Building equipment management system and method based on artificial intelligence

Through the artificial intelligence-based building equipment management method, the power of ventilation equipment is dynamically adjusted, which solves the problem of energy waste in the mechanical ventilation process and achieves more efficient ventilation effects and lower energy consumption.

CN118759983AInactive Publication Date: 2024-10-11XIAN LEYI TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410970792.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing building equipment management system fails to effectively control the operating power of ventilation equipment during the mechanical ventilation process, resulting in energy waste and increased operating costs.

Method used

Adopt artificial intelligence-based building equipment management methods to monitor the indoor environment, analyze environmental data, adjust the initial power of ventilation equipment, and update the power adjustment curve according to changes in air quality to optimize energy demand in the ventilation process and reduce power redundancy. surplus and energy consumption.

Benefits of technology

By dynamically adjusting the power of ventilation equipment, the operating power consumption of ventilation equipment is reduced, the ventilation effect is improved, energy consumption is reduced, and the operating efficiency of ventilation equipment is optimized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118759983A_ABST
    Figure CN118759983A_ABST
Patent Text Reader

Abstract

The invention discloses a building equipment management system and method based on artificial intelligence, and the method comprises the steps: monitoring an indoor environment, so as to obtain environment monitoring data, and carrying out the ventilation processing judgment of the environment monitoring data; if ventilation treatment is needed, ventilation equipment is controlled and started according to the initial power adjusting curve, and when the indoor air quality reaches the stopping grade, ventilation is stopped, and indoor ventilation data corresponding to the ventilation adjusting process is output; drawing the relation that the air quality changes along with the change of the ventilation time to obtain an air transformation curve graph; the air transformation curve graph is analyzed to obtain the influence of the corresponding current power on the indoor air quality, and then the initial power adjustment curve is adjusted and updated; and obtaining corresponding energy demand data according to the power regulation curve and the operation duration, performing screening to obtain a power regulation curve with the lowest energy demand, and replacing the initial power regulation curve. The method has the effect of reducing energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of construction equipment management, and in particular to an artificial intelligence-based construction equipment management system and method. Background Art

[0002] Building equipment refers to equipment that provides people with daily necessities such as water, electricity, and air in buildings. Building equipment mainly includes ventilation, water supply and drainage, air conditioning, artificial lighting, elevators, etc. Among them, ventilation equipment is mainly used to discharge indoor bad air such as moisture, waste heat, dust, and harmful gases in the air, and input outdoor fresh air into the room. Ventilation equipment includes natural ventilation and mechanical ventilation. Natural ventilation uses environmental factors to allow air to circulate naturally so that the building can obtain good air indoors, reduce energy consumption and operating costs, while mechanical ventilation uses mechanical equipment to transport outdoor air into the room and extract indoor air. At the same time, it can also filter outdoor air to ensure the quality of indoor air.

[0003] In the related technology, the air quality of the environment is obtained through sensors. When the air quality reaches the preset ventilation start standard value, the system starts the ventilation equipment and begins ventilation to reduce air pollutants and improve air quality. In this process, the air quality is monitored in real time. When the detected air quality reaches the ventilation shutdown standard value, the system shuts down the ventilation equipment and stops mechanical ventilation.

[0004] With regard to the above-mentioned related technologies, when mechanically ventilating the indoor air, the system only controls the opening and closing of the ventilation equipment but does not control the operating power of the ventilation equipment during mechanical ventilation, resulting in an excess power problem in the operating power of the ventilation equipment during the ventilation process, which leads to energy waste and increased operating costs. There is room for improvement. Summary of the invention

[0005] In order to reduce energy consumption, the present application provides a building equipment management system and method based on artificial intelligence.

[0006] In the first aspect, the present application provides a construction equipment management method based on artificial intelligence, which adopts the following technical solutions:

[0007] A construction equipment management method based on artificial intelligence, comprising:

[0008] Monitor the indoor environment and output environmental monitoring data;

[0009] Based on the preset activation level, the environmental monitoring data is analyzed to determine whether ventilation is required;

[0010] If it is determined that ventilation is required, the ventilation equipment is controlled according to the preset initial power adjustment curve to ventilate the indoor air, and the indoor environment is continuously collected;

[0011] When it is detected that the indoor air quality reaches the stop level, the ventilation process is stopped, and the continuously collected indoor environment data is output to obtain the corresponding indoor ventilation data;

[0012] Based on the indoor ventilation data, the relationship between air quality and ventilation time is plotted to obtain an air transformation curve;

[0013] Analyze the air conversion curve to obtain the impact of the corresponding current power on the indoor air quality, and adjust and update the initial power adjustment curve according to the air conversion curve, and act on the next ventilation process;

[0014] According to the power regulation curve and the corresponding operation time, the energy demand of the corresponding power regulation curve during the working process is calculated to obtain energy demand data;

[0015] The energy demand data is screened to determine the minimum energy demand data and the corresponding power regulation curve, and the power regulation curve is applied to subsequent ventilation processing.

[0016] Through the above technical scheme, the indoor environment is monitored, and the monitored data is compared with the preset startup data to determine whether ventilation is needed to improve the indoor air quality. If ventilation is needed, the ventilation equipment is controlled according to the preset initial power adjustment curve, so that the ventilation equipment can perform quantitative power adjustment according to the air quality of the indoor environment, thereby reducing the occurrence of power redundancy phenomenon in which the power of the ventilation equipment is too large and the ventilation effect is not saturated, thereby reducing the operating power of the ventilation equipment under the condition of achieving the same effect, thereby reducing the operating power consumption; at the same time, the indoor environment data when the indoor air is ventilated according to the initial power adjustment curve is collected to determine the air quality of the indoor environment during the ventilation process, and the air quality is sorted according to the time axis to obtain an air conversion curve chart, and the air conversion curve chart is analyzed and judged to determine the improvement change of air quality under the same power, and the operating power of the ventilation equipment is adjusted and updated according to the change, and the adjusted and updated power is used in the next ventilation adjustment process. According to the actual environmental data and the size of the environmental space, the actual effect of the ventilation power is judged, so that the operating power of the ventilation equipment is adapted to the actual environmental adjustment effect, the ventilation effect is improved and the operating power consumption of the corresponding ventilation effect is reduced.

