Smart city control system and method using digital twin technology
Using digital twin technology to analyze the usage history data of shared equipment, optimize maintenance time and storage location, solve the problem of aging and fault imbalance of shared equipment in smart cities, and improve the maintenance efficiency and service life of equipment.
Patent Information
- Application Number
- CN202410805033.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-06-21
AI Technical Summary
In smart cities, shared equipment ages faster due to improper placement or return, resulting in unbalanced faults and increasing the difficulty of maintenance.
Use digital twin technology to build a smart city regional model, create a 3D model through images, videos and laser scanning data, analyze the usage history data of shared equipment, adjust maintenance time, optimize the return method and storage location of equipment, and reduce maintenance pressure.
It achieves a balanced use of shared equipment, reduces maintenance pressure, and improves equipment maintenance efficiency and service life.
Smart Images

Figure CN118378852B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of smart city data management and control technology, and specifically to a smart city management and control system and method using digital twin technology. Background Art
[0002] Digital twin technology is a technology that makes full use of data such as physical models, sensor updates, and operation history, integrates multi-disciplinary, multi-physical, multi-scale, and multi-probability simulation processes, and completes mapping in virtual space, thereby reflecting the entire life cycle of the corresponding physical equipment. With the gradual development of digital technology, the combination of urban IoT and digital twin technology can realize the heuristic data control of smart cities in digital twins, and can make full use of digital models to perform forward-looking processing of smart city data.
[0003] In smart cities, shared equipment is developing rapidly as a measure to benefit the people, such as the use of shared facilities and shared equipment leasing within urban areas. In the use of shared equipment, some equipment often ages faster due to the location where it is placed or returned, resulting in an imbalance in the failure conditions between shared equipment and increasing the difficulty of maintenance. Summary of the invention
[0004] The purpose of the present invention is to provide a smart city management and control system and method using digital twin technology to solve the problems raised in the above-mentioned background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solution: a smart city management and control method using digital twin technology, the method comprising the following steps:
[0006] S1. Based on the smart city regional model data, build a regional digital twin model and mark the shared equipment points within the region;
[0007] S2. Obtain historical usage data of shared devices within the region, build a shared device data analysis model, and output a return method for the shared devices based on the shared device data analysis model;
[0008] S3. Based on different return methods, adjust the maintenance time of shared equipment and provide feedback to the smart city area management and control module.
[0009] According to the above technical solution, the construction of the regional digital twin model body includes:
[0010] Collect regional project image data;
[0011] The collecting of regional project image data refers to collecting image data related to the region by using images, videos, and laser scanning, and performing cleaning, denoising, and correction processing on the collected image data;
[0012] Model building;
[0013] The model building refers to using 3D software to restore the provided image, video, laser scan material data. First, the model is initially established based on the material, and then the model is high-poly sculptured and detail optimized. The high-poly sculpture is performed through the UV expansion operation so that the texture can be better fitted to the 3D model. The normal information on the object's high-poly model is recorded as intact as possible through baking. Then, in SP, the baked various textures are pasted on the low-poly model of the high-poly topology, the parameters of various materials are adjusted, and the details of the texture track, wear and scratches are added. Finally, the effect rendering is performed and the model is exported to a commonly used three-dimensional file format;
[0014] Prototyping;
[0015] The prototype design refers to building a prototype diagram, which provides users with the product interface style, the function of each button, the interaction logic, and the basic framework and operation mechanism of the product in advance;
[0016] UI design;
[0017] The UI design is based on prototype design, and the user interface is designed and laid out in detail, using rich and diverse chart components to perform visual design and presentation of different data display requirements;
[0018] Scene design;
[0019] The scene design refers to the process of highly restoring the 3D scenes involved in the regional project through 3D modeling, material mapping, and environment rendering, and then artistically processing and sublimating them; for example: scene visual adjustment, adjustment of overall scene coloring, adjustment of model shadows, production of weather particles, modification of scene atmosphere, etc.
