Sewage treatment control method, medium and equipment based on carbon emission accounting

Through the sewage treatment control method based on carbon emission accounting, feature recognition and optimization constraint trees are used to optimize the sewage treatment plan, which solves the problem of insufficient carbon emission control in sewage treatment and achieves the effect of reducing energy consumption and carbon emissions.

CN118625674BActive Publication Date: 2024-10-25SHENZHEN LIYUAN WATER DESIGN & CONSULTANT LTD

Patent Information

Application Number
CN202411084975.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-25
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Existing sewage treatment technology focuses on improving treatment efficiency and water quality standards, but pays insufficient attention to the control of carbon emissions, resulting in increased energy consumption and carbon emissions, and low control pertinence and effectiveness.

Method used

A sewage treatment control method based on carbon emission accounting is adopted to optimize the sewage treatment control plan, reduce energy consumption and carbon emissions, and improve treatment pertinence through feature identification, carbon emission accounting, sewage treatment quality prediction and construction of optimization constraint trees.

Benefits of technology

It achieves the reduction of energy consumption and carbon emissions in the sewage treatment process, improves the pertinence and effectiveness of sewage treatment control, and achieves synergy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118625674B_ABST
    Figure CN118625674B_ABST
Patent Text Reader

Abstract

The present invention discloses a sewage treatment control method, medium and equipment based on carbon emission accounting, and relates to the technical field of sewage treatment control. The method includes: performing feature identification based on sewage monitoring data sets to generate feature information of sewage to be treated; generating a sewage treatment control plan; performing carbon emission accounting and sewage treatment quality prediction to generate sewage treatment prediction results; judging whether the expected constraints of sewage treatment are met; if not, constructing a sewage treatment optimization constraint tree; optimizing and adjusting to generate the optimization results of the sewage treatment control plan; and treating the sewage to be treated. The method solves the technical problems that the existing sewage treatment control focuses on improving treatment efficiency and water quality standards, and pays insufficient attention to the accounting and control of carbon emissions, which leads to increased energy consumption and carbon emissions, as well as low pertinence and effectiveness of sewage treatment control, and realizes the synergistic efficiency of pollution reduction and carbon reduction, and achieves the technical effects of reducing energy consumption and carbon emissions and improving the pertinence of sewage treatment control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field related to sewage treatment control, and specifically to sewage treatment control methods, media and equipment based on carbon emission accounting. Background Art

[0002] As the global climate change problem becomes increasingly serious, reducing greenhouse gas emissions has become a key link at present. As one of the important sources of carbon emissions, the sewage treatment industry has a particularly arduous task of reducing carbon emissions. With the acceleration of urbanization, the amount of sewage treatment continues to increase, and the problem of carbon emissions in the sewage treatment process has become increasingly prominent. How to achieve low carbon, high efficiency and environmental protection in the sewage treatment process has become a technical problem that needs to be solved urgently. Traditional sewage treatment methods often focus on improving treatment efficiency and water quality standards, but pay insufficient attention to the control of carbon emissions, resulting in a large amount of greenhouse gas emissions indirectly generated in the sewage treatment process. Traditional sewage treatment control schemes are often based on experience and fixed parameters, lack scientificity and flexibility, and increase carbon emissions.

[0003] Therefore, at the current stage, there is a technical problem that the sewage treatment control related technologies focus on improving treatment efficiency and water quality standards, but pay insufficient attention to the accounting and control of carbon emissions, which leads to increased energy consumption and carbon emissions, and low targetedness and effectiveness of sewage treatment control. Summary of the invention

[0004] This application provides a sewage treatment control method, medium and equipment based on carbon emission accounting, and adopts technical means such as feature recognition, carbon emission accounting, sewage treatment quality prediction, and construction of sewage treatment optimization constraint tree. It solves the technical problems that the existing sewage treatment control focuses on improving treatment efficiency and water quality standards, but pays insufficient attention to the accounting and control of carbon emissions, which leads to increased energy consumption and carbon emissions, as well as low targetedness and effectiveness of sewage treatment control. It realizes the synergistic effect of reducing pollution and carbon emissions, and achieves the technical effect of reducing energy consumption and carbon emissions and improving the targetedness of sewage treatment control.

[0005] The present application provides a sewage treatment control method based on carbon emission accounting, the method comprising: obtaining a sewage monitoring data set of sewage to be treated according to a sewage monitoring module, and performing feature identification according to the sewage monitoring data set to generate feature information of the sewage to be treated; generating a sewage treatment control scheme according to the feature information of the sewage to be treated based on a multivariate sewage treatment control factor, wherein the sewage treatment control scheme includes multiple node sewage treatment decisions corresponding to multiple sewage treatment nodes; performing carbon emission accounting and sewage treatment quality prediction according to the sewage treatment control scheme based on a sewage treatment simulation platform to generate a sewage treatment prediction result; judging whether the sewage treatment prediction result meets the sewage treatment expected constraint; if the sewage treatment prediction result does not meet the sewage treatment expected constraint, mining sewage treatment decision features according to the multiple sewage treatment nodes and the feature information of the sewage to be treated, and constructing a sewage treatment optimization constraint tree; optimizing and adjusting the sewage treatment control scheme according to the sewage treatment optimization constraint tree based on the sewage treatment expected constraint and the sewage treatment simulation platform to generate a sewage treatment control scheme optimization result; and treating the sewage to be treated according to the sewage treatment control scheme optimization result based on the sewage treatment control module.

[0006] In a possible implementation, based on multiple sewage treatment control factors and according to the characteristic information of the sewage to be treated, a sewage treatment control plan is generated, and the following processing is performed: a sewage characteristic information record set and a sewage treatment control plan record set are loaded; the multiple sewage treatment control factors include sewage treatment nodes, node sewage treatment equipment models, node sewage treatment equipment control parameters, node sewage treatment additive types and node sewage treatment additive usage; the sewage treatment control plan record set is feature integrated according to the multiple sewage treatment control factors to obtain a sewage treatment control plan data set; a sewage treatment decision learning model is supervised and trained according to the sewage characteristic information record set and the sewage treatment control plan data set to obtain sewage treatment decision accuracy; if the sewage treatment decision accuracy is greater than / equal to the preset sewage treatment decision accuracy, a multi-feature sewage treatment decision channel is generated; based on the characteristic information of the sewage to be treated, the sewage treatment control plan is obtained according to the multi-feature sewage treatment decision channel.

[0007] In a possible implementation, carbon emission accounting and sewage treatment quality prediction are performed according to the sewage treatment control scheme to generate sewage treatment prediction results, and the following processing is performed: based on the characteristic information of the sewage to be treated and the sewage treatment control scheme, simulated sewage treatment is performed according to the sewage treatment simulation platform to generate a sewage treatment carbon emission simulation data set and simulated sewage treatment results; based on the sewage treatment carbon emission accounting record set, a sewage treatment carbon emission accounting model is built; based on the sewage treatment carbon emission simulation data set, according to the sewage treatment carbon emission accounting model, the sewage treatment carbon emission accounting coefficient is obtained; based on the simulated sewage treatment results, in combination with the characteristic information of the sewage to be treated, a sewage treatment quality prediction coefficient is generated; the sewage treatment carbon emission accounting coefficient and the sewage treatment quality prediction coefficient are added to the sewage treatment prediction results.