[0017] Preferably, the environmental monitoring data is compared with a preset environmental quality level to determine the current environmental quality level, and the current environmental level is output;

[0018] The starting and ending values ​​of the air quality when ventilation is required for the indoor environment, so as to obtain the corresponding start level and stop level;

[0019] Compare the current environmental level with the start-up level. If the current environmental level is lower than the start-up level, ventilation is determined to be required.

[0020] The matched environmental levels are analyzed to select the initial power of the ventilation equipment when the ventilation equipment is started according to different environmental levels.

[0021] Through the above technical solution, the operating conditions and end conditions of the ventilation equipment are manually set to avoid wasting excess energy during the operation of the ventilation equipment. The monitored environmental monitoring data is matched with the environmental quality level to determine the corresponding environmental level in the current environment, and the environmental levels are compared to determine whether the current indoor environment needs to be ventilated; at the same time, the matched environmental level is judged, and the initial power of different ventilation equipment is matched according to different judgment results, so that the ventilation equipment can adjust the indoor environment as quickly as possible, thereby reducing the operating time of the ventilation equipment to a certain extent, and thus reducing the corresponding energy consumption.

[0022] Preferably, the environmental quality level is to determine different pollution indexes according to the degree of air pollution in the environment, and to divide the pollution indexes into different levels of environmental quality levels; the environmental quality level includes five levels: excellent, good, moderate, polluted, and severely polluted; the higher the environmental quality level, the lower the corresponding pollution index;

[0023] The start-up level is a start-up standard for starting ventilation equipment when the indoor air quality reaches a certain pollution level according to actual needs of users;

[0024] The stop level is the user's requirement for indoor air quality according to actual needs. By selecting the indoor environment quality level, a judgment standard is provided when judging the indoor air quality.

[0025] When it is detected that the air quality of the indoor environment reaches the set environmental quality level, the ventilation process of the indoor air is stopped.

[0026] Preferably, the air conversion curve is analyzed to determine the effect of the power of the same equipment on the indoor environment;

[0027] When the air quality improvement rate of the indoor environment slows down under the same power, the air pollution index corresponding to the slowdown in air quality improvement is recorded to obtain the speed change point data;

[0028] The operating power of the equipment is adjusted based on the speed change point data to reduce the operating power of the equipment, and the air quality of the indoor environment is collected and tracked to obtain an adjusted air conversion curve, that is, a new air conversion curve diagram;

[0029] Compare the air change curve with the new air change curve to determine the impact of the reduced equipment operating power on the air quality of the indoor environment. If the impact is small, re-analyze the new air change curve to determine whether the rate of improvement of the indoor air quality has slowed down.

[0030] If it exists, the air pollution index corresponding to the air quality improvement change is recorded, and the corresponding equipment operating power is adjusted, and the air quality of the indoor environment is collected and tracked, and the adjusted air transformation curve is output; repeat the above steps until different equipment operating powers corresponding to different air qualities are obtained, and the optimal power adjustment data is output to adjust the output of the ventilation equipment in real time.

[0031] Through the above technical scheme, since the pollution index in the air gradually decreases when the ventilation equipment ventilates the indoor environment, the improvement of the indoor air quality cannot be saturated when the same power is used for ventilation, which makes the operating power of the ventilation equipment redundant. Therefore, it is necessary to judge the improvement effect of the indoor air quality according to the operating power of the ventilation equipment to determine whether it is necessary to modify the operating efficiency of the ventilation equipment at a certain air quality to reduce the power redundancy of the ventilation equipment, thereby reducing energy consumption.

[0032] Preferably, the activation frequency of the ventilation process is recorded to obtain ventilation frequency data;

[0033] The air pollution index of the environmental quality level corresponding to the stop level is read to determine the air pollution index threshold of the stop level;

[0034] Calculating the difference between the air pollution index of the stop level and the air pollution index of the start level in the initial state to obtain buffer data; the initial state is that when the indoor air quality reaches the initial value of the stop level, the ventilation process is immediately terminated;

[0035] The indoor air pollution rate is calculated based on the ventilation frequency data and the buffer data, and the duration of the air pollution index threshold of the stop level is calculated based on the indoor air pollution rate to obtain the additional duration data;

[0036] According to the additional duration data, the ventilation cycle is judged, and the minimum ventilation frequency data is determined according to the ventilation cycle;

[0037] Calculate the ventilation frequency data and operation time under the initial state to obtain the initial energy demand data;

[0038] Calculate the minimum ventilation frequency data and the corresponding operating time to obtain the adjusted energy demand data;

[0039] The initial energy demand data and the adjusted energy demand data are compared to screen out the minimum energy demand, and the optimal air pollution index after ventilation treatment is determined according to the minimum energy demand.

[0040] Through the above technical scheme, since each environmental quality level contains a certain air pollution index threshold when dividing the environmental quality levels, there is a need to adjust the air pollution index to the maximum and minimum values ​​of the threshold corresponding to the corresponding stop level when performing ventilation processing. Therefore, within this threshold range, the ventilation frequency and indoor air pollution rate are judged to determine the optimal adjustment index, so that the ventilation equipment can reduce the adjustment frequency during the adjustment process, thereby minimizing the energy loss in the overall adjustment process.

[0041] Preferably, the ventilation rate of the ventilation equipment is matched according to the indoor air pollution rate to obtain an operating power that matches the ventilation rate, that is, a constant output power;

[0042] Obtain the total operating time of the ventilation equipment, and calculate the energy demand for the constant output power according to the operating time to obtain the constant energy demand data;

[0043] The constant energy demand data is compared with the initial energy demand data and the adjusted energy demand data to screen out the minimum energy demand, and the working mode corresponding to the minimum energy demand is used as the final working mode.

