An environmental risk assessment management system
By constructing a three-dimensional map of the power plant's work unit area and conducting hazard factor matching and assessment, an environmental risk assessment management system that focuses on system assessment and is assisted by artificial intelligence has been established to solve the problem of environmental risk assessment in power plants and improve management efficiency and safety. .
Patent Information
- Application Number
- CN202311739888.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-12-15
AI Technical Summary
During the operation of power plants, it is difficult to effectively assess and manage environmental risks in each work link, making it difficult to eliminate potential safety hazards.
By acquiring regional image collections at each work unit area of the power plant, a three-dimensional map is constructed, and a set of risk factors is obtained through matching. Through supplementation and evaluation by the management center, a risk assessment sheet is generated, and an environmental risk assessment-based, artificial-assisted environment risk is established. Assessment management system.
It improves the management efficiency and accuracy of environmental risk assessment of power plants and ensures a safe environment for power plant operations.
Smart Images

Figure CN117852870B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of risk assessment, and in particular to an environmental risk assessment management system. Background Art
[0002] The development of electricity has brought convenience to people's production and life that has not been seen in the past thousand years. Today, electricity plays an important role in social stability and economic development. The operation of a power plant is a very complex systematic process involving a variety of basic equipment. In order to ensure the stability of the operation process, it is necessary to evaluate the risks of the operating environment of each working link in the operation of the power plant and eliminate various safety hazards in the bud.
[0003] Therefore, the present invention provides an environmental risk assessment management system. Summary of the invention
[0004] The present invention provides an environmental risk assessment management system, which is used to construct a corresponding regional three-dimensional map through a set of regional images obtained at each moment according to each working unit area of a power plant, and to match and obtain a corresponding first risk factor set according to all three-dimensional features in each regional three-dimensional map. The first risk factor set is sent to a management center for supplementation and improvement to obtain a second risk factor set and construct a corresponding risk scenario, and to conduct a risk assessment on each risk scenario to obtain a risk assessment sheet, which is sent to a management center to obtain a risk review and assessment sheet, generate a list of important environmental factors, establish an environmental risk assessment management system with system assessment as the main and manual auxiliary assessment, improve the efficiency and accuracy of environmental risk assessment management of power plants, and ensure a safe operating environment for power plants.
[0005] The present invention provides an environmental risk assessment management system, comprising:
[0006] 3D construction module: obtain the corresponding regional 3D map based on the regional image set obtained at each time in each working unit area of the power plant;
[0007] Matching module: based on all the three-dimensional features in the three-dimensional map of each region, matching to obtain the corresponding first risk factor set;
[0008] Supplementation module: sending the first risk factor set to the management center for supplementation and improvement to obtain the second risk factor set;
[0009] Evaluation module: constructing a corresponding dangerous scenario based on the second dangerous factor set, and performing risk assessment on the dangerous scenario to obtain a risk assessment sheet;
[0010] Audit module: Send the risk assessment form to the management center to obtain a risk audit assessment form and generate a list of important environmental factors.
[0011] Preferably, the present invention provides an environmental risk assessment management system, a three-dimensional building block, comprising:
[0012] Unit acquisition unit: Based on the acquisition range of the power plant camera, determine the unit range that meets the no-blind-angle coverage constraint;
[0013] Unit division unit: based on the unit range, the entire working area of the power plant is divided to obtain several working unit areas;
[0014] Collection construction unit: constructs a regional image collection based on the regional images at each moment acquired by all power plant cameras in each work unit area.
[0015] Preferably, the present invention provides an environmental risk assessment management system, a three-dimensional building module, and further comprising:
[0016] Grayscale conversion unit: convert the grayscale values of all regional images in each regional image set to obtain the corresponding grayscale image set;
[0017] Three-dimensional construction unit: Based on the three-dimensional coordinates of each pixel in each grayscale image set, a corresponding three-dimensional map of the area is constructed.
