Research and development team operation quality evaluation system, method, equipment and medium
Through the R&D team operation quality assessment system, the data collection and cost structure ratio modules are used to evaluate the operation quality of the R&D team, which solves the problem of the inability of existing technology to effectively evaluate R&D cost quality and improves assessment accuracy and R&D efficiency.
Patent Information
- Application Number
- CN202410685763.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology cannot effectively evaluate the operating cost quality of the R&D team, resulting in poor R&D efficiency and economic benefits.
Provides an R&D team operation quality assessment system, including a data collection module, an R&D cost structure ratio module, and an operation quality assessment module. By collecting and analyzing working hours data, it calculates the R&D cost structure ratio and evaluates the operation quality of the R&D team.
It improves the accuracy of the assessment of the R&D team's operating cost quality, makes the assessment process more objective and comprehensive, provides targeted improvement suggestions, and improves R&D efficiency and economic benefits.
Smart Images

Figure CN118780657A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of software evaluation management, and in particular to a system, method, device and medium for evaluating the management quality of a research and development team. Background Art
[0002] R&D team management quality assessment is a popular tool for Internet companies. It evaluates the behaviors that occur during the company's product development and iteration process. In the R&D process of the R&D team, R&D costs usually include labor costs, equipment costs, and other costs. In the composition of R&D costs, personnel costs are usually the largest expense.
[0003] However, due to the more complicated number of personnel and personnel structure, the human cost allocation under each R&D cost structure of the company is unreasonable, making it difficult to fully evaluate the quality of the operating costs of the R&D team, and thus unable to make targeted improvement measures in a timely manner, affecting R&D efficiency. Therefore, how to improve the evaluation accuracy of the operating cost quality of the R&D team to improve the R&D efficiency and economic benefits of the R&D team has become a technical problem that needs to be solved urgently by those skilled in the art. Summary of the invention
[0004] Based on this, it is necessary to provide a research and development team operating quality assessment system, method, equipment and medium to address the above-mentioned technical problems, so as to solve the problem that the existing technology cannot improve the assessment accuracy of the operating cost quality of the research and development team, thereby leading to poor research and development efficiency and economic benefits of the research and development team.
[0005] A first aspect of an embodiment of the present application provides a R&D team management quality assessment system, the R&D team management quality assessment system comprising a data collection module, a R&D cost structure matching module and a management quality assessment module;
[0006] The data collection module is used to collect the working time data of the R&D team during the R&D process;
[0007] The R&D cost structure matching module includes a data analysis submodule and a data calculation submodule. The data analysis submodule is used to analyze the man-hour data and determine the relationship between the R&D project type, R&D matters and the R&D cost structure based on the analyzed man-hour data. The data calculation submodule is used to calculate the R&D cost structure matching according to the relationship between the R&D project type, R&D matters and the R&D cost structure.
[0008] The operating quality assessment module is used to determine the quality assessment result of the operating quality of the R&D team according to the R&D cost structure ratio.
[0009] Optionally, the working time data includes at least one of the following: R&D personnel, R&D group, R&D department, R&D project, R&D project type, R&D matters, R&D cost structure, working time duration and R&D date.
[0010] Optionally, the R&D project type includes at least one of the following: technology R&D, product function development, business management, business affairs, administration & management, production maintenance, and project preparation.
[0011] Optionally, the types of R&D matters include at least one of the following: personal-preliminary research & selection, personal-demand & design, personal-code writing, personal-unit testing, personal-inspection & detection, personal-Bug Fix, personal-integration & compilation, meeting-document review, meeting-code review, meeting-project communication, deployment & release, project management, travel & transportation, business activities, contract work, after-sales training, learning & further study, training & sharing, business management (cost, budget, etc.), administrative management (regular meetings and material preparation, etc.), administrative expenses (reimbursement, application, procurement, etc.), team building, recruitment, accident handling, operation and maintenance, emergency response, user service, user survey, quality promotion, quality tracking, quality analysis & summary, quality improvement & guidance, target survey, feasibility analysis, cost assessment, risk & value analysis, and others.
[0012] Optionally, the type of the R&D cost structure includes at least one of the following: active quality improvement, passive quality improvement, product development, technical research, document accumulation, administration & management, and others.