[0044] Through the above technical scheme, the operating power of the ventilation equipment corresponding to the pollution rate is determined according to the indoor air pollution rate, so that the ventilation effect corresponding to the operating power can be consistent with the pollution rate, so that the indoor environmental quality can be kept stable and consistent, and the length of time that the indoor environment needs to maintain the environmental quality is obtained, that is, the total operating time that the ventilation equipment needs to ventilate, and the energy demand under the corresponding constant output mode is determined through the total operating time and the corresponding constant output power, and then the constant energy demand data, the initial energy demand data and the adjusted energy demand data are compared to screen out the minimum energy demand, and then the corresponding working mode is read according to the minimum energy demand, and the working mode is determined as the final working mode to reduce the energy consumption of the ventilation equipment when adjusting the indoor environmental quality.

[0045] Preferably, if the selected working mode is constant power output, data collection is performed on the indoor environment during operation to obtain environmental monitoring data under a constant state, i.e., constant monitoring data;

[0046] If the constant monitoring data shows that the air quality is getting better and is gradually decreasing, the operating power will be further reduced;

[0047] When the operating power reaches the minimum and / or the air quality enters the next level, the ventilation device is stopped and the ventilation device is started when the air quality reaches the start level.

[0048] Through the above technical scheme, when the selected working mode is constant power output, data is collected on the indoor environment in the constant mode to obtain environmental monitoring data in the constant mode. Since the constant output power of the constant mode is compatible with the indoor air pollution rate, when the monitored environmental quality improves and gradually decreases, it indicates that the indoor air pollution rate has decreased, and the constant output power of the constant mode is synchronously reduced until the monitored environmental monitoring data reaches the next environmental quality level or the operating power reaches the minimum, and the operation of the ventilation equipment is stopped; thereby reducing unnecessary energy waste caused by the ventilation equipment continuing to work while the indoor environmental quality improves due to some reason.

[0049] In the second aspect, the present application provides a construction equipment management system based on artificial intelligence, which adopts the following technical solutions:

[0050] An artificial intelligence-based building equipment management system, comprising:

[0051] The indoor environment monitoring module is set in each major area of ​​the room to monitor the air quality of the major areas of the room and output the corresponding environmental monitoring data;

[0052] A ventilation processing module, with built-in environmental quality level and power adjustment curve, the ventilation processing module is connected to the indoor environment monitoring module by signal, and is used to receive the environmental monitoring data, and match the environmental monitoring data with the environmental quality level to obtain the corresponding environmental level, and compare the current environmental level with the start level and the stop level. If the start level is reached, the ventilation equipment is started according to the power adjustment curve, and if the stop level is reached, the ventilation equipment is stopped;

[0053] The data analysis module is configured to be signal-connected to the ventilation processing module and the indoor environment monitoring module, and is used to receive the environmental monitoring data and the power adjustment curve, and perform time and air quality analysis on the environmental detection data to obtain the ventilation effect under the same ventilation power, and adjust the power adjustment curve according to the ventilation effect to obtain the optimal power adjustment data, and transmit the optimal power adjustment data to the ventilation processing module to obtain the corresponding optimal power adjustment curve.

[0054] Preferably, the ventilation processing module includes a ventilation opening and closing judgment component and a power output control unit;

[0055] The ventilation opening and closing judgment component includes an environment level analysis unit and an opening and closing judgment unit, the environment level analysis unit has the environment quality level built in, the environment level analysis unit is connected to the indoor environment monitoring unit signal, and is used to receive the environment monitoring data and match the environment monitoring data to determine the current environment level, and output the environment level data;

[0056] The on / off judgment unit is used to receive the user's demand for indoor air quality, to input the required environmental quality level when ventilation is started and the environmental quality level when ventilation is closed, and to output the start level and the stop level; the on / off judgment unit is connected to the environmental level analysis unit signal, to receive the environmental level data, and to compare the environmental level data with the start level and the stop level, and to output a corresponding control signal according to the comparison result, wherein the control signal includes a start signal and a stop signal;

[0057] The power output control unit has the power regulation curve built in, and the power output control unit is connected to the opening and closing judgment unit signal for receiving the control signal, and performing opening and closing control on the ventilation equipment according to the control signal, and controlling the output power of the ventilation equipment according to the power regulation curve.

[0058] Preferably, the data analysis module includes an air quality tracking unit and a data analysis unit;

[0059] The air quality tracking unit is connected to the indoor environment monitoring unit by signal, and is used to receive and record the environment monitoring data in real time, and perform ventilation time and air quality analysis on the environment monitoring data to obtain an air change curve diagram of the relationship between ventilation time and air quality;

[0060] The data analysis unit is connected to the air quality tracking unit signal, and is used to receive and analyze the air change curve to determine the time point when the air quality improves slowly and the corresponding air pollution index, and output the analysis time node; the data analysis unit is connected to the power output control unit signal, and is used to receive the power adjustment curve, read the power of the power adjustment curve according to the analysis time node, and reduce the read power to obtain an operating power with less impact on the air change curve, and match the operating power with the air pollution index to obtain corresponding power adjustment data, and output it to the power output control unit.

[0061] In summary, the present application includes at least one of the following beneficial technical effects:

[0062] 1. By monitoring the indoor environment and comparing the monitored data with the preset startup data, it is determined whether ventilation is required to improve the indoor air quality. If ventilation is required, the ventilation equipment is controlled according to the preset initial power adjustment curve, so that the ventilation equipment can perform quantitative power adjustment according to the air quality of the indoor environment, thereby reducing the occurrence of power redundancy phenomenon in which the power of the ventilation equipment is too large and the ventilation effect is not saturated, thereby reducing the operating power of the ventilation equipment while achieving the same effect, thereby reducing the operating power consumption; at the same time, the indoor environment data when the indoor air is ventilated according to the initial power adjustment curve is collected to determine the air quality of the indoor environment during the ventilation process, and the air quality is sorted according to the time axis to obtain an air transformation curve diagram, and the air transformation curve diagram is analyzed and judged to determine the improvement change of air quality under the same power, and the operating power of the ventilation equipment is adjusted and updated according to the change, and the adjusted and updated power is used in the next ventilation adjustment process; according to the actual environmental data and the size of the environmental space, the actual effect of the ventilation power is judged, so that the operating power of the ventilation equipment is adapted to the actual environmental adjustment effect, the ventilation effect is improved and the operating power consumption of the corresponding ventilation effect is reduced;