[0018] Preferably, the present invention provides an environmental risk assessment management system, a matching module, comprising:
[0019] A removal unit: determining a minimum grayscale value from the characterization pixels corresponding to each preset risk factor in the preset risk factor set, and removing pixels whose grayscale values in the three-dimensional image of each region are less than the minimum grayscale value;
[0020] Danger judgment unit: based on the processed three-dimensional image of each area and the normal three-dimensional image of the same work unit area, judge whether the processed three-dimensional image and the corresponding normal three-dimensional image are consistent;
[0021] Background removal unit: If the processed 3D image is inconsistent with the corresponding normal 3D image, the background removal unit removes the background from the processed 3D image. Figure 1 The consistent background pixels are obtained to obtain the area map to be identified;
[0022] Color level histogram acquisition unit: acquires the color level histogram of each area map to be identified;
[0023] Peak acquisition unit: obtains the obvious peak of each color level histogram;
[0024] Peak and trough analysis unit: obtains a first threshold value based on the trough between every two adjacent obvious peaks;
[0025] Binarization unit: performs binarization processing on the image of the region to be identified based on each first threshold value to obtain a corresponding binarized image;
[0026] Contour identification unit: Based on all binary images in the same working unit area, identify the most clear contour to be identified in the same coordinates;
[0027] Feature acquisition unit: based on continuous pixel points whose curvature is greater than a preset curvature in each contour to be identified, obtains a number of corresponding three-dimensional features;
[0028] Human body recognition unit: based on all the three-dimensional features corresponding to each contour to be recognized in each working unit area and the preset human body features, it is determined whether the contour to be recognized has a three-dimensional human body feature;
[0029] Human body analysis unit: if the contour to be identified has three-dimensional features of the human body, the corresponding work unit area is determined to be a human work table;
[0030] A human body risk factor acquisition unit: if there is no work in the human work table, the contour to be identified is generated into a first risk factor;
[0031] Risk factor matching unit: if the contour to be identified does not have a three-dimensional human body feature, all three-dimensional features of the contour to be identified are matched with a preset risk factor set to obtain a matched second risk factor and an unmatched third risk factor;
[0032] Risk set construction unit: based on the first risk factor, the second risk factor and the third risk factor, a first risk factor set is constructed.
[0033] Preferably, the present invention provides an environmental risk assessment management system, a supplementary module, comprising:
[0034] Risk factor extraction unit: sending the first risk factor set to the management center, extracting the first risk factor and the third risk factor;
[0035] A manual supplement list construction unit: constructs a manual supplement list based on the contours to be identified and the three-dimensional map of the region corresponding to the first risk factor and the third risk factor;
[0036] Manual feedback acquisition unit: sends the manual supplement list to the manual supplement port to obtain manual supplement feedback;
[0037] The second risk factor set construction unit: constructs the second risk factor set based on the artificially supplemented fourth risk factor and the second risk factor.
[0038] Preferably, the present invention provides an environmental risk assessment management system, an assessment module, comprising:
[0039] A third risk factor set construction unit: constructs a corresponding third risk factor set based on all risk factors of the same work unit area in the second risk factor set;
[0040] Dangerous scenario construction unit: constructing a corresponding dangerous scenario based on the coordinates of each dangerous factor in the third dangerous factor set;
[0041] Risk assessment index calculation unit: based on all risk factors in the dangerous scene, calculate the risk assessment index;
[0042] Risk assessment sheet construction unit: based on the risk assessment index and the corresponding possible dangers, a risk assessment sheet is obtained.
[0043] Preferably, the present invention provides an environmental risk assessment management system, a risk assessment index calculation unit, comprising:
[0044] ;in, Indicates the risk assessment index corresponding to the dangerous scenario; The number of factors representing non-human risk factors in hazardous scenarios; Indicates the non-human risk factors in dangerous scenes. The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of occurrence of non-human risk factors in dangerous scenarios; It indicates the maximum possibility of occurrence of non-human risk factors in dangerous scenarios; Indicates the non-human risk factors in dangerous scenes. The weight of the risk factors; Indicates the number of human risk factors in dangerous scenarios; Indicates the first risk factor of human body in dangerous scene The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of occurrence of human risk factors in dangerous scenes; It indicates the maximum value of the occurrence probability of human risk factors in dangerous scenes; Indicates the first risk factor of human body in dangerous scene The weight of the risk factors; Represents the sum of the occurrence weights of non-human risk factors in dangerous scenarios; Represents the sum of the occurrence weights of human risk factors in dangerous scenarios.
