An audit platform supervision system and method based on artificial intelligence
By retrieving and analyzing enterprise business data in real-time in the audit platform and constructing a transition lattice model, the problem of balancing business market regulation and manual intervention in the existing technology is solved, and effective impact analysis and feedback on business development is achieved, improving business performance. development environment.
Patent Information
- Application Number
- CN202410405627.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-04-07
AI Technical Summary
The existing audit platform lacks pertinence in the regulation of business market development, resulting in deformed or failed business development. It cannot effectively balance market regulation and manual intervention, resulting in the failure to fully utilize the market development space.
By opening a temporary one-way docking port in the enterprise business database, using a derivative algorithm to generate a restricted pass code, retrieving periodic data in real time, and performing digital-to-analog conversion and fuzzy feature alienation processing through a visual model, a transition lattice model is constructed to analyze the business development status. , determine the impact ratio of market and human intervention, and generate abnormal object forms to feedback to auditors.
It realizes real-time proportional impact analysis on business development, provides targeted regulatory suggestions, helps auditors judge and predict business development, improves the business development environment, and ensures a balance between market and human intervention.
Smart Images

Figure CN118229112B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of artificial intelligence technology, and specifically to an audit platform supervision system and method based on artificial intelligence. Background Art
[0002] An audit platform is a software or system specifically used for auditing. It provides a series of functions and tools to help auditors conduct effective audit activities, including data analysis, risk assessment, audit planning, workflow management, report generation, etc. The audit platform can help auditors collect, analyze and interpret data more efficiently and provide comprehensive audit reports and recommendations.
[0003] Under the current environment, enterprises usually conduct business development regulation and analysis through data collection, analysis, plan formulation and implementation. However, there are often two situations in this process. One is that the business market is developing well and no artificial plans are taken to guide development. The other is that artificial plans intervene too much to guide business development, and there is little room for business market development. Both of the above business regulation situations do not adopt targeted balanced regulation of the business, which cannot give full play to the development characteristics of each business and often leads to abnormal business development or even business failure. Summary of the invention
[0004] The purpose of the present invention is to provide an audit platform supervision system and method based on artificial intelligence to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] An audit platform supervision method based on artificial intelligence, the method comprising the following steps:
[0007] S100, by opening a temporary one-way docking port for the enterprise business database and generating a restricted access code through a derivative algorithm, real-time periodic data retrieval of target business project data is achieved;
[0008] S200, converting the retrieved data into digital-to-analog data by using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singular points of the curve by using fuzzy feature alienation processing;
[0009] S300, performing mutation property analysis on the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model;
[0010] S400, the feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds back the form to the auditor through the output port.
[0011] The specific steps of S100 to realize real-time periodic data retrieval of target business project data by opening a temporary one-way docking port for the enterprise business database and generating a restricted pass code through a derivative algorithm are as follows:
[0012] S101. In the enterprise big data repository, trace the source of a single business data for the business data storage sub-repository; according to the data traceability result, spatially locate the data traceability point of the target business data storage space, and open a temporary port for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed;
[0013] S102. When a temporary port is opened, the system generates a corresponding restricted access code using a derivative algorithm according to factors such as the opening time, location, and target business of the temporary port, which is used to verify and restrict the identity of the person retrieving data.
[0014] The specific steps of S200 converting the retrieved data into digital-to-analog using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singularity of the curve using fuzzy feature alienation processing are as follows:
[0015] S201, pre-processing the retrieved business data, planning the data into stacks, using periodic data as stack labels and corresponding business type data as stack body data to construct a data stack list set for the target business; the corresponding business type data includes customer data, sales data, inventory data, financial data, duration data, operation data, employee data and customer feedback data;
[0016] S202, input the constructed data stack list of each sub-type of the business into the visualization model for digital-to-analog conversion, compare the corresponding stack list data with the periodic time axis as the development trend, and insert independent time point data on the time axis; completely insert the data of each sub-type data stack list to obtain discrete trend data of the corresponding type of data, perform interval simulation filling on the discrete trend data through the model, fit the discrete data into the corresponding type of development curve, and obtain the periodic stage development curve of each sub-type of business data;
[0017] S203, fuzzy feature alienation processing is performed on the development curves of each sub-type of the target business that has been fitted, and fuzzy precision amplification processing is performed on the time axis precision; q is used as the time axis precision amplification factor, and the overall precision of the time axis is amplified to collect feature points for each sub-type development curve; t is used as the time collection interval, and the development trend of the curve in the interval is observed by translating the time collection interval on the time axis, and the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is shrunk to have only one pole, and the current shrunk time interval is used as the new time translation interval; the translation time collection interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a corresponding pole coordinate set and a frozen interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants;
[0018] By magnifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set collection process, the collected pole coordinate set is compared step by step to determine whether the curve pole collection work is completed. Are they equal? is the set of pole coordinates, and n is the number of acquisitions; if the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis; if the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed.