[0008] In a possible implementation, the sewage treatment quality prediction coefficient is generated in combination with the characteristic information of the sewage to be treated, and the following processing is also performed: the simulated sewage treatment result includes the characteristic information of the treated sewage; a deviation comparison is performed based on the characteristic information of the sewage to be treated and the characteristic information of the treated sewage to generate a sewage characteristic deviation vector; a sewage treatment quality assessment model is built based on a set of sample sewage characteristic deviation vectors and a set of sample sewage treatment quality assessments; based on the sewage characteristic deviation vector and according to the sewage treatment quality assessment model, the sewage treatment quality prediction coefficient is obtained.

[0009] In a possible implementation, if the sewage treatment prediction result does not meet the expected constraints of the sewage treatment, sewage treatment decision features are mined according to the multiple sewage treatment nodes and the characteristic information of the sewage to be treated, and a sewage treatment optimization constraint tree is constructed. The following processing is also performed: taking the characteristic information of the sewage to be treated as the retrieval constraint condition, sewage treatment decision retrieval is performed on the multiple sewage treatment nodes respectively to obtain multiple node sewage treatment decision retrieval sets; performing interval analysis in the decision feature concentration according to the multiple node sewage treatment decision retrieval sets to obtain multiple sewage treatment decision feature intervals; taking the multiple sewage treatment nodes as multiple sewage treatment optimization constraint first-level nodes; taking the multiple sewage treatment decision feature intervals as multiple sewage treatment optimization constraint second-level nodes; generating a mapping relationship between nodes according to the corresponding relationship between the multiple sewage treatment nodes and the multiple sewage treatment decision feature intervals; based on the mapping relationship between nodes, sorting the multiple sewage treatment optimization constraint first-level nodes and the multiple sewage treatment optimization constraint second-level nodes to generate the sewage treatment optimization constraint tree.

[0010] In a possible implementation, based on the sewage treatment desired constraint and the sewage treatment simulation platform, the sewage treatment control scheme is optimized and adjusted according to the sewage treatment optimization constraint tree to generate a sewage treatment control scheme optimization result, and the following processing is also performed: the sewage treatment control scheme is randomly adjusted according to the sewage treatment optimization constraint tree to generate a first adjustment domain of the sewage treatment control scheme; sewage treatment verification is performed on the first adjustment domain of the sewage treatment control scheme according to the sewage treatment desired constraint and the sewage treatment simulation platform to generate a second adjustment domain of the sewage treatment control scheme; carbon emissions are optimized according to the second adjustment domain of the sewage treatment control scheme to generate a first optimized sewage treatment control scheme; sewage treatment quality is optimized according to the second adjustment domain of the sewage treatment control scheme to generate a second optimized sewage treatment control scheme; carbon emissions and sewage treatment quality are jointly optimized according to the second adjustment domain of the sewage treatment control scheme to generate a third optimized sewage treatment control scheme; the first optimized sewage treatment control scheme, the second optimized sewage treatment control scheme and the third optimized sewage treatment control scheme are added to the sewage treatment control scheme optimization result.

[0011] In a possible implementation, the first adjustment domain of the sewage treatment control scheme is verified for sewage treatment according to the sewage treatment expected constraint and the sewage treatment simulation platform to generate a second adjustment domain of the sewage treatment control scheme, and the following processing is also performed: according to the first adjustment domain of the sewage treatment control scheme, a first adjusted sewage treatment control scheme is extracted; based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the first adjusted sewage treatment control scheme to generate a sewage treatment prediction result of the first adjustment scheme; it is determined whether the sewage treatment prediction result of the first adjustment scheme meets the sewage treatment expected constraint; if the sewage treatment prediction result of the first adjustment scheme meets the sewage treatment expected constraint, the first adjusted sewage treatment control scheme is added to the second adjustment domain of the sewage treatment control scheme; if the sewage treatment prediction result of the first adjustment scheme does not meet the sewage treatment expected constraint, the first adjusted sewage treatment control scheme is eliminated; according to the sewage treatment expected constraint and the sewage treatment simulation platform, the first adjustment domain of the sewage treatment control scheme is continued to be verified for sewage treatment to generate a second adjustment domain of the sewage treatment control scheme that meets the predetermined scheme capacity.

[0012] The present application also provides an electronic device, comprising: a memory for storing executable instructions; and a processor for implementing a sewage treatment control method based on carbon emission accounting when executing the executable instructions stored in the memory.

[0013] The present application also provides a computer-readable storage medium, including: a computer program stored thereon, which, when executed by a processor, implements a sewage treatment control method based on carbon emission accounting.

[0014] The sewage treatment control method based on carbon emission accounting proposed in this application is proposed to identify features based on the sewage monitoring data set to generate feature information of the sewage to be treated; generate sewage treatment control schemes based on multiple sewage treatment control factors; perform carbon emission accounting and sewage treatment quality prediction to generate sewage treatment prediction results; determine whether the sewage treatment prediction results meet the sewage treatment expectation constraints; if not, construct a sewage treatment optimization constraint tree; optimize and adjust to generate the sewage treatment control scheme optimization results; and treat the sewage to be treated. This solves the technical problems that the existing sewage treatment control focuses on improving treatment efficiency and water quality standards, and pays insufficient attention to the accounting and control of carbon emissions, which leads to increased energy consumption and carbon emissions, as well as low pertinence and effectiveness of sewage treatment control, and achieves the synergistic effect of reducing pollution and carbon emissions, and achieves the technical effects of reducing energy consumption and carbon emissions and improving the pertinence of sewage treatment control. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0016] Figure 1 A schematic diagram of the process of the sewage treatment control method, medium and equipment based on carbon emission accounting provided in the embodiment of the present application;

[0017] Figure 2 A schematic diagram of a process for generating a sewage treatment control scheme in a sewage treatment control method, medium and device based on carbon emission accounting provided in an embodiment of the present application;

[0018] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0019] Description of the reference numerals: input device 401 , processor 402 , memory 403 , output device 404 . DETAILED DESCRIPTION

[0020] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.

[0021] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0022] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.

[0023] The present application embodiment provides a sewage treatment control method based on carbon emission accounting, such as Figure 1 As shown, the method includes:

[0024] Step S100, according to the sewage monitoring module, obtain the sewage monitoring data set of the sewage to be treated, and perform feature identification based on the sewage monitoring data set to generate feature information of the sewage to be treated. The sewage monitoring module is deployed at key locations such as the water inlet, each treatment unit and the water outlet of the sewage treatment plant. It usually integrates a variety of sensors, such as pH sensors, dissolved oxygen sensors, conductivity sensors, COD (chemical oxygen demand) sensors, etc., which are used to monitor various parameters of sewage in real time. The sewage monitoring module collects various data of sewage in real time through sensors to form a sewage monitoring data set of the sewage to be treated, which includes various parameter values ​​of the sewage to be treated at different times and locations; before performing feature identification, the sewage monitoring data set needs to be preprocessed, including removing outliers, filling missing values, data smoothing and other steps to ensure the quality and reliability of the data. According to the needs and purposes of the sewage treatment process, the sewage monitoring data set is preprocessed from the sewage monitoring data set. Representative characteristic parameters are selected from the measured data. These characteristic parameters can comprehensively reflect the pollution degree and treatment effect of sewage, such as pH value, dissolved oxygen concentration, COD concentration, etc. Then, statistical methods are used to further process and extract the selected characteristic parameters. For example, statistical indicators such as the mean, variance, and kurtosis of the characteristic parameters are calculated to reflect the changes of the characteristic parameters at different times or spatial scales. Then, principal component analysis or cluster analysis is used to classify and identify sewage according to the extracted characteristic parameters, and the sewage to be treated is divided into different categories or types. Finally, the characteristic information of the sewage to be treated is generated, including information on the pollution degree of sewage, types of major pollutants, and treatment difficulty.

