Urban inland inundation prevention and control method and device, electronic equipment and medium
By obtaining and matching urban waterlogging prevention and control evaluation parameters, target construction strategies are generated, including drainage channels, sponge cities, etc., which solves the problems of high rainwater pipe network renovation costs and low applicability in the existing technology, and improves urban disaster prevention and reduction capabilities and safety. The level of protection ensures the high-quality development of the economy and society.
Patent Information
- Application Number
- CN202410763176.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the urban rainwater pipe network is comprehensively transformed to prevent waterlogging, which results in high investment costs, long time and low applicability, and cannot guarantee the high-quality development of the urban economy and society.
By obtaining the city's waterlogging prevention and control evaluation parameters, it detects whether it meets the preset requirements, and matches construction goals based on these parameters to generate target waterlogging prevention and control construction strategies, including drainage channels, sponge cities, new rainwater pipe networks, special improvements to urban water accumulation points, and embankments. Construction, etc., to carry out prevention and control.
It has effectively improved the city's disaster prevention and reduction capabilities and safety assurance level, guaranteed the high-quality development of the city's economy and society, and solved the problems of high rainwater pipe network renovation costs and low applicability.
Smart Images

Figure CN118729162A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of urban waterlogging prevention and control, and in particular to a method, device, electronic equipment and medium for preventing and controlling urban waterlogging. Background Art
[0002] With the intensification of global climate change and human activities, extreme rainfall weather has occurred frequently, and the "urban heat island effect" and "rain island effect" have also increased significantly, which can easily form extreme sudden rainstorms with heavy rainfall, strong rainfall and high frequency. The advancement of urbanization has changed the underlying surface conditions, causing changes in runoff production and convergence, and accelerating the formation of urban waterlogging. In the past 40 years, my country's urbanization process has been advancing rapidly, and the impermeable ground has continued to increase, blocking the natural channel for rainwater to penetrate into the ground. Rainfall has gathered quickly, and short-term heavy rainfall can easily form high-peak waterlogging with large volume. The water level of the peripheral water network has been rising year by year, and the difficulty of drainage from the pipe network has increased. The probability of waterlogging in the same scale of rainstorm has increased significantly.
[0003] In recent years, China has repeatedly experienced serious urban waterlogging disasters that have a wide impact and are destructive to social stability, posing a serious threat to people's lives and property and attracting the attention of all sectors of society. In related technologies, the rainwater pipe network in urban areas is comprehensively transformed by expanding the pipe diameter or appropriately increasing the design slope of the pipe to increase the city's disaster prevention and mitigation capabilities.
[0004] However, relevant technologies can only be used to comprehensively transform the rainwater pipe network, which increases investment costs, the methods of urban waterlogging prevention and control are relatively single, and the transformation time is relatively long. The applicability of urban rainwater pipe network transformation is low, which reduces the city’s disaster prevention and mitigation capabilities and safety levels, and cannot guarantee the high-quality development of the city’s economy and society, which needs to be urgently addressed. Summary of the invention
[0005] The present application provides a method, device, electronic equipment and medium for preventing and controlling urban waterlogging to solve the problem in related technologies that the only way to prevent and control urban waterlogging is to comprehensively renovate the rainwater pipe network, which increases investment costs and takes a long time. The applicability of urban rainwater pipe network renovation is low, which reduces the city's disaster prevention and mitigation capabilities and safety assurance levels, and cannot ensure high-quality economic and social development in the city.
[0006] The first aspect of the present application provides a method for preventing and controlling urban waterlogging, comprising the following steps: obtaining at least one waterlogging prevention and control evaluation parameter of a city, and detecting whether the city meets preset waterlogging prevention and control requirements; when it is detected that the city does not meet the preset waterlogging prevention and control requirements, matching at least one waterlogging prevention and control construction target based on the at least one waterlogging prevention and control evaluation parameter; generating a target waterlogging prevention and control construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy.