[0019] The specific steps of S300 for analyzing the mutation properties of the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model are as follows:
[0020] S301, taking the collected pole coordinate set as the mutation transition point, and calculating the instantaneous mutation significance of each point in the original curve, the calculation formula is: ;in is the instantaneous mutation significance of each pole in the corresponding pole coordinate set, i is the pole position order in the pole coordinate set, is the y-axis value of the corresponding pole on the original curve, is the y-axis value of the right adjacent point of the corresponding pole on the original curve, is the x-axis value of the corresponding pole on the original curve, is the x-axis value of the adjacent point on the right side of the corresponding pole on the original curve; the sign carried by the calculation result is the meaning of the direction of the pole mutation; calculating the significance of the instantaneous mutation at the pole can estimate the potential of the subsequent development trend of the curve at this point; since each pole is obtained by magnifying the original curve, in this case, after the part of the curve where the pole is located is magnified, the significance of the instantaneous mutation at the pole position can be calculated and analyzed with the adjacent points instead of the tangent calculation;
[0021] S302, judging the mutation degree by the instantaneous mutation significance of each extreme point, if , then the current corresponding pole is judged to be a first-order mutation pole; if , then the current corresponding pole is judged to be a secondary mutation pole; It is the reference evaluation value of the pole instantaneous mutation significance of the system combined with the comprehensive evaluation of the enterprise database business data; since the pole mutation has two situations, rising and falling, there are negative values when calculating the pole instantaneous mutation significance. At this time, the sign of the negative value represents the direction, and its value itself represents the degree of mutation; according to the judgment result, the original pole coordinate set is classified and divided into corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set;
[0022] S303, mapping the classified pole coordinate sets to the two-dimensional coordinate system through fixed points, and obtaining the vertical longitudinal axis segments of each pole in the coordinate system by connecting each point with its corresponding projection point on the horizontal axis; extending the horizontal rays of each pole until they touch the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, and obtaining the horizontal adjacent line segments of each pole in the coordinate system; taking the contact point on the longitudinal axis of the coordinate system in the horizontal adjacent line segment between the pole adjacent to the longitudinal axis of the coordinate system and the longitudinal axis of the coordinate system as the transition starting point, and combining the vertical longitudinal axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, obtaining the traversal route and clearing the line segments and extension lines not involved in the traversal route, and constructing the transition lattice model corresponding to the original curve;
[0023] S304, by retrieving the enterprise planned human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; according to the distinction result, each transition point is classified into a spontaneous transition point and a human intervention transition point, and each transition point is categorized and marked in the transition lattice model; the transition cycle of the corresponding transition point is obtained according to the traversal route segment of each transition point in the transition lattice model; the business development impact of the spontaneous transition point and the human intervention transition point is calculated respectively, wherein the business development impact calculation formula of the spontaneous transition point is:
[0024] ;
[0025] The calculation formula for the business development impact of human intervention transition points is:
[0026] ;
[0027] in, is the business development impact of the spontaneous transition point, The impact of human intervention on business development of the transition point. is the transition period corresponding to each transition point, is the influence parameter of the spontaneous transition point corresponding to the first-order mutation transition point, is the influence parameter of the corresponding secondary mutation transition point in the spontaneous transition point, is the influence parameter of the first-order mutation transition point in the artificial intervention transition point, is the influence parameter of the corresponding secondary mutation transition point in the artificial intervention transition point, The target transition point for the current participation in computing business development impact, is the set of spontaneous transition point types, is the set of human intervention transition point types; the spontaneous transition impact and human intervention impact of the service are calculated respectively, where the spontaneous transition impact calculation formula is: ; The calculation formula for the impact of human intervention is: ;in is the spontaneous transition influence, The impact of human intervention, is the business development impact of each spontaneous transition point in the spontaneous transition point type set, is the business development impact of each human intervention transition point in the human intervention transition point type set, is the number of spontaneous transition points in the spontaneous transition point type set, is the number of human intervention transition points in the human intervention transition point type set;
[0028] The business development intervention ratio is calculated by combining the spontaneous transition impact and human intervention impact of the business. The calculation formula is: ;in is the business development intervention ratio; then the development intervention ratio of each business is analyzed. If , then the current business development is considered to be normal; if and , then it is judged that the current business development is abnormal and needs to be strengthened by human intervention; if and , it is judged that the current business development is abnormal and human intervention needs to be reduced; among them, It is the optimal business development intervention ratio range obtained by analyzing the development impact of business data through big data analysis models; since business development is often carried out under the joint action of market and human intervention, and the different proportions contained in different businesses often affect the ultimate development direction of the business, the business development intervention ratio needs to be controlled.
[0029] The S400 feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds the form back to the auditor through the output port:
[0030] S401, the feedback port receives the business analysis data, and generates an exception object form for the business items and their corresponding states; the exception object form records the business name, business progress, business status and solution;
[0031] S402. The output port feeds back the generated abnormal object form to the auditor through the display port.
[0032] An audit platform supervision system based on artificial intelligence, the system comprising a business data retrieval module, a business data visualization module, a business status analysis module and a business status feedback module;
[0033] The business data retrieval module opens a temporary one-way docking port for the enterprise business database and generates a restricted access code through a derivative algorithm to achieve real-time periodic data retrieval of target business project data; the business data visualization module uses a visualization model to perform digital-to-analog conversion on the retrieved data, constructs a corresponding cycle stage development curve by sequentially splicing discrete data with differences, and highlights the singularities of the curve using fuzzy feature alienation processing; the business status analysis module analyzes the mutation properties of the singularities of the curve in combination with the processed curve, constructs a transition lattice model for the original curve based on the analysis results, and judges the development status of the business in combination with the model; the business status feedback module receives the analysis results through the feedback port, generates an abnormal object form for the abnormal business, and feeds the form back to the auditor through the output port.
[0034] The business data retrieval module includes a business data retrieval unit and a restriction code generation unit; the business data retrieval unit traces the source of a single business data for the business data storage sub-library in the enterprise big data storage library; based on the data tracing results, the data tracing point of the target business data storage space is spatially located, and a temporary port is opened for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed; when the temporary port is opened, the restriction code generation unit generates a corresponding restriction pass code using a derivative algorithm based on the opening time factor, location factor and target business factor of the temporary port, which is used to verify and restrict the identity of the data retrieval personnel.