[0045] Preferably, the present invention provides an environmental risk assessment management system, an audit module, comprising:
[0046] Risk review unit: Send the risk assessment form to the management center, conduct manual review on the risk assessment form, and obtain the risk review assessment form;
[0047] A first probability calculation unit: based on the future dangers and danger scenarios in the risk review and assessment form, matches the first probability of the corresponding danger scenario in the historical danger scenario database;
[0048] Probability judgment unit: based on each first probability and preset important probability in the risk review and assessment form, obtain the corresponding future dangers and dangerous scenarios whose first probability is greater than the preset important probability;
[0049] List generation unit: Generates a list of important environmental factors based on all future hazards and corresponding hazard scenarios.
[0050] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0051] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0053] Figure 1 The figure is a structural diagram of an environmental risk assessment management system in an embodiment of the present invention. DETAILED DESCRIPTION
[0054] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0055] Embodiment 1:
[0056] The embodiment of the present invention provides an environmental risk assessment management system, such as Figure 1 As shown, including:
[0057] 3D construction module: obtain the corresponding regional 3D map based on the regional image set obtained at each time in each working unit area of the power plant;
[0058] Matching module: based on all the three-dimensional features in the three-dimensional map of each region, matching to obtain the corresponding first risk factor set;
[0059] Supplementation module: sending the first risk factor set to the management center for supplementation and improvement to obtain the second risk factor set;
[0060] Evaluation module: constructing a corresponding dangerous scenario based on the second dangerous factor set, and performing risk assessment on the dangerous scenario to obtain a risk assessment sheet;
[0061] Audit module: Send the risk assessment form to the management center to obtain a risk audit assessment form and generate a list of important environmental factors.
[0062] In this embodiment, the working unit area refers to a unit area of an image captured within the range of a picture captured without blind spots in the working area of the power plant by analyzing the range of the image captured by the camera in the power plant, wherein the working area of the power plant refers to all areas related to the normal operation of the power plant.
[0063] In this embodiment, the regional image set refers to the set of images acquired at each moment by all power plant cameras in each work unit area.
[0064] In this embodiment, the regional three-dimensional map refers to a three-dimensional image of all equipment in the region and the current environment obtained by analyzing all regional images in each regional image set.
[0065] In this embodiment, the three-dimensional feature refers to continuous pixel points that are obtained by analyzing the three-dimensional image of the region and can represent the characteristics of a segment.
[0066] In this embodiment, the first risk factor set refers to a set of risk factors, three-dimensional features matched to the human body, and three-dimensional features that failed to match successfully, obtained by matching the three-dimensional features of each area with the pre-set three-dimensional features of various risks.
[0067] In this embodiment, the management center refers to a data platform that processes all data of the environmental risk assessment management system and interacts with humans.
[0068] In this embodiment, the second risk factor set refers to a set of manually confirmed risk factors obtained by manually supplementing and improving all risk factors in the first risk factor set, three-dimensional features matched to the human body, and three-dimensional features that failed to match successfully.
[0069] In this embodiment, the dangerous scene refers to a scene of an area marked with dangerous factors constructed according to the coordinates of all dangerous factors in the same work unit area in the second dangerous factor set.
[0070] In this embodiment, risk assessment refers to obtaining the degree of possibility of risk occurrence by calculating all risk factors in the dangerous scene, thereby achieving the purpose of assessing the risk of the work unit area corresponding to the dangerous scene.
[0071] In this embodiment, the risk assessment sheet refers to a sheet including possible dangers and the degree of possibility of the corresponding dangers occurring.
[0072] In this embodiment, the risk review and assessment form refers to a risk assessment form that is sent to a human through a management center, and the risk assessment form is manually reviewed to determine the risks that may occur in the future.
[0073] In this embodiment, the list of important environmental factors refers to the possible future dangers that may occur in the current environmental risk assessment management process and the corresponding dangerous scenarios that may occur. The list of dangerous factors with important reference value in the environment of the power plant is obtained after the probability of occurrence of the dangerous scenarios when historical dangers occur is greater than a certain probability, which is beneficial to the next environmental risk assessment management process.
