A type of high bearing capacity pile
By setting an expansion material block at the bottom of the pile, the expansion absorbs pore water and causes volume expansion, squeezing the soil layer at the pile tip to drain and consolidate, thus solving the problem of insufficient bearing capacity of the soil at the pile tip in low-permeability cohesive soil, achieving efficient improvement of pile bearing capacity and reduction of engineering costs.
Patent Information
- Application Number
- CN202311805578.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-12-26
AI Technical Summary
Existing technologies are insufficient to improve the bearing capacity of the soil at the pile tip in low-permeability cohesive soils. Mechanical compression and pile bottom pressure grouting methods are not very effective, and residual grout residue in bored piles affects the bearing capacity at the pile tip.
An expansion material block is placed at the bottom of the pile. It absorbs pore water and expands in volume, squeezing the soil layer at the pile tip to drain and consolidate, thereby improving the soil bearing capacity and reducing compressibility.
It effectively improves the bearing capacity of the soil at the pile tip, reduces pile settlement, improves the problem of sediment at the pile tip of bored cast-in-place piles, and is simple to construct, low in cost, and improves project quality.
Smart Images

Figure CN117822545B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of foundation treatment and pile foundation construction technology, and specifically relates to a high bearing capacity pile. Background Technology
[0002] Improving the bearing capacity of the soil at the pile tip is an effective method to increase the pile's bearing capacity. This is especially true when the pile tip is located in a shallow bearing layer where the pile's bearing capacity is slightly insufficient, and the next bearing layer is separated from it by a thick layer of soft soil. If the soil at the pile tip of the shallow bearing layer can be modified to increase its bearing capacity, thereby improving the pile's bearing capacity to meet engineering requirements, the pile length can be significantly reduced, thus significantly lowering engineering costs.
[0003] Currently, the main methods for improving the bearing capacity of soil at the pile tip are mechanical compression and pressure grouting at the pile bottom. However, both methods are technically complex and relatively expensive. In particular, these two methods are less effective for low-permeability cohesive soils. Low-permeability cohesive soils can hardly drain during the short period of mechanical compression, thus failing to achieve soil consolidation and compaction, and therefore cannot improve soil strength, i.e., cannot effectively improve the pile's bearing capacity. In low-permeability soils, pressure grout cannot form a uniform seepage flow; instead, it flows along paths with low resistance, such as cracks. The grout flow direction is uncontrollable, therefore it cannot form a uniform solidified soil mass at the pile tip, and thus cannot effectively and reliably improve the pile's bearing capacity.
[0004] During the construction of bored piles, mud slurry is often used to prevent borehole wall collapse. After drilling, a reinforcing cage is placed, and concrete is poured to form the pile. With current engineering technology, it is difficult to avoid the presence of a certain thickness of residual soil and rock slurry at the bottom of the pile. The presence of this residual slurry prevents the pile tip bearing capacity from being fully utilized, thus affecting the overall bearing capacity of the bored pile. Summary of the Invention
[0005] The purpose of this invention is to provide a high bearing capacity pile. By setting a block made of an expansive material at the bottom of the pile, after the pile is installed, the expansive material block absorbs pore water in the soil layer at the pile tip within the designed time, and then expands in volume, squeezing the soil layer at the pile tip to drain and consolidate it, thereby improving the bearing capacity of the soil at the pile tip and reducing its compressibility, thereby improving the bearing capacity of the pile and reducing the settlement of the pile.
[0006] The objective of this invention can be achieved through the following technical solution: a high bearing capacity pile, the high bearing capacity pile comprising a pile body and an expansion material block located at the bottom end of the pile body.
[0007] Preferably, the expanded material block comprises the following components: a material containing active aluminum, a material containing calcium, and a material containing sulfate. The proportions of the material containing active aluminum, calcium, and sulfate in the expanded material are such that it produces ettringite-like hydrates upon hydration. The material containing active aluminum is selected from one or more of aluminate cement, sulfoaluminate cement, alunite, calcium aluminate, and polyaluminum. The material containing calcium is selected from one or more of quicklime, hydrated lime, and carbide slag. The material containing sulfate is selected from one or more of gypsum and sodium sulfate.
[0008] Preferably, the preparation method of the expanded material block specifically includes the following steps: grinding each component raw material into powder and mixing them to obtain a mixed powder, and then pressing the mixed powder using a pressure molding method to obtain a density ≥1500kg / m³. 3 The expanded material block.
[0009] Preferably, the expanded material block also includes a non-aqueous liquid, which is selected from one or more of waste engine oil, anhydrous ethanol, and glycerin, and the mass of the non-aqueous liquid is 0.1-10% of the mass of the expanded material. The reason for adding a non-aqueous liquid to the raw materials of the expanded material block in this invention is mainly to facilitate compaction.
[0010] Preferably, the surface of the expanded material block is treated with a hydrophobic coating, which is a thin film coating; the thin film can be selected from kraft paper, PVA water-soluble film, and gum arabic film.
[0011] Preferably, the pile body includes precast piles, driven cast-in-place piles, cast-in-place concrete piles that can maintain stability of the hole wall without the need for mud slurry protection after the pile hole is formed, and cast-in-place concrete piles using mud slurry protection.
