A test data management system and method based on evaluation model
Through the test data management system based on the evaluation model, the equipment performance changes are monitored, performance degradation is predicted, and the detection interval is adjusted to solve the problem of predicting equipment performance degradation, extend the service life of the equipment, and improve maintenance efficiency.
Patent Information
- Application Number
- CN202411027757.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-30
AI Technical Summary
In industrial production, equipment performance degradation and failure are costly problems for enterprises. It is difficult to effectively predict the time when equipment performance levels will decline with existing technology, resulting in untimely maintenance and affecting the service life of equipment.
Through the test data management system based on the evaluation model, the historical evaluation records of the equipment are collected, the performance level changes are monitored, the characteristic nodes are captured, the early warning prompt model is built, the equipment performance changes are monitored in real time, the detection interval is adjusted, the performance degradation is predicted and maintenance is carried out in advance.
It realizes predictive maintenance for equipment performance degradation, extends the service life of equipment, and improves the timeliness and efficiency of equipment maintenance.
Smart Images

Figure CN118551277B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of evaluation model test data management, and in particular to a test data management system and method based on an evaluation model. Background Art
[0002] Equipment performance appraisal refers to the process of evaluating the operating conditions, functional performance, service life and operating stability of various equipment. It is an important way for producers and users to communicate with each other, and it is also an important basis for users to select, use and maintain equipment. When conducting equipment performance appraisal, it is necessary to conduct comprehensive testing and evaluation of various functions of the equipment, including the main technical indicators, performance parameters, external characteristics, internal structure, operation interface and other aspects of the equipment, in order to fully understand the performance characteristics and use requirements of the equipment. Finally, the test results should be input into the pre-built performance evaluation model for comparison and evaluation to obtain the equipment performance level, thereby providing a reference for users to select, use and formulate maintenance plans.
[0003] During the use of machinery and equipment, the performance of the equipment will gradually decrease due to wear, aging, improper use and other reasons. If the adaptability of the equipment is low, it will limit its use within the applicable scope. At the same time, the maintenance methods for equipment at different performance levels are also different. In modern industrial production, equipment failure and performance degradation are extremely challenging and costly problems for enterprises. Predictive maintenance is a maintenance strategy based on equipment operation data and analysis technology. It aims to predict the approximate time range for the performance level of the equipment to decline by monitoring the changes in test data obtained from the test feedback of the equipment, and adjust the equipment repair and maintenance measures in time based on this time range. Summary of the invention
[0004] The object of the present invention is to provide a test data management system and method based on an evaluation model to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a test data management method based on an evaluation model, the method comprising:
[0006] Step S1: Collect historical evaluation records generated by conducting performance evaluation tests on equipment of different models and configurations through a digital performance evaluation model in chronological order from the time of commissioning to the time of retirement;
[0007] Step S2: monitor the evaluation changes of historical performance level order values, capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each characteristic node;
[0008] Step S3: Classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in each type of feature node, and capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution;
[0009] Step S4: Collect the critical test data sets corresponding to various feature nodes, build an early warning model for real-time monitoring of equipment performance changes, and assist the management terminal in adjusting the interval period for performance evaluation and testing based on the output results of the early warning model.
[0010] Preferably, step S2 comprises:
[0011] Step S2-1: Collect historical evaluation records generated by the performance evaluation test of each device in chronological order, generate an evaluation record sequence corresponding to each device, and collect the evaluation record sequences corresponding to devices with the same model and configuration data to obtain several evaluation record sequence sets; traverse the performance level order value fed back by the digital performance evaluation model to the corresponding device in each historical evaluation record, and extract the performance level order value change sequence presented in each evaluation record sequence;
[0012] Step S2-2: In the performance level order value change sequence, every two adjacent performance level order values D 1 , D 2 Constitute a performance evaluation node P={D 1 ,D 2}, where D 1 represents the performance level order value of the first ranking, represents the performance level order value of the last ranking; if a performance evaluation node satisfies D 1 <D 2 , determine that there is a performance level decline fluctuation in a certain performance evaluation node, and extract the certain performance evaluation node as a feature node;
[0013] Step S2-3: D 1 As the first attribute label of the feature node, D 2 As the second attribute label of the feature node, it captures the corresponding D from the performance level order value change sequence. 1 , D 2 Historical evaluation records of L(D 1 )、L(D 2 ), extract historical evaluation records L(D 1 )、L(D 2), and the interval time T between them is used as the third attribute label of the feature node; wherein, the smaller the performance level order value is, the higher the corresponding performance level is, and the better the performance of the corresponding device is.
