A computer resource management system and method based on cloud computing
Through the computer resource management system based on cloud computing, through simulated allocation and scene control, the problem of low efficiency of enterprise resource allocation is solved, and more efficient resource management and processing efficiency are achieved.
Patent Information
- Application Number
- CN202410912482.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-09
AI Technical Summary
In enterprise computer resource management, resource allocation cannot meet enterprise needs due to network problems, making it difficult to ensure reasonable resource allocation and processing efficiency.
A computer resource management system based on cloud computing is used to regulate the allocation and use of computer resources by simulating allocation plans, setting multiple scenarios, monitoring management status and building allocation models to improve resource processing efficiency.
By optimizing resource allocation, the computer's resource processing efficiency is improved, and better resource scheduling management and processing efficiency are achieved.
Smart Images

Figure CN118467179B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a computer resource management system and method based on cloud computing. Background Art
[0002] With the popularization and deepening of the Internet, computer technology is being used more and more widely in all walks of life. In the management of enterprises, resources need to be allocated, managed and processed. In the process of resource allocation, computer network problems may cause the processing of resources to fail to meet the needs of the enterprise. Therefore, it is difficult to regulate and manage resources, ensure that resources are reasonably allocated, and ensure the efficiency of computer processing of resources. Summary of the invention
[0003] The purpose of the present invention is to provide a computer resource management system and method based on cloud computing to solve the shortcomings of the background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a computer resource management method based on cloud computing, comprising the following steps:
[0005] Determine the resources that need to be managed, and simulate the allocation of multiple computers based on the resources that need to be managed to obtain an allocation plan;
[0006] Setting multiple scenarios, simulating computer resource management through the set multiple scenarios, obtaining simulation results under multiple scenarios and binding the simulation results with corresponding scenarios to obtain allocation information;
[0007] Determine the allocation information corresponding to the actual computer and build an allocation model;
[0008] The corresponding scenario monitors the management status of the actual computer for the resources to be managed, and based on the corresponding relationship between the management status and the simulation result of the corresponding scenario, the computer is regulated according to the simulation result.
[0009] In a preferred embodiment, the step of determining the resources to be managed and obtaining an allocation scheme by simulating allocation to a plurality of computers based on the resources to be managed includes:
[0010] Collect resource management types of multiple computers, and divide the resources to be managed into multiple sub-resources based on the database;
[0011] The allocation scheme is obtained by simulating the allocation of multiple sub-resources to corresponding computers.
[0012] In a preferred embodiment, the step of simulating the allocation of the plurality of sub-resources to the corresponding computers to obtain the allocation plan comprises:
[0013] Setting a database, wherein the database includes sub-resources and corresponding resource management types;
[0014] Extract features of resources to be managed to obtain multiple feature information, and perform text matching based on the database according to the multiple feature information to obtain multiple sub-resources;
[0015] The resource management types corresponding to the plurality of sub-resources are respectively determined based on the database, and the sub-resources are simulated and allocated to the corresponding computers based on the resource management types as an allocation scheme.
[0016] In a preferred embodiment, the step of obtaining simulation results under multiple scenarios and binding the simulation results with corresponding scenarios to obtain allocation information includes:
[0017] Set multiple scenes, and configure label information corresponding to the multiple scenes, wherein the label information includes the network level corresponding to the scene;
[0018] The simulation computer is used to simulate multiple scenarios respectively to obtain simulation results, and the simulation results are bound to the corresponding scenarios to obtain allocation information.
