A method and system for visualizing dynamic control of earthwork in a pumped storage power station
Through the dynamic management and control method that combines BIM models and oblique photogrammetry, it solves the problems of difficult material source control and poor performance display in pumped storage power station earthwork projects, achieves orderly control of material sources and accurate statistics of project quantities, and reduces costs. cost and manual intervention, improving engineering efficiency.
Patent Information
- Application Number
- CN202411005529.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-25
AI Technical Summary
There are problems in the earthwork engineering of pumped storage power stations, such as difficulty in controlling material sources, poor results presentation, and complicated later modification of results, which makes it difficult to effectively realize project progress, quality, and investment.
A visual dynamic management and control method based on the BIM model is used to create a multi-dimensional information model of earth and stone through geological survey and design data, perform unit cutting and lightweight processing, combine oblique photogrammetry and vehicle transportation management, build a dynamic allocation model, and set early warning thresholds and feedback mechanisms. Realize dynamic control of material sources and optimization of construction plans.
It achieves orderly, controllable and stable regulation of material sources, reduces the amount of discarded slag, increases the rate of direct access to the dam, ensures the accuracy and timeliness of earthwork quantities, and reduces manual intervention and calculation costs.
Smart Images

Figure CN118552353B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of earthwork engineering of a pumped storage power station, and in particular to a method and system for visualizing dynamic control of earthwork in a pumped storage power station. Background Art
[0002] Earthwork balance is a core issue in the construction process of pumped storage power station projects. It is related to all aspects of project construction and affects the reasonable realization of the three major goals of project progress, quality and investment. How to complete the project construction tasks efficiently and with high quality in a short period of time is an urgent issue facing the pumped storage industry.
[0003] The earthwork excavation and filling volume of pumped storage power station projects is often tens of millions of cubic meters. Not only is the earthwork excavation and filling volume large, but compared with other projects, there are also common problems such as numerous material sources, long construction period, staggered slag transportation paths, and difficult management and control. At present, the static balance calculation of earthwork is mainly carried out, and the problems existing in the material source regulation process are not taken seriously enough. The resulting design results conflict with the owner's concerns, cannot scientifically guide the material source regulation, and the results are complicated to modify later and the results are poorly displayed. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a method and system for visual dynamic control of earthwork in a pumped storage power station to solve the problems raised in the background technology, thereby reducing the amount of abandoned slag, increasing the direct dam rate, and realizing orderly, controllable and stable regulation of material sources.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for visualizing dynamic control of earthwork in a pumped storage power station, which comprises the following steps:
[0006] Based on geological survey and design data, create a multi-dimensional information BIM model of earthwork in the pumped storage power station;
[0007] Perform unit cutting and lightweight processing on the multi-dimensional information BIM model of earthwork to obtain the unit model data and lightweight model of earthwork in each part;
[0008] Create a material source object in the material source object management module and upload the earthwork unit model data and lightweight model;
[0009] Analyze the constraints and existing construction bottlenecks in the deployment process, set the early warning threshold of the deployment process, and define the early warning feedback prompt method;
[0010] Comprehensively adopt oblique photogrammetry and vehicle transportation management to collect on-site material source object information and provide data support for dynamic regulation of earthwork during the process;
[0011] Customize earthwork allocation rules based on design experience and build a dynamic visualization model for earthwork allocation;
[0012] Before construction begins, obtain static earthwork balance design results, preview and optimize the earthwork balance plan, dynamically adjust subsequent plans based on measurement data collected on-site and construction progress warnings during construction, and conduct construction progress comparison analysis and allocation result traceability analysis based on the planned and actual earthwork allocation plans after construction.
[0013] Preferably, during the unit cutting process of the earthwork multi-dimensional information BIM model, the unit cutting is automatically performed according to the pile number, elevation, and basin circumference of the structure.
[0014] Preferably, the constraints in the analysis and deployment process include:
[0015] Constraints on over- and under-allocation of feed: , where the feed amount , Total allocation ;
[0016] Slag yard and material yard capacity constraints: , where the original stockpile at a certain moment is , Allocation amount , Maximum heap storage .
[0017] Preferably, the earthwork multi-dimensional information BIM model includes geotechnical information, weathering information, spatial information, excavation type, structural location, and engineering quantity information.
[0018] Preferably, during the unit cutting process of the multi-dimensional information BIM model of earthwork, the corresponding unit elevation and pile number information are added synchronously, and the generated unit data constitutes the deployment basic database. The output lightweight model can include geotechnical information, weathering information, spatial information, excavation type, structural location, and engineering quantity information.