[0013] Optionally, the business quality assessment module includes a ratio range submodule, and the ratio range submodule is used to determine whether the R&D cost structure ratio is within a reasonable ratio range.
[0014] Optionally, the ratio range submodule includes at least one of the following: a research and development company, an application product research and development team, a platform product research and development team, and a technology research and development team.
[0015] A second aspect of the embodiments of the present application provides a method for evaluating the management quality of a research and development team, the method comprising:
[0016] Obtaining the time data of the R&D team during the R&D process, and determining the relationship between the R&D project types, R&D matters, and R&D cost structure in the time data;
[0017] Calculate the R&D cost structure ratio based on the relationship between the R&D project type, R&D matters and R&D cost structure;
[0018] Based on the R&D cost structure ratio, the quality assessment result of the R&D team's operating quality is determined.
[0019] In a third aspect, an embodiment of the present invention provides a computer device, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned R&D team management quality assessment method when executing the computer program.
[0020] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned R&D team management quality assessment method are implemented.
[0021] In summary, the present invention provides a research and development team management quality assessment system, method, equipment and medium. The research and development team management quality assessment system can provide research and development cost structure matching for the collection of working hour data in the research and development process by utilizing three modules: data collection module, research and development cost structure matching module and management quality assessment module, so as to achieve accurate and comprehensive assessment of the research and development team management quality, and can intuitively judge the quality of the research and development team's management costs, thereby improving the assessment accuracy of the research and development team's management cost quality, making the evaluation process of the research and development team's management cost quality more objective and comprehensive, and making targeted suggestions for improvement to abnormal teams, thereby improving the research and development efficiency and economic benefits of the research and development team. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0023] Figure 1 This is a schematic diagram of an application environment of a R&D team management quality evaluation system provided by an embodiment of the present invention;
[0024] Figure 2 It is a structural diagram of a R&D team management quality evaluation system provided by an embodiment of the present invention;
[0025] Figure 3 It is a flowchart of a method for evaluating the management quality of a research and development team provided by an embodiment of the present invention;
[0026] Figure 4 It is a structural schematic diagram of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0029] It should also be understood that the term "and / or" used in the present description and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
[0030] As used in the present specification and the appended claims, the term "if" may be interpreted as "when" or "upon" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" may be interpreted as meaning "upon determination" or "in response to determining" or "upon detection of [described condition or event]" or "in response to detecting [described condition or event]", depending on the context.
[0031] In addition, in the description of the present specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0032] References to "one embodiment" or "some embodiments" etc. described in the present specification mean that one or more embodiments of the present invention include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0033] It should be understood that the order of execution of the steps in the following embodiments does not imply a precedence of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0034] In order to illustrate the technical solution of the present invention, specific embodiments are provided below for illustration.
[0035] An embodiment of the present invention provides a R&D team management quality evaluation system, which can be applied in Figure 1 In the application environment, the client communicates with the server. The client includes but is not limited to PDA, desktop computer, laptop computer, ultra-mobile personal computer (UMPC), netbook, personal digital assistant (PDA), smart TV and other devices. The server can be implemented by an independent server or a server cluster composed of multiple servers. The R&D team management quality evaluation system is transmitted to the server through the client, so that the server controls the R&D team management quality evaluation system, thereby achieving the purpose of R&D team management quality evaluation.
[0036] See also Figure 2 , is a schematic diagram of the structure of a R&D team management quality evaluation system provided by an embodiment of the present invention. The R&D team management quality evaluation system can be applied to a server, such as Figure 2 As shown, the R&D team management quality evaluation system includes a data collection module, a R&D cost structure matching module and a management quality evaluation module;
[0037] The data collection module is used to collect the working time data of the R&D team during the R&D process;
[0038] The R&D cost structure matching module includes a data analysis submodule and a data calculation submodule. The data analysis submodule is used to analyze the man-hour data and determine the relationship between the R&D project type, R&D matters and the R&D cost structure based on the analyzed man-hour data. The data calculation submodule is used to calculate the R&D cost structure matching according to the relationship between the R&D project type, R&D matters and the R&D cost structure.
[0039] The operating quality assessment module is used to determine the quality assessment result of the operating quality of the R&D team according to the R&D cost structure ratio.