[0074] The working principle and beneficial effects of the above technical solution are: by constructing a corresponding regional three-dimensional map according to a set of regional images obtained at each moment in each working unit area of the power plant, matching the corresponding first hazard factor set according to all three-dimensional features in the three-dimensional map of each region, sending the first hazard factor set to the management center for supplementation and improvement, obtaining a second hazard factor set and constructing a corresponding hazard scenario, and conducting a risk assessment on each hazard scenario to obtain a risk assessment sheet, sending the risk assessment sheet to the management center to obtain a risk review assessment sheet, generating a list of important environmental factors, establishing an environmental risk assessment management system with system assessment as the main and manual assisted assessment, improving the efficiency and accuracy of environmental risk assessment management of power plants, and ensuring a safe operating environment for power plants.
[0075] Embodiment 2:
[0076] According to the system provided by embodiment 1 of the invention, the three-dimensional building module includes:
[0077] Unit acquisition unit: Based on the acquisition range of the power plant camera, determine the unit range that meets the no-blind-angle coverage constraint;
[0078] Unit division unit: based on the unit range, the entire working area of the power plant is divided to obtain several working unit areas;
[0079] Collection construction unit: constructs a regional image collection based on the regional images at each moment acquired by all power plant cameras in each work unit area.
[0080] In this embodiment, the unit range refers to the area that satisfies the no-blind-angle coverage constraint by determining the area of the acquisition range of the power plant camera.
[0081] In this embodiment, the working area refers to all areas related to the normal operation of the power plant.
[0082] The working principle and beneficial effects of the above technical solution are: by analyzing the acquisition range of the power plant camera, determining the unit range that meets the constraint of no-dead-angle coverage, dividing the entire working area of the power plant according to the unit range, obtaining the working unit area and acquiring the corresponding regional image set, thereby improving the environmental risk assessment management efficiency and accuracy of the power plant.
[0083] Embodiment 3:
[0084] According to the system provided by embodiment 1 of the invention, the three-dimensional building module further includes:
[0085] Grayscale conversion unit: convert the grayscale values of all regional images in each regional image set to obtain the corresponding grayscale image set;
[0086] Three-dimensional construction unit: Based on the three-dimensional coordinates of each pixel in each grayscale image set, a corresponding three-dimensional map of the area is constructed.
[0087] In this embodiment, the grayscale image set refers to a set constructed by converting all regional images in each regional image set into grayscale images.
[0088] The working principle and beneficial effect of the above technical solution are: by converting the grayscale values of all regional images in each regional image set, a corresponding grayscale image set is obtained, and the three-dimensional coordinates of each pixel point in each grayscale image set are combined to obtain a corresponding regional three-dimensional map, which is conducive to the subsequent extraction of three-dimensional features.
[0089] Embodiment 4:
[0090] According to the system provided by embodiment 1 of the invention, the matching module includes:
[0091] A removal unit: determining a minimum grayscale value from the characterization pixels corresponding to each preset risk factor in the preset risk factor set, and removing pixels whose grayscale values in the three-dimensional image of each region are less than the minimum grayscale value;
[0092] Danger judgment unit: based on the processed three-dimensional image of each area and the normal three-dimensional image of the same work unit area, judge whether the processed three-dimensional image and the corresponding normal three-dimensional image are consistent;
[0093] Background removal unit: If the processed 3D image is inconsistent with the corresponding normal 3D image, the background removal unit removes the background from the processed 3D image. Figure 1 The consistent background pixels are obtained to obtain the area map to be identified;
[0094] Color level histogram acquisition unit: acquires the color level histogram of each area map to be identified;
[0095] Peak acquisition unit: obtains the obvious peak of each color level histogram;
[0096] Peak and trough analysis unit: obtains a first threshold value based on the trough between every two adjacent obvious peaks;
[0097] Binarization unit: performs binarization processing on the image of the region to be identified based on each first threshold value to obtain a corresponding binarized image;
[0098] Contour identification unit: Based on all binary images in the same working unit area, identify the most clear contour to be identified in the same coordinates;
[0099] Feature acquisition unit: based on continuous pixel points whose curvature is greater than a preset curvature in each contour to be identified, obtains a number of corresponding three-dimensional features;
[0100] Human body recognition unit: based on all the three-dimensional features corresponding to each contour to be recognized in each working unit area and the preset human body features, it is determined whether the contour to be recognized has a three-dimensional human body feature;
[0101] Human body analysis unit: if the contour to be identified has three-dimensional features of the human body, the corresponding work unit area is determined to be a human work table;
[0102] A human body risk factor acquisition unit: if there is no work in the human work table, the contour to be identified is generated into a first risk factor;
[0103] Risk factor matching unit: if the contour to be identified does not have a three-dimensional human body feature, all three-dimensional features of the contour to be identified are matched with a preset risk factor set to obtain a matched second risk factor and an unmatched third risk factor;
[0104] Risk set construction unit: based on the first risk factor, the second risk factor and the third risk factor, a first risk factor set is constructed.
