High-underground-water-level sand gravel foundation pressure steel pipe construction device
By using water-stopping grooves and water-closing gates on a sandy gravel foundation with high groundwater levels to isolate groundwater, and combining support components to support steel pipes, the problems of difficulty in drainage and potential safety hazards in the existing technology have been solved, and efficient and safe trenching of pressure steel pipes has been achieved. Excavation construction reduces cost and construction period.
Patent Information
- Application Number
- CN202411024193.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-29
AI Technical Summary
When excavating trenches for pressure steel pipes on sandy gravel foundations with high groundwater levels, the existing technology has problems such as difficulty in drainage, high cost, and potential safety hazards. In particular, the steel sheet pile support process is complex and the grading excavation work is large. It is easy to cause landslide accidents.
The water-stopping channel and water-closing door are used to isolate groundwater from the water-stopping channel, reducing drainage treatment procedures and costs. Steel pipes are supported through support components, reducing the amount of earthwork excavation and support costs, and improving construction safety.
This device improves construction safety and efficiency by reducing drainage treatment and support costs, reduces construction period and investment, and significantly improves the safety and economic benefits of trench excavation construction.
Smart Images

Figure CN118856098A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a high groundwater level gravel foundation pressure steel pipe construction device. Background Art
[0002] Penstock refers to a steel pipe that transports water from a reservoir, forebay or surge chamber to a turbine generator. It is an important part of the water diversion system of a hydropower station project. It can be divided into backfill steel pipes (buried pipes) and exposed pipes according to the layout. Compared with exposed pipes, the advantages of buried pipes are that temperature stress is greatly reduced, expansion joints and supports are reduced, construction costs are reduced, the original vegetation can be restored, and the ecological environment can be protected. The excavation method of the buried pipe trench is restricted by factors such as geology, hydrology and on-site construction conditions, and needs to be determined after technical and economic comparison. When trench excavation is carried out on a gravel foundation with a high groundwater level, drainage and support are difficult and expensive, and there is a risk of landslides, which is a major difficulty in the construction process. Reasonable technical treatment measures should be taken for this.
[0003] Due to the high groundwater level and the large water permeability of the gravel foundation, in order to maintain dry field operations for pipeline construction, the construction plan of steel sheet pile support + pipe well dewatering or slope excavation + pipe well dewatering is generally adopted. During the pipeline construction process, the trench must be stable and safe, and the groundwater level must be kept down to a controllable range.
[0004] However, the above method has the following problems: (1) The steel sheet pile support process is complex and expensive; (2) The amount of slope excavation is large and the pipe well dewatering takes a long time; (3) Due to the influence of drainage, landslides may occur during the construction process, resulting in safety accidents or negative impacts on surrounding buildings, pipelines, and plants.
[0005] In summary, the traditional trench excavation construction method for high groundwater level gravel foundations is expensive, difficult to drain, and has great safety hazards, so it needs to be improved. Summary of the invention
[0006] In view of this, the present invention provides a high groundwater level gravel foundation pressure steel pipe construction device.
[0007] Specifically, the present invention is achieved through the following technical solutions:
[0008] According to a first aspect of the present invention, there is provided a high groundwater level gravel foundation pressure steel pipe construction device, comprising:
[0009] Water stop groove, used for installing pressure steel pipe;
[0010] A pressure steel pipe is used to transport water; the pressure steel pipe is installed in the water stop groove, and both ends of the pressure steel pipe pass through the water stop groove;
[0011] A support assembly, used to support the pressure steel pipe; the support assembly is arranged in the water stop groove, and the top supports the pressure steel pipe;
[0012] A drainage component, used to drain the water accumulated in the water stop groove; the drainage component is arranged in the water stop groove;
[0013] The water-blocking component is used to block the flow of water; the water-blocking component is arranged on the water-stopping groove and passes through the water-stopping groove.
[0014] Optionally, the pressure steel pipe includes: an upstream steel pipe, and the upstream steel pipe passes through the left side wall of the water stop groove.