[0012] Preferably, the system also includes a load-bearing device comprising an upper end plate and a lower end plate. The upper end plate is connected to the bottom surface of the pile body, and a support member is provided between the upper and lower end plates to separate them, forming an installation space. The expansion material block is disposed within this installation space. In this invention, the load-bearing device functions to bear the force acting on the pile end when the pile body connected to the expansion material block is implanted into the soil, thus preventing the expansion block from bearing a load and protecting it from damage.
[0013] The second objective of this invention is to provide a method for preparing a high-bearing-capacity pile, the method specifically including the following steps: the pile body is a precast pile, an expansion material block is placed in a bearing device, the bearing device is placed at the bottom end of the precast pile, and the precast pile and bearing device are implanted into the soil to the designed depth by static pressure, hammering or vibration methods.
[0014] The third objective of this invention is to provide a method for preparing a high-bearing-capacity pile. The method specifically includes the following steps: the pile body is a driven cast-in-place pile; an expansion material block is placed in a bearing device; the bearing device is placed at the bottom of a steel pipe and the lower end of the steel pipe is sealed; the steel pipe and the bearing device are driven into the soil to the designed depth using static pressure, hammering, or vibration methods; a reinforcing cage can be installed in the steel pipe and concrete can be poured, or concrete can be poured directly in the steel pipe; as the concrete is poured, the steel pipe is gradually pulled out until the concrete is poured to the top elevation of the pile, thus completing the construction of the concrete pile.
[0015] The fourth objective of this invention is to provide a method for preparing a high-bearing-capacity pile. The method specifically includes the following steps: the pile body is a cast-in-place concrete pile that can remain stable without mud slurry protection after the pile hole is formed; an expansion block is directly placed at the bottom of the pile hole before subsequent pouring work is carried out; or, the pile body is a cast-in-place concrete pile that can remain stable without mud slurry protection after the pile hole is formed; a load-bearing device with an internal expansion material block is fixed to the bottom end of the reinforcing cage; the load-bearing device is placed at the bottom of the pile hole using a conventional method of placing the reinforcing cage; and then concrete is poured.
[0016] The fifth objective of this invention is to provide a method for preparing a high bearing capacity pile, the method specifically including the following steps: the pile body is a cast-in-place concrete pile with mud slurry wall protection, an expansion material block is placed in a bearing device and the bearing device is fixed to the bottom of the reinforcing cage, the bearing device is placed at the bottom of the pile hole using a conventional method of placing the reinforcing cage, and then concrete is poured.
[0017] Compared with the prior art, the present invention has the following advantages:
[0018] 1. This invention provides a high bearing capacity pile, which is made of an expansive material and is installed at the bottom end of the pile. After the pile is installed, the expansive material block absorbs pore water in the soil layer at the pile tip within the design time and then expands in volume, squeezing the soil layer at the pile tip to drain and consolidate it, thereby improving the bearing capacity of the soil at the pile tip and reducing its compressibility, thereby improving the bearing capacity of the pile and reducing the settlement of the pile.
[0019] 2. This invention can also improve the problem of insufficient bearing capacity of bored cast-in-place piles caused by pile tip sediment.
[0020] 3. The expansion material block and load-bearing device of this invention can be pre-customized in the factory according to requirements, and can be installed on site through simple assembly, which effectively improves the construction speed and the quality of the project. The implementation technology of this invention is simple, the construction is convenient, and the cost is relatively low compared with the existing technology; thus, it can significantly reduce the project cost. Attached Figure Description
[0021] Figure 1This is a schematic diagram of the vertical cross-section of a precast pile and its load-bearing device;
[0022] Figure 2 This is a schematic diagram showing the connection between the steel pipe and the load-bearing device during the construction of driven cast-in-place piles;
[0023] Figure 3 yes Figure 2 A schematic diagram of the cross-sectional structure of the connection between the steel pipe and the load-bearing device;
[0024] Figure 4 This is a schematic diagram of a connection between a reinforced concrete cast-in-place pile that requires mud slurry wall protection and a load-bearing device.
[0025] Figure 5 yes Figure 4 Schematic diagram of the cross-sectional structure of the load-bearing device;
[0026] Figure 6 This is a schematic diagram of the vertical cross-sectional structure of Embodiment 2 of the load-bearing device;
[0027] Figure 7 This is a cross-sectional structural diagram of Embodiment 2 of the load-bearing device;
[0028] Figure 8 This is a schematic diagram of the vertical cross-sectional structure of Embodiment 3 of the load-bearing device;
[0029] Figure 9 This is a cross-sectional structural diagram of Embodiment 3 of the load-bearing device.
[0030] In the figure, the upper end plate is 100; the lower end plate is 101; the expansion material block is 103; the support tube is 104; the pile body is 106; the water-permeable hole is 107; the conical rib is 108; the abutment column is 109; the abutment rib is 110; the limit bolt is 112; the steel cage is 113; and the steel pipe is 200. Detailed Implementation
[0031] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below.
