Container placement position determination method and device
By automatically dividing the planning group and preset rules to determine the container target yard and bay position, the problem of unreasonable placement caused by manual judgment is solved, the port throughput and operating efficiency are improved, and the resource coordination is achieved.
Patent Information
- Application Number
- CN202410977291.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
In the prior art, the determination of container placement locations depends on manual judgment, which is prone to unreasonable position arrangements due to fatigue or insufficient experience, and there are few considerations, resulting in low operating efficiency and poor resource coordination.
By dividing the planning group based on the attribute information of the container, determining the required number of baits and target yards, and automatically determining the target yard and baits of the container using preset rules, considering various factors such as mechanical movement distance and vehicle congestion prevention in the yard. Distribute containers with the same ship to optimize container placement.
It improves the rationality and operating efficiency of container placement, coordinates the resources of each module to the greatest extent, reduces mechanical waiting time, avoids manual errors, and improves port throughput.
Smart Images

Figure CN118917473A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of computer technology, and in particular, relates to a method and device for determining a container placement position. Background Art
[0002] With the rapid development of maritime trade, the scale of ports is getting larger and larger, and the throughput is also increasing. In order to cope with the problem of large throughput, in addition to expansion, various types of containers can also be efficiently arranged in the limited space of the port.
[0003] Therefore, it is necessary to plan in advance the yard and the bay where the container should be placed. The existing method for determining the container placement position is to manually determine the container placement position based on experience.
[0004] However, factors such as fatigue or lack of experience may cause the human-determined container placement to be unreasonable. Summary of the invention
[0005] The embodiments of the present application provide a method and device for determining a container placement position, which can make the determined container placement position more reasonable.
[0006] In a first aspect, an embodiment of the present application provides a method for determining a container placement position, the method comprising:
[0007] Dividing the first container into plan groups according to attribute information of the first container to obtain at least one plan group, wherein the attribute information at least includes size, type and transportation information of the first container;
[0008] For each plan group in at least one plan group, perform the following steps:
[0009] Determining a first number of bays required for the plan group according to a first number of containers included in the plan group;
[0010] Determine, from the reserved yards and the reserved bays in the reserved yards, the target reserved yards corresponding to the planning group and the number of target reserved bays in each target reserved yard according to the first bay number and the first preset rule;
[0011] According to the number of target reserved bays in each target reserved yard and a second preset rule, the target bays in the target yard corresponding to the containers included in the plan group are determined from the reserved bays in the target reserved yard.
[0012] In a second aspect, an embodiment of the present application provides a device for determining a container placement position, the device comprising:
[0013] A division module, used for dividing the first container into plan groups according to the attribute information of the first container to obtain at least one plan group, wherein the attribute information at least includes the size, type and transportation information of the first container;
[0014] The processing module is used to perform the following steps for each plan group in the at least one plan group:
[0015] Determining a first number of bays required for the plan group according to a first number of containers included in the plan group;
[0016] Determine, from the reserved yards and the reserved bays in the reserved yards, the target reserved yards corresponding to the planning group and the number of target reserved bays in each target reserved yard according to the first bay number and the first preset rule;
[0017] According to the number of target reserved bays in each target reserved yard and a second preset rule, the target bays in the target yard corresponding to the containers included in the plan group are determined from the reserved bays in the target reserved yard.
[0018] In a third aspect, an embodiment of the present application provides an electronic device, the device comprising: a processor and a memory storing computer program instructions,
[0019] When the processor executes the computer program instructions, the method for determining the container placement position as shown in any one of the embodiments of the first aspect is implemented.
[0020] In a fourth aspect, an embodiment of the present application provides a computer storage medium having computer program instructions stored thereon, and when the computer program instructions are executed by a processor, the method for determining the container placement position shown in any one of the embodiments of the first aspect is implemented.
[0021] In a fifth aspect, an embodiment of the present application provides a computer program product. When the instructions in the computer program product are executed by a processor of an electronic device, the electronic device executes the method for determining the container placement position shown in any one of the embodiments of the first aspect.
[0022] The method and device for determining the container placement position of the embodiment of the present application can divide the first container into a plan group according to the attribute information of the first container to obtain at least one plan group; for each plan group in the at least one plan group, the following steps are respectively performed: according to the first number of containers included in the plan group, the first number of bays required by the plan group is determined; according to the first number of bays and the first preset rule, the target reserved yard corresponding to the plan group and the number of target reserved bays in each target reserved yard are determined from the reserved yard and the reserved bays in the reserved yard; according to the number of target reserved bays in each target reserved yard and the second preset rule, the target bay in the target yard corresponding to the container included in the plan group is determined from the reserved bays in the target reserved yard. In this way, the target bay in the target yard corresponding to the container can be automatically determined, so that the determined container placement position is more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solution of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0024] Figure 1 This is one of the flow charts of a method for determining a container placement position provided by an embodiment of the present application;
[0025] Figure 2 This is a second flowchart of a method for determining a container placement position provided by an embodiment of the present application;
[0026] Figure 3 It is a structural schematic diagram of a device for determining a container placement position provided by an embodiment of the present application;
[0027] Figure 4 It is a structural schematic diagram of an electronic device provided by an embodiment of the present application. DETAILED DESCRIPTION
[0028] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only intended to explain the present application, rather than to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.
[0029] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0030] As mentioned in the background technology, with the rapid development of ocean trade, the scale of ports is getting bigger and bigger, and the throughput is also getting bigger and bigger. In order to cope with the problem of large throughput, in addition to expansion, it is necessary to efficiently arrange various types of containers in the limited space of the port. The yard plan is to allocate each group of containers to the appropriate area of the yard. The main purpose is to reasonably allocate yard resources. The yard plan can determine the placement of the container. Positioning is to find the specific location of each container in the yard. Generally, positioning is used in conjunction with the yard plan. Positioning can greatly increase the flexibility of container allocation. Existing yard plans are manually or semi-automatically generated according to certain logical rules. Existing positioning is automatically generated according to algorithmic rules. Generally, different yard plans correspond to different positioning algorithms.
[0031] Traditional yard plans are made by dispatchers on the Terminal Operation System (TOS), or semi-automated but still require human intervention. However, people may make wrong yard plans due to factors such as fatigue, and cannot guarantee complete correctness. In addition, traditional yard plans consider fewer factors, and the yard plans made may not be the most efficient, and cannot coordinate the various modules to the greatest extent. For example, the impact of external container truck collection and distribution ports on internal container truck loading and unloading operations is not considered. At the same time, traditional yard plans may also lead to long waiting times for quay cranes during unloading operations, vehicles queuing in the yard, and yard machinery turning over the containers before picking up containers when external container trucks come to pick up containers. Traditional location finding is inefficient due to insufficient input and few factors considered.