[0015] Optionally, the pressure steel pipe also includes: a downstream steel pipe, and the downstream steel pipe passes through the right side wall of the water stop groove.
[0016] Optionally, the pressure steel pipe further includes: an intermediate steel pipe, the left end of the intermediate steel pipe is seal-welded to the upstream steel pipe, and the right end of the intermediate steel pipe is seal-welded to the downstream steel pipe.
[0017] Optionally, the support assembly includes: a left support, which is arranged on the left bottom wall of the water stop groove and supports the upstream steel pipe at the top.
[0018] Optionally, the support assembly further includes: a right support, which is arranged on the right bottom wall of the water stop groove and supports the downstream steel pipe at the top.
[0019] Optionally, the support assembly further includes: an intermediate support, which is arranged on the inner bottom wall of the water stop groove and supports the intermediate steel pipe at the top.
[0020] Optionally, the drainage assembly includes: a drainage pump and a drainage pipe, wherein the drainage pump is arranged in the water-stopping groove, and the drainage pipe is connected to the drainage pump, and the end of the drainage pipe extends out of the water-stopping groove.
[0021] Optionally, the water-blocking assembly includes: a door groove and a water-blocking door, wherein the door groove is arranged on the side wall of the water-stop groove, and the water-blocking door is arranged at the door groove.
[0022] Optionally, the water-blocking component further includes: a sealing ring, which is arranged at the connection between the drainage component and the water-stop groove.
[0023] The technical solution provided by the present invention brings at least the following beneficial effects:
[0024] The application provides a high groundwater level gravel foundation pressure steel pipe construction device. When excavating a pressure steel pipe trench on a gravel foundation with a high groundwater level, the groundwater can be isolated outside the water stop groove through a water stop groove and a closed water gate. There is no need to adopt continuous precipitation measures such as pipe wells or well points, which reduces the drainage treatment process and costs. At the same time, the water stop groove can play a supporting role, reducing the earthwork excavation project volume and support costs. The operator is safe in the water stop groove, and there is no risk of casualties even if the slope collapses. In short, this new construction equipment and solution improves the safety of trench excavation construction, saves construction time, reduces investment, and has obvious direct and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0027] Figure 1 A schematic structural diagram of a high groundwater level gravel foundation pressure steel pipe construction device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Figure 1 A high groundwater level gravel foundation pressure steel pipe construction device applicable to an embodiment of the present invention is schematically shown.
[0030] Reference Figure 1 As shown, the present application provides a high groundwater level gravel foundation pressure steel pipe construction device, comprising:
[0031] Water stop groove 1, used for installing the pressure steel pipe;
[0032] A pressure steel pipe is used to transport water; the pressure steel pipe is installed in the water stop groove 1, and both ends of the pressure steel pipe pass through the water stop groove 1;
[0033] A support assembly, used to support the pressure steel pipe; the support assembly is arranged in the water stop groove 1, and supports the pressure steel pipe at the top;
[0034] A drainage component, used to drain the accumulated water in the water stop groove 1; the drainage component is arranged in the water stop groove 1;
[0035] The water-blocking component is used to block the flow of water; the water-blocking component is arranged on the water-stopping groove 1 and passes through the water-stopping groove 1.
[0036] First, a rectangular water stop groove 1 (the side wall and bottom plate of the water stop groove 1 are detachable structures) is prefabricated according to the conditions such as the diameter of the pressure steel pipe, the length of the pipe section and the depth of the groove, and the foundation trench is excavated according to the size of the water stop groove 1; then the water stop groove 1 is sunk, the pressure steel pipe is fixed, and the water-blocking component is lowered; then the water accumulated in the water stop groove 1 is drained with the drainage component; then the bottom plate of the water stop groove 1 is dismantled and taken out, and the groove is backfilled as soon as possible; finally, the water-blocking component is opened, the side wall of the water stop groove 1 is taken out, and then the next pipe section is implemented.