[0063] 2. Since the pollution index in the air gradually decreases when the ventilation equipment is ventilating the indoor environment, the improvement of indoor air quality cannot be saturated when the same power is used for ventilation, which makes the operating power of the ventilation equipment redundant. Therefore, it is necessary to judge the improvement effect of indoor air quality according to the operating power of the ventilation equipment to determine whether it is necessary to modify the operating efficiency of the ventilation equipment at a certain air quality to reduce the power redundancy of the ventilation equipment, thereby reducing energy consumption;

[0064] 3. Since each environmental quality level contains a certain air pollution index threshold when dividing the environmental quality levels, the air pollution index needs to be adjusted to the maximum and minimum values ​​of the threshold corresponding to the corresponding stop level during ventilation. Therefore, within this threshold range, the ventilation frequency and indoor air pollution rate are judged to determine the best adjustment index, so that the ventilation equipment can reduce the adjustment frequency during the adjustment process, thereby minimizing the energy loss in the overall adjustment process. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 This is a flowchart of the steps of the construction equipment management method based on artificial intelligence that is mainly embodied in this embodiment;

[0066] Figure 2 This embodiment mainly embodies the sub-step flow chart of S200 in the construction equipment management method based on artificial intelligence;

[0067] Figure 3 This embodiment mainly embodies the sub-step flow chart of S600 in the construction equipment management method based on artificial intelligence;

[0068] Figure 4 This embodiment mainly embodies the flow chart of the steps of adjusting the specific air pollution index value in the building equipment management method based on artificial intelligence;

[0069] Figure 5 This embodiment mainly embodies the flow chart of the judgment and selection steps of the constant ventilation mode in the building equipment management method based on artificial intelligence;

[0070] Figure 6 This is a module block diagram of a building equipment management system based on artificial intelligence, which is mainly embodied in this embodiment.

[0071] Figure numerals: 1. Indoor environment monitoring module; 2. Ventilation processing module; 21. Ventilation opening and closing judgment component; 211. Environmental level analysis unit; 212. Opening and closing judgment unit; 22. Power output control unit; 3. Data analysis module; 31. Air quality tracking unit; 32. Data analysis unit. DETAILED DESCRIPTION

[0072] The following is combined with Figure 1-6 This application is described in further detail.

[0073] The embodiments of the present application disclose a construction equipment management system and method based on artificial intelligence.

[0074] Example: Figure 1 As shown, the present invention provides a construction equipment management method based on artificial intelligence, comprising:

[0075] S100, monitor the indoor environment and output the environmental monitoring data;

[0076] S200, based on the preset start level, analyzing the environmental monitoring data to determine whether ventilation is required;

[0077] S300, if it is determined that ventilation is required, the ventilation equipment is controlled according to a preset initial power adjustment curve to ventilate the indoor air, and the indoor environment is continuously collected;

[0078] S400, when it is detected that the indoor air quality reaches the stop level, the ventilation process is stopped, and the continuously collected indoor environment data is output to obtain corresponding indoor ventilation data;

[0079] S500, based on the indoor ventilation data, plotting the relationship between the change of air quality and the change of ventilation time to obtain an air transformation curve diagram;

[0080] S600, analyzing the air conversion curve to obtain the influence of the corresponding current power on the indoor air quality, and adjusting and updating the initial power adjustment curve according to the air conversion curve, and acting on the next ventilation process;

[0081] S700, calculating the energy demand of the corresponding power regulation curve during the working process according to the power regulation curve and the corresponding operating time to obtain energy demand data;

[0082] S800, screening the energy demand data to determine the minimum energy demand data and the corresponding power regulation curve, and applying the power regulation curve to subsequent ventilation processing.

[0083] In this embodiment, by monitoring the indoor environment and comparing the monitored data with the preset startup data, it is determined whether ventilation is needed to improve the indoor air quality. If ventilation is needed, the ventilation equipment is controlled according to a preset initial power adjustment curve, so that the ventilation equipment can perform quantitative power adjustment according to the air quality of the indoor environment, thereby reducing the occurrence of power redundancy caused by excessive power of the ventilation equipment and unsaturated ventilation effect, thereby reducing the operating power of the ventilation equipment while achieving the same effect, thereby reducing the operating power consumption.

[0084] At the same time, the indoor environment data when the indoor air is ventilated according to the initial power adjustment curve is collected to determine the air quality of the indoor environment during the ventilation process, and the air quality is sorted according to the time axis to obtain an air conversion curve chart, and the air conversion curve chart is analyzed and judged to determine the improvement of air quality under the same power, and the operating power of the ventilation equipment is adjusted and updated according to the change, and the adjusted and updated power is used in the next ventilation adjustment process. According to the actual environmental data and the size of the environmental space, the actual effect of the ventilation power is judged, so that the operating power of the ventilation equipment is adapted to the actual environmental adjustment effect, the ventilation effect is improved and the operating power consumption of the corresponding ventilation effect is reduced. Since the operating power is reduced, the corresponding ventilation effect is reduced, and the operating time required for ventilation will increase. The power consumption of different power adjustment curves is calculated by the obtained power adjustment curve and the corresponding operating time to determine the best power adjustment curve, and it is used as the adjustment power curve under the indoor environment.

[0085] Exemplarily, the operating power of the ventilation equipment has a range of 0 to 10, where power 10 means full power on and 0 means turning off the equipment. In this environment, when the operating power of the ventilation equipment is 10, the corresponding ventilation effect is 10. After a certain period of operation, the indoor air quality improves, and the ventilation effect corresponding to the operating power of 10 drops to 8, indicating that there is power redundancy in the operating power of 10. It is necessary to adjust the operating power so that the operating power drops to 9, and detect the corresponding ventilation effect. If the ventilation effect is still 8, the operating power is readjusted to 8, and the corresponding ventilation effect is determined. If the corresponding ventilation effect is 7, it indicates that when the operating power is 8, the ventilation effect of the ventilation equipment is full-load ventilation. Power consumption calculation is performed on two ventilation modes, where the operating power is 9 and the ventilation effect is 8, and the operating power is 8 and the ventilation effect is 7, so as to screen out the best operating power of the ventilation equipment, and adopt the corresponding operating power when the ventilation effect is 8 next time.

