Water breakthrough layer section early warning method for vertical well of fracture type reservoir based on water coning height
CN117927227BActive Publication Date: 2026-07-24CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 2 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA PETROLEUM & CHEMICAL CORP
- Filing Date
- 2022-10-26
- Publication Date
- 2026-07-24
Smart Images

Figure CN117927227B_ABST
Abstract
The application provides a water-coning height-based crack-type oil reservoir straight well water breakthrough layer section early warning method and a storage medium, and belongs to the technical field of crack-type oil reservoir development. The method comprises the following steps: according to the characteristics of the crack-type oil reservoir, the production well is divided into a crack-type production well and a fracture-type production well; based on the radial flow theory, the water-coning height of the crack-type production well is calculated; based on the crack plate flow theory, the water-coning height of the fracture-type production well is calculated; based on the water-coning heights of the crack-type production well and the fracture-type production well, and in combination with the original oil-water interface, the highest water breakthrough layer sections of the crack-type production well and the fracture-type production well are determined. The method is based on the radial flow and crack plate flow theories, establishes a water-coning height calculation method for different types of production wells, can conveniently and quickly determine the water-coning height, and further determines the water breakthrough layer section of the production well.
Need to check novelty before this filing date? Find Prior Art