[0040] In this embodiment, firstly, the working time data of the R&D team in the R&D process is collected through the data collection module. Various methods can be used to collect the working time data of the R&D team. For example, using project management software or online collaboration tools to record the start time, end time and working time allocation of each project, the working time situation of each project can be easily tracked and analyzed. It should be noted that the method of collecting the working time data of the R&D team in this application is not limited in any way. By selecting a suitable method to collect and manage working time data according to the actual situation of the R&D team, the team can be helped to better evaluate the operating quality and optimize the cost structure. Then, the current working time data is analyzed through the data analysis submodule in the R&D cost structure matching module to determine the relationship between the R&D project type, R&D matters and R&D cost structure, and then the R&D cost structure matching is calculated according to the relationship between the R&D project type, R&D matters and R&D cost structure through the data calculation submodule in the R&D cost structure matching module. Finally, the operating quality evaluation module is used to compare the actual R&D cost structure matching calculated previously with the pre-defined reasonable range of the R&D cost structure matching. If the actual R&D cost structure ratio is within the reasonable range of the R&D cost structure ratio, it indicates that the R&D team has performed well in terms of operating quality. If the actual R&D cost structure ratio is not within the reasonable range of the R&D cost structure ratio, it indicates that the R&D team has performed poorly in terms of operating quality. It is necessary to make targeted suggestions for improvement to the abnormal team and further adjust the R&D strategy and management measures. This application can derive a quality assessment result of the operating quality of the R&D team based on the comparison results of the actual R&D cost structure ratio and the reasonable range of the R&D cost structure ratio, thereby ensuring the accuracy, timeliness and security of the assessment results. Through such quality assessment results, the company can promptly discover the strengths and weaknesses of the R&D team and further improve management methods so as to make targeted suggestions for improvement to the abnormal team and improve the efficiency of operating quality assessment and the overall performance level.
[0041] Specifically, the relationship between the R&D project types, R&D matters and R&D cost structure in this application is shown in Table 1:
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
[0048] In this embodiment, to calculate the ratio of the R&D cost structure, it is first necessary to clarify the relationship between various R&D project types, R&D matters and R&D cost structures. Then, based on these relationships, the overall R&D costs can be allocated to different project types and R&D matters to achieve effective resource allocation and reasonable cost allocation. For the calculation formula for the structural ratio of R&D costs, there may be multiple ways in actual application, depending on the company's definition and calculation method of cost structure and working hours. A common calculation method is to use the proportion of various costs in the R&D cost structure (such as active quality improvement, passive quality improvement, product development, technology research, document accumulation, administration & management, others, etc.) to the total cost as a benchmark, and then further calculate the cost structure ratio according to the relationship between various costs and R&D working hours. The following is the calculation method:
[0049] R&D cost structure ratio = R&D cost structure * working hours / total R&D working hours;
[0050] By calculating the R&D cost structure ratio, we can clearly understand the contribution ratio of various costs in the total R&D working hours, so as to accurately and comprehensively evaluate the operating quality of the R&D team. We can intuitively judge the quality of the operating costs of the R&D team, thereby improving the evaluation accuracy of the operating cost quality of the R&D team, making the evaluation process of the operating cost quality of the R&D team more objective and comprehensive, and making targeted suggestions for improvement to abnormal teams, thereby improving the R&D efficiency and economic benefits of the R&D team.
[0051] As an optional embodiment, the working time data includes at least one of the following: R&D personnel, R&D group, R&D department, R&D project, R&D project type, R&D matters, R&D cost structure, working time duration and R&D date.
[0052] In this embodiment, R&D personnel refers to employees or teams engaged in R&D work, such as Zhang San; R&D group refers to a group of R&D personnel, usually responsible for specific tasks or projects, such as Development Group 1; R&D department refers to a department or unit responsible for organizing and managing R&D activities, such as Development Department; R&D project refers to R&D activities carried out to achieve specific goals, such as Project A; R&D project type refers to R&D management carried out for specific functions, such as product function development; R&D matters refer to specific problems or tasks that need to be dealt with or solved in the R&D process, such as Personal-Demand & Design; R&D cost structure refers to the structure of various costs spent in R&D activities, including administrative management, technical research, product development, document accumulation, active quality improvement, passive quality improvement, etc. in R&D activities, such as document accumulation; working hours refer to the length of time employees spend on R&D activities, such as 3 hours; R&D date refers to the date on which the R&D activity occurs or is completed, such as 2023.11.23. For example: In a software development company, suppose there is a R&D department responsible for developing a new mobile application. The R&D department has multiple R&D groups, each responsible for the development of different modules. For example, R&D group A is responsible for user interface design, and R&D group B is responsible for function development. In this project, developer Xiao Ming is a member of R&D group A. He spent 50 working hours to design the user interface of the application. The start date of this R&D project is May 1, 2024, and it is expected to be completed on July 1, 2024.