[0035] The business data visualization module includes a data preprocessing unit, a curve fitting unit and a pole collection unit; the data preprocessing unit preprocesses the retrieved business data, stacks the data, takes the periodic data as the stack label, and takes the corresponding business type data as the stack column body data to construct a data stack list set of the target business; the curve fitting unit inputs the constructed business each type data stack list into the visualization model for digital-to-analog conversion, and compares the corresponding stack list data with the periodic time axis as the development trend, and inserts independent time point data on the time axis; the data of each type data stack list is completely inserted to obtain the discrete trend data of the corresponding type data, and the discrete trend data is simulated and filled in the interval by the model, and the discrete data is fitted into the corresponding type development curve to obtain the periodic stage development curve of each type data of the business; the pole collection unit performs fuzzy feature alienation processing on the development curve of each type of target business that has been fitted, and performs fuzzy precision amplification processing on the time axis precision; q is the time axis precision amplification factor, and the overall precision amplification of the time axis is performed to collect feature points for each type development curve; t is the time collection interval, and The time acquisition interval is translated on the time axis, the development trend of the curve in the interval is observed, the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is contracted to have only one pole, and the current contracted time interval is used as the new time translation interval; the translation time acquisition interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a pair The corresponding pole coordinate set and fixed interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants; by amplifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set acquisition process, by performing a step-by-step forward comparison on the acquired pole coordinate set, it is determined whether the curve pole acquisition work is completed; if the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis; if the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed.
[0036] The business status analysis module includes a pole mutation degree analysis unit, a transition lattice model construction unit and a business development impact analysis unit; the pole mutation degree analysis unit takes the collected pole coordinate set as the mutation transition point, and calculates the instantaneous mutation significance of each point in the original curve; the instantaneous mutation significance of each pole is judged by the mutation degree, and the original pole coordinate set is classified and divided according to the judgment result to construct the corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set; the transition lattice model construction unit respectively divides the classified The pole coordinate set is mapped to the two-dimensional coordinate system through fixed point mapping, and the vertical longitudinal axis segment of each pole in the coordinate system is obtained by connecting each point with its corresponding projection point on the horizontal axis; by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, the horizontal rays of each pole are extended until they touch the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system, and the horizontal adjacent line segment of each pole in the coordinate system is obtained; by taking the adjacent longitudinal axis pole of the coordinate system and the longitudinal axis of the coordinate system in the horizontal adjacent line segment on the longitudinal axis of the coordinate system The contact point is the starting point of the transition. The traversal route is obtained by combining the vertical longitudinal axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, and the line segments and extension lines not involved in the traversal route are cleared to construct a transition lattice model corresponding to the original curve; the business development impact analysis unit retrieves the enterprise plan human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; and each transition point is classified as a spontaneous transition according to the discrimination result. points and human intervention transition points, and classify and mark each transition point in the transition lattice model; obtain the transition period of the corresponding transition point according to the traversal route segment of each transition point in the transition lattice model; calculate the business development impact of the spontaneous transition point and the human intervention transition point respectively, and calculate the spontaneous transition impact and human intervention impact of the business based on the calculation results; calculate the business development intervention ratio based on the spontaneous transition impact and human intervention impact of the business, and analyze the development intervention ratio of each business based on the calculation results of the business status data.
[0037] The business status feedback module includes an abnormal object form generation unit and a business status comprehensive feedback unit; the abnormal object form generation unit receives business analysis data through a feedback port, and generates an abnormal object form for business items and their corresponding states; the abnormal object form records the business name, business progress, business status and solution; the business status comprehensive feedback unit feeds back the generated abnormal object form to the auditor through the display port via the output port.
[0038] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention retrieves, visualizes and analyzes the development transition of the business development cycle through multi-module units, and conducts targeted real-time proportional impact analysis on the market regulation and human intervention regulation of the business, so as to assist auditors in business development regulation; the present invention can perform abstract transition analysis on the real-time development curve of each business, so as to obtain the proportion of the development regulation of the current business affected by the market and human intervention, and conduct targeted regulation proportion feedback to obtain the development status of the current business; the present invention can help auditors to judge the impact of the regulation level on each business, and help relevant personnel to predict and regulate each business, effectively improving the good environment for business development. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0040] Figure 1 It is a structural diagram of an audit platform supervision system based on artificial intelligence in the present invention. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] See also Figure 1 , the present invention provides a technical solution:
[0043] An audit platform supervision method based on artificial intelligence, the method comprising the following steps:
[0044] S100, by opening a temporary one-way docking port for the enterprise business database and generating a restricted access code through a derivative algorithm, real-time periodic data retrieval of target business project data is achieved;
[0045] S200, converting the retrieved data into digital-to-analog data by using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singular points of the curve by using fuzzy feature alienation processing;
[0046] S300, performing mutation property analysis on the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model;
[0047] S400, the feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds back the form to the auditor through the output port.
[0048] The specific steps of S100 to realize real-time periodic data retrieval of target business project data by opening a temporary one-way docking port for the enterprise business database and generating a restricted pass code through a derivative algorithm are as follows:
[0049] S101. In the enterprise big data repository, trace the source of a single business data for the business data storage sub-repository; according to the data traceability result, spatially locate the data traceability point of the target business data storage space, and open a temporary port for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed;
[0050] S102. When a temporary port is opened, the system generates a corresponding restricted access code using a derivative algorithm according to factors such as the opening time, location, and target business of the temporary port, which is used to verify and restrict the identity of the person retrieving data.