[0086] refer to Figure 2 In step S200, based on the preset start-up level, the environmental monitoring data is analyzed to determine whether ventilation is required, including the following steps:

[0087] S210, compare the environmental monitoring data with the preset environmental quality level to determine the current environmental quality level, and output the current environmental quality level; wherein the environmental quality level is to determine the corresponding air pollution index according to the degree of air pollution in the environment, and then divide the air pollution index to obtain the corresponding environmental quality level. The environmental quality level includes five levels: excellent, good, moderate, polluted, and severely polluted. The higher the environmental quality level, the lower the corresponding air pollution index. The levels are: excellent>good>moderate>polluted>severely polluted. Exemplarily, the excellent air pollution index is 0-10, the good level is 11-40, the moderate level is 41-80, the pollution level is 81-100, and the severe pollution level is above 100. The monitored data is matched with the preset environmental quality level, and then matched to the corresponding environmental quality level.

[0088] S220, the starting value and ending value of the air quality when the indoor environment needs to be ventilated, so as to obtain the corresponding start level and stop level; wherein the start level is the environmental quality level for starting the ventilation equipment when the air quality reaches a certain pollution level according to the actual needs of the user, and the stop level is the environmental quality level for stopping the ventilation equipment when the pollution level of the indoor environment air is reduced to a certain index according to the needs.

[0089] S230, comparing the current environmental level with the start-up level, and if the current environmental level reaches the start-up level, it is determined that ventilation is required;

[0090] S240, analyzing the matched environmental levels to select the initial power of the ventilation equipment when the ventilation equipment is started according to different environmental levels.

[0091] In this embodiment, the operating conditions and end conditions of the ventilation equipment are manually set to avoid wasting excess energy during the operation of the ventilation equipment. The monitored environmental monitoring data is matched with the environmental quality level to determine the corresponding environmental level under the current environment, and the environmental levels are compared to determine whether the current indoor environment needs to be ventilated. At the same time, the matched environmental level is judged, and the initial power of different ventilation equipment is matched according to different judgment results, so that the ventilation equipment can adjust the indoor environment as quickly as possible, thereby reducing the operating time of the ventilation equipment to a certain extent, and then reducing the corresponding energy consumption.

[0092] For example, when the indoor environment level is severely polluted, the initial power used by the ventilation equipment is 10, and the corresponding ventilation effect is 10, it will take 10 minutes to reduce the ventilation effect to 9, and the power consumption required during this period is 10×10=100. If the initial power used is 8, it will take 15 minutes to reduce the ventilation effect to 9, and the power consumption required during this period is 8×15=120, so more energy consumption is required. However, if the indoor environment level is a pollution level, the initial power of 10 is used again, and the corresponding ventilation effect is 9. Then the initial power will have power redundancy and lead to unnecessary consumption of energy.

[0093] refer to Figure 3 In step S600, the air conversion curve is analyzed to obtain the influence of the corresponding current power on the indoor air quality, and the preset initial power adjustment curve is adjusted and updated according to the air conversion curve, and acts on the next ventilation process, including the following steps:

[0094] S610, analyzing the air conversion curve diagram to determine the impact of the power of the same equipment on the indoor environment;

[0095] S620, when the air quality improvement rate of the indoor environment slows down under the same power, the air pollution index corresponding to the slowing down of the air quality improvement is recorded to obtain speed change point data;

[0096] S630, adjusting the operating power of the device based on the speed change point data to reduce the operating power of the device, and collecting and tracking the air quality of the indoor environment to obtain an adjusted air conversion curve, that is, a new air conversion curve diagram;

[0097] S640, comparing the air change curve with the new air change curve to determine the impact of the reduced equipment operating power on the air quality of the indoor environment. If the impact is small, reanalyzing the new air change curve to determine whether the rate of improvement of the air quality of the indoor environment has slowed down.

[0098] S650, if it exists, then record the air pollution index corresponding to the air quality improvement change, adjust the corresponding equipment operating power, collect and track the air quality of the indoor environment, and output the adjusted air transformation curve; repeat the above steps until different equipment operating powers corresponding to different air qualities are obtained, and output the optimal power adjustment data to adjust the output of the ventilation equipment in real time.

[0099] In the present embodiment, since the pollution index in the air gradually decreases when the ventilation equipment is ventilating the indoor environment, the improvement of the indoor air quality cannot be saturated when the same power is used for ventilation, which makes the operating power of the ventilation equipment redundant. Therefore, it is necessary to judge the improvement effect of the indoor air quality according to the operating power of the ventilation equipment to determine whether it is necessary to modify the operating efficiency of the ventilation equipment at a certain air quality to reduce the power redundancy of the ventilation equipment, thereby reducing energy consumption.

[0100] By analyzing the air conversion curve, it is determined whether the ventilation effect of the air conversion curve has a downward trend. If there is a downward trend, that is, the air quality improvement slows down, the air pollution index at this time is recorded and the operating power of the corresponding ventilation equipment is recorded, and the operating power of the ventilation equipment is reduced according to the speed change point data. At the same time, the ventilation effect of the ventilation equipment after the power reduction is collected and tracked to obtain the adjusted air conversion curve to determine the improvement effect of the adjusted power on the indoor air quality, and the air conversion curve is compared with the new air conversion curve to determine the impact of the new air conversion curve on the indoor air quality, so as to obtain the minimum operating power with the least impact, and the corresponding new air conversion curve is re-analyzed until the indoor environmental quality level reaches the stop level or the power of the ventilation equipment is reduced to the minimum power. Through the above steps, the operating power of the ventilation equipment can be adjusted according to the actual situation, so that the operating power of the ventilation equipment is always fully loaded to improve the indoor environmental quality, avoiding unnecessary energy waste caused by the power redundancy of the ventilation equipment, thereby reducing power consumption without affecting the indoor environmental quality.

