Multi-user medium and long term load prediction method, system, device and medium

The GRU model is combined with historical and meteorological data to perform load forecasting for different user groups, solving the problem of multi-user medium and long-term load forecasting in the existing technology, achieving high-precision load forecasting, and providing better decision-making support for power suppliers. .

CN118801341APending Publication Date: 2024-10-18TBEA SUNOASIS
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410779501.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing technology cannot effectively carry out multi-user medium and long-term load forecasting and cannot support long-term trading decisions. Moreover, traditional methods mainly focus on short-term forecasting and cannot meet the forecasting needs of ten-day, monthly and longer periods.

Method used

The GRU model is used to combine historical load data, meteorological measured data and holiday data, and through preprocessing and classification, user category information is constructed, and high-precision load forecasting is performed for different user groups. The GRU model is constructed using user category information for prediction.

Benefits of technology

It achieves high-precision forecasting of medium and long-term loads for multiple users, reduces forecast deviations, provides better decision support, and provides power suppliers with more accurate long-term trading strategies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118801341A_ABST
    Figure CN118801341A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-user medium and long term load prediction method, system, equipment and medium, and belongs to the field of power transaction load prediction, and the method comprises the following steps: obtaining historical load data, meteorological measured data and holiday and festival data of power market users, carrying out the preprocessing, and constructing a model input feature data set; constructing a label data set according to the preprocessed historical load data; industry information of electricity market users is obtained, the users are classified according to the industry information and the historical load data, and user category information is obtained; and constructing a GRU model according to the user category information and the corresponding model input feature data set and label data set, and then performing prediction to obtain load prediction data. According to the invention, the problem that medium and long term load prediction cannot be carried out for multiple users in the prior art so as to support long-period transaction decision making can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power trading load forecasting, and specifically relates to a multi-user medium- and long-term load forecasting method, system, equipment and medium. Background Art

[0002] With the development of the global economy, energy demand continues to increase, and the power market is gradually transforming towards marketization and competition. In the power trading market, power sales transactions are an important link, and the core is the transaction between power suppliers and users. However, due to the imbalance between power supply and demand, the power market price fluctuates greatly, which brings great risks to power sales transactions. Therefore, studying the user load situation in power sales transactions in the power market is of great significance to both power suppliers and users.

[0003] Load forecasting refers to the prediction of the load of the power system in the future, so that power suppliers can better formulate power sales strategies, reduce transaction risks and improve economic benefits. Traditional load forecasting methods are mainly based on statistical analysis and modeling of historical load data. These methods have certain application limitations. On the one hand, most of the existing load forecasting methods focus on ultra-short-term and short-term load forecasts for the next 24 to 96 hours, and cannot support trading decisions for ten days, months and longer periods; on the other hand, in actual applications, it is often necessary to predict the load of multiple users represented by a power sales company at one time. Each user's load situation has its own characteristics, and it is difficult to find a general model that can achieve high-precision load prediction for each user. Summary of the invention

[0004] The purpose of the present invention is to provide a method, system, device and medium for medium- and long-term load forecasting for multiple users, so as to solve the problem that the prior art cannot perform medium- and long-term load forecasting for multiple users, thereby supporting long-term trading decisions.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A method for predicting medium- and long-term loads of multiple users comprises the following steps:

[0007] Obtain historical load data, meteorological data and holiday data of power market users and construct the model input feature data set after preprocessing. At the same time, construct the label data set based on the preprocessed historical load data.

[0008] Obtaining industry information of users in the power market, classifying users according to the industry information and historical load data, and obtaining user category information;

[0009] A GRU model is constructed based on the user category information and its corresponding model input feature data set and label data set, and then prediction is performed to obtain load prediction data.

[0010] In some embodiments, the pretreatment specifically comprises the following steps:

[0011] Using the 3σ criterion to perform outlier detection on the historical load data and the meteorological measured data, and then performing missing value detection on the historical load data and the meteorological measured data to obtain missing values ​​and outliers and corresponding missing data amounts and outlier data amounts;

[0012] Filling missing values ​​and abnormal values ​​according to the amount of missing data and the amount of abnormal data;

[0013] The holiday data is quantized to obtain quantized holiday data.

