Method, device and equipment for deducing disaster range of power distribution network

By generating a disaster-affected network diagram and analyzing the distribution network lines, predicting the scope of disaster expansion, the problem of deduction of the disaster-affected scope of the distribution network is solved, and the preparation and response capabilities for disaster response are improved.

CN118886535APending Publication Date: 2024-11-01STATE GRID CORPORATION OF CHINA +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410904514.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing technology is difficult to deduce the disaster scope of the distribution network in advance, making it difficult to predict and prepare response measures in advance when a disaster occurs, affecting the stability of the power grid and the safety of users' power consumption.

Method used

By obtaining the coordinate location and distribution network lines of the substation that have been affected by the disaster, generating a disaster-affected network diagram, analyzing the location and number of main and secondary trunk lines, determining the extension direction of the main trunk lines, and then predicting the possible expansion range of future disasters, and accordingly Adjust the deduction range of disaster movement direction.

Benefits of technology

It has achieved rapid and accurate assessment of the disaster range of the distribution network, provided a basis for advance prediction and response to disasters, and ensured grid stability and user power safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886535A_ABST
    Figure CN118886535A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power distribution networks, and discloses a power distribution network disaster range deduction method, device and equipment, the power distribution network comprises a central substation and sub-substations radiating outwards from the central substation, and the method comprises the following steps: obtaining a first coordinate position, a second coordinate position and a disaster distribution network line which are affected by a disaster; generating a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster-affected mesh diagram comprises a disaster-affected main trunk line and a disaster-affected auxiliary trunk line; determining the extension direction of the disaster-affected main line according to the position of the disaster-affected main line in the disaster-affected mesh diagram and the number of the disaster-affected auxiliary main lines in the disaster-affected mesh diagram; and extending the disaster-affected trunk line according to the extension direction, and generating a first deduction range of the future disaster. According to the invention, the power grid disaster range can be predicted in advance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of distribution network, and in particular to a method, device and equipment for deducing a disaster affected area of ​​a distribution network. Background Art

[0002] The distribution network is an indispensable part of the power system. Its main function is to receive the electric energy transmitted from the transmission network or regional power plants, and distribute it to various users locally or step by step according to the voltage through the distribution facilities. It usually adopts closed-loop design and open-loop operation, and its structure is radial. This design enables the electric energy to be effectively transmitted from the center (such as the substation) to each user, and at the same time helps to manage and control the operation of the power grid. If the central substation is affected by a disaster, it will directly affect the power consumption of users in the corresponding area.

[0003] Therefore, it is urgent to solve the problem of how to predict the disaster-stricken scope of the distribution network in advance. Summary of the invention

[0004] The present application provides a method, device and equipment for deducing the disaster-affected scope of a distribution network, which solves the technical problem of how to pre-deduce the disaster-affected scope of a distribution network and achieves the technical effect of predicting the disaster-affected scope of the power grid in advance.

[0005] In order to achieve the above objectives, the main technical solutions adopted in this application include: In a first aspect, an embodiment of the present application provides a method for deducing a disaster range of a distribution network, wherein the distribution network includes a central substation and substations radiating outward from the central substation, and the method includes: Acquire a first coordinate position, a second coordinate position, and a distribution network line affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the distribution network line affected by the disaster represents the line connection between the central substation and the sub-substation; Generate a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster-affected distribution network line; wherein the disaster-affected network diagram includes a disaster-affected main line and a disaster-affected secondary line; Determine the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram; The affected trunk line is extended according to the extension direction to generate a first deduced range of future disasters.

[0006] The embodiment of the present application proposes a method for deducing the affected range of a distribution network, which ensures that deduction can be performed based on the substations and lines actually affected by the disaster by obtaining the first coordinate position, the second coordinate position and the affected distribution network line. Then, the generation of the affected network diagram can quickly and intuitively understand the affected range of the disaster area. By analyzing the position of the affected trunk line in the network diagram and the number of affected secondary trunk lines in the affected network diagram, the future extension direction of the affected trunk line can be predicted. Based on the extension direction, the affected trunk line can be extended to obtain the first deduction range, and the possible extension range of the future disaster can be predicted.

[0007] Optionally, generating a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster network diagram includes a disaster main line and a disaster secondary line, including: Screening the disaster conditions of the affected distribution network line adjacent to the first coordinate position to determine a first target position; judging the number of connections and line connection mode of the first target position to the affected distribution network line, and determining the affected main line and the first affected secondary line according to the judgment result; Determine the second coordinate position and the affected distribution network line corresponding to the second coordinate position as the second affected secondary trunk line; The first damaged secondary trunk line and the second damaged secondary trunk line are combined into the damaged secondary trunk line, and the damaged secondary trunk line and the damaged main trunk line are combined to generate the damaged network diagram.

[0008] The embodiment of the present application proposes to analyze the affected distribution network lines and screen out the disaster conditions adjacent to the affected central substation (first coordinate position) to determine the first target position. Then, according to the number of affected distribution network lines connected to the first target position and the connection method, the main line connection method involved is determined as the affected main line, and the secondary line connection method is determined as the first affected secondary trunk line. At the same time, all the second coordinate positions and the affected distribution network lines corresponding to the second coordinate positions are directly determined as the second affected secondary trunk lines. This combination obtains a disaster network diagram, which can effectively distinguish the affected lines of different levels in the distribution network, and form a comprehensive disaster situation diagram, which is helpful to provide a basis for the subsequent intuitive deduction of future disaster situations.

[0009] Optionally, the determining the number of connections and the line connection mode of the first target location connected to the affected distribution network line, and determining the affected main line and the first affected secondary line according to the determination result, includes: According to the time sequence of the disaster, determining the number of connections and the line connection mode of the first target location to the affected distribution network line; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is unique, the line connection mode corresponding to the largest number of connections is determined as the affected main line, and the remaining line connection modes are determined as the first affected secondary trunk lines; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is not unique, the affected main line and the first affected secondary line are determined according to the time taken by each line connection mode corresponding to the largest number of connections.

