Inclined shaft large-section pressure steel pipe mounting device and method
By designing multi-functional pressure steel pipe installation devices and methods in the inclined shaft, the space limitation, alignment difficulties and safety risks of large pressure steel pipe installation in the inclined shaft is solved, efficient welding and installation is achieved, and cost and construction period are reduced. Improved quality and safety.
Patent Information
- Application Number
- CN202411043057.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
Smart Images

Figure CN118911764A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of installation of large-scale pressure steel pipes for water conservancy and hydropower under environmental conditions of a construction site, and particularly relates to an installation device and method for large-segment pressure steel pipes in inclined shafts. Background Art
[0002] There are many large-scale water conservancy and hydropower projects built in high mountain canyons. In the tunnels where the water diversion penstocks are arranged, there are technical difficulties in installing large penstocks in inclined shafts. Due to the influence of the tunnel working environment, large penstocks can usually only be transported in short sections (or tiles) to the turning position of the inclined shaft, and then transferred to the assembly position by an inclined transport trolley. At the inclined shaft assembly position, the short sections of penstocks are assembled into a whole. Since the length of the inclined shaft section ranges from tens of meters to hundreds of meters, or even thousands of meters, this inclined shaft penstock installation method has the following problems: limited installation space, many pipe section alignments, difficult precision control, many welds in the inclined position, difficult quality assurance, high safety risks, and a long installation period. In view of the characteristics and difficulties of the inclined shaft installation of large penstocks, it is necessary to study an inclined shaft penstock installation method and device to solve the construction technical problems and ensure the construction quality, construction period and safety. Summary of the Invention
[0003] In response to the technical difficulties to be solved by the present invention, the present invention provides a device and method for installing large-section pressure steel pipes in inclined wells, which can effectively solve the technical difficulties such as the large number of installation and assembly sections of short-section inclined well pressure steel pipes, long cycles, large welding workload at unfavorable welding positions, high difficulty in quality control, and high safety risks, thereby reducing installation costs and optimizing construction management.
[0004] The purpose of the present invention is achieved through the following technical solutions: A device for installing large-section pressure steel pipes in an inclined shaft comprises a frame, a transfer platform, a transfer trolley, a winch, a pressure steel pipe installation bridge crane and a transfer mechanism, wherein the transfer platform is arranged at the entrance of the inclined shaft, the frame is arranged on the transfer platform, a roller welding trolley, a welding machine, a sliding trolley, adjustable rollers and a pressure steel pipe limiting and holding device are arranged on the transfer platform, the pressure steel pipe limiting and holding device and the roller welding trolley are arranged at intervals, the transfer trolley and the winch are arranged in a straight section of the tunnel, the pressure steel pipe installation bridge crane is slidingly arranged in the straight section of the tunnel, the pressure steel pipe limiting and holding device is used to clamp and fix the pressure steel pipe short section, the pressure steel pipe installation bridge crane and the pressure steel pipe limiting and holding device cooperate with the pressure steel pipe short section to move in the three axes of X, Y and Z in the straight section of the tunnel; the winch cooperates with the sliding trolley to slide or lift the long pressure steel pipe section after welding; the transfer mechanism is used for the transfer of the transfer platform.
[0005] Preferably, the pressure steel pipe limiting and holding device includes two vertical clamping parts and a horizontal part, a first slide rail is provided on the horizontal part, the two vertical clamping parts are hinged to the horizontal part, the vertical clamping parts are connected to the horizontal part through a locking cylinder, and the locking cylinder drives the vertical clamping parts to rotate to achieve clamping or loosening of the short section of the pressure steel pipe.
[0006] Preferably, both sides of the transfer platform are arranged at the entrance of the inclined shaft through platform locking devices.
[0007] Preferably, the indexing mechanism includes an indexing drive gear, an indexing drive rack and an indexing drive cylinder. The front end of the indexing drive cylinder is connected to the indexing drive rack, the indexing drive rack is engaged with the indexing drive gear, and the indexing drive cylinder drives the indexing drive gear to rotate. The indexing drive gear is fixedly arranged on the frame.