[0014] In some implementations, the step of filling missing values ​​and abnormal values ​​according to the amount of missing data and the amount of abnormal data specifically includes:

[0015] If the amount of missing data or abnormal data is a single time point, the missing value or abnormal value is filled with the data before and after the corresponding time point;

[0016] If the amount of missing data or abnormal data is greater than 2 / 3 of the total data volume of the corresponding day, all the data of the day will be eliminated;

[0017] If the amount of missing data or abnormal data is less than or equal to 2 / 3 of the total data volume of the corresponding day, the data of the same period of the previous day corresponding to the missing values ​​or abnormal values ​​will be used to fill in the gaps.

[0018] In some implementations, the quantization process specifically includes the following steps:

[0019] If the corresponding date of the holiday data is a national statutory holiday, the holiday data of the corresponding date is quantized to 1;

[0020] If the corresponding date of the holiday data is Saturday or Sunday, and the corresponding date is not a national statutory holiday, the holiday data of the corresponding date is quantized to 2;

[0021] If the corresponding date of the holiday data is Monday, Tuesday, Wednesday, Thursday or Friday, and the corresponding date is not a national statutory holiday, the holiday data of the corresponding date is quantized to 3.

[0022] In some embodiments, the model input feature data set includes: temperature, irradiance, wind speed, daily maximum temperature, daily minimum temperature, quantified holiday data, and historical load data;

[0023] The label data set includes: historical load data.

[0024] In some implementations, the step of classifying users according to the industry information and historical load data specifically includes:

[0025] Firstly, users are roughly classified according to the industry information to obtain industrial users and commercial users;

[0026] Then, the load peak value, load valley value, load mean value and load standard deviation corresponding to the industrial users and commercial users are calculated according to the historical load data;

[0027] According to the load peak value, load valley value, load mean value and load standard deviation, the industrial users and commercial users are subclassified by using K-means clustering method to obtain user category information;

[0028] The user category information includes classification category data, and the number of classification categories is determined by using the elbow rule.

[0029] In some embodiments, the following steps are also included:

[0030] The mean absolute error and root mean square error were used to perform model verification on the GRU model.

[0031] A multi-user medium- and long-term load forecasting system, comprising:

[0032] The data set construction module is used to obtain the historical load data, meteorological measured data and holiday data of the power market users and construct the model input feature data set after preprocessing, and at the same time construct the label data set based on the preprocessed historical load data;

[0033] A user classification module is used to obtain industry information of users in the power market, classify users according to the industry information and historical load data, and obtain user category information;

[0034] The load prediction module is used to construct a GRU model based on the user category information and its corresponding model input feature data set and label data set, and then perform prediction to obtain load prediction data.

[0035] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable in the processor. When the processor executes the computer program, the steps of the method for predicting medium- and long-term loads for multiple users are implemented.

[0036] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for predicting medium- and long-term loads for multiple users are implemented.

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] The present invention provides a method for medium- and long-term load forecasting for multiple users. The method first obtains historical load data, meteorological measured data, and holiday data of users in the power market, and constructs a model input feature data set and a label data set after preprocessing. Then, the users in the power market are classified. Finally, a GRU (Gated Recurrent Unit) model is constructed in combination with user category information and data sets to perform load forecasting. The present invention combines user category information to construct corresponding GRU models for different users to perform load forecasting. At the same time, the long-term regularity characteristics hidden in historical load data, meteorological measured data, and holiday data are comprehensively integrated to perform fine classification of users. Then, a suitable GRU model is selected for each type of user for forecasting, so as to better adapt to the load characteristics of different user groups, realize high-precision forecasting of medium- and long-term loads of users in multiple industries, and provide better decision support for power suppliers.

[0039] Furthermore, the present invention performs outlier detection and missing value detection on historical load data and meteorological measured data, and quantifies holiday data, which can improve the accuracy and reliability of the data, reduce the negative impact on subsequent modeling, and reduce load forecasting deviations.