[0032] A specific embodiment of the present invention provides a high bearing capacity pile, which includes a pile body and an expansion material block located at the bottom end of the pile body.
[0033] In this invention, the bulk material made of the expanding material needs to meet the following basic technical requirements:
[0034] 1. It should be able to produce a sufficiently large expansion amount;
[0035] To increase the bearing capacity of cohesive soil layers, the layers must undergo compression deformation of several centimeters to tens of centimeters. This requires the expansive material blocks to expand significantly. However, due to limitations in pile-laying technology, the volume of the expansive material blocks cannot be very large. Therefore, the expansive material blocks used must possess a sufficiently high expansion capacity. The specific required expansion capacity of the expansive material blocks needs to be determined based on the soil conditions at the pile bottom.
[0036] 2. It should be able to provide sufficient expansion stress;
[0037] The expansion of the expansion material block under the pile tip is not free expansion, but expansion under the confining pressure of the soil at the pile bottom. This requires that the compressive force generated during the expansion process of the expansion material block be greater than the resistance of the original pile bottom bearing layer, so as to achieve compaction of the original pile bottom bearing layer, thereby enabling the pile bottom bearing layer to achieve higher density, strength and stiffness.
[0038] 3. Long-term strength, stiffness, and durability must meet the requirements;
[0039] The requirement is that the hydrates produced by the expanding material can ensure the stability of the strength, stiffness and durability required for the bearing capacity of the pile bottom throughout the service life of the building (structure).
[0040] 4. It has a controllable and appropriate expansion time;
[0041] The expansion material blocks should achieve volume expansion within the designed timeframe. Significant expansion should only begin after the pile concrete has reached adequate strength; for example, for precast piles, the expansion material blocks can begin expanding immediately after pile construction; however, for cast-in-place concrete piles, expansion should only begin after the concrete has reached basic strength (e.g., three days later). If expansion occurs while the concrete is still in its plastic stage, the expansion energy will be consumed in the plastic deformation of the concrete, failing to achieve the effect of compacting the soil at the pile tip. Therefore, the expansion material blocks must have a certain degree of delayed expansion performance. The expansion completion time is generally controlled within 28 days (pile construction quality inspection or pile bearing capacity testing is usually conducted at this time).
[0042] 5. The construction process can ensure volume stability and integrity;
[0043] Before the expansion material is placed in the designated location, it must not be damaged or deformed in volume under the influence of groundwater in the pile hole or the impact and collision during the pile construction process.
[0044] 6. Good economic benefits;
[0045] The cost is low, including material costs, material processing costs, and additional labor costs during construction.
[0046] The expanded material block comprises the following components: a material containing active aluminum, a material containing calcium, and a material containing sulfate. The proportions of the material containing active aluminum, calcium, and sulfate in the expanded material are such that it can produce ettringite-like hydrates upon hydration. The material containing active aluminum includes, but is not limited to, aluminate cement, sulfoaluminate cement, alunite, calcium aluminate, and polyaluminum; the material containing calcium includes, but is not limited to, quicklime, hydrated lime, and carbide slag; and the material containing sulfate includes, but is not limited to, gypsum and sodium sulfate.
[0047] The term "ettringite-type expanding components" refers to the expanding hydrates produced after their hydration reaction. These include high-sulfur calcium sulfoaluminate hydrate, low-sulfur calcium sulfoaluminate hydrate, calcium chloroaluminate hydrate, calcium aluminocarbonate hydrate, and other hydrated products obtained by replacing some ions in their crystal lattice with other ions. These various hydrates can be generated in multiple ways, and their solid phase volume increases during formation. Taking high-sulfur calcium sulfoaluminate hydrate as an example, its reaction chemical formulas include, but are not limited to, the following:
[0048] C3A+3(CaSO4·2H2O)+26H2O=3CaO·Al2O3·3CaSO4·32H2O
[0049] C2A+3(CaSO4·2H2O)+Ca(OH)2+25H2O=3CaO·Al2O3·3CaSO4·32H2O
[0050] CA+3(CaSO4·2H2O)+2Ca(OH)2+24H2O=3CaO·Al2O3·3CaSO4·32H2O
[0051] 4CaO·3Al2O3·CaSO4+8CaSO4+5CaO+96H2O=3(3CaO·Al2O3·3CaSO4·32H2O)
[0052] Al2O3+3Ca(OH)2+3CaSO4+29H2O=3CaO·Al2O3·3CaSO4·32H2O
[0053] 2AlO 2- +4OH - +30H2O+6Ca 2+ +3SO4 2- = 3CaO·Al2O3·3CaSO4·32H2O
[0054] 2Al 3+ +3SO4 2- +6Ca 2+ +12OH -+26H2O=3CaO·Al2O3·3CaSO4·32H2O
[0055] Therefore, it can be seen that calcium sulfoaluminate hydrate can be generated under certain conditions by combining suitable substances containing active aluminum and calcium components with sulfates. This includes, but is not limited to, the following compositions: using calcium sulfoaluminate hydrate produced by the hydration of aluminate cement as the aluminum-containing phase, and then adding appropriate amounts of calcium phases such as calcium oxide and sulfates such as calcium sulfate; or using calcium sulfoaluminate hydrate produced by the hydration of sulfoaluminate cement and the calcium sulfoaluminate hydrate produced by hydration as the aluminum-containing phase, and then adding appropriate amounts of calcium phases such as calcium oxide and sulfates such as calcium sulfate. Alternatively, it can be composed of industrial waste residues containing various effective components: waste residue containing active aluminum + waste residue containing calcium oxide + waste residue containing sulfates. For example: polyaluminum (such as [Al2(OH)2]). n Cl 6-n ] m [AL2(OH)] n (SO4) 3-n / 2 ] m An expansion material can also be formed by appropriately proportioning waste residue containing polyaluminum oxide, waste residue containing calcium oxide or calcium hydroxide (such as carbide slag), and waste residue containing sulfate (such as phosphogypsum); waste residue containing activated alumina (such as fly ash and calcined coal gangue after pre-hydration and calcination), waste residue containing calcium oxide or calcium hydroxide (such as carbide slag), and waste residue containing sulfate (such as desulfurization gypsum); smelting slag containing activated calcium aluminate (such as refined steel slag), waste residue containing calcium oxide (such as carbide slag), and titanium gypsum; or a mixture containing alum powder (KAl(SO4)2·12H2O), waste residue containing calcium oxide or calcium hydroxide (such as carbide slag), and fluorogypsum. Various commercially available concrete expansion agents can also be used as expansion materials.