[0019] Preferably, the allocation process warning includes over-allocation warning, under-allocation warning, capacity shortage warning, material source shortage warning and transfer intensity warning during the allocation process.
[0020] Preferably, the custom earthwork allocation rules include material property matching relationship, material supply priority and allocation calculation coefficient.
[0021] The present invention discloses a visualized dynamic control system for earthwork of a pumped storage power station, comprising:
[0022] Basic data management module, configured to digitally manage the project's earthwork unit information, deployment process information, and object structure information;
[0023] The material source object management module is configured to manage the material source objects, including excavation projects, filling projects, slag yards, material yards and transfer yards;
[0024] Control the early warning feedback module, which is configured for early warning threshold setting and early warning feedback prompts;
[0025] The vehicle transportation management module is configured to collect on-site data terminal information and manage vehicle transportation information;
[0026] Aerial photography results management module, configured to collect and manage aerial photography results files, including real-scene models and aerial images;
[0027] The material source dynamic control module is configured to define material matching rules and perform dynamic and visual allocation of material sources;
[0028] Construction process simulation module, configured to simulate the construction plan and compare and analyze the progress;
[0029] Process information analysis module, configured to view the dynamic allocation process information and status statistics of material sources;
[0030] The output module of the results file is configured to view the deployment results and customize the output results file.
[0031] The present invention discloses a computer-readable storage medium storing computer program instructions, which realize the method for visual dynamic control of earthwork in a pumped storage power station when the computer program instructions are executed by a processor.
[0032] The present invention discloses a computer device, comprising a memory and a processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the method for visualizing dynamic control of earthwork in a pumped storage power station is executed.
[0033] Beneficial effects of the present invention:
[0034] 1. The present invention realizes the visualized and unified management of material source objects and transportation vehicle information in the platform, refines the quality requirements and quantity requirements of the material sources, and clarifies the temporal and spatial distribution of the material sources.
[0035] 2. The present invention constructs a dynamic earthwork control and early warning system by analyzing the constraints and control bottlenecks in the earthwork allocation process of a pumped-storage power station, including two types of early warnings: allocation process early warning and construction process early warning, to achieve early warning feedback in the allocation process, and provide a decision-making basis for dynamic control of earthwork.
[0036] 3. The data collection of the present invention adopts a combination of oblique photography and vehicle transportation management to calculate the on-site engineering quantity. The oblique photography technology is used to collect data on large-volume open excavation areas. Based on the real-life model, users can realize online quantity calculation and construction image viewing; combined with vehicle transportation management, the on-site earthwork excavation and filling volume is reviewed to meet the engineering quantity statistics of different periods.
[0037] 4. Through the present invention, construction design management personnel can customize deployment rules according to their own experience and project characteristics, and use database technology as the core drive to achieve digital management and automated deployment of material source objects, greatly reducing manual intervention and computing time costs.
[0038] 5. The visualized dynamic control system for earthwork of a pumped storage power station constructed by the present invention can respectively carry out the whole process material source control including pre-plan optimization, dynamic adjustment of the plan during the process, and traceability analysis of the plan after the event.
[0039] 6. The present invention is based on the measurement and acceptance records of the on-site construction units, and adopts a collection and measurement method that combines oblique photogrammetry and vehicle transportation management to automatically calculate the on-site earthwork excavation and filling volume and statistics in different time dimensions, thereby ensuring the accuracy and timeliness of the on-site earthwork volume calculation.
[0040] 7. The present invention can reduce the amount of waste slag, increase the direct dam rate, and achieve orderly, controllable and stable regulation of material sources. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a flow chart of a method for visualizing dynamic control of earthwork in a pumped storage power station;
[0042] Figure 2 It is a specific implementation flow chart of the deployment process in a method for visual dynamic control of earthwork in a pumped storage power station;
[0043] Figure 3 It is a module block diagram of a visual dynamic control system for earthwork in a pumped storage power station;
[0044] Figure 4 The model result of information integration after cutting and processing of earthwork model unit developed by the present invention;
[0045] Figure 5 It is a unit data information table output after the earthwork model unit cutting process of the present invention. DETAILED DESCRIPTION
[0046] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0047] Embodiment 1:
[0048] like Figure 1and 2 As shown, a method for visualizing dynamic control of earthwork in a pumped storage power station includes:
[0049] Based on the previous survey and design data, the material source information integration technology is used to integrate multi-source information of the material source objects, including model geometry information, excavation type, rock and soil type, weathering type, engineering quantity information, spatial location information, structural part information, and task information; the material source objects include excavation projects, filling projects, slag yards, transfer yards, and material collection yards;
[0050] Among them, excavation types include open excavation, hole excavation, trench excavation, and well excavation; weathering types include overburden, strong weathering, weak weathering, and slight weathering; rock and soil types include granite, marble, and other rock and soil types actually excavated on site; spatial position information includes elevation and pile number.
