A new type of grounding short-circuit device for power transmission and distribution line construction work
By introducing IoT gateways and sensors into grounded short-circuit devices, establishing strong relationships, monitoring and alerting of missed installations, exceeding the protection range and missed dismantling situations in real time, the problem that existing equipment cannot monitor high-risk situations in real time, and improve power The safety of construction operations and reduces the power consumption of the equipment.
Patent Information
- Application Number
- CN202411147531.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-21
AI Technical Summary
Existing intelligent grounding short-circuit equipment cannot monitor and alert high-risk situations such as misinstallation, exceeding the protection range, and missing grounding short-circuit equipment. High power consumption leads to frequent charging, which may lead to personal and grid accidents.
Design a new ground short circuit device including the Internet of Things gateway and ground short circuit device. By establishing a strong relationship, it periodically sends installation status, monitors and alerts for missed installation, exceeding the protection range and missing removal, and through the positioning module and The sensor determines the ground protection range and reduces power consumption.
It improves the safety production capacity during the construction of transmission and distribution lines, and perceives and alerts to high-risk violations in real time, reduces the risk of personal and power grid accidents, and reduces the power consumption of grounded short-circuit equipment.
Smart Images

Figure CN118677110B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power systems, in particular to the field of maintenance in power systems, and specifically to a novel grounding short-circuit device for construction work of power transmission and distribution lines. Background Art
[0002] In the field of power construction operations, it is extremely important to ensure that no electric shock occurs, protect the personal safety of operators, prevent the failure to remove the grounding short-circuit equipment during power transmission, and cause power grid and equipment accidents, and ensure the safety of personnel, power grids, and equipment. At present, the main protection method is to install grounding short-circuit equipment on the power supply equipment for power outage and maintenance. On the one hand, even if there is a sudden call, it can ensure that the operators are protected from electric shock. On the other hand, it can also effectively shield the induced electricity on the equipment to prevent the operators from being injured by induced electricity. The installation of grounding short-circuit equipment plays the most core role in protecting the personal safety of power construction workers and is an essential safety measure for power construction operations. During power construction operations, during the power outage and maintenance of power equipment, operators must correctly perform measures such as power outage, electricity testing, and installation of grounding short-circuit equipment before contacting the maintenance equipment to ensure personal safety and prevent personal electric shock casualties. However, in the actual work on site, due to the negligence, lack of concentration and desire for convenience of the staff, there are non-compliant situations in the installation, use and removal of grounding short-circuit equipment, which can easily lead to safety accidents, especially in the construction of power transmission and distribution lines: the installation of grounding short-circuit equipment is not comprehensive, and it fails to comply with the installation on all sides of the maintenance equipment where power may come (i.e., the grounding short-circuit equipment is omitted); the operating personnel exceed the protection range of the grounding short-circuit device and cannot effectively prevent personal electric shock (i.e., exceed the grounding protection range); the removal of grounding short-circuit equipment is incomplete, and grounding short-circuit equipment is left on the power equipment (i.e., the grounding short-circuit equipment is omitted) and other high-risk situations. Once the above situation occurs, it is very easy to cause malignant safety accidents such as personal electric shock and closing the switch with grounding short-circuit equipment, which will cause great harm to personal and power grid safety. In recent years, many personal and power grid accidents in the domestic power industry have been caused by this, with extremely huge losses and extremely profound lessons.
[0003] In order to improve the compliance of the use of grounding and short-circuiting equipment, some intelligent grounding and short-circuiting equipment have appeared on the market in recent years. The main approach is to install sensors on traditional grounding and short-circuiting equipment to sense the information status of the grounding and short-circuiting equipment. Once problems such as loose installation of grounding and short-circuiting equipment occur, an alarm can be issued to remind the operator to make corrections, which plays a positive role in promoting the compliance use of grounding and short-circuiting equipment. However, there are two more prominent problems with the current intelligent grounding and short-circuiting equipment. First, it can only sense its own status and does not have the function of full-scene analysis and judgment. It cannot sense the status of other related grounding and short-circuiting equipment and other intelligent safety tools. It cannot monitor high-risk situations such as missing installation of grounding and short-circuiting equipment, exceeding the grounding protection range, and missing removal of grounding and short-circuiting equipment in real time. It cannot timely perceive the above-mentioned major risks and issue alarms to avoid accidents that may be caused by them. Second, the energy-saving design is not combined with the usage status, resulting in high power consumption of grounding short-circuit equipment, which requires frequent charging (battery replacement) of the grounding short-circuit equipment. On the one hand, it increases the workload of operation and maintenance personnel. On the other hand, when the grounding short-circuit equipment is installed on the power outage maintenance equipment for a long time, it is easy to cause information interruption, false alarm, and missed alarm due to battery power shortage. The biggest risk of improper use of grounding short-circuit equipment is that it may directly lead to personal and power grid accidents due to the omission of grounding short-circuit equipment, exceeding the grounding protection range, and omission of grounding short-circuit equipment. However, the current various intelligent grounding short-circuit equipment cannot provide the above-mentioned key information in real time and accurately.