[0105] In this embodiment, the preset risk factor set refers to a set of risk factors that may occur in the power plant that are preset.
[0106] In this embodiment, the preset risk factors refer to pre-set risk factors that may occur in the power plant.
[0107] In this embodiment, the representative pixel point refers to the pixel point of the grayscale image corresponding to the preset risk factor.
[0108] In this embodiment, the minimum grayscale value refers to the minimum grayscale value of all pixels of the grayscale image corresponding to the preset risk factor.
[0109] In this embodiment, the normal three-dimensional image refers to a three-dimensional image of all the equipment and the current environment in each work unit area under normal operation.
[0110] In this embodiment, the background pixels refer to a set of identical pixel points in the processed three-dimensional image of each region and in the normal three-dimensional image of the same working unit region.
[0111] In this embodiment, the to-be-identified region map refers to the region map after processing, wherein the corresponding normal three-dimensional Figure 1 The consistent background pixels are used to obtain a grayscale 3D image containing only non-background areas.
[0112] In this embodiment, the color level histogram refers to a histogram of all brightness in the to-be-identified region map.
[0113] In this embodiment, the obvious peaks refer to continuous peaks in the color level histogram where the overall image changes dramatically and is very prominent.
[0114] In this embodiment, the trough refers to the lowest point in the color level histogram.
[0115] In this embodiment, the first threshold refers to the valley between every two adjacent obvious peaks.
[0116] In this embodiment, the binarization process refers to converting each pixel in the image into black and white according to a first threshold.
[0117] In this embodiment, the binary image refers to an image obtained by binarizing the to-be-identified region map at each first threshold.
[0118] In this embodiment, the contour to be identified refers to all binary images in the same working unit area, and the contour that is displayed most clearly in the same coordinates is identified.
[0119] In this embodiment, the preset curvature refers to a preset curvature value that can represent a characteristic.
[0120] In this embodiment, the preset human body feature refers to a preset curvature that can represent the characteristics of the human body.
[0121] In this embodiment, the manual work table refers to a work content table that requires manual work in each work unit area.
[0122] In this embodiment, the first risk factor refers to the contour to be identified and the corresponding three-dimensional features that are not working in the human work table of the corresponding work unit area where the contour to be identified has the three-dimensional features of the human body.
[0123] In this embodiment, the second risk factor refers to a risk factor that is successfully matched with a preset risk factor set when the contour to be identified does not have a three-dimensional human body feature.
[0124] In this embodiment, the third risk factor refers to the unsuccessful matching of the to-be-identified contour and the corresponding three-dimensional features when the to-be-identified contour does not have the three-dimensional features of the human body and is matched with the preset risk factor set.
[0125] The working principle and beneficial effects of the above technical solution are as follows: by removing the pixel points whose grayscale values are less than the minimum grayscale value in the preset risk factor set in each area three-dimensional map, removing the background pixels from the processed area three-dimensional map, obtaining the area map to be identified and performing color scale analysis and threshold selection, binarizing the area map to be identified according to the selected threshold to obtain the contour to be identified, obtaining the corresponding three-dimensional features according to the curvature of continuous pixel points of the contour to be identified, comparing the three-dimensional features with the three-dimensional features of the human body to determine whether human-caused danger occurs, matching the three-dimensional features without the three-dimensional features of the human body in the preset risk factor set to obtain the risk factors that are successfully matched and the three-dimensional features that are not successfully matched, constructing the first risk factor set by combining the three-dimensional features with human-caused dangers, the risk factors that are successfully matched and the three-dimensional features that are not successfully matched, thereby improving the efficiency and accuracy of environmental risk assessment management of power plants and ensuring a safe operating environment for power plants.