[0051] The specific steps of S200 converting the retrieved data into digital-to-analog using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singularity of the curve using fuzzy feature alienation processing are as follows:
[0052] S201, pre-process the retrieved business data, plan the data into stacks, use periodic data as stack labels, and use the typed data of the corresponding business as stack body data to build a data stack list set of the target business;
[0053] S202, input the constructed data stack list of each sub-type of the business into the visualization model for digital-to-analog conversion, compare the corresponding stack list data with the periodic time axis as the development trend, and insert independent time point data on the time axis; completely insert the data of each sub-type data stack list to obtain discrete trend data of the corresponding type of data, perform interval simulation filling on the discrete trend data through the model, fit the discrete data into the corresponding type of development curve, and obtain the periodic stage development curve of each sub-type of business data;
[0054] S203, fuzzy feature alienation processing is performed on the development curves of each sub-type of the target business that has been fitted, and fuzzy precision amplification processing is performed on the time axis precision; q is used as the time axis precision amplification factor, and the overall precision of the time axis is amplified to collect feature points for each sub-type development curve; t is used as the time collection interval, and the development trend of the curve in the interval is observed by translating the time collection interval on the time axis, and the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is shrunk to have only one pole, and the current shrunk time interval is used as the new time translation interval; the translation time collection interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a corresponding pole coordinate set and a frozen interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants;
[0055] By magnifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set collection process, the collected pole coordinate set is compared step by step to determine whether the curve pole collection work is completed. Are they equal? is the set of pole coordinates, and n is the number of acquisitions; if the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis; if the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed.
[0056] The specific steps of S300 for analyzing the mutation properties of the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model are as follows:
[0057] S301, taking the collected pole coordinate set as the mutation transition point, and calculating the instantaneous mutation significance of each point in the original curve, the calculation formula is: ;in is the instantaneous mutation significance of each pole in the corresponding pole coordinate set, i is the pole position order in the pole coordinate set, is the y-axis value of the corresponding pole on the original curve, is the y-axis value of the right adjacent point of the corresponding pole on the original curve, is the x-axis value of the corresponding pole on the original curve, is the x-axis value of the adjacent point on the right side of the corresponding pole on the original curve; the sign carried by the calculation result indicates the direction of the pole mutation;
[0058] S302, judging the mutation degree by the instantaneous mutation significance of each extreme point, if , then the current corresponding pole is judged to be a first-order mutation pole; if , then the current corresponding pole is judged to be a secondary mutation pole; It is a reference evaluation value of the instantaneous mutation significance of the poles that is comprehensively evaluated by the system in combination with the business data of the enterprise database; according to the judgment result, the original pole coordinate set is classified and divided into sets to construct the corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set;
[0059] S303, mapping the classified pole coordinate sets to the two-dimensional coordinate system through fixed points, and obtaining the vertical longitudinal axis segments of each pole in the coordinate system by connecting each point with its corresponding projection point on the horizontal axis; extending the horizontal rays of each pole until they touch the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, and obtaining the horizontal adjacent line segments of each pole in the coordinate system; taking the contact point on the longitudinal axis of the coordinate system in the horizontal adjacent line segment between the pole adjacent to the longitudinal axis of the coordinate system and the longitudinal axis of the coordinate system as the transition starting point, and combining the vertical longitudinal axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, obtaining the traversal route and clearing the line segments and extension lines not involved in the traversal route, and constructing the transition lattice model corresponding to the original curve;
[0060] S304, by retrieving the enterprise planned human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; according to the distinction result, each transition point is classified into a spontaneous transition point and a human intervention transition point, and each transition point is categorized and marked in the transition lattice model; the transition cycle of the corresponding transition point is obtained according to the traversal route segment of each transition point in the transition lattice model; the business development impact of the spontaneous transition point and the human intervention transition point is calculated respectively, wherein the business development impact calculation formula of the spontaneous transition point is:
[0061] ;
[0062] The calculation formula for the business development impact of human intervention transition points is:
[0063] ;
[0064] in, is the business development impact of the spontaneous transition point, The impact of human intervention on business development of the transition point. is the transition period corresponding to each transition point, is the influence parameter of the spontaneous transition point corresponding to the first-order mutation transition point, is the influence parameter of the corresponding secondary mutation transition point in the spontaneous transition point, is the influence parameter of the first-order mutation transition point in the artificial intervention transition point, is the influence parameter of the corresponding secondary mutation transition point in the artificial intervention transition point, The target transition point for the current participation in computing business development impact, is the set of spontaneous transition point types, is the set of human intervention transition point types; the spontaneous transition impact and human intervention impact of the service are calculated respectively, where the spontaneous transition impact calculation formula is: ; The calculation formula for the impact of human intervention is: ;in is the spontaneous transition influence, The impact of human intervention, is the business development impact of each spontaneous transition point in the spontaneous transition point type set, is the business development impact of each human intervention transition point in the human intervention transition point type set, is the number of spontaneous transition points in the spontaneous transition point type set, is the number of human intervention transition points in the human intervention transition point type set;
[0065] The business development intervention ratio is calculated by combining the spontaneous transition impact and human intervention impact of the business. The calculation formula is: ;in is the business development intervention ratio; then the development intervention ratio of each business is analyzed. If , then the current business development is considered to be normal; if and , then it is judged that the current business development is abnormal and needs to be strengthened by human intervention; if and , it is judged that the current business development is abnormal and human intervention needs to be reduced; among them, It is the optimal business development intervention ratio range obtained by analyzing the development impact of business data through big data analysis models.
[0066] The S400 feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds the form back to the auditor through the output port:
[0067] S401, the feedback port receives the business analysis data, and generates an exception object form for the business items and their corresponding states; the exception object form records the business name, business progress, business status and solution;
[0068] S402. The output port feeds back the generated abnormal object form to the auditor through the display port.
[0069] An audit platform supervision system based on artificial intelligence, the system comprising a business data retrieval module, a business data visualization module, a business status analysis module and a business status feedback module;
[0070] The business data retrieval module opens a temporary one-way docking port for the enterprise business database and generates a restricted access code through a derivative algorithm to achieve real-time periodic data retrieval of target business project data; the business data visualization module uses a visualization model to perform digital-to-analog conversion on the retrieved data, constructs a corresponding cycle stage development curve by sequentially splicing discrete data with differences, and highlights the singularities of the curve using fuzzy feature alienation processing; the business status analysis module analyzes the mutation properties of the singularities of the curve in combination with the processed curve, constructs a transition lattice model for the original curve based on the analysis results, and judges the development status of the business in combination with the model; the business status feedback module receives the analysis results through the feedback port, generates an abnormal object form for the abnormal business, and feeds the form back to the auditor through the output port.