[0020] 3D interactive development;
[0021] The 3D interactive development is based on prototype design and UI design. According to the project requirements and goals, the appropriate development platform and tools are selected; for example, Unreal Engine or WebGL. Create 3D scenes and models on the selected development platform, implement specific functional logic, add corresponding interactive logic, implement regional project operation logic, test and optimize, and after completing development, testing and optimization, publish and deploy the 3D function to the target platform or device; the target platform or device refers to the current application system;
[0022] Data fusion;
[0023] The data fusion refers to the fusion of the model with the regional project data to construct a data model of the digital twin model body, including regional equipment location data, human flow data, and regional plate data;
[0024] Digital collection;
[0025] The digital collection refers to the accurate collection of data during the operation of the digital twin model after the digital twin model is built, and the storage, analysis and visualization of the collected data.
[0026] According to the above technical solution, the construction of the shared device data analysis model includes:
[0027] The shared devices in the area are numbered and numbered by position. The numbering means that each shared device has a separate number; the position numbering means that each storage location in each shared device storage area in the area project has a separate number;
[0028] Construct digital simulation training data, take any shared equipment storage area as the center and R as the radius, form a crowd flow coverage area corresponding to the shared equipment storage area, take a fixed time period T as the analysis period, collect the total crowd flow in the crowd flow coverage area at a fixed time period T, calculate the crowd flow data within a unit time, and use it as the crowd flow analysis data within a unit time;
[0029] The system sets different sets of passenger flow ranges, and distributes passenger flow analysis data in different unit times to different sets of passenger flow ranges. The data in the same passenger flow range set becomes a group of control group data.
[0030] In any group of control group data, select the data with the same shared equipment storage area to build a shared equipment data analysis model:
[0031] Select any storage location A in the shared device storage area, and obtain the probability of the storage location A being selected within a fixed time period T under different constraints, where the different constraints refer to the number c of shared devices stored in the shared device storage area within the fixed time period T, where c≥3;
[0032]
[0033] in, represents the probability of storage location A being selected under constraint condition c; B represents the number of samples; i represents the sample number; It is equal to 1 when storage location A is selected and equal to 0 when it is not selected; Refers to the number of shared devices selected. In group B samples, at least one shared device is selected in each group of samples.
[0034] According to the above technical solution, the pedestrian flow data per unit time in the area is obtained, the corresponding pedestrian flow range set is selected, and the corresponding shared device data analysis model is obtained based on the corresponding pedestrian flow range set, and the shared devices to be returned in the area are obtained, and the shared devices to be returned refer to the shared devices that have not been returned to the shared device storage area by the user, and do not include the shared devices that are being used by the user; the usage time of each shared device to be returned is marked, and a return sequence is created from long to short based on the usage time, and the shared devices are selected in sequence order, and placed at the storage location with the smallest probability of being selected, and the selection probability of other vacant storage locations in the storage area where the selected storage location is located is updated; the selection continues in sequence order until all selections are completed;
[0035] During the selection process, if there are any two or more storage locations with the same minimum selection probability, one will be randomly selected; if the storage area corresponding to the selected storage location has been used to place a shared device in the sequence, the selection probabilities of the vacant storage locations in the corresponding storage area will be traversed, and the shared device at the front of the sequence will be placed in the storage location with the lowest selection probability, and this process will be repeated in the corresponding storage area until all the shared devices that have been placed in the sequence have been adjusted in this storage area;
[0036] After all the sequences are selected, a return method marking diagram of the shared device is formed, each storage location is marked with a digital number of the shared device to be returned, and the marking diagram is fed back to the administrator port.
[0037] According to the above technical solution, a maintenance threshold of shared equipment is set. According to different usage times, when the number of shared equipment whose usage time exceeds the maintenance threshold of shared equipment reaches one-half of the total number, the current time is marked and set as the maintenance time of the shared equipment, and the time is fed back to the smart city area management and control module.
