Highway roadside equipment installation point selection method based on deep learning
Through deep learning and CNN-RNN combined network models, combined with high-precision maps and GIS data, the layout of highway roadside equipment is optimized, solving the problem of inefficiency of traditional methods, achieving a more efficient and accurate equipment layout, and adapting to complex traffic. environment.
Patent Information
- Application Number
- CN202410858669.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-15
AI Technical Summary
The traditional highway roadside equipment layout method relies on manual experience and historical data, which is difficult to adapt to the complex and changing traffic environment and needs, and there is huge room for efficiency improvement.
Using a method based on deep learning, combined with high-precision maps and GIS systems, a CNN-RNN combined network model is constructed. Through data preprocessing and model training, the layout of roadside equipment is optimized, taking into account factors such as road structure, terrain, traffic flow, weather conditions, etc. , optimize equipment layout location and cost.
It significantly improves the accuracy and efficiency of roadside equipment layout, adapts to complex traffic environments and needs, and provides support for intelligent transportation systems.
Smart Images

Figure CN118781802A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of intelligent transportation technology, and specifically relates to a site selection method for installing highway roadside equipment based on deep learning. Background Art
[0002] With the rapid development of intelligent transportation systems, the layout of highway roadside equipment has become a key factor in improving road safety and traffic efficiency. Traditional roadside equipment layout methods mainly rely on manual experience and historical data, which are difficult to adapt to complex and changing traffic environments and needs, and traditional layout methods still have a lot of room for improvement in efficiency. To this end, this application proposes an intelligent layout method based on high-precision maps and GIS systems, combined with neural network learning methods, aiming to achieve optimization and intelligentization of roadside equipment layout. Summary of the invention
[0003] In view of the shortcomings of the prior art, the purpose of this application is to provide a point selection method for the installation of highway roadside equipment based on deep learning, which solves the problems in the prior art.
[0004] The purpose of this application can be achieved through the following technical solutions:
[0005] The method for selecting a point for installing highway roadside equipment based on deep learning includes the following steps:
[0006] Collect high-precision map data of the road sections to be laid out and geographic information data of the GIS system;
[0007] Preprocessing the collected data includes: using Gaussian filtering to remove noise from the data, using KNN filling method to deal with missing values in the data, and using minimum-maximum scaling method to normalize the data;
[0008] Construct a CNN-RNN combined network model that can predict the layout of roadside equipment;
[0009] Use the preprocessed data set to train the CNN-RNN combined network model;
[0010] After preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, input them into the trained CNN-RNN combined network model to output the appropriate roadside equipment layout location on the road section;
[0011] According to the roadside equipment layout positions output by the model, the layout plan is optimized and adjusted in combination with actual conditions and traffic needs.
[0012] Furthermore, the collected data include: road structure, topography, traffic flow and weather conditions.
[0013] Furthermore, the calculation formula of the Gaussian filter is:
[0014]
[0015] In the formula, I(x,y) is the original data, I smooth (x, y) is the data after Gaussian filtering, G(i, j) is the value of the Gaussian kernel function at position (i, j), and σ is the standard deviation of the Gaussian kernel.
[0016] Furthermore, the steps of using the KNN filling method to process missing values in the data include:
[0017] 1) Determine where there are missing values in the dataset;
[0018] 2) Select the K value, that is, how many nearest neighbors each missing value should be filled with, and select the Euclidean distance as the similarity measure;
[0019] 3) For each sample containing missing values, calculate its similarity measure with all other samples;
[0020] 4) Based on the calculated similarity measure, identify the K nearest neighbors of each missing value sample;
[0021] 5) Using the known values of the selected K nearest neighbors, the missing values are estimated using the mean filling method:
[0022]
[0023] in, is the estimated value of the missing value, N i is the set of K nearest neighbors of sample i, l j is the known value of neighbor j;
[0024] 6) Repeat steps 3) to 5) until all missing values are filled.