[0025] Step S200, based on the multivariate sewage treatment control factor and according to the characteristic information of the sewage to be treated, a sewage treatment control plan is generated, wherein the sewage treatment control plan includes a plurality of node sewage treatment decisions corresponding to a plurality of sewage treatment nodes. Based on the multivariate sewage treatment control factors, a sewage treatment control plan is generated according to the characteristic information of the sewage to be treated, aiming to achieve efficient, stable and environmentally friendly sewage treatment through scientific methods and means. Among them, the multivariate sewage treatment control factors refer to the key factors that affect the treatment effect and operation efficiency in the sewage treatment process. The multivariate sewage treatment control factors include sewage treatment nodes, node sewage treatment equipment models, node sewage treatment equipment control parameters, node sewage treatment additive types and node sewage treatment additive dosages. They are key elements of the sewage treatment control plan, including but not limited to different stages or links in the sewage treatment process, the specific equipment models used at each node, node sewage treatment equipment control parameters, such as aeration volume, stirring speed, reaction time, etc.; chemical additives that promote or inhibit specific chemical reactions and the dosage of additives; specifically, the sewage treatment process is divided into multiple nodes, each node represents a specific treatment stage or process unit, these nodes can be physical treatment units (such as screens, grit chambers), biological treatment units (such as activated sludge tanks, biofilm reactors), deep treatment units (such as coagulation sedimentation tanks, filters), etc. For each node, according to the multivariate sewage treatment control factors and the characteristic information of the sewage to be treated, specific sewage treatment decisions are made, including the selection of Appropriate treatment process, setting reasonable process parameters, determining necessary control measures, etc. For example, in the biological treatment unit, according to the characteristic information of sewage BOD / COD ratio, ammonia nitrogen concentration, etc., appropriate microbial species and quantity can be selected, aeration volume can be adjusted, sludge age and other process parameters can be controlled to achieve the best biological treatment effect, and the sewage treatment decisions of each node can be integrated to form a complete sewage treatment control plan. At the same time, the plan can be optimized and adjusted to ensure the coordination between each node and the optimization of the overall treatment effect. Taking a sewage treatment plant as an example, its sewage treatment control plan may include the following nodes and their corresponding treatment decisions: At the pretreatment node, screens and grit chambers are used to remove large particles and inorganic sand in the sewage, and appropriate screen gaps and grit chamber retention times are set; at the biological treatment node, the activated sludge method is used to treat organic matter and nutrients such as nitrogen and phosphorus in the sewage, and appropriate microbial species and quantities are selected according to sewage characteristic information, and process parameters such as aeration volume and sludge volume are adjusted; at the deep treatment node, coagulation, sedimentation and filtration processes are used to further remove suspended matter and colloidal substances in the sewage, and appropriate coagulant dosage and filtration speed are set; at the disinfection node, ultraviolet disinfection or chlorine disinfection is used to kill pathogenic microorganisms in the sewage to ensure that the effluent quality meets the hygiene standards.

[0026] In one possible implementation, Figure 2As shown, step S200 further includes step S210, loading sewage characteristic information record set and sewage treatment control scheme record set. Sewage characteristic information records and sewage treatment control scheme records are collected from the operation records, historical data or experimental data of the sewage treatment plant. Specifically, the sewage characteristic information record set contains information about the physical, chemical and other characteristics of different sewage samples, such as COD (chemical oxygen demand), BOD (biological oxygen demand), pH value, temperature, suspended solids content, etc., and the sewage treatment control scheme record set records the sewage treatment control schemes used in the past for different sewage characteristics, including the equipment model used, control parameter settings, additive types and dosages, etc. It also includes step S220, and the multivariate sewage treatment control factors include sewage treatment nodes, node sewage treatment equipment models, node sewage treatment equipment control parameters, node sewage treatment additive types and node sewage treatment additive dosages. Sewage treatment nodes refer to different stages or links in the sewage treatment process; node sewage treatment equipment model refers to the specific equipment model used at each node; node sewage treatment equipment control parameters, such as aeration volume, stirring speed, reaction time, etc.; node sewage treatment additive types refer to chemical substances used to promote or inhibit specific chemical reactions; node sewage treatment additive dosage refers to the amount of additive added.

[0027] Step S200 also includes step S230, which integrates the characteristics of the sewage treatment control scheme record set according to the multivariate sewage treatment control factor to obtain a sewage treatment control scheme data set. The multivariate sewage treatment control factor is associated and integrated with other relevant information (such as treatment effect, energy consumption, material consumption, etc.) in the sewage treatment control scheme record set to construct a sewage treatment control scheme data set containing rich characteristic information. Specifically, the multivariate sewage treatment control factor corresponding to each control scheme is associated with its treatment effect, energy consumption, material consumption and other information, and the associated data is organized and stored in a certain format and structure to form a complete sewage treatment control scheme data set, which contains rich characteristic information and treatment effect data, and can be used for subsequent data analysis, model training and prediction tasks.

[0028] Step S200 also includes step S240, which performs supervised training on the sewage treatment decision learning model based on the sewage characteristic information record set and the sewage treatment control scheme data set to obtain the sewage treatment decision accuracy. The sewage treatment decision learning model is constructed based on decision trees, random forests, neural networks, etc., and the architecture and parameters of the model are designed according to specific needs. For example, for a neural network model, it is necessary to determine the number of network layers, the number of neurons in each layer, the activation function, etc., and preprocess the sewage characteristic information record set and the sewage treatment control plan data set, including data cleaning, standardization, normalization and other steps. Features useful for model training are extracted from the sewage characteristic information record set, and then the preprocessed data is divided into a training set and a test set (or validation set). The model is trained using the training set. During the training process, the model will continuously adjust its own parameters based on the input characteristic information and the corresponding control plan (label) to minimize the prediction error. The trained model is evaluated using the test set (or validation set). Through supervised training, the sewage treatment decision-making learning model can predict or generate the optimal sewage treatment control plan based on the sewage characteristic information, thereby obtaining the sewage treatment decision accuracy. The higher the decision accuracy, the more accurately the model can generate effective control plans when processing similar sewage samples.