[0019] In a preferred embodiment, the step of simulating the simulation computer corresponding to multiple scenarios respectively to obtain simulation results and binding the simulation results with the corresponding scenarios to obtain allocation information includes:
[0020] A plurality of simulated computers are constructed corresponding to the plurality of computers, the connection relationship between the plurality of computers is used as the connection relationship between the plurality of simulated computers, and the plurality of simulated computers connected according to the connection relationship between the plurality of simulated computers is used as a simulated computer group;
[0021] An upper resource network is set corresponding to the simulated computer based on the connection relationship between the simulated computers, wherein the upper resource network is a plurality of upper resource points connected based on the connection relationship, and the upper resource points store sub-resources corresponding to the simulated computer;
[0022] The upper-layer resource network is copied to correspond to multiple scenarios and information is bound as test scenarios;
[0023] The simulation computer group is replicated according to the number of scenarios and respectively put into the test scenarios for simulation;
[0024] Dividing and storing the sub-resources in the simulated computer to obtain a plurality of processing resources, obtaining the status information of the simulated computer processing sub-resources, and treating the status information that does not meet the preset conditions as abnormal information;
[0025] Select processing resources exceeding the preset number and the corresponding simulation computers to be separated and put into simulation computers that meet the preset conditions as simulation results, and mark the simulation results on the upper resource network;
[0026] The simulation results are bound to the corresponding scenarios to obtain the allocation information.
[0027] In a preferred embodiment, the step of dividing and storing the sub-resources in the simulation computer to obtain a plurality of processing resources includes:
[0028] A cloud server is configured corresponding to the simulation computer, and multiple space areas are configured in the cloud server;
[0029] A plurality of contact points are arranged in the space area, a plurality of pheromones are arranged in the plurality of contact points respectively, and communication association is performed between the plurality of contact points;
[0030] Dividing the sub-resources in the simulation computer based on the number of contacts in the spatial region to obtain multiple unit resources of the same number;
[0031] Multiple unit resources are stored one-to-one in a spatial area, and characteristic information in the unit resources is extracted, wherein the characteristic information includes characteristic content and characteristic position where the characteristic content is located. The characteristic information is bound through multiple contacts in the spatial area, and pheromones are matched with the characteristic information to obtain corresponding multiple processing resources.
[0032] In a preferred embodiment, the step of determining the allocation information corresponding to the actual computer and constructing the allocation model includes:
[0033] Determine the scenario and obtain corresponding allocation information, and allocate multiple processing resources in the cloud server corresponding to the simulated computer to the corresponding computer based on the allocation plan;
[0034] The allocation model is obtained by constructing the computer to which the processing resources are allocated.
[0035] In a preferred embodiment, the corresponding scenario monitors the management status of the actual computer for the resources to be managed, and the step of regulating the computer according to the simulation result based on the corresponding relationship between the management status and the simulation result of the corresponding scenario includes:
[0036] A cloud server corresponding to the allocation model is configured, a communication channel between the computer in the allocation model and the corresponding actual computer is established based on the cloud server, and a plurality of processing resources corresponding to the computer in the allocation model is sent to the corresponding actual computer based on the communication channel;
[0037] Monitor the actual management status of the computer for processing resources, where the management status is the processing efficiency of the computer for processing resources, and transmit the management status to the cloud server;
[0038] In the cloud server, the corresponding scenario is determined based on the management status, the corresponding simulation result is obtained according to the scenario, the allocation model is adjusted according to the simulation result to obtain the adjusted allocation model, and the processing resources in the computer are regulated by the adjusted allocation model.
[0039] The present invention also provides a computer resource management system based on cloud computing, comprising:
[0040] A determination module is used to determine the resources that need to be managed, and obtain an allocation plan by simulating allocation to multiple computers based on the resources that need to be managed;
[0041] An information setting module, connected to the determination module, is used to set multiple scenarios, simulate computer resource management through the set multiple scenarios, obtain simulation results under multiple scenarios, and bind the simulation results with corresponding scenarios to obtain allocation information;
[0042] A construction module, connected to the information setting module, is used to determine the allocation information corresponding to the actual computer and to construct an allocation model;
[0043] The management module is connected to the construction module and is used to monitor the management status of the actual computer for the resources to be managed in the corresponding scenario, and to regulate the computer according to the simulation results based on the corresponding relationship between the management status and the simulation results of the corresponding scenario.
[0044] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0045] During processing, the efficiency of the simulated computer in processing sub-resources is lower than the preset conditions. In order to ensure the high efficiency of resource processing, the processing resources exceeding the preset quantity are separated from the corresponding simulated computers and invested in the simulated computers that meet the preset conditions. This can ensure the computer's processing efficiency of resources, better schedule and manage resources, and ensure the processing efficiency of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0047] Figure 1 The present invention is a flow chart of the method.