[0008] Preferably, the roller welding trolley includes a roller welding base, a second slide rail is provided on the roller welding base, and roller welding assemblies are hinged on the left and right sides of the roller welding base. The roller welding assembly includes a rotating part, and the rotating part is rotatably connected to the roller welding base. Rollers are provided on the upper and lower sides of the rotating part, and the lower roller is connected to the rotating drive part through a connecting part.
[0009] Preferably, a plurality of adjustable rollers are provided, and the adjustable rollers are arranged between the frame and the horizontal portion or between the frame and the roller welding base.
[0010] Preferably, the frame is provided with multiple groups of adjustable electric push rods.
[0011] Preferably, it also includes an installation slide rail and an adjustment jack, the installation slide rail is arranged in the inclined shaft, and the adjustment jack is arranged on both sides of the installation slide rail.
[0012] Preferably, the sled trolley includes a sled platform, which is provided with a pin shaft hole matching the ear plate hole on the pressure steel pipe short section, and a slider is provided on the sled platform, which is slidably arranged with the first slide rail or the second slide rail or the installation slide rail.
[0013] Preferably, it further includes a hydraulic control system, which is used to control the start and stop of the locking cylinder and the indexing drive cylinder.
[0014] A method for installing a large-segment pressure steel pipe in an inclined shaft comprises the following steps: Step 1: Transfer the penstock short section 1 to the adjustable rollers and adjust the verticality of the end face of the penstock short section 1; Step 2: Transfer the second penstock section to the adjustable rollers, and adjust and assemble the first and second penstock sections. Step 3: Weld the welds of the first and second penstock nipples and perform nondestructive testing. Step 4: After the non-destructive test is passed, repeat steps 1 to 3 to complete the welding of the long section penstock; Step 5: Connect the trolley to the winch, then unlock the transfer platform, transfer the transfer platform, and pre-tighten the winch to lower the long section of the penstock; Step 6: The transfer platform is transferred, the sliding trolley is connected to the winch, the winch is pre-tightened, and then the transfer platform is unlocked and the long section of the penstock is lowered; Step 7: Adjust and assemble to meet the requirements, and weld the oblique sections; Step 8. Repeat steps 5 to 7 until the inclined well pressure steel pipe is installed.
[0015] Preferably, in step one and step two, the pressure steel pipe short section one is placed on the pressure steel pipe limiting and holding device, and the pressure steel pipe short section two is placed on the roller welding trolley. The pressure steel pipe is first installed by the bridge crane to lift the pressure steel pipe short section two and the pressure steel pipe short section one to complete the rough positioning, and then the pressure steel pipe limiting and holding device is used to adjust the verticality of the end face of the short section one, and the horizontal coaxiality of the pressure steel pipe short section two and the pressure steel pipe short section one is adjusted by the adjustable roller and the adjusting electric push rod.
[0016] Preferably, in the step three, after the connected penstock sections are fixed by manual spot welding, the penstock limiting holding device is released, and the submerged arc welding machine mounting bracket and the submerged arc welding machine are installed on the indexing platform; the roller welding trolley drives the penstock section 1 and the penstock section 2 to rotate, and at the same time, the submerged arc welding machine automatically welds the circumferential seam between the penstock section 1 and the penstock section 2.
[0017] Preferably, in step five, the pin hole on the connecting piece is fixed to the ear plate hole on the outer side of the long-segment pressure steel pipe by a pin connection, and the electric push rod is adjusted to retract so that the telescopic end of the electric push rod is disengaged from the horizontal part or the roller welding base, and the sliding trolley is connected to the transfer platform through a safety pin.
[0018] Preferably, in step six, the sled is connected to the winch, and the locking electric push rod retracts the locking beam and moves away from the locking beam fixing pin of the civil engineering to complete the unlocking of the transfer platform; the frame on the transfer platform is hinged to the ground through an axis, and the transfer platform is transferred by pushing and pulling a set of hydraulic cylinders provided on both sides of the transfer platform; the winch simultaneously releases the wire rope, and after the transfer platform moves into place, the winch pre-tightens the wire rope, and lowers the long section pressure steel pipe through the winch.