[0051] Among them, the earthwork multi-dimensional information BIM model must contain model geometry information, structural part information, excavation type, rock and soil type, weathering type and other information when it is created. Unit cutting is performed based on the earthwork multi-dimensional information BIM model, integrating material space information and unit engineering quantity information. The unit cutting results lay a data foundation for the dynamic allocation of material sources. By lightweighting the earthwork unit model, a visualization and construction simulation presentation carrier is provided for the dynamic allocation of material sources. During the unit cutting process, the unit cutting is automatically cut according to the pile number, elevation, and reservoir basin circumference of the structure.
[0052] like Figure 4 and 5 As shown in the figure, in order to meet the dynamic regulation of earthwork, unit cutting is performed based on the multi-dimensional information BIM model of earthwork. The open excavation and well excavation projects are cut according to the elevation spacing of 1m and the pile number spacing of 10m, and the hole excavation and trench excavation projects are cut according to the pile number spacing of 1m. In this way, the free combination of model units can be realized according to the excavation and filling plans at different stages, and a BIM decomposition model matching the actual construction tasks can be obtained. The model accuracy is consistent with the granularity of the engineering plan control, so that the temporal and spatial distribution of the material source can be accurately grasped, and the earthwork engineering volume of the specified time and specified area can be intuitively viewed. The cutting speed of tens of thousands of units is only about 50s, which effectively avoids the model lag caused by cutting according to the progress in the process.
[0053] In order to meet the construction simulation and visualization effects, the file size and smoothness of the earthwork model must be considered during the unit cutting process. The model cannot be cut according to the above-mentioned unit particle size. The model unit particle size is used as the basis for cutting to meet the online visualization display.
[0054] Based on the dynamic allocation database, the real-time parameters of earthwork control are accessed and threshold settings are provided for key indicators and constraints. It is mainly divided into two types: construction process warning and allocation process warning, including construction progress warning, capacity shortage warning, material source shortage warning, over-allocation warning and transfer intensity warning.
[0055] By comparing the actual construction progress reported during the construction process with the planned construction progress, graded feedback and early warning prompts are given according to the degree of lag to guide the dynamic adjustment of subsequent earthwork allocation plans.
[0056] Through the feedback prompts of over-allocation and under-allocation warning, insufficient capacity warning, insufficient material source warning and transfer intensity warning during the allocation process, it can guide the rational allocation of materials and formulate a scientific and orderly allocation plan.
[0057] In the excavation of earthwork for pumped storage power stations, tunnel excavation and open excavation are the main forms of excavation. In addition to the on-site measurement and acceptance record filling by the construction unit, for large-volume open excavation projects, the on-site earthwork engineering quantity is reviewed monthly using oblique photography technology, and the engineering quantity is reviewed through efficient measurement.
[0058] In addition, on-site transportation information is collected through the on-site vehicle transportation information collection terminal and stored in the database. The earthwork volume can be statistically analyzed in multiple dimensions on a daily, weekly, and monthly basis according to the set screening conditions.
[0059] Based on the measurement and acceptance records of the on-site construction units, a collection and measurement method combining oblique photogrammetry and vehicle transportation management is adopted to automatically calculate the on-site earthwork excavation and filling volume and statistics in different time dimensions, ensuring the accuracy and timeliness of the on-site earthwork volume calculation.
[0060] Taking into account the project characteristics and construction conditions, construction designers can customize the matching relationship of fill material properties, excavation material feeding priority and allocation calculation coefficient.
[0061] Based on the test results of excavated materials, the best suitable filling area for the materials is determined. Designers customize the material property matching relationship of the filling materials, such as: cushion material-weakly weathered, transition material-weakly weathered, main rockfill area-weakly weathered / strongly weathered.
[0062] The feeding priority of excavated materials needs to comprehensively consider factors such as transportation route, construction conditions, and construction sequence. The feeding priority includes the priority of filling site, waste slag and transfer priority.
[0063] After setting the allocation coefficient, the automatic calculation of loose and solid volume conversion, design requirements, planned mining volume and other values can be realized during the allocation process. The allocation coefficient includes the square folding coefficient, various loss compensation coefficients, planned mining coefficient, and excavation utilization coefficient.