[0048] Figure 2 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] Example 1, please refer to Figure 1 As shown, the computer resource management method based on cloud computing described in this embodiment includes the following steps:
[0051] S1. Determine the resources that need to be managed, and simulate the allocation of multiple computers based on the resources that need to be managed to obtain an allocation plan;
[0052] S2. Setting multiple scenarios, simulating computer resource management through the set multiple scenarios, obtaining simulation results under the multiple scenarios, and binding the simulation results with the corresponding scenarios to obtain allocation information;
[0053] S3, determining the allocation information corresponding to the actual computer and building an allocation model;
[0054] S4, monitoring the management status of the actual computer for the resources to be managed in the corresponding scenario, and regulating the computer according to the simulation results based on the corresponding relationship between the management status and the simulation results of the corresponding scenario;
[0055] As described in the above steps S1-S4, with the popularization and deepening of the Internet, computer technology is being used more and more widely in all walks of life. In the management of an enterprise, resources need to be allocated, managed and processed. In the process of resource allocation, computer network problems may cause the processing of resources to fail to meet the needs of the enterprise. Therefore, it is difficult to regulate and manage resources, ensure that resources are reasonably allocated, and ensure the efficiency of computer processing of resources. In this application, during processing, since the efficiency of the simulated computer in processing sub-resources is lower than the preset conditions, in order to ensure the high efficiency of resource processing, the processing resources that exceed the preset number are separated from the corresponding simulated computers and put into the simulated computers that meet the preset conditions. This can ensure the computer's processing efficiency of resources, better schedule and manage resources, and ensure the efficiency of resource processing.
[0056] In one embodiment, the step S1 of determining the resources to be managed and simulating the allocation of the resources to be managed to multiple computers to obtain an allocation plan includes:
[0057] S11, collecting resource management types of multiple computers, and dividing the resources to be managed into multiple sub-resources based on the database;
[0058] S12, simulating the allocation of multiple sub-resources to corresponding computers to obtain an allocation plan;
[0059] As described in the above steps S11-S12, the resource management type of the computer is collected, wherein the resource management type includes the form and content of the resources that can be managed, and then the resources to be managed are divided according to the database to obtain multiple sub-resources; then the multiple sub-resources are simulated and allocated to the corresponding computers to obtain an allocation plan, and the simulated allocation here can be allocated using a linear programming or integer programming algorithm, and the allocation here is used to allocate multiple sub-resources of the corresponding resource management type to the computer of the corresponding resource management type, and the multiple sub-resources here are the resources that need to be managed of the corresponding computer management type, and have a better division management effect.
[0060] In one embodiment, the step S12 of simulating the allocation of the plurality of sub-resources to the corresponding computers to obtain the allocation scheme includes:
[0061] S121, setting a database, wherein the database includes sub-resources and corresponding resource management types;
[0062] S122, extracting features of the resources to be managed to obtain multiple feature information, and performing text matching based on the database according to the multiple feature information to obtain multiple sub-resources;
[0063] S123: Determine resource management types corresponding to the plurality of sub-resources based on the database, and simulate allocating the sub-resources to corresponding computers based on the resource management types as an allocation solution.
[0064] As described in the above steps S121-S123, a database is set, where the database is the stored resource management type and the corresponding sub-resources, and the sub-resources are the behavior information formulated by the corresponding enterprise in the database, for example, an overall technical information, under which there are corresponding multiple technical information branches, such as an instruction information, and the instruction information requires multiple branch instructions corresponding to multiple technical information branches to be completed together, and then the corresponding resource management type is set for the corresponding sub-resource to store it to obtain a database, and then feature extraction is performed on the resources to be managed to obtain multiple feature information; the resource to be managed is a paragraph of text, and keyword extraction is performed on the paragraph of text to obtain multiple feature information, and keyword extraction here can be achieved by performing keyword extraction natural language processing (NLP) technology on the content of the resource to be managed, such as using TF-IDF algorithm, LDA topic model, etc., to identify and extract important keywords, and based on the database, text matching is performed according to multiple feature information to obtain multiple sub-resources, and multiple feature information corresponds to branch instructions in the database, so text matching is performed based on multiple feature information to obtain multiple sub-resources, and the resource management types corresponding to the multiple sub-resources are determined based on the database.