[0126] Embodiment 5:
[0127] According to the system provided by embodiment 4 of the invention, the supplementary module includes:
[0128] Risk factor extraction unit: sending the first risk factor set to the management center, extracting the first risk factor and the third risk factor;
[0129] A manual supplement list construction unit: constructs a manual supplement list based on the contours to be identified and the three-dimensional map of the region corresponding to the first risk factor and the third risk factor;
[0130] Manual feedback acquisition unit: sends the manual supplement list to the manual supplement port to obtain manual supplement feedback;
[0131] The second risk factor set construction unit: constructs the second risk factor set based on the artificially supplemented fourth risk factor and the second risk factor.
[0132] In this embodiment, the manually supplemented list refers to a list constructed by the contours to be identified and the corresponding three-dimensional features corresponding to the first risk factor and the third risk factor, which cannot be identified by the management center and need to be manually supplemented.
[0133] In this embodiment, the manual supplement port refers to a port for sending the manual supplement list to a human.
[0134] In this embodiment, the artificial supplementary feedback refers to the risk factor corresponding to each three-dimensional feature after artificial supplementation and improvement.
[0135] In this embodiment, the fourth risk factor refers to the risk factor that is manually supplemented and improved in the manual supplement feedback.
[0136] The working principle and beneficial effect of the above technical solution are: by manually supplementing and perfecting complex human risk factors and matching unsuccessful three-dimensional features, accurate risk factors are obtained, thereby improving the accuracy of risk factor identification.
[0137] Embodiment 6:
[0138] According to the system provided by embodiment 1 of the invention, the evaluation module includes:
[0139] A third risk factor set construction unit: constructs a corresponding third risk factor set based on all risk factors of the same work unit area in the second risk factor set;
[0140] Dangerous scenario construction unit: constructing a corresponding dangerous scenario based on the coordinates of each dangerous factor in the third dangerous factor set;
[0141] Risk assessment index calculation unit: based on all risk factors in the dangerous scene, calculate the risk assessment index;
[0142] Risk assessment sheet construction unit: based on the risk assessment index and the corresponding possible dangers, a risk assessment sheet is obtained.
[0143] In this embodiment, the third risk factor set refers to all risk factors in the same work unit area in the second risk factor set.
[0144] In this embodiment, the risk assessment index refers to the degree of possibility of the danger occurring obtained by calculating all the danger factors in the danger scenario.
[0145] The working principle and beneficial effects of the above technical solution are: by analyzing all hazardous factors in the same work unit area, constructing hazardous scenarios, calculating corresponding risk assessment indexes, generating risk assessment sheets, improving the efficiency and accuracy of environmental risk assessment management in power plants, and ensuring a safe operating environment for power plants.
[0146] Embodiment 7:
[0147] According to the system provided by embodiment 6 of the invention, the risk assessment index calculation unit includes:
[0148] ;in, Indicates the risk assessment index corresponding to the dangerous scenario; The number of factors representing non-human risk factors in hazardous scenarios; Indicates the non-human risk factors in dangerous scenes. The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of occurrence of non-human risk factors in dangerous scenarios; It indicates the maximum possibility of occurrence of non-human risk factors in dangerous scenarios; Indicates the non-human risk factors in dangerous scenes. The weight of the risk factors; Indicates the number of human risk factors in dangerous scenarios; Indicates the first risk factor of human body in dangerous scene The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of occurrence of human risk factors in dangerous scenes; It indicates the maximum value of the occurrence probability of human risk factors in dangerous scenes; Indicates the first risk factor of human body in dangerous scene The weight of the risk factors; Represents the sum of the occurrence weights of non-human risk factors in dangerous scenarios; Represents the sum of the occurrence weights of human risk factors in dangerous scenarios.
[0149] In this embodiment, the occurrence weight refers to the relative importance of the harmfulness of the risk factor in the harmfulness of all risk factors. The greater the harmfulness, the greater the occurrence weight.