[0004] To sum up, how to perceive the status of associated grounding and short-circuit equipment during the construction of high-voltage transmission and distribution lines, and perceive and issue alarms for high-risk violation scenarios such as failure to install grounding and short-circuit equipment, exceeding the grounding protection range, and failure to remove grounding and short-circuit equipment, are issues that need to be considered in solving the above problems or risks. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a new grounding and short-circuiting device for use in power transmission and distribution line construction operations, which is used to reduce the risks of personal injury, power grid and equipment accidents caused by non-compliant use of grounding and short-circuiting equipment during power transmission and distribution line construction operations.
[0006] The objective of the present invention is achieved through the following solutions:
[0007] The present invention provides a novel grounding short-circuit device for power transmission and distribution line construction work, comprising an Internet of Things gateway and at least two grounding short-circuit devices, wherein:
[0008] After the grounding short-circuit device is in the powered-on state, it periodically sends the installation status to the Internet of Things gateway;
[0009] Within the preset monitoring time, the Internet of Things gateway sends a strong correlation signal to all grounding and short-circuiting devices corresponding to the received installation status, and all grounding and short-circuiting devices enter a strong correlation relationship state;
[0010] Each ground short-circuit device in a strong association state receives the installation status of other ground short-circuit devices sent by the IoT gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices;
[0011] The ground short circuit device issues an alarm based on the prompt information.
[0012] In some embodiments, each ground short-circuit device in a strong association state receives the installation status of other ground short-circuit devices sent by the Internet of Things gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices, including:
[0013] The installation state of any grounding short-circuit device in a strong association state changes from an unconnected state to an installation start state, and determines that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the installation start state generate first prompt information;
[0014] The installation status of all the grounding and short-circuiting devices in the strong association state is the installation completion state, and it is determined that all the grounding and short-circuiting devices generate the second prompt information;
[0015] The installation state of any grounding short-circuit device in a strong association state is from the installation completion state to the removal start state, and it is determined that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the removal start state generate third prompt information;
[0016] The installation status of all the grounding and short-circuiting devices in the strong association state changes from the installation completed state to the unconnected state, and it is determined that all the grounding and short-circuiting devices generate fourth prompt information;
[0017] Within the preset removal time, if the installation status of any grounding and short-circuiting device in a strong association state has not changed from the installed state to the unconnected state, the grounding and short-circuiting device whose installation status is the installed state generates the fifth prompt information.
[0018] In some embodiments, including:
[0019] The installation status of all grounding and short-circuiting devices in a strong association state is unconnected. After the preset delay time limit is reached, the Internet of Things gateway sends a release signal to all grounding and short-circuiting devices in a strong association state, and all grounding and short-circuiting devices release the strong association state.
[0020] In some embodiments, including:
[0021] The grounding short-circuit device is in a state of being installed, and periodically sends location information to the Internet of Things gateway, and the Internet of Things gateway determines the grounding protection range according to the received location information of the grounding short-circuit device;
[0022] If any of the grounding and short-circuiting devices in the strong association state is not in the installation completion state, the Internet of Things gateway detects that a tower climbing signal appears within the grounding protection range, and the Internet of Things gateway sends a sixth prompt information to all the grounding and short-circuiting devices, and the grounding and short-circuiting devices issue an alarm based on the sixth prompt information;
[0023] The installation status of all grounding and short-circuit devices in a strong association state is in the installed state. The Internet of Things gateway detects the tower climbing signal outside the grounding protection range. The Internet of Things gateway sends the seventh prompt information to all grounding and short-circuit devices, and the grounding and short-circuit devices issue an alarm based on the seventh prompt information.
[0024] In some embodiments, the ground short-circuit device is in an installed state, and periodically sends location information to the Internet of Things gateway, and the Internet of Things gateway determines the ground protection range according to the received location information of the ground short-circuit device, including:
[0025] The coordinates of the location information of the grounding short-circuit devices in a strongly associated state are connected end to end in the order of installation, and the formed area is extended outward according to the preset value to generate a grounding protection range.