[0032] Based on this, an embodiment of the present application provides a method for determining a container placement position. The method for determining a container placement position provided by an embodiment of the present application is introduced below.
[0033] Figure 1A flow chart of a method for determining a container placement position provided by an embodiment of the present application is shown.
[0034] like Figure 1 As shown, the execution subject of the method for determining the container placement position may be a device for determining the container placement position, and the method for determining the container placement position may include the following steps:
[0035] S110, dividing the first container into plan groups according to the attribute information of the first container, to obtain at least one plan group;
[0036] For each plan group in at least one plan group, perform the following steps:
[0037] S120, determining a first number of bays required by the plan group according to a first number of containers included in the plan group;
[0038] S130, determining, from the reserved yards and the reserved bays in the reserved yards, a target reserved yard corresponding to the plan group and the number of target reserved bays in each target reserved yard according to the first bay number and the first preset rule;
[0039] S140, determining the target bays in the target yard corresponding to the containers included in the plan group from the reserved bays in the target reserved yard according to the number of target reserved bays in each target reserved yard and a second preset rule.
[0040] Thus, the first container can be divided into plan groups according to the attribute information of the first container to obtain at least one plan group; for each plan group in the at least one plan group, the following steps are respectively performed: according to the first number of containers included in the plan group, the first number of bays required by the plan group is determined; according to the first number of bays and the first preset rule, the target reserved yard corresponding to the plan group and the number of target reserved bays in each target reserved yard are determined from the reserved yard and the reserved bays in the reserved yard; according to the number of target reserved bays in each target reserved yard and the second preset rule, the target bay in the target yard corresponding to the container included in the plan group is determined from the reserved bays in the target reserved yard. In this way, the target bay in the target yard corresponding to the container can be automatically determined, so that the determined container placement position is more reasonable.
[0041] In S110, the first container may be a container that needs to be placed in the yard. The number of first containers may be multiple. The first container may be a container currently transported by the first transport device.
[0042] The first transport device may be a ship or a vehicle.
[0043] The attribute information of each first container may be obtained first.
[0044] The attribute information can be obtained from the TOS. The attribute information of the first container may include at least the size, type and transportation information of the first container. For example, the attribute information may include but is not limited to the size of the container, the type of container, the import (export) container, the container flow direction, the empty and loaded container, the unloading port, the container company, and whether it needs to be placed in the multi-catch area of the yard crane.
[0045] The yard crane multi-grab area can be a yard crane double-grab area. The yard crane double-grab area can be a yard crane operating in this area (whether loading or unloading) that can handle two 20-foot containers at the same time, that is, the yard crane's spreader grabs two 20-foot containers during operation.
[0046] The principle for judging whether it needs to be placed in the yard crane double grab area can be: if it is a quay crane double grab, then the yard crane double grab is allocated first. If the yard does not support it, that is, there are no two consecutive empty plan group bays, then the quay crane double grab boxes are allocated normally. Here, it is assumed that the quay crane double grab boxes must be in the same plan group.
[0047] Specifically, first containers with the same attribute information may be grouped into the same plan group. Each plan group may include at least one container.
[0048] In addition, the yard information, machinery information and the assigned tasks of the quay cranes that will be unloading at this port can also be obtained from TOS. The yard information can include the distribution of yard areas and the stacking of containers in the yard, and the machinery information can include the current location of the machinery. The machinery can refer to the yard crane.
[0049] In S120, the first quantity may be the quantity of containers included in a single plan group. The first bay quantity may be the quantity of bays that need to be reserved for a single plan group.
[0050] For each plan group, the number of bays required for the plan group is determined according to the number of containers included in the plan group.
[0051] Specifically, the number of bay spaces required for the plan group can be determined according to the number of containers included in the plan group and the number of containers that a single bay space can accommodate.
[0052] In order to increase the selectivity of the yard and make the operation more flexible, the first bay position quantity can be calculated by the following formula: first bay position quantity = first quantity × a ÷ maximum capacity allowed by the bay position.
[0053] Where a is a number greater than 1, for example, a = 1.2. The maximum capacity allowed by a bay is not the number of containers that can be accommodated when a bay is full, but the maximum number of containers allowed to be placed in a bay. Because a bay cannot be full, the container turnover constraint must be met.
[0054] Container flipping means moving a container from one location to another. Container flipping is usually performed when the container of the unloading task is pressed by other containers. Therefore, the upper container needs to be moved away before the unloading task can be performed. Container flipping is usually performed in the same location, so the number of containers in the location cannot reach the maximum capacity of the location. For example, the 3 locations in the I01 yard can hold 4 layers and 7 rows. If the container flipping constraint is to be met, 28 containers cannot be placed in this location. Because if there is a 1-row, 1-layer unloading task, but this location already has 28 containers and needs to be flipped, but there is no location for flipping in the same location, the container needs to be flipped to other locations. In this way, the vehicle needs to move, which increases energy consumption and reduces efficiency. Therefore, a location for container flipping needs to be reserved in each location. This requires that when placing containers, the number of containers placed in a single location needs to meet the container flipping constraint.
[0055] The container turning constraint may refer to that the number of containers in a bay cannot exceed the difference between the maximum capacity of the bay and the maximum number of layers that can be placed. The maximum capacity of a bay may be the number of containers that can be accommodated when the bay is full.
[0056] In this way, the operation can be made more flexible, and when a certain yard is busy, there will not be a situation where only this yard is allocated to the plan group. This improves efficiency to a certain extent, and the extra allocated positions can be reclaimed after the operation is completed.
[0057] In relation to S130 , the reserved storage yard and the reserved bay space may be predetermined.
[0058] The first preset rule may be a rule for determining, from the reserved yards and the reserved bays in the reserved yards, a target reserved yard corresponding to a certain plan group and the number of target reserved bays in each target reserved yard.
[0059] In some embodiments, Figure 2 As shown, before S130, the method may further include:
[0060] S150, determining the number of yards and the number of first bays required to place the first container according to the type of the first transport device and the second number of the first containers;
[0061] S160: Determine a reserved yard and a reserved bay in the reserved yard reserved for the first container according to the number of yards, the number of first bays, and a third preset rule.
[0062] Here, the first container may be a container transported by a first transport device. Different types of first transport devices can transport different numbers of first containers, and therefore, different types of first transport devices have different numbers of yards where first containers transported are placed. For example, a large first transport device transports a large number of first containers, and therefore, it can be preset that the first containers in the large first transport device are placed in four yards, and a small first transport device transports a small number of first containers, and therefore, it can be preset that the first containers in the small first transport device are placed in two yards.