[0010] The embodiment of the present application proposes that through time sequence analysis, the first target position that is affected first or simultaneously can be identified, providing basic data for determining the affected main line and the first secondary line. If the line connection method corresponding to the first target position with the largest number of connections is unique, this indicates that the propagation of the disaster has a clear directionality. When there are multiple line connection methods with the largest number of connections, time analysis can help determine the speed and priority of the disaster propagation, and the final affected main line and the first affected secondary line determine the disaster propagation path and impact range.

[0011] Optionally, determining the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram includes: Partitioning the disaster-stricken network graph according to the position of the disaster-stricken trunk line in the disaster-stricken network graph to obtain a first partition and a second partition; Determine a first area ratio of the first partition in the disaster-affected network graph, and a second area ratio of the second partition in the disaster-affected network graph; The extension direction of the damaged main trunk line is determined according to the number of the damaged secondary trunk lines in the first subarea and the second subarea.

[0012] The embodiment of the present application proposes to partition the network diagram according to the position of the affected main trunk line in the affected network diagram to obtain the first partition and the second partition; calculate the area ratio of the first partition and the second partition in the affected network diagram, which reflects the importance of each partition in the overall disaster-stricken area and the possible degree of disaster, which helps to evaluate the severity of the disaster in each partition; count the number of affected secondary trunk lines in the first partition and the second partition, which helps to identify possible disaster propagation paths and high-risk areas, and provide support for determining the extension direction of the main trunk line. Then, based on the area ratio of the first partition and the second partition and the number of secondary trunk lines, determine the extension direction of the affected main trunk line, provide direction for subsequent deductions, and ensure the accuracy of the deductions.

[0013] Optionally, extending the affected trunk line according to the extension direction to generate a first deduced range of future disasters includes: The affected trunk line is extended according to the extension direction to generate the first simulated range of future disasters; wherein, during the extension operation, the first area ratio and the second area ratio are controlled to remain unchanged.

[0014] The embodiment of the present application proposes to extend the affected trunk line according to the determined extension direction to generate a first deduction range that may be affected in the future. The control of the area ratio helps to maintain a balanced consideration of the affected area and avoid over- or under-estimation of certain areas due to the extension operation.

[0015] Optionally, the method further comprises: According to the pre-acquired disaster movement direction, the first deduction range is adjusted to generate a second deduction range.

[0016] The embodiment of the present application proposes to adjust the first deduction range according to the pre-acquired disaster movement direction to more accurately reflect the actual propagation path of the disaster. The adjusted deduction range is closer to the actual disaster propagation situation and can more effectively guide disaster response and power dispatching.

[0017] Optionally, adjusting the first deduction range according to the pre-acquired disaster movement direction to generate a second deduction range includes: Obtaining the coordinates of a central substation on the affected trunk line within the first deduction range; Fitting the coordinate points to generate a fitting curve; The angle between the disaster movement direction and the fitting curve is judged, and the central substation on the disaster-affected trunk line in the first deduction range is adjusted according to the judgment result to obtain the second deduction range.

[0018] The embodiment of the present application proposes to extract the coordinate points of the central substation on the affected trunk line from the first deduction range for fitting, providing a trend describing the current distribution of the affected area, which is helpful to predict the further propagation path of the disaster. The angle between the disaster movement direction and the fitting curve is calculated to reflect the relationship between the disaster propagation direction and the current distribution of the affected area. The consistency or deviation between the disaster movement direction and the existing affected area can be evaluated through the size of the angle, providing a basis for adjusting the deduction range and obtaining a second deduction range with high accuracy.

[0019] Optionally, judging the angle between the disaster moving direction and the fitting curve, and adjusting the central substation on the affected trunk line in the first deduction range according to the judgment result to obtain the second deduction range, comprises: Determining the angle between the disaster moving direction and the fitting curve; If the angle is greater than a first threshold, a central substation in the area between the disaster moving direction and the fitting curve that is not on the disaster-affected trunk line in the first deduction range is determined as a target central substation; Determining the distance between the central substation on the affected trunk line in the first deduction range and the adjacent target central substation; If the distance is less than a second threshold, the central substation on the affected trunk line in the first deduction range is replaced by the target central substation to generate the second deduction range.

[0020] The size of the angle proposed in the embodiment of the present application provides a quantitative measure of the relationship between the direction of disaster propagation and the trend of the affected area. If the angle is greater than a preset first threshold, it indicates that the disaster may propagate in a new direction outside the current affected area. At this time, the central substation in the area between the disaster movement direction and the fitting curve is determined as the target central substation, and a new area that may be affected is obtained. Then, the distance between the central substation on the affected trunk line within the first deduction range and the adjacent target central substation is judged. If the distance between the central substation and the adjacent target central substation is less than the second threshold, the central substation within the first deduction range is replaced with the target central substation to generate a second deduction range. It ensures that the deduction range is as close as possible to the actual possible disaster propagation path, thereby improving the accuracy and practicality of the deduction.

[0021] In a second aspect, an embodiment of the present application provides a device for deducing a disaster range of a distribution network, wherein the distribution network includes a central substation and substations radiating outward from the central substation, and the device includes: A position acquisition module, used to acquire a first coordinate position, a second coordinate position and a distribution network line affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the distribution network line affected by the disaster represents the line connection between the central substation and the sub-substation; A network diagram generating module, used for generating a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster network diagram includes a disaster main line and a disaster secondary line; An extension direction determination module, used to determine the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram; The first deduction module is used to extend the disaster-affected trunk line according to the extension direction to generate a first deduction range of future disasters.

[0022] The embodiment of the present application proposes a distribution network disaster range deduction device, which obtains the first coordinate position, the second coordinate position and the affected distribution network line that have been affected by the disaster, to ensure that deduction can be performed based on the substations and lines that are actually affected. Then, the generation of the disaster network diagram can quickly and intuitively understand the impact range of the disaster area. By analyzing the position of the affected trunk line in the network diagram and the number of affected secondary trunk lines in the affected network diagram, the future extension direction of the affected trunk line can be predicted. Based on the extension direction, the affected trunk line can be extended to obtain the first deduction range, and the range of possible expansion of future disasters can be predicted.