[0053] In this embodiment, the R&D department needs to constantly deal with various R&D matters, such as solving technical problems, optimizing code structure, etc. By recording working hours and R&D dates, the R&D department can track and manage R&D progress, evaluate cost structure, and solve R&D matters in a timely manner to ensure that the project is completed on time and reaches the expected quality level.
[0054] As an optional embodiment, the R&D project type includes at least one of the following: technology R&D, product function development, business management, business affairs, administration & management, production maintenance, and project preparation.
[0055] In this embodiment, technology research and development mainly revolves around technological innovation and research, aiming to develop new technologies or improve existing technologies; product function development aims to develop new products or add new functions to existing products; business management mainly focuses on improving management efficiency and management processes to achieve efficient operation of the organization; business affairs deal with daily business activities, such as customer service, marketing, etc.; administration & management is mainly to support the administrative functions and management needs of the organization, such as administrative management, human resources, financial management, etc.; production maintenance is mainly maintenance work to maintain the normal operation of production facilities and equipment; project preparation is mainly to prepare for projects to be launched or planned, including project planning, demand analysis, etc. By confirming the type of R&D project, the relationship between the type of R&D project, R&D matters and R&D cost structure can be obtained later, so as to determine the R&D cost structure ratio, so as to achieve accurate and comprehensive evaluation of the operating quality of the R&D team.
[0056] As an optional embodiment, the types of R&D matters include at least one of the following: personal-preliminary research & selection, personal-demand & design, personal-code writing, personal-unit testing, personal-inspection & detection, personal-Bug Fix, personal-integration & compilation, meeting-document review, meeting-code review, meeting-project communication, deployment & release, project management, travel & transportation, business activities, contract work, after-sales training, learning & further study, training & sharing, business management (cost, budget, etc.), administrative management (regular meetings and material preparation, etc.), administrative expenses (reimbursement, application, procurement, etc.), team building, recruitment, accident handling, operation and maintenance, emergency response, user service, user survey, quality promotion, quality tracking, quality analysis & summary, quality improvement & guidance, target survey, feasibility analysis, cost assessment, risk & value analysis, and others.
[0057] In this embodiment, individual-preliminary research & selection means that individuals conduct preliminary research and technical selection to determine the direction of project implementation; individual-requirements & design means that individuals are responsible for requirements analysis and system design; individual-code writing means that individuals independently write code to implement functions; individual-unit testing means that individuals perform unit testing on the written code to ensure code quality; individual-inspection & testing means that individuals inspect and test the functions to ensure that they meet the requirements; individual-bug Fix refers to an individual fixing problems or bugs found in the code; Individual-Integration & Compilation refers to an individual performing code integration and compilation work; Meeting-Document Review refers to the team holding a meeting to review documents; Meeting-Code Review refers to the team holding a meeting to review the code; Meeting-Project Communication refers to project progress and communication between team members; Deployment & Release refers to being responsible for the deployment and release of the application to the production environment; Project Management refers to being responsible for the overall management and coordination of the project; Travel & Transportation refers to the travel and transportation arrangements of relevant personnel; Business Activities refers to participating in business activities inside and outside the company; Contract Work refers to completing the contract work signed with customers; After-sales Training refers to providing after-sales training services to customers; Learning & Further Education refers to continuous learning to improve one's own skills and knowledge; Training & Sharing refers to providing training and knowledge sharing for team members; Operational Management (cost, budget, etc.) refers to being responsible for the cost and budget management of the project; Administrative Management (regular meetings and material preparation, etc.) refers to being responsible for administrative work, such as meeting preparation, etc. ;Administrative expenses (reimbursement, application, procurement, etc.) refers to the reimbursement and application of administrative expenses;Team building refers to organizing team building activities;Recruitment refers to recruiting new employees;Accident handling refers to handling various accidents and problems that occur in the project;Operation and maintenance refers to the daily operation and maintenance of the application;Emergency response refers to the emergency response work of handling emergencies;User service refers to providing product-related service support to users;User research refers to conducting user demand research and