[0007] Optionally, in one embodiment of the present application, generating the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter includes: generating the drainage channel and drainage pump station construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0008] Optionally, in one embodiment of the present application, generating the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter includes: generating the sponge city construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0009] Optionally, in one embodiment of the present application, the target waterlogging prevention and control construction strategy of the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter, including: generating the city's rainwater pipe network new construction strategy and rainwater pump station construction strategy based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0010] Optionally, in one embodiment of the present application, generating the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter includes: generating a special remediation strategy for urban waterlogging points in the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0011] Optionally, in one embodiment of the present application, generating the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter includes: generating the embankment construction and river channel regulation strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0012] The second aspect of the present application provides an urban waterlogging prevention and control device, including: a detection module, used to obtain at least one waterlogging prevention and control evaluation parameter of a city, and detect whether the city meets the preset waterlogging prevention and control requirements; a matching module, used to match at least one waterlogging prevention and control construction target based on the at least one waterlogging prevention and control evaluation parameter when it is detected that the city does not meet the preset waterlogging prevention and control requirements; a control module, used to generate a target waterlogging prevention and control construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter, so as to prevent and control the urban waterlogging according to the target waterlogging prevention and control construction strategy.
[0013] Optionally, in one embodiment of the present application, the control module includes: a first generation unit, used to generate a drainage channel and drainage pump station construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0014] Optionally, in one embodiment of the present application, the control module includes: a second generation unit, used to generate a sponge city construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0015] Optionally, in one embodiment of the present application, the control module includes: a third generation unit, used to generate a new rainwater pipe network construction strategy and a rainwater pump station construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0016] Optionally, in one embodiment of the present application, the control module includes: a fourth generation unit, used to generate a special remediation strategy for urban waterlogging points in the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0017] Optionally, in one embodiment of the present application, the control module includes: a fifth generation unit, used to generate the city's embankment construction and river regulation strategy based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
[0018] A third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for preventing and controlling urban waterlogging as described in the above embodiment.
[0019] The fourth aspect of the present application provides a computer-readable storage medium, which stores a computer program. When the program is executed by a processor, it implements the above-mentioned method for preventing and controlling urban waterlogging.
[0020] The fifth aspect of the present application provides a computer program product, including a computer program, which is executed by a processor to implement the above-mentioned urban waterlogging prevention and control method.
[0021] In the case where it is detected that a city does not meet the preset waterlogging prevention and control requirements, the embodiment of the present application matches the waterlogging prevention and control construction target based on the waterlogging prevention and control evaluation parameters of the city, generates the city's target waterlogging prevention and control construction strategy based on the actual type of the waterlogging prevention and control construction target and the waterlogging prevention and control evaluation parameters, and prevents and controls urban waterlogging according to the target waterlogging prevention and control construction strategy, effectively improving the city's disaster prevention and mitigation capabilities and safety assurance levels, and ensuring high-quality economic and social development of the city. Thus, the problem that the relevant technology can only be achieved by comprehensively transforming the rainwater pipe network, which increases investment costs and takes a long time, and the applicability of the urban rainwater pipe network transformation is low, which reduces the city's disaster prevention and mitigation capabilities and safety assurance levels, and cannot ensure high-quality economic and social development of the city.