[0026] In some embodiments, including:
[0027] When the number of times the Internet of Things gateway sends the seventh prompt information to all grounding short-circuit devices exceeds the preset number, when the Internet of Things gateway detects the presence of a pole climbing tower signal outside the grounding protection range, the grounding protection range is regenerated according to the coordinates of the location information of the pole climbing tower signal and the coordinates of the location information of the grounding short-circuit device.
[0028] In some embodiments, the device includes a ground terminal and a plurality of conductor terminals connected to the ground terminal through a wire, and also includes a single chip microcomputer, wherein the single chip microcomputer is electrically connected to a pressing sensor, a hook sensor, a vibration sensor, a positioning module, a communication unit, a voice module, and a prompt light respectively; the voice module issues a voice prompt based on the prompt information, and the prompt light issues a light prompt based on the prompt information; the pressing sensor is arranged at the ground terminal for generating a ground terminal connection signal, and the hook sensor is arranged at the conductor terminal for generating a conductor terminal connection signal, and one conductor terminal corresponds to one hook sensor;
[0029] In response to the vibration signal generated by the vibration sensor, the single chip microcomputer obtains the current position information generated by the positioning module, and determines whether to generate a transport signal according to the current position information and the preset initial position information; wherein, when the position information is inconsistent with the preset initial position information, the transport signal is generated;
[0030] In response to the carried signal, the single chip microcomputer obtains the ground terminal connection signal and the conductor terminal connection signal;
[0031] The single chip computer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, and sends the installation state through the communication unit according to a preset sending time period.
[0032] In some embodiments, in response to the vibration signal generated by the vibration sensor, the microcontroller enters the power-on state from the sleep state; within a preset time, the microcontroller does not obtain the ground terminal connection signal and the conductor terminal connection signal, and the microcontroller enters the sleep state from the power-on state.
[0033] In some embodiments, the single chip microcomputer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, including:
[0034] During the preset installation time, when both the ground terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state; when the ground terminal connection signal changes from non-existent to existing and the conductor terminal connection signal does not exist, the installation state is marked as the installation start state; when both the ground terminal connection signal and the conductor terminal connection signal exist, the installation state is marked as the installation completion state;
[0035] Within the preset removal time, when the grounding terminal connection signal exists and the conductor terminal connection signal changes from existence to non-existence, the installation state is marked as the removal start state; when both the grounding terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state.
[0036] In some embodiments, including:
[0037] Within the preset installation time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs installation sequence monitoring according to the order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the generation time of the ground terminal connection signal is later than the generation time of the conductor terminal connection signal, an installation sequence error prompt signal is issued; when the generation time of the ground terminal connection signal is earlier than the generation time corresponding to the conductor terminal connection signal, the installation sequence monitoring is terminated;
[0038] Within the preset dismantling time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs dismantling sequence monitoring according to the chronological order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the disappearance time of the ground terminal connection signal is earlier than the disappearance time of the conductor terminal connection signal, a dismantling sequence error prompt signal is issued; when the disappearance time of the ground terminal connection signal is later than the disappearance time corresponding to the conductor terminal connection signal, the dismantling sequence monitoring is terminated.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] By establishing a strong correlation status among multiple grounding and short-circuiting devices, the installation status of the grounding and short-circuiting devices themselves is sent to the IoT gateway, and the installation status of other grounding and short-circuiting devices sent by the IoT gateway is received. By obtaining the installation status of each strongly correlated grounding and short-circuiting device, high-risk violation scenarios such as failure to install grounding and short-circuiting devices, exceeding the grounding protection range, and failure to remove grounding and short-circuiting devices are perceived and alarmed, thereby improving the safety production capacity of the transmission and distribution line construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The embodiments of the present invention are further described below with reference to the accompanying drawings:
[0042] Figure 1 A schematic diagram of the components of a new type of grounding short-circuit device for power transmission and distribution line construction work provided by an embodiment of the present invention;
[0043] Figure 2 A schematic diagram of components of a ground short-circuit device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below through specific embodiments in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0045] The present application provides a new type of grounding short-circuit device for power transmission and distribution line construction work. Figure 1 A schematic diagram of the components of a new type of grounding short-circuit device for power transmission and distribution line construction work provided by an embodiment of the present invention, such as Figure 1 As shown, it includes an Internet of Things gateway and at least two ground short-circuit devices, wherein:
[0046] After the grounding short-circuit device is in the powered-on state, it periodically sends the installation status to the Internet of Things gateway;
[0047] Within the preset monitoring time, the Internet of Things gateway sends a strong correlation signal to all grounding and short-circuiting devices corresponding to the received installation status, and all grounding and short-circuiting devices enter a strong correlation relationship state;
[0048] Each ground short-circuit device in a strong association state receives the installation status of other ground short-circuit devices sent by the IoT gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices;
[0049] The ground short circuit device issues an alarm based on the prompt information.