[0071] The business data retrieval module includes a business data retrieval unit and a restriction code generation unit; the business data retrieval unit traces the single business data of the business data storage sub-library in the enterprise big data storage library; according to the data tracing result, the data tracing point of the target business data storage space is spatially located, and a temporary port is opened for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed; when the temporary port is opened, the restriction code generation unit generates a corresponding restriction pass code using a derivative algorithm based on the opening time factor, location factor and target business factor of the temporary port, which is used to verify and restrict the identity of the data retrieval personnel.
[0072] The business data visualization module includes a data preprocessing unit, a curve fitting unit and a pole collection unit; the data preprocessing unit preprocesses the retrieved business data, stacks the data, takes the periodic data as the stack label, and takes the corresponding business type data as the stack column body data to construct a data stack list set of the target business; the curve fitting unit inputs the constructed business each type data stack list into the visualization model for digital-to-analog conversion, and compares the corresponding stack list data with the periodic time axis as the development trend, and inserts independent time point data on the time axis; the data of each type data stack list is completely inserted to obtain the discrete trend data of the corresponding type data, and the discrete trend data is simulated and filled in the interval by the model, and the discrete data is fitted into the corresponding type development curve to obtain the periodic stage development curve of each type data of the business; the pole collection unit performs fuzzy feature alienation processing on the development curve of each type of target business that has been fitted, and performs fuzzy precision amplification processing on the time axis precision; q is the time axis precision amplification factor, and the overall precision amplification of the time axis is performed to collect feature points for each type development curve; t is the time collection interval, and The time acquisition interval is translated on the time axis, the development trend of the curve in the interval is observed, the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is contracted to have only one pole, and the current contracted time interval is used as the new time translation interval; the translation time acquisition interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a pair The corresponding pole coordinate set and fixed interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants; by amplifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set acquisition process, by performing a step-by-step forward comparison on the acquired pole coordinate set, it is determined whether the curve pole acquisition work is completed; if the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis; if the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed.
[0073] The business status analysis module includes a pole mutation degree analysis unit, a transition lattice model construction unit and a business development impact analysis unit; the pole mutation degree analysis unit takes the collected pole coordinate set as the mutation transition point, and calculates the instantaneous mutation significance of each point in the original curve; the instantaneous mutation significance of each pole is judged by the mutation degree, and the original pole coordinate set is classified and divided according to the judgment result to construct the corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set; the transition lattice model construction unit respectively divides the classified The pole coordinate set is mapped to the two-dimensional coordinate system through fixed point mapping, and the vertical longitudinal axis segment of each pole in the coordinate system is obtained by connecting each point with its corresponding projection point on the horizontal axis; by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, the horizontal rays of each pole are extended until they touch the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system, and the horizontal adjacent line segment of each pole in the coordinate system is obtained; by taking the adjacent longitudinal axis pole of the coordinate system and the longitudinal axis of the coordinate system in the horizontal adjacent line segment located on the longitudinal axis of the coordinate system The contact point is the starting point of the transition. The traversal route is obtained by combining the vertical longitudinal axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, and the line segments and extension lines not involved in the traversal route are cleared to construct a transition lattice model corresponding to the original curve; the business development impact analysis unit retrieves the enterprise plan human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; and each transition point is classified as a spontaneous transition according to the discrimination result. points and human intervention transition points, and classify and mark each transition point in the transition lattice model; obtain the transition period of the corresponding transition point according to the traversal route segment of each transition point in the transition lattice model; calculate the business development impact of the spontaneous transition point and the human intervention transition point respectively, and calculate the spontaneous transition impact and human intervention impact of the business based on the calculation results; calculate the business development intervention ratio based on the spontaneous transition impact and human intervention impact of the business, and analyze the development intervention ratio of each business based on the calculation results.
[0074] The business status feedback module includes an abnormal object form generation unit and a business status comprehensive feedback unit; the abnormal object form generation unit receives business analysis data through a feedback port, and generates an abnormal object form for business items and their corresponding states; the abnormal object form records the business name, business progress, business status and solution; the business status comprehensive feedback unit feeds back the generated abnormal object form to the auditor through the display port via the output port.