[0038] A smart city management and control system using digital twin technology, which includes: a digital twin module, a shared equipment analysis module, a regulation module, and a smart city area management and control module;
[0039] The digital twin module builds a regional digital twin model based on the smart city regional model data and marks the shared equipment points within the region; the shared equipment analysis module is used to obtain the historical usage data of shared equipment within the region, build a shared equipment data analysis model, and output the return method of the shared equipment based on the shared equipment data analysis model; the adjustment module adjusts the maintenance time of the shared equipment based on different return methods and feeds back to the smart city regional control module; the smart city regional control module is used to build data storage and processing within the smart city region and issue instructions and measures to the administrator port;
[0040] The output end of the digital twin module is connected to the input end of the shared device analysis module; the output end of the shared device analysis module is connected to the input end of the adjustment module; the output end of the adjustment module is connected to the input end of the smart city area management and control module.
[0041] According to the above technical solution, the digital twin module includes a digital twin model construction unit and a marking unit;
[0042] The digital twin model construction unit constructs a regional digital twin model body based on the smart city regional model data; the marking unit is used to mark the shared device points within the region on the regional digital twin model body;
[0043] The output end of the digital twin model construction unit is connected to the input end of the marking unit.
[0044] According to the above technical solution, the shared device analysis module includes a data storage unit and a data analysis unit;
[0045] The data storage unit is used to obtain the historical usage data of the shared equipment within the area and store it for analysis; the data analysis unit is used to build a shared equipment data analysis model and output the return method of the shared equipment based on the shared equipment data analysis model;
[0046] The output end of the data storage unit is connected to the input end of the data analysis unit.
[0047] According to the above technical solution, the adjustment module includes a time adjustment unit and a feedback unit;
[0048] The time adjustment unit adjusts the maintenance time of the shared equipment based on different return methods; the feedback unit is used to feed back the time to the smart city area management and control module;
[0049] The output end of the time adjustment unit is connected to the input end of the feedback unit.
[0050] According to the above technical solution, the smart city area control module includes a smart city area processing unit and a command unit;
[0051] The smart city area processing unit is used to construct data storage and processing in the smart city area, and issue instructions to the administrator port; the instruction unit is used to execute and store instructions;
[0052] The output end of the smart city area processing unit is connected to the input end of the instruction unit.
[0053] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention constructs a digital twin model based on smart city regional components, combines urban Internet of Things with digital twin technology, realizes heuristic data management and control under the smart city in the digital twin, and provides storage and usage analysis of shared equipment in the data processing of shared equipment under the smart city, provides data support for the maintenance and inspection of shared equipment, improves usage balance, and reduces maintenance pressure. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0055] Figure 1 It is a flow chart of the smart city management and control method using digital twin technology according to the present invention. DETAILED DESCRIPTION
[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0057] See also Figure 1 In the first embodiment of the present invention, a smart city management and control method using digital twin technology includes:
[0058] Based on the smart city regional model data, build a regional digital twin model and mark the shared equipment points within the region;
[0059] In this embodiment, a scenic spot in a smart city is used as a regional analysis, and shared bicycles are used as shared devices for analysis.
