A control method for group-run trains under communication failure

By employing a train-following model control method under train communication failure conditions, the train is separated into A1, A2, and A3 groups, generating new operating curves. This solves the problem of safe train following under communication failure conditions and achieves efficient and safe train operation.

CN118358624BActive Publication Date: 2026-11-17CHINA SHENHUA ENERGY CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410600278.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2026-11-17
Estimated Expiration
2044-05-15

AI Technical Summary

Technical Problem

When a communication failure occurs in a group of trains, existing technology cannot effectively guarantee the safe operation of the train, posing a significant safety hazard. Furthermore, emergency braking and hard coupling can lead to a reduction in operating efficiency.

Method used

The train following model control method is adopted. By acquiring information such as the distance and speed difference between trains through onboard sensors, the trains are separated into A1, A2 and A3 groups, and a new running curve is generated to ensure that the trains can follow each other safely in the event of a communication failure.

Benefits of technology

This effectively solved the problem of safe following of trains during communication failures, reduced operational risks, and improved the operational efficiency and safety of heavy-haul train groups.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118358624B_ABST
    Figure CN118358624B_ABST
Patent Text Reader

Abstract

This invention discloses a control method for heavy-haul trains operating in groups under communication failure conditions. The group of heavy-haul trains includes q traction locomotives, each traction locomotive pulling at least one freight car. When the xth train experiences a communication failure, the control is performed according to the following steps: the group control center marks the train with the communication failure and diagnoses the communication failure information; after the group control center sends out the failure information s time after the failure, the group trains simultaneously reduce speed and separate according to a preset program, separating into three groups of trains; the acceleration of the xth train is calculated; the xth train is controlled to maintain a safe distance from the train in front; two sets of group train operation curves are generated; and the operating speeds of groups A1 and A3 are controlled. Using the control method of this invention, the problem of heavy-haul train groups being unable to operate normally due to communication failures can be efficiently solved, greatly reducing the operational risks of group operation technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of transportation engineering technology, and specifically to a control method for group-operated trains under communication failure. Background Technology

[0002] Due to the characteristics of heavy-haul trains, such as large weight, long formations, increased traction mass, and complex track conditions, their transportation efficiency and operational control safety face enormous challenges. Group operation technology achieves a "virtual connection" between trains through wireless communication between trains and between trains and the ground, operating at the same speed and with small intervals. There are no mechanical coupling devices between trains; dynamic coupling can be performed during operation, effectively improving rail transit transportation efficiency, reducing transportation costs, and enhancing safety capabilities.

[0003] The vehicle-to-vehicle and vehicle-to-ground communication modules are among the key infrastructure components of a group train operation system. If a communication module fails, a single train operates independently, compromising its operational efficiency. This could even lead to serious rear-end collisions. Therefore, when a communication failure occurs in a group of trains, all trains will apply emergency braking, creating a "hard connection" between the faulty train and the preceding train to allow the group to continue operating. For example, patent application CN115520244A discloses a control method for degraded operation of virtual coupled trains under vehicle-to-vehicle communication failure. After a vehicle-to-vehicle communication failure, the vehicle-to-ground communication module generates a braking deceleration command until the distance between the front of the faulty train and the rear of the faulty train reaches a value of D. Then, the original virtual coupled train is converted into two virtual coupled train groups. The trains before the faulty train continue to operate under the original virtual coupled control method, while the trains after the faulty train use a temporary automatic driving curve generated by the onboard main module to control their autonomous operation. This method only considers the conditions of vehicle-to-vehicle communication failure and assumes the faulty train is the lead car to complete the remaining section of the route, posing certain safety risks. For example, patent application CN113734244A discloses a control method for virtual coupled high-speed trains under communication failure. After a train-to-train communication failure occurs, the ground control module generates emergency braking commands and sends them sequentially to each train at time intervals t, causing each train to stop sequentially from back to front, ensuring sufficient safety distance. Then, the train preceding the failed train is hard-coupled to form a new combined train. Finally, the ground train control center controls the combined train and other trains to re-establish the virtual coupling control mode and continue operation. However, this method only considers the condition of train-to-train communication failure and requires emergency braking to stop the group of trains, hard-coupling the failed train with the preceding train, thus reducing operational efficiency. Summary of the Invention

