to determine the traffic edge end impact evaluation information set; Integrate and transmit the traffic edge impact assessment information set to the traffic cloud dispatch center for traffic impact assessment to obtain traffic impact assessment information results; Traffic planning optimization is performed based on the traffic impact assessment information results, traffic coordination planning parameters are determined, and traffic optimization decisions are made based on the traffic coordination planning parameters.
7. An electronic device, comprising a bus, a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the transceiver, the memory, and the processor are connected via the bus, wherein: When the computer program is executed by the processor, the steps of an online traffic impact assessment system according to any one of claims 1 to 5 are implemented.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of an online traffic impact assessment system according to any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Multifunctional V2X intelligent roadside base station system
CN111554088A
Cloud service comprehensive scheduling optimization system and method fusing edge facilities
CN111932027A
Traffic information processing method, device, system and equipment and storage medium
CN112837535A
Multi-dimensional heterogeneous resource quantification method and device based on industrial edge computing system
CN114064261A
Automatic computing power scheduling method, device and system for intelligent video analysis platform