[0040] Furthermore, the present invention first roughly classifies the users and then divides them into industrial users and commercial users. The electricity demands of industrial users and commercial users are quite different, so the classification scope can be narrowed and the accuracy of subsequent detailed classification can be improved. The load peak, load valley, load mean and load standard deviation are combined with the K-means clustering method for detailed classification. The load data can more accurately reflect the user's electricity consumption behavior and demand characteristics, and obtain a more reasonable user category. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 Flow chart for the implementation of this embodiment;

[0042] Figure 2 Schematic diagram of input and output of the GRU model in this embodiment;

[0043] Figure 3 Schematic diagram of the training data set and test data set of the GRU model in this embodiment;

[0044] Figure 4 A flow chart of a method for mid- to long-term load forecasting for multiple users provided in this embodiment;

[0045] Figure 5 A schematic diagram of the structure of a multi-user medium- and long-term load forecasting system provided in this embodiment;

[0046] Figure 6 This is a schematic diagram of the structure of an electronic device used in the present invention. DETAILED DESCRIPTION

[0047] In order to enable those skilled in the art to better understand the solution of the present invention, the technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, and the described content is intended to explain the present invention rather than to limit it.

[0048] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present invention are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or are inherent to these processes, methods, systems, products or devices; in addition, in the specification, the training set refers to the training data set, the test set refers to the test data set, and the meteorological data refers to the measured meteorological data.

[0049] like Figure 1 As shown, this embodiment provides a multi-user medium- and long-term load forecasting method, which specifically includes the following steps:

[0050] Step 1: Obtain the historical load data, meteorological measured data, and holiday data of users in a regional power market for the past three months, as well as the meteorological forecast data and holiday data for the next 15 days. All data are valid data for 96 moments each day, and the data are recorded every 15 minutes; the meteorological measured data include three characteristics: irradiance, 10-meter wind speed, and 2-meter temperature. First, use the 3σ criterion to detect whether there are abnormal values ​​in the historical load data and meteorological measured data; then, detect whether the historical load data and meteorological measured data contain 96 data every day. If there are less than 96 data, there is missing data. The detected abnormal values ​​and missing values ​​are processed as follows:

[0051] If a single point in time is missing or abnormal, fill it with the arithmetic mean of the data before and after the abnormal moment, that is:

[0052] S m,n =0.5a m,n-1 +0.5a m,n+1 (1)

[0053] Where S m,n is a missing value or an abnormal value at time m on day n, m,n-1 is the data at the time point before m day n time, a m,n+1 The data is the data at a point in time after m days and n moments. If there are missing or abnormal data in consecutive time periods on a certain day, and the amount of missing or abnormal data accounts for more than 2 / 3 of the total amount of data on that day, then all the data on that day will be removed. If the amount of missing or abnormal data accounts for no more than 2 / 3 of the total amount of data on that day, then the data of the corresponding time period of the previous day will be used to fill it, that is:

[0054] S m,n =a m-1,n (2)

[0055] where a m-1,n It is the data value at time n on day m-1.

[0056] Step 2: Quantify the holiday data and calculate the daily temperature maximum as a new feature. The method for quantifying the holiday data is as follows: if a certain day is a national statutory holiday, such as Qingming Festival, Labor Day, etc., the holiday data of that day is quantified to 1, and for the rest of the days, Saturday and Sunday are quantified to 2, and Monday to Friday are quantified to 3;

[0057] Then, the maximum and minimum temperature values ​​in the 96 time point data of each day are calculated respectively to obtain the daily maximum temperature and daily minimum temperature, and fill them into the 96 time point data as new input features of the model.

[0058] Step 3: Construct the model input feature data set based on the historical load data and meteorological measured data after outlier and missing value detection, and construct the label data set based on the quantified holiday data. After processing in steps 1 and 2, the model input feature data set includes seven features: temperature, irradiance, wind speed, daily maximum temperature, daily minimum temperature, quantified holiday data and historical load data, and the label data set includes historical load data;

[0059] Among them, the relationship between the historical load data in the model input feature data set and the historical load data in the label data set is as follows: Figure 2 As shown in the figure, if the forecast day is D-day, the historical load data from D-1 to D-16 are taken as an input feature of the model, and the temperature, irradiance, wind speed, daily maximum temperature, daily minimum temperature and quantified holiday data from D-day to D+14 are also taken as feature inputs to the model. The model outputs the forecast load data from D-day to D+14, and uses the real load data from D-day to D+14 as the label optimization model, and then predicts the load data of each user at 96 time points in the next 15 days.

[0060] Step 4: First, roughly classify the users according to their industry information in the power market, and divide the users into industrial users and commercial users. Then calculate the load peak, load valley, load mean and load standard deviation of each user every 10 days in the past three months. According to the load peak, load valley, load mean and load standard deviation, the K-means clustering method is used to classify the industrial users and commercial users in detail to obtain the user category information. The classification category data in the user category information is determined by the elbow rule.