[0101] refer to Figure 4 , the construction equipment management method based on artificial intelligence also includes the following steps:

[0102] S11, recording the start-up frequency of the ventilation process to obtain ventilation frequency data;

[0103] S12, reading the air pollution index of the environmental quality level corresponding to the stop level to determine the air pollution index threshold of the stop level;

[0104] S13, calculating the difference between the air pollution index of the stop level and the air pollution index of the start level in the initial state to obtain buffer data; the initial state is that when the indoor air quality reaches the initial value of the stop level, the ventilation process is immediately terminated;

[0105] S14, calculating the indoor air pollution rate according to the ventilation frequency data and the buffer data, and calculating the duration of the air pollution index threshold of the stop level according to the indoor air pollution rate to obtain additional duration data;

[0106] S15, judging the ventilation cycle according to the additional duration data, and determining the minimum ventilation frequency data according to the ventilation cycle;

[0107] S16, calculating ventilation frequency data and operation time in an initial state to obtain initial energy demand data;

[0108] S17, calculating minimum ventilation frequency data and corresponding operation duration to obtain adjusted energy demand data;

[0109] S18, comparing the initial energy demand data and the adjusted energy demand data to screen out the minimum energy demand, and determining the optimal air pollution index after ventilation treatment according to the minimum energy demand.

[0110] In this embodiment, since each environmental quality level includes a certain air pollution index threshold when the environmental quality level is divided, the air pollution index needs to be adjusted to the maximum and minimum values ​​of the threshold corresponding to the corresponding stop level when ventilation is performed. Therefore, within this threshold range, the ventilation frequency and the indoor air pollution rate are judged to determine the optimal adjustment index, so that the ventilation equipment can reduce the adjustment frequency during the adjustment process, thereby minimizing the energy loss in the overall adjustment process.

[0111] The ventilation frequency data is obtained by recording the start-up frequency of the ventilation equipment, and the air pollution index is read for the set stop level to obtain the corresponding air pollution index threshold. The difference between the air pollution index of the stop level in the initial state and the air pollution index of the start level is calculated to obtain the buffer data. The corresponding indoor air pollution rate is calculated based on the ventilation frequency data and the buffer data. The indoor air pollution rate and the air pollution index of the stop level are calculated for a duration to determine the time required for the air pollution index of the stop level to go from the minimum value to the maximum value, that is, the additional duration data. The ventilation cycle is calculated based on the additional duration data to further determine the minimum ventilation frequency data of the ventilation equipment, calculate the energy required for the ventilation equipment in the initial state and the energy required under the minimum ventilation frequency data, and compare the energy under the two different states to screen out the air pollution index of the stop level corresponding to the minimum energy demand.

[0112] For example, it takes 10 minutes to ventilate from the start level to the stop level, and the number of ventilations required per day is 10 times, with a total energy consumption of 10×1×10=100. After the additional time consumption is adjusted, the time required for one ventilation treatment is 11 minutes, and the number of ventilations required per day is reduced to 9 times, then the corresponding total energy consumption is 11×1×9=99, 99 is less than 100, so it is judged that the energy required for the adjustment with additional time consumption is smaller. Therefore, when making the adjustment, the air pollution index corresponding to the stop level is adjusted to the air pollution index corresponding to the additional time consumption to reduce the energy loss of the ventilation treatment.

[0113] refer to Figure 5 , the construction equipment management method based on artificial intelligence also includes the following steps:

[0114] S21, matching the ventilation rate of the ventilation equipment according to the indoor air pollution rate to obtain an operating power that matches the ventilation rate, that is, a constant output power;

[0115] S22, obtaining the total operating time of the ventilation equipment, and calculating the energy demand of the constant output power according to the operating time to obtain constant energy demand data;

[0116] S23, comparing the constant energy demand data with the initial energy demand data and the adjusted energy demand data to screen out the minimum energy demand, and taking the working mode corresponding to the minimum energy demand as the final working mode.

[0117] S24, if the selected working mode is constant power output, data collection is performed on the indoor environment during operation to obtain environmental monitoring data under a constant state, i.e., constant monitoring data;

[0118] S25, if the constant monitoring data shows that the air quality is getting better and is gradually decreasing, the operating power is further reduced;

[0119] S26, when the operating power reaches the minimum and / or the air quality enters the next level, the operation of the ventilation device is stopped, and the ventilation device is started until the air quality reaches the start level.

[0120] In this embodiment, when the indoor air quality is adjusted and the ventilation process is started, the lowest ventilation power consumption during the ventilation process can also be determined by selecting a ventilation mode of the ventilation equipment.

[0121] Determining the operating power of the ventilation equipment corresponding to the pollution rate according to the indoor air pollution rate can make the ventilation effect corresponding to the operating power consistent with the pollution rate, so that the indoor environmental quality remains stable and consistent, and obtain the length of time that the indoor environment needs to maintain the environmental quality, that is, the total operating time that the ventilation equipment needs to ventilate, and determine the energy demand under the corresponding constant output mode through the total operating time and the corresponding constant output power, and then compare the constant energy demand data, the initial energy demand data and the adjusted energy demand data to screen out the minimum energy demand, and then read the corresponding working mode according to the minimum energy demand, and determine the working mode as the final working mode to reduce the energy consumption of the ventilation equipment when adjusting the indoor environmental quality.

[0122] When the selected working mode is constant power output, data is collected for the indoor environment in constant mode to obtain environmental monitoring data in constant mode. Since the constant output power of the constant mode is compatible with the indoor air pollution rate, when the monitored environmental quality improves and gradually decreases, it indicates that the indoor air pollution rate has decreased. Then the constant output power of the constant mode is synchronously reduced until the monitored environmental monitoring data reaches the next environmental quality level or the operating power reaches the minimum, and the operation of the ventilation equipment is stopped. This reduces the unnecessary energy waste caused by the ventilation equipment continuing to work while the indoor environmental quality improves due to some reason.