[0029] Step S200 also includes step S250, if the sewage treatment decision accuracy is greater than / equal to the preset sewage treatment decision accuracy, a multi-feature sewage treatment decision channel is generated. If the sewage treatment decision accuracy meets or exceeds the preset accuracy standard, the system automatically constructs a decision channel for multiple sewage characteristics, which is used to formulate a more accurate and efficient sewage treatment plan according to the different characteristics of the sewage (such as chemical composition, concentration, temperature, pH value, etc.), ensuring that sewage with different characteristics can be optimally treated. Specifically, the input sewage sample is feature identified and classified into different treatment categories according to its characteristics. For each treatment category, a specific treatment plan is formulated based on preset rules or algorithms, which may include different treatment processes, treatment parameters, and required additives, etc., and finally a complete decision channel, i.e., a multi-feature sewage treatment decision channel, is obtained.

[0030] Step S200 also includes step S260, based on the characteristic information of the sewage to be treated, according to the multi-characteristic sewage treatment decision channel, obtaining the sewage treatment control plan. According to the characteristic information of the sewage to be treated, a decision channel matching it is selected in the multi-characteristic sewage treatment decision channel library, and based on the selected multi-characteristic sewage treatment decision channel, combined with the specific characteristic information of the sewage to be treated, a detailed sewage treatment control plan is formulated, including the selection of treatment process, the setting of treatment parameters, the type and amount of required additives, etc.

[0031] Step S300, based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the sewage treatment control scheme to generate sewage treatment prediction results. The sewage treatment simulation platform is a comprehensive platform that integrates a variety of mathematical models, algorithms and data processing technologies. It can simulate, analyze and optimize the sewage treatment process, and provide scientific basis and technical support for the operation and management of sewage treatment plants. It usually includes multiple modules such as data input, model construction, simulation calculation, and result output, so as to realize the simulation of the entire sewage treatment process. The sewage treatment control scheme is input as input data into the sewage treatment simulation platform. The simulation model of the sewage treatment simulation platform calculates carbon emissions in the sewage treatment process. Among them, carbon emission accounting mainly uses carbon emission accounting methods (such as IPCC methods) to calculate the emissions of greenhouse gases such as carbon dioxide generated by energy consumption (such as electricity, fuel, etc.) in each link of the sewage treatment process. , and the total carbon emissions of sewage treatment are summarized; sewage treatment quality prediction specifically includes defining sewage treatment effect evaluation indicators, such as chemical oxygen demand (COD), biochemical oxygen demand (BOD), total nitrogen (TN) and total phosphorus (TP), etc., based on the sewage treatment simulation model, predicting the treatment effect of each indicator under different process parameters and operating conditions, running the simulation model, predicting the quality of the treated effluent, and evaluating the sewage treatment effect. Specifically, the initial conditions and parameter ranges of the simulation operation are set, such as water inlet flow rate, aeration intensity, and dosage of the reagent, etc. Within the set parameter range, multiple simulation runs are performed to generate prediction results under different operating conditions, and the results of each simulation run are collected to form multiple prediction results, each of which contains corresponding carbon emissions and treatment quality data. These data can be used to optimize sewage treatment control schemes, improve treatment efficiency, and reduce carbon emissions. For example, a sewage treatment plant treats 1000m³ of sewage every day. The input parameters are daily treatment volume 1000m³, chemical oxygen demand COD 500mg / L, biological oxygen demand BOD 250mg / L, nitrogen content 50mg / L, phosphorus content 10mg / L, and treatment process (activated sludge process). The simulation runs under different treatment process parameter adjustments, and the predicted data are as follows:

[0032]

[0033] In a possible implementation, step S300 further includes step S310, based on the characteristic information of the sewage to be treated and the sewage treatment control scheme, simulate sewage treatment according to the sewage treatment simulation platform, and generate a sewage treatment carbon emission simulation data set and simulated sewage treatment results. The characteristic information of the sewage to be treated (such as water quality parameters, pollutant concentration, etc.) and the sewage treatment control scheme (including treatment process, operation parameters, etc.) are input into the sewage treatment simulation platform to simulate the entire sewage treatment process, taking into account various physical, chemical and biological processes to simulate the changes and results of sewage during the treatment process, and generate two main results, a sewage treatment carbon emission simulation data set (recording the carbon emission data of each link in the simulation process) and a simulated sewage treatment result (i.e., the water quality parameters of the treated sewage, such as whether various indicators meet the standards, etc.). It also includes step S320, building a sewage treatment carbon emission accounting model based on the sewage treatment carbon emission accounting record set. The sewage treatment carbon emission accounting record set (including carbon emission data, treatment process, treatment volume and other information in the historical sewage treatment process) uses machine learning algorithms to build a model that can accurately calculate the carbon emissions in the sewage treatment process based on the data in the record set. The model can receive data similar to that generated in the simulation process and output corresponding carbon emission accounting results, which will be used for the subsequent accounting of carbon emissions in the simulated or actual sewage treatment process.

[0034] Step S300 further includes step S330, based on the wastewater treatment carbon emission simulation data set, according to the wastewater treatment carbon emission accounting model, obtaining the wastewater treatment carbon emission accounting coefficient. The wastewater treatment carbon emission simulation data set is input into the constructed wastewater treatment carbon emission accounting model. The model calculates and outputs the corresponding carbon emission accounting results according to the information in the data set, such as treatment process, treatment volume, treatment time, energy consumption, etc., and encapsulates them as wastewater treatment carbon emission accounting coefficients. Each wastewater treatment carbon emission accounting coefficient contains a corresponding simulation data set identifier, which is used to identify which simulation data set the accounting result is based on; it also includes carbon emission accounting results, including carbon emissions in each link of the simulated wastewater treatment process, as well as total carbon emissions, carbon emissions per unit treatment volume, etc., reflecting the carbon emissions that may be generated by the wastewater treatment process under a given treatment scheme. For example, the carbon emission simulation data set includes treatment process (activated sludge method), daily treatment volume (1000m³), energy consumption (2000KW h), assuming that the carbon emission factor is 0.5kg / KW h, then the carbon emissions per unit treatment volume is the total emissions divided by the daily treatment volume, that is, the carbon emissions per unit treatment volume = 2000×0.5 / 1000=1. The carbon emissions per unit treatment volume is used as the carbon emission accounting coefficient for sewage treatment.

[0035] Step S300 also includes step S340, generating a sewage treatment quality prediction coefficient based on the simulated sewage treatment result and the characteristic information of the sewage to be treated. The simulated sewage treatment result and the characteristic information of the sewage to be treated are integrated to form a complete data set, and the integrated data set is trained based on a machine learning model (such as a neural network, a random forest, etc.), and the data features are extracted and the sewage treatment quality is predicted accordingly. The prediction result of the model is the sewage treatment quality prediction coefficient. Each prediction result contains the quality prediction information of the corresponding simulated sewage treatment result, such as the predicted value of water quality indicators such as COD (chemical oxygen demand), BOD (biological oxygen demand), ammonia nitrogen, total phosphorus, and total nitrogen after treatment, and the compliance status. A weight value can be assigned to each removal efficiency to reflect the importance of each parameter on the overall water quality. For example, COD weight is 0.4, BOD weight is 0.3, nitrogen weight is 0.2, and phosphorus weight is 0.1. The calculation formula of the prediction coefficient (Q) is:

[0036] ;

[0037] in, is the COD removal rate, is the BOD removal rate, is the nitrogen removal rate, is the phosphorus removal rate. Based on the data in the above table, the sewage treatment quality prediction coefficients are calculated, Q1, Q2, and Q3 are:

[0038]

[0039] It means that the effects of the three sewage treatments are very good.