[0060] The construction of the regional digital twin model body includes:
[0061] Collect image data of scenic area projects;
[0062] The collecting of regional project image data refers to collecting image data related to the region by using images, videos, and laser scanning, and performing cleaning, denoising, and correction processing on the collected image data;
[0063] Model building;
[0064] The model building refers to using 3D software to restore the provided image, video, laser scan material data. First, the model is initially established based on the material, and then the model is high-poly sculptured and detail optimized. The high-poly sculpture is performed through the UV expansion operation so that the texture can be better fitted to the 3D model. The normal information on the object's high-poly model is recorded as intact as possible through baking. Then, in SP, the baked various textures are pasted on the low-poly model of the high-poly topology, the parameters of various materials are adjusted, and the details of the texture track, wear and scratches are added. Finally, the effect rendering is performed and the model is exported to a commonly used three-dimensional file format;
[0065] Prototyping;
[0066] The prototype design refers to building a prototype diagram, which provides users with the product interface style, the function of each button, the interaction logic, and the basic framework and operation mechanism of the product in advance;
[0067] UI design;
[0068] The UI design is based on prototype design, and the user interface is designed and laid out in detail, using rich and diverse chart components to perform visual design and presentation for different data display requirements;
[0069] Scene design;
[0070] The scene design refers to the process of highly restoring the three-dimensional scenes involved in the regional project through three-dimensional modeling, material mapping, and environment rendering, and then artistically processing and sublimating them on this basis;
[0071] 3D interactive development;
[0072] The three-dimensional interactive development is based on prototype design and UI design, and the appropriate development platform and tools are selected according to project requirements and goals; three-dimensional scenes and models are created on the selected development platform, specific functional logic is implemented, corresponding interactive logic is added, regional project operation logic is implemented, and testing and optimization are performed. After the development, testing and optimization are completed, the three-dimensional function is released and deployed to the target platform or device; the target platform or device refers to the current application system;
[0073] Data fusion;
[0074] The data fusion refers to the fusion of the model with the regional project data to construct a data model of the digital twin model body, including regional equipment location data, human flow data, and regional plate data;
[0075] Digital collection;
[0076] The digital collection refers to the accurate collection of data during the operation of the digital twin model after the digital twin model is built, and the storage, analysis and visualization of the collected data.
[0077] Obtain historical usage data of shared devices within the scenic area and build a shared device data analysis model:
[0078] The shared devices in the area are numbered and numbered by position. The numbering means that each shared device has a separate number; the position numbering means that each storage location in each shared device storage area in the area project has a separate number;
[0079] For example, if there are 8 storage areas in the scenic area, and each storage area can store 10 shared bicycles, then the 8 storage areas are marked as AH areas, and each area is marked as A1-A10. The shared bicycles are marked with names, such as GD-10225, and the system can mark numbers;
[0080] Construct digital simulation training data, take any shared equipment storage area as the center and R as the radius, form a crowd flow coverage area corresponding to the shared equipment storage area, take a fixed time period T as the analysis period, collect the total crowd flow in the crowd flow coverage area at a fixed time period T, calculate the crowd flow data within a unit time, and use it as the crowd flow analysis data within a unit time;
[0081] The system sets different sets of passenger flow ranges, and distributes passenger flow analysis data in different unit times to different sets of passenger flow ranges. The data in the same passenger flow range set becomes a group of control group data.
[0082] In any group of control group data, select the data with the same shared equipment storage area to build a shared equipment data analysis model:
[0083] Select any storage location A in the shared device storage area, and obtain the probability of the storage location A being selected within a fixed time period T under different constraints, where the different constraints refer to the number c of shared devices stored in the shared device storage area within the fixed time period T, where c≥3;
[0084] ;
[0085] in, represents the probability of storage location A being selected under constraint condition c; B represents the number of samples; i represents the sample number; It is equal to 1 when storage location A is selected and equal to 0 when it is not selected; Refers to the number of shared devices selected. In group B samples, at least one shared device is selected in each group of samples.
