Tunnel boring machine tunneling parameter processing method based on change point detection

Through the method based on change point detection, the problem of invalid data identification in the tunnel boring machine excavation parameters is solved, effective data screening and cleaning is achieved, the accuracy of the data is improved, and it provides a basis for the analysis of tunnel excavation parameters under different geological conditions. , has high engineering application value.

CN118760976AInactive Publication Date: 2024-10-11STATE KEY LAB OF SHIELD & TUNNELING TECH +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410769162.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the tunnel excavation process, excavation parameters are affected by a variety of factors, resulting in invalid data in the collected data, which is difficult to correctly identify and filter, especially during the startup and shutdown stages, affecting the accuracy and validity of the data.

Method used

Using a method based on change point detection, through threshold judgment and data segmentation cleaning, invalid data segments are identified and deleted, and complete data segments are reassembled to ensure data accuracy. Specific steps include data screening, change point detection and data segment cleaning, using extreme low points and slope differences to determine invalid data segments.

Benefits of technology

Effectively screening and cleaning data improves the accuracy of tunneling parameters, provides a basis for analyzing changes in tunnel boring machine parameters under different geological conditions, and has high engineering application value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760976A_ABST
    Figure CN118760976A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel boring machine tunneling parameter processing method based on change point detection. The method comprises the following steps: firstly, screening abnormal tunneling state data in collected tunneling parameters through a set threshold value; effective data and invalid data are segmented through variable point detection and data segmentation and cleaning methods, invalid data segments are deleted, and new effective data segments are recombined. According to the method, statistical excavation of effective tunneling parameters by a big data technology is facilitated, a basis is provided for research on analysis of tunneling parameter changes of different types of tunnel boring machines under different geological conditions, and the method has high engineering application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel boring machine construction, and in particular to a tunnel boring machine excavation parameter processing method based on change point detection. Background Art

[0002] Tunnel boring machines are widely used in tunnel construction, and the selection of tunneling parameters is particularly important. However, tunneling parameters are affected by factors such as the driver's operation, the machine itself, and geological conditions during the tunneling process. Therefore, the data collected by PLC may generate some invalid data. How to correctly identify and filter out these invalid data, conduct statistical mining of effective tunneling parameters through big data technology, and analyze the changes in tunneling parameters of different types of tunnel boring machines under different geological conditions is one of the problems that need to be solved urgently.

[0003] Relying on the original data of the actual project, the variation law of the tunneling parameters is observed and summarized, and the tunneling parameters that are not within the set threshold range and the tunneling parameters in the start-stop stage are classified as invalid data. The tunneling parameters that are not within the normal threshold range are screened out. The data characteristics of this type of data are obvious and easy to process. When the tunnel boring machine is in the process of starting and stopping, the tunnel boring machine is in an incomplete working state, and it is difficult to identify and recognize the data in this state in a large amount of data. In order to more accurately screen the tunneling parameters in the process of starting and stopping, a tunnel boring machine tunneling parameter segmentation and cleaning method based on change point detection is designed. Summary of the invention

[0004] The purpose of the present invention is to provide a tunnel boring machine excavation parameter processing method based on change point detection in order to solve the above problems.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A tunnel boring machine excavation parameter processing method based on change point detection is designed, which is characterized by comprising the following steps:

[0007] (1) Data screening

[0008] Perform threshold judgment on the collected raw data of tunnel boring machine excavation parameters, and judge it as invalid data if it is not within the threshold range;

[0009] (2) Change point detection

[0010] Perform change point detection on the data during the start-up and shutdown phases to find out the point where the tunneling parameters begin to change within a certain period of time during the start-up and shutdown phases. First, find the extreme low point of the parameter, and then perform point-by-point detection on the tunneling parameters within a period of time before and after the extreme low point to find the change point, thereby identifying the invalid data segment;

[0011] (3) Data segmentation cleaning

[0012] After data screening and change point detection, the data is divided into valid data segments and invalid data segments. The invalid data segments are deleted and the valid data segments are spliced ​​to re-form a complete new data segment, completing the data segmentation and cleaning tasks.