[0064] The dynamic allocation of earthwork is actually a chain multi-stage dynamic optimization problem divided by time. The dynamic programming method is used to divide the time periods by month, and the excavation and filling information of the source objects and the status information of the slag yard in any period are obtained based on the dynamic allocation database of the source of materials. According to the object status information of each stage, based on the established allocation rules and calculation coefficients, the earthwork of the month is automatically allocated.
[0065] When there is a large gap between the corresponding excavation and filling intensity and the storage and use of materials in the allocation period, a transfer intensity warning will be issued when a large number of transfers occur. By modifying the task elevation, the unit database based on the background can automatically calculate the engineering quantity of different materials in the current excavation and filling area, thereby assisting in formulating reasonable progress tasks.
[0066] After completing the automatic allocation, the designer can make manual modifications based on the allocation results. During the manual modification process, feedback will be given when the corresponding warning threshold is exceeded. After completing the allocation for the current month, the allocation data for the current month can be temporarily stored and managed. The temporary storage management data is not directly saved to the allocation database. After temporary storage, dynamic allocation for subsequent periods will continue. When the material allocation for the target period is completed, the data will be filled in and uploaded to the allocation database to form an established allocation plan.
[0067] Embodiment 2:
[0068] like Figure 3 As shown in the figure, a visual dynamic control system for earthwork in a pumped storage power station is Figure 3 Only some core modules are shown, all modules include:
[0069] The basic data management module provides functions such as user management authority setting, overview information definition, unit data management, and terrain surface information management.
[0070] The material source object management module mainly includes excavation project, filling project, slag yard, transfer yard and material yard object management modules, providing editing and management of basic object information, construction task information and status information.
[0071] The excavation project management module provides editing and management of each excavation object, visual viewing of object material source information, spatial information, construction progress, excavation status and other information, uploading of excavation models, engineering quantity unit data and task information, and material source and property modification functions.
[0072] When uploading the engineering quantity unit data of the structural parts, the user is provided with the function of setting the available coefficient, which can calculate the available quantity according to the properties of the materials.
[0073] When there is a difference between the material properties of the earthwork model and the actual excavated material during project implementation, the material property modification function is used to select the weathering surface of geological change, specify the spatial position of the change (elevation-pile number), and set the weathering surface offset distance. The unit data in the database can be obtained and the material type of the specified space can be modified, thereby effectively avoiding the redundant work of multiple cutting of the model.
[0074] The filling project management module provides editing and management of objects in each filling part, visual viewing of object material source information, space information, construction progress, filling status and other information, and upload management of filling models, engineering quantity unit data and task information.
[0075] The slag yard and material yard management module manages the three objects of transfer yard, abandoned slag yard and material yard in a unified manner because of their similar characteristics. It provides functions such as viewing the location information and status information of slag yard, transfer yard and material yard, as well as object information editing, deployment record viewing and material inventory.
[0076] When creating objects for slag yards, material yards, and transfer yards, since the upper and lower reservoirs of pumped storage power stations are far apart, the upper and lower reservoirs are allocated separately, and the allocation areas of slag yards and material yards are set, including upper reservoir, lower reservoir, and shared. According to the area set for the object, participate in the dynamic allocation of earthwork in the corresponding area.
[0077] The control and early warning feedback module includes the early warning threshold setting module and the early warning prompt module. According to the severity of the on-site earthwork allocation problem, the threshold interval can be customized to carry out graded early warning.
[0078] During the allocation process, database management technology is used to obtain characteristic values such as the project's slag yard capacity, material yard reserves, and transfer yard capacity. The characteristic values serve as constraints for automatic allocation and are also warning thresholds for manual allocation.
[0079] The vehicle transportation management module manages the collected information from the on-site terminals, provides multiple ways to view earthwork transportation information, and automatically calculates the transportation volume of each construction area.
[0080] The aerial photography results management module calculates earthwork quantities and visualizes construction images based on regular drone oblique photography results. It allows users to customize the range of calculations for area excavation and filling online, and can also select measurement results at different times to automatically calculate the excavation and filling quantities for that period.
[0081] The material source dynamic control module provides functions such as defining material matching rules, setting material supply priority, modifying allocation calculation coefficients, automatically allocating materials, and dynamically displaying allocation trajectories.
[0082] The allocation process is displayed in two parts. The upper part shows the material source object legend, and the lower part is the allocation calculation table. The legend allows you to intuitively view the reserves of different materials in the current period. Click to preview the earthwork information of the corresponding lightweight model and structural parts.