[0023] Optionally, the network diagram generating module includes: A first target position determining unit, configured to screen the disaster conditions adjacent to the first coordinate position in the disaster-affected distribution network line to determine the first target position; A quantity and connection mode judgment unit, used to judge the number of connections and line connection modes of the first target location connected to the affected distribution network line, and determine the affected main line and the first affected secondary line according to the judgment result; A second damaged secondary trunk line determining unit, configured to determine the second coordinate position and the damaged distribution network line corresponding to the second coordinate position as a second damaged secondary trunk line; The disaster network diagram generating unit is used for forming the first disaster-affected secondary trunk line and the second disaster-affected secondary trunk line into the disaster-affected secondary trunk line, and combining the disaster-affected secondary trunk line with the disaster-affected main trunk line to generate the disaster network diagram.

[0024] The embodiment of the present application proposes to analyze the affected distribution network lines and screen out the disaster conditions adjacent to the affected central substation (first coordinate position) to determine the first target position. Then, according to the number of affected distribution network lines connected to the first target position and the connection method, the main line connection method involved is determined as the affected main line, and the secondary line connection method is determined as the first affected secondary trunk line. At the same time, all the second coordinate positions and the affected distribution network lines corresponding to the second coordinate positions are directly determined as the second affected secondary trunk lines. This combination obtains a disaster network diagram, which can effectively distinguish the affected lines of different levels in the distribution network, and form a comprehensive disaster situation diagram, which is helpful to provide a basis for the subsequent intuitive deduction of future disaster situations.

[0025] Optionally, the quantity and connection mode determination unit includes: According to the time sequence of the disaster, determining the number of connections and the line connection mode of the first target location to the affected distribution network line; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is unique, the line connection mode corresponding to the largest number of connections is determined as the affected main line, and the remaining line connection modes are determined as the first affected secondary trunk lines; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is not unique, the affected main line and the first affected secondary line are determined according to the time taken by each line connection mode corresponding to the largest number of connections.

[0026] The embodiment of the present application proposes that through time sequence analysis, the first target position that is affected first or simultaneously can be identified, providing basic data for determining the affected main line and the first secondary line. If the line connection method corresponding to the first target position with the largest number of connections is unique, this indicates that the propagation of the disaster has a clear directionality. When there are multiple line connection methods with the largest number of connections, time analysis can help determine the speed and priority of the disaster propagation, and the final affected main line and the first affected secondary line determine the disaster propagation path and impact range.

[0027] Optionally, the extension direction determination module includes: A partitioning unit, configured to partition the disaster-affected network diagram according to the position of the disaster-affected trunk line in the disaster-affected network diagram to obtain a first partition and a second partition; An area ratio determination unit, configured to determine a first area ratio of the first partition in the disaster-affected network graph, and a second area ratio of the second partition in the disaster-affected network graph; An extension direction determining unit is used to determine the extension direction of the affected main line according to the number of the affected secondary trunk lines in the first partition and the second partition.

[0028] The embodiment of the present application proposes to partition the network diagram according to the position of the affected main trunk line in the affected network diagram to obtain the first partition and the second partition; calculate the area ratio of the first partition and the second partition in the affected network diagram, which reflects the importance of each partition in the overall disaster-stricken area and the possible degree of disaster, which helps to evaluate the severity of the disaster in each partition; count the number of affected secondary trunk lines in the first partition and the second partition, which helps to identify possible disaster propagation paths and high-risk areas, and provide support for determining the extension direction of the main trunk line. Then, based on the area ratio of the first partition and the second partition and the number of secondary trunk lines, determine the extension direction of the affected main trunk line, provide direction for subsequent deductions, and ensure the accuracy of the deductions.

[0029] Optionally, the first deduction module includes: An extension operation unit, configured to perform an extension operation on the affected trunk line according to the extension direction to generate the first deduction range of future disasters; Wherein, during the extending operation, the first area ratio and the second area ratio are controlled to remain unchanged.

[0030] The embodiment of the present application proposes to extend the affected trunk line according to the determined extension direction to generate a first deduction range that may be affected in the future. The control of the area ratio helps to maintain a balanced consideration of the affected area and avoid over- or under-estimation of certain areas due to the extension operation.

[0031] Optionally, the device further comprises: The second deduction module is used to adjust the first deduction range according to the pre-acquired disaster movement direction to generate a second deduction range.

[0032] The embodiment of the present application proposes to adjust the first deduction range according to the pre-acquired disaster movement direction to more accurately reflect the actual propagation path of the disaster. The adjusted deduction range is closer to the actual disaster propagation situation and can more effectively guide disaster response and power dispatching.

[0033] Optionally, the second deduction module includes: A coordinate point acquisition unit, used to acquire the coordinate point of the central substation on the affected trunk line in the first deduction range; A fitting unit, used for fitting the coordinate points to generate a fitting curve; The second deduction unit is used to judge the angle between the disaster movement direction and the fitting curve, and adjust the central substation on the disaster-stricken trunk line in the first deduction range according to the judgment result to obtain the second deduction range.

[0034] The embodiment of the present application proposes to extract the coordinate points of the central substation on the affected trunk line from the first deduction range for fitting, providing a trend describing the current distribution of the affected area, which is helpful to predict the further propagation path of the disaster. The angle between the disaster movement direction and the fitting curve is calculated to reflect the relationship between the disaster propagation direction and the current distribution of the affected area. The consistency or deviation between the disaster movement direction and the existing affected area can be evaluated through the size of the angle, providing a basis for adjusting the deduction range and obtaining a second deduction range with high accuracy.

[0035] Optionally, the second deduction unit includes: An angle judgment subunit, used for judging the angle between the disaster moving direction and the fitting curve; a target central substation determination subunit, configured to determine, if the angle is greater than a first threshold, a central substation in the area between the disaster movement direction and the fitting curve that is not on the disaster-affected trunk line in the first deduction range as a target central substation; A distance judgment subunit, used for judging the distance between the central substation on the affected trunk line in the first deduction range and the adjacent target central substation; The second deduction generation subunit is used to replace the central substation on the disaster-stricken trunk line in the first deduction range with the target central substation to generate the second deduction range if the distance is less than a second threshold.