[0086] Obtain the pedestrian flow data per unit time in the area, select the corresponding pedestrian flow range set, obtain the corresponding shared device data analysis model based on the corresponding pedestrian flow range set, obtain the shared devices to be returned in the area, the "to be returned" refers to the shared devices that the user has not returned to the shared device storage area, and does not include the shared devices that the user is using; mark the usage time of each shared device to be returned, create a return sequence from long to short based on the usage time, select the shared devices in sequence order, place them at the storage location with the smallest probability of being selected, and update the selection probability of other vacant storage locations in the storage area where the selected storage location is located; continue to select in sequence order until all selections are completed;
[0087] For example, for storage locations A1-A10 in a storage area A, when the flow of people is 1000, the probabilities of A1 and A2 are 10% and 5% respectively. Assuming that there are devices in the other locations, when allocating a device in the sequence, it should be first allocated to the 5% A2 location, and the A1 probability under 9 devices should be recalculated; at this time, if another device is to be allocated to the A1 location, the probabilities of A1 and A2 locations when the number of devices is 10 should be recalculated, and the smaller one should be selected and given to the device at the front of the sequence;
[0088] During the selection process, if there are any two or more storage locations with the same minimum selection probability, one will be randomly selected; if the storage area corresponding to the selected storage location has been used to place a shared device in the sequence, the selection probabilities of the vacant storage locations in the corresponding storage area will be traversed, and the shared device at the front of the sequence will be placed in the storage location with the lowest selection probability, and this process will be repeated in the corresponding storage area until all the shared devices that have been placed in the sequence have been adjusted in this storage area;
[0089] After all the sequences are selected, a return method marking diagram of the shared device is formed, each storage location is marked with a digital number of the shared device to be returned, and the marking diagram is fed back to the administrator port.
[0090] Set the maintenance threshold of shared devices. According to different usage times, when the number of shared devices whose usage time exceeds the maintenance threshold reaches half of the total number, mark the current time, set it as the maintenance time of the shared device, and feedback it to the smart city area management and control module.
[0091] In the second embodiment, a smart city management and control system using digital twin technology is provided, the system comprising: a digital twin module, a shared device analysis module, a regulation module, and a smart city area management and control module;
[0092] The digital twin module builds a regional digital twin model based on the smart city regional model data and marks the shared equipment points within the region; the shared equipment analysis module is used to obtain the historical usage data of shared equipment within the region, build a shared equipment data analysis model, and output the return method of the shared equipment based on the shared equipment data analysis model; the adjustment module adjusts the maintenance time of the shared equipment based on different return methods and feeds back to the smart city regional control module; the smart city regional control module is used to build data storage and processing within the smart city region and issue instructions and measures to the administrator port;
[0093] The output end of the digital twin module is connected to the input end of the shared device analysis module; the output end of the shared device analysis module is connected to the input end of the adjustment module; the output end of the adjustment module is connected to the input end of the smart city area management and control module.
[0094] The digital twin module includes a digital twin model construction unit and a marking unit;
[0095] The digital twin model construction unit constructs a regional digital twin model body based on the smart city regional model data; the marking unit is used to mark the shared device points within the region on the regional digital twin model body;
[0096] The output end of the digital twin model construction unit is connected to the input end of the marking unit.
[0097] The shared device analysis module includes a data storage unit and a data analysis unit;
[0098] The data storage unit is used to obtain the historical usage data of the shared equipment within the area and store it for analysis; the data analysis unit is used to build a shared equipment data analysis model and output the return method of the shared equipment based on the shared equipment data analysis model;
[0099] The output end of the data storage unit is connected to the input end of the data analysis unit.
[0100] The adjustment module includes a time adjustment unit and a feedback unit;
[0101] The time adjustment unit adjusts the maintenance time of the shared equipment based on different return methods; the feedback unit is used to feed back the time to the smart city area management and control module;
[0102] The output end of the time adjustment unit is connected to the input end of the feedback unit.
[0103] The smart city area control module includes a smart city area processing unit and a command unit;
[0104] The smart city area processing unit is used to construct data storage and processing in the smart city area, and issue instructions to the administrator port; the instruction unit is used to execute and store instructions;
[0105] The output end of the smart city area processing unit is connected to the input end of the instruction unit.