[0040] The method further includes step S350, in which the sewage treatment carbon emission accounting coefficient and the sewage treatment quality prediction coefficient are added to the sewage treatment prediction result. The generated sewage treatment carbon emission accounting coefficient and sewage treatment quality prediction coefficient are integrated to form a sewage treatment prediction result containing complete information, which together constitute a comprehensive prediction result of a sewage treatment process.

[0041] In a possible implementation, step S340 further includes step S341, wherein the simulated sewage treatment result includes characteristic information of the treated sewage. The characteristic information of the treated sewage refers to the physical, chemical and biological characteristics of the sewage after the sewage is treated by the sewage treatment process, such as pH value, suspended solids concentration, organic matter content, concentration of nutrients such as nitrogen and phosphorus, etc. It also includes step S342, wherein a deviation comparison is performed based on the characteristic information of the sewage to be treated and the characteristic information of the treated sewage to generate a sewage characteristic deviation vector. The sewage characteristic deviation vector is obtained by performing a deviation comparison between the characteristic information of the sewage to be treated and the characteristic information of the treated sewage. Specifically, the difference or relative change rate of each characteristic indicator between the two is calculated to form a vector reflecting the quality of the sewage treatment effect. Each element in the vector represents the degree of change of the corresponding characteristic indicator before and after the treatment, which is used to evaluate the performance of the sewage treatment.

[0042] Step S340 also includes step S343, building a sewage treatment quality assessment model based on the sample sewage characteristic deviation vector set and the sample sewage treatment quality assessment set. The assessment model is constructed based on linear regression, random forest, neural network, etc., the sample sewage characteristic deviation vector set and the sample sewage treatment quality assessment set are pre-processed, the processed sample sewage characteristic deviation vector set is used as input data, and the processed sample sewage treatment quality assessment set is used as output data to train the model. The model learns the relationship between the input data and the output data, and obtains a sewage treatment quality assessment model, which can evaluate the quality of the sewage after treatment according to the sewage characteristic deviation vector. It also includes step S344, based on the sewage characteristic deviation vector, according to the sewage treatment quality assessment model, obtaining the sewage treatment quality prediction coefficient. The sewage treatment quality assessment model predicts the quality of sewage treatment according to the input sewage characteristic deviation vector, and obtains the sewage treatment quality prediction coefficient, which includes the sewage treatment quality assessment coefficient, which is used to measure the quality of sewage treatment. Specifically, the sewage treatment quality assessment coefficient directly reflects the quality level of sewage treatment. By comparing the assessment coefficients of different sewage treatment cases, the quality difference after sewage treatment can be intuitively understood.

[0043] Step S400, determine whether the sewage treatment prediction result meets the expected constraints of sewage treatment. The expected constraints of sewage treatment include carbon emission accounting constraints and sewage treatment quality constraints. The carbon emission accounting constraints mean that the carbon emissions of the predicted results must be within the prescribed carbon emission limit range to ensure that the carbon emissions generated during the sewage treatment process meet the requirements. The carbon emission limit refers to the maximum carbon emissions allowed by the sewage treatment system. For example, the carbon emissions per ton of treated water must not exceed a certain number of kilograms. The sewage treatment quality constraint means that the treatment effect of the predicted results must meet the prescribed water quality standards to ensure that the treated sewage meets the emission requirements. Specifically, the carbon emissions of each predicted result and the water quality of the treated effluent are obtained from the sewage treatment simulation platform. Indicators, compare the carbon emissions of the predicted results with the preset carbon emission limits. If the carbon emissions are within the limits, the result meets the carbon emission accounting constraints. For example, the carbon emissions of result 1 are 4kg / ton of water, and the preset carbon emission limit is 5kg / ton of water, so result 1 meets the carbon emission accounting constraints; compare each water quality indicator with the preset limit. If all water quality indicators are within the limit, the predicted result meets the sewage treatment quality constraints. For example, the treated effluent COD of predicted result 1 is 50mg / L, and the preset COD limit is 60mg / L, so the COD of predicted result 1 meets the sewage treatment quality constraints. If any of the carbon emission accounting constraints and sewage treatment quality constraints are not met, it is deemed that the sewage treatment prediction result does not meet the sewage treatment expectation constraints.

[0044] Step S500, if the sewage treatment prediction result does not meet the sewage treatment expected constraints, the sewage treatment decision feature mining is performed according to the multiple sewage treatment nodes and the sewage to be treated feature information, and the sewage treatment optimization constraint tree is constructed. When the sewage treatment prediction result does not meet the sewage treatment expected constraints, the sewage treatment decision feature mining is performed according to the multiple sewage treatment nodes and the sewage to be treated feature information, and the sewage treatment optimization constraint tree is constructed to optimize the sewage treatment process, improve the treatment efficiency and the water quality compliance rate. Specifically, data mining technology (such as correlation analysis, principal component analysis, etc.) is used to extract characteristic variables that have an important impact on the sewage treatment effect from multiple sewage treatment nodes and the sewage to be treated feature information. The variables may include the physical properties of sewage (such as temperature, pH value), chemical properties (such as the concentration of pollutants such as COD, BOD, and ammonia nitrogen), and biological properties (such as microbial population, activated sludge concentration, etc.), and then the sewage treatment optimization constraint tree is constructed. Specifically, according to the goals and requirements of sewage treatment (such as effluent water quality compliance, carbon emission minimization, energy consumption and material consumption minimization, etc.), the optimization problem is determined. The objective function establishes the constraints of the optimization problem according to the expected constraints of sewage treatment (carbon emission accounting constraints and sewage treatment quality constraints) and other relevant regulations and standards (such as emission standards, safety standards, etc.). The objective function and constraints of the optimization problem are expressed in the form of a tree structure to form a sewage treatment optimization constraint tree, which clearly shows the interaction and dependency between decision variables and how they jointly affect the realization of the optimization goal. Each node in the constraint tree represents a decision variable or constraint, and the connection between nodes represents the interaction and dependency between decision variables. Under the guidance of the constraint tree, a suitable optimization algorithm (such as genetic algorithm, particle swarm algorithm, simulated annealing algorithm, etc.) is used to optimize the sewage treatment process. Through continuous iteration and optimization, a sewage treatment solution that meets all constraints and optimizes the objective function is found.

[0045] In a possible implementation, step S500 further includes step S510, using the characteristic information of the sewage to be treated as a retrieval constraint condition, performing sewage treatment decision retrieval on the multiple sewage treatment nodes respectively, and obtaining multiple node sewage treatment decision retrieval sets. Using the characteristic information of the sewage to be treated (such as the pH value, suspended solids concentration, organic matter content, etc. of the sewage) as a retrieval constraint condition, a decision retrieval is performed on multiple sewage treatment nodes (these nodes may represent different sewage treatment processes, equipment or treatment units), and by comparing the characteristic information of the sewage to be treated with the sewage characteristic range or condition that each node can process, multiple node sewage treatment decision retrieval sets are obtained, each set containing the sewage treatment decision that each node may take for a specific sewage to be treated.