[0063] It is also possible to pre-set the storage yards corresponding to different types of first transport devices, that is, according to the type of the first transport device, not only the number of storage yards but also the specific storage yards can be determined.
[0064] The second quantity is the number of first containers transported by the first transport device this time. The number of bay spaces required for placing the first containers, that is, the first bay space quantity, can be determined based on the second quantity.
[0065] Then, according to the third preset rule, the reserved yard and the reserved bay positions in the reserved yard that need to be reserved for the first container can be determined according to the number of yards and the number of first bay positions.
[0066] There may be multiple reserved storage yards, and the reserved bay spaces may include reserved bay spaces within each reserved storage yard.
[0067] The third preset rule may be a rule for determining the reserved yard and the reserved bays in the reserved yard that need to be reserved for the first container according to the number of yards and the number of first bays.
[0068] In this way, through the above process, the reserved yard reserved for the first container and the reserved bay in the reserved yard can be accurately determined.
[0069] In some embodiments, the determining of the reserved yard and the reserved bay in the reserved yard for the first container according to the number of yards, the number of first bays, and the third preset rule may include:
[0070] Determine a reserved storage yard for the first container according to the number of storage yards;
[0071] When the first ratio of the first number of bay positions to the number of stockyards is an integer and there are N consecutive bay positions in each reserved stockyard, N consecutive bay positions are determined from each reserved stockyard as reserved bay positions;
[0072] When the first ratio of the number of first bay positions to the number of yards is a non-integer and there are M consecutive bay positions in each reserved yard, M consecutive bay positions are determined as reserved bay positions from each first yard, and P consecutive bay positions are determined as reserved bay positions from the second yard.
[0073] Among them, N can be the first ratio, M can be the result of rounding down the first ratio, the second yard can be the yard with the smallest number of reserved bays in the reserved yards, the first yard can be the yard in the reserved yards except the second yard, P can be the difference between the first number of bays and the first numerical value, and the first numerical value can be the product of M and the number of the first yard.
[0074] Here, the number of reserved storage yards may be the number of storage yards.
[0075] If the first ratio of the first bay space quantity to the number of storage yards is an integer, it indicates that the reserved bay space required for the first container can be evenly shared by a plurality of reserved storage yards.
[0076] If there are N consecutive bays in each reserved yard, and N is the first ratio, it means that the consecutive bays in each reserved yard can bear the average number of bays, so N consecutive bays can be determined from each reserved yard as reserved bays.
[0077] If the first ratio of the first number of bays to the number of yards is a non-integer, it indicates that the reserved bays required for the first container cannot be evenly shared by multiple reserved yards. Therefore, the portion that can be evenly shared can be shared first. Therefore, the first ratio can be rounded down to get M. If there are M consecutive bays in each reserved yard, it indicates that the consecutive bays in each reserved yard can bear the evenly shared M consecutive bays, so M consecutive bays can be determined from each reserved yard as reserved bays, and the reserved yard with the smallest number of currently reserved bays will bear the remaining bays.
[0078] That is, it is necessary to determine the reserved bays allocated to the first container transported by the first transport device in each reserved yard. In order to prevent insufficient reserved bays, the reserved bays here can be greater than the actual number of first containers, and the excess reserved bays can be returned to the unreserved state after the operation is completed. The reserved bays can be allocated using an evenly distributed and continuous rule.
[0079] For example, if the containers transported by this import ship require 20 reserved bays and are planned to be allocated to 4 reserved yards, then each reserved yard needs to be allocated 5 consecutive bays.
[0080] If it is not possible to evenly distribute the load, first distribute it to the corresponding reserved yard according to the maximum number that can be evenly distributed. The remaining reserved bays can be allocated in a weighted manner based on the number of bays occupied in the reserved yard and the distribution of the reserved containers of the external container trucks in the yard during the operation. This can make the containers in each reserved yard as balanced as possible, and at the same time, it also avoids the competition between the external container trucks and the internal container trucks for mechanical resources when unloading the ship to a certain extent.
[0081] For example, if 21 reserved bays are required for the import ship containers and they are planned to be allocated to 4 reserved yards: I01, I02, I03 and I04, then each reserved yard can be allocated 5 consecutive bays first. At this time, if 30 bays have been allocated to the I01, I02 and I03 yards, 15 bays have been allocated to the I04 yard, and the number of container trucks entering and leaving the port at the I04 yard during the expected operating time period is small, then the remaining reserved bay will be allocated to the I04 yard.
[0082] If the number of consecutive bays in the reserved yard is insufficient, multiple consecutive bays with smaller numbers can be allocated, and the sum of the number of bays is greater than or equal to the required number of reserved bays. For example, the I01 yard plans to allocate 10 consecutive bays, but the number of consecutive empty bays in the I01 yard is less than 10, but there are 5 consecutive empty bays, 4 consecutive empty bays, 3 consecutive empty bays, and 2 consecutive empty bays. In this case, a block of 5 consecutive empty bays, a block of 3 consecutive empty bays, and a block of 2 consecutive empty bays can be allocated.
[0083] In this way, through the above process, the yard and bay space can be reserved for the first container more reasonably.
[0084] In some implementations, S130 may include:
[0085] When a second ratio of the first number of bay positions to the third number of reserved stockyards is an integer, and the number of reserved bay positions in each reserved stockyard is greater than or equal to the second ratio, each reserved stockyard is determined to be a target reserved stockyard, and the second ratio is the number of target reserved bay positions in each target reserved stockyard;
[0086] When the second ratio of the first number of bay positions to the third number of reserved yards is a non-integer, and the number of reserved bay positions in each reserved yard is greater than or equal to the second value, it is determined that each reserved yard is a target reserved yard, and the number of target reserved bay positions in each third yard is the second value, and the number of target reserved bay positions in the fourth yard is the third value.
[0087] Among them, the second value can be obtained by rounding down the second ratio, the fourth yard can be the yard with the smallest number of reserved bays in the target reserved yards, the third yard can be the yard in the target reserved yard other than the fourth yard, the third value can be the difference between the first bay number and the fourth value, and the fourth value can be the product of the second value and the number of the third yard.
[0088] Here, if the second ratio of the first number of bay positions to the third number of reserved yards is an integer, it can be indicated that the first number of bay positions required by the plan group can be evenly distributed among all reserved yards. If the number of reserved bay positions in each reserved yard is greater than or equal to the second ratio, it can be indicated that the number of reserved bay positions in each reserved yard is sufficient to bear the bay positions required by the plan group after averaging. Therefore, all reserved yards can be used as target reserved yards, and the number of target reserved bay positions in each target reserved yard is the second ratio, that is, the average number.