[0036] The size of the angle proposed in the embodiment of the present application provides a quantitative measure of the relationship between the direction of disaster propagation and the trend of the affected area. If the angle is greater than a preset first threshold, it indicates that the disaster may propagate in a new direction outside the current affected area. At this time, the central substation in the area between the disaster movement direction and the fitting curve is determined as the target central substation, and a new area that may be affected is obtained. Then, the distance between the central substation on the affected trunk line within the first deduction range and the adjacent target central substation is judged. If the distance between the central substation and the adjacent target central substation is less than the second threshold, the central substation within the first deduction range is replaced with the target central substation to generate a second deduction range. It ensures that the deduction range is as close as possible to the actual possible disaster propagation path, thereby improving the accuracy and practicality of the deduction.

[0037] In a third aspect, an embodiment of the present application provides a computer device, including: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the above-mentioned method for simulating the disaster affected range of the distribution network by executing the computer instructions.

[0038] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, on which computer instructions are stored, and the computer instructions are used to enable a computer to execute the above-mentioned method for simulating the disaster-affected scope of a distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the specific implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0040] Figure 1 A flow chart of a method for deducing a disaster-affected area of ​​a distribution network provided in an embodiment of the present application; Figure 2 A flowchart of step S3 provided in an embodiment of the present application; Figure 3A flowchart of step S33 provided in an embodiment of the present application; Figure 4 A flowchart of step S5 provided in an embodiment of the present application; Figure 5 A flowchart for generating a second deduction range provided in an embodiment of the present application; Figure 6 A flowchart of step S9 provided in an embodiment of the present application; Figure 7 A flowchart of step S95 provided in an embodiment of the present application; Figure 8 A device for deducing the disaster-affected range of a distribution network provided in an embodiment of the present application; Fig. 9 A schematic diagram of the structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0042] The distribution network is an important part of the power system. It receives electricity from the transmission network or regional power plants and distributes it to various users on-site or step by step according to voltage through distribution facilities. However, natural disasters such as earthquakes, typhoons, and floods may have varying degrees of impact on substation facilities in the distribution network. The distribution network usually adopts a closed-loop design with a radial structure. If the central substation is affected by a disaster, it will directly affect the substations connected to it, thereby affecting the electricity consumption of users in the corresponding area. Therefore, it is necessary to predict possible disasters in the future so that staff can plan and prepare response measures in advance to reduce the impact of disasters on the power grid.

[0043] This specification provides a distribution network disaster range deduction method, device and equipment, which can quickly evaluate the distribution network area that may be affected when a natural disaster occurs and take emergency measures in time. For example, when a coastal area is affected by a typhoon, the possible future disaster range can be deduced based on the actual disaster situation so that the staff can formulate corresponding emergency plans.

[0044] According to an embodiment of the present application, an embodiment of a method for simulating the disaster-affected scope of a distribution network is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0045] In this embodiment, a method for deducing the disaster affected area of ​​a distribution network is provided. Figure 1 A flow chart of a method for deducing a disaster-affected area of ​​a distribution network provided in an embodiment of the present application, such as Figure 1 As shown, the second distribution network includes a central substation and substations radiating outward from the second central substation. The process includes the following steps: Step S1, obtaining a first coordinate position, a second coordinate position and an affected distribution network line that have been affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the affected distribution network line represents the line connection between the central substation and the sub-substation.

[0046] Specifically, the geographical location information of each central substation and substation, such as longitude and latitude, is used to determine the coordinate position of each substation in the plane coordinate system, and the line connection between the central substation and the substation is represented by a connecting line in the plane coordinate system, including the line connection between adjacent central substations and the line connection between each central substation and its corresponding substation. These line connections reflect the path of power transmission in the distribution network. When a disaster occurs, the first coordinate position corresponding to the central substation affected by the disaster and the second coordinate position corresponding to the substation are obtained in the plane coordinate system, and the affected distribution network line, that is, the line connection between the affected central substation and the substation, is determined.

[0047] Step S3, generating a disaster-affected network diagram according to the first coordinate position, the second coordinate position and the disaster-affected distribution network line; wherein the disaster-affected network diagram includes a disaster-affected main line and a disaster-affected secondary line.

[0048] Specifically, the first coordinate position, the second coordinate position and the affected distribution network line are used to establish a disaster network diagram, including all substations and the line connections between them. The distribution and severity of the affected area and the possible disaster propagation path are determined through the affected main lines and secondary lines in the disaster network diagram, providing a visual analysis diagram for subsequent disaster simulation.

[0049] Step S5, determining the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram.

[0050] Specifically, according to the position of the affected main trunk line in the affected network diagram, the severely affected substations and the main propagation paths of the disaster can be located. By analyzing the number of affected secondary trunk lines in the affected network diagram, the possibility of the expansion of the affected area and the potential impact range of the disaster propagation can be evaluated. Generally, the direction with more secondary trunk lines may indicate an area where the disaster is more likely to spread. Therefore, combined with the position of the affected main trunk line in the network diagram and the number of affected secondary trunk lines, the extension direction of the affected main trunk line can be determined.

[0051] Step S7, extending the affected trunk line according to the extension direction to generate a first deduced range of future disasters.

[0052] Specifically, according to the determined extension direction, the affected trunk line is extended to generate a first deduced range that may be affected in the future.

[0053] The embodiment of the present application proposes a method for deducing the affected range of a distribution network, which ensures that deduction can be performed based on the substations and lines actually affected by the disaster by obtaining the first coordinate position, the second coordinate position and the affected distribution network line. Then, the generation of the affected network diagram can quickly and intuitively understand the affected range of the disaster area. By analyzing the position of the affected trunk line in the network diagram and the number of affected secondary trunk lines in the affected network diagram, the future extension direction of the affected trunk line can be predicted. Based on the extension direction, the affected trunk line can be extended to obtain the first deduction range, and the possible extension range of the future disaster can be predicted.