[0004] The purpose of this invention is to provide a control method for group-operated heavy-haul trains under communication failure, so as to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this invention provides a control method for heavy-haul trains operating in a group under communication failure conditions. The group of heavy-haul trains includes q locomotives, where q is a positive integer and q≥2. Each locomotive pulls at least one freight car, forming a group operation control mode with q trains in a formation. The q trains are sequentially labeled from front to back according to their direction of travel as train 1 to train q. Each locomotive is equipped with onboard ATP equipment, onboard ATO equipment, a group control center, an onboard control module, a car-to-car communication module, a car-to-ground communication module, group interlocking equipment, and onboard sensors. The trains in the group of heavy-haul trains achieve virtual connections between vehicles through car-to-car and car-to-ground wireless communication, and each train exchanges information with trackside communication equipment through a car-to-ground transmission network. During the operation of the group of heavy-haul trains, when train x experiences a communication failure (x≠1), control is performed according to the following steps:

[0006] S1. The group control center marks the train that has a communication failure and diagnoses the communication failure information, while informing the other trains of the information of the faulty train.

[0007] S2. After the fault information s of the faulty train is issued by the group control center, the group trains simultaneously reduce speed and separate according to a preset program, separating into group train A1, train A2, and group train A3. Group train A1 is formed from train 1 to train x-1, train A2 is formed from train x, and group train A3 is formed from train x+1 to train q. During the speed reduction and separation process, train x obtains the distance between itself and train x-1, the speed of train x-1, the speed difference between the two trains, the rate of change of the speed difference between the two trains, and the rate of change of the speed and acceleration of train x through onboard sensors.

[0008] S3. Input the preceding vehicle information collected by the x-th train in step S2 into the following model of the control vehicle for calculation to obtain the acceleration of the x-th train; wherein, the following model of the control vehicle is: (1);

[0009] In equation (1), Let x be the maximum acceleration of the x-th train. Let x be the current speed of train x. Let D be the desired speed of train x, and D1 be the safe operating distance between train x and the preceding train. Let x be the distance between train x and the train in front of it;

[0010] S4: Control train x to maintain a safe distance from the train in front. D1 continues to follow the train.

[0011] S5: Based on global traffic information, the ground center control module generates two groups of train operation curves and assigns them to A1 group trains and A3 group trains;

[0012] S6: Control the running speed of the A3 group train through the ground center control module, adjust the safe running distance D2 between the A3 group train and the A2 train, so that the A1 group train, A2 train and A3 group train can continue to run until the next stop.

[0013] Furthermore, in step S2, trains A1, A2, and A3 simultaneously reduce their speed and meet the following conditions: , The speed of the A1 group train after it has been slowed down. The speed of train A2 after it has been slowed down. The speed of the A3 group train after it has been slowed down.

[0014] Furthermore, the safe operating distances D1 and D2 in step S3 are set according to the following formulas (2) and (3), respectively: (2); (3);

[0015] In equations (2) and (3), The minimum safe distance between A1 group trains and A2 trains. To determine the desired following distance, Indicates the expected deceleration. d1 represents the speed difference between the train and the train in front, d2 is the distance calculated from the current speed of the A3 group train based on the minimum braking force, and d2 is the minimum safe distance between the A2 train and the A3 group train.

[0016] Furthermore, in step S5, the endpoint position and running speed of the two new train running curves can be set differently according to safety conditions.

[0017] Furthermore, in step S6, the final operating status of train groups A1, A2, and A3 meets the following conditions: ;in, This refers to the final operating speed of trains in group A1. This refers to the final operating speed of the A3 group trains. The final operating speed of the autonomously following A2 train.

[0018] Group operation technology establishes virtual couplers through communication, enabling multiple trains to operate collaboratively at the same speed with minimal spacing, thus improving operational efficiency. However, if one train experiences a communication failure, the safety of the entire train group cannot be guaranteed, posing a safety hazard. Even in the event of a communication failure, the train's control system remains operational. Therefore, this invention creatively proposes a follow-up model-based solution to address the problem of how trains with communication failures can continue following each other. Specifically, when a single train experiences a communication failure and cannot communicate with the ground or other trains, the group of trains, according to a preset program, simultaneously decelerates and separates after a set time s, forming three groups: A1 (trains 1 to x-1), A2 (train x), and A3 (trains x+1 to q). During the deceleration and separation process, the faulty train x uses onboard sensors to acquire the distance, speed difference, and rate of change of the speed difference between itself and train x-1, as well as the speed and acceleration rate of change of train x. The A1 group of trains continues operating as a group. Train A2 follows other trains by collecting data. In this situation, if the malfunctioning A2 train is at the rear of the A1 group of trains, it will not affect the A1 group even if the malfunctioning train loses communication capabilities. Simultaneously, train A2 can also reach the next stop by following other trains. Furthermore, for the A3 group of trains, it will continue operating as a group according to the new driving curve.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] The control method for heavy-haul trains operating in groups under communication failures, as described in this invention, addresses the issue of how a train with communication failure can continue to follow other trains when a single train experiences a communication failure and is unable to communicate with the ground or other trains. This method utilizes the train's control system to establish a following model. By employing this control method, the problem of heavy-haul train groups being unable to operate normally due to communication failures can be efficiently solved, significantly reducing the operational risks associated with group operation technology.