[0089] If the second ratio of the first number of bays to the third number of reserved stockyards is a non-integer, it can be shown that the first number of bays required by the plan group cannot be evenly distributed by all reserved stockyards, so the part that can be evenly distributed can be evenly distributed first. Therefore, the second ratio can be rounded down to get a second value, and if the number of reserved bays in each reserved stockyard is greater than or equal to the second value, it can be shown that the reserved bays in each reserved stockyard can bear the second value of target reserved bays evenly distributed, so the second value of reserved bays can be determined from the reserved bays in each reserved stockyard as the target reserved bays, and the reserved stockyard with the smallest number of currently reserved bays will bear the remaining bays.
[0090] In other words, the number of bay spaces required by each planning group can be allocated to the corresponding reserved yards according to the principle of equal distribution. If it is impossible to equalize, then first allocate it to each reserved yard according to the maximum number that can be equalized. The remaining number that cannot be equalized will be allocated from the reserved yard with the smallest number of bay spaces of the planning group that has been allocated to the corresponding yard by the ship for this operation. In this way, the operation can be relatively balanced in the corresponding reserved yard.
[0091] For example, a certain plan group requires 4 yards, so the yards numbered I01, I02, I03 and I04 are used as reserved yards for the plan group. The plan group requires 13 reserved bays, which can be allocated to the 4 reserved yards I01, I02, I03 and I04. Because they are not divisible evenly, each reserved yard first allocates 3 bays from the bays allocated to the first transport device to the plan group as the reserved bays of the plan group. Then, since 10 bays among the bays allocated by the I01 yard to the first transport device are allocated to other planning groups of the first transport device, 8 bays among the bays allocated by the I02 yard to the first transport device are allocated to other planning groups of the ship, 9 bays among the bays allocated by the I03 yard to the first transport device are allocated to other planning groups of the first transport device, and 5 bays among the bays allocated by the I04 yard to the first transport device are allocated to other planning groups of the first transport device, the remaining 1 bay will be allocated to the I04 yard.
[0092] In this way, through the above process, the target reserved yard corresponding to each planning group and the number of target reserved bays in each target reserved yard can be determined more accurately.
[0093] In some implementations, S140 may include:
[0094] For each reserved bay in each target reserved yard, determine a first score of the reserved bay according to whether the adjacent bays of the reserved bay have been reserved for other containers belonging to the same plan group as the container, if the adjacent bays of the reserved bay have been reserved for other containers belonging to the same plan group as the container, the first score is increased by a preset value, if the adjacent bays of the reserved bay have not been reserved for other containers belonging to the same plan group as the container, the first score is not increased, and determine a second score of the reserved bay according to a first distance between a center point of a plurality of reserved bays in the target reserved yard and the reserved bay, the second score may be negatively correlated with the first distance;
[0095] For each of the multiple reserved bays in the target reserved storage yard, the multiple reserved bays are sorted in descending order according to the total scores corresponding to the multiple reserved bays, to obtain a reserved bay sequence;
[0096] When the total score of the Qth reserved bay is greater than the total score corresponding to the Q+ith reserved bay, the first Q reserved bays in the reserved bay sequence are determined as the target bays in the target yard corresponding to the containers included in the plan group;
[0097] When the total scores corresponding to the Qth reserved bay and the Q+ith reserved bay are equal, the first Q-1 reserved bays and the first reserved bay in the reserved bay sequence are determined as the target bays in the target yard corresponding to the containers included in the plan group.
[0098] Here, the total score may be the sum of the first score and the second score.
[0099] Q may be determined based on the number of target reserved bays, i=1, 2, 3, ... n, where n is a positive integer.
[0100] The first reserved bay may be a bay farther from the entrance of the target reserved storage yard between the Qth reserved bay and the Q+ith reserved bay.
[0101] Specifically, each reserved bay in each target reserved yard may be scored. Scoring may be performed based on the adjacent principle and the central principle, wherein the adjacent principle may mean that if the adjacent bay of the reserved bay has been reserved for other containers that belong to the same plan group as the container of the adjacent bay, the first score of the reserved bay is increased by a preset value, otherwise, it is not increased or increased by 0. The central principle may mean that a second score is added to the reserved bay based on the distance between the center point of multiple reserved bays in the target reserved yard and the reserved bay, and the second score may be negatively correlated with the distance, that is, the closer the distance, the higher the second score. In this way, the total score of each reserved bay can be obtained, that is, the sum of the first score and the second score.
[0102] After obtaining the total score of each reserved bay, the first Q bays with the highest total scores can be selected as target bays. However, if there are multiple reserved bays with equal total scores, the reserved bay farthest from the yard entrance can be preferred. In this way, congestion at the yard entrance can be avoided.
[0103] Among them, the distance between the reserved bay and the yard entrance can be determined based on the number of the reserved bay. The larger the number, the farther the distance.
[0104] In order to prevent the frequent movement of the field bridge during operation, the weight of the adjacent principle can be higher than the central principle, that is, the first score can be higher than the second score.
[0105] Exemplarily, the IO1 yard has 9 reserved bays, the first plan group requires 3 bays, and the second plan group requires two bays. When allocating the first plan group, it can be allocated to bays 4, 5, and 6 according to the central principle and the adjacent principle. When allocating the second plan group, it can be allocated to bays 7, 8 or bays 2, 3 according to the central principle and the adjacent principle. At this time, bays 7 and 8, which are farther away from the yard entrance, can be preferred.
[0106] In this way, through the above process, the target container position in the target yard corresponding to the container can be accurately determined.
[0107] In some implementations, after S140, the method may further include:
[0108] In the case where the plurality of second containers are located in the multi-grabbing area of the yard crane, determining the first yard crane for operating the plurality of second containers according to the busyness of each yard crane in the target yard corresponding to the second containers, and determining the first position of the plurality of second containers in the target yard based on a fourth preset rule;
[0109] The plurality of second containers are moved to the first location using the first crane.
[0110] Here, the plurality of second containers may be containers transported by a second transport device, the second transport device may be a vehicle, the second container may be a container currently transported by the second transport device, and the first position may be a layer and a row of a bay where the second container should be placed.
[0111] When the quay crane trolley moves horizontally with the container through the container number recognition device, TOS will obtain the container number and attribute information of the container to be placed in the yard, and then TOS will call the positioning algorithm to obtain the location where the container should be placed in the yard.
[0112] The yard area distribution, container attribute information, container status and the current task status of yard machinery can be obtained in advance from TOS.