[0046] Step S500 also includes step S520, performing concentrated interval analysis of decision features according to the multiple node sewage treatment decision retrieval sets, and obtaining multiple sewage treatment decision feature intervals. Further analysis is performed on the multiple node sewage treatment decision retrieval sets, especially concentrated interval analysis of the decision features therein, quantifying the key features (such as treatment efficiency, effluent water quality indicators, etc.) in the decision results of each node, and determining its possible value range or interval, and obtaining multiple sewage treatment decision feature intervals, which describe the effect range that different nodes may achieve when treating specific sewage. It also includes step S530, using the multiple sewage treatment nodes as multiple sewage treatment optimization constraint first-level nodes. Using the multiple sewage treatment nodes themselves as the first-level constraint nodes for sewage treatment optimization represents different links or stages in the sewage treatment process, and is the basis for constructing an optimization constraint tree. It also includes step S540, using the multiple sewage treatment decision feature intervals as multiple sewage treatment optimization constraint second-level nodes. Using multiple sewage treatment decision feature intervals as constraint second-level nodes for sewage treatment optimization, these intervals provide specific quantitative information about the sewage treatment effect.

[0047] Step S500 also includes step S550, generating a mapping relationship between nodes according to the corresponding relationship between the multiple sewage treatment nodes and the multiple sewage treatment decision feature intervals. In the sewage treatment process, by analyzing and determining the direct connection between different sewage treatment nodes (these nodes represent various links or units in the sewage treatment process, such as pretreatment units, biological treatment units, deep treatment units, etc.) and the sewage treatment decision feature intervals that they can achieve (these intervals describe the water quality index range, treatment efficiency and other quantitative characteristics that each node may achieve after treating sewage), a clear and queryable corresponding relationship, that is, the mapping relationship between nodes, is constructed. It also includes step S560, based on the mapping relationship between nodes, sorting out the multiple sewage treatment optimization constraint primary nodes and the multiple sewage treatment optimization constraint secondary nodes, and generating the sewage treatment optimization constraint tree. Identify all links or units in the sewage treatment process and take them as first-level nodes. According to the performance parameters and historical data of each node, determine its corresponding sewage treatment decision-making characteristic interval as the second-level node, establish a mapping relationship between the first-level node and the second-level node, and design the hierarchical structure and connection relationship of the sewage treatment optimization constraint tree based on the mapping relationship to ensure that the tree structure can clearly display the constraint relationship between each link and the sewage treatment effect they can achieve, and finally generate a sewage treatment optimization constraint tree.

[0048] Step S600, based on the sewage treatment desired constraints and the sewage treatment simulation platform, the sewage treatment control scheme is optimized and adjusted according to the sewage treatment optimization constraint tree to generate a sewage treatment control scheme optimization result. Based on the simulation platform and the optimization constraint tree, the initial sewage treatment control scheme is set, the initial control scheme is run on the simulation platform, the sewage treatment process is simulated, and key indicator data such as effluent water quality, energy consumption, and material consumption are collected. The simulation results are compared with the constraints and goals to evaluate the feasibility and effect of the initial scheme. If the initial scheme does not meet the constraints or does not achieve the optimization goal, the decision variables in the control scheme are adjusted according to the guidance of the optimization constraint tree. For example, an intelligent optimization algorithm (such as genetic algorithm, particle swarm algorithm, etc.) is used to search for a better solution. The process of simulation, scheme evaluation and scheme adjustment is repeated until a sewage treatment control scheme that meets all constraints and makes the objective function optimal is found. After multiple iterative optimizations, the optimal sewage treatment control scheme is determined, and the various parameters of the optimal scheme (such as aeration volume, sludge return volume, agent dosage, etc.) and the corresponding key indicator data such as effluent water quality, energy consumption, and material consumption are displayed, that is, the optimization result of the sewage treatment control scheme is generated, which helps to improve the efficiency of sewage treatment and the water quality compliance rate, and reduce energy consumption and material consumption.

[0049] In a possible implementation, step S600 further includes step S610, randomly adjusting the sewage treatment control scheme according to the sewage treatment optimization constraint tree to generate a first adjustment domain of the sewage treatment control scheme. Based on the sewage treatment optimization constraint tree, the original sewage treatment control scheme is randomly adjusted, that is, based on the constraints in the tree structure and the mapping relationship between nodes, in order to explore different control parameter combinations and generate a set of multiple potential optimization control schemes, that is, the first adjustment domain of the sewage treatment control scheme, and the schemes in the first adjustment domain of the sewage treatment control scheme all meet the basic constraints in the constraint tree.

[0050] Step S600 also includes step S620, performing sewage treatment verification on the first adjustment domain of the sewage treatment control scheme according to the sewage treatment expected constraint and the sewage treatment simulation platform, and generating a second adjustment domain of the sewage treatment control scheme. Using the sewage treatment expected constraint and the sewage treatment simulation platform, the schemes in the first adjustment domain are verified for sewage treatment, including simulating the effect of the control scheme in the actual sewage treatment process, and evaluating its feasibility and performance. Through verification, those schemes that do not meet the particle constraints or have poor simulation effects are eliminated, and a more refined adjustment domain, i.e., the second adjustment domain of the sewage treatment control scheme, is generated. The schemes in the second adjustment domain of the sewage treatment control scheme are theoretically more likely to achieve the optimization goal.

[0051] Step S600 also includes step S630, performing carbon emission optimization according to the second adjustment domain of the sewage treatment control scheme to generate a first optimized sewage treatment control scheme. In the second adjustment domain, taking minimization of carbon emissions as the optimization goal, a genetic algorithm or a particle swarm algorithm is used to perform optimization calculations to search for a sewage treatment control scheme with the lowest carbon emissions, and finally generating a first optimized sewage treatment control scheme, which performs best in reducing carbon emissions. It also includes step S640, performing sewage treatment quality optimization according to the second adjustment domain of the sewage treatment control scheme to generate a second optimized sewage treatment control scheme. Similarly, in the second adjustment domain, optimization is performed with the optimal sewage treatment quality (such as effluent water quality indicators) as the optimization goal, searching for a sewage treatment control scheme that can produce the highest quality effluent, and generating a second optimized sewage treatment control scheme, which performs best in improving sewage treatment quality.

[0052] Step S600 also includes step S650, performing joint optimization of carbon emissions and sewage treatment quality according to the second adjustment domain of the sewage treatment control scheme to generate a third optimized sewage treatment control scheme. Comprehensive optimization is performed in the second adjustment domain, that is, the two optimization objectives of carbon emissions and sewage treatment quality are considered at the same time, that is, multi-objective optimization is performed to find a sewage treatment control scheme that achieves the best balance between the two objectives. For example, according to the relative importance of carbon emissions and sewage treatment quality, appropriate weights are set, the fitness of carbon emissions and sewage treatment quality are evaluated respectively, and weighted calculations are performed to find a control scheme that achieves the best balance between carbon emissions and sewage treatment quality, that is, the fitness value after weighted calculation is the largest, which is used as the third optimized sewage treatment control scheme.