[0013] In the above technical solution, the problems of a large number of excavation parameters in non-excavation state and artificially changing excavation parameters in the collected data are addressed. First, the threshold range of each excavation parameter in normal excavation state is set according to expert experience, and then the collected data is subjected to threshold judgment. If the data is outside the threshold range, it is judged as invalid data and deleted, completing the data screening task of abnormal excavation state and excavation state. Specifically, in the step (1), the threshold range of each excavation parameter in normal excavation state is first set, and then the threshold range of the collected data is judged. If the data is outside the threshold range, it is judged as invalid data and deleted.

[0014] In order to solve the problem that the fluctuation of tunneling parameters in the start-up and shutdown stages of the tunneling process is difficult to identify, the change point detection method is used. Change point detection is to find the point where the tunneling parameters begin to change within a certain period of time in the start-up and shutdown stages through two-step judgment. The first step is to find the extreme low point of the parameter. By observing and summarizing the laws of the data, the overall mean of each tunneling parameter is multiplied by an extreme value coefficient as the judgment standard of the extreme low point, that is, when the tunneling parameter is not greater than this standard, it is judged to be an extreme low point. The second step is to find the point where the tunneling parameter begins to change. Through the extreme low point found, the tunneling parameters for a certain period of time before and after the extreme low point are detected point by point. When the slope difference on both sides of the point is the largest, it is a change point, and the data segment from the change point to the extreme low point is identified as an invalid data segment.

[0015] Specifically, in step (2), the process of determining the extreme low point is as follows: first, the overall mean of the excavation parameters is calculated based on the data filtered in step (1): Then multiply the overall mean by an extreme value coefficient a, and we get Then the excavation parameters selected in step (1) are compared with X min Compare, not greater than X min The excavation parameter of is judged to be an extremely low point. Wherein, X represents the excavation parameter to be processed.

[0016] Preferably, the extreme value coefficient a=0.25.

[0017] Furthermore, after all the extreme low points are determined, the data range within a period of time t before and after the extreme low point is calculated according to the timestamp, and the excavation parameters within this range are detected point by point. When the difference in slopes on both sides of a certain point is the largest, this point is the changing point, and the data segment from the changing point to the extreme low point is identified as an invalid data segment.

[0018] Preferably, the time t is 6 minutes.

[0019] For invalid data segments in the data, the excavation parameters are divided into valid data segments and invalid data segments according to the recognition results, and the invalid data segments are deleted. At the same time, the valid data segments are re-spliced ​​to form a complete new data, thus completing the data segmentation and cleaning tasks.

[0020] The beneficial effects of the present invention are:

[0021] The present invention adopts a threshold setting method to screen abnormal excavation state data in the collected excavation parameters; segmentation of valid data and invalid data is achieved through change point detection and data segmentation and cleaning methods, invalid data segments are deleted, and new valid data segments are reorganized. This method is helpful for statistical mining of effective excavation parameters by big data technology, provides a basis for the analysis of the changes in excavation parameters of different types of tunnel boring machines under different geological conditions, and has high engineering application value. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a csv file diagram of the collected data in the embodiment;

[0023] Figure 2 is a diagram of the torque variation of the cutter disc before segmentation and cleaning in the embodiment;

[0024] Figure 3 Graph showing the torque variation of the cutter disc after segmentation and cleaning in the embodiment. DETAILED DESCRIPTION

[0025] The specific implementation of the present invention is described below in conjunction with examples, but the following examples are only used to illustrate the present invention in detail and do not limit the scope of the present invention in any way. Unless otherwise specified, the equipment components involved in the following examples are all conventional equipment components.

[0026] Example: Take the cutter head torque of a tunneling parameter in a line as an example. The data comes from the second phase of Xuzhou Rail Transit Line 3, which is an earth pressure shield. The collected data is as follows: Figure 1 The tunnel boring machine excavation parameter processing method based on change point detection in the present invention is used to process the collected cutter head torque data, and the specific steps are as follows:

[0027] (1) Data screening

[0028] Observe and analyze the data collected by the ring, set the normal threshold range of the cutter head torque to [200kN·m, 2500kN·m], judge the values ​​of the cutter head torque in the table one by one, and delete the values ​​that are not in the range as abnormal excavation status.