[0056] The different materials mentioned above have varying contents of active ingredients, resulting in different expansion amounts of their hydration products; the expansion rates of ettringite obtained through various formation pathways also differ. Appropriate compositions and reaction pathways for ettringite can be selected based on the specific engineering requirements for expansion amount and rate.
[0057] Specifically, the preparation method of the expanded material block includes the following steps: grinding each component raw material into powder and mixing them to obtain a mixed powder, and then pressing the mixed powder using a pressure molding method to obtain a density ≥1500kg / m³. 3The expansion material blocks should be selected to ensure an expansion rate of no less than 30% under a confining pressure of at least 800 kPa. The density of the expansion material blocks significantly affects their expansion rate under the working confining pressure. If the density of the expansion blocks is low, the volume expansion of ettringite under the working confining pressure will be largely used to fill the internal pores of the expansion blocks, thus reducing their external expansion. The shape and size of the cross-section of the expansion material blocks should be compatible with the shape and size of the pile's cross-section; the height of the expansion blocks should not exceed 1.5 times the pile's diameter or short side dimension, and should be determined by the designer through testing based on the required compression deformation applied to the soil layer at the pile tip, the expansion rate of the selected expansion material, and the compaction density of the expansion blocks.
[0058] In a specific embodiment, the expanded material block also includes a non-aqueous liquid, the mass of which is 0.1-10% of the mass of the expanded material. The non-aqueous liquid includes, but is not limited to, waste engine oil, anhydrous ethanol, and glycerin. The addition of a non-aqueous liquid to the raw materials of the expanded material block is primarily for ease of compaction.
[0059] The expansion material block's initiation and completion times are limited. In a specific embodiment, the surface of the expansion material block undergoes a hydrophobic treatment, which is a thin film coating. The thin film includes, but is not limited to, kraft paper, PVA water-soluble film, and gum arabic film.
[0060] The expansion material block only begins to react upon contact with water; therefore, controlling the contact time between the block and water controls the expansion time. The moisture-blocking effect of the coating layer weakens after a period of time, triggering the expansion reaction. If the coating layer fails at any point in its water-blocking action, the hydration and expansion of the expansion material will tear the coating layer, leading to its failure. The selection of the coating layer is determined through experimentation based on the specific geological conditions, pile-laying process, and required water-blocking time. Applying a protective film to the exterior of the expansion material can also maintain its volume stability and integrity during construction.
[0061] In a specific embodiment, a load-bearing device is also included, comprising an upper end plate 100 and a lower end plate 101, with the upper end plate 100 connected to the bottom end face of the pile. A support member is provided between the upper end plate 100 and the lower end plate 101, separating them and forming an installation space. An expansion material block 103 is placed within the installation space. All components of the load-bearing device are made of materials with sufficient strength and rigidity. The planar shape and dimensions of the upper end plate 100 and the lower end plate 101 should preferably be consistent with the outer shape and dimensions of the pile's cross-section. The thickness of the upper end plate 100 and the lower end plate 101, as well as the transverse interface dimensions of the support member, are determined by mechanical calculations based on the loads experienced at the pile end during the pile formation process. The height of the support member corresponds to the designed height of the expansion block. In a specific embodiment, a tapered rib 108 is fixedly provided at the lower end of the lower end plate. The function of the load-bearing device is to bear the force acting on the pile end when the pile body together with the expansion material block is implanted into the soil so that the expansion block does not bear the load, thereby ensuring that the expansion material block is not damaged.
[0062] In a specific embodiment, the support includes a ring-shaped support tube 104, with an upper end plate 100 and a lower end plate 101 respectively disposed on the two end faces of the support tube 104. The connection between the upper end plate 100 and / or the lower end plate 101 and the support tube 104 can be detached under the expansion force generated when the expansion material block expands. The upper end plate 100, the lower end plate 101 and the support tube 104 form an installation space, and a plurality of water-permeable holes 107 communicating with the installation space are provided on the outer peripheral surface of the support tube 104.