[0054] Figure 2 The flowchart of step S3 provided in the embodiment of the present application may include the following steps: Step S31, screening the disaster conditions of the distribution network lines adjacent to the first coordinate position in the disaster-stricken distribution network line to determine a first target position.

[0055] Specifically, the adjacent positions of each affected central substation, that is, the first coordinate positions of other directly connected central substations, are analyzed, and the adjacent positions are screened. Network analysis techniques, such as clustering algorithms, can be used to identify the affected central substations, and identify the central substations that are affected in the disaster and closely connected to other affected central substations. These represent strongly correlated affected central substations. For those adjacent central substations that are not affected or have fewer connections, they are determined to be weakly correlated and are not used as the first target position.

[0056] Step S33, determining the number of connections and the line connection mode of the first target location to the affected distribution network line, and determining the affected main line and the first affected secondary line according to the determination result.

[0057] Specifically, the number of connections of the affected distribution network lines connected to each first target location (i.e., the strongly related affected central substation) is counted, and the connection methods of these lines are analyzed, including how they are connected to each other and whether there are multiple paths connecting the same central substation. According to the number of connections and the connection methods, the affected main line and the first affected secondary line are distinguished. The affected main line is usually a line connecting multiple affected central substations, while the first affected secondary line may be a line with fewer connections.

[0058] Step S35: determine the second coordinate position and the affected distribution network line corresponding to the second coordinate position as the second affected secondary trunk line.

[0059] Specifically, the lines connected to each affected sub-substation are analyzed. Due to the large number of sub-substations, all the affected distribution network lines connected to the affected sub-substations are defined as the second affected secondary trunk lines.

[0060] Step S37, the first affected secondary trunk line and the second affected secondary trunk line are combined into the affected secondary trunk line, and the affected secondary trunk line and the affected main trunk line are combined to generate the affected network diagram.

[0061] Specifically, the first affected secondary trunk line and the second affected secondary trunk line are combined to form a total affected secondary trunk line, which forms a network structure, and then the affected secondary trunk line and the affected main trunk line are combined to obtain a disaster network map. GIS (Geographic Information System) or other visualization tools can be used to represent the affected main trunk line and the affected secondary trunk line on the map to form a disaster network map, which is convenient for analyzing future disaster trends.

[0062] and Figure 1 Compared with the embodiment shown, this embodiment analyzes the affected distribution network lines and screens out the disaster conditions adjacent to the affected central substation (first coordinate position) to determine the first target position. Next, according to the number of affected distribution network lines connected to the first target position and the connection method, the main line connection method involved is determined as the affected main line, and the secondary line connection method is determined as the first affected secondary line. At the same time, all the second coordinate positions and the affected distribution network lines corresponding to the second coordinate positions are directly determined as the second affected secondary lines. This combination obtains a disaster network diagram, which can effectively distinguish the affected lines of different levels in the distribution network, and form a comprehensive disaster situation diagram, which is helpful to provide a basis for the subsequent intuitive deduction of future disaster conditions.

[0063] Figure 3 The flowchart of step S33 provided in the embodiment of the present application may include the following steps: Step S331, determining the number of connections and line connection mode of the first target location to the affected distribution network line according to the time sequence of the disaster.

[0064] Specifically, according to the time sequence of the disaster, the line connection mode of the first target location connecting the affected distribution network line is collected, and the number of connections of all the affected distribution network lines connected to each first target location is collected, and the disaster time of each central substation is recorded. The number of connections of each first target location is counted to identify the central substation with the highest connectivity. For example, suppose that a distribution network in a region is damaged due to severe rainstorms. The affected central substations are collected in chronological order, including central substation A, central substation B, and central substation C. For each central substation, the number and line connection mode of the affected distribution network lines connected to them are recorded: central substation A is connected to 3 affected distribution network lines, central substation B is connected to 5 affected distribution network lines, and central substation C is connected to 2 affected distribution network lines. By comparison, it is found that central substation B has the largest number of connections, and there is only one line connection mode corresponding to central substation B.

[0065] For another example, central substation A is connected to 3 affected distribution network lines, central substation B is connected to 5 affected distribution network lines, and central substation C is connected to 5 affected distribution network lines. By comparison, it is found that central substation B and central substation C have the largest number of connections, so there are two corresponding line connection methods for central substation B and central substation C.

[0066] Step S333: If the number of connections is the largest and the line connection mode corresponding to the largest number of connections is unique, the line connection mode corresponding to the largest number of connections is determined as the affected main line, and the remaining line connection modes are determined as the first affected secondary lines.

[0067] Specifically, this unique line connection mode with the largest number of connections is defined as the disaster-affected main trunk line. Other line connection modes except the disaster-affected main trunk line, even if they have a smaller number of connections, are also defined as the first disaster-affected secondary trunk lines. By identifying the disaster-affected main trunk line and the first disaster-affected secondary trunk line, the main distribution of the disaster can be assessed more accurately.

[0068] Step S335, if the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is not unique, then determine the affected main line and the first affected secondary line according to the time taken by each line connection mode corresponding to the largest number of connections.

[0069] Specifically, in the case of multiple connection modes, the time taken for each line connection mode may include the time of disaster, to determine the main trunk line affected by the disaster and the first secondary trunk line affected by the disaster. The line connection mode with the shortest time is selected as the main trunk line affected by the disaster. For example, the time of disaster for each central substation is recorded in the order of the time of disaster impact; the sum of the disaster time for each central substation on the corresponding line connection mode is calculated; the line connection mode with the shortest sum of disaster time is confirmed as the main trunk line affected by the disaster, and the remaining line connection modes are determined as the first secondary trunk lines affected by the disaster.

[0070] and Figure 2 Compared with the embodiment shown, the present embodiment can identify the first target position that is affected first or simultaneously through time sequence analysis, providing basic data for determining the affected main line and the first secondary line. If the line connection method corresponding to the first target position with the largest number of connections is unique, this indicates that the disaster propagation has a clear directionality. When there are multiple line connection methods with the largest number of connections, time analysis can help determine the speed and priority of disaster propagation, and the final affected main line and the first affected secondary line determine the disaster propagation path and impact range.