[0075] In the example:
[0076] An existing enterprise adopts an audit platform supervision system based on artificial intelligence. Its audit department audits the current status of a batch of businesses. In the enterprise big data repository, the business data storage sub-library is traced for single business data; based on the data tracing results, the data tracing point of the target business data storage space is spatially located, and a temporary port is opened for data retrieval; when the temporary port is opened, the system uses a derivative algorithm to generate a corresponding restricted pass code based on the opening time factor, location factor and target business factor of the temporary port, which is used to verify and restrict the identity of the data retrieval personnel; after completing the identity authentication, data retrieval for related audit business is performed; the retrieved business data is pre-processed, the data is stacked and planned, and a data stack list set of the target business is constructed with periodic data as the stack label and the corresponding business type data as the stack column body data; the constructed business each type of data stack list is input into the visualization model for digital-to-analog conversion, and the corresponding stack list data is compared with the periodic timeline as the development trend, and the independent time point data is performed on the timeline. Insert points; completely insert points on the data stack list of each sub-type, obtain discrete trend data of the corresponding type of data, simulate and fill the interval of discrete trend data through the model, fit the discrete data into the corresponding type of development curve, and obtain the periodic stage development curve of the business corresponding to each sub-type of data; perform fuzzy feature alienation processing on the development curve of each sub-type of the target business that has completed the fitting, and perform fuzzy precision amplification processing on the time axis precision; take 2 as the time axis precision amplification factor; by amplifying the overall precision of the time axis, collect feature points for each sub-type development curve; take 2 as the time collection interval, translate the time collection interval on the time axis, observe the development trend of the curve in the interval, mark the poles of the curve in each interval respectively, and freeze the time axis with the corresponding interval where the pole exists, and also mark the frozen interval; by amplifying the time axis precision several times and repeating the above pole coordinate set and freeze interval set collection process, by performing step-by-step forward comparison on the collected pole coordinate set, determine whether the curve pole collection work is completed, and the comparison method is to judge If the current comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis. The collection is the target data for analysis;
[0077] The collected pole coordinate set is taken as the mutation transition point, and the instantaneous mutation significance of each point in the original curve is calculated. The calculation formula is: ; For example, if the calculation result of a certain extreme point is 2; the degree of mutation is judged by the instantaneous mutation significance of each extreme point; due to the current , judge that the current corresponding pole is a secondary mutation pole; =1.5; according to the judgment result, the original pole coordinate set is classified and divided to construct the corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set; the classified pole coordinate set is respectively mapped to the two-dimensional coordinate system through fixed points, and the vertical longitudinal axis segment of each pole in the coordinate system is obtained by connecting each point with its corresponding projection point on the horizontal axis; by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, each pole is horizontally extended until it contacts the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system, and the horizontal adjacent line segment of each pole in the coordinate system is obtained; by taking the contact point on the longitudinal axis of the coordinate system in the horizontal adjacent line segment between the pole adjacent to the longitudinal axis of the coordinate system and the longitudinal axis of the coordinate system as the transition starting point, combining the vertical longitudinal axis segment and extension line of each pole and the horizontal adjacent line segment of each pole, the traversal route is obtained and the line segments and extension lines not involved in the traversal route are cleared, and the transition lattice model corresponding to the original curve is constructed;
[0078] By retrieving the enterprise planned human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; according to the distinction result, each transition point is classified into a spontaneous transition point and a human intervention transition point, and each transition point is categorized and marked in the transition lattice model; the transition cycle of the corresponding transition point is obtained according to the traversal route segment of each transition point in the transition lattice model; the business development impact of the spontaneous transition point and the human intervention transition point is calculated respectively, and the business development impact calculation formula of the spontaneous transition point is:
[0079] ;
[0080] The calculation formula for the business development impact of human intervention transition points is:
[0081] ;
[0082] The spontaneous transition impact and human intervention impact of the business are calculated respectively, and the spontaneous transition impact calculation formula is: ; The calculation formula for the impact of human intervention is: ; The business development intervention ratio is calculated by combining the spontaneous transition impact of the business and the human intervention impact. The calculation formula is: ; Analyze the development intervention ratio of each business; such as calculating the business development intervention ratio of a current business for ; Due to its and ;in for , then it is judged that the current business development is abnormal and human intervention needs to be reduced; the current business analysis data is received through the feedback port, and the abnormal object form is generated for the business items and their corresponding states; the output port feeds back the generated abnormal object form to the auditor through the display port.
[0083] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0084] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An audit platform supervision method based on artificial intelligence, characterized by: The method comprises the following steps: S100, by opening a temporary one-way docking port for the enterprise business database and generating a restricted access code through a derivative algorithm, real-time periodic data retrieval of target business project data is achieved; S200, converting the retrieved data into digital-to-analog data by using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singular points of the curve by using fuzzy feature alienation processing; The specific steps of S200 converting the retrieved data into digital-to-analog using a visualization model, constructing a corresponding cycle stage development curve by sequentially splicing the discrete data with differences, and highlighting the singularity of the curve using fuzzy feature alienation processing are as follows: S201, pre-process the retrieved business data, plan the data into stacks, use periodic data as stack labels, and use the typed data of the corresponding business as stack body data to build a data stack list set of the target business; S202, input the constructed data stack list of each sub-type of the business into the visualization model for digital-to-analog conversion, compare the corresponding stack list data with the periodic time axis as the development trend, and insert independent time point data on the time axis; completely insert the data of each sub-type data stack list to obtain discrete trend data of the corresponding type of data, perform interval simulation filling on the discrete trend data through the model, fit the discrete data into the corresponding type of development curve, and obtain the periodic stage development curve of each sub-type of business data; S203, fuzzy feature alienation processing is performed on the development curves of each sub-type of the target business that has been fitted, and fuzzy precision amplification processing is performed on the time axis precision; q is used as the time axis precision amplification factor, and the overall precision of the time axis is amplified to collect feature points for each sub-type development curve; t is used as the time collection interval, and the development trend of the curve in the interval is observed by translating the time collection interval on the time axis, and the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is shrunk to have only one pole, and the current shrunk time interval is used as the new time translation interval; the translation time collection interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a corresponding pole coordinate set and a frozen interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants; By magnifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set collection process, the collected pole coordinate set is compared step by step to determine whether the curve pole collection work is completed. The comparison method is to determine SAM(top) n With SAM(top) n-1 Are they equal? Where SAM(top) is the pole coordinate set, and n is the number of acquisitions. If the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis. If the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed. S300, performing mutation property analysis