[0065] In one embodiment, the step S2 of obtaining simulation results under multiple scenarios and binding the simulation results with corresponding scenarios to obtain allocation information includes:
[0066] S21, setting multiple scenarios, and configuring label information corresponding to the multiple scenarios, wherein the label information includes a network level corresponding to the scenario;
[0067] S22, simulating the simulation computer corresponding to the multiple scenarios respectively to obtain simulation results and binding the simulation results with the corresponding scenarios to obtain allocation information;
[0068] As described in the above steps S21 and S22, multiple scenarios are set, and the scenarios here are to configure label information corresponding to multiple scenarios, wherein the label information includes the network level corresponding to the scenario, and the network level here is the range level of network stability and signal strength, for example, the range level includes: very weak signal: <-100 dBm, may not be able to connect or the connection quality is extremely poor; weak signal: -85 dBm to -100 dBm, the connection may be unstable and the speed is slow; medium signal: -70 dBm to -85dBm, the connection is relatively stable, but may be subject to certain interference; strong signal: >-70 dBm, at this time the connection is stable and the speed is fast; then the simulation computer is simulated corresponding to multiple scenarios respectively to obtain simulation results and the simulation results are bound to the corresponding scenarios to obtain allocation information, and simulation can be performed corresponding to multiple scenarios to obtain simulation results, wherein the simulation results are a plan for the computer to reallocate subsequent processing resources, so that after the simulation results exist, the computer can manage the allocation of resources based on the simulation results in subsequent actual use.
[0069] In one embodiment, the step S22 of simulating the simulation computer corresponding to the multiple scenarios to obtain simulation results and binding the simulation results with the corresponding scenarios to obtain allocation information includes:
[0070] S221, constructing a plurality of simulated computers corresponding to the plurality of computers, taking the connection relationship between the plurality of computers as the connection relationship between the plurality of simulated computers, and taking the plurality of simulated computers connected according to the connection relationship between the plurality of simulated computers as a simulated computer group;
[0071] S222, setting an upper-layer resource network corresponding to the simulated computer based on the connection relationship between the simulated computers, wherein the upper-layer resource network is a plurality of upper-layer resource points connected based on the connection relationship, and the upper-layer resource points store sub-resources corresponding to the simulated computer;
[0072] S223, duplicating the upper-layer resource network to correspond to multiple scenarios and binding information to serve as test scenarios;
[0073] S224, duplicating the simulation computer group according to the number of scenarios and respectively putting them into the test scenarios for simulation;
[0074] S225, dividing and storing the sub-resources in the simulated computer to obtain a plurality of processing resources, obtaining the status information of the sub-resources processed by the simulated computer, and treating the status information that does not meet the preset conditions as abnormal information;
[0075] S226, selecting processing resources exceeding a preset number and the corresponding simulation computers to be separated and put into simulation computers meeting preset conditions as simulation results, and marking the simulation results on the upper resource network;
[0076] S227, binding the simulation result with the corresponding scenario to obtain allocation information;
[0077] As described in the above steps S221-S227, corresponding to the connection relationship of the actual multiple computers, the same connection relationship between the multiple simulated computers is constructed, and the upper-level resource network is set for the simulated computer based on the connection relationship between the simulated computers, wherein the upper-level resource network is multiple upper-level resource points connected based on the connection relationship, and the upper-level resource points store the sub-resources corresponding to the simulated computer, and the upper-level resource network is copied to correspond to multiple scenarios and bind information as test scenarios. The number of scenarios is the same as the number of test scenarios. Then, the simulated computer group is copied according to the number of scenarios and is respectively put into the test scenarios for simulation. The simulated computer group here is multiple simulated computers connected according to the connection relationship between the multiple simulated computers. Then, the sub-resources in the simulated computer are divided to obtain multiple processing resources, and the status information of the simulated computer processing sub-resources is obtained. The status information that does not meet the preset conditions is used as abnormal information. The status information of the simulated computer processing sub-resources here is The state information is the efficiency information of processing sub-resources, the preset condition is the efficiency of the preset simulation computer in processing sub-resources, the processing resources exceeding the preset number are selected and separated from the corresponding simulation computers and put into the simulation computer that meets the preset conditions as the simulation result, the simulation result is marked in the upper resource network, and the simulation result is bound to the corresponding scene to obtain the allocation information. The sub-resources here are divided. During processing, since the efficiency of the simulation computer in processing sub-resources is lower than the preset condition, in order to ensure the high efficiency of resource processing, the processing resources exceeding the preset number are separated from the corresponding simulation computers and put into the simulation computer that meets the preset conditions. Among them, the simulation computer that meets the preset conditions is other computers with the same resource management type as the processing resources. Here, multiple computers with the same resource management type are connected, and the processing resources can be interconnected and allocated; it can ensure the computer's processing efficiency of resources, can better schedule and manage resources, and ensure the processing efficiency of resources;