[0071] Figure 4 The flowchart of step S5 provided in the embodiment of the present application may include the following steps: Step S51, partitioning the disaster-stricken network graph according to the position of the disaster-stricken trunk line in the disaster-stricken network graph to obtain a first partition and a second partition.

[0072] Specifically, in order to identify and distinguish areas with different disaster severity, the disaster network diagram is partitioned according to the location of the disaster trunk line in the disaster network diagram, so as to predict the possible further propagation path of the disaster.

[0073] Step S53: determining a first area ratio of the first partition in the disaster-stricken network graph, and a second area ratio of the second partition in the disaster-stricken network graph.

[0074] Specifically, different area ratios reflect the different degrees of disaster damage in various regions. In the later stage of disaster simulation, predictions must be made based on actual data. Therefore, determining the area ratio of each region is the basis for ensuring that subsequent simulations are in line with actual conditions.

[0075] Step S55: determining the extension direction of the damaged main trunk line according to the number of the damaged secondary trunk lines in the first subarea and the second subarea.

[0076] Specifically, by counting the number of affected secondary trunks in each zone, the difference in the degree of damage in each zone can be reflected. A large number of secondary trunks may mean a more serious disaster. According to the distribution of the affected secondary trunks, the direction or trend of disaster propagation can be revealed, thereby helping to determine the extension direction of the affected main trunk. In this embodiment, the zone with a large number of affected secondary trunks is used as the extension direction of the affected main trunk.

[0077] and Figure 1 Compared with the embodiment shown in the figure, the present embodiment proposes to partition the network diagram according to the position of the affected main trunk line in the affected network diagram to obtain the first partition and the second partition; calculate the area ratio of the first partition and the second partition in the affected network diagram, which reflects the importance of each partition in the overall disaster-stricken area and the possible degree of disaster, which is helpful to evaluate the severity of the disaster in each partition; count the number of affected secondary trunk lines in the first partition and the second partition, which is helpful to identify possible disaster propagation paths and high-risk areas, and provide support for determining the extension direction of the main trunk line. Then, based on the area ratio of the first partition and the second partition and the number of secondary trunk lines, the extension direction of the affected main trunk line is determined to provide direction for subsequent deductions and ensure the accuracy of the deductions.

[0078] In some embodiments, the affected trunk line is extended according to the extension direction to generate the first deduction range of future disasters; Wherein, during the extending operation, the first area ratio and the second area ratio are controlled to remain unchanged.

[0079] Specifically, the affected trunk line is extended according to the extension direction to generate the first deduction range. During the extension process, the area ratio of the first partition and the second partition is constantly checked and ensured to be consistent with the original data. If the area ratio is not controlled, the deduction results may be biased due to human factors or changes in the calculation method, affecting the accuracy of the results. Therefore, the first area ratio and the second area ratio are controlled to remain unchanged to ensure that the deduction results are consistent with the actual disaster situation.

[0080] For example, the disaster-stricken trunk line divides the disaster network map into the first zone and the second zone. The area of ​​the first zone accounts for 30%, and the area of ​​the second zone accounts for 70%. During the extension operation of the disaster-stricken trunk line, the area of ​​the first zone remains at 30%, and the area of ​​the second zone remains at 70% to ensure that the simulation results are consistent with the actual disaster situation.

[0081] The embodiment of the present application proposes to extend the affected trunk line according to the determined extension direction to generate a first deduction range that may be affected in the future. The control of the area ratio helps to maintain a balanced consideration of the affected area and avoid over- or under-estimation of certain areas due to the extension operation.

[0082] Figure 5 The flowchart for generating the second deduction range provided in the embodiment of the present application may include the following steps: Step S9, adjusting the first deduction range according to the pre-acquired disaster movement direction to generate the second deduction range.

[0083] Specifically, due to the dynamic nature of natural disasters, they will change over time and develop. For example, typhoons and floods will adjust their paths and intensities according to meteorological conditions. In order to ensure that the first simulation range is more in line with the actual situation, it is necessary to consider the direction of movement of the disaster. This can be predetermined by analyzing meteorological data, using geographic information systems (GIS), and referring to historical disaster records. By adjusting the first simulation range, the accuracy of the simulation can be improved, making the final simulation range more precise, thereby helping staff improve the disaster response capabilities of the distribution network and ensuring the stability and reliability of the power supply.

[0084] and Figure 1 Compared with the embodiment shown in FIG. 1 , the present embodiment proposes to adjust the first deduction range according to the pre-acquired disaster movement direction to more accurately reflect the actual propagation path of the disaster. The adjusted deduction range is closer to the actual disaster propagation situation and can more effectively guide disaster response and power dispatching.

[0085] Figure 6 The flowchart of step S9 provided in the embodiment of the present application may include the following steps: Step S91, obtaining the coordinate point of the central substation on the affected trunk line in the first deduction range.

[0086] Step S93, fitting the coordinate points to generate a fitting curve.

[0087] Step S95, judging the angle between the disaster moving direction and the fitting curve, and adjusting the central substation on the disaster-affected trunk line in the first deduction range according to the judgment result to obtain the second deduction range.

[0088] Specifically, the locations of all central substations on the affected trunk line are determined, and these locations are represented in the form of coordinate points. Mathematical fitting methods, such as polynomial fitting or linear fitting, are applied to the acquired coordinate points to generate a fitting curve to represent the distribution trend of the affected trunk line. Next, the angle between the direction of disaster movement and the fitting curve is calculated to determine the potential impact of the disaster on the distribution network. The size of the angle can reflect the degree of deviation between the direction of disaster movement and the deduction. Finally, based on the result of the angle judgment, the first deduction range is adjusted to more accurately reflect the possible disaster situation in the future. This embodiment can improve the accuracy of prediction of future disaster-stricken areas.

[0089] and Figure 1 Compared with the embodiment shown in the figure, the coordinate points of the central substation on the affected trunk line are extracted from the first deduction range for fitting, providing a trend describing the current distribution of the affected area, which is helpful to predict the further propagation path of the disaster. The angle between the disaster movement direction and the fitting curve is calculated to reflect the relationship between the disaster propagation direction and the current distribution of the affected area. The consistency or deviation between the disaster movement direction and the existing affected area can be evaluated through the size of the angle, providing a basis for adjusting the deduction range, and obtaining a second deduction range with high accuracy.