on the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model; The specific steps of S300 for analyzing the mutation properties of the singular points of the curve in combination with the processed curve, constructing a transition lattice model for the original curve according to the analysis result, and judging the development status of the business in combination with the model are as follows: S301, taking the collected pole coordinate set as the mutation transition point, and calculating the instantaneous mutation significance of each point in the original curve, the calculation formula is: Among them Sf i is the instantaneous mutation significance of each pole in the corresponding pole coordinate set, i is the pole position order in the pole coordinate set, Top i (y) is the y-axis value of the corresponding pole on the original curve, Top i (y+1) is the y-axis value of the adjacent point on the right side of the corresponding pole on the original curve. i (x) is the x-axis value of the corresponding pole on the original curve, Top i (x+1) is the x-axis value of the right adjacent point of the corresponding pole on the original curve; the sign carried by the calculation result indicates the direction of the pole mutation; S302, by judging the degree of mutation based on the instantaneous mutation significance of each extreme point, if |Sf i | <Sf ae , then the current corresponding pole is judged to be a first-order mutation pole; if |Sf i |≥Sf ae , then the current corresponding pole is judged to be a secondary mutation pole; where Sf ae It is a reference evaluation value of the instantaneous mutation significance of the poles that is comprehensively evaluated by the system in combination with the business data of the enterprise database; according to the judgment result, the original pole coordinate set is classified and divided into sets to construct the corresponding first-level mutation pole coordinate set and second-level mutation pole coordinate set; S303, mapping the classified pole coordinate sets to the two-dimensional coordinate system through fixed points, and obtaining the vertical longitudinal axis segments of each pole in the coordinate system by connecting each point with its corresponding projection point on the horizontal axis; extending the horizontal rays of each pole until they touch the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system by taking the vertical longitudinal axis and extension line of the adjacent pole or the longitudinal axis of the coordinate system as the horizontal reference, and obtaining the horizontal adjacent line segments of each pole in the coordinate system; taking the contact point on the longitudinal axis of the coordinate system in the horizontal adjacent line segment between the pole adjacent to the longitudinal axis of the coordinate system and the longitudinal axis of the coordinate system as the transition starting point, and combining the vertical longitudinal axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, obtaining the traversal route and clearing the line segments and extension lines not involved in the traversal route, and constructing the transition lattice model corresponding to the original curve; S304, by retrieving the enterprise planned human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; according to the distinction result, each transition point is classified into a spontaneous transition point and a human intervention transition point, and each transition point is categorized and marked in the transition lattice model; the transition cycle of the corresponding transition point is obtained according to the traversal route segment of each transition point in the transition lattice model; the business development impact of the spontaneous transition point and the human intervention transition point is calculated respectively, wherein the business development impact calculation formula of the spontaneous transition point is: The calculation formula for the business development impact of human intervention transition points is: Among them, Im sp is the business development impact of the spontaneous transition point, Im hu is the business development impact of human intervention transition points, T is the transition period corresponding to each transition point, δ sp1 is the influence parameter of the spontaneous transition point corresponding to the first-order mutation transition point, δ sp2 is the influence parameter of the corresponding secondary mutation transition point in the spontaneous transition point, δ hu1 is the influence parameter of the first-order mutation transition point in the artificial intervention transition point, δ hu2 is the influence parameter of the corresponding secondary mutation transition point in the artificial intervention transition point, Top(Sf i ) is the target transition point currently involved in calculating the business development impact, Top(sp) is the spontaneous transition point type set, and Top(hu) is the human intervention transition point type set; the spontaneous transition impact and human intervention impact of the business are calculated respectively, where the spontaneous transition impact calculation formula is The calculation formula for the impact of human intervention is: Among them Im sp总 is the spontaneous transition influence, Im hu总 is the influence of human intervention, Im[Top(sp)] is the business development influence of each spontaneous transition point in the spontaneous transition point type set, Im[Top(hu)] is the business development influence of each human intervention transition point in the human intervention transition point type set, M is the number of spontaneous transition points in the spontaneous transition point type set, and N is the number of human intervention transition points in the human intervention transition point type set; Calculate the business development intervention ratio by combining the spontaneous transition influence degree and the human intervention influence degree of the business. The calculation formula is where ITR is the business development intervention ratio; then analyze the business development intervention ratios of each business. If ITR ∈ [P, Q], it is determined that the current business development is in a normal state; if and ITR < P, it is determined that the current business development is abnormal and human intervention needs to be strengthened; if and ITR > Q, it is determined that the current business development is abnormal and human intervention needs to be reduced; where [P, Q] is the optimal business development intervention ratio interval obtained by analyzing the development influence of business data through a big data analysis model; S400, the feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds back the form to the auditor through the output port.
2. According to the artificial intelligence-based audit platform supervision method of claim 1, it is characterized by: The specific steps of S100 to realize real-time periodic data retrieval of target business project data by opening a temporary one-way docking port for the enterprise business database and generating a restricted pass code through a derivative algorithm are as follows: S101. In the enterprise big data repository, trace the source of a single business data for the business data storage sub-repository; according to the data traceability result, spatially locate the data traceability point of the target business data storage space, and open a temporary port for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed; S102. When a temporary port is opened, the system generates a corresponding restricted access code using a derivative algorithm according to factors such as the opening time, location, and target business of the temporary port, which is used to verify and restrict the identity of the person retrieving data.
3. The method for supervising an audit platform based on artificial intelligence according to claim 2, characterized in that: The S400 feedback port receives the analysis results, generates an abnormal object form for the abnormal business status, and feeds the form back to the auditor through the output port: S401, the feedback port receives the business analysis data, and generates an exception object form for the business items and their corresponding states; the exception object form records the business name, business progress, business status and solution; S402. The output port feeds back the generated abnormal object form to the auditor through the display port.
4. An audit platform supervision system based on artificial intelligence, applying an audit platform supervision method based on artificial intelligence as described in any one of claims 1 to 3, characterized in that: The system includes a business data retrieval module, a business data visualization module, a business status analysis module and a business status feedback module; The business data retrieval module opens a temporary one-way docking port for the enterprise business database and generates a restricted access code through a derivative algorithm to achieve real-time periodic data retrieval of target business project data; the business data visualization module converts the retrieved data into digital-to-analog using a visualization model, constructs a corresponding periodic stage development curve by sequentially splicing discrete data with differences, and highlights the singular points of the curve using fuzzy feature alienation processing; The business status analysis module analyzes the mutation properties of the singular points of the curve in combination with the processed curve, constructs a transition lattice model of the original curve based on the analysis results, and judges the development status of the business in combination with the model; the business status feedback module receives the analysis results through the feedback port, generates an abnormal object form for the abnormal business, and feeds the form back to the auditor through the output port.