[0014] Preferably, step S3 includes:
[0015] Step S3-1: In each evaluation record sequence set, all feature nodes extracted from each evaluation record sequence are classified into categories to obtain a number of feature node sets, wherein one feature node set corresponds to one type of feature node, i.e., one type of performance level decline fluctuation; the first attribute labels and the second attribute labels corresponding to all feature nodes included in each feature node set are the same;
[0016] Step S3-2: In each feature node set, the third attribute label corresponding to each feature node is traversed, and all feature nodes are sorted from large to small according to the interval time T in the corresponding third attribute label, and the feature node with the smallest interval time T is set as the target node in each feature node set;
[0017] Step S3-3: Extract the first attribute label A of the target node in each feature node set, and retrieve the performance level order value A (D) corresponding to the first attribute label A from the corresponding evaluation record sequence. 1 ) to obtain the performance ranking value A(D) of the corresponding equipment feedback in the digital performance evaluation model. 1 ), the manager inputs the test data set of the relevant equipment into the digital performance evaluation model, takes the test data set as the critical test data set before the corresponding performance level decreases and fluctuates, and obtains the critical test data sets corresponding to various feature nodes respectively;
[0018] The test data set obtained during the performance test of the equipment is input into the digital performance evaluation model to output the corresponding performance grade order value. No matter how detailed the performance grade division of the equipment is, for equipment at the same performance grade, that is, with the same performance grade order value, there are differences in the distribution of test data presented in the corresponding test data set input into the digital performance evaluation model, and there is no specific measurement standard. Because when multiple equipment of the same model and configuration are at a certain performance grade, it means that the corresponding test data set meets the data distribution characteristics of the test data under the performance grade regulations, but there are differences between such data distribution characteristics, because in the process of performance evaluation of equipment, multiple tests related to equipment performance are often conducted. The process of comprehensive measurement of data is based on the objective phenomenon of a performance level reduction from a higher level to a lower level, that is, the natural aging process of equipment performance. The test data distribution presented near the occurrence of each performance level reduction can be found. It is assumed that the test data distribution is close to the most extreme test data distribution before the performance level reduction occurs. From the perspective of phenomenon data analysis, if the equipment has a reduction from a higher performance level to a lower performance level in two adjacent historical records, the shorter the interval between the two adjacent historical records, the closer the test data set input by the manager into the digital performance evaluation model to obtain a higher performance level is to the most extreme test data distribution before the current performance level reduction occurs.
[0019] Preferably, step S4 comprises:
[0020] Step S4-1: Obtain the model and configuration data of the current device, and retrieve various feature nodes corresponding to the model and configuration data and corresponding critical test data sets;
[0021] Step S4-2: Real-time monitoring is based on the performance ranking value F obtained by the management personnel after inputting the test data set into the digital performance evaluation model. Among various feature nodes corresponding to the model and configuration data of the current device, the feature node corresponding to the first attribute label of the performance ranking value F is set as a reference node, and the critical test data set of the reference node is extracted to obtain the similarity β between the test data set input by the real-time monitoring and the critical test data set;
[0022] Step S4-3: When the similarity β is less than the similarity threshold β', capture the time t of the equipment in use up to the time of the current performance evaluation test, calculate the performance aging rate α=β / t, and predict the transition time T required to present the critical test data set f =(β'-β) / α, sending transition duration T f To the administrator terminal, prompt the administrator to fSetting the performance evaluation detection interval means that the device can continue to be used for a certain period of time based on the current usage time. f Only then can a test data set close to the critical test data set be obtained; when the similarity is greater than the similarity threshold, an early warning prompt is sent to the management terminal, which means that the performance level order obtained after inputting the current test data set will not be maintained for too long, and the equipment will experience performance degradation in a relatively short period of time, prompting the management personnel to perform equipment maintenance in advance according to the equipment maintenance method when the equipment drops a performance level, or to appropriately shorten the time for the next performance evaluation test.