[0025] Furthermore, the CNN-RNN combined network model includes a CNN network and an RNN network, the CNN network extracts features from spatial data and generates feature representations, the feature representations are used as inputs to the RNN network, and the RNN network further processes time series data and combines previous hidden states and current inputs to update states and generate outputs;
[0026] The CNN network includes:
[0027] Convolutional layer: extracts spatial features from the input data and detects features of different scales through convolution operations;
[0028] Pooling layer: reduces the spatial size of feature data and retains important feature information;
[0029] The RNN network includes:
[0030] Recurrent layer: Processes time series data through a recurrent structure, maintaining and utilizing the sequential information in the data;
[0031] Hidden state: RNN retains a hidden state at each time step to capture historical information;
[0032] Output layer: Generates output based on the characteristics of sequence data.
[0033] Furthermore, the loss function of the CNN-RNN combined network model is:
[0034]
[0035] In the formula, y i is a real numerical attribute, is the numerical attribute predicted by the model and N is the number of samples.
[0036] Furthermore, the specific contents of optimizing and adjusting the layout plan include:
[0037] 1) Analyze the coverage of each device;
[0038] 2) Evaluate the signal transmission distance and coverage capabilities of each device;
[0039] 3) Use radio spectrum analysis tools or simulation software to assess possible interference between devices and take measures to reduce interference;
[0040] 4) Place the equipment in a location that can improve traffic safety and traffic efficiency;
[0041] 5) Considering the purchase cost, installation cost, maintenance cost and long-term operating cost of the equipment, with the goal of minimizing the total cost, find the optimal equipment layout plan. The objective function is:
[0042] MinC=λ1C P +λ2C I +λ3C M +λ4C O
[0043] In the formula, C P is the purchase cost of the equipment; C I Equipment installation cost, including equipment installation, connection and configuration costs; C M Equipment maintenance cost, including daily maintenance and upkeep costs of equipment; C O is the long-term operating cost, including the cost of long-term equipment operation and energy consumption, such as electricity consumption, etc.; λ1, λ2, λ3 and λ4 are weight coefficients;
[0044] 6) Use simulation tools to simulate different equipment layout schemes and evaluate their impact on equipment performance and overall system effects;
[0045] 7) Conduct field verification and adjustments based on simulation analysis;
[0046] 8) Continuously monitor equipment operation and data collection, and through data analysis and feedback, promptly identify problems and improve equipment layout plans.
[0047] Intelligent layout system based on highway roadside equipment, including:
[0048] Data collection module: collects high-precision map data of the road section to be laid out and geographic information data of the GIS system;
[0049] Data preprocessing module: preprocess the collected data, including: denoising the data by Gaussian filtering, processing missing values in the data by KNN filling method, and normalizing the data by minimum-maximum scaling method;
[0050] Model building module: building a CNN-RNN combined network model that can predict the layout of roadside equipment;
[0051] Model training module: Use the preprocessed data set to train the CNN-RNN combined network model;
[0052] Layout prediction module: After preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, it is input into the trained CNN-RNN combined network model to output the appropriate roadside equipment layout location on the road section;
[0053] And, layout optimization module: according to the layout location of roadside equipment output by the model, combined with actual conditions and traffic needs, the layout plan is optimized and adjusted.
[0054] A computer storage medium stores a readable program, which, when running, can execute the above-mentioned method for selecting points for installing highway roadside equipment based on deep learning.
[0055] An electronic device, comprising: a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other through the communication bus;
[0056] The memory is used to store at least one executable instruction, and the executable instruction enables the processor to perform operations corresponding to the above-mentioned deep learning-based highway roadside equipment installation point selection method.
[0057] Beneficial effects of this application:
[0058] The site selection method for highway roadside equipment installation based on deep learning in this application realizes the optimization and intelligence of roadside equipment layout by combining high-precision maps and geographic information data of GIS system, and adopting CNN-RNN combined neural network learning method for intelligent prediction and optimization. This method can significantly improve the accuracy and efficiency of roadside equipment layout and provide strong support for the construction of intelligent transportation system. At the same time, this method also has good adaptability and scalability, and can adapt to complex and changing traffic environment and needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0060] Figure 1 This is a flow chart of the method for selecting a point for installing highway roadside equipment based on deep learning in this application. DETAILED DESCRIPTION
[0061] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0062] Example 1
[0063] like Figure 1 As shown, the point selection method for installing highway roadside equipment based on deep learning includes the following steps:
[0064] S1, collect high-precision map data of the road section to be laid out and geographic information data of the GIS system.