[0063] In a specific embodiment, the support includes an abutment post 109 disposed between the upper end plate 100 and the lower end plate 101. The two end faces of the abutment post 109 are respectively connected to the center of the upper end plate 100 and the center of the lower end plate 101. The connection between the upper end plate 100 and / or the lower end plate 101 and the abutment post 109 can be detached under the expansion force generated when the expansion material block expands. The upper end plate 100, the lower end plate 101 and the abutment post 109 form an installation space, and the expansion material block with a hole in the center is fitted onto the abutment post.
[0064] In a specific embodiment, the support member includes at least two abutting ribs 110 that are spaced apart between the upper end plate 100 and the lower end face and extend outward from the center. The spaced distribution of multiple abutting ribs 110 can ensure uniform force distribution. The two end faces of the abutting ribs 110 are respectively connected to the center of the upper end plate 100 and the center of the lower end plate 101. The connection between the upper end plate 100 and / or the lower end plate 101 and the abutting ribs 110 can be detached under the expansion force generated when the expansion material block expands. The upper end plate 100, the lower end plate 101 and the abutting ribs 110 form an installation space, and the expansion material block 103 is disposed between two adjacent abutting ribs 110.
[0065] When applied to precast piles, the bearing device can be placed directly at the bottom of the pile, and the precast pile can be pressed vertically onto the bearing device to carry out the construction of high bearing capacity piles. However, for greater reliability, precast piles usually have embedded iron plates on the end face, which can be welded to the reserved iron plate on the bottom end face of the precast pile.
[0066] When applied to driven pipe piles, the bearing device can be directly placed at the bottom of the steel pipe, with the steel pipe pressing vertically onto the bearing device. The bearing device completely seals the lower end of the steel pipe, allowing for the construction of high-bearing-capacity piles. To strengthen the stable connection between the upper end plate 100 and the steel pipe in the bearing device, a limit bolt 112 is installed on the upper end plate 100. When the steel pipe 200 is connected to the upper end plate 100, the inner wall of the steel pipe abuts against the limit bolt 112.
[0067] For solidified soil reinforced core composite piles, after the solidified soil pile construction is completed, depending on whether a precast pile or a driven cast-in-place pile is actually inserted into the solidified soil, one of the above two construction methods can be selected to carry out the construction method of inserting reinforced core material piles into the solidified soil.
[0068] For cast-in-place concrete piles that can remain stable without mud slurry protection after the pile hole is formed, expansion blocks are directly placed at the bottom of the pile hole before subsequent pouring. Under these conditions, the radial expansion of the expansion material blocks can be constrained by materials with sufficient rigidity and strength on the sidewalls. Alternatively, for cast-in-place concrete piles that can remain stable without mud slurry protection after the pile hole is formed, the load-bearing device with the built-in expansion material blocks is fixed to the bottom of the reinforcing cage. The load-bearing device is placed at the bottom of the pile hole using conventional methods for placing the reinforcing cage, and then concrete is poured.
[0069] For cast-in-place concrete piles using mud slurry wall protection, expansion material blocks can be placed in the bearing device. The cross-sectional dimensions of the bearing device containing the expansion material blocks can be set to be similar to the cross-sectional dimensions of the reinforcing cage. The bearing device is then fixed (welded) to the bottom of the reinforcing cage. The bearing device is placed at the bottom of the pile hole using the conventional method of placing the reinforcing cage. During the process of sinking the bearing device to the bottom of the pile hole, the wall protection mud below the bearing device in the pile hole can flow through the gap between the reinforcing cage and the pile hole wall. Then, the concrete for the cast-in-place pile can be poured in the conventional method of underwater concrete pouring.
[0070] The innovative aspects of this invention will be illustrated below with reference to specific embodiments.
[0071] Example 1
[0072] The geological conditions of a certain project are as follows: sandy silt within 21m, slightly dense to medium dense, with a moisture content of 25.8% to 28.7%; the pile type is driven reinforced concrete cast-in-place pile, with a pile diameter of 500mm and a pile length of 12m. The pile side friction is 16 to 20kPa, and the pile end resistance below 10m is 1000kPa.
[0073] An expansion device, consisting of a load-bearing structure and an expansion material block, is installed at the bottom of the pile. It has a diameter of 500mm and a height of 300mm. Figure 2 , Figure 3 As shown, the load-bearing device is made of steel and includes an upper end plate 100 and a lower end plate 101. The upper end plate 100 is connected to the steel pipe 200. A support member is provided between the upper end plate 100 and the lower end plate 101. The support member is a steel support tube 104 with a diameter of 500 mm and a height of 300 mm. The upper end plate 100 and the support tube 104 are welded together. The support tube 104 has a wall thickness of 1 cm and has laser-cut 0.1 mm wide and 12 cm long slits with a circumferential spacing of 1 cm and a 2 cm spacing between the upper and lower rows of slits, serving as water permeable holes 107. The support tube 104 separates the upper end plate 100 and the lower end plate 101, forming an installation space between them. An expansion material block 103 is installed in the installation space. The lower end plate 101 and the tube 104 are temporarily fixed with tape. When the expansion material block 103 expands when it comes into contact with water, the resulting expansion force can separate the lower end plate 101 from the tube 104. A tapered rib 108 is fixedly installed on the bottom surface of the lower end plate 101.