[0023] Preferably, step S4-3 comprises:
[0024] Step S4-3-1: When the total number of times N when the cumulative digital performance evaluation model feedbacks the same performance level order value is greater than the number threshold, the test time t corresponding to each performance evaluation test is respectively d , and the similarity β between the test data set input for each performance evaluation test and the critical test data set is obtained to construct N groups of test data (t d ,β);
[0025] Step S4-3-2: N groups of test data (t d ,β) is used to perform curve fitting to generate a function curve of similarity varying with test time β=k×t d +b, where k represents the slope of the curve and b represents a constant. Input the similarity threshold β' to the function curve β = k × t d +b, the output test time t d 'Feedback to the management terminal, prompting the management to d 'Set the performance evaluation detection interval period;
[0026] When the total number N of times the cumulative digital performance evaluation model feeds back the same performance level order value is greater than the number threshold, the shorter the transition time required to predict the critical test data set is, the more accurate the prediction method is needed to assist managers in knowing the critical time range for the equipment to drop from the current higher performance level to the lower performance level. This helps managers to adjust the equipment maintenance method in a timely manner to extend the equipment service life as much as possible.
[0027] In order to better implement the above method, a test data management system is also proposed, which includes: a historical evaluation record data management module, a feature node identification management module, a critical test data set extraction management module, and an early warning prompt model construction management module;
[0028] The historical evaluation record data management module is used to collect historical evaluation records generated by the digital performance evaluation model for equipment of different models and configurations, from the time they are put into use to the time they are withdrawn from use, and to conduct performance evaluation tests in chronological order;
[0029] The feature node identification management module is used to monitor the evaluation changes of historical performance level order values, capture and identify the feature nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each feature node;
[0030] The critical test data set extraction management module is used to classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in various feature nodes, and capture and identify the critical test data set before the performance level corresponding to various feature nodes decreases and fluctuates according to the information difference distribution;
[0031] The early warning model construction management module is used to collect critical test data sets corresponding to various feature nodes, build an early warning model for real-time monitoring of equipment performance changes, and assist management personnel terminals in adjusting the interval settings for performance evaluation and testing based on the output results of the early warning model.
[0032] Preferably, the characteristic node identification management module includes a characteristic node extraction unit and an attribute label management unit;
[0033] A characteristic node extraction unit is used to monitor the evaluation changes of historical performance level order values, and to capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence;
[0034] The attribute label management unit is used to construct an attribute label for each feature node.
[0035] Preferably, the critical test data set extraction management module includes an attribute label information combing unit and a critical test data set capturing unit;
[0036] An attribute label information combing unit is used to classify all feature nodes according to attribute labels and comb the information difference distribution of attribute labels presented in various feature nodes;
[0037] The critical test data set capturing unit is used to capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution.
[0038] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention comprehensively monitors the changes in data distribution of the test data set input into the digital performance evaluation model, causes the digital performance evaluation model to feedback changes in the performance level of equipment of different models and configurations, captures and identifies the critical test data set before each performance level decline fluctuation, and constructs an early warning prompt model for real-time monitoring of equipment performance changes in combination with the temporary test data set. By adjusting and setting the interval period for performance evaluation detection through the auxiliary management personnel terminal, predictive maintenance of the equipment before the performance level declines is achieved, so as to extend the service life of the equipment as much as possible. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0040] Figure 1 It is a flow chart of a test data management method based on an evaluation model of the present invention;
[0041] Figure 2 It is a structural schematic diagram of a test data management system based on an evaluation model of the present invention. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] See also Figure 1-Figure 2 The present invention provides a technical solution: a test data management method based on an evaluation model, the method comprising:
[0044] Step S1: Collect historical evaluation records generated by conducting performance evaluation tests on equipment of different models and configurations through a digital performance evaluation model in chronological order from the time of commissioning to the time of retirement;
[0045] Step S2: monitor the evaluation changes of historical performance level order values, capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each characteristic node;
[0046] Wherein, step S2 comprises:
[0047] Step S2-1: Collect historical evaluation records generated by the performance evaluation test of each device in chronological order, generate an evaluation record sequence corresponding to each device, and collect the evaluation record sequences corresponding to devices with the same model and configuration data to obtain several evaluation record sequence sets; traverse the performance level order value fed back by the digital performance evaluation model to the corresponding device in each historical evaluation record, and extract the performance level order value change sequence presented in each evaluation record sequence;