[0019] Preferably, in step seven, after the slid into place, the pipe is raised and lowered by a winch, and an adjustment jack is installed between the slide rail and the slid trolley to adjust the end face matching between the slid pressure steel pipe segment and the installed pressure steel pipe segment; and manual circumferential butt welding is performed.
[0020] The beneficial effects of this technical solution are as follows: 1. The present invention provides a device for installing large-segment pressure steel pipes in inclined shafts. The device has the functions of assembling short-segment steel pipes, clamping and positioning, inter-segment adjustment, steel pipe rotation drive, inter-segment weld welding, rotating long-segment pressure steel pipes, locking and holding the pressure steel pipes during the rotation process and in the inclined state, and can cooperate with the sliding or lifting system to complete the installation of inclined section pressure steel pipes.
[0021] 2. The present invention provides a method for installing large-section pressure steel pipes in inclined shafts, which can effectively solve the technical problems of short-section inclined shaft pressure steel pipes, such as many sections for assembly, long cycle, large welding workload at unfavorable welding positions, high difficulty in quality control, and high safety risks, thereby reducing installation costs and optimizing construction management.
[0022] 3. The present invention provides a method for installing large-segment pressure steel pipes in inclined shafts. A welding transfer platform is set near the interface between the straight section and the inclined bend of the tunnel. Short segments are assembled into long segments on the platform and welded into long-segment pressure steel pipes by submerged arc welding. The long-segment pressure steel pipe is positioned on the installation axis by a hinge transfer method, and is slid or lifted into place by a steel pipe lowering trolley, and is butt-welded with the front-segment pressure steel pipe. This method decomposes the serial installation work into parallel work of two workstations, and can significantly reduce the number of assembly times and the amount of welding of the inclined pressure steel pipe (calculated based on a minimum of two short segments, the workload of unfavorable workstations can be reduced by 50%), thereby achieving the purposes of reducing construction difficulty, ensuring installation quality, reducing labor intensity, improving efficiency, reducing costs, shortening construction period and improving safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 This is a schematic structural diagram of the penstock limiting and holding device of the present invention; Figure 3 This is a schematic structural diagram of the roller welding trolley in the present invention; Figure 4 This is a schematic diagram of the structure of the slide rail installation in the present invention; Figure 5 This is a schematic diagram of the structure of step 1 of the installation method of the present invention; Figure 6 This is a structural diagram of step three of the installation method of the present invention; Figure 7 This is a structural diagram of step four of the installation method of the present invention; Figure 8 This is a structural diagram of step five of the installation method of the present invention; Figure 9 This is a schematic diagram of the structure of step six of the installation method of the present invention. Figure 1 ; Figure 10This is a schematic diagram of the structure of step six of the installation method of the present invention. Figure 2 ; Figure 11 This is a structural diagram of step seven of the installation method of the present invention; Figure 12 This is a structural diagram of step eight of the installation method of the present invention; Among them: 1. Frame; 2. Turning platform; 3. Penstock limit holding device; 31. Vertical clamping part; 32. Horizontal part; 33. First slide rail; 34. Locking cylinder; 4. Transfer trolley; 5. Winch; 6. Penstock installation bridge crane; 7. Turning mechanism; 71. Turning drive gear; 72. Turning drive cylinder; 73. Turning drive rack; 8. Adjustable roller; 9. Platform locking device; 10. Installing slide rail; 11. Roller welding trolley; 111. Roller welding base; 112. Second slide rail; 113. Roller welding assembly; 114. Rotating part; 115. Roller; 12. Sliding trolley; 121. Sliding platform; 122. Sliding block; 13. Adjusting electric push rod; 14. Adjusting jack. DETAILED DESCRIPTION
[0024] The present invention will be further described in detail below with reference to the examples, but the embodiments of the present invention are not limited thereto.