[0061] Step 5: Divide each user data set of each category of users into a training data set and a test data set. If the current date is D, and the input feature data set and the label data set contain 96 time-point data from the past 90 days, then the 96-point meteorological characteristics, holiday data from D-75 to D-16, and the 96-point historical load data from D-90 to D-31 are taken as the input data set of the training data set, and the 96-point historical load data from D-75 to D-16 are taken as the label data set of the training data set. The 96-point meteorological characteristics, holiday data from D-15 to D-1, and the 96-point historical load data from D-30 to D-16 are taken as the input data set of the test data set, and the 96-point historical load data from D-15 to D-1 are taken as the label data set of the test data set. The relationship between the training data set and the test data set is as follows. Figure 3 shown.

[0062] Step 6: Determine the parameters of the GRU model for load prediction for each type of user. Randomly select a user's data set from each type of user, and use the GRU model with different hyperparameters to predict the user's load. The hyperparameters include the number of GRU layers, the number of hidden units, the learning rate, and the batch size. The mean square error of the test set data is used as the evaluation indicator. The final hyperparameters of the GRU model for this type of user are determined by the control variable method, and then the GRU models of each type of user are trained separately.

[0063] Among them, the Gated Recurrent Unit (GRU) is a variant of the Recurrent Neural Network (RNN) and is widely used in time series prediction. Compared with the traditional RNN, the GRU model has advantages in regression prediction. It can better handle long-term dependencies and reduce the gradient vanishing problem, and it has fewer parameters and high computational efficiency.

[0064] Step 7: Use the test data set to test the generalization performance of the model, and use the mean absolute error and root mean square error to calibrate the GRU model.

[0065] Step 8: For each user, the weather forecast data for the next 15 days, holiday data, and historical load data for the past 15 days are input into the trained GRU model to obtain the load forecast data for the next 15 days.

[0066] like Figure 4 and Figure 5 As shown, this embodiment also provides a multi-user medium- and long-term load forecasting system, including: a data set construction module, a user classification module and a load forecasting module;

[0067] The data set construction module obtains the historical load data, meteorological measured data and holiday data of the power market users and constructs the model input feature data set after preprocessing, and constructs the label data set based on the preprocessed historical load data;

[0068] Specifically, the data set construction module includes a data acquisition module and a data verification module. The data acquisition module obtains the historical load data, meteorological measured data and holiday data of power market users and records them every 15 minutes. There are 96 valid historical load data and meteorological measured data at each moment every day. The data verification module performs preprocessing, detects missing values ​​and outliers on historical load data and meteorological measured data, fills in outliers and missing values ​​with adjacent data, and quantifies holiday data.

[0069] The user classification module obtains industry information of users in the power market, and classifies users according to the industry information and historical load data to obtain user category information.

[0070] The load forecasting module constructs a GRU model based on the user category information and its corresponding model input feature data set and label data set, and then performs forecasting to obtain load forecast data;

[0071] Specifically, the load prediction module includes a model training module, a model verification module and a prediction output module. The model training module uses the feature data set consisting of pre-processed meteorological measured data, holiday data, and historical load data as the input of the GRU model for each user according to the user category information, and uses the actual load data as the label of the GRU model output data, and divides the training set and the test set. For users of different categories, different GRU models are used to predict the load data to train the model;

[0072] The model verification module tests the performance of the GRU model through the test data set, and uses the mean absolute error and root mean square error to calibrate the GRU model;

[0073] After the model verification module completes the inspection, the forecast output module inputs the weather forecast data for the next 15 days, holiday data, and historical load data for the past 15 days into the optimized model to forecast the load for the next 15 days.

[0074] The division of modules in the embodiments of the present invention is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional module in each embodiment of the present invention may be integrated into one processor, or may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of software functional modules.

[0075] like Figure 6 As shown, a computer device is also provided in this embodiment, which includes a processor and a memory, the memory is used to store a computer program (in this embodiment, the computer program includes a computing component and an iterative component, which can perform model calculation and model update), the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in a computer storage medium to implement a corresponding method flow or a corresponding function; the processor described in the embodiment of the present invention can be used for the operation of a multi-user medium- and long-term load forecasting method.