[0048] Step S2-2: In the performance level order value change sequence, every two adjacent performance level order values D 1 , D 2 Constitute a performance evaluation node P={D 1 ,D 2}, where D 1 represents the performance level order value of the first ranking, represents the performance level order value of the last ranking; if a performance evaluation node satisfies D 1 <D 2 , determine that there is a performance level decline fluctuation in a certain performance evaluation node, and extract the certain performance evaluation node as a feature node;
[0049] Step S2-3: D 1 As the first attribute label of the feature node, D 2 As the second attribute label of the feature node, it captures the corresponding D from the performance level order value change sequence. 1 , D 2 Historical evaluation records of L(D 1 )、L(D 2 ), extract historical evaluation records L(D 1 )、L(D 2 ), and the interval time T between them is used as the third attribute label of the feature node; wherein the smaller the performance level order value is, the higher the corresponding performance level is, and the better the performance of the corresponding device is;
[0050] For example, a certain evaluation record sequence is {historical evaluation record S1, historical evaluation record S2, historical evaluation record S3, historical evaluation record S4}, and in the historical evaluation record S1, the performance level order value fed back by the digital performance evaluation model to the corresponding device is 1, in the historical evaluation record S2, the performance level order value fed back by the digital performance evaluation model to the corresponding device is 1, in the historical evaluation record S3, the performance level order value fed back by the digital performance evaluation model to the corresponding device is 2, and in the historical evaluation record S4, the performance level order value fed back by the digital performance evaluation model to the corresponding device is 3;
[0051] In summary, we can see that performance evaluation nodes P={1,1}, P={1,2}, and P={2,3} can be extracted from a certain evaluation record sequence in sequence; because P={1,2} and P={2,3} satisfy 1<2, 2<3, P={1,2} and P={2,3} are characteristic nodes;
[0052] Among them, the first attribute label of the feature node P={1,2} is the performance level order value 1, and the second attribute label is the performance level order value 2. If the generation timestamp of the historical evaluation record S2 is April 2, 2021, and the generation timestamp of the historical evaluation record S3 is April 30, 2021, then the third attribute label of the feature node P={1,2} is the interval time T=28 days between April 2, 2021 and April 30, 2021;
[0053] Step S3: Classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in each type of feature node, and capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution;
[0054] Wherein, step S3 comprises:
[0055] Step S3-1: In each evaluation record sequence set, all feature nodes extracted from each evaluation record sequence are classified into categories to obtain a number of feature node sets, wherein one feature node set corresponds to one type of feature node, i.e., one type of performance level decline fluctuation; the first attribute labels and the second attribute labels corresponding to all feature nodes included in each feature node set are the same;
[0056] Step S3-2: In each feature node set, the third attribute label corresponding to each feature node is traversed, and all feature nodes are sorted from large to small according to the interval time T in the corresponding third attribute label, and the feature node with the smallest interval time T is set as the target node in each feature node set;
[0057] Step S3-3: Extract the first attribute label A of the target node in each feature node set, and retrieve the performance level order value A (D) corresponding to the first attribute label A from the corresponding evaluation record sequence. 1 ) to obtain the performance ranking value A(D) of the corresponding equipment feedback in the digital performance evaluation model. 1 ), the manager inputs the test data set of the relevant equipment into the digital performance evaluation model, takes the test data set as the critical test data set before the corresponding performance level decreases and fluctuates, and obtains the critical test data sets corresponding to various feature nodes respectively;
[0058] Step S4: Collect the critical test data sets corresponding to various feature nodes, build an early warning prompt model for real-time monitoring of equipment performance changes, and assist the management terminal in adjusting the interval period for performance evaluation and detection according to the output results of the early warning prompt model;
[0059] Wherein, step S4 comprises:
[0060] Step S4-1: Obtain the model and configuration data of the current device, and retrieve various feature nodes corresponding to the model and configuration data and corresponding critical test data sets;
[0061] Step S4-2: Real-time monitoring is based on the performance ranking value F obtained by the management personnel after inputting the test data set into the digital performance evaluation model. Among various feature nodes corresponding to the model and configuration data of the current device, the feature node corresponding to the first attribute label of the performance ranking value F is set as a reference node, and the critical test data set of the reference node is extracted to obtain the similarity β between the test data set input by the real-time monitoring and the critical test data set;
[0062] Step S4-3: When the similarity β is less than the similarity threshold β', capture the time t of the equipment in use up to the time of the current performance evaluation test, calculate the performance aging rate α=β / t, and predict the transition time T required to present the critical test data set f =(β'-β) / α, sending transition duration T f To the administrator terminal, prompt the administrator to f Set the performance evaluation detection interval period; when the similarity is greater than the similarity threshold, send an early warning prompt to the management terminal;
[0063] Wherein, step S4-3 comprises:
[0064] Step S4-3-1: When the total number of times N when the cumulative digital performance evaluation model feedbacks the same performance level order value is greater than the number threshold, the test time t corresponding to each performance evaluation test is respectively d , and the similarity β between the test data set input for each performance evaluation test and the critical test data set is obtained to construct N groups of test data (t d ,β);
[0065] Step S4-3-2: N groups of test data (t d ,β) is used to perform curve fitting to generate a function curve of similarity varying with test time β=k×t d +b, where k represents the slope of the curve and b represents a constant. Input the similarity threshold β' to the function curve β = k × t d +b, the output test time t d'Feedback to the management terminal, prompting the management to d 'Set the performance evaluation detection interval.