[0022] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0024] Figure 1 A flowchart of a method for preventing and controlling urban waterlogging provided according to an embodiment of the present application;
[0025] Figure 2 This is a schematic diagram of the principle of urban waterlogging prevention and treatment according to a specific embodiment of the present application;
[0026] Figure 3 A schematic diagram showing a comparison of urban waterlogging before and after the flood control planning according to a specific embodiment of the present application;
[0027] Figure 4 A schematic diagram of the structure of a device for preventing and controlling urban waterlogging provided according to an embodiment of the present application;
[0028] Figure 5 It is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0029] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0030] The following is a description of the method, device, electronic device and medium for preventing and controlling urban waterlogging in the embodiment of the present application with reference to the accompanying drawings. In view of the problem that the related technologies mentioned in the above background technology center can only be comprehensively transformed by rainwater pipe networks, which increases investment costs and takes a long time, the applicability of urban rainwater pipe network transformation is low, and the urban disaster prevention and mitigation capabilities and safety assurance levels are reduced, and the high-quality development of urban economy and society cannot be guaranteed, the present application provides a method for preventing and controlling urban waterlogging, in which, when it is detected that the city does not meet the preset waterlogging prevention and control requirements, the waterlogging prevention and control construction target is matched based on the waterlogging prevention and control evaluation parameters of the city, and the target waterlogging prevention and control construction strategy of the city is generated based on the actual type of the waterlogging prevention and control construction target and the waterlogging prevention and control evaluation parameters, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy, effectively improve the urban disaster prevention and mitigation capabilities and safety assurance levels, and ensure the high-quality development of urban economy and society. Thus, the problem that the related technologies can only be comprehensively transformed by rainwater pipe networks, which increases investment costs and takes a long time, the applicability of urban rainwater pipe network transformation is low, the urban disaster prevention and mitigation capabilities and safety assurance levels are reduced, and the high-quality development of urban economy and society cannot be guaranteed.
[0031] Specifically, Figure 1 A schematic flow chart of a method for preventing and controlling urban waterlogging provided in an embodiment of the present application.
[0032] like Figure 1 As shown, the method for preventing and controlling urban waterlogging includes the following steps:
[0033] In step S101, at least one urban flood control evaluation parameter of a city is obtained, and it is detected whether the city meets the preset urban flood control requirements.
[0034] It is understandable that the embodiment of the present application can obtain at least one urban flood control evaluation parameter, for example, Figure 2As shown, the embodiment of the present application will be elaborated in detail by taking District B of City A in southern Jiangsu as an example, wherein District B is located in the heart of the Taihu Lake Basin. The embodiment of the present application can obtain the current flood control standard of District B and the design recurrence period of the rainwater pipe. Then, the embodiment of the present application can detect that the current flood control standard of District B is once in 40 years, which is a certain gap from the 100-200-year recurrence required by the flood control specification, and the compliance rate of rainwater pipes that meet the recurrence period of once in 5 years is 28.5%, which is low. Among them, the compliance rate of rainwater pipe drainage is calculated by relevant technical personnel according to local rainwater pipe drainage standards. Therefore, the embodiment of the present application can determine that District B does not meet the requirements of urban waterlogging prevention and control, and it is necessary to improve the urban waterlogging prevention and control capabilities of District B.
[0035] In step S102, when it is detected that the city does not meet the preset waterlogging prevention and control requirements, at least one waterlogging prevention and control construction target is matched based on at least one waterlogging prevention and control evaluation parameter.
[0036] In the embodiment of the present application, the preset requirements for waterlogging prevention and control are to achieve a flood control standard of once in 100 to 200 years and a rainwater pipe compliance rate that is higher than the current level.
[0037] It is understandable that the embodiments of the present application can be used when it is detected that the city does not meet the requirements for waterlogging prevention and control, for example, Figure 2 As shown in the figure, when it is detected that area B does not meet the requirements for urban waterlogging prevention and control, the construction goals for urban waterlogging prevention and control can be matched based on the current flood control standards and the rate of compliance with the rainwater pipe standard for a return period of once in five years, such as building drainage pumping stations, rebuilding the rainwater pipe network, and rectifying urban waterlogging points, which effectively improves the feasibility of urban waterlogging prevention and control.
[0038] In step S103, a target waterlogging prevention and control construction strategy for the city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy.
[0039] In the embodiment of the present application, the target waterlogging prevention and control construction strategy is all construction projects related to waterlogging prevention and control carried out to prevent and control urban waterlogging.
[0040] It can be understood that the embodiments of the present application can generate a target waterlogging prevention and control construction strategy for the city based on the actual type of waterlogging prevention and control construction goals and waterlogging prevention and control evaluation parameters in the following steps, and prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy, thereby effectively improving the city's waterlogging prevention and control capabilities, improving the city's disaster prevention and mitigation capabilities and security levels, and ensuring high-quality urban economic and social development.