feedback collection;Quality advocacy refers to promoting and promoting quality management and standards;Quality tracking refers to tracking the quality status and progress of the project;Quality analysis & summary refers to analyzing and summarizing the quality of the project;Quality improvement & guidance refers to providing quality improvement plans and guidance;Target research refers to investigating the achievement of project goals;Feasibility analysis refers to conducting project feasibility analysis;Cost assessment refers to assessing and controlling project costs;Risk & value analysis refers to analyzing the risks and values in the project;Others refers to other project-related work. For example: In a software development project, a team member needs to do personal-code writing. He is responsible for implementing a new user login function module. The team member first wrote the login function code according to the requirements and design documents, and then performed unit testing to verify whether the function was correctly implemented according to the requirements. After testing, he found some bugs, and he fixed them. Finally, he submitted the code and integrated and compiled it, integrating the login function module into the project.This application confirms the types of R&D matters so that the relationship between R&D project types, R&D matters and R&D cost structure can be obtained later, thereby determining the R&D cost structure ratio to achieve an accurate and comprehensive assessment of the operating quality of the R&D team.
[0058] As an optional embodiment, the type of the R&D cost structure includes at least one of the following: active quality improvement, passive quality improvement, product development, technical research, document accumulation, administration & management, and others.
[0059] In this embodiment, active quality improvement refers to the team taking the initiative to improve product quality and work efficiency. For example, team members regularly participate in quality management meetings to share experiences and lessons in order to improve the overall level of the team; passive quality improvement refers to the team taking corrective measures to correct errors or improve products when problems are found or challenges are encountered. For example, when customer complaints arise after the product is released, the team needs to respond quickly and solve the problem to meet customer needs and improve product quality; product development refers to the team designing, developing and testing new software products or functions based on market demand and customer feedback. For example, a team is developing a new social media application. They design the interface, write code and perform functional testing to ensure that the product meets user expectations; technical research refers to team members researching new technology trends and solutions to apply to product development. For example, the team may be researching artificial intelligence technology to integrate intelligent recommendation systems into their products to provide users with a personalized experience; document accumulation refers to the team organizing and archiving various documents and materials generated during the project for project management and knowledge inheritance. For example, the team records project requirements documents, design documents, test reports, etc. so that team members can consult them at any time; administration & management refers to project managers responsible for project planning, organization, coordination and control. For example, project managers develop project plans and monitor progress, manage team resource allocation and resolve project risks to ensure that projects are delivered on time and meet quality standards; other types of work may include work content specific to specific industries or project requirements, such as compliance audits, security verification, etc. These jobs do not fall into the above categories, but are equally important. For example, in a banking software project, the team may need to conduct a security audit to ensure system security. This application confirms the type of R&D cost structure so that the relationship between R&D project types, R&D matters and R&D cost structures can be obtained in the future, thereby determining the R&D cost structure ratio to achieve an accurate and comprehensive assessment of the operating quality of the R&D team.
[0060] As an optional embodiment, the business quality assessment module includes a ratio range submodule, and the ratio range submodule is used to determine whether the R&D cost structure ratio is within a reasonable ratio range.
[0061] In this embodiment, the business quality assessment module includes a matching range sub-module, and the matching range sub-module is mainly used to determine whether the R&D cost structure matching is within a reasonable range. If all items of the R&D cost structure are within a reasonable range, it means that the business quality is normal. If all items of the R&D cost structure are not within a reasonable range, it means that the business quality is abnormal. The reasons for the R&D cost structure that exceeds the reasonable range are analyzed accordingly. This application can help companies better manage and control R&D costs, improve resource utilization efficiency, support management decisions, and promote R&D performance improvement by determining whether the R&D cost structure matching is within a reasonable range.
[0062] As an optional embodiment, the ratio range submodule includes at least one of the following: a research and development company, an application product research and development team, a platform product research and development team, and a technology research and development team.