[0113] The multiple second containers can be two second containers. Each time you find a location, you can first get the container number of the first container, which is the container number of the front container of the vehicle. If the second container and the first container belong to the same plan group and the plan group needs to be placed in the double-grab area of the yard bridge, you need to get the container number of the second container, which is the container number of the rear container of the vehicle. If the second container and the first container do not belong to the same plan group and / or the plan group does not need to be placed in the double-grab area of the yard bridge, you need to determine the positions where the two containers should be placed.
[0114] Whether multiple second containers are located in the multi-grab area of the yard crane can be determined by judging whether there is a second container number.
[0115] The multi-grasping area of the field bridge can be a double-grasping area of the field bridge.
[0116] If multiple second containers are located in the multi-grab area of the yard crane, the least busy yard crane can be found first according to the busyness of each yard crane in the target yard corresponding to the second container, and then the target bays allocated by this planning group in the target yard are traversed from the target bays with smaller numbers to the target bays with larger numbers, and a target bay with a vacant position can be found. If the task cannot be assigned to the least busy yard crane or there is no assignable bay in the least busy yard, then find the next least busy yard machinery, and so on.
[0117] Among them, the situation where tasks cannot be allocated to the least busy yard bridge is as follows: the yard bridge A01 in the reserved yard is operating three tasks at the 15th bay, and the double-catch area of the yard bridge of the reserved yard is at 1 to 10 bays. At this time, if the yard bridge A02 is the least busy, but the yard bridge A02 is at the 25th bay, in this case, A02 cannot bypass A01 to work at a smaller bay, so in this case the task cannot be allocated.
[0118] The fourth preset rule may be that the number of rows of containers in a single bay is greater than the number of layers.
[0119] When determining the specific position of the second container in the target bay, in order to improve safety, it is necessary to determine the first position based on the fourth preset rule.
[0120] In addition to the fourth preset rule, the principle of being as concentrated as possible and not wasting too many columns should also be met. In addition, the box flipping constraint needs to be met.
[0121] In this way, through the above process, the container located in the multi-grab area of the yard crane can be placed in a reasonable position quickly and accurately.
[0122] In some embodiments, the method may further include:
[0123] In the case where a plurality of second containers transported by the second transport device are located in a non-yard bridge multi-grab area, determining a target container that needs to be placed first;
[0124] Determine a second yard crane for operating the target container according to the busyness of each yard crane in the target yard corresponding to the target container, and determine a second position of the target container in the target bay based on a fourth preset rule;
[0125] The target container is moved to the second location using the second crane.
[0126] Here, if multiple second containers are located in the non-yard bridge multi-grab area, it is necessary to determine the placement position and place them one by one. Usually, the front box transported by the second transportation device needs to be placed first. Therefore, the front box and the rear box can be determined first, and the front box can be determined as the target container.
[0127] The second position may be the layer and row of the bay where the target container should be placed. The method for determining the second position is the same as the method for determining the first position, and will not be repeated here.
[0128] If the front box is a container of a larger size (eg, 40 feet or 45 feet), the second transport device may only transport the front box as a container.
[0129] In this way, through the above process, the container located in the non-yard bridge multi-grab area can be placed in a reasonable position quickly and accurately.
[0130] In some embodiments, the method may further include:
[0131] Determine whether each third container and the target container belong to the same plan group, the third container being any container among the plurality of second containers except the target container;
[0132] When the third container and the target container belong to the same plan group and are placed in the same bay, determining a third position corresponding to the third container from the bay where the second position is located based on a fourth preset rule;
[0133] Each third container is moved to a third position using the second crane.
[0134] Here, the third position may be a layer and a row of a bay where the third container should be placed.
[0135] The third container may be one or more, for example, the third container may be a rear container.
[0136] Specifically, it can be determined whether the front box and the rear box belong to the same planning group. If so, they can be allocated to the same bay first. If they can be allocated to the same bay first, the method for determining the specific position within the bay is the same as the method for determining the first position.
[0137] In this way, through the above process, the container located in the non-yard bridge multi-grab area can be placed in a reasonable position quickly and accurately.
[0138] In some embodiments, before using the second field crane to move each third container to the third position, the method may further include:
[0139] When the third container and the target container belong to the same planning group and cannot be placed in the same bay, or when the third container and the target container do not belong to the same planning group, a third position corresponding to the third container is determined from the yard where the second position is located.
[0140] Here, if the front box and the rear box belong to different planning groups, or belong to the same planning group but cannot be assigned to the same bay position, they can be assigned to the same yard; if they cannot be assigned to the same yard, they can be assigned to other yards, and the method for determining the bay position in other yards and the specific position within the bay position is the same as the method for determining the first position.
[0141] In this way, through the above process, the container located in the non-yard bridge multi-grab area can be placed in a reasonable position quickly and accurately.
[0142] The method for determining the container placement provided by the embodiment of the present application can avoid errors that may be caused by manually determining the container placement. At the same time, it can maximize the operating efficiency by considering the influence of multiple factors, such as the impact of foreign container truck collection and distribution ports on the loading and unloading of domestic container trucks, the impact of insufficient yard allocation on operating efficiency, the impact of mixed storage of different types of boxes on foreign container trucks picking up containers, etc. In addition, it can coordinate the resources of each module well, such as vehicles, yard cranes and quay cranes, and reduce the waiting time of each module by making full use of current resources.
[0143] Specifically, the method for determining the container placement position provided in the embodiment of the present application takes into account factors such as the machine moving distance, the number of allocated machines, anti-congestion of yard vehicles, rationality of yard stacking, priority allocation of adjacent bays for containers on the same ship, and double-grab areas in the yard when determining the container placement position. Among them, the mechanical moving distance refers to the priority allocation of adjacent bays in a whole block when allocating bays in the same yard to containers on the same ship. In this way, the worst case movement of the yard machinery during operation is also jittering within a shorter distance; the number of allocable machines can refer to the experience of the port, generally one quay crane corresponds to two yards, that is, the containers operated by one quay crane must be allocated to the corresponding two yards. This ratio can maximize the operation efficiency; yard vehicle congestion prevention: when the vehicle is performing unloading operations, if the tasks are all assigned to the same yard, then the vehicle will be stuck in this yard waiting for the yard crane to operate, which will lead to a waste of resources. The yard crane of this yard has been operating, but the yard cranes of other yards are idle, and because the vehicles are stuck in the yard waiting for operations, they cannot reach the quay crane to load containers, so the quay crane has to wait for the arrival of the vehicle before it can operate. The above allocation is definitely unreasonable, so this plan is to allocate containers of the same ship to different yards, so as to maximize efficiency, and different ship types correspond to different yard allocation numbers. The allocation rules of ship types and quay cranes are given by the quay crane plan. The allocation rules of quay cranes and yards can be one quay crane corresponds to two yards; the rationality of yard stacking can refer to the need to meet the container constraints of the yard, such as: the two small bays on both sides of the yard cannot place containers, and the number of bays placed must meet the container turning constraint; the priority allocation of adjacent bays for containers on the same ship can refer to the priority allocation of the entire block of adjacent bays when allocating bays in the same yard to containers on the same ship. If there are no adjacent bays to allocate, the nearest adjacent bays are allocated; the yard double-grab area can refer to the yard cranes operating in this area (whether entering or exiting the container) all operating two 20-foot containers at the same time, that is, when operating, the yard crane's hoist grabs two 20-foot containers. When making the unloading yard plan, it can support the allocation of the yard double-grab container area, and the plan group can be used to determine whether there are containers in the yard double-grab container area for unloading this ship.