[0041] Optionally, in one embodiment of the present application, a target waterlogging prevention and control construction strategy for a city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, including: generating a drainage channel and drainage pump station construction strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0042] In the actual implementation process, Figure 2 As shown, taking District B of City A in southern Jiangsu as an example, the embodiment of the present application can carry out drainage channel construction projects. Based on the flood control standard of once in 100 to 200 years and the compliance rate of rainwater pipes higher than the current situation, it is detected that the total length of the river channel regulation project outside the dike in District B that needs to be rectified is about 27.75 km, the comprehensive regulation river channel that needs to be rectified is about 4.97 km, the dredging and silting of the river channel that needs to be rectified is about 22.78 km, and the silting and dredging of the river channel within the dike that needs to be rectified is 1.89 km. After the regulation is completed, the connectivity of the water system in the local area can be improved, the water flow capacity of the river channel can be restored and improved, and the flood discharge and drainage capacity of the urban drainage channel can be improved to ensure that it matches the drainage capacity of the urban rainwater pipe network.
[0043] Then, if Figure 2 As shown, the embodiment of the present application can also carry out drainage pump station construction projects. When the drainage pump station is laid out and the scale is distributed, relative concentration and station-river matching are considered, combined with the orderly flow demand of water bodies, which is conducive to drainage. Based on the flood control standard of once in 100 to 200 years and the compliance rate of rainwater pipes higher than the current situation, a control piece can be built in area B, 12 new pump gates are added, and the drainage flow rate of the area is 95m 3 / s, drainage flow in the polder area 8m 3 / s, so that the river channel with poor self-drainage due to external water support can be renovated or additional drainage pump stations can be added to improve the ability to pre-lower the river water level and quickly discharge the flood water.
[0044] Optionally, in one embodiment of the present application, a target waterlogging prevention and control construction strategy for a city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, including: generating a sponge city construction strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0045] As a possible way to achieve this, Figure 2As shown, the embodiment of the present application can carry out sponge city construction projects, actively implement measures such as "infiltration, retention, storage, purification, use, and discharge", promote the construction of low-impact development facilities, adopt control and management measures based on the whole process system of rainwater runoff such as source, path and terminal, and plan to implement 8 source control projects in the near future. For example, in the residential areas, roads, and green spaces in Zone B, sponge facilities such as rainwater flower beds or gardens, grass-planted ditches, sunken green spaces, and permeable pavements can be constructed or renovated according to local conditions, and every effort should be made to control the rainwater runoff at the source, so that Zone B can meet the requirements of urban waterlogging prevention and control and achieve rainwater source reduction.
[0046] Optionally, in one embodiment of the present application, a target waterlogging prevention and control construction strategy for a city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, including: generating a new rainwater pipe network construction strategy and a rainwater pump station construction strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0047] In some embodiments, Figure 2 As shown, the embodiment of the present application can carry out rainwater pipe network construction projects. In order to meet the requirements of waterlogging prevention and control in Area B, that is, the flood control standard of once in 100 to 200 years and the compliance rate of rainwater pipes higher than the current situation, Area B needs to plan the total length of newly built or rebuilt rainwater pipes of 320.95 km, and implement them simultaneously with the road construction, and complete the inspection of 1058 km of rainwater pipes in Area B. For the rainwater pipes directly connected to the external river in the low-lying areas of Area B, they will be rectified by retention, redirection, isolation, etc., a new drainage pipe network will be built in the blank areas of the rainwater pipe network, and the rainwater pipe network that is prone to waterlogging will be renovated to improve the rainwater discharge capacity.
[0048] Then, if Figure 2 As shown, in order to meet the requirements of waterlogging prevention and control in Area B, the embodiment of the present application can also carry out rainwater pump station construction projects, plan to build supporting rainwater pump stations in new municipal interchange road areas, ensure the safety of rainwater drainage in the area, and upgrade some of the existing interchange pump stations in Area B. It is planned to build and upgrade a total of 21 interchange rainwater pump stations in Area B to meet the requirements of waterlogging prevention and control, so that in areas where the pumping and drainage capacity does not meet the standards, the pumping capacity can be improved by renovating or adding pump stations, thereby ensuring smooth drainage.