[0090] Figure 7 The flowchart of step S95 provided in the embodiment of the present application may include the following steps: Step S951, determining the angle between the disaster moving direction and the fitting curve.

[0091] Step S953: If the angle is greater than a first threshold, a central substation in the area between the disaster movement direction and the fitting curve that is not on the disaster-affected trunk line in the first deduction range is determined as a target central substation.

[0092] Step S955, determining the distance between the central substation on the affected trunk line in the first deduction range and the adjacent target central substation.

[0093] Step S957: If the distance is less than the second threshold, the central substation on the affected trunk line in the first deduction range is replaced with the target central substation to generate the target deduction range.

[0094] Specifically, if the second angle is less than or equal to the first threshold, it means that the result of the first deduction range is relatively accurate and no adjustment is required. If the second angle is greater than the first threshold, it means that the disaster may affect the area outside the current first deduction range. It is necessary to identify the central substations in the area between the disaster movement direction and the fitting curve that are not yet included in the first deduction range, and determine these substations as target central substations. Next, evaluate the distance between the central substation in the first deduction range and the newly determined target central substation to determine whether the deduction range needs to be adjusted. If the distance between the central substations is less than the second threshold, it indicates that the target central substation is likely to be affected by the disaster. At this time, it is necessary to replace the central substation in the first deduction range with the adjacent target central substation to generate an updated second deduction range. This implementation can dynamically evaluate the potential impact of disasters on the distribution network, update risk areas in a timely manner, and improve the accuracy of future predictions of disaster-stricken areas.

[0095] and Figure 6Compared with the embodiment shown, the size of the angle proposed in this embodiment provides a quantitative measure of the relationship between the direction of disaster propagation and the trend of the affected area. If the angle is greater than the preset first threshold, it indicates that the disaster may propagate in a new direction outside the current affected area. At this time, the central substation in the area between the disaster movement direction and the fitting curve is determined as the target central substation, and the new area that may be affected is obtained. Then, the distance between the central substation on the affected trunk line within the first deduction range and the adjacent target central substation is judged. If the distance between the central substation and the adjacent target central substation is less than the second threshold, the central substation within the first deduction range is replaced with the target central substation to generate a second deduction range. It ensures that the deduction range is as close as possible to the actual possible disaster propagation path, and improves the accuracy and practicality of the deduction.

[0096] Accordingly, please refer to Figure 8 , Figure 8 A device for simulating the disaster range of a distribution network provided in an embodiment of the present application, wherein the distribution network includes a central substation and substations radiating outward from the central substation, and the device includes: The position acquisition module 101 is used to acquire a first coordinate position, a second coordinate position and a distribution network line affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the distribution network line affected by the disaster represents the line connection between the central substation and the sub-substation; The network diagram generation module 103 is used to generate a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster network diagram includes a disaster main line and a disaster secondary line; An extension direction determination module 105, configured to determine the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram; The first deduction module 107 is used to extend the affected trunk line according to the extension direction to generate a first deduction range of future disasters.

[0097] In some optional implementations, the network diagram generating module 103 includes: A first target position determining unit, configured to screen the disaster conditions adjacent to the first coordinate position in the disaster-affected distribution network line to determine the first target position; A quantity and connection mode judgment unit, used to judge the number of connections and line connection modes of the first target location connected to the affected distribution network line, and determine the affected main line and the first affected secondary line according to the judgment result; A second damaged secondary trunk line determining unit, configured to determine the second coordinate position and the damaged distribution network line corresponding to the second coordinate position as a second damaged secondary trunk line; The disaster network diagram generating unit is used for forming the first disaster-affected secondary trunk line and the second disaster-affected secondary trunk line into the disaster-affected secondary trunk line, and combining the disaster-affected secondary trunk line with the disaster-affected main trunk line to generate the disaster network diagram.

[0098] In some optional implementations, the quantity and connection mode determination unit includes: According to the time sequence of the disaster, determining the number of connections and the line connection mode of the first target location to the affected distribution network line; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is unique, the line connection mode corresponding to the largest number of connections is determined as the affected main line, and the remaining line connection modes are determined as the first affected secondary trunk lines; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is not unique, the affected main line and the first affected secondary line are determined according to the time taken by each line connection mode corresponding to the largest number of connections.

[0099] In some optional implementations, the extension direction determination module includes: A partitioning unit, configured to partition the disaster-affected network diagram according to the position of the disaster-affected trunk line in the disaster-affected network diagram to obtain a first partition and a second partition; An area ratio determination unit, configured to determine a first area ratio of the first partition in the disaster-affected network graph, and a second area ratio of the second partition in the disaster-affected network graph; An extension direction determining unit is used to determine the extension direction of the affected main line according to the number of the affected secondary trunk lines in the first partition and the second partition.

[0100] In some optional implementations, the first deduction module 107 includes: An extension operation unit, configured to perform an extension operation on the affected trunk line according to the extension direction to generate the first deduction range of future disasters; Wherein, during the extending operation, the first area ratio and the second area ratio are controlled to remain unchanged.

[0101] In some optional embodiments, the device further comprises: The second deduction module is used to adjust the first deduction range according to the pre-acquired disaster movement direction to generate a second deduction range.

[0102] In some optional implementations, the second deduction module includes: A coordinate point acquisition unit, used to acquire the coordinate point of the central substation on the affected trunk line in the first deduction range; A fitting unit, used for fitting the coordinate points to generate a fitting curve; The second deduction unit is used to judge the angle between the disaster movement direction and the fitting curve, and adjust the central substation on the disaster-stricken trunk line in the first deduction range according to the judgment result to obtain the second deduction range.