[0050] In the embodiment of the present application, the starting time of the preset monitoring time is the time node when the Internet of Things gateway receives the installation status of the first ground short-circuit device. The preset monitoring time can be set as needed, such as 5 minutes, 10 minutes, etc. Within the preset monitoring time, the Internet of Things gateway sends a strong correlation signal to all ground short-circuit devices corresponding to the received installation status, and all ground short-circuit devices receive the strong correlation signal, so that multiple ground short-circuit devices enter a strong correlation state, and the strong correlation state of the ground short-circuit device can be indicated by the corresponding indicator light. For example, the corresponding indicator light is on, indicating that the ground short-circuit device is in a strong correlation state, and the corresponding indicator light is off, indicating that the ground short-circuit device is not in a strong correlation state. The ground short-circuit device in a strong correlation state can receive the installation status of other ground short-circuit devices sent by the Internet of Things gateway. The ground short-circuit device analyzes the installation status of itself and the installation status of other ground short-circuit devices to determine whether to generate prompt information. If prompt information is generated, the ground short-circuit device issues an alarm according to the prompt information. It can perceive and alarm high-risk violation scenarios such as missing installation of ground short-circuit devices and missing removal of ground short-circuit devices, and improve the safety production capacity of the power transmission and distribution line construction process.
[0051] In order to better illustrate the novel grounding short-circuit device for power transmission and distribution line construction provided by the present invention, a detailed explanation is given below in combination with a detailed implementation process.
[0052] In some embodiments, each ground short-circuit device in a strong association state receives the installation status of other ground short-circuit devices sent by the Internet of Things gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices, including:
[0053] The installation state of any grounding short-circuit device in a strong association state changes from an unconnected state to an installation start state, and determines that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the installation start state generate first prompt information;
[0054] The installation status of all the grounding and short-circuiting devices in the strong association state is the installation completion state, and it is determined that all the grounding and short-circuiting devices generate the second prompt information;
[0055] The installation state of any grounding short-circuit device in a strong association state is from the installation completion state to the removal start state, and it is determined that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the removal start state generate third prompt information;
[0056] The installation status of all the grounding and short-circuiting devices in the strong association state changes from the installation completed state to the unconnected state, and it is determined that all the grounding and short-circuiting devices generate fourth prompt information;
[0057] Within the preset removal time, if the installation status of any grounding and short-circuiting device in a strong association state has not changed from the installed state to the unconnected state, the grounding and short-circuiting device whose installation status is the installed state generates the fifth prompt information.
[0058] In the embodiment of the present application, the installation state of any grounding short-circuit device in a strong association state changes from an unconnected state to an installation start state. The grounding short-circuit device does not generate the first prompt information, and other grounding short-circuit devices generate the first prompt information. The first prompt information can be a voice message and a light prompt, such as a voice prompt of "the grounding short-circuit device begins to be arranged", and the prompt light is used to prompt that the power transmission and distribution line construction work is in the grounding short-circuit device arrangement state. The installation state of all grounding short-circuit devices in a strong association state is the installation completion state, and each grounding short-circuit device generates the second prompt information. The second prompt information can be a voice message and a light prompt, such as a voice prompt of "the grounding short-circuit device is arranged", and the prompt light is used to prompt that the power transmission and distribution line construction work is in the grounding short-circuit device arrangement completion state. If the installation state of any grounding short-circuit device in a strong association state is from the installation completion state to the removal start state, the grounding short-circuit device does not generate the third prompt information, and other grounding short-circuit devices generate the third prompt information, which can be voice information and light prompts, such as the voice prompt of "the grounding short-circuit device starts to be removed", and the prompt light is used; if the installation state of all grounding short-circuit devices in a strong association state is from the installation completion state to the unconnected state, each grounding short-circuit device generates the fourth prompt information, which can be voice information and light prompts, such as the voice prompt of "the grounding short-circuit device is removed", and the prompt light is used to indicate that the construction work of the power transmission and distribution line at this location is in the state where the grounding short-circuit device is removed. Within the preset removal time, if the installation state of any grounding short-circuit device in a strong association state does not change from the installation completion state to the unconnected state, the grounding short-circuit device generates the fifth prompt information, which can be voice information and light prompts, such as the voice prompt of "the grounding short-circuit device is missing to be removed", and the prompt light is used to indicate. It is possible to monitor the status of the grounding short-circuit device starting to be arranged, completed, started to be removed, completed and missed to be removed. It is understandable that the first prompt information, the second prompt information, the third prompt information, the fourth prompt information and the fifth prompt information can be sent by the grounding short-circuit device to the Internet of Things gateway, and then sent to the corresponding terminal through the Internet of Things gateway, so as to facilitate remote notification of relevant personnel through the terminal.