[0025] Example 1 like Figures 1-4 As shown, a device for installing a large-section pressure steel pipe in an inclined shaft comprises a frame 1, a transfer platform 2, a transfer trolley 4, a winch 5, a pressure steel pipe installation bridge machine 6 and a transfer mechanism 7. The transfer platform 2 is arranged at the entrance of the inclined shaft, and the frame 1 is arranged on the transfer platform 2. The transfer platform 2 is provided with a roller welding trolley 11, a welding machine, a slipping trolley 12, an adjustable roller 8 and a pressure steel pipe limiting holding device 3. The pressure steel pipe limiting holding device 3 and the roller welding trolley 11 are arranged at intervals, and the transfer trolley 4 is provided with a roller welding trolley 11. The winch 5 is arranged in the straight section of the tunnel, the pressure steel pipe installation bridge crane 6 is slidingly arranged in the straight section of the tunnel, the pressure steel pipe limiting and holding device 3 is used to clamp and fix the pressure steel pipe short section, the pressure steel pipe installation bridge crane 6 and the pressure steel pipe limiting and holding device 3 cooperate with the pressure steel pipe short section to move in the X, Y and Z three axes in the straight section of the tunnel; the winch 5 is cooperated with the sliding trolley 12 to slid or lift the long pressure steel pipe section after welding; the transfer mechanism 7 is used for the transfer platform 2.
[0026] Example 2 The difference between this embodiment and embodiment 1 is that the pressure steel pipe limiting and holding device 3 includes two vertical clamping parts 31 and a horizontal part 32, and the horizontal part 32 is provided with a first slide rail 33. The two vertical clamping parts 31 are hinged to the horizontal part 32, and the vertical clamping part 31 is connected to the horizontal part 32 through a locking cylinder 34. The locking cylinder 34 drives the vertical clamping part 31 to rotate to achieve clamping or loosening of the short section of the pressure steel pipe.
[0027] The platform locking device 9 is installed on both sides of the transfer platform 2 at the entrance of the inclined shaft. The platform locking device 9 uses two box beams that are driven to extend and retract by electric push rods. When the transfer platform 2 needs to be locked, the electric push rods push the locking beams out and insert them into the locking beam fixing pins of the civil engineering to complete the locking of the transfer platform 2.
[0028] Among them, the indexing mechanism 7 includes an indexing drive gear 71, an indexing drive rack 73 and an indexing drive cylinder 72. The front end of the indexing drive cylinder 72 is connected to the indexing drive rack 73, and the indexing drive rack 73 is engaged with the indexing drive gear 71. The indexing drive cylinder 72 drives the indexing drive gear 71 to rotate, and the indexing drive gear 71 is fixedly set on the frame 1.
[0029] The roller welding trolley 11 includes a roller welding base 111, a second slide rail 112 is provided on the roller welding base 111, and roller welding assemblies 113 are hingedly connected to the left and right sides of the roller welding base 111. The roller welding assembly 113 includes a rotating member 114, which is rotatably connected to the roller welding base 111. The rotating member 114 is provided with rollers 115 on both the upper and lower sides, and the lower roller 115 is connected to the rotating drive member through a connecting member. The rotating drive member and the connecting member are conventional technologies, and the rotating drive member may be a rotating motor, and the connecting member may be a chain.
[0030] There are multiple adjustable rollers 8 , and the adjustable rollers 8 are arranged between the frame 1 and the horizontal portion 32 or between the frame 1 and the roller welding base 111 .
[0031] Among them, the sled trolley 12 includes a sled platform 121, and the sled platform 121 is provided with a pin shaft hole matching the ear plate hole on the pressure steel pipe short section. The sled platform 121 is provided with a slider 122, and the slider 122 is slidably set with the first slide rail 33 or the second slide rail 112 or the installation slide rail 10.
[0032] Wherein, the frame 1 is provided with multiple groups of adjustable electric push rods 13 .
[0033] It also includes an installation slide rail 10 and an adjustment jack 14 . The installation slide rail 10 is arranged in the inclined shaft, and the adjustment jack 14 is arranged on both sides of the installation slide rail 10 .
[0034] It also includes a hydraulic control system, which is used to control the start and stop of the locking cylinder 34 and the indexing drive cylinder 72.