[0144] Based on the same inventive concept, the embodiment of the present application also provides a device for determining the placement position of a container. Figure 3 The device for determining the container placement position provided in an embodiment of the present application is described in detail.
[0145] Figure 3 A schematic structural diagram of a device for determining a container placement position provided by an embodiment of the present application is shown.
[0146] like Figure 3 As shown, the container placement position determination device may include:
[0147] A division module 301 is used to divide the first container into plan groups according to the attribute information of the first container to obtain at least one plan group, wherein the attribute information at least includes the size, type and transportation information of the first container;
[0148] The processing module 302 is used to perform the following steps for each plan group in the at least one plan group:
[0149] Determining a first number of bays required for the plan group according to a first number of containers included in the plan group;
[0150] Determine, from the reserved yards and the reserved bays in the reserved yards, the target reserved yards corresponding to the planning group and the number of target reserved bays in each target reserved yard according to the first bay number and the first preset rule;
[0151] According to the number of target reserved bays in each target reserved yard and a second preset rule, the target bays in the target yard corresponding to the containers included in the plan group are determined from the reserved bays in the target reserved yard.
[0152] Thus, the first container can be divided into plan groups according to the attribute information of the first container to obtain at least one plan group; for each plan group in the at least one plan group, the following steps are respectively performed: according to the first number of containers included in the plan group, the first number of bays required by the plan group is determined; according to the first number of bays and the first preset rule, the target reserved yard corresponding to the plan group and the number of target reserved bays in each target reserved yard are determined from the reserved yard and the reserved bays in the reserved yard; according to the number of target reserved bays in each target reserved yard and the second preset rule, the target bay in the target yard corresponding to the container included in the plan group is determined from the reserved bays in the target reserved yard. In this way, the target bay in the target yard corresponding to the container can be automatically determined, so that the determined container placement position is more reasonable.
[0153] In some implementations, the processing module 302 is further configured to:
[0154] Before determining the target reserved yard corresponding to the planning group and the number of target reserved bays in each target reserved yard from the reserved yards and the reserved bays in the reserved yards according to the first bay number and the first preset rule, determining the number of yards and the number of first bays required for placing the first container according to the type of the first transport device and the second number of the first containers, the first container being a container transported by the first transport device;
[0155] According to the number of storage yards, the number of first bay positions and a third preset rule, a reserved storage yard and a reserved bay position in the reserved storage yard reserved for the first container are determined.
[0156] In some implementations, the processing module 302 may include:
[0157] A first determining submodule, configured to determine a reserved storage yard reserved for the first container according to the number of storage yards;
[0158] A second determination submodule is used for determining N consecutive bay positions from each reserved stockyard as reserved bay positions when a first ratio of the first bay position number to the stockyard number is an integer and there are N consecutive bay positions in each reserved stockyard, where N is the first ratio;
[0159] The third determination submodule is used to determine M consecutive bay positions as reserved bay positions from each first yard and P consecutive bay positions as reserved bay positions from the second yard when the first ratio of the number of first bay positions to the number of stockpiles is a non-integer and there are M consecutive bay positions in each reserved stockpiles, wherein M is rounded down from the first ratio, the second stockpiles are the stockpiles with the smallest number of reserved bay positions in the reserved stockpiles, the first stockpiles are the stockpiles in the reserved stockpiles other than the second stockpiles, P is the difference between the first number of bay positions and the first value, and the first value is the product of M and the number of the first stockpiles.
[0160] In some implementations, the processing module 302 may include:
[0161] a fourth determination submodule, configured to determine that each reserved stockyard is a target reserved stockyard and the second ratio is the number of target reserved stockyards in each target reserved stockyard when a second ratio of the first number of bay positions to the third number of reserved stockyards is an integer and the number of reserved bay positions in each reserved stockyard is greater than or equal to the second ratio;
[0162] The fifth determination submodule is used to determine that each reserved yard is a target reserved yard, and the number of target reserved bays in each third yard is the second value, and the number of target reserved bays in the fourth yard is the third value, when the second ratio of the first number of bays to the third number of reserved yards is a non-integer, and the number of reserved bays in each reserved yard is greater than or equal to the second value, wherein the second value is rounded down from the second ratio, the fourth yard is the yard with the smallest number of reserved bays in the target reserved yards, the third yard is the yard other than the fourth yard in the target reserved yards, the third value is the difference between the first number of bays and the fourth value, and the fourth value is the product of the second value and the number of the third yards.
[0163] In some implementations, the processing module 302 may include:
[0164] a sixth determination submodule, configured to determine, for each reserved bay in each target reserved yard, a first score of the reserved bay according to whether an adjacent bay of the reserved bay has been reserved for other containers belonging to the same plan group as the container, increase the first score by a preset value when the adjacent bay of the reserved bay has been reserved for other containers belonging to the same plan group as the container, and not increase the first score when the adjacent bay of the reserved bay has not been reserved for other containers belonging to the same plan group as the container, and determine a second score of the reserved bay according to a first distance between a center point of a plurality of reserved bays in the target reserved yard and the reserved bay, wherein the second score is negatively correlated with the first distance;
[0165] A sorting submodule is used to sort the multiple reserved bays in each target reserved storage yard according to the total scores corresponding to the multiple reserved bays from high to low, to obtain a reserved bay sequence, where the total score is the sum of the first score and the second score;
[0166] a seventh determination submodule, configured to determine, when the total score of the Qth reserved bay is greater than the total score corresponding to the Q+ith reserved bay, the first Q reserved bays in the reserved bay sequence as target bays in the target yard corresponding to the container included in the plan group, Q being determined based on the number of target reserved bays, i=1,2,3…n, and n is a positive integer;
[0167] The eighth determination submodule is used to determine, when the total scores corresponding to the Qth reserved bay and the Q+ith reserved bay are equal, the first Q-1 reserved bays and the first reserved bay in the reserved bay sequence as the target bays in the target yard corresponding to the containers included in the plan group, and the first reserved bay is the bay farther from the entrance of the target reserved yard between the Qth reserved bay and the Q+ith reserved bay.