[0053] Step S600 also includes step S660, adding the first optimized sewage treatment control scheme, the second optimized sewage treatment control scheme and the third optimized sewage treatment control scheme to the sewage treatment control scheme optimization result. The three control schemes obtained through the optimization process of different optimization objectives (or target combinations) are integrated and stored into a set, namely, the sewage treatment control scheme optimization result. Specifically, the sewage treatment control scheme optimization result includes the best or approximately best control schemes obtained for different optimization objectives (such as single carbon emission minimization, single sewage treatment quality optimization, and joint optimization of carbon emission and sewage treatment quality). Each control scheme represents the optimal operating state that the sewage treatment system may achieve under a specific optimization objective.

[0054] In a possible implementation, step S620 further includes step S621, extracting a first adjusted sewage treatment control scheme according to the first adjustment domain of the sewage treatment control scheme. According to the set first adjustment domain of the sewage treatment control scheme, a sewage treatment control scheme to be further verified is randomly extracted therefrom, that is, the first adjusted sewage treatment control scheme. It also includes step S622, based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the first adjusted sewage treatment control scheme, and a sewage treatment prediction result of the first adjustment scheme is generated. Based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed on the extracted first adjusted sewage treatment control scheme, that is, the control scheme is input into the simulation model, the sewage treatment process is simulated, and key indicators such as carbon emissions and effluent water quality are calculated, and the simulation results (including carbon emissions and sewage treatment quality prediction values) are used as the sewage treatment prediction results of the first adjustment scheme, which represents the performance of a specific control scheme under simulation conditions.

[0055] Step S620 also includes step S623, judging whether the sewage treatment prediction result of the first adjustment scheme meets the expected constraint of sewage treatment. Compare the sewage treatment prediction result of the first adjustment scheme with the preset expected constraint of sewage treatment to judge whether it meets the requirements, and screen out the control scheme that meets environmental protection and economic requirements. It also includes step S624, if the sewage treatment prediction result of the first adjustment scheme meets the expected constraint of sewage treatment, add the first adjustment sewage treatment control scheme to the second adjustment domain of the sewage treatment control scheme. If the sewage treatment prediction result of the first adjustment scheme meets the constraint, the control scheme is added to the second adjustment domain of the sewage treatment control scheme. It also includes step S625, if the sewage treatment prediction result of the first adjustment scheme does not meet the expected constraint of sewage treatment, eliminate the first adjustment sewage treatment control scheme. If the sewage treatment prediction result of the first adjustment scheme does not meet the constraint, the control scheme is eliminated and no further consideration is given.

[0056] Step S620 also includes step S626, continuing to perform sewage treatment verification on the first adjustment domain of the sewage treatment control scheme according to the sewage treatment expected constraints and the sewage treatment simulation platform, and generating the sewage treatment control scheme second adjustment domain that meets the predetermined scheme capacity. According to the sewage treatment expected constraints and the simulation platform, continue to verify other control schemes in the first adjustment domain, use the simulation platform to simulate the sewage treatment process, run the simulation model according to the input control scheme, calculate and record relevant performance indicators, such as carbon emissions and effluent water quality, compare the simulation results with the preset sewage treatment expected constraints, evaluate whether each control scheme meets the constraints, and select the control scheme that meets the sewage treatment expected constraints from the first adjustment domain until the second adjustment domain that meets the predetermined scheme capacity is generated. The predetermined scheme capacity refers to the upper limit of the number of control schemes set according to actual needs and hoped to be retained in subsequent analysis. In order to meet the requirements of the predetermined scheme capacity, it may be necessary to further streamline or optimize the control schemes in the second adjustment domain.

[0057] Step S700, based on the sewage treatment control module, the sewage to be treated is treated according to the optimization result of the sewage treatment control scheme. According to the optimized and adjusted sewage treatment control scheme, the sewage entering the sewage treatment system is subjected to a series of treatment operations by using various functions and equipment in the sewage treatment control module to achieve the purpose of purifying water quality, reducing pollutant concentration, meeting emission standards, etc. Specifically, the sewage treatment control module usually integrates functions such as automatic control, real-time monitoring, and data analysis, and can realize accurate control and optimization adjustment of each link in the sewage treatment process. The optimization result of the sewage treatment control scheme is input into the control module as the basis for control parameters and instructions, such as aeration volume, sludge return volume, dosage of reagents, suspended solids concentration of mixed liquor, dissolved oxygen concentration and other key control points. Through sensors and monitoring equipment installed in various links of the sewage treatment system, water quality indicators, equipment operating parameters and other data are collected in real time to evaluate whether the treatment effect meets the expected goal. According to the data analysis results and actual conditions, the parameters and instructions in the control module are adjusted and optimized in real time to realize accurate control and optimization adjustment of the sewage treatment process.

[0058] Based on the foregoing embodiments, the embodiments of the present application further provide an electronic device and a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of the electronic device, it can implement the method described in any of the foregoing embodiments.

[0059] Figure 3 1 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, showing a block diagram of an exemplary electronic device suitable for implementing an implementation of the present invention. Figure 3The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention. The electronic device is in the form of a general computing device, and its components may include but are not limited to an input device 401, a processor 402, a memory 403, and an output device 404. Among them, the processor 402 may be one or more; the memory 403 may include a computer-readable medium and at least one program product, and the program product has a set (at least one) of program modules, which are configured to perform the functions of each embodiment of the present application.

[0060] The memory 403 shown in the embodiment of the present invention may adopt any combination of one or more computer-readable media; the computer-readable storage medium may be, but is not limited to, an infrared, semiconductor system, device or device, or any combination of the above, for storing software programs, computer executable programs and modules, such as the program instructions / modules corresponding to the sewage treatment control method based on carbon emission accounting in the embodiment of the present invention. The processor 402 executes various functional applications and data processing of the computer device by running the software programs, instructions and modules stored in the memory 403, thereby realizing the above-mentioned sewage treatment control method based on carbon emission accounting.