[0123] Based on the description of the above-mentioned embodiment of the construction equipment management method based on artificial intelligence, the embodiment of the present invention further discloses a construction equipment management system based on artificial intelligence:

[0124] like Figure 6 As shown, an artificial intelligence-based building equipment management system includes: an indoor environment monitoring module 1, a ventilation processing module 2 and a data analysis module 3.

[0125] Indoor environment monitoring module 1, which is set in each major area of ​​the room, is used to monitor the air quality of the major areas of the room and output the corresponding environmental monitoring data;

[0126] The ventilation processing module 2 includes a ventilation opening and closing judgment component 21 and a power output control unit 22; the ventilation opening and closing judgment component 21 includes an environment level analysis unit 211 and an opening and closing judgment unit 212, the environment level analysis unit 211 has a built-in environment quality level, and the environment level analysis unit 211 is connected to the indoor environment monitoring module 1 by signal, and is used to receive and match the environment monitoring data to determine the current environment level, and output the environment level data;

[0127] The opening and closing judgment unit 212 is used to receive the user's demand for indoor air quality, to input the required environmental quality level when ventilation is started and the environmental quality level when ventilation is closed, and to output the start level and the stop level; the opening and closing judgment unit 212 is connected to the environmental level analysis unit 211 by signal, to receive environmental level data, and to compare the environmental level data with the start level and the stop level, and to output a corresponding control signal according to the comparison result, and the control signal includes a start signal and a stop signal;

[0128] The power output control unit 22 has a built-in power regulation curve. The power output control unit 22 is signal-connected to the opening and closing judgment unit 212 for receiving a control signal and performing opening and closing control on the ventilation equipment according to the control signal, and controlling the output power of the ventilation equipment according to the power regulation curve.

[0129] The data analysis module 3 includes an air quality tracking unit 31 and a data analysis unit 32; the air quality tracking unit 31 is connected to the indoor environment monitoring module 1 by signal, and is used to receive and record the environmental monitoring data in real time, and analyze the ventilation time and air quality of the environmental monitoring data to obtain an air change curve diagram of the corresponding ventilation time and air quality relationship;

[0130] The data analysis unit 32 is signal-connected to the air quality tracking unit 31, and is used to receive and analyze the air change curve to determine the time point when the air quality improves slowly and the corresponding air pollution index, and output the analysis time node; it is signal-connected to the power output control unit 22, and is used to receive the power adjustment curve, read the power of the power adjustment curve according to the analysis time node, and reduce the read power to obtain an operating power with less impact on the air change curve, and match the operating power with the air pollution index to obtain corresponding power adjustment data, and output it to the power output control unit 22.

[0131] Compared with the existing artificial intelligence-based building equipment management system and method, the present invention reduces energy consumption.

[0132] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction equipment management method based on artificial intelligence, characterized in that: include: Monitor the indoor environment and output environmental monitoring data; Based on the preset activation level, the environmental monitoring data is analyzed to determine whether ventilation is required; If it is determined that ventilation is required, the ventilation equipment is controlled according to the preset initial power adjustment curve to ventilate the indoor air, and the indoor environment is continuously collected; When it is detected that the indoor air quality reaches the stop level, the ventilation process is stopped, and the continuously collected indoor environment data is output to obtain the corresponding indoor ventilation data; Based on the indoor ventilation data, the relationship between air quality and ventilation time is plotted to obtain an air transformation curve; Analyze the air conversion curve to obtain the impact of the corresponding current power on the indoor air quality, and adjust and update the initial power adjustment curve according to the air conversion curve, and act on the next ventilation process; According to the power regulation curve and the corresponding operation time, the energy demand of the corresponding power regulation curve during the working process is calculated to obtain energy demand data; The energy demand data is screened to determine the minimum energy demand data and the corresponding power regulation curve, and the power regulation curve is applied to subsequent ventilation processing.

2. The method for managing construction equipment based on artificial intelligence according to claim 1, characterized in that: The step of analyzing the environmental monitoring data based on the preset start-up level to determine whether ventilation treatment is required specifically includes: Compare the environmental monitoring data with the preset environmental quality level to determine the current environmental quality level and output the current environmental level; The starting and ending values ​​of the air quality when ventilation is required for the indoor environment, so as to obtain the corresponding start level and stop level; Compare the current environmental level with the start-up level. If the current environmental level is lower than the start-up level, ventilation is determined to be required. The matched environmental levels are analyzed to select the initial power of the ventilation equipment when the ventilation equipment is started according to different environmental levels.

3. The method for managing construction equipment based on artificial intelligence according to claim 2, characterized in that: The environmental quality level is determined by different pollution indexes according to the degree of air pollution in the environment, and the pollution index is divided into different levels of environmental quality levels; the environmental quality level includes five levels: excellent, good, moderate, polluted, and severely polluted; the higher the environmental quality level, the lower the corresponding pollution index; The start-up level is a start-up standard for starting ventilation equipment when the indoor air quality reaches a certain pollution level according to actual needs of users; The stop level is the user's requirement for indoor air quality according to actual needs. By selecting the indoor environment quality level, a judgment standard is provided when judging the indoor air quality. When it is detected that the air quality of the indoor environment reaches the set environmental quality level, the ventilation process of the indoor air is stopped.

4. The method for managing construction equipment based on artificial intelligence according to claim 3, characterized in that: The steps of analyzing the air conversion curve diagram to obtain the influence of the corresponding current power on the indoor air quality, adjusting and updating the preset initial power adjustment curve according to the air conversion curve diagram, and acting on the next ventilation process specifically include: Analyze the air conversion curve to determine the impact of the same equipment power on the indoor environment; When the air quality improvement rate of the indoor environment slows down under the same power, the air pollution index corresponding to the slowdown in air quality improvement is recorded to obtain the speed change point data; The operating power of the equipment is adjusted based on the speed change point data to reduce the operating power of the equipment, and the air quality of the indoor environment is collected and tracked to obtain an adjusted air conversion curve, that is, a new air conversion curve diagram; Compare the air change curve with the new air change curve to determine the impact of the reduced equipment operating power on the air quality of the indoor environment. If the impact is small, re-analyze the new air change curve to determine whether the rate of improvement of the indoor air quality has slowed down. If it exists, the air pollution index corresponding to the air quality improvement change is recorded, and the corresponding equipment operating power is adjusted, and the air quality of the indoor environment is collected and tracked, and the adjusted air transformation curve is output; repeat the above steps until different equipment operating powers corresponding to different air qualities are obtained, and the optimal power adjustment data is output to adjust the output of the ventilation equipment in real time.