[0065] The data include but are not limited to: road structure, topography, traffic flow, weather conditions;
[0066] Among them: Road structure: including road width, number of lanes and other spatial factors that affect equipment installation;
[0067] Topography: including information on land use (such as residential areas, industrial areas), hydrological information (the impact of nearby water bodies on equipment installation and maintenance);
[0068] Traffic flow: vehicle flow and congestion level in different time periods;
[0069] Weather conditions: climate conditions (temperature, humidity, precipitation, etc.) in different seasons and time periods, sunshine conditions (which have a certain impact on roadside equipment equipped with solar panels), wind speed conditions (which have a certain impact on the installation of roadside equipment on viaducts and open areas), etc.
[0070] S2, preprocessing the collected data to form a data set that can be used for neural network learning;
[0071] The specific processing process includes:
[0072] ① Use Gaussian filtering to denoise the data and achieve smoothing of the data:
[0073] Assume that the original data is I(x,y), and the data after Gaussian filtering is I smooth (x,y), then the calculation formula of Gaussian filtering is:
[0074]
[0075] Where G(i,j) is the value of the Gaussian kernel function at position (i,j), defined as:
[0076]
[0077] Where σ is the standard deviation of the Gaussian kernel, which determines the spatial range of the filter and the weight of the corresponding position; a larger σ value will lead to a wider smoothing effect, but may lose details.
[0078] ② Use KNN filling method to handle missing values in data:
[0079] KNN filling uses the information of the K nearest neighbors to the missing value sample to fill the missing value. These neighbors can be the nearest neighbors under Euclidean distance or other similarity measures; the specific steps of using KNN filling method to handle missing values in data are:
[0080] 1) Determine where there are missing values in the dataset;
[0081] 2) Select the K value, that is, how many nearest neighbors each missing value should be filled in. Usually the choice of K can be determined by cross-validation, and the Euclidean distance is selected as the similarity measure;
[0082] 3) For each sample containing missing values, calculate its similarity measure (i.e., Euclidean distance) with all other samples;
[0083] 4) Based on the calculated similarity measure, identify the K nearest neighbors of each missing value sample;
[0084] 5) Using the known values of the selected K nearest neighbors, the missing values are estimated using the mean filling method:
[0085]
[0086] in, is the estimated value of the missing value, N i is the set of K nearest neighbors of sample i, l j is the known value of neighbor j.
[0087] 6) Repeat steps 3) to 5) until all missing values are filled.
[0088] ③ The minimum-maximum scaling method was used to normalize the data;
[0089] The normalization formula is:
[0090]
[0091] In the formula, x is a characteristic value of the original data, min(x) is the minimum value of the characteristic, max(x) is the maximum value of the characteristic, and x scaled is the scaled value.
[0092] S3, building a CNN-RNN combined network model that can predict the layout of roadside equipment;
[0093] Among them, in the CNN-RNN combined network model, the CNN network can extract features from spatial data such as road structure and topography, and the RNN network can extract time series data such as traffic flow and weather conditions; and finally output the prediction results of roadside equipment layout;
[0094] Among them, the CNN-RNN combined network model includes a CNN network and a RNN network;
[0095] The CNN network includes:
[0096] Convolutional layer: extracts spatial features from the input data and detects features of different scales through convolution operations;
[0097] Pooling layer: reduces the spatial size of feature data and retains important feature information, such as maximum pooling or average pooling;
[0098] The RNN network consists of:
[0099] Recurrent layer: Processes time series data through a recurrent structure, maintaining and utilizing the sequential information in the data.
[0100] Hidden state: RNN retains a hidden state at each time step to capture historical information Output layer: Generates output based on the characteristics of the sequence data.
[0101] The CNN network extracts features from spatial data and generates feature representations, which are used as inputs to the RNN network. The RNN further processes time series data and combines the previous hidden state with the current input to update the state and generate outputs. The final output of the model is the layout prediction result of the roadside equipment, such as the probability or predicted value of whether each location is suitable for installing a certain equipment.