[0106] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0107] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A smart city management and control method using digital twin technology, characterized by: The method comprises the following steps: S1. Based on the smart city regional model data, build a regional digital twin model and mark the shared equipment points within the region; S2. Obtain historical usage data of shared devices within the region, build a shared device data analysis model, and output a return method for the shared devices based on the shared device data analysis model; S3. Adjust the maintenance time of shared equipment based on different return methods and provide feedback to the smart city regional management and control module; The construction of the regional digital twin model body includes: Collect regional project image data; The collecting of regional project image data refers to collecting image data related to the region by using images, videos, and laser scanning, and performing cleaning, denoising, and correction processing on the collected image data; Model building; The model building refers to using 3D software to restore the provided image, video, laser scan material data. First, the model is initially established based on the material, and then the model is high-poly sculptured and detail optimized. The high-poly sculpture is performed through the UV expansion operation so that the texture can be better fitted to the 3D model. The normal information on the object's high-poly model is recorded as intact as possible through baking. Then, in SP, the baked various textures are pasted on the low-poly model of the high-poly topology, the parameters of various materials are adjusted, and the details of the texture track, wear and scratches are added. Finally, the effect rendering is performed and the model is exported to a commonly used three-dimensional file format; Prototyping; The prototype design refers to building a prototype diagram, which provides users with the product interface style, the function of each button, the interaction logic, and the basic framework and operation mechanism of the product in advance; UI design; The UI design is based on prototype design, and the user interface is designed and laid out in detail, using rich and diverse chart components to perform visual design and presentation for different data display requirements; Scene design; The scene design refers to the process of highly restoring the three-dimensional scenes involved in the regional project through three-dimensional modeling, material mapping, and environment rendering, and then artistically processing and sublimating them on this basis; 3D interactive development; The three-dimensional interactive development is based on prototype design and UI design, and the appropriate development platform and tools are selected according to project requirements and goals; three-dimensional scenes and models are created on the selected development platform, specific functional logic is implemented, corresponding interactive logic is added, regional project operation logic is implemented, and testing and optimization are performed. After the development, testing and optimization are completed, the three-dimensional function is released and deployed to the target platform or device; the target platform or device refers to the current application system; Data fusion; The data fusion refers to the fusion of the model with the regional project data to construct a data model of the digital twin model body, including regional equipment location data, human flow data, and regional plate data; Digital collection; The digital collection refers to the accurate collection of data during the operation of the digital twin model after the digital twin model is built, and the storage, analysis and visualization of the collected data; The constructing of the shared device data analysis model comprises: The shared devices in the area are numbered and numbered by position. The numbering means that each shared device has a separate number; the position numbering means that each storage location in each shared device storage area in the area project has a separate number; Construct digital simulation training data, take any shared equipment storage area as the center and R as the radius, form a crowd flow coverage area corresponding to the shared equipment storage area, take a fixed time period T as the analysis period, collect the total crowd flow in the crowd flow coverage area at a fixed time period T, calculate the crowd flow data within a unit time, and use it as the crowd flow analysis data within a unit time; The system sets different sets of passenger flow ranges, and distributes passenger flow analysis data in different unit times to different sets of passenger flow ranges. The data in the same passenger flow range set becomes a group of control group data. In any group of control group data, select the data with the same shared equipment storage area to build a shared equipment data analysis model: Select any storage location A in the shared device storage area, and obtain the probability of the storage location A being selected within a fixed time period T under different constraints, where the different constraints refer to the number c of shared devices stored in the shared device storage area within the fixed time period T, where c≥3; in, represents the probability of storage location A being selected under constraint condition c; B represents the number of samples; i represents the sample number; It is equal to 1 when storage location A is selected and equal to 0 when it is not selected; Refers to the number of shared devices selected. In group B samples, at least one shared device is selected in each group of samples.