[0066] In order to better implement the above method, a test data management system is also proposed, which includes: a historical evaluation record data management module, a feature node identification management module, a critical test data set extraction management module, and an early warning prompt model construction management module;
[0067] The historical evaluation record data management module is used to collect historical evaluation records generated by the digital performance evaluation model for equipment of different models and configurations, from the time they are put into use to the time they are withdrawn from use, and to conduct performance evaluation tests in chronological order;
[0068] The feature node identification management module is used to monitor the evaluation changes of historical performance level order values, capture and identify the feature nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each feature node;
[0069] Among them, the feature node identification management module includes a feature node extraction unit and an attribute label management unit;
[0070] A characteristic node extraction unit is used to monitor the evaluation changes of historical performance level order values, and to capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence;
[0071] An attribute label management unit, used to construct an attribute label for each feature node;
[0072] The critical test data set extraction management module is used to classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in various feature nodes, and capture and identify the critical test data set before the performance level corresponding to various feature nodes decreases and fluctuates according to the information difference distribution; wherein the critical test data set extraction management module includes an attribute label information sorting unit and a critical test data set capture unit;
[0073] An attribute label information combing unit is used to classify all feature nodes according to attribute labels and comb the information difference distribution of attribute labels presented in various feature nodes;
[0074] A critical test data set capturing unit is used to capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution;
[0075] The early warning model construction management module is used to collect critical test data sets corresponding to various feature nodes, build an early warning model for real-time monitoring of equipment performance changes, and assist management personnel terminals in adjusting the interval settings for performance evaluation and testing based on the output results of the early warning model.
[0076] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0077] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A test data management method based on an evaluation model, characterized in that: The method comprises: Step S1: Collect historical evaluation records generated by conducting performance evaluation tests on equipment of different models and configurations through a digital performance evaluation model in chronological order from the time of commissioning to the time of retirement; Step S2: monitor the evaluation changes of historical performance level order values, capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each characteristic node; Step S3: Classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in each type of feature node, and capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution; Step S4: Collect the critical test data sets corresponding to various feature nodes, build an early warning model for real-time monitoring of equipment performance changes, and assist the management terminal in adjusting the interval period for performance evaluation and testing based on the output results of the early warning model.
2. A test data management method based on an evaluation model according to claim 1, characterized in that: The step S2 comprises: Step S2-1: Collect historical evaluation records generated by the performance evaluation test of each device in chronological order, generate an evaluation record sequence corresponding to each device, and collect the evaluation record sequences corresponding to devices with the same model and configuration data to obtain several evaluation record sequence sets; traverse the performance level order value fed back by the digital performance evaluation model to the corresponding device in each historical evaluation record, and extract the performance level order value change sequence presented in each evaluation record sequence; Step S2-2: In the performance level order value change sequence, every two adjacent performance level order values D 1 , D 2 Constitute a performance evaluation node P={D 1 ,D 2 }, where D 1 represents the performance level order value of the first ranking, represents the performance level order value of the last ranking; if a performance evaluation node satisfies D 1 <D 2 , determining that there is a performance level decline fluctuation in the certain performance evaluation node, and extracting the certain performance evaluation node as a feature node; Step S2-3: D 1 As the first attribute label of the feature node, D 2 As the second attribute label of the feature node, capture the corresponding D from the performance level order value change sequence 1 , D 2 Historical evaluation records of L(D 1 )、L(D 2 ), extract historical evaluation records L(D 1 )、L(D 2 ), and use the interval time T between the two nodes as the third attribute label of the feature node.
3. A test data management method based on an evaluation model according to claim 2, characterized in that: The step S3 comprises: Step S3-1: In each evaluation record sequence set, all feature nodes extracted from each evaluation record sequence are classified into categories to obtain a number of feature node sets, wherein one feature node set corresponds to one type of feature node, i.e., one type of performance level decline fluctuation; the first attribute labels and the second attribute labels corresponding to all feature nodes included in each feature node set are the same; Step S3-2: In each feature node set, the third attribute label corresponding to each feature node is traversed, all feature nodes are sorted from large to small according to the interval time T in the corresponding third attribute label, and the feature node with the smallest interval time T is set as the target node in each feature node set; Step S3-3: extract the first attribute label A of the target node in each feature node set, and retrieve the performance level order value A (D) corresponding to the first attribute label A from the corresponding evaluation record sequence. 1 ) to obtain the performance ranking value A(D) of the corresponding equipment feedback in the digital performance evaluation model. 1 ), the management personnel input the test data set of the corresponding equipment into the digital performance evaluation model, and use the test data set as the critical test data set before the corresponding performance level declines and fluctuates, to obtain the critical test data sets corresponding to each type of feature node.