[0029] (2) Change point detection

[0030] The cutter head torque is represented by T. The average value of the cutter head torque data after the screening in step (1) is calculated. Then calculate the minimum value of the cutter head torque T min , which is the average value multiplied by 0.25, and the calculation formula is as follows:

[0031]

[0032]

[0033] By traversing the data file, all the extremely low values ​​are found, and then the data range of six minutes before and after the extremely low point is calculated according to the timestamp rockey. The data within the six minutes before and after each extremely low point is roughly tested with a step size of 10, and the difference in slopes on both sides of each change point is calculated. The index of the point with the largest slope difference is returned, and K is used to calculate the slope difference. 1 Indicates that, then local fine detection is performed, in K 1 -10, K 1 +10 interval, perform point-by-point detection with a step size of 1, find the index of the point with the largest slope difference on both sides, and use K 2 It means that this point is the change point, and the data segment from the change point to the extreme low point is an invalid data segment.

[0034] (3) Data segmentation and cleaning

[0035] According to the above test results, the cutter disc torque in the data is divided into valid data segments and invalid data segments, the invalid data segments are deleted, and the valid data segments of the deleted data are reorganized. The change of the cutter disc torque before and after processing is shown in the figure.

[0036] The present invention has been described in detail above in conjunction with the embodiments. However, those skilled in the art will appreciate that, without departing from the spirit of the present invention, the specific parameters in the above embodiments may be changed to form a plurality of specific embodiments, which are all within the common variation range of the present invention and will not be described in detail herein.

Claims

1. A tunnel boring machine excavation parameter processing method based on change point detection, characterized in that: The following steps are involved: (1) Data screening Perform threshold judgment on the collected raw data of tunnel boring machine excavation parameters, and judge it as invalid data if it is not within the threshold range; (2) Change point detection Perform change point detection on the data during the start-up and shutdown phases to find out the point where the tunneling parameters begin to change within a certain period of time during the start-up and shutdown phases. First, find the extreme low point of the parameter, and then perform point-by-point detection on the tunneling parameters within a period of time before and after the extreme low point to find the change point, thereby identifying the invalid data segment; (3) Data segmentation cleaning After data screening and change point detection, the data is divided into valid data segments and invalid data segments. The invalid data segments are deleted and the valid data segments are spliced ​​to re-form a complete new data segment, completing the data segmentation and cleaning tasks.

2. The tunnel boring machine excavation parameter processing method based on change point detection according to claim 1 is characterized in that: In the step (1), the threshold range of each excavation parameter under normal excavation state is first set, and then the threshold value judgment is performed on the collected data. If the data is outside the threshold range, it is judged as invalid data and deleted.

3. The tunnel boring machine excavation parameter processing method based on change point detection according to claim 1 is characterized in that: In step (2), the process of determining the extreme low point is as follows: first, the overall mean of the excavation parameters is calculated based on the data filtered in step (1): Then multiply the overall mean by an extreme value coefficient a, and we get Then the excavation parameters selected in step (1) are compared with X min Compare, not greater than X min The excavation parameters were judged to be extremely low.

4. The tunnel boring machine excavation parameter processing method based on change point detection according to claim 3 is characterized in that: The extreme value coefficient a=0.

25.

5. The tunnel boring machine excavation parameter processing method based on change point detection according to claim 3 is characterized in that: After all the extremely low points are determined, the data range within a period of time t before and after the extremely low point is calculated according to the timestamp, and the excavation parameters within this range are detected point by point. When the slope difference on both sides of a certain point is the largest, this point is the changing point, and the data segment from the changing point to the extremely low point is identified as an invalid data segment.

6. The tunnel boring machine excavation parameter processing method based on change point detection according to claim 5 is characterized in that: The time t is 6 minutes.

Citation Information

Patent Citations

  • Control valve fault detection method based on multi-scale analysis

    CN108896287A

  • A method and apparatus for identifying transmission control protocol states

    CN109167734A

  • Full-face tunnel boring machine construction parameter processing method

    CN110888868A

  • Association rule mining method for multivariate time series monitoring data

    CN111046084A

  • Motor stalling analysis method and system

    CN116383752A