[0074] The raw materials for the expanded material blocks include 19 wt% aluminate cement clinker, 16 wt% calcium oxide, and 65 wt% soluble anhydrous gypsum produced by high-temperature calcination of desulfurized gypsum. The three powdered materials are mixed and stirred evenly in a specific ratio. 5 wt% of waste engine oil is then added to the mixture and stirred until homogeneous. The mixture is then placed in a pressing mold and pressed tightly using a press, maintaining pressure for a period of time until the density of the expanded material is not less than 2500 kg / m³.3 The material is then slowly depressurized and demolded to form an expanded material block. It is then sealed and wrapped in kraft paper of appropriate thickness for later use. The kraft paper serves as a short-term waterproof barrier, preventing water from contacting the expanded material during piling. After piling is completed, water gradually soaks through the kraft paper. Upon contact with the expanded material, the water begins to expand, further tearing the kraft paper. Subsequently, the expanded material block gradually absorbs groundwater, continuously expanding in volume. Tests show that under a confining pressure of 1.2 MPa, the volume expansion of this expanded material block is 1.7 times its original volume.
[0075] The basic method of pile driving is as follows: Prepare the expansion material block 103 and process the bearing device according to the above method. Insert the expansion material block 103 into the bearing device. Place the expansion device composed of the bearing device and the expansion material block 103 on the designed pile position. Lift the steel pipe and place it on the expansion device. The steel pipe is placed on the top end cap and inserted outside the limit bolt 112. Use a static pressure pile driver to press the steel pipe into the depth required by the design. Then insert the reinforcing cage and pour concrete. As the concrete is continuously poured in, the steel pipe is slowly pulled up until the concrete is poured to the top of the pile. The steel pipe is then completely pulled out, thus completing the construction of a concrete cast-in-place pile.
[0076] Meanwhile, as a comparison, conventional driven reinforced concrete piles of the same specifications were also made. To ensure consistency with the conditions of this invention, the size of the pile head at the pile end is consistent with the size of the expansion device.
[0077] Thirty days after the pile driving was completed, a load test was conducted, and the test results are as follows:
[0078] The bearing capacity of a conventional driven cast-in-place pile is 1200 kN, with a corresponding settlement of 15.35 mm. The driven cast-in-place pile using the present invention has a bearing capacity of 1500 kN, with a corresponding settlement of 18.55 mm.
[0079] Example 2
[0080] The geological conditions of a certain project are as follows: 7m of silty clay with a water content of 52.8% and a pile side friction of 6kPa; 7-24m of silty clay with a water content of 25.8%-30.3%; pile side friction of 16-22kPa and pile end resistance of 1300kPa. The pile type used is PHC500(100)BA precast pipe pile with a diameter of 500mm, a wall thickness of 100mm, and a length of 22m.
[0081] An expansion device consisting of a load-bearing structure and an expansion material block is installed at the bottom of the pile. The load-bearing structure has a diameter of 500mm and a height of 500mm. Figure 6 , Figure 7As shown, the device includes an upper end plate 100 and a lower end plate 101. A support member is provided between the upper end plate 100 and the lower end plate 101. The support member consists of two steel abutment ribs 110, which are spaced apart between the upper end plate 100 and the lower end plate and extend outward from the center. The spaced distribution of the two abutment ribs 110 ensures uniform force distribution. The two end faces of the abutment ribs 110 are connected to the center of the upper end plate 100 and the center of the lower end plate 101, respectively. A groove with a corresponding cross-sectional size is provided on the lower surface of the upper end plate or the upper surface of the lower end plate, into which the abutment post or abutment rib is inserted. An installation space is formed between the upper end plate 100, the lower end plate 101, and the abutment ribs 110. An expansion material block 103 is provided between two adjacent abutment ribs 110. A tapered rib 108 is fixedly provided on the bottom surface of the lower end plate 101.
[0082] The raw materials for the expanded material block consist of 37 wt% sulfoaluminate cement clinker; 15 wt% soluble anhydrous lime made from calcined carbide slag; and 48 wt% soluble anhydrous gypsum made from phosphogypsum calcined at high temperature. These three powder materials are mixed and stirred evenly in a specific ratio. Anhydrous ethanol (10 wt% of the total powder content) is added to the mixture and stirred until homogeneous. The mixture is then placed in a custom-made pressing mold and pressed tightly using a press, maintaining pressure for a period of time until the density of the expanded material is not less than 2300 g / cm³. 3 The material was then slowly depressurized and demolded to form an expandable material. This expandable material was then vacuum-sealed with a PVA water-soluble membrane of appropriate thickness for later use. The PVA water-soluble membrane served as a short-term water barrier, preventing water from contacting the expandable material during piling. After piling was completed, the PVA water-soluble membrane dissolved and ruptured, allowing water to contact the expandable material block and further tear the PVA water-soluble membrane. Subsequently, the expandable material block gradually absorbed groundwater, continuously expanding in volume. Tests showed that under a confining pressure of 1.5 MPa, the volume of the expandable material block increased to 1.6 times its original volume.