[0076] This embodiment also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of a multi-user medium- and long-term load forecasting method in the above embodiment.

[0077] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0078] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0079] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0080] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0081] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for multi-user medium- and long-term load forecasting, characterized in that: The following steps are involved: Obtain historical load data, meteorological data and holiday data of power market users and construct the model input feature data set after preprocessing. At the same time, construct the label data set based on the preprocessed historical load data. Obtaining industry information of users in the power market, classifying users according to the industry information and historical load data, and obtaining user category information; A GRU model is constructed based on the user category information and its corresponding model input feature data set and label data set, and then prediction is performed to obtain load prediction data.

2. A method for multi-user medium- and long-term load forecasting according to claim 1, characterized in that: The pretreatment specifically comprises the following steps: Using the 3σ criterion to perform outlier detection on the historical load data and the meteorological measured data, and then performing missing value detection on the historical load data and the meteorological measured data to obtain missing values ​​and outliers and corresponding missing data amounts and outlier data amounts; Filling missing values ​​and abnormal values ​​according to the amount of missing data and the amount of abnormal data; The holiday data is quantized to obtain quantized holiday data.

3. A method for multi-user medium- and long-term load forecasting according to claim 2, characterized in that: The step of filling missing values ​​and abnormal values ​​according to the amount of missing data and the amount of abnormal data specifically includes: If the amount of missing data or abnormal data is a single time point, the missing value or abnormal value is filled with the data before and after the corresponding time point; If the amount of missing data or abnormal data is greater than 2 / 3 of the total data volume of the corresponding day, all the data of the day will be eliminated; If the amount of missing data or abnormal data is less than or equal to 2 / 3 of the total data volume of the corresponding day, the data of the same period of the previous day corresponding to the missing values ​​or abnormal values ​​will be used to fill in the gaps.

4. A method for multi-user medium- and long-term load forecasting according to claim 2, characterized in that: The quantization process specifically includes the following steps: If the corresponding date of the holiday data is a national statutory holiday, the holiday data of the corresponding date is quantized to 1; If the corresponding date of the holiday data is Saturday or Sunday, and the corresponding date is not a national statutory holiday, the holiday data of the corresponding date is quantized to 2; If the corresponding date of the holiday data is Monday, Tuesday, Wednesday, Thursday or Friday, and the corresponding date is not a national statutory holiday, the holiday data of the corresponding date is quantized to 3.

5. A method for multi-user medium- and long-term load forecasting according to claim 1, characterized in that: The model input feature data set includes: temperature, irradiance, wind speed, daily maximum temperature, daily minimum temperature, quantified holiday data and historical load data; The label data set includes: historical load data.

6. A method for multi-user medium- and long-term load forecasting according to claim 1, characterized in that: The step of classifying users according to the industry information and historical load data specifically includes: Firstly, users are roughly classified according to the industry information to obtain industrial users and commercial users; Then, the load peak value, load valley value, load mean value and load standard deviation corresponding to the industrial users and commercial users are calculated according to the historical load data; According to the load peak value, load valley value, load mean value and load standard deviation, the industrial users and commercial users are subclassified by using K-means clustering method to obtain user category information; The user category information includes classification category data, and the number of classification categories is determined by using the elbow rule.

7. A method for multi-user medium- and long-term load forecasting according to claim 1, characterized in that: The following steps are also included: The mean absolute error and root mean square error were used to perform model verification on the GRU model.

8. A multi-user medium- and long-term load forecasting system, characterized in that: include: The data set construction module is used to obtain the historical load data, meteorological measured data and holiday data of the power market users and construct the model input feature data set after preprocessing, and at the same time construct the label data set based on the preprocessed historical load data; A user classification module is used to obtain industry information of users in the power market, classify users according to the industry information and historical load data, and obtain user category information; The load prediction module is used to construct a GRU model based on the user category information and its corresponding model input feature data set and label data set, and then perform prediction to obtain load prediction data.

9. An electronic device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable in the processor. When the processor executes the computer program, the method implements the steps of a multi-user medium- and long-term load forecasting method as claimed in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for multi-user medium- and long-term load forecasting according to any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Abnormal recognition method and device, computer equipment and storage medium

    CN119558986A

  • Festival and holiday load prediction method and system based on curve form clustering and data labeling

    CN121658815A