[0168] In some embodiments, the device may further include:
[0169] A first determination module is used for, after determining the target bay in the target yard corresponding to the container included in the plan group from the reserved bays in the target reserved yard according to the number of target reserved bays in each target reserved yard and a second preset rule, determining the first yard crane for operating the plurality of second containers according to the busyness of each yard crane in the target yard corresponding to the second containers when the plurality of second containers are located in the yard crane multi-grab area, and determining the first position of the plurality of second containers in the target bay based on a fourth preset rule, the fourth preset rule being that the number of rows of containers in a single bay is greater than the number of layers, and the plurality of second containers are containers transported by the second transport device;
[0170] The first moving module is used to move the plurality of second containers to the first position using the first field bridge.
[0171] In some embodiments, the device may further include:
[0172] A second determination module is used to determine a target container that needs to be placed first when a plurality of second containers transported by the second transport device are located in a non-yard bridge multi-grab area;
[0173] A third determination module is used to determine a second yard crane for operating the target container according to the busyness of each yard crane in the target yard corresponding to the target container, and to determine a second position of the target container in the target bay based on a fourth preset rule;
[0174] The second moving module is used to move the target container to a second position using a second field crane.
[0175] In some embodiments, the device may further include:
[0176] A judgment module, used to judge whether each third container and the target container belong to the same plan group, the third container being any container among the plurality of second containers except the target container;
[0177] a fourth determination module, configured to determine, based on a fourth preset rule, a third position corresponding to the third container from the bay where the second position is located, when the third container and the target container belong to the same plan group and are placed at the same bay;
[0178] The third moving module is used to move each third container to a third position by using the second field bridge.
[0179] In some embodiments, the device may further include:
[0180] The fifth determination module is used to determine the third position corresponding to the third container from the yard where the second position is located before using the second yard bridge to move each third container to the third position, when the third container and the target container belong to the same plan group and cannot be placed in the same bay, or when the third container and the target container do not belong to the same plan group.
[0181] Figure 4 A schematic structural diagram of an electronic device provided by an embodiment of the present application is shown.
[0182] like Figure 4 As shown, the electronic device 4 is a structural diagram of an exemplary hardware architecture of an electronic device that can implement the method for determining the container placement position and the device for determining the container placement position in the embodiment of the present application. The electronic device may refer to the electronic device in the embodiment of the present application.
[0183] The electronic device 4 may include a processor 401 and a memory 402 storing computer program instructions.
[0184] Specifically, the processor 401 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.
[0185] The memory 402 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 402 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a tape, or a universal serial bus (USB) drive, or a combination of two or more of these. Where appropriate, the memory 402 may include a removable or non-removable (or fixed) medium. Where appropriate, the memory 402 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 402 is a non-volatile solid-state memory. In a specific embodiment, the memory 402 may include a read-only memory (ROM), a random access memory (RAM), a disk storage medium device, an optical storage medium device, a flash memory device, an electrical, optical, or other physical / tangible memory storage device. Therefore, typically, the memory 402 includes one or more tangible (non-transitory) computer-readable storage media (e.g., a memory device) encoded with software including computer executable instructions, and when the software is executed (e.g., by one or more processors), it is operable to perform the operations described with reference to the method according to one aspect of the present application.
[0186] The processor 401 reads and executes the computer program instructions stored in the memory 402 to implement any one of the container placement position determination methods in the above embodiments.
[0187] In one example, the electronic device may further include a communication interface 403 and a bus 404. Figure 4 As shown, the processor 401, the memory 402, and the communication interface 403 are connected via a bus 404 and communicate with each other.
[0188] The communication interface 403 is mainly used to implement communication between various modules, devices, units and / or equipment in the embodiments of the present application.
[0189] Bus 404 includes hardware, software or both, and the parts of electronic equipment are coupled to each other. For example, but not limitation, bus may include accelerated graphics port (AGP) or other graphics bus, enhanced industrial standard architecture (EISA) bus, front side bus (FSB), hypertransport (HT) interconnection, industrial standard architecture (ISA) bus, infinite bandwidth interconnection, low pin count (LPC) bus, memory bus, micro channel architecture (MCA) bus, peripheral component interconnection (PCI) bus, PCI-Express (PCI-X) bus, serial advanced technology attachment (SATA) bus, video electronics standard association local (VLB) bus or other suitable bus or two or more of these combinations. In appropriate cases, bus 404 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the application considers any suitable bus or interconnection.
[0190] The electronic device can execute the method for determining the container placement position in the embodiment of the present application, thereby realizing the combination Figures 1 to 3 The invention discloses a method and device for determining the container placement position.
[0191] In addition, in combination with the container placement determination method in the above embodiment, the present application embodiment can provide a computer storage medium for implementation. The computer storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, any of the container placement determination methods in the above embodiment is implemented.
[0192] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.
[0193] The functional blocks shown in the above-described block diagram can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments that are used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link by a data signal carried in a carrier wave. "Machine-readable medium" can include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.
[0194] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.
[0195] The above reference is according to the method of the embodiment of the present application, the flow chart of the device (system) and the computer program product and / or the block diagram described various aspects of the present application.It should be understood that each square box in the flow chart and / or the block diagram and the combination of each square box in the flow chart and / or the block diagram can be realized by computer program instructions.These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine so that these instructions executed by the processor of the computer or other programmable data processing device enable the realization of the function / action specified in one or more square boxes of the flow chart and / or the block diagram.Such a processor can be but is not limited to a general-purpose processor, a special-purpose processor, a special application processor or a field programmable logic circuit.It can also be understood that each square box in the block diagram and / or the flow chart and the combination of the square boxes in the block diagram and / or the flow chart can also be realized by the dedicated hardware that performs the specified function or action, or can be realized by the combination of dedicated hardware and computer instructions.
[0196] The above is only a specific implementation of the present application. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. It should be understood that the protection scope of the present application is not limited to this. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in this application, and these modifications or replacements should be included in the protection scope of this application.