[0078] In one embodiment, the step S225 of dividing and storing the sub-resources in the simulated computer to obtain a plurality of processing resources includes:
[0079] S2251. Configure a corresponding cloud server corresponding to the simulated computer, and configure multiple space areas in the cloud server;
[0080] S2252, setting a plurality of contact points in the space area, setting a plurality of pheromones in the plurality of contact points respectively, and establishing communication association between the plurality of contact points;
[0081] S2253, dividing the sub-resources in the simulation computer based on the number of contacts in the spatial region to obtain multiple unit resources of the same number;
[0082] S2254, storing multiple unit resources one-to-one in the spatial area, extracting characteristic information from the unit resources, wherein the characteristic information includes characteristic content and characteristic position where the characteristic content is located, binding the characteristic information through multiple contacts in the spatial area, matching pheromones with the characteristic information to obtain multiple processing resources;
[0083] As described in the above steps S2251-S2254, one simulated computer is configured with one cloud server, where the cloud server is used to store unit resources, multiple space areas are set in the cloud server, multiple contacts are set in the space areas, multiple pheromones are set in the multiple contacts respectively, and communication association is performed between the multiple contacts, where the communication association is to exchange the binding information of the subsequent pheromone and the corresponding unit resource, and then the sub-resources in the simulated computer are divided based on the number of contacts in the space area to obtain multiple unit resources of the same number, and the multiple unit resources are stored one-to-one in the space area, and feature information in the unit resources is extracted, wherein the feature information includes feature content and feature position where the feature content is located, and the feature information is bound through multiple contacts in the space area, and the pheromone is matched with the feature information to obtain multiple processing resources, which can perform security monitoring on the unit resources, and obtain the unit resources for security monitoring as processing resources, which have a good monitoring effect and ensure the accuracy of computer management resources;
[0084] In one embodiment, the step S3 of determining the allocation information corresponding to the actual computer and constructing the allocation model includes:
[0085] S31, determining a scenario and obtaining corresponding allocation information, and allocating multiple processing resources in a cloud server corresponding to the simulated computer to the corresponding computer based on the allocation plan;
[0086] S32, constructing a computer to which processing resources are allocated to obtain an allocation model;
[0087] As described in the above steps S31 and S32, the actual network level of the computer is obtained, the scenario is determined based on the network level and the corresponding allocation information is obtained, and multiple processing resources in the cloud server corresponding to the simulated computer are allocated to the corresponding computer based on the allocation plan to complete the allocation of the computer, and then the computer with the allocated processing resources is constructed to obtain an allocation model, through which the allocation status of the computer can be clearly understood;
[0088] In one embodiment, the corresponding scenario monitors the management status of the actual computer for the resources to be managed, and based on the corresponding relationship between the management status and the simulation result of the corresponding scenario, step S4 of regulating the computer according to the simulation result includes:
[0089] S41, configuring a corresponding cloud server corresponding to the allocation model, establishing a communication channel between the computer in the allocation model and the corresponding actual computer based on the cloud server, and sending multiple processing resources corresponding to the computer in the allocation model to the corresponding actual computer based on the communication channel;
[0090] S42, monitoring the actual management status of the computer on the processing resources, wherein the management status is the processing efficiency of the computer on the processing resources, and transmitting the management status to the cloud server;
[0091] S43, determining a corresponding scenario based on the management state in the cloud server, obtaining a corresponding simulation result according to the scenario, adjusting the allocation model according to the simulation result to obtain an adjusted allocation model, and regulating the processing resources in the computer according to the adjusted allocation model;