[0037] Exemplarily, the pressure steel pipe includes: an upstream steel pipe 2 , and the upstream steel pipe 2 passes through the left side wall of the water stop groove 1 .
[0038] In the embodiment of the present application, the upstream steel pipe 2 is used to receive external drainage.
[0039] Exemplarily, the pressure steel pipe further includes: a downstream steel pipe 4 , and the downstream steel pipe 4 passes through the right side wall of the water stop groove 1 .
[0040] In the embodiment of the present application, the downstream steel pipe 4 is used to receive the water discharged from the upstream steel pipe 2.
[0041] Exemplarily, the pressure steel pipe further includes: an intermediate steel pipe 3 , the left end of the intermediate steel pipe 3 is sealed and welded to the upstream steel pipe 2 , and the right end of the intermediate steel pipe 3 is sealed and welded to the downstream steel pipe 4 .
[0042] In the embodiment of the present application, the intermediate steel pipe 3 is used to connect the upstream steel pipe 2 and the downstream steel pipe 4 , and the water in the upstream steel pipe 2 flows into the downstream steel pipe 4 through the intermediate steel pipe 3 .
[0043] Exemplarily, the support assembly includes: a left support 5, which is arranged on the left bottom wall of the water stop groove 1 and supports the upstream steel pipe 2 at the top.
[0044] In the embodiment of the present application, the left support 5 is used to support the upstream steel pipe 2.
[0045] Exemplarily, the support assembly further includes: a right support 13 , which is disposed on the right bottom wall of the water stop groove 1 and supports the downstream steel pipe 4 at the top.
[0046] In the embodiment of the present application, the right support 13 is used to support the downstream steel pipe 4.
[0047] Exemplarily, the support assembly further includes: an intermediate support 6 , which is disposed on the inner bottom wall of the water stop groove 1 and supports the intermediate steel pipe 3 at the top.
[0048] In the embodiment of the present application, the middle support 6 is used to support the middle steel pipe 3 .
[0049] Exemplarily, the drainage assembly includes: a drainage pump 10 and a drainage pipe, wherein the drainage pump 10 is disposed in the water-stopping groove 1 , and the drainage pipe is connected to the drainage pump 10 , and an end thereof extends out of the water-stopping groove 1 .
[0050] In the embodiment of the present application, the drainage pump 10 is used to extract and drain the water in the water-stopping groove 1 .
[0051] Exemplarily, the water-blocking assembly includes: a door groove 7 and a water-blocking door 8 , wherein the door groove 7 is arranged on the side wall of the water-stop groove 1 , and the water-blocking door 8 is arranged at the door groove 7 .
[0052] In the embodiment of the present application, the water-blocking door 8 is detachably installed at the door groove 7, and can close the door groove 7 to block water.
[0053] Exemplarily, the water-blocking component further includes: a sealing ring 9 , which is arranged at the connection between the drainage component and the water-stop groove 1 .
[0054] In the embodiment of the present application, the sealing ring 9 is used to prevent water from flowing into the water stopping groove from the gap at the connection between the drainage component and the water stopping groove 1.
[0055] When using the high groundwater level gravel foundation pressure steel pipe construction device provided by the present application, firstly, a rectangular water stop groove 1 (the side wall and bottom plate of the water stop groove 1 are detachable structures) is prefabricated according to conditions such as the pressure steel pipe diameter, pipe section length and groove depth, and the foundation trench is excavated according to the size of the water stop groove 1; then the water stop groove 1 is sunk, the upstream steel pipe 2 and the downstream steel pipe 4 are fixed, the water closing gate 8 is lowered, and the water is stopped by the sealing ring 9 (no continuous precipitation measures such as pipe wells or well points are required); then the water in the water stop groove 1 is drained with a water pump 10, and the middle steel pipe 3 is hoisted in to complete the welding operation, forming the left weld 11 and the right weld 12 respectively; after the welding operation is completed, the bottom plate of the water stop groove 1 is removed and taken out, and the groove is backfilled as soon as possible; finally, the water closing gate 8 is opened, the side wall of the water stop groove 1 is taken out, and the next pipe section is implemented.