Claims
1. A method for determining a container placement position, characterized in that: The method comprises: Dividing the first container into plan groups according to attribute information of the first container to obtain at least one plan group, wherein the attribute information at least includes size, type and transportation information of the first container; For each of the at least one plan group, the following steps are performed respectively: Determining a first number of bays required for the plan group according to a first number of containers included in the plan group; Determine, from the reserved yards and the reserved bays in the reserved yards, the target reserved yards corresponding to the plan group and the number of target reserved bays in each of the target reserved yards according to the first number of bays and the first preset rule; According to the number of target reserved bays in each of the target reserved yards and a second preset rule, the target bays in the target yard corresponding to the containers included in the plan group are determined from the reserved bays in the target reserved yard.
2. The method for determining the container placement position according to claim 1, characterized in that: Before determining the target reserved stockyard corresponding to the plan group and the number of target reserved bays in each of the target reserved stockyards from the reserved stockyards and the reserved bays in the reserved stockyards according to the first number of bays and the first preset rule, the method further comprises: Determine, according to the type of the first transport device and the second number of first containers, the number of yards and the number of first bays required to place the first containers, the first containers being containers transported by the first transport device; A reserved yard reserved for the first container and a reserved bay in the reserved yard are determined according to the number of the yards, the number of the first bays, and a third preset rule.
3. The method for determining the container placement position according to claim 2, characterized in that: The step of determining the reserved storage yard and the reserved bay in the reserved storage yard for the first container according to the number of storage yards, the number of the first bays and a third preset rule includes: Determining a reserved storage yard reserved for the first container according to the number of storage yards; When a first ratio of the first number of bay positions to the number of stockpiles is an integer and there are N consecutive bay positions in each of the reserved stockpiles, N consecutive bay positions are determined from each of the reserved stockpiles as reserved bay positions, where N is the first ratio; When the first ratio of the first number of bay positions to the number of stockpiles is a non-integer and there are M consecutive bay positions in each of the reserved stockpiles, M consecutive bay positions are determined as reserved bay positions from each first stockpiles, and P consecutive bay positions are determined as reserved bay positions from the second stockpiles, wherein M is rounded down to an integer for the first ratio, the second stockpiles are the stockpiles with the smallest number of reserved bay positions in the reserved stockpiles, the first stockpiles are the stockpiles in the reserved stockpiles excluding the second stockpiles, P is the difference between the first number of bay positions and a first value, and the first value is the product of M and the number of the first stockpiles.
4. The method for determining the container placement position according to claim 1, characterized in that: The step of determining, from the reserved yards and the reserved bays in the reserved yards according to the first number of bays and the first preset rule, the target reserved yard corresponding to the plan group and the number of target reserved bays in each of the target reserved yards comprises: When a second ratio of the first number of bays to the third number of the reserved stockyards is an integer, and the number of reserved bays in each of the reserved stockyards is greater than or equal to the second ratio, it is determined that each of the reserved stockyards is the target reserved stockyard, and the second ratio is the number of target reserved bays in each of the target reserved stockyards; When the second ratio of the first number of bay positions to the third number of the reserved yards is a non-integer, and the number of reserved bay positions in each of the reserved yards is greater than or equal to the second value, it is determined that each of the reserved yards is the target reserved yard, and the number of target reserved bay positions in each third yard is the second value, and the number of target reserved bay positions in the fourth yard is the third value, wherein the second value is rounded down from the second ratio, the fourth yard is the yard with the smallest number of reserved bay positions in the target reserved yard, the third yard is the yard in the target reserved yard other than the fourth yard, the third value is the difference between the first number of bay positions and the fourth value, and the fourth value is the product of the second value and the number of the third yards.
5. The method for determining the container placement position according to claim 1, characterized in that: The step of determining, from the reserved bays in the target reserved yard according to the number of target reserved bays in each target reserved yard and a second preset rule, a target bay in the target yard corresponding to the container included in the plan group comprises: for each of the reserved bays in each of the target reserved yards, determining a first score for the reserved bay according to whether an adjacent bay of the reserved bay has been reserved for other containers belonging to the same plan group as the container, increasing the first score by a preset value when an adjacent bay of the reserved bay has been reserved for other containers belonging to the same plan group as the container, and not increasing the first score when an adjacent bay of the reserved bay has not been reserved for other containers belonging to the same plan group as the container, and determining a second score for each of the reserved bays according to a first distance between a center point of a plurality of the reserved bays in the target reserved yard and the reserved bay, wherein the second score is negatively correlated with the first distance; For each of the plurality of reserved bays in the target reserved storage yard, the plurality of reserved bays are sorted in descending order according to the total scores corresponding to the plurality of reserved bays to obtain a reserved bay sequence, wherein the total score is the sum of the first score and the second score; In the case where the total score of the Qth reserved bay is greater than the total score corresponding to the Q+ith reserved bay, the first Q reserved bays in the reserved bay sequence are determined as target bays in the target yard corresponding to the containers included in the plan group, Q is determined based on the number of the target reserved bays, i=1,2,3…n, and n is a positive integer; When the total scores corresponding to the Qth reserved bay and the Q+ith reserved bay are equal, the first Q-1 reserved bays and the first reserved bay in the reserved bay sequence are determined as the target bays in the target yard corresponding to the containers included in the plan group, and the first reserved bay is the bay between the Qth reserved bay and the Q+ith reserved bay that is farther from the entrance of the target reserved yard.
6. The method for determining the container placement position according to any one of claims 1 to 5, characterized in that: After determining the target bays in the target yard corresponding to the containers included in the plan group from the reserved bays in the target reserved yard according to the number of the target reserved bays in each of the target reserved yards and the second preset rule, the method further comprises: In the case where a plurality of second containers are located in a multi-grabbing area of a yard crane, a first yard crane for operating the plurality of second containers is determined according to the busyness of each yard crane in a target yard corresponding to the second containers, and a first position of the plurality of second containers in the target bay is determined based on a fourth preset rule, wherein the fourth preset rule is that the number of rows of containers in a single bay is greater than the number of layers, and the plurality of second containers are containers transported by a second transport device; The plurality of second containers are moved to the first position using the first crane.
7. The method for determining the container placement position according to claim 6, characterized in that: The method further comprises: In the case where a plurality of second containers transported by the second transport device are located in a non-yard bridge multi-grab area, determining a target container that needs to be placed first; Determine a second yard crane for operating the target container according to the busyness of each yard crane in the target yard corresponding to the target container, and determine a second position of the target container in the target bay based on the fourth preset rule; The target container is moved to the second position by using the second crane.
8. The method for determining the container placement position according to claim 7, characterized in that: The method further comprises: Determine whether each third container and the target container belong to the same plan group, the third container being any container among the plurality of second containers except the target container; In a case where the third container and the target container belong to the same plan group and are placed in the same bay, determining a third position corresponding to the third container from the bay where the second position is located based on the fourth preset rule; Each of the third containers is moved to the third position using the second crane.
9. The