[0150] The working principle and beneficial effect of the above technical solution are: by calculating the risk assessment index corresponding to the dangerous scenario, the efficiency and accuracy of the environmental risk assessment management of the power plant are improved, and the safe environment of the power plant operation is ensured.
[0151] Embodiment 8:
[0152] According to the system provided by embodiment 1 of the invention, the audit module includes:
[0153] Risk review unit: Send the risk assessment form to the management center, conduct manual review on the risk assessment form, and obtain the risk review assessment form;
[0154] A first probability calculation unit: based on the future dangers and danger scenarios in the risk review and assessment form, matches the first probability of the corresponding danger scenario in the historical danger scenario database;
[0155] Probability judgment unit: based on each first probability and preset important probability in the risk review and assessment form, obtain the corresponding future dangers and dangerous scenarios whose first probability is greater than the preset important probability;
[0156] List generation unit: Generates a list of important environmental factors based on all future hazards and corresponding hazard scenarios.
[0157] In this embodiment, the historical danger scenario database refers to a database containing danger scenarios in which dangers have occurred in history.
[0158] In this embodiment, the first probability refers to the future dangers and danger scenarios in the risk review and assessment form, and the probability of occurrence of corresponding danger scenarios matched in the historical danger scenario database.
[0159] In this embodiment, the preset important probability refers to the probability of a danger occurring that the pre-set dangerous scenario has a significant impact on the safety of the power plant.
[0160] The working principle and beneficial effects of the above technical solution are: by manually reviewing the risk assessment form, a risk review assessment form is obtained, and the future hazards and hazardous environments in the risk review assessment form are matched with the first probability of occurrence of the corresponding hazardous environment in the historical hazardous environment database, and the corresponding future hazards and hazardous environments with a probability greater than the preset importance are obtained to construct a list of important environmental factors of the environment, thereby improving the efficiency and accuracy of the environmental risk assessment management of the power plant and ensuring the safe environment for the operation of the power plant.
[0161] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An environmental risk assessment management system, characterized in that: include: 3D construction module: obtains the corresponding regional 3D map based on the regional image set obtained at each working unit area of the power plant at each moment; Matching module: based on all the three-dimensional features in the three-dimensional map of each region, matching to obtain the corresponding first risk factor set; Supplementation module: sending the first risk factor set to the management center for supplementation and improvement to obtain the second risk factor set; Evaluation module: constructing a corresponding dangerous scenario based on the second dangerous factor set, and performing risk assessment on the dangerous scenario to obtain a risk assessment sheet; Audit module: Send the risk assessment form to the management center to obtain the risk audit assessment form and generate a list of important environmental factors; The matching module includes: A removal unit: determining a minimum grayscale value from the characterization pixels corresponding to each preset risk factor in the preset risk factor set, and removing pixels whose grayscale values in the three-dimensional image of each region are less than the minimum grayscale value; Danger judgment unit: based on the processed three-dimensional image of each area and the normal three-dimensional image of the same work unit area, judge whether the processed three-dimensional image and the corresponding normal three-dimensional image are consistent; Background removal unit: if the processed three-dimensional image and the corresponding normal three-dimensional image are inconsistent, then background pixels consistent with the corresponding normal three-dimensional image are removed from the processed three-dimensional image to obtain a map of the area to be identified; Color level histogram acquisition unit: acquires the color level histogram of each area map to be identified; Peak acquisition unit: obtains the obvious peak of each color level histogram; Peak and trough analysis unit: obtains a first threshold value based on the trough between every two adjacent obvious peaks; Binarization unit: performs binarization processing on the image of the region to be identified based on each first threshold value to obtain a corresponding binarized image; Contour identification unit: Based on all binary images in the same working unit area, identify the most clear contour to be identified in the same coordinates; Feature acquisition unit: based on continuous pixel points whose curvature is greater than a preset curvature in each contour to be identified, obtains a number of corresponding three-dimensional features; Human body recognition unit: based on all the three-dimensional features corresponding to each contour to be recognized in each working unit area and the preset human body features, it is determined whether the contour to be recognized has a three-dimensional human body feature; Human body analysis unit: if the contour to be identified has three-dimensional features of the human body, the corresponding