[0102] S4, using the preprocessed data set CNN-RNN combined network model for training;
[0103] During the training process, the model parameters and structure are continuously adjusted to enable the model to learn the complex relationship between the layout of roadside equipment and various influencing factors. After the training is completed, the model is evaluated and verified to ensure that it has high prediction accuracy and generalization ability.
[0104] The steps of model training and tuning include:
[0105] S41, dividing the preprocessed data set into a training set, a validation set and a test set;
[0106] The ratio is: 70% of the data is used as a training set, 15% as a validation set, and 15% as a test set. The training set is used to optimize the model parameters, the validation set is used to adjust the hyperparameters and monitor the model training process, and the test set is used to finally evaluate the performance of the model.
[0107] S42, define the loss function;
[0108] In this embodiment, the assumed task is to predict a certain attribute value of the roadside equipment layout (such as the numerical attribute of the equipment installation location), and the mean square error MSE can be selected as the loss function:
[0109]
[0110] In the formula, y i is a real numerical attribute, is the numerical attribute predicted by the model and N is the number of samples.
[0111] S43, input the prepared training data into the model for training. In each training cycle, the model calculates the loss according to the loss function and uses the back propagation algorithm to update the parameters of the model to reduce the loss.
[0112] S44, use the validation set to adjust the model's hyperparameters, such as learning rate, convolution kernel size, number of hidden units in the recurrent layer, etc. These adjustments can be evaluated using the performance metrics of the validation set to improve the model's generalization and performance.
[0113] S45, after training is completed, use the test set to evaluate the final performance of the model;
[0114] Various indicators such as root mean square error (RMSE), mean absolute error (MAE), etc. between the predicted results and the true labels can be calculated to measure the prediction accuracy of the model.
[0115] S5, after preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, input them into the trained CNN-RNN combined network model, and output the appropriate roadside equipment layout location on the road section; the prediction results can be displayed in the form of images or tables for users to view and analyze;
[0116] S6: Optimize and adjust the layout plan based on the roadside equipment layout positions output by the model and in combination with actual conditions and traffic demands.
[0117] Factors such as equipment coverage, signal transmission distance, and interference between devices can be considered to fine-tune the location and quantity of the equipment. The final roadside equipment layout plan should meet multiple requirements such as traffic safety, traffic efficiency, and economic benefits.
[0118] The specifics of fine-tuning the location and quantity of equipment include the following:
[0119] 1) Analyze the coverage of each device, which depends on the type and function of the device;
[0120] For example, video surveillance equipment may need to cover a large area, while environmental sensors may only need to cover a specific geographic area.
[0121] 3) Evaluate the signal transmission distance and coverage capabilities of each device;
[0122] This can be determined through equipment specifications or field testing to ensure that the equipment is located in a location that will effectively cover the target area.
[0123] 3) Consider interference issues between devices, especially in terms of signal transmission or spectrum sharing; use radio spectrum analysis tools or simulation software to evaluate possible interference between devices and take measures to reduce interference.
[0124] 4) Place the equipment in a location that can improve traffic safety and traffic efficiency;
[0125] For example, traffic monitoring equipment can be installed near intersections, and traffic flow monitoring equipment can be installed on highways to adjust traffic lights and speed limits in real time.
[0126] 5) Conduct cost-benefit analysis; ensure that the layout plan can not only meet the functional requirements, but also be implemented within the budget; consider the purchase cost, installation cost, maintenance cost and long-term operating cost of the equipment to find the optimal equipment layout plan; the optimal equipment layout plan needs to minimize the total cost, that is, the objective function is:
[0127] MinC=λ1C P +λ2C I +λ3C M +λ4C O
[0128] In the formula, C P is the purchase cost of the equipment; C I Equipment installation cost, including equipment installation, connection and configuration costs; C M Equipment maintenance cost, including daily maintenance and upkeep costs of equipment; C O is the long-term operating cost, including the cost of long-term equipment operation and energy consumption, such as electricity consumption; λ1, λ2, λ3 and λ 4为 Weight coefficient.