[0083] The corresponding excavation and filling object information is displayed based on the selected time period and the upper and lower warehouse filters. The visual legend is synchronously linked to the allocation calculation table, and automatic allocation is performed based on the set allocation rules. The allocation trajectory is visualized while the materials are being distributed, so you can intuitively view the whereabouts of the materials.
[0084] The construction process simulation module provides visual simulation of earthwork plan and actual construction progress, comparative analysis of progress between plan and plan, and between plan and actual progress. By conducting construction simulation preview of the plan, the rationality of the plan can be intuitively analyzed.
[0085] After completing the dynamic control of material sources, the process information analysis module provides functions such as statistical analysis of the allocation records of each material source object based on the allocation plan, construction intensity analysis, transfer rate and direct dam rate calculation. By viewing the key evaluation indicators in the allocation process, the optimization direction of the plan can be clarified.
[0086] The results file output module can view the allocation plan for any period of time after completing the dynamic regulation of material sources, and can output the corresponding allocation results according to the standard template.
[0087] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A method for visualizing dynamic control of earthwork in a pumped storage power station, characterized in that: It includes the following steps: Based on geological survey and design data, create a multi-dimensional information BIM model of earthwork in the pumped storage power station; Perform unit cutting and lightweight processing on the multi-dimensional information BIM model of earthwork to obtain the unit model data and lightweight model of earthwork in each part; Create a material source object in the material source object management module and upload the earthwork unit model data and lightweight model; Analyze the constraints and existing construction bottlenecks in the deployment process, set the early warning threshold of the deployment process, and define the early warning feedback prompt method; Comprehensively adopt oblique photogrammetry and vehicle transportation management to collect on-site material source object information and provide data support for dynamic regulation of earthwork during the process; Customize earthwork allocation rules based on design experience and build a dynamic visualization model for earthwork allocation; Obtain static earthwork balance design results before construction begins, perform preview and optimization of earthwork balance schemes, dynamically adjust subsequent schemes based on on-site measurement data and construction progress warnings during construction, and conduct construction progress comparison and analysis and allocation result traceability analysis based on planned and actual earthwork allocation schemes after construction is completed; During the unit cutting process of the earthwork multi-dimensional information BIM model, the unit cutting is automatically cut according to the pile number, elevation, and basin circumference of the structure; The multi-dimensional information BIM model of earthwork includes geotechnical information, weathering information, spatial information, excavation type, structural location, and engineering quantity information; During the unit cutting process of the multi-dimensional information BIM model of earthwork, the corresponding unit elevation and pile number information are added synchronously. The generated unit data constitutes the basic database for deployment. The output lightweight model can include geotechnical information, weathering information, spatial information, excavation type, structural location, and engineering quantity information. The constraints in the analysis and deployment process include: Constraints on over- and under-allocation of feed: , where the feed amount , Total allocation ; Slag yard and material yard capacity constraints: , where the original stockpile at a certain moment is , Allocation amount , Maximum heap storage ; The custom earthwork allocation rules include material property matching relationship, material supply priority and allocation calculation coefficient.
2. According to claim 1, a method for visualizing dynamic control of earthwork in a pumped storage power station is characterized in that: The early warning of the allocation process includes early warning of over-allocation and under-allocation, early warning of insufficient capacity, early warning of insufficient material sources and early warning of transfer intensity.
3. A system for implementing the method for visualizing dynamic control of earthwork in a pumped storage power station according to claim 1, characterized in that: include: Basic data management module, configured to digitally manage the project's earthwork unit information, deployment process information, and object structure information; The material source object management module is configured to manage the material source objects, including excavation projects, filling projects, slag yards, material yards and transfer yards; Control the early warning feedback module, which is configured for early warning threshold setting and early warning feedback prompts; The vehicle transportation management module is configured to collect on-site data terminal information and manage vehicle transportation information; Aerial photography results management module, configured to collect and manage aerial photography results files, including real-scene models and aerial images; The material source dynamic control module is configured to define material matching rules and perform dynamic and visual allocation of material sources; Construction process simulation module, configured to simulate the construction plan and compare and analyze the progress; Process information analysis module, configured to view the dynamic allocation process information and status statistics of material sources; The output module of the results file is configured to view the deployment results and customize the output results file.
4. A computer-readable storage medium, characterized in that: Computer program instructions are stored, and when the computer program instructions are executed by a processor, the method for visualizing dynamic control of earthwork in a pumped-storage power station as claimed in claim 1 or 2 is implemented.
5. A computer device comprising a memory and a processor, characterized in that: The memory stores a computer program, and when the computer program is executed by the processor, the method for visualizing dynamic control of earthwork in a pumped-storage power station as claimed in claim 1 or 2 is implemented.