[0061] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. Wastewater treatment control method based on carbon emission accounting, It is characterized in that The method comprises: According to the sewage monitoring module, a sewage monitoring data set of the sewage to be treated is obtained, and feature recognition is performed according to the sewage monitoring data set to generate feature information of the sewage to be treated; Based on the multivariate sewage treatment control factor, according to the characteristic information of the sewage to be treated, a sewage treatment control plan is generated, wherein the sewage treatment control plan includes a plurality of node sewage treatment decisions corresponding to a plurality of sewage treatment nodes; Based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the sewage treatment control scheme to generate sewage treatment prediction results; Determining whether the sewage treatment prediction result meets the sewage treatment expectation constraint; If the sewage treatment prediction result does not meet the sewage treatment expected constraints, mining sewage treatment decision features according to the multiple sewage treatment nodes and the characteristic information of the sewage to be treated, and constructing a sewage treatment optimization constraint tree; Based on the sewage treatment expected constraints and the sewage treatment simulation platform, the sewage treatment control scheme is optimized and adjusted according to the sewage treatment optimization constraint tree to generate a sewage treatment control scheme optimization result; Based on the sewage treatment control module, the sewage to be treated is treated according to the optimization result of the sewage treatment control scheme; Based on the sewage treatment expected constraints and the sewage treatment simulation platform, the sewage treatment control scheme is optimized and adjusted according to the sewage treatment optimization constraint tree to generate a sewage treatment control scheme optimization result, including: Randomly adjusting the sewage treatment control scheme according to the sewage treatment optimization constraint tree to generate a first adjustment domain of the sewage treatment control scheme; Performing sewage treatment verification on the first adjustment domain of the sewage treatment control scheme according to the sewage treatment expected constraints and the sewage treatment simulation platform to generate a second adjustment domain of the sewage treatment control scheme; Perform carbon emission optimization according to the second adjustment domain of the sewage treatment control scheme to generate a first optimized sewage treatment control scheme; Optimizing the sewage treatment quality according to the second adjustment domain of the sewage treatment control scheme to generate a second optimized sewage treatment control scheme; Performing joint optimization of carbon emissions and sewage treatment quality according to the second adjustment domain of the sewage treatment control scheme to generate a third optimized sewage treatment control scheme; Adding the first optimal sewage treatment control scheme, the second optimal sewage treatment control scheme and the third optimal sewage treatment control scheme to the sewage treatment control scheme optimization result; Performing sewage treatment verification on the first adjustment domain of the sewage treatment control scheme according to the sewage treatment expected constraint and the sewage treatment simulation platform to generate a second adjustment domain of the sewage treatment control scheme, including: Extracting a first adjusted sewage treatment control scheme according to the first adjustment domain of the sewage treatment control scheme; Based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the first adjusted sewage treatment control scheme to generate a sewage treatment prediction result of the first adjustment scheme; Determining whether the sewage treatment prediction result of the first adjustment scheme meets the sewage treatment expectation constraints; If the sewage treatment prediction result of the first adjustment scheme meets the sewage treatment expectation constraint, adding the first adjustment sewage treatment control scheme to the second adjustment domain of the sewage treatment control scheme; If the sewage treatment prediction result of the first adjustment scheme does not meet the sewage treatment expectation constraint, eliminating the first adjustment sewage treatment control scheme; The first adjustment domain of the sewage treatment control scheme is continuously subjected to sewage treatment verification according to the sewage treatment expected constraints and the sewage treatment simulation platform, and a second adjustment domain of the sewage treatment control scheme that meets the predetermined scheme capacity is generated.

2. The sewage treatment control method based on carbon emission accounting as claimed in claim 1, It is characterized in that Based on the multivariate sewage treatment control factors and according to the characteristic information of the sewage to be treated, a sewage treatment control plan is generated, including: Load the sewage characteristic information record set and sewage treatment control plan record set; The multivariate sewage treatment control factors include sewage treatment nodes, node sewage treatment equipment models, node sewage treatment equipment control parameters, node sewage treatment additive types and node sewage treatment additive dosages; Performing feature integration on the sewage treatment control scheme record set according to the multiple sewage treatment control factors to obtain a sewage treatment control scheme data set; Performing supervised training on the sewage treatment decision learning model according to the sewage characteristic information record set and the sewage treatment control scheme data set to obtain sewage treatment decision accuracy; If the sewage treatment decision accuracy is greater than / equal to a preset sewage treatment decision accuracy, a multi-feature sewage treatment decision channel is generated; Based on the characteristic information of the sewage to be treated and according to the multi-characteristic sewage treatment decision channel, the sewage treatment control plan is obtained.

3. The sewage treatment control method based on carbon emission accounting as claimed in claim 1, It is characterized in that Based on the sewage treatment simulation platform, carbon emission accounting and sewage treatment quality prediction are performed according to the sewage treatment control scheme to generate sewage treatment prediction results, including: Based on the characteristic information of the sewage to be treated and the sewage treatment control scheme, simulate sewage treatment according to the sewage treatment simulation platform to generate a sewage treatment carbon emission simulation data set and simulated sewage treatment results; Build a sewage treatment carbon emission accounting model based on the sewage treatment carbon emission accounting record set; Based on the sewage treatment carbon emission simulation data set and according to the sewage treatment carbon emission accounting model, obtaining a sewage treatment carbon emission accounting coefficient; Based on the simulated sewage treatment results and in combination with the characteristic information of the sewage to be treated, a sewage treatment quality prediction coefficient is generated; The sewage treatment carbon emission accounting coefficient and the sewage treatment quality prediction coefficient are added to the sewage treatment prediction result.

4. The sewage treatment control method based on carbon emission accounting as claimed in claim 3, It is characterized in that Based on the simulated sewage treatment results and in combination with the characteristic information of the sewage to be treated, a sewage treatment quality prediction coefficient is generated, including: The simulated sewage treatment result includes characteristic information of the treated sewage; Perform deviation comparison based on the characteristic information of the sewage to be treated and the characteristic information of the treated sewage to generate a sewage characteristic deviation vector; According to the sample sewage characteristic deviation vector set and the sample sewage treatment quality assessment set, a sewage treatment quality assessment model is built; Based on the sewage characteristic deviation vector and according to the sewage treatment quality assessment model, the sewage treatment quality prediction coefficient is obtained.

5. The sewage treatment control method based on carbon emission accounting as claimed in claim 1, It is characterized in that If the sewage treatment prediction result does not meet the sewage treatment expected constraint, sewage treatment decision feature mining is performed according to the multiple sewage treatment nodes and the characteristic information of the sewage to be treated, and a sewage treatment optimization constraint tree is constructed, including: Taking the characteristic information of the sewage to be treated as a retrieval constraint condition, respectively performing sewage treatment decision retrieval on the multiple sewage treatment nodes to obtain a sewage treatment decision retrieval set of multiple nodes; Performing decision feature concentration interval analysis based on the multiple node sewage treatment decision retrieval sets to obtain multiple sewage treatment decision feature intervals; Taking the plurality of sewage treatment nodes as a plurality of sewage treatment optimization constraint primary nodes; Taking the plurality of sewage treatment decision feature intervals as a plurality of sewage treatment optimization constraint secondary nodes; Generate an inter-node mapping relationship according to the correspondence between the plurality of sewage treatment nodes and the plurality of sewage treatment decision feature intervals; Based on the mapping relationship between the nodes, the plurality of sewage treatment optimization constraint first-level nodes and the plurality of sewage treatment optimization constraint second-level nodes are sorted to generate the sewage treatment optimization constraint tree.

6. An electronic device, It is characterized in that The electronic device comprises: A memory for storing executable instructions; The processor is used to implement the sewage treatment control method based on carbon emission accounting as described in any one of claims 1 to 5 when executing the executable instructions stored in the memory.

7. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, a sewage treatment control method based on carbon emission accounting as described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Low-carbon operation optimization method for biological sewage treatment

    CN116562412A

  • Intelligent control system and method based on sewage treatment process diagnosis

    CN118131620A

  • Sewage treatment carbon footprint accounting method and device

    CN118134506A

  • Sewage treatment plant pollution reduction and carbon reduction coordinated regulation and control method, terminal equipment and medium

    CN118153992A

  • System and method for simulating and predicting forecasts for carbon emissions

    EP4307189A1

Cited By

  • A sewage treatment facility carbon emission real-time accounting and intelligent early warning method and system

    CN123014383A