work unit area is determined to be a human work table; A human body risk factor acquisition unit: if there is no work in the human work table, the contour to be identified is generated into a first risk factor; Risk factor matching unit: if the contour to be identified does not have a three-dimensional human body feature, all three-dimensional features of the contour to be identified are matched with a preset risk factor set to obtain a matched second risk factor and an unmatched third risk factor; Risk set construction unit: constructing a first risk factor set based on the first risk factor, the second risk factor and the third risk factor; Among them, the supplementary modules include: Risk factor extraction unit: sending the first risk factor set to the management center, extracting the first risk factor and the third risk factor; A manual supplement list construction unit: constructs a manual supplement list based on the contours to be identified and the three-dimensional map of the region corresponding to the first risk factor and the third risk factor; Manual feedback acquisition unit: sends the manual supplement list to the manual supplement port to obtain manual supplement feedback; A second risk factor set construction unit: constructing a second risk factor set based on the fourth risk factor after artificial supplementation and the second risk factor; The first risk factor set refers to a set of risk factors, three-dimensional features matched to human bodies, and three-dimensional features that failed to be successfully matched, obtained by matching the three-dimensional features of each area with the three-dimensional features of various risks that are preset; The second risk factor set refers to a set of manually confirmed risk factors obtained by manually supplementing and improving all risk factors in the first risk factor set, three-dimensional features matched to the human body, and three-dimensional features that failed to match successfully.
2. The system according to claim 1, characterized in that 3D building blocks, including: Unit acquisition unit: Based on the acquisition range of the power plant camera, determine the unit range that meets the no-blind-angle coverage constraint; Unit division unit: based on the unit range, the entire working area of the power plant is divided to obtain several working unit areas; Collection construction unit: constructs a regional image collection based on the regional images at each moment acquired by all power plant cameras in each work unit area.
3. The system according to claim 1, characterized in that Three-dimensional building blocks, including: Grayscale conversion unit: convert the grayscale values of all regional images in each regional image set to obtain the corresponding grayscale image set; Three-dimensional construction unit: Based on the three-dimensional coordinates of each pixel in each grayscale image set, a corresponding three-dimensional map of the area is constructed.
4. The system according to claim 1, characterized in that Assessment modules include: A third risk factor set construction unit: constructs a corresponding third risk factor set based on all risk factors of the same work unit area in the second risk factor set; Dangerous scenario construction unit: constructing a corresponding dangerous scenario based on the coordinates of each dangerous factor in the third dangerous factor set; Risk assessment index calculation unit: based on all risk factors in the dangerous scene, calculate the risk assessment index; Risk assessment sheet construction unit: based on the risk assessment index and the corresponding possible dangers, a risk assessment sheet is obtained.
5. The system according to claim 4, characterized in that Risk assessment index calculation unit, including: ;in, Indicates the risk assessment index corresponding to the dangerous scenario; The number of factors representing non-human risk factors in hazardous scenarios; Indicates the non-human risk factors in dangerous scenes. The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of non-human risk factors in dangerous scenarios; It indicates the maximum possibility of occurrence of non-human risk factors in dangerous scenarios; Indicates the non-human risk factors in dangerous scenes. The weight of the risk factors; Indicates the number of human risk factors in dangerous scenarios; Indicates the first risk factor of human body in dangerous scene The likelihood of occurrence of a risk factor; It indicates the minimum value of the possibility of occurrence of human risk factors in dangerous scenes; Indicates the maximum value of the occurrence probability of human risk factors in dangerous scenarios; Indicates the first risk factor of human body in dangerous scene The weight of the risk factors; Represents the sum of the occurrence weights of non-human risk factors in dangerous scenarios; Represents the sum of the occurrence weights of human risk factors in dangerous scenarios.
6. The system according to claim 1, characterized in that Audit modules, including: Risk review unit: Send the risk assessment form to the management center, conduct manual review on the risk assessment form, and obtain the risk review assessment form; A first probability calculation unit: based on the future dangers and danger scenarios in the risk review and assessment form, matches the first probability of the corresponding danger scenario in the historical danger scenario database; Probability judgment unit: based on each first probability and preset important probability in the risk review and assessment form, obtain the corresponding future dangers and dangerous scenarios whose first probability is greater than the preset important probability; List generation unit: Generates a list of important environmental factors based on all future hazards and corresponding hazard scenarios.