2. The smart city management and control method using digital twin technology according to claim 1 is characterized by: Also includes: Obtain the pedestrian flow data per unit time in the area, select the corresponding pedestrian flow range set, obtain the corresponding shared device data analysis model based on the corresponding pedestrian flow range set, obtain the shared devices to be returned in the area, the "to be returned" refers to the shared devices that the user has not returned to the shared device storage area, and does not include the shared devices that the user is using; mark the usage time of each shared device to be returned, create a return sequence from long to short based on the usage time, select the shared devices in sequence order, place them at the storage location with the smallest probability of being selected, and update the selection probability of other vacant storage locations in the storage area where the selected storage location is located; continue to select in sequence order until all selections are completed; During the selection process, if there are any two or more storage locations with the same minimum selection probability, one will be randomly selected; if the storage area corresponding to the selected storage location has been used to place a shared device in the sequence, the selection probabilities of the vacant storage locations in the corresponding storage area will be traversed, and the shared device at the front of the sequence will be placed in the storage location with the lowest selection probability, and this process will be repeated in the corresponding storage area until all the shared devices that have been placed in the sequence have been adjusted in this storage area; After all the sequences are selected, a return method marking diagram of the shared device is formed, each storage location is marked with a digital number of the shared device to be returned, and the marking diagram is fed back to the administrator port.
3. The smart city management and control method using digital twin technology according to claim 2 is characterized in that: Set the maintenance threshold of shared devices. According to different usage times, when the number of shared devices whose usage time exceeds the maintenance threshold reaches half of the total number, mark the current time, set it as the maintenance time of the shared device, and feedback it to the smart city area management and control module.
4. A smart city management and control system using digital twin technology, using the smart city management and control method using digital twin technology as claimed in claim 1, characterized in that: The system includes: digital twin module, shared equipment analysis module, adjustment module and smart city area control module; The digital twin module builds a regional digital twin model based on the smart city regional model data and marks the shared equipment points within the region; the shared equipment analysis module is used to obtain the historical usage data of shared equipment within the region, build a shared equipment data analysis model, and output the return method of the shared equipment based on the shared equipment data analysis model; the adjustment module adjusts the maintenance time of the shared equipment based on different return methods and feeds back to the smart city regional control module; the smart city regional control module is used to build data storage and processing within the smart city region and issue instructions and measures to the administrator port; The output end of the digital twin module is connected to the input end of the shared device analysis module; the output end of the shared device analysis module is connected to the input end of the adjustment module; the output end of the adjustment module is connected to the input end of the smart city area management and control module.
5. The smart city management and control system using digital twin technology according to claim 4 is characterized in that: The digital twin module includes a digital twin model construction unit and a marking unit; The digital twin model construction unit constructs a regional digital twin model body based on the smart city regional model data; the marking unit is used to mark the shared device points within the region on the regional digital twin model body; The output end of the digital twin model construction unit is connected to the input end of the marking unit.
6. The smart city management and control system using digital twin technology according to claim 4 is characterized by: The shared device analysis module includes a data storage unit and a data analysis unit; The data storage unit is used to obtain the historical usage data of the shared equipment within the area and store it for analysis; the data analysis unit is used to build a shared equipment data analysis model and output the return method of the shared equipment based on the shared equipment data analysis model; The output end of the data storage unit is connected to the input end of the data analysis unit.
7. The smart city management and control system using digital twin technology according to claim 4 is characterized by: The adjustment module includes a time adjustment unit and a feedback unit; The time adjustment unit adjusts the maintenance time of the shared equipment based on different return methods; the feedback unit is used to feed back the time to the smart city area management and control module; The output end of the time adjustment unit is connected to the input end of the feedback unit.
8. The smart city management and control system using digital twin technology according to claim 4 is characterized by: The smart city area control module includes a smart city area processing unit and a command unit; The smart city area processing unit is used to construct data storage and processing in the smart city area, and issue instructions to the administrator port; the instruction unit is used to execute and store instructions; The output end of the smart city area processing unit is connected to the input end of the instruction unit.
Citation Information
Patent Citations
Smart city modularization construction method and system based on digital twinning
CN115906261A
Smart city management method and system based on digital twinning
CN117670242A