[0083] The basic method of pile driving is as follows: The expansion material block 103 is prepared using the method described above, and a bearing device is fabricated. The expansion material block 103 is then installed into the bearing device. Next, high-elastic fiberglass cloth is used to wrap its sidewalls circumferentially, forming a radial constraint on the expansion material block 103, so that the expansion force generated by the expansion material block 103 acts more downwards onto the soil at the pile tip. The expansion device, consisting of the bearing device and the expansion material block 103, is placed at the designed pile location. The upper end plate 100 of the bearing device is connected to the bottom of the precast pipe pile. The precast pile, along with the expansion device, is driven into the soil at the designed 22m position using a hammer.
[0084] Meanwhile, as a comparison, conventional PHC500(100)BA precast pipe piles of the same specifications were also made. In order to ensure consistency with the conditions of the present invention, the pile ends were also provided with pile heads of the same size as the expansion device.
[0085] Thirty days after the pile driving was completed, a load test was conducted, and the results are as follows:
[0086] The ultimate bearing capacity of a conventional PHC500(100)BA precast pipe pile is 2000kN, with a corresponding settlement of 12.85mm. The ultimate bearing capacity of a cast-in-place pile using the present invention is 2500kN, with a corresponding settlement of 17.74mm.
[0087] Example 3
[0088] The geological conditions of a certain project are as follows: 14m silty clay, fluid plastic, water content 60.7%, side friction 5kPa; 14-16m gravelly sand, medium dense, side friction 26kPa; 16-23m rounded gravel, medium dense, side friction 35kPa; 23-37m silty clay, plastic, water content 35.8%, side friction 19kPa; pile end resistance below 23m is 900kPa; the pile type is a bored reinforced concrete cast-in-place pile requiring mud slurry wall protection, with a pile diameter of 600mm, a reinforcing cage diameter of 500mm, and a pile length of 35m.
[0089] An expansion device consisting of a load-bearing structure and an expansion material block is installed at the bottom of the pile. The load-bearing structure has a diameter of 500mm and a height of 400mm, matching the size of the reinforcing cage. Figure 8 , Figure 9 As shown, the load-bearing device is made of steel and includes an upper end plate 100 and a lower end plate 101. A support member, a steel abutment column 109, is provided between the upper end plate 100 and the lower end plate 101. The upper end plate 100 and the steel abutment column 109 are welded together. The steel abutment column 109 separates the upper end plate 100 and the lower end plate 101, forming an installation space between them. An expansion material block 103 is placed in the installation space. A groove with the same size as the steel abutment column 109 is cut out at the center of the upper surface of the lower end plate 101 and inserted into it to restrict horizontal movement. The steel abutment column 109 and the lower end plate are temporarily fixed with tape. When the expansion material block 103 expands when it comes into contact with water, the resulting expansion force can separate the lower end plate 101 from the steel abutment column 109.
[0090] The raw materials for the expanded material block consist of 28 wt% calcium aluminate; 18 wt% soluble anhydrous lime made from calcined quicklime; and 54 wt% soluble anhydrous gypsum made from titanium gypsum through high-temperature calcination. These three powdered materials are mixed and stirred evenly in a specific ratio. Then, 5 wt% of liquid glycerin is added to the mixture and stirred until homogeneous. The mixture is then placed in a pressing mold and compacted using a press, maintaining pressure for a period of time until the density of the expanded material is not less than 2400 kg / m³. 3The material is then slowly depressurized and demolded to produce the expanding material. It is then vacuum-wrapped with a water-soluble film of suitable thickness made of gum arabic. The water-soluble film acts as a short-term water barrier, preventing water from contacting the expanding material block within a specified time. When the cast-in-place concrete reaches a certain strength, the moisture at the pile bottom gradually decomposes the gum arabic film. Upon contact with water, the expanding material block begins to expand, further tearing the gum arabic film. The expansion of the expanding material block compresses the residue at the pile bottom, increasing the amount of expansion at the pile bottom. Laboratory tests show that under a confining pressure of 1.3 MPa, the volume of the expanding material block expands to 1.4 times its original volume.
[0091] The basic method of pile driving is as follows: Prepare the expansion material block 103 and process the bearing device according to the above method. Insert the expansion material block 103 into the bearing device. Insert the steel abutment column 109 into the groove of the lower end plate 101 and temporarily fix it with tape. Weld the upper end plate of the bearing device with the built-in expansion material block to the reinforcing cage 113. Place it together with the reinforcing cage into the pile hole filled with mud. As the reinforcing cage descends, the mud in the lower part of the bearing device is discharged to the upper part of the bearing device through the gap between the bearing device and the pile wall. Place the reinforcing cage to the design depth. Pour concrete until the top of the pile, thus completing the construction of one concrete cast-in-place pile.