[0063] In this embodiment, the R&D company is usually a third-party organization or company specializing in software development, providing R&D services to customers. These companies have professional R&D teams and technical resources and can undertake various software development projects. In the project, the R&D company may undertake the R&D work of the entire project, such as design, development, testing and deployment. For example: a financial technology company needs to develop a new mobile payment application, and they entrust a R&D company to carry out project development. This R&D company is responsible for the entire development process from demand analysis to application release, and team members include project managers, designers, developers and testers; the application product R&D team is usually a team dedicated to developing specific application products or projects. They may be teams within the company or teams outsourced to R&D companies. These teams focus on the functions and user experience of the application products themselves, and develop products that meet market demand. For example: an e-commerce company has set up a team dedicated to developing mobile shopping applications. This team is responsible for designing and developing various functions of mobile applications to ensure that users can easily browse products, place orders and purchase, etc.; the platform product R&D team is a team responsible for developing and maintaining the core platform or framework of the company's products or services. They focus on building reusable code, services and infrastructure to support the development of various products and projects. For example, the platform product development team of a cloud computing service provider is responsible for developing and maintaining the core functions and services of the cloud computing platform. They develop a reliable and stable platform for use by various business lines within the company; the technical research and development team is usually a team specializing in technological innovation and cutting-edge research, dedicated to exploring new technological trends, solving technical problems, and applying innovative technologies to product development. These teams play a key role in the company's technological development and innovation. For example, an artificial intelligence startup has set up a technical research and development team that specializes in the application of deep learning algorithms in the field of speech recognition. This team constantly explores and tries new algorithms and technologies to improve the intelligence level of products.
[0064] Specifically, the ratio range submodule in this application is shown in Table 2:
[0065]
[0066]
[0067]
[0068]
[0069] In this embodiment, the reasonable range of the R&D cost structure ratio in the ratio range submodule is determined by the R&D company, the application product R&D team, the platform product R&D team and the technical R&D team, and then whether the R&D cost structure ratio is within the reasonable range of the R&D cost structure ratio is determined. If all items of the R&D cost structure are within the reasonable range, it means that the business quality is normal. If all items of the R&D cost structure are not within the reasonable range, it means that the business quality is abnormal. The R&D cost structure that exceeds the reasonable range is analyzed accordingly. For example, the passive quality improvement in the overall R&D cost structure accounts for 18.71%, the active quality improvement accounts for 11.20%, the product development accounts for 36.75%, the technical research accounts for 5.70%, the document accumulation accounts for 3.89%, the administration & management accounts for 10.37%, and the others account for 13.38%. The analysis and measures for the above data are as follows: the passive quality improvement accounts for 18.71%, which is larger than the reasonable range of 5% to 10%, indicating that more time is spent on BUG FIX, testing, customer complaints / accident handling, etc. Quality should be put in front to improve the design quality and code quality to avoid BUGs from entering the verification stage. The proportion of technical research is 5.70%, which is slightly different from the reasonable range of 8% to 12%, indicating that R&D is mostly to meet product needs, and the cost of in-depth technology and research investment is not enough. Technological innovation and development should be continuously carried out to obtain long-term market competitiveness. This application makes the R&D cost structure ratio within a reasonable range according to the above improvement measures, so that the R&D team's operating quality continues to be excellent, and the team's R&D efficiency and economic efficiency are improved.
[0070] In summary, the present invention provides a research and development team management quality assessment system, method, equipment and medium. The research and development team management quality assessment system can provide research and development cost structure matching for the collection of working hour data in the research and development process by utilizing three modules: data collection module, research and development cost structure matching module and management quality assessment module, so as to achieve accurate and comprehensive assessment of the research and development team management quality, and can intuitively judge the quality of the research and development team's management costs, thereby improving the assessment accuracy of the research and development team's management cost quality, making the evaluation process of the research and development team's management cost quality more objective and comprehensive, and making targeted suggestions for improvement to abnormal teams, thereby improving the research and development efficiency and economic benefits of the research and development team.
[0071] In one embodiment, if Figure 3 As shown, a method for evaluating the management quality of a research and development team is provided, and the method for evaluating the management quality of a research and development team includes the following steps:
[0072] S301: Obtain the working time data of the R&D team during the R&D process, and determine the relationship between the R&D project type, R&D matters and R&D cost structure in the working time data.