[0059] In some embodiments, including:
[0060] The installation status of all grounding and short-circuiting devices in a strong association state is unconnected. After the preset delay time limit is reached, the Internet of Things gateway sends a release signal to all grounding and short-circuiting devices in a strong association state, and all grounding and short-circuiting devices release the strong association state.
[0061] In an embodiment of the present application, when the grounding short-circuit device is in the turned-on state but not in use, the Internet of Things gateway does not receive any other status except the installation state being the unconnected state within the preset delay time limit, and the Internet of Things gateway sends a release signal to the grounding short-circuit device in the strong association state.
[0062] In some embodiments, including:
[0063] The grounding short-circuit device is in a state of being installed, and periodically sends location information to the Internet of Things gateway, and the Internet of Things gateway determines the grounding protection range according to the received location information of the grounding short-circuit device;
[0064] If any of the grounding and short-circuiting devices in the strong association state is not in the installation completion state, the Internet of Things gateway detects that a tower climbing signal appears within the grounding protection range, and the Internet of Things gateway sends a sixth prompt information to all the grounding and short-circuiting devices, and the grounding and short-circuiting devices issue an alarm based on the sixth prompt information;
[0065] The installation status of all grounding and short-circuit devices in a strong association state is in the installed state. The Internet of Things gateway detects the tower climbing signal outside the grounding protection range. The Internet of Things gateway sends the seventh prompt information to all grounding and short-circuit devices, and the grounding and short-circuit devices issue an alarm based on the seventh prompt information.
[0066] In the embodiment of the present application, the location information of the grounding short-circuit device is obtained in real time through the positioning module configured by the grounding short-circuit device, and when the grounding short-circuit device is in the state of installation completion, the location information is periodically sent to the Internet of Things gateway, and the Internet of Things gateway can determine the grounding protection range according to the received location information of the grounding short-circuit device. In the case that the installation state of any grounding short-circuit device in a strong correlation state is not in the state of installation completion, the Internet of Things gateway detects that a tower climbing signal appears within the grounding protection range, and the Internet of Things gateway immediately sends the sixth prompt information to each grounding short-circuit device. The sixth prompt information can be a voice message and a light prompt, such as a voice prompt of "missing to install the grounding short-circuit device", and the prompt light is used. In the case that the installation states of all grounding short-circuit devices in a strong correlation state are in the state of installation completion, the Internet of Things gateway detects that a tower climbing signal appears outside the grounding protection range, and the Internet of Things gateway immediately sends the seventh prompt information to each grounding short-circuit device. The seventh prompt information can be a voice message and a light prompt, such as a voice prompt of "out of the grounding protection range", and the prompt light is used. It is understandable that the tower climbing signal is sent to the IoT gateway by other smart safety tools that are connected to the IoT gateway. For example, the smart safety tools can be smart safety belts, smart helmets, etc., among which smart safety belts and smart helmets should have positioning and height monitoring functions. It can sense and alarm high-risk violation scenarios such as missing grounding short-circuit equipment and exceeding the grounding protection range. It is understandable that the sixth prompt information and the seventh prompt information can be sent to the corresponding terminal through the IoT gateway, so as to facilitate remote notification of relevant personnel through the terminal, and can also be sent to the corresponding smart safety tools through the IoT gateway, so as to facilitate prompting relevant personnel through the smart safety tools.
[0067] In some embodiments, the ground short-circuit device is in an installed state, and periodically sends location information to the Internet of Things gateway, and the Internet of Things gateway determines the ground protection range according to the received location information of the ground short-circuit device, including:
[0068] The coordinates of the location information of the grounding short-circuit devices in a strongly associated state are connected end to end in the order of installation, and the formed area is extended outward according to the preset value to generate a grounding protection range.
[0069] In the embodiment of the present application, the grounding protection range is generated by extending outward according to the preset value on the basis of the formed area, thereby expanding the protection range and reducing false alarms.
[0070] In some embodiments, including:
[0071] When the number of times the Internet of Things gateway sends the seventh prompt information to all grounding short-circuit devices exceeds the preset number, when the Internet of Things gateway detects the presence of a pole climbing tower signal outside the grounding protection range, the grounding protection range is regenerated according to the coordinates of the location information of the pole climbing tower signal and the coordinates of the location information of the grounding short-circuit device.