[0092] Meanwhile, as a comparison, conventional drilled reinforced concrete piles of the same specifications were also made. To ensure consistency with the conditions of this invention, a pile head of the same size as the expansion device was welded to the bottom of the reinforcing cage.
[0093] Thirty days after the pile driving was completed, a load test was conducted, and the test results are as follows:
[0094] The ultimate bearing capacity of a conventional bored pile is 3200 kN, with a corresponding settlement of 21.6 mm. The ultimate bearing capacity of the bored pile using this invention is 3800 kN, with a corresponding settlement of 17.34 mm.
[0095] While the disclosure is as stated above, its scope of protection is not limited thereto. Those skilled in the art can make various changes and modifications without departing from the spirit and scope of this disclosure, and all such changes and modifications will fall within the protection scope of this invention.
Claims
1. A high bearing capacity pile, characterized in that, The high bearing capacity pile includes a pile body and an expansion material block located at the bottom of the pile body. The expansion material block includes the following components: a material containing active aluminum, a material containing calcium, and a material containing sulfate. The proportions of the active aluminum, calcium, and sulfate components in the expansion material are such that they can produce ettringite-like hydrates upon hydration. The active aluminum component is selected from one or more of aluminate cement, sulfoaluminate cement, alunite, calcium aluminate, and polyaluminum. The calcium component is selected from one or more of quicklime, hydrated lime, and carbide slag. The sulfate component is selected from one or more of gypsum and sodium sulfate. The preparation method of the expansion material block specifically includes the following steps: grinding each component raw material into powder and mixing them to obtain a mixed powder, and then pressing the mixed powder using a pressure molding method to obtain a density ≥1500 kg / m³. 3 The expanded material block.
2. The high bearing capacity pile as described in claim 1, characterized in that, The expanded material block also includes a non-aqueous liquid, which is selected from one or more of waste engine oil, anhydrous ethanol, and glycerin, and the mass of the non-aqueous liquid is 0.1-10% of the mass of the expanded material.
3. The high bearing capacity pile as described in claim 1, characterized in that, The surface of the expanded material block is treated with a hydrophobic coating, which is a thin film coating; the thin film is selected from kraft paper, PVA water-soluble film, and gum arabic film.
4. The high bearing capacity pile as described in claim 1, characterized in that, The pile body includes precast piles, driven cast-in-place piles, cast-in-place concrete piles that can maintain stability of the borehole wall without the need for mud slurry protection after the pile hole is formed, and cast-in-place concrete piles that use mud slurry protection.
5. The high bearing capacity pile as described in claim 1, characterized in that, It also includes a load-bearing device, which includes an upper end plate and a lower end plate. The upper end plate is connected to the bottom surface of the pile body. A support member is provided between the upper end plate and the lower end plate. The support member separates the upper end plate and the lower end plate, forming an installation space between the upper end plate and the lower end plate. The expansion material block is placed in the installation space.
6. A method for preparing a high-bearing-capacity pile as described in any one of claims 1-5, characterized in that, The preparation method specifically includes the following steps: the pile body is a precast pile, the expansion material block is placed in the bearing device, the bearing device is placed at the bottom of the precast pile, and the precast pile and bearing device are implanted into the soil to the designed depth by static pressure, hammering or vibration.
7. A method for preparing a high-bearing-capacity pile as described in any one of claims 1-5, characterized in that, The preparation method specifically includes the following steps: the pile body is a driven pipe cast-in-place pile, the expansion material block is placed in the bearing device, the bearing device is placed at the bottom of the steel pipe and the lower end of the steel pipe is sealed, the steel pipe and the bearing device are driven into the soil to the designed depth by static pressure, hammering or vibration, a steel cage is set in the steel pipe and concrete is poured or concrete is poured directly in the steel pipe, as the concrete is poured, the steel pipe is gradually pulled out until the concrete is poured to the top elevation of the pile, thus completing the construction of the concrete pile.
8. A method for preparing a high-bearing-capacity pile as described in any one of claims 1-5, characterized in that, The preparation method specifically includes the following steps: the pile body is a cast-in-place concrete pile that can remain stable without mud slurry protection after the pile hole is formed; the expansion block is placed at the bottom of the pile hole before subsequent pouring work is carried out; or, the pile body is a cast-in-place concrete pile that can remain stable without mud slurry protection after the pile hole is formed; the load-bearing device with built-in expansion material block is fixed to the bottom end of the reinforcing cage; the load-bearing device is placed at the bottom of the pile hole using the conventional method of placing the reinforcing cage; and then concrete is poured.
9. A method for preparing a high-bearing-capacity pile as described in any one of claims 1-5, characterized in that, The preparation method specifically includes the following steps: the pile body is a cast-in-place concrete pile with mud slurry wall protection, the expansion material block is placed in the bearing device, and the bearing device is fixed to the bottom of the reinforcing cage. The bearing device is placed at the bottom of the pile hole using the conventional method of placing the reinforcing cage, and then concrete is poured.
Citation Information
Patent Citations
Preparation method of core material solidified soil composite pile
CN115852941A
High efficiency ground pile
CN2153578Y