[0035] Example 3 This embodiment adopts a large-segment penstock installation device for inclined wells in embodiment 2, such as Figure 5-Figure 12 As shown, a method for installing a large-segment pressure steel pipe in an inclined well includes the following steps: Step 1: Transfer the penstock short section 1 to the adjustable roller 8 and adjust the verticality of the end face of the penstock short section 1; Step 2: The second penstock section is transferred to the adjustable roller 8, and the first and second penstock sections are adjusted and assembled; Step 3: Weld the welds of the first and second penstock nipples and perform nondestructive testing. Step 4: After the non-destructive test is passed, repeat steps 1 to 3 to complete the welding of the long section penstock; Step 5: The long section penstock is fixed to the sliding platform 121, the adjustable rollers 8 are retracted, and the sliding trolley 12 is locked to the indexing platform 2; Step 6: The sled trolley 12 is connected to the hoist 5, and then the indexing platform 2 is opened and locked. The indexing platform 2 is indexed, and the hoist 5 is pre-tightened and lowered into the long section of the penstock; Step 7: Adjust and assemble to meet the requirements, and weld the oblique sections; Step 8. Repeat steps 5 to 7 until the inclined well pressure steel pipe is installed.
[0036] Among them, in the steps one and two, the pressure steel pipe short section one is placed on the pressure steel pipe limiting and holding device 3, and the pressure steel pipe short section two is placed on the roller welding trolley 11. The pressure steel pipe installation bridge crane 6 is first used to lift the pressure steel pipe short section two and the pressure steel pipe short section one to complete the rough positioning, and then the pressure steel pipe limiting and holding device 3 is used to adjust the verticality of the end face of the short section one, and the horizontal coaxiality of the pressure steel pipe short section two and the pressure steel pipe short section one is adjusted by the adjustable roller 8 and the adjusting electric push rod 13.
[0037] Among them, in the step three, after the connected pressure steel pipe short sections are fixed by manual spot welding, the pressure steel pipe limiting holding device 3 is released, and the submerged arc welding machine mounting bracket and the submerged arc welding machine are installed on the indexing platform 2; the roller welding trolley 11 drives the pressure steel pipe short section 1 and the pressure steel pipe short section 2 to rotate, and at the same time the submerged arc welding machine automatically welds the circumferential seam between the pressure steel pipe short section 1 and the pressure steel pipe short section 2.
[0038] Among them, in the step five, the pin hole on the connecting part and the ear plate hole on the outer side of the long-segment pressure steel pipe are fixed by a pin connection, and the electric push rod retracts, so that the telescopic end of the electric push rod is disengaged from the horizontal part 32 or the roller welding base 111, and the sliding trolley 12 is connected to the transfer platform 2 through the safety pin.
[0039] Among them, in the step six, the sled trolley 12 is connected to the winch 5, and the locking electric push rod retracts the locking beam and moves away from the locking beam fixing pin of the civil engineering to complete the unlocking of the transfer platform 2; the frame 1 on the transfer platform 2 is hinged to the ground through an axis, and the transfer platform 2 is transferred by pushing and pulling through a set of hydraulic cylinders arranged on both sides of the transfer platform 2; the winch 5 simultaneously releases the wire rope, and after the transfer platform 2 moves into place, the winch 5 pre-tightens the wire rope, and lowers the long section pressure steel pipe through the winch 5.
[0040] Among them, in the step seven, after the slid into place, it is raised and lowered by the winch 5, and the adjustment jack 13 between the slide rail 10 and the slid trolley 12 is installed to adjust the end face matching between the slid pressure steel pipe segment and the installed pressure steel pipe segment; manual circumferential butt welding is used.
[0041] 1. The present invention provides a device for installing large-segment pressure steel pipes in inclined shafts. The device has the functions of assembling short-segment steel pipes, clamping and positioning, inter-segment adjustment, steel pipe rotation drive, inter-segment weld welding, rotating long-segment pressure steel pipes, locking and holding the pressure steel pipes during the rotation process and in the inclined state, and can cooperate with the sliding or lifting system to complete the installation of inclined section pressure steel pipes.