[0073] In the embodiment of the present application, the R&D team members are asked to record working hours in their daily work and integrate the data into the time tracking software, which can accurately record the working hours of each R&D project and task, and then use data statistics tools to analyze and organize the working hours data to find out the relationship between different R&D project types, R&D matters and R&D cost structures. By obtaining the working hours data of the R&D team during the R&D process, the relationship between different R&D project types, R&D matters and R&D cost structures can be better understood, so as to better manage and optimize working hours and costs.
[0074] S302: Calculate the R&D cost structure ratio according to the relationship between the R&D project type, R&D matters and R&D cost structure.
[0075] In the embodiment of the present application, the type of R&D project is first determined, and the R&D project is classified according to field or technology, such as software development, hardware development, process improvement, etc. Then, for each R&D project, its specific R&D matters are analyzed, including design, development, testing, deployment, etc., and then according to the actual situation, the R&D cost is decomposed into active quality improvement, passive quality improvement, product development, technical research, document accumulation, administration & management or other expenses, etc., to determine the proportion of each cost item in the entire R&D process. For example, suppose a company has carried out an R&D project: for a software development project, according to data analysis, active quality improvement accounts for 60% of the total cost, passive quality improvement accounts for 50% of the total cost, product development accounts for 40% of the total cost, technical research accounts for 30% of the total cost, document accumulation accounts for 20% of the total cost, administration & management accounts for 10% of the total cost, and other expenses account for 5% of the total cost. According to the above data, the R&D cost structure ratio of the software development project can be calculated, so that the cost structure differences between different R&D project types and matters can be better understood, and cost control and optimization can be carried out in a targeted manner to improve R&D efficiency and economic benefits.
[0076] S303: Determine a quality assessment result of the R&D team's operating quality based on the R&D cost structure ratio.
[0077] In the embodiment of the present application, by pre-defining the reasonable range of the R&D cost structure ratio according to the R&D company, the application product R&D team, the platform product R&D team and the technical R&D team, the reasonable range of the R&D cost structure ratio should be in line with the characteristics of the R&D team's operation to ensure the effective operation and cost control of the R&D team. Compare the actual R&D cost structure ratio calculated previously with the reasonable range of the R&D cost structure ratio. If the actual R&D cost structure ratio is within the reasonable range of the R&D cost structure ratio, it indicates that the R&D team has performed well in terms of business quality. If the actual R&D cost structure ratio is not within the reasonable range of the R&D cost structure ratio, it indicates that the R&D team has performed poorly in terms of business quality, and it is necessary to make targeted improvement suggestions for the abnormal team and further adjust the R&D strategy and management measures. This application can obtain the quality assessment results of the R&D team's business quality based on the comparison results of the actual R&D cost structure ratio and the reasonable range of the R&D cost structure ratio. Through such quality assessment results, the company can promptly discover the advantages and disadvantages of the R&D team, further improve the management method, and improve the efficiency of business quality assessment and the overall performance level.
[0078] The R&D team management quality assessment method provided by the embodiment of the present invention obtains the working time data of the R&D team during the R&D process, and determines the relationship between the R&D project type, R&D matters and R&D cost structure in the working time data, calculates the R&D cost structure ratio according to the relationship between the R&D project type, R&D matters and R&D cost structure, and then determines the quality assessment result of the R&D team management quality according to the R&D cost structure ratio. This application provides R&D cost structure ratio for the collection of working time data in R&D activities to achieve accurate and comprehensive assessment of the R&D team management quality, and can intuitively judge the quality of the R&D team management cost, thereby improving the assessment accuracy of the R&D team management cost quality, making the R&D team management cost quality assessment process more objective and comprehensive, and making targeted suggestions for improvement to abnormal teams, thereby improving the R&D efficiency and economic benefits of the R&D team.
[0079] Figure 4 Schematic diagram of the structure of a computer device provided by an embodiment of the present invention. Figure 4As shown, the computer device of this embodiment includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps in any of the above-mentioned embodiments of the R&D team management quality assessment system are implemented.
[0080] The computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that Figure 4 This is merely an example of a computer device and does not constitute a limitation on the computer device. The computer device may include more or fewer components than those shown in the figure, or a combination of certain components, or different components. For example, it may also include a network interface, a display screen, and an input device.