[0129] 6) Use simulation tools to simulate different equipment layout schemes and evaluate their impact on equipment performance and overall system effects. Through simulation, it is possible to predict the performance of different schemes in actual applications, so as to make more rational decisions. AnyLogic or Simulink can be used as simulation tools.
[0130] In the equipment layout evaluation, AnyLogic can be used to simulate the impact of different equipment arrangements on system efficiency. Simulink can also be used to model and simulate control systems to evaluate the impact of different layouts on system control performance.
[0131] 7) Conduct field verification and adjustments based on simulation analysis. Field verification can help confirm the accuracy of simulation results and fine-tune and optimize the location and quantity of equipment according to actual conditions.
[0132] 8) Once deployed, continuously monitor equipment operation and data collection, and make optimization adjustments based on actual usage; through data analysis and feedback, timely identify problems and improve equipment layout plans to ensure long-term effectiveness and economic benefits.
[0133] Example 2
[0134] In this embodiment, based on the intelligent layout method of roadside equipment in Embodiment 1, an intelligent layout system based on highway roadside equipment is proposed, which specifically includes:
[0135] Data collection module: collects high-precision map data of the road section to be laid out and geographic information data of the GIS system;
[0136] Data preprocessing module: preprocesses the collected data to form a data set that can be used for neural network learning;
[0137] Model building module: building a CNN-RNN combined network model that can predict the layout of roadside equipment;
[0138] Model training module: Use the preprocessed data set to train the CNN-RNN combined network model;
[0139] Layout prediction module: After preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, it is input into the trained CNN-RNN combined network model to output the appropriate layout location of the roadside equipment on the road section; the prediction results can be displayed in the form of images or tables for easy viewing and analysis by users;
[0140] And, layout optimization module: according to the layout location of roadside equipment output by the model, combined with actual conditions and traffic needs, the layout plan is optimized and adjusted.
[0141] The method of the present application may be implemented in hardware, firmware, or as software or computer code that can be stored in a recording medium (such as a CDROM, RAM, floppy disk, hard disk, or magneto-optical disk), or as computer code that is originally stored in a remote recording medium or a non-temporary machine-readable medium downloaded over a network and will be stored in a local recording medium, so that the method described herein can be stored in such software processing on a recording medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware (such as an ASIC or FPGA). It is understood that a computer, processor, microprocessor controller, or programmable hardware includes a storage component (e.g., RAM, ROM, flash memory, etc.) that can store or receive software or computer code, and when the software or computer code is accessed and executed by a computer, processor, or hardware, the method described herein is implemented. In addition, when a general-purpose computer accesses the code for implementing the method shown herein, the execution of the code converts the general-purpose computer into a dedicated computer for executing the method shown herein.
[0142] The above shows and describes the basic principles, main features and advantages of the present application. Those skilled in the art should understand that the present application is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present application. Without departing from the spirit and scope of the present application, the present application may have various changes and improvements, and these changes and improvements all fall within the scope of the present application to be protected.
Claims
1. Site selection method for highway roadside equipment installation based on deep learning, It is characterized in that The following steps are involved: Collect high-precision map data of the road sections to be laid out and geographic information data of the GIS system; Preprocessing the collected data includes: using Gaussian filtering to remove noise from the data, using KNN filling method to deal with missing values in the data, and using minimum-maximum scaling method to normalize the data; Construct a CNN-RNN combined network model that can predict the layout of roadside equipment; Use the preprocessed data set to train the CNN-RNN combined network model; After preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, input them into the trained CNN-RNN combined network model to output the appropriate roadside equipment layout location on the road section; According to the roadside equipment layout positions output by the model, the layout plan is optimized and adjusted in combination with actual conditions and traffic needs.
2. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 1, It is characterized in that The data collected includes: road structure, topography, traffic flow and weather conditions.
3. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 1, It is characterized in that The calculation formula of the Gaussian filter is: In the formula, I(x,y) is the original data, I smooth (x, y) is the data after Gaussian filtering, G(i, j) is the value of the Gaussian kernel function at position (i, j), and σ is the standard deviation of the Gaussian kernel.
4. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 1, It is characterized in that The steps to use KNN filling method to handle missing values in data include: 1) Determine where there are missing values in the dataset; 2) Select the K value, that is, how many nearest neighbors each missing value should be filled with, and select the Euclidean distance as the similarity measure; 3) For each sample containing missing values, calculate its similarity measure with all other samples; 4) Based on the calculated similarity measure, identify the K nearest neighbors of each missing value sample; 5) Using the known values of the selected K nearest neighbors, the missing values are estimated using the mean filling method: in, is the estimated value of the missing value, N i is the set of K nearest neighbors of sample i, l j is the known value of neighbor j; 6) Repeat steps 3) to 5) until all missing values are filled.
5. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 1, It is characterized in that The CNN-RNN combined network model includes a CNN network and an RNN network. The CNN network extracts features from spatial data and generates feature representations. The feature representations are used as inputs to the RNN network. The RNN network further processes time series data and combines previous hidden states and current inputs to update states and generate outputs. The CNN network includes: Convolutional layer: extracts spatial features from the input data and detects features of different scales through convolution operations; Pooling layer: reduces the spatial size of feature data and retains important feature information; The RNN network includes: Recurrent layer: Processes time series data through a recurrent structure, maintaining and utilizing the sequential information in the data; Hidden state: RNN retains a hidden state at each time step to capture historical information; Output layer: Generates output based on the characteristics of sequence data.
6. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 5, It is characterized in that The loss function of the CNN-RNN combined network model is: In the formula, y i is a real numerical attribute, is the numerical attribute predicted by the model and N is the number of samples.
7. The method for selecting a point for installing highway roadside equipment based on deep learning according to claim 1, It is characterized in that The specific contents of optimizing and adjusting the layout plan include: 1) Analyze the coverage of each device; 2) Evaluate the signal transmission distance and coverage capabilities of each device; 3) Use radio spectrum analysis tools or simulation software to assess possible interference between devices and take measures to reduce interference; 4) Place the equipment in a location that can improve traffic safety and traffic efficiency; 5) Considering the purchase cost, installation cost, maintenance cost and long-term operating cost of the equipment, with the goal of minimizing the total cost, find the optimal equipment layout plan. The objective function is: MinC=λ 1 C P +λ 2 C I +λ 3 C M +λ 4 C O In the formula, C P is the purchase cost of the equipment; C I Equipment installation cost, including equipment installation, connection and configuration costs; C M Equipment maintenance cost, including daily maintenance and upkeep costs of equipment; C O is the long-term operating cost, including the cost of long-term equipment operation and energy consumption, such as electricity consumption; 1 , 2 , 3 and 4 is the weight coefficient; 6) Use simulation tools to simulate different equipment layout schemes and evaluate their impact on equipment performance and overall system effects; 7) Conduct field verification and adjustments based on simulation analysis; 8) Continuously monitor equipment operation and data collection, and through data analysis and feedback, promptly identify problems and improve equipment layout plans.
8. Intelligent layout system based on highway roadside equipment, It is characterized in that include: Data collection module: collects high-precision map data of the road section to be laid out and geographic information data of the GIS system; Data preprocessing module: preprocess the collected data, including: denoising the data by Gaussian filtering, processing missing values in the data by KNN filling method, and normalizing the data by minimum-maximum scaling method; Model building module: building a CNN-RNN combined network model that can predict the layout of roadside equipment; Model training module: Use the preprocessed data set to train the CNN-RNN combined network model; Layout prediction module: After preprocessing the high-precision map and GIS geographic information data of the road section to be laid out, it is input into the trained CNN-RNN combined network model to output the appropriate roadside equipment layout location on the road section; And, layout optimization module: according to the layout location of roadside equipment output by the model, combined with actual conditions and traffic needs, the layout plan is optimized and adjusted.
9. A computer storage medium storing a readable program, It is characterized in that When the program is running, it can execute the point selection method for installing highway roadside equipment based on deep learning as described in any one of claims 1-7.
10. An electronic device, It is characterized in that include: A processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus; The memory is used to store at least one executable instruction, and the executable instruction enables the processor to perform operations corresponding to the point selection method for installing highway roadside equipment based on deep learning as described in any one of claims 1-7.