5. According to claim 4, an artificial intelligence-based audit platform supervision system is characterized by: The business data retrieval module includes a business data retrieval unit and a restriction code generation unit; the business data retrieval unit traces the source of a single business data for the business data storage sub-library in the enterprise big data storage library; based on the data tracing results, the data tracing point of the target business data storage space is spatially located, and a temporary port is opened for data retrieval; the temporary port is a one-way data retrieval port and is automatically closed after the data retrieval is completed; when the temporary port is opened, the restriction code generation unit generates a corresponding restriction pass code using a derivative algorithm based on the opening time factor, location factor and target business factor of the temporary port, which is used to verify and restrict the identity of the data retrieval personnel.
6. According to claim 5, an artificial intelligence-based audit platform supervision system is characterized by: The business data visualization module includes a data preprocessing unit, a curve fitting unit and a pole collection unit; the data preprocessing unit preprocesses the retrieved business data, stacks the data, takes the periodic data as the stack label, and takes the corresponding business type data as the stack column body data to construct a data stack list set of the target business; the curve fitting unit inputs the constructed business each type data stack list into the visualization model for digital-to-analog conversion, and compares the corresponding stack list data with the periodic time axis as the development trend, and inserts independent time point data on the time axis; the data of each type data stack list is completely inserted to obtain the discrete trend data of the corresponding type data, and the discrete trend data is simulated and filled in the interval by the model, and the discrete data is fitted into the corresponding type development curve to obtain the periodic stage development curve of each type data of the business; the pole collection unit performs fuzzy feature alienation processing on the development curve of each type of target business that has been fitted, and performs fuzzy precision amplification processing on the time axis precision; q is the time axis precision amplification factor, and the overall precision amplification of the time axis is performed to collect feature points for each type development curve; t is the time collection interval, and The time acquisition interval is translated on the time axis, the development trend of the curve in the interval is observed, the poles of the curve in each interval are marked respectively, and the time axis is frozen with the corresponding interval with the pole, and the frozen interval is also marked; wherein, when there are two or more poles in a certain interval at the same time, the interval is contracted to have only one pole, and the current contracted time interval is used as the new time translation interval; the translation time acquisition interval is step-by-step translated on the time axis with the length of its own interval as the translation interval; the curve is traversed throughout the entire period interval, and the marked pole coordinates and the corresponding frozen interval are collected to construct a pair The corresponding pole coordinate set and fixed interval set; the pole is the highest point or the lowest point of the local curve in the interval; wherein q and t are constants; by amplifying the time axis precision several times and repeating the above pole coordinate set and fixed interval set acquisition process, by performing a step-by-step forward comparison on the acquired pole coordinate set, it is determined whether the curve pole acquisition work is completed; if the comparison result is equal, the acquisition operation is stopped and the currently acquired pole data is used as the target data for analysis; if the comparison result is not equal, the acquisition operation is continued until the comparison result is equal, then the acquisition operation is stopped and subsequent analysis operations are performed.
7. The artificial intelligence-based audit platform supervision system according to claim 6 is characterized by: The business status analysis module includes a pole mutation degree analysis unit, a transition lattice model construction unit and a business development impact analysis unit; the pole mutation degree analysis unit uses the collected pole coordinate set as the mutation transition point, and calculates the instantaneous mutation significance of each point in the original curve; by judging the mutation degree of the instantaneous mutation significance of each pole, the original pole coordinate set is classified and divided according to the judgment result to construct a corresponding first-level mutation pole coordinate set and a second-level mutation pole coordinate set; the transition lattice model construction unit maps the classified pole coordinate set to a two-dimensional coordinate system through a fixed point, and obtains the vertical longitudinal axis segment of each pole in the coordinate system by connecting each point with its corresponding projection point on the horizontal axis; by using the vertical longitudinal axis of the adjacent pole and the extension line or the longitudinal axis of the coordinate system as the horizontal reference, each pole is horizontally extended until it is aligned with the vertical axis of the adjacent pole. The vertical axis and the extension line or the vertical axis of the coordinate system are in contact, and the horizontal adjacent line segments of each pole in the coordinate system are obtained; by taking the contact point on the vertical axis of the coordinate system in the horizontal adjacent line segment between the pole of the vertical axis of the coordinate system and the vertical axis of the coordinate system as the starting point of the transition, combining the vertical vertical axis segments and extension lines of each pole and the horizontal adjacent line segments of each pole, the traversal route is obtained and the line segments and extension lines not involved in the traversal route are cleared to construct a transition lattice model corresponding to the original curve; the business development impact analysis unit retrieves the enterprise plan human intervention cycle data of the corresponding business in the business database; in the transition lattice model constructed by the classification curve of the corresponding business, the corresponding human intervention cycle is used as the reference cycle to distinguish the type of each transition point; according to the discrimination result, each transition point is classified into a spontaneous transition point and a human intervention transition point, and each transition point is marked by category in the transition lattice model; The transition period of the corresponding transition point is obtained according to the traversal route segment of each transition point in the transition lattice model; the business development impact of the spontaneous transition point and the human intervention transition point are calculated respectively, and the spontaneous transition impact and human intervention impact of the business are calculated based on the calculation results; the business development intervention ratio is calculated based on the spontaneous transition impact and human intervention impact of the business, and the development intervention ratio of each business is analyzed according to the calculation results to obtain the business status data.
8. The artificial intelligence-based audit platform supervision system according to claim 7 is characterized by: The business status feedback module includes an abnormal object form generation unit and a business status comprehensive feedback unit; the abnormal object form generation unit receives business analysis data through a feedback port, and generates an abnormal object form for business items and their corresponding states; The abnormal object form records the business name, business progress, business status and solution; the business status comprehensive feedback unit feeds back the generated abnormal object form to the auditor through the display port via the output port.