[0092] As described in the above steps S41-S43, the allocation information is obtained by the allocation scheme obtained by the simulation allocation and the simulation result obtained by the corresponding scenario. The allocation information is the information after the simulation result is bound to the corresponding scenario. The allocation model is constructed corresponding to the allocation information corresponding to the actual computer. The corresponding cloud server is configured through the allocation model. A communication channel between the computer in the allocation model and the corresponding actual computer is established based on the cloud server. Based on the communication channel, multiple processing resources corresponding to the computer in the allocation model are sent to the corresponding actual computer. Here, the corresponding multiple processing resources can be directly obtained according to the model. After that, the actual computer manages the allocated processing resources, monitors the processing efficiency of the actual computer on the processing resources as the management state, and transmits the management state to the cloud server. In the cloud server, the corresponding scenario is determined based on the management state. The processing resources in the computer are regulated by the simulation result of the corresponding scenario. When the processing efficiency reaches the corresponding scenario (network level), the corresponding simulation result is obtained according to the scenario. The allocation model is adjusted to the corresponding scenario through the simulation result to obtain the adjusted allocation model. The processing resources in the computer are regulated by the adjusted allocation model, which can meet the processing efficiency of the computer on the processing resources and ensure the processing of the resources.
[0093] Example 2, please refer to Figure 2 As shown, the computer resource management system based on cloud computing described in this embodiment includes:
[0094] A determination module is used to determine the resources that need to be managed, and obtain an allocation plan by simulating allocation to multiple computers based on the resources that need to be managed;
[0095] An information setting module, connected to the determination module, is used to set multiple scenarios, simulate computer resource management through the set multiple scenarios, obtain simulation results under multiple scenarios, and bind the simulation results with corresponding scenarios to obtain allocation information;
[0096] A construction module, connected to the information setting module, is used to determine the allocation information corresponding to the actual computer and to construct an allocation model;
[0097] The management module is connected to the construction module and is used to monitor the management status of the actual computer for the resources to be managed in the corresponding scenario, and to regulate the computer according to the simulation results based on the corresponding relationship between the management status and the simulation results of the corresponding scenario.
[0098] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A computer resource management method based on cloud computing, characterized in that: The following steps are involved: Determine the resources that need to be managed, and simulate the allocation of multiple computers based on the resources that need to be managed to obtain an allocation plan; The step of determining the resources to be managed and simulating allocation to multiple computers based on the resources to be managed to obtain an allocation plan includes: Collect resource management types of multiple computers, and divide the resources to be managed into multiple sub-resources based on the database; Simulate the allocation of multiple sub-resources to corresponding computers to obtain an allocation plan; Setting multiple scenarios, simulating computer resource management through the set multiple scenarios, obtaining simulation results under multiple scenarios and binding the simulation results with corresponding scenarios to obtain allocation information; The step of obtaining simulation results under multiple scenarios and binding the simulation results with corresponding scenarios to obtain allocation information includes: Set multiple scenes, and configure label information corresponding to the multiple scenes, wherein the label information includes the network level corresponding to the scene; Simulate the simulation computer corresponding to multiple scenarios respectively to obtain simulation results and bind the simulation results with the corresponding scenarios to obtain allocation information; The step of simulating the simulation computer corresponding to the multiple scenarios respectively to obtain simulation results and binding the simulation results with the corresponding scenarios to obtain allocation information includes: A plurality of simulated computers are constructed corresponding to the plurality of computers, the connection relationship between the plurality of computers is used as the connection relationship between the plurality of simulated computers, and the plurality of simulated computers connected according to the connection relationship between the plurality of simulated computers is used as a simulated computer group; An upper resource network is set corresponding to the simulated computer based on the connection relationship between the simulated computers, wherein the upper resource network is a plurality of upper resource points connected based on the connection relationship, and the upper resource points store sub-resources corresponding to the simulated computer; The upper-layer resource network is copied to correspond to multiple scenarios and information is bound as test scenarios; The simulation computer group is replicated according to the number of scenarios and respectively put into the test scenarios for simulation; Divide and store the sub-resources in the simulated computer to obtain multiple processing resources, obtain the status information of the simulated computer processing