[0081] In one embodiment, a computer-readable storage medium is provided. When the instructions in the computer-readable storage medium are executed by a processor in a computer device, the computer device can execute the steps of any embodiment of the R&D team management quality evaluation system disclosed in the present invention, which will not be repeated here. The computer-readable storage medium can be non-volatile or volatile.
[0082] The processor may be a CPU, or other general-purpose processors, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0083] The memory includes a readable storage medium, an internal memory, etc., wherein the internal memory may be the memory of a computer device, and the internal memory provides an environment for the operation of an operating system and computer-readable instructions in the readable storage medium. The readable storage medium may be a hard disk of a computer device, and in other embodiments may also be an external storage device of a computer device, for example, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on a computer device. Further, the memory may also include both an internal storage unit of a computer device and an external storage device. The memory is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as program codes of computer programs, etc. The memory may also be used to temporarily store data that has been output or is to be output.
[0084] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0085] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device is divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention. The specific working process of the units and modules in the above-mentioned device can refer to the corresponding process in the above-mentioned method embodiment, which will not be repeated here. If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.
[0086] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0087] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A R&D team management quality assessment system, characterized in that: The R&D team management quality assessment system includes a data collection module, a R&D cost structure matching module and a management quality assessment module; The data collection module is used to collect the working time data of the R&D team during the R&D process; The R&D cost structure matching module includes a data analysis submodule and a data calculation submodule. The data analysis submodule is used to analyze the man-hour data and determine the relationship between the R&D project type, R&D matters and the R&D cost structure based on the analyzed man-hour data. The data calculation submodule is used to calculate the R&D cost structure matching according to the relationship between the R&D project type, R&D matters and the R&D cost structure. The operating quality assessment module is used to determine the quality assessment result of the operating quality of the R&D team according to the R&D cost structure ratio.
2. The R&D team management quality evaluation system according to claim 1, characterized in that: The working time data includes at least one of the following: R&D personnel, R&D group, R&D department, R&D project, R&D project type, R&D matters, R&D cost structure, working time duration and R&D date.
3. The R&D team management quality evaluation system according to claim 1, characterized in that: The R&D project types include at least one of the following: technology R&D, product function development, business management, business affairs, administration & management, production maintenance, and project preparation.
4. The R&D team management quality evaluation system according to claim 1, characterized in that: The types of R&D matters include at least one of the following: personal-preliminary research & selection, personal-demand & design, personal-code writing, personal-unit testing, personal-inspection & detection, personal-Bug Fix, personal-integration & compilation, meeting-document review, meeting-code review, meeting-project communication, deployment & release, project management, travel & transportation, business activities, contract work, after-sales training, learning & further study, training & sharing, business management (cost, budget, etc.), administrative management (regular meetings and material preparation, etc.), administrative expenses (reimbursement, application, procurement, etc.), team building, recruitment, accident handling, operation and maintenance, emergency response, user service, user survey, quality promotion, quality tracking, quality analysis & summary, quality improvement & guidance, target survey, feasibility analysis, cost assessment, risk & value analysis, and others.
5. The R&D team management quality evaluation system according to claim 1, characterized in that: The type of the R&D cost structure includes at least one of the following: active quality improvement, passive quality improvement, product development, technology research, document accumulation, administration & management, and others.
6. The R&D team management quality evaluation system according to claim 1, characterized in that: The business quality assessment module includes a ratio range submodule, and the ratio range submodule is used to determine whether the R&D cost structure ratio is within a reasonable ratio range.
7. The R&D team management quality evaluation system according to claim 6, characterized in that: The ratio range submodule includes at least one of the following: a research and development company, an application product research and development team, a platform product research and development team, and a technology research and development team.
8. A method for evaluating the management quality of a research and development team, characterized in that: include: Obtaining the time data of the R&D team during the R&D process, and determining the relationship between the R&D project types, R&D matters, and R&D cost structure in the time data; Calculate the R&D cost structure ratio based on the relationship between the R&D project type, R&D matters and R&D cost structure; Based on the R&D cost structure ratio, the quality assessment result of the R&D team's operating quality is determined.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the R&D team management quality assessment method according to claim 8 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the R&D team management quality assessment method according to claim 8 are implemented.