5. The method for managing construction equipment based on artificial intelligence according to claim 4, characterized in that: Also includes: Determine the specific air pollution index in the same environmental quality level adjusted: Record the start-up frequency of ventilation treatment to obtain ventilation frequency data; The air pollution index of the environmental quality level corresponding to the stop level is read to determine the air pollution index threshold of the stop level; Calculating the difference between the air pollution index of the stop level and the air pollution index of the start level in the initial state to obtain buffer data; the initial state is that when the indoor air quality reaches the initial value of the stop level, the ventilation process is immediately terminated; The indoor air pollution rate is calculated based on the ventilation frequency data and the buffer data, and the duration of the air pollution index threshold of the stop level is calculated based on the indoor air pollution rate to obtain the additional duration data; According to the additional duration data, the ventilation cycle is judged, and the minimum ventilation frequency data is determined according to the ventilation cycle; Calculate the ventilation frequency data and operation time under the initial state to obtain the initial energy demand data; Calculate the minimum ventilation frequency data and the corresponding operating time to obtain the adjusted energy demand data; The initial energy demand data and the adjusted energy demand data are compared to screen out the minimum energy demand, and the optimal air pollution index after ventilation treatment is determined according to the minimum energy demand.

6. The method for managing construction equipment based on artificial intelligence according to claim 5, characterized in that: Also includes: According to the indoor air pollution rate, the ventilation rate of the ventilation equipment is matched to obtain the operating power that matches the ventilation rate, that is, the constant output power; Obtain the total operating time of the ventilation equipment, and calculate the energy demand for the constant output power according to the operating time to obtain the constant energy demand data; The constant energy demand data is compared with the initial energy demand data and the adjusted energy demand data to screen out the minimum energy demand, and the working mode corresponding to the minimum energy demand is used as the final working mode.

7. The method for managing construction equipment based on artificial intelligence according to claim 6, characterized in that: Also includes: If the selected working mode is constant power output, data of the indoor environment is collected during operation to obtain environmental monitoring data under a constant state, i.e., constant monitoring data; If the constant monitoring data shows that the air quality is getting better and is gradually decreasing, the operating power will be further reduced; When the operating power reaches the minimum and / or the air quality enters the next level, the ventilation device is stopped and the ventilation device is started when the air quality reaches the start level.

8. A construction equipment management system based on artificial intelligence, applied to the method described in any one of claims 1 to 7, characterized in that: include: An indoor environment monitoring module (1) is arranged in each major area of ​​the room, and is used to monitor the air quality of the major areas of the room and output corresponding environmental monitoring data; A ventilation processing module (2) has a built-in environment quality level and a power adjustment curve. The ventilation processing module (2) is connected to the indoor environment monitoring module (1) by signals and is used to receive the environment monitoring data, match the environment monitoring data with the environment quality level to obtain a corresponding environment level, and compare the current environment level with the start level and the stop level. If the start level is reached, the ventilation device is started according to the power adjustment curve, and if the stop level is reached, the ventilation device is stopped. The data analysis module (3) is configured to be signal-connected to the ventilation processing module (2) and the indoor environment monitoring module (1), and is used to receive the environmental monitoring data and the power adjustment curve, and to perform time and air quality analysis on the environmental monitoring data to obtain the ventilation effect under the same ventilation power, and to adjust the power adjustment curve according to the ventilation effect to obtain optimal power adjustment data, and to transmit the optimal power adjustment data to the ventilation processing module (2) to obtain the corresponding optimal power adjustment curve.

9. The artificial intelligence-based construction equipment management system according to claim 8, characterized in that: The ventilation processing module (2) comprises a ventilation opening and closing judgment component (21) and a power output control unit (22); The ventilation opening and closing judgment component (21) comprises an environment level analysis unit (211) and an opening and closing judgment unit (212); the environment level analysis unit (211) has the environment quality level built in; the environment level analysis unit (211) is connected to the indoor environment monitoring module (1) by signal, and is used to receive the environment monitoring data and match the environment monitoring data to determine the current environment level, and output the environment level data; The on / off judgment unit (212) is used to receive the user's demand for indoor air quality, to input the required environmental quality level when ventilation is started and the environmental quality level when ventilation is closed, and to output the start level and the stop level; the on / off judgment unit (212) is connected to the environmental level analysis unit (211) by signal, to receive the environmental level data, to compare the environmental level data with the start level and the stop level, and to output a corresponding control signal according to the comparison result, wherein the control signal includes a start signal and a stop signal; The power output control unit (22) has the power regulation curve built in. The power output control unit (22) is signal-connected to the opening and closing judgment unit (212) for receiving the control signal and performing opening and closing control on the ventilation device according to the control signal, and at the same time controlling the output power of the ventilation device according to the power regulation curve.

10. The artificial intelligence-based construction equipment management system according to claim 9, characterized in that: The data analysis module (3) comprises an air quality tracking unit (31) and a data analysis unit (32); The air quality tracking unit (31) is connected to the indoor environment monitoring module (1) by signal, and is used to receive and record the environment monitoring data in real time, and to analyze the ventilation time and air quality of the environment monitoring data to obtain an air change curve diagram showing the relationship between the ventilation time and the air quality; The data analysis unit (32) is connected to the air quality tracking unit (31) by signal, and is used to receive and analyze the air change curve to determine the time point when the air quality improves slowly and the corresponding air pollution index, and output the analysis time node; and is connected to the power output control unit (22) by signal, and is used to receive the power adjustment curve, read the power of the power adjustment curve according to the analysis time node, and reduce the read power to obtain an operating power with less impact on the air change curve, and match the operating power with the air pollution index to obtain corresponding power adjustment data, and output it to the power output control unit (22).