[0021] In addition to the objectives, features, and advantages described above, the present invention has other objectives, features, and advantages. The invention will now be described in further detail with reference to the accompanying drawings. Attached Figure Description

[0022] The accompanying drawings are provided to further illustrate embodiments of the present invention and form part of the specification. They are used together with the following detailed description to explain the embodiments of the present invention, but do not constitute a limitation thereof. In the drawings:

[0023] Figure 1This is a schematic diagram illustrating the separation of a group of heavy-load trains after a communication failure, according to the present invention. Detailed Implementation

[0024] The present invention will now be described in detail with reference to the embodiments shown in the accompanying drawings. However, it should be noted that these embodiments are not intended to limit the present invention. Equivalent transformations or substitutions in function, method, or structure made by those skilled in the art based on these embodiments are all within the scope of protection of the present invention.

[0025] Please see Figure 1 This embodiment provides a control method for heavy-haul trains operating in a group under communication failure. The group of heavy-haul trains includes q traction locomotives and several freight cars, where q is a positive integer and q≥2. Each traction locomotive pulls at least one freight car, forming a group operation control mode with q trains in a formation. The train at the front is designated as train 1, followed by trains numbered sequentially from front to back according to their direction of travel as train 2, train 3, ..., train q. The q trains achieve "virtual connection" between vehicles through car-to-car and car-to-ground wireless communication. In this structure, each traction locomotive is equipped with onboard ATP equipment, onboard ATO equipment, a group control center, an onboard control module, a car-to-car communication module, a car-to-ground communication module, group interlocking equipment, and onboard sensors for various measurement and sensing. The trains in the group of heavy-haul trains communicate wirelessly with the aforementioned control equipment and communication modules to exchange information and achieve virtual connection. Each train also exchanges information with the communication equipment beside the track through the car-to-ground transmission network. Specifically, when a heavy-haul train in a group is in operation, if the xth train experiences a communication failure (x≠1), the following control steps should be taken:

[0026] S1. The group control center marks the trains that have communication failures and diagnoses the communication failure information, while informing the other trains of the information of the trains that have failures.

[0027] S2. After the fault information of the faulty train is issued by the group control center, the group trains simultaneously reduce speed and separate according to a preset procedure, forming group trains A1, A2, and A3. Group train A1 is formed from train 1 to train x-1, group train A2 is formed from train x, and group train A3 is formed from train x+1 to train q. During the speed reduction and separation process, train x obtains the distance between itself and train x-1, the speed of train x-1, the speed difference between the two trains, the rate of change of the speed difference between the two trains, and the rate of change of its own speed and acceleration through onboard sensors. Group trains A1, A2, and A3 simultaneously reduce speed and satisfy… , The speed of the A1 group train after it has been slowed down. The speed of train A2 after it has been slowed down (that is, the expected speed of train x). The speed of the A3 group train after it has been slowed down.

[0028] S3. Input the preceding vehicle information collected by the x-th train in step S2 into the following model of the control vehicle for calculation to obtain the acceleration of the x-th train; wherein, the following model of the control vehicle is: (1);

[0029] In equation (1), Let x be the maximum acceleration of the x-th train. Let x be the current speed of train x. Let D be the desired speed of train x, and D1 be the safe operating distance between train x and the preceding train. Let x be the distance between train x and the train in front.

[0030] In one specific implementation, the safe operating distances D1 and D2 are set according to the following formulas (2) and (3), respectively: (2); (3);

[0031] In equations (2) and (3), The minimum safe distance between A1 group trains and A2 trains. To determine the desired following distance, This represents the expected deceleration of train A2. d1 represents the speed difference between the train (train A2, i.e. the train x that has malfunctioned) and the train in front, d2 is the distance calculated from the current speed of train A3 based on the minimum braking force, and d2 is the minimum safe distance between train A2 and train A3.

[0032] S4: Control train x to maintain a safe distance from the train in front. D1 continues to follow the train.