4. A test data management method based on an evaluation model according to claim 3, characterized in that: The step S4 comprises: Step S4-1: Obtain the model and configuration data of the current device, and retrieve various feature nodes corresponding to the model and configuration data and corresponding critical test data sets; Step S4-2: Real-time monitoring is performed based on the performance ranking value F obtained by the management personnel after inputting the test data set into the digital performance evaluation model. Among various feature nodes corresponding to the model and configuration data of the current device, the feature node corresponding to the first attribute label of the performance ranking value F is set as a reference node, and the critical test data set of the reference node is extracted to obtain the similarity β between the test data set input by the real-time monitoring and the critical test data set; Step S4-3: When the similarity β is less than the similarity threshold β', capture the time t of the equipment in use up to the time of the current performance evaluation test, calculate the performance aging rate α=β / t, and predict the transition time T required to present the critical test data set f =(β'-β) / α, sending transition duration T f To the administrator terminal, prompt the administrator to f The performance evaluation detection interval period is set; when the similarity is greater than the similarity threshold, an early warning prompt is sent to the management terminal.
5. A test data management method based on an evaluation model according to claim 4, characterized in that: The step S4-3 comprises: Step S4-3-1: When the total number of times N when the cumulative digital performance evaluation model feedbacks the same performance level order value is greater than the number threshold, the test time t corresponding to each performance evaluation test is respectively d , and the similarity β between the test data set input for each performance evaluation test and the critical test data set is obtained to construct N groups of test data (t d ,β); Step S4-3-2: N groups of test data (t d ,β) is used to perform curve fitting to generate a function curve of similarity varying with test time β=k×t d +b, where k represents the slope of the curve, b represents a constant, and the similarity threshold β' is input to the function curve β=k×t d +b, the output test time t d 'Feedback to the management terminal, prompting the management to d 'Set the performance evaluation detection interval.
6. A test data management system, used to execute a test data management method based on an evaluation model as claimed in any one of claims 1 to 5, characterized in that: The system includes: a historical assessment record data management module, a characteristic node identification management module, a critical test data set extraction management module, and an early warning prompt model construction management module; The historical evaluation record data management module is used to collect historical evaluation records generated by conducting performance evaluation tests on equipment of different models and configurations through a digital performance evaluation model in chronological order from the time of commissioning to the time of withdrawal from service; The characteristic node identification management module is used to monitor the evaluation changes of historical performance level order values, capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence, and construct attribute labels for each characteristic node; The critical test data set extraction management module is used to classify all feature nodes based on attribute labels, sort out the information difference distribution of attribute labels presented in various feature nodes, and capture and identify the critical test data set before the performance level corresponding to each feature node decreases and fluctuates according to the information difference distribution; The early warning prompt model construction management module is used to collect critical test data sets corresponding to various feature nodes, build an early warning prompt model for real-time monitoring of equipment performance changes, and assist the management personnel terminal in adjusting the interval period for performance evaluation and detection according to the output results of the early warning prompt model.
7. A test data management system according to claim 6, characterized in that: The characteristic node identification management module includes a characteristic node extraction unit and an attribute label management unit; The characteristic node extraction unit is used to monitor the evaluation changes of historical performance level order values, and to capture and identify characteristic nodes with performance level decline fluctuations from the corresponding performance level order value change sequence; The attribute label management unit is used to construct an attribute label for each feature node.
8. A test data management system according to claim 6, characterized in that: The critical test data set extraction management module includes an attribute tag information combing unit and a critical test data set capturing unit; The attribute label information combing unit is used to classify all feature nodes according to the attribute labels, and comb the information difference distribution of the attribute labels presented in each type of feature node; The critical test data set capturing unit is used to capture and identify the critical test data set before the performance level corresponding to each type of feature node decreases and fluctuates according to the information difference distribution.
Citation Information
Patent Citations
State detection circuit control method of IGBT (Insulated Gate Bipolar Translator) device
CN117421652A
Power supply chip test data processing system and method based on big data
CN118331834A