[0056] The application provides a high groundwater level gravel foundation pressure steel pipe construction device. When excavating a pressure steel pipe trench on a gravel foundation with a high groundwater level, the groundwater can be isolated outside the water stop groove through a water stop groove and a closed water gate. There is no need to adopt continuous precipitation measures such as pipe wells or well points, which reduces the drainage treatment process and costs. At the same time, the water stop groove can play a supporting role, reducing the earthwork excavation project volume and support costs. The operator is safe in the water stop groove, and there is no risk of casualties even if the slope collapses. In short, this new construction equipment and solution improves the safety of trench excavation construction, saves construction time, reduces investment, and has obvious direct and social benefits.
[0057] It should be noted that, in the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0058] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0059] In addition, the terms "installed", "set", "provided with", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0060] In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, elements or components (the specific types and structures may be the same or different), and are not used to indicate or imply the relative importance and quantity of the indicated devices, elements or components. Unless otherwise specified, "plurality" means two or more.
[0061] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.
Claims
1. A high groundwater level gravel foundation pressure steel pipe construction device, It is characterized in that include: Water stop groove, used for installing pressure steel pipe; A pressure steel pipe is used to transport water; the pressure steel pipe is installed in the water stop groove, and both ends of the pressure steel pipe pass through the water stop groove; A support assembly, used to support the pressure steel pipe; the support assembly is arranged in the water stop groove, and the top supports the pressure steel pipe; A drainage component, used to drain the water accumulated in the water stop groove; the drainage component is arranged in the water stop groove; The water-blocking component is used to block the flow of water; the water-blocking component is arranged on the water-stopping groove and passes through the water-stopping groove.
2. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 1, It is characterized in that The pressure steel pipe includes: an upstream steel pipe, and the upstream steel pipe passes through the left side wall of the water stop groove.
3. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 2, It is characterized in that The pressure steel pipe also includes: a downstream steel pipe, and the downstream steel pipe passes through the right side wall of the water stop groove.
4. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 3, It is characterized in that The pressure steel pipe also includes: an intermediate steel pipe, the left end of the intermediate steel pipe is sealed and welded to the upstream steel pipe, and the right end of the intermediate steel pipe is sealed and welded to the downstream steel pipe.
5. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 2, It is characterized in that The support assembly includes: a left support, which is arranged on the left bottom wall of the water stop groove and supports the upstream steel pipe at the top.
6. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 3, It is characterized in that The support assembly also includes: a right support, which is arranged on the right bottom wall of the water stop groove and supports the downstream steel pipe at the top.
7. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 4, It is characterized in that The support assembly further includes: an intermediate support, which is arranged on the inner bottom wall of the water stop groove and supports the intermediate steel pipe at the top.
8. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 1, It is characterized in that The drainage assembly comprises: a drainage pump and a drainage pipe, wherein the drainage pump is arranged in the water-stopping groove, and the drainage pipe is connected to the drainage pump, and the end of the drainage pipe extends out of the water-stopping groove.
9. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 1, It is characterized in that The water-blocking assembly comprises: a door groove and a water-blocking door, wherein the door groove is arranged on the side wall of the water-stop groove, and the water-blocking door is arranged at the door groove.
10. The high groundwater level gravel foundation pressure steel pipe construction device according to claim 9, It is characterized in that The water-blocking component also includes a sealing ring, which is arranged at the connection between the drainage component and the water-stopping groove.
Citation Information
Patent Citations
Pipe foundation dewatering construction method adopted during buried pipe construction
CN107724405A
Water flow channel-changing transition device between new and old pipelines
CN112554279A
Direct-buried steam pipeline caisson structure and construction method
CN113863346A
Light well point and steel jacket box combined dewatering support construction method
CN115110538A
Fabricated concrete structure for supporting deep foundation pit
CN115573350A