[0049] Optionally, in one embodiment of the present application, a target waterlogging prevention and control construction strategy for a city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, including: generating a special remediation strategy for urban waterlogging points in the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0050] In some embodiments, Figure 2As shown, in order to achieve the flood control standard of once in 100 to 200 years and a rainwater pipe compliance rate higher than the current situation, the embodiment of the present application can carry out waterlogging point remediation projects. For those with poor drainage caused by pipe blockage, the maintenance frequency of rainwater pipes can be increased. For those with small pipe diameters inside the community and lack of dredging and maintenance, the drainage facilities in the community can be maintained. It is planned that 45 typical waterlogging points will be rectified in Area B in the near future, and the priorities will be distinguished and eliminated. For those that are temporarily difficult to complete the remediation, temporary measures should be taken during the flood season to reduce the impact of waterlogging and meet the requirements for waterlogging prevention and control.
[0051] Optionally, in one embodiment of the present application, a target waterlogging prevention and control construction strategy for a city is generated based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, including: generating a embankment construction and river channel regulation strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0052] As a possible way to achieve this, Figure 2 As shown, the embodiment of the present application can carry out levee construction projects to achieve a flood control standard of once in 100 to 200 years and a rainwater pipe compliance rate higher than the current level. First, the levee project design in Area B can be optimized, 16 gate buildings can be heightened and reinforced, 2 new flood gates can be built, and 2 km of levees can be built to meet the standards. Ecological transformation projects such as flood levees, seawalls and revetments can be implemented according to local conditions to provide the ability to defend against corresponding flood disasters.
[0053] Then, if Figure 2 As shown, the embodiment of the present application can also carry out river regulation projects, build ecologically beautiful rivers and lakes, implement river and lake environmental protection and ecological restoration work, plan to build 70 happy rivers and lakes in the near future, protect the ecological balance of rivers and lakes, and make the waterlogging prevention and control standards in Area B reach the flood control standards of once in 100 to 200 years and the rainwater pipe compliance rate higher than the current level.
[0054] For example, Figure 3 As shown, it is a comparison diagram of urban waterlogging before and after the waterlogging prevention and control plan, wherein the red part is the waterlogged part. The embodiment of the present application can optimize the current 40-year flood control standard of Area B to a 100-200-year flood control standard, and improve the compliance rate of rainwater pipes that meet the 5-year return period, reduce urban waterlogging, and improve the city's flood control capabilities. Relying on the basin regional management and this newly added project, the flood control capacity is fully improved, and active flood control and drainage measures are available, which creates conditions for improving the water environment management effect, expands the scope of the water environment beneficiary area, further improves the lake water quality, and increases pollution prevention and control measures.
[0055] The embodiments of the present application can enhance the city's ability to prevent and control urban waterlogging, have the ability to control water levels, improve the drainage capacity of the pipe network, reduce the time and scope of waterlogging, significantly reduce the risk of waterlogging, and enhance the city's flood control capabilities. Relying on river basin regional management and this newly added project, it can fully realize the improvement of flood control capabilities, have active flood control and drainage methods, create conditions for improving the effect of water environment management, expand the scope of the water environment benefiting area, further improve the water quality of lakes, and increase pollution prevention and control methods.
[0056] According to the method for preventing and controlling urban waterlogging proposed in the embodiment of the present application, when it is detected that the city does not meet the preset waterlogging prevention and control requirements, the waterlogging prevention and control construction target is matched based on the waterlogging prevention and control evaluation parameters of the city, and the target waterlogging prevention and control construction strategy of the city is generated based on the actual type of the waterlogging prevention and control construction target and the waterlogging prevention and control evaluation parameters, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy, effectively improve the city's disaster prevention and mitigation capabilities and safety assurance level, and ensure the high-quality development of the city's economy and society. Thus, the problem that the relevant technology can only be achieved through comprehensive transformation of the rainwater pipe network, which takes a long time, the applicability of the transformation of the urban rainwater pipe network is low, the city's disaster prevention and mitigation capabilities and safety assurance level are reduced, and the high-quality development of the city's economy and society cannot be guaranteed.