[0072] In an embodiment of the present application, the working point may appear outside the grounding protection range. In order to prevent false alarms from occurring all the time, when the Internet of Things gateway sends the seventh prompt information to all grounding short-circuit devices more than a preset number of times, when the Internet of Things gateway detects the appearance of a pole climbing tower signal outside the grounding protection range, the coordinates of the location information of the grounding short-circuit device are connected in sequence according to the installation order, and then the coordinates of the location information of the pole climbing tower signal are connected, and then the end-to-end connection is performed. The formed area is extended outward according to the preset value, and the grounding protection range is regenerated, and the working point appearing outside the grounding protection range is included in the regenerated grounding protection range.
[0073] In some embodiments, Figure 2 A schematic diagram of components of a ground short-circuit device provided in an embodiment of the present invention, such as Figure 2 As shown, it includes a ground terminal and a plurality of conductor terminals connected to the ground terminal through a wire, and also includes a single chip microcomputer, the single chip microcomputer is electrically connected to a pressing sensor, a hook sensor, a vibration sensor, a positioning module, a communication unit, a voice module, and a prompt light respectively; the voice module issues a voice prompt based on the prompt information, and the prompt light issues a light prompt based on the prompt information; the pressing sensor is arranged at the ground terminal for generating a ground terminal connection signal, the hook sensor is arranged at the conductor terminal for generating a conductor terminal connection signal, and one conductor terminal corresponds to one hook sensor;
[0074] In response to the vibration signal generated by the vibration sensor, the single chip microcomputer obtains the current position information generated by the positioning module, and determines whether to generate a transport signal according to the current position information and the preset initial position information; wherein, when the position information is inconsistent with the preset initial position information, the transport signal is generated;
[0075] In response to the carried signal, the single chip microcomputer obtains the ground terminal connection signal and the conductor terminal connection signal;
[0076] The single chip computer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, and sends the installation state through the communication unit according to a preset sending time period.
[0077] In the embodiment of the present application, the pressing sensor and the hook sensor are both pressure sensors, and the number of hook sensors is set according to specific needs. For example, when the three-phase four-wire system corresponding to the power construction is used, the number of hook sensors can be four, which is used to ensure that each transmission line is reliably connected to the ground. The positioning module can be a Beidou positioning system positioning, and the communication unit can be a wireless transmission unit such as 4G. In addition, a conventional voice module (not shown in the figure) and a prompt light (not shown in the figure) can be configured as needed, and voice prompts are given through the voice module, and display prompts are given according to the prompt light. The transported signal is generated by the presence or absence of the vibration signal of the vibration sensor and the position information generated by the positioning module, which can exclude redundant data of the ground short-circuit equipment in non-operating scenes such as the warehouse, and improve the monitoring accuracy of the power construction operation. The introduction of the transported signal of the ground short-circuit equipment as a trigger for the ground short-circuit equipment to obtain information and send information can improve the degree of automation of the perception information of the ground short-circuit equipment and reduce the interference caused by the active opening of the ground short-circuit equipment detection function. Specifically, using the transported signal generated in the grounding short-circuit device as the grounding short-circuit device startup signal can reduce the amount of data generated by the grounding short-circuit device detection, reduce the power consumption of the detection logic at the running grounding short-circuit device end, and more accurately adapt to the startup and standby stage of the power operation. In addition, after the grounding short-circuit device is transported, the installation status of the grounding short-circuit device is sent according to a preset sending time period, such as 10 minutes (the monitoring time after the grounding short-circuit device is transported is longer than the preset sending time period), and the preset sending time period can be adjusted according to the monitoring effect to improve the monitoring data accuracy.
[0078] In order to achieve low power consumption, in some embodiments, in response to the vibration signal generated by the vibration sensor, the single-chip microcomputer enters the power-on state from the sleep state; within a preset time, the single-chip microcomputer does not obtain the ground terminal connection signal and the conductor terminal connection signal, and the single-chip microcomputer enters the sleep state from the power-on state.
[0079] In the embodiment of the present application, the single-chip microcomputer is electrically connected to the pressing sensor, the hook sensor, the vibration sensor, the positioning module and the communication unit respectively, and the power supply is electrically connected to the pressing sensor, the hook sensor, the vibration sensor, the positioning module and the communication unit, the voice module and the prompt light through the single-chip microcomputer; the voice module issues a voice prompt based on the prompt information, and the prompt light issues a light prompt based on the prompt information; the single-chip microcomputer is in a dormant state when the working conditions are not met, and the vibration signal generated by the vibration sensor can be used as a wake-up signal for the single-chip microcomputer, that is, in response to the vibration signal, the single-chip microcomputer enters the power-on state from the dormant state, and the single-chip microcomputer enters the power-on state, and the power supply is supplied to the pressing sensor, the hook sensor, the vibration sensor, the positioning module and the communication unit through the single-chip microcomputer. Within the preset time, the single-chip microcomputer does not obtain the ground terminal connection signal and the conductor terminal connection signal, and the single-chip microcomputer enters the dormant state from the power-on state. It can be understood that within the preset time, in response to the vibration signal, the power-on state time of the single-chip microcomputer is extended, and the extension time can be a preset time. It can reduce power consumption and, when batteries are used as the power source, reduce the frequency of battery replacement. In combination with wireless charging equipment and solar cell charging modules, it can achieve maintenance-free use.