[0033] S5: Based on global traffic information, the ground center control module generates two groups of train operation curves and assigns them to A1 group trains and A3 group trains; the destination position and operating speed of the two new train operation curves can be set differently according to safety conditions.

[0034] S6: Control the operating speed of train A3 via the ground control module, adjust the safe operating distance D2 between train A3 and train A2, and allow trains A1, A2, and A3 to continue running until they stop at the next stop; in this step, the final operating status of trains A1, A2, and A3 must meet the following conditions: ;in, This refers to the final operating speed of trains in group A1. This refers to the final operating speed of the A3 group trains. The final operating speed of the autonomously following A2 train.

[0035] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A control method for heavy-haul trains operating in groups under communication failure, characterized in that, The group of heavy-haul trains includes q traction locomotives, where q is a positive integer and q≥2. Each traction locomotive pulls at least one freight car, forming a group operation control mode with q trains in a formation. The q trains are sequentially labeled from front to back according to their direction of travel as train 1 to train q. Each traction locomotive is equipped with onboard ATP equipment, onboard ATO equipment, a group control center, an onboard control module, a car-to-car communication module, a car-to-ground communication module, group interlocking equipment, and onboard sensors. The trains in the group of heavy-haul trains are virtually connected through car-to-car and car-to-ground wireless communication, and each train exchanges information with the communication equipment beside the track through the car-to-ground transmission network. During the operation of the group of heavy-haul trains, when the xth train experiences a communication failure (x≠1), the following steps are taken for control: S1. The group control center marks the train that has a communication failure and diagnoses the communication failure information, while informing the other trains of the information of the faulty train. S2. After the fault information s of the faulty train is issued by the group control center, the heavy-load trains in the group simultaneously reduce speed and separate according to a preset program, separating into group trains A1, A2, and A3. Group train A1 is formed from train 1 to train x-1, group train A2 is formed from train x, and group train A3 is formed from train x+1 to train q. During the speed reduction and separation process, train x obtains the distance between itself and train x-1, the speed of train x-1, the speed difference between the two trains, the rate of change of the speed difference between the two trains, and the rate of change of the speed and acceleration of train x through onboard sensors. S3. Input the preceding vehicle information collected by the x-th train in step S2 into the following model of the control vehicle for calculation to obtain the acceleration of the x-th train; wherein, the following model of the control vehicle is: (1); In equation (1), Let x be the maximum acceleration of the x-th train. Let x be the current speed of train x. Let D be the desired speed of train x, and D1 be the safe operating distance between train x and the preceding train. Let x be the distance between train x and the train in front of it; S4. Control train x to maintain a safe distance from the train in front. D1. Continue following the train. S5. Based on global traffic information, the ground center control module generates two groups of train operation curves and assigns them to A1 group trains and A3 group trains. S6. Control the running speed of the A3 group train through the ground center control module, adjust the safe running distance D2 between the A3 group train and the A2 train, so that the A1 group train, A2 train and A3 group train can continue to run until the next stop.

2. The control method according to claim 1, characterized in that, In step S2, trains A1, A2, and A3 simultaneously reduce their speed and meet the following conditions. , The speed of the A1 group train after it has been slowed down. The speed of train A2 after it has been slowed down. The speed of the A3 group train after it has been slowed down.

3. The control method according to claim 1, characterized in that, The safe operating distances D1 and D2 in step S3 are set according to the following formulas (2) and (3), respectively: (2); (3); In equations (2) and (3), This refers to the minimum safe distance between A1 group trains and A2 trains. To determine the desired following distance, Indicates the expected deceleration. d1 represents the speed difference between the train and the train in front, d2 is the distance calculated from the current speed of the A3 group train based on the minimum braking force, and d2 is the minimum safe distance between the A2 train and the A3 group train.

4. The control method according to claim 1, characterized in that, In step S5, the endpoint position and running speed of the two new train running curves can be set differently according to safety conditions.

5. The control method according to claim 1, characterized in that, In step S6, the final operating status of trains A1, A2, and A3 meets the following conditions: ;in, This refers to the final operating speed of trains in group A1. This refers to the final operating speed of the A3 group trains. The final operating speed of the autonomously following A2 train.

Citation Information

Patent Citations

  • Control method for virtual coupling high-speed train under communication fault

    CN113734244A

  • Control method for degradation operation of virtual coupling train under train-train communication fault

    CN115520244A

  • Control method and system under vehicle-to-vehicle communication fault

    CN117985080A