[0057] Next, the device for preventing and controlling urban waterlogging proposed in accordance with the embodiment of the present application will be described with reference to the accompanying drawings.
[0058] Figure 4 It is a block diagram of a device for preventing and controlling urban waterlogging according to an embodiment of the present application.
[0059] like Figure 4 As shown, the urban waterlogging prevention and control device 10 includes: a detection module 100, a matching module 200 and a control module 300.
[0060] Specifically, the detection module 100 is used to obtain at least one urban flood control evaluation parameter of the city and detect whether the city meets the preset urban flood control requirements.
[0061] The matching module 200 is used to match at least one waterlogging prevention and control construction target based on at least one waterlogging prevention and control evaluation parameter when it is detected that the city does not meet the preset waterlogging prevention and control requirements.
[0062] The control module 300 is used to generate a target waterlogging prevention and control construction strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy.
[0063] Optionally, in one embodiment of the present application, the control module 300 includes: a first generating unit.
[0064] Among them, the first generation unit is used to generate a city's drainage channel and drainage pump station construction strategy based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0065] Optionally, in one embodiment of the present application, the control module 300 includes: a second generating unit.
[0066] Among them, the second generation unit is used to generate a sponge city construction strategy for the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0067] Optionally, in one embodiment of the present application, the control module 300 includes: a third generating unit.
[0068] Among them, the third generation unit is used to generate a city's rainwater pipe network construction strategy and rainwater pump station construction strategy based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0069] Optionally, in one embodiment of the present application, the control module 300 includes: a fourth generating unit.
[0070] Among them, the fourth generation unit is used to generate a special remediation strategy for urban waterlogging points in the city based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0071] Optionally, in one embodiment of the present application, the control module 300 includes: a fifth generating unit.
[0072] Among them, the fifth generation unit is used to generate the city's embankment construction and river regulation strategy based on the actual type of at least one waterlogging prevention and control construction target and at least one waterlogging prevention and control evaluation parameter.
[0073] It should be noted that the above explanation of the embodiment of the method for preventing and controlling urban waterlogging is also applicable to the device for preventing and controlling urban waterlogging of this embodiment, and will not be repeated here.
[0074] According to the urban waterlogging prevention and control device proposed in the embodiment of the present application, when it is detected that the city does not meet the preset waterlogging prevention and control requirements, the waterlogging prevention and control construction target is matched based on the waterlogging prevention and control evaluation parameters of the city, and the target waterlogging prevention and control construction strategy of the city is generated based on the actual type of the waterlogging prevention and control construction target and the waterlogging prevention and control evaluation parameters, so as to prevent and control urban waterlogging according to the target waterlogging prevention and control construction strategy, effectively improve the city's disaster prevention and mitigation capabilities and safety assurance level, and ensure the high-quality development of the city's economy and society. Thus, the problem that the relevant technology can only be achieved by comprehensively transforming the rainwater pipe network, which increases the investment cost and takes a long time, the applicability of the urban rainwater pipe network transformation is low, the urban disaster prevention and mitigation capabilities and safety assurance level are reduced, and the high-quality development of the urban economy and society cannot be guaranteed.
[0075] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:
[0076] A memory 501 , a processor 502 , and a computer program stored in the memory 501 and executable on the processor 502 .
[0077] When the processor 502 executes the program, the urban waterlogging prevention and control method provided in the above embodiment is implemented.
[0078] Furthermore, the electronic device further comprises:
[0079] The communication interface 503 is used for communication between the memory 501 and the processor 502 .
[0080] The memory 501 is used to store computer programs that can be executed on the processor 502 .
[0081] The memory 501 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.
[0082] If the memory 501, the processor 502 and the communication interface 503 are implemented independently, the communication interface 503, the memory 501 and the processor 502 can be connected to each other through a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0083] Optionally, in a specific implementation, if the memory 501, the processor 502 and the communication interface 503 are integrated on a chip, the memory 501, the processor 502 and the communication interface 503 can communicate with each other through an internal interface.