sub-resources, and regard the status information that does not meet the preset conditions as abnormal information; Select processing resources exceeding the preset number and the corresponding simulation computers to be separated and put into simulation computers that meet the preset conditions as simulation results, and mark the simulation results on the upper resource network; Bind the simulation results with the corresponding scenarios to obtain allocation information; Determine the allocation information corresponding to the actual computer and build an allocation model; The step of determining the allocation information corresponding to the actual computer and constructing the allocation model includes: Determine the scenario and obtain corresponding allocation information, and allocate multiple processing resources in the cloud server corresponding to the simulated computer to the corresponding computer based on the allocation plan; The computer with allocated processing resources is constructed to obtain an allocation model; Monitor the management status of the actual computer for the resources to be managed in the corresponding scenario, and adjust the computer according to the simulation results based on the corresponding relationship between the management status and the simulation results of the corresponding scenario; The corresponding scenario monitors the management status of the actual computer for the resources to be managed, and based on the corresponding relationship between the management status and the simulation result of the corresponding scenario, the step of regulating the computer according to the simulation result includes: A cloud server corresponding to the allocation model is configured, a communication channel between the computer in the allocation model and the corresponding actual computer is established based on the cloud server, and a plurality of processing resources corresponding to the computer in the allocation model is sent to the corresponding actual computer based on the communication channel; Monitor the actual management status of the computer for processing resources, where the management status is the processing efficiency of the computer for processing resources, and transmit the management status to the cloud server; In the cloud server, the corresponding scenario is determined based on the management status, the corresponding simulation result is obtained according to the scenario, the allocation model is adjusted according to the simulation result to obtain the adjusted allocation model, and the processing resources in the computer are regulated by the adjusted allocation model.
2. The computer resource management method based on cloud computing according to claim 1, characterized in that: The step of simulating and allocating the plurality of sub-resources to the corresponding computers to obtain an allocation plan comprises: Setting a database, wherein the database includes sub-resources and corresponding resource management types; Extract features of resources to be managed to obtain multiple feature information, and perform text matching based on the database according to the multiple feature information to obtain multiple sub-resources; The resource management types corresponding to the plurality of sub-resources are respectively determined based on the database, and the sub-resources are simulated and allocated to the corresponding computers based on the resource management types as an allocation scheme.
3. The computer resource management method based on cloud computing according to claim 1, characterized in that: The step of dividing and storing the sub-resources in the simulated computer to obtain a plurality of processing resources comprises: A cloud server is configured corresponding to the simulation computer, and multiple space areas are configured in the cloud server; A plurality of contact points are arranged in the space area, a plurality of pheromones are arranged in the plurality of contact points respectively, and communication association is performed between the plurality of contact points; Dividing the sub-resources in the simulation computer based on the number of contacts in the spatial region to obtain multiple unit resources of the same number; Multiple unit resources are stored one-to-one in a spatial area, and characteristic information in the unit resources is extracted, wherein the characteristic information includes characteristic content and characteristic position where the characteristic content is located. The characteristic information is bound through multiple contacts in the spatial area, and pheromones are matched with the characteristic information to obtain corresponding multiple processing resources.
4. A computer resource management system based on cloud computing, used to implement a computer resource management method based on cloud computing as described in any one of claims 1 to 3, characterized in that: include: A determination module is used to determine the resources that need to be managed, and obtain an allocation plan by simulating allocation to multiple computers based on the resources that need to be managed; An information setting module, connected to the determination module, is used to set multiple scenarios, simulate computer resource management through the set multiple scenarios, obtain simulation results under multiple scenarios, and bind the simulation results with corresponding scenarios to obtain allocation information; A construction module, connected to the information setting module, is used to determine the allocation information corresponding to the actual computer and to construct an allocation model; The management module is connected to the construction module and is used to monitor the management status of the actual computer for the resources to be managed in the corresponding scenario, and to regulate the computer according to the simulation results based on the corresponding relationship between the management status and the simulation results of the corresponding scenario.