[0042] 2. The present invention provides a method for installing large-section pressure steel pipes in inclined shafts, which can effectively solve the technical problems of short-section inclined shaft pressure steel pipes, such as many sections for assembly, long cycle, large welding workload at unfavorable welding positions, high difficulty in quality control, and high safety risks, thereby reducing installation costs and optimizing construction management.
[0043] 3. The present invention provides a method for installing large-segment pressure steel pipes in inclined shafts. A welding transfer platform 2 is set near the interface between the straight section and the inclined bend of the tunnel. Short segments are assembled into long segments on the platform and welded into long-segment pressure steel pipes by submerged arc welding. The long-segment pressure steel pipe is positioned on the installation axis by a hinge displacement method, and is slid or lifted into place by a steel pipe lowering trolley, and is butt-welded with the front-segment pressure steel pipe. This method decomposes the serial installation work into parallel work of two workstations, and can significantly reduce the number of assembly times and the amount of welding of the inclined pressure steel pipe (calculated based on a minimum of two short segments, the workload of unfavorable workstations can be reduced by 50%), thereby achieving the purposes of reducing construction difficulty, ensuring installation quality, reducing labor intensity, improving efficiency, reducing costs, shortening construction period and improving safety.
[0044] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention is within the scope of protection of the present invention.
Claims
1. A device for installing a large-section pressure steel pipe in an inclined shaft, characterized in that: The invention comprises a frame (1), a transfer platform (2), a transfer trolley (4), a winch (5), a pressure steel pipe installation bridge machine (6) and a transfer mechanism (7), wherein the transfer platform (2) is arranged at the entrance of the inclined shaft, the frame (1) is arranged on the transfer platform (2), the transfer platform (2) is provided with a roller welding trolley (11), a welding machine, a sliding trolley (12), an adjustable roller (8) and a pressure steel pipe limiting holding device (3), the pressure steel pipe limiting holding device (3) and the roller welding trolley (11) are arranged at intervals, the transfer trolley (4) and The winch (5) is arranged in the straight section of the tunnel, the pressure steel pipe installation bridge crane (6) is slidably arranged in the straight section of the tunnel, the pressure steel pipe limit holding device (3) is used to clamp and fix the pressure steel pipe short section, the pressure steel pipe installation bridge crane (6) and the pressure steel pipe limit holding device (3) cooperate with the pressure steel pipe short section to move in the three axes of X, Y and Z in the straight section of the tunnel; the winch (5) cooperates with the sliding trolley (12) to slid or lift the long pipe section of the pressure steel pipe after welding; the transfer mechanism (7) is used for the transfer of the transfer platform (2).
2. The device for installing a large-segment pressure steel pipe in an inclined shaft according to claim 1, characterized in that: The penstock position limiting and holding device (3) comprises two vertical clamping parts (31) and a horizontal part (32). The horizontal part (32) is provided with a first slide rail (33). The two vertical clamping parts (31) are hinged to the horizontal part (32). The vertical clamping parts (31) are connected to the horizontal part (32) via a locking oil cylinder (34). The locking oil cylinder (34) drives the vertical clamping parts (31) to rotate to clamp or release the penstock short section.
3. The device for installing a large-segment pressure steel pipe in an inclined shaft according to claim 2, characterized in that: The indexing mechanism (7) comprises an indexing drive gear (71), an indexing drive rack (73) and an indexing drive cylinder (72); the front end of the indexing drive cylinder (72) is connected to the indexing drive rack (73); the indexing drive rack (73) is meshed with the indexing drive gear (71); the indexing drive cylinder (72) drives the indexing drive gear (71) to rotate; and the indexing drive gear (71) is fixedly arranged on the frame (1).
4. The device for installing a large-segment pressure steel pipe in an inclined shaft according to claim 3, characterized in that: The roller welding trolley (11) comprises a roller welding base (111), a second slide rail (112) is arranged on the roller welding base (111), roller welding assemblies (113) are hingedly connected to the left and right sides of the roller welding base (111), the roller welding assembly (113) comprises a rotating member (114), the rotating member (114) is rotatably connected to the roller welding base (111), and rollers (115) are arranged on the upper and lower sides of the rotating member (114), and the lower roller (115) is connected to the rotating drive member via a connecting member.