[0084] The processor 502 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application.
[0085] This embodiment also provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the above-mentioned method for preventing and controlling urban waterlogging is implemented.
[0086] This embodiment also provides a computer program product, including a computer program, which is executed by a processor to implement the above urban waterlogging prevention and control method.
[0087] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0088] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0089] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0090] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or N wirings (electronic devices), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways as necessary and then storing it in a computer memory.
[0091] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one or a combination of the following technologies known in the art: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0092] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0093] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0094] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A method for preventing and controlling urban waterlogging, characterized in that: The following steps are involved: Obtaining at least one waterlogging prevention and control evaluation parameter of a city, and detecting whether the city meets a preset waterlogging prevention and control requirement; When it is detected that the city does not meet the preset waterlogging prevention and control requirements, matching at least one waterlogging prevention and control construction target based on the at least one waterlogging prevention and control evaluation parameter; A target waterlogging prevention and control construction strategy for the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter, so as to prevent and control waterlogging in the city according to the target waterlogging prevention and control construction strategy.
2. The method according to claim 1, characterized in that: The generating of the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter comprises: A construction strategy for drainage channels and drainage pump stations for the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
3. The method according to claim 1, characterized in that The generating of the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter comprises: A sponge city construction strategy for the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
4. The method according to claim 1, characterized in that: The generating of the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter comprises: A new rainwater pipe network construction strategy and a rainwater pump station construction strategy for the city are generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
5. The method according to claim 1, characterized in that The generating of the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter comprises: A special regulation strategy for urban waterlogging points in the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
6. The method according to claim 1, characterized in that The generating of the target waterlogging prevention and control construction strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter comprises: A dike construction and river regulation strategy for the city is generated based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
7. A device for preventing and controlling urban waterlogging, characterized in that: include: A detection module, used to obtain at least one waterlogging prevention and control evaluation parameter of a city, and detect whether the city meets the preset waterlogging prevention and control requirements; A matching module, configured to match at least one waterlogging prevention and control construction target based on the at least one waterlogging prevention and control evaluation parameter when it is detected that the city does not meet the preset waterlogging prevention and control requirements; A control module is used to generate a target waterlogging prevention and control construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter, so as to prevent and control waterlogging in the city according to the target waterlogging prevention and control construction strategy.
8. The device according to claim 7, characterized in that The control module comprises: The first generating unit is used to generate a construction strategy of a drainage channel and a drainage pump station for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
9. The device according to claim 7, characterized in that The control module comprises: The second generating unit is used to generate a sponge city construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
10. The device according to claim 7, characterized in that The control module comprises: The third generating unit is used to generate a new rainwater pipe network construction strategy and a rainwater pump station construction strategy for the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
11. The device according to claim 7, characterized in that The control module comprises: The fourth generating unit is used to generate a special regulation strategy for urban waterlogging points in the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
12. The device according to claim 7, characterized in that The control module comprises: The fifth generating unit is used to generate the dike construction and river regulation strategy of the city based on the actual type of the at least one waterlogging prevention and control construction target and the at least one waterlogging prevention and control evaluation parameter.
13. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for preventing and controlling urban waterlogging as described in any one of claims 1 to 6.
14. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement the method for preventing and controlling urban waterlogging as described in any one of claims 1 to 6.
15. A computer program product comprising a computer program, characterized in that The computer program is executed by a processor to implement the method for preventing and controlling urban waterlogging as described in any one of claims 1 to 6.
Citation Information
Patent Citations
Application management of BIM technology to sponge city construction
CN106812145A
Method and system for joint optimization scheduling of flood prevention, waterlogging drainage and running water of plain city river network
CN109872063A
Water conservancy flood control, drought resistance and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN113434565A
Urban flood control design method and device
CN114548949A
Urban inland inundation monitoring and alarming system and method based on Internet of Things data fusion
CN116434506A