[0103] In some optional implementations, the second deduction unit includes: An angle judgment subunit, used for judging the angle between the disaster moving direction and the fitting curve; a target central substation determination subunit, configured to determine, if the angle is greater than a first threshold, a central substation in the area between the disaster movement direction and the fitting curve that is not on the disaster-affected trunk line in the first deduction range as a target central substation; A distance judgment subunit, used for judging the distance between the central substation on the affected trunk line in the first deduction range and the adjacent target central substation; The second deduction generation subunit is used to replace the central substation on the disaster-stricken trunk line in the first deduction range with the target central substation to generate the second deduction range if the distance is less than a second threshold.

[0104] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0105] In this embodiment, a distribution network disaster range simulation device is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0106] See also Fig. 9 , Fig. 9 A schematic diagram of the structure of a computer device provided in an embodiment of the present application is shown in FIG. Fig. 9As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Fig. 9 A processor 10 is taken as an example.

[0107] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0108] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0109] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0110] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0111] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0112] The embodiment of the present application also provides a computer-readable storage medium. The above method according to the embodiment of the present application can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0113] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.

[0114] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing the present application, the functions of each unit can be implemented in the same or multiple software and / or hardware.

[0115] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0116] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0117] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0118] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0119] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0120] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0121] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

[0122] Although the embodiments of the present application have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present application, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for deriving a disaster-affected area of ​​a distribution network, characterized in that: The distribution network includes a central substation and substations radiating outward from the central substation, and the method includes: Acquire a first coordinate position, a second coordinate position, and a distribution network line affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the distribution network line affected by the disaster represents the line connection between the central substation and the sub-substation; Generate a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster-affected distribution network line; wherein the disaster-affected network diagram includes a disaster-affected main line and a disaster-affected secondary line; Determine the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram; The affected trunk line is extended according to the extension direction to generate a first deduced range of future disasters.

2. The method according to claim 1, characterized in that: The method generates a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster network diagram includes a disaster main line and a disaster secondary line, including: Screening the disaster conditions of the affected distribution network line adjacent to the first coordinate position to determine a first target position; judging the number of connections and line connection mode of the first target position to the affected distribution network line, and determining the affected main line and the first affected secondary line according to the judgment result; Determine the second coordinate position and the affected distribution network line corresponding to the second coordinate position as the second affected secondary trunk line; The first damaged secondary trunk line and the second damaged secondary trunk line are combined into the damaged secondary trunk line, and the damaged secondary trunk line and the damaged main trunk line are combined to generate the damaged network diagram.

3. The method according to claim 2, characterized in that The determining of the number of connections and the line connection mode of the first target location connected to the affected distribution network line, and determining the affected main line and the first affected secondary line according to the determination result, includes: According to the time sequence of the disaster, determining the number of connections and the line connection mode of the first target location to the affected distribution network line; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is unique, the line connection mode corresponding to the largest number of connections is determined as the affected main line, and the remaining line connection modes are determined as the first affected secondary trunk lines; If the number of connections is the largest, and the line connection mode corresponding to the largest number of connections is not unique, the affected main line and the first affected secondary line are determined according to the time taken by each line connection mode corresponding to the largest number of connections.

4. The method according to claim 1, characterized in that: The step of determining the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary main lines in the affected network diagram comprises: Partitioning the disaster-stricken network graph according to the position of the disaster-stricken trunk line in the disaster-stricken network graph to obtain a first partition and a second partition; Determine a first area ratio of the first partition in the disaster-affected network graph, and a second area ratio of the second partition in the disaster-affected network graph; The extension direction of the damaged main trunk line is determined according to the number of the damaged secondary trunk lines in the first subarea and the second subarea.

5. The method according to claim 4, characterized in that The step of extending the affected trunk line according to the extension direction to generate a first deduced range of future disasters includes: Extend the affected trunk line according to the extension direction to generate the first deduction range of future disasters; Wherein, during the extending operation, the first area ratio and the second area ratio are controlled to remain unchanged.

6. The method according to claim 1, characterized in that The method further comprises: According to the pre-acquired disaster movement direction, the first deduction range is adjusted to generate a second deduction range.

7. The method according to claim 6, characterized in that The step of adjusting the first deduction range according to the pre-acquired disaster movement direction to generate a second deduction range includes: Obtaining the coordinates of a central substation on the affected trunk line within the first deduction range; Fitting the coordinate points to generate a fitting curve; The angle between the disaster movement direction and the fitting curve is judged, and the central substation on the disaster-affected trunk line in the first deduction range is adjusted according to the judgment result to obtain the second deduction range.

8. The method according to claim 7, characterized in that The step of judging the angle between the disaster moving direction and the fitting curve, and adjusting the central substation on the affected trunk line in the first deduction range according to the judgment result to obtain the second deduction range includes: Determining the angle between the disaster moving direction and the fitting curve; If the angle is greater than a first threshold, a central substation in the area between the disaster moving direction and the fitting curve that is not on the disaster-affected trunk line in the first deduction range is determined as a target central substation; Determining the distance between the central substation on the affected trunk line in the first deduction range and the adjacent target central substation; If the distance is less than a second threshold, the central substation on the affected trunk line in the first deduction range is replaced by the target central substation to generate the target deduction range.

9. A device for simulating the disaster-affected area of ​​a distribution network, characterized in that: The distribution network includes a central substation and substations radiating outward from the central substation, and the device includes: A position acquisition module, used to acquire a first coordinate position, a second coordinate position and a distribution network line affected by a disaster; wherein the first coordinate position represents the coordinate position corresponding to the central substation, the second coordinate position represents the coordinate position corresponding to the sub-substation, and the distribution network line affected by the disaster represents the line connection between the central substation and the sub-substation; A network diagram generating module, used for generating a disaster network diagram according to the first coordinate position, the second coordinate position and the disaster distribution network line; wherein the disaster network diagram includes a disaster main line and a disaster secondary line; An extension direction determination module, used to determine the extension direction of the affected main line according to the position of the affected main line in the affected network diagram and the number of the affected secondary trunk lines in the affected network diagram; The first deduction module is used to extend the affected trunk line according to the extension direction to generate a first deduction range of future disasters.

10. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for simulating the disaster affected range of a distribution network according to any one of claims 1 to 8 by executing the computer instructions.