[0080] In some embodiments, the single chip microcomputer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, including:
[0081] During the preset installation time, when both the ground terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state; when the ground terminal connection signal changes from non-existent to existing and the conductor terminal connection signal does not exist, the installation state is marked as the installation start state; when both the ground terminal connection signal and the conductor terminal connection signal exist, the installation state is marked as the installation completion state;
[0082] Within the preset removal time, when the grounding terminal connection signal exists and the conductor terminal connection signal changes from existence to non-existence, the installation state is marked as the removal start state; when both the grounding terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state.
[0083] In the embodiment of the present application, the setting of the preset installation time and the preset removal time can be specifically set in combination with the specific circumstances of the power construction operation. In this embodiment, it is preferably 5 minutes. The grounding short-circuit device can perform installation and disassembly operations and generate a corresponding installation state. When the conductor end connection signal is generated by multiple sensors, it is preferably determined that the conductor end connection signal exists when multiple sensors generate pressure signals at the same time. By judging the installation status, it is possible to accurately provide monitoring of each link of the power construction, making the monitoring more accurate and comprehensive.
[0084] The installation sequence and disassembly sequence of the ground short-circuit device are also detected within the preset installation time, which can improve the accuracy of monitoring. In some embodiments, the method includes:
[0085] Within the preset installation time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs installation sequence monitoring according to the order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the generation time of the ground terminal connection signal is later than the generation time of the conductor terminal connection signal, an installation sequence error prompt signal is issued; when the generation time of the ground terminal connection signal is earlier than the generation time corresponding to the conductor terminal connection signal, the installation sequence monitoring is terminated;
[0086] Within the preset dismantling time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs dismantling sequence monitoring according to the chronological order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the disappearance time of the ground terminal connection signal is earlier than the disappearance time of the conductor terminal connection signal, a dismantling sequence error prompt signal is issued; when the disappearance time of the ground terminal connection signal is later than the disappearance time corresponding to the conductor terminal connection signal, the dismantling sequence monitoring is terminated.
[0087] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A new type of grounding short-circuit device for power transmission and distribution line construction, characterized in that: It includes an IoT gateway and at least two ground shorting devices, wherein: After the grounding short-circuit device is in the powered-on state, it periodically sends the installation status to the Internet of Things gateway; Within the preset monitoring time, the Internet of Things gateway sends a strong correlation signal to all grounding and short-circuiting devices corresponding to the received installation status, and all grounding and short-circuiting devices enter a strong correlation relationship state; Each ground short-circuit device in a strong association state receives the installation status of other ground short-circuit devices sent by the IoT gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices; The ground short circuit device issues an alarm based on the prompt information; Each ground short-circuit device in the strong association state receives the installation status of other ground short-circuit devices sent by the Internet of Things gateway, and determines whether to generate prompt information according to its own installation status and the installation status of other ground short-circuit devices, including: The installation state of any grounding short-circuit device in a strong association state changes from an unconnected state to an installation start state, and determines that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the installation start state generate first prompt information; The installation status of all the grounding and short-circuiting devices in the strong association state is the installation completion state, and it is determined that all the grounding and short-circuiting devices generate the second prompt information; The installation state of any grounding short-circuit device in a strong association state is from the installation completion state to the removal start state, and it is determined that other grounding short-circuit devices except the grounding short-circuit device whose installation state is the removal start state generate third prompt information; The installation status of all the grounding and short-circuiting devices in the strong association state changes from the installation completed state to the unconnected state, and it is determined that all the grounding and short-circuiting devices generate fourth prompt information; Within the preset removal time, if the installation status of any grounding and short-circuiting device in a strong association state has not changed from the installed state to the unconnected state, the grounding and short-circuiting device whose installation status is the installed state generates the fifth prompt information.
2. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 1, characterized in that: include: The installation status of all grounding and short-circuiting devices in a strong association state is unconnected. After the preset delay time limit is reached, the Internet of Things gateway sends a release signal to all grounding and short-circuiting devices in a strong association state, and all grounding and short-circuiting devices release the strong association state.
3. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 1, characterized in that: include: The grounding short-circuit device is in a state of being installed, and periodically sends location information to the Internet of Things gateway, and the Internet of Things gateway determines the grounding protection range according to the received location information of the grounding short-circuit device; If any of the grounding and short-circuiting devices in the strong association state is not in the installation completion state, the Internet of Things gateway detects that a tower climbing signal appears within the grounding protection range, and the Internet of Things gateway sends a sixth prompt information to all the grounding and short-circuiting devices, and the grounding and short-circuiting devices issue an alarm based on the sixth prompt information; The installation status of all grounding and short-circuit devices in a strong association state is in the installed state. The Internet of Things gateway detects the tower climbing signal outside the grounding protection range. The Internet of Things gateway sends the seventh prompt information to all grounding and short-circuit devices, and the grounding and short-circuit devices issue an alarm based on the seventh prompt information.
4. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 3, characterized in that: The grounding short-circuit device is in an installed state, and periodically sends location information to the Internet of Things gateway. The Internet of Things gateway determines the grounding protection range according to the received location information of the grounding short-circuit device, including: The coordinates of the location information of the grounding short-circuit devices in a strongly associated state are connected end to end in the order of installation, and the formed area is extended outward according to the preset value to generate a grounding protection range.
5. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 4, characterized in that: include: When the number of times the Internet of Things gateway sends the seventh prompt information to all grounding short-circuit devices exceeds the preset number, when the Internet of Things gateway detects the presence of a pole climbing tower signal outside the grounding protection range, the grounding protection range is regenerated according to the coordinates of the location information of the pole climbing tower signal and the coordinates of the location information of the grounding short-circuit device.
6. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 1, characterized in that: The ground short-circuit device includes a ground terminal and a plurality of conductor terminals connected to the ground terminal through a wire, and also includes a single-chip microcomputer, which is electrically connected to a pressing sensor, a hook sensor, a vibration sensor, a positioning module, a communication unit, a voice module, and a prompt light respectively; the voice module issues a voice prompt based on the prompt information, and the prompt light issues a light prompt based on the prompt information; the pressing sensor is arranged at the ground terminal for generating a ground terminal connection signal, and the hook sensor is arranged at the conductor terminal for generating a conductor terminal connection signal, and one conductor terminal corresponds to one hook sensor; In response to the vibration signal generated by the vibration sensor, the single chip microcomputer obtains the current position information generated by the positioning module, and determines whether to generate a transport signal according to the current position information and the preset initial position information; wherein, when the position information is inconsistent with the preset initial position information, the transport signal is generated; In response to the carried signal, the single chip microcomputer obtains the ground terminal connection signal and the conductor terminal connection signal; The single chip computer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, and sends the installation state through the communication unit according to a preset sending time period.
7. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 6, characterized in that: In response to the vibration signal generated by the vibration sensor, the single chip microcomputer enters the power-on state from the sleep state; within a preset time, the single chip microcomputer fails to obtain the ground terminal connection signal and the conductor terminal connection signal, and the single chip microcomputer enters the sleep state from the power-on state.
8. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 6, characterized in that: The single chip computer determines the installation state according to the ground terminal connection signal and the conductor terminal connection signal, including: During the preset installation time, when both the ground terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state; when the ground terminal connection signal changes from non-existent to existing and the conductor terminal connection signal does not exist, the installation state is marked as the installation start state; when both the ground terminal connection signal and the conductor terminal connection signal exist, the installation state is marked as the installation completion state; Within the preset removal time, when the grounding terminal connection signal exists and the conductor terminal connection signal changes from existence to non-existence, the installation state is marked as the removal start state; when both the grounding terminal connection signal and the conductor terminal connection signal do not exist, the installation state is marked as the unconnected state.
9. A new type of grounding short-circuit device for power transmission and distribution line construction work according to claim 6, characterized in that: include: Within the preset installation time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs installation sequence monitoring according to the order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the generation time of the ground terminal connection signal is later than the generation time of the conductor terminal connection signal, an installation sequence error prompt signal is issued; when the generation time of the ground terminal connection signal is earlier than the generation time corresponding to the conductor terminal connection signal, the installation sequence monitoring is terminated; Within the preset dismantling time, the single-chip microcomputer obtains the generation time of the current ground terminal connection signal and the conductor terminal connection signal, and performs dismantling sequence monitoring according to the chronological order of the generation time corresponding to the received ground terminal connection signal and the conductor terminal connection signal, wherein, when the disappearance time of the ground terminal connection signal is earlier than the disappearance time of the conductor terminal connection signal, a dismantling sequence error prompt signal is issued; when the disappearance time of the ground terminal connection signal is later than the disappearance time corresponding to the conductor terminal connection signal, the dismantling sequence monitoring is terminated.