5. A method for installing a large-segment pressure steel pipe in an inclined shaft, characterized in that: The following steps are involved: Step 1: The first penstock short section is transferred to the adjustable roller (8), and the verticality of the end face of the first penstock short section is adjusted; Step 2: The second penstock short section is transferred to the adjustable roller (8), and the first penstock short section and the second penstock short section are adjusted and assembled; Step 3: Weld the welds of the penstock short section 1 and the penstock short section 2, and perform nondestructive testing; Step 4: After the non-destructive test is qualified, repeat steps 1 to 3 to complete the welding of the long section pressure steel pipe; Step 5: The long section pressure steel pipe is fixed to the sliding platform (121), the adjustable roller (8) is retracted, and the sliding trolley (12) is locked to the transfer platform (2); Step 6: The sled trolley (12) is connected to the winch (5), and then the transfer platform (2) is opened and locked, the transfer platform (2) is transferred, and the winch (5) is pre-tightened to lower the long section of the pressure steel pipe; Step 7: Adjust and assemble to meet the requirements, and weld the oblique sections; Step 8. Repeat steps 5 to 7 until the inclined shaft pressure steel pipe is installed.
6. The method for installing a large-segment pressure steel pipe in an inclined shaft according to claim 5, characterized in that: In the steps 1 and 2, the pressure steel pipe short section 1 is placed on the pressure steel pipe limiting holding device (3), and the pressure steel pipe short section 2 is placed on the roller welding trolley (11). The pressure steel pipe installation bridge crane (6) is first used to lift the pressure steel pipe short section 2 and the pressure steel pipe short section 1 to complete the rough positioning. After that, the pressure steel pipe limiting holding device (3) is used to adjust the verticality of the end face of the short section 1. The coaxiality of the pressure steel pipe short section 2 and the pressure steel pipe short section 1 in the horizontal direction is adjusted by the adjustable roller (8) and the adjusting electric push rod (13).
7. The method for installing a large-segment pressure steel pipe in an inclined shaft according to claim 6, characterized in that: In the step three, after the connected penstock short sections are fixed by manual spot welding, the penstock limiting holding device (3) is released, and a submerged arc welding machine mounting bracket and a submerged arc welding machine are installed on the transfer platform (2); the roller welding trolley (11) drives the penstock short section one and the penstock short section two to rotate, and the submerged arc welding machine automatically welds the annular seam between the penstock short section one and the penstock short section two.
8. The method for installing a large-segment pressure steel pipe in an inclined shaft according to claim 7, characterized in that: In the step five, the pin hole on the connecting member is connected and fixed to the ear plate hole on the outer side of the long section pressure steel pipe by means of a pin, and the electric push rod (13) is adjusted to retract so that the telescopic end of the electric push rod (13) is disengaged from the horizontal portion (32) or the roller welding base (111); and the sled trolley (12) is connected to the transfer platform (2) by means of a safety pin.
9. The method for installing a large-segment pressure steel pipe in an inclined shaft according to claim 8, characterized in that: In the step six, the trolley (12) is connected to the winch (5), and the locking electric push rod retracts the locking beam and moves away from the locking beam fixing pin of the civil engineering, thereby completing the unlocking of the transfer platform (2); the frame (1) on the transfer platform (2) is hinged to the ground through an axis, and the transfer platform (2) is transferred by pushing and pulling through a set of hydraulic cylinders arranged on both sides of the transfer platform (2); the winch (5) simultaneously releases the wire rope, and after the transfer platform (2) moves into place, the winch (5) pre-tightens the wire rope, and the long section pressure steel pipe is lowered through the winch (5).
10. The method for installing a large-segment pressure steel pipe in an inclined shaft according to claim 9, characterized in that: In the step seven, after the slidable pipe is in place, it is raised and lowered by a winch (5), and an adjustment jack (14) is installed between the slide rail (10) and the slidable pipe trolley (12) to adjust the end surface matching between the slidable pressure steel pipe segment and the installed pressure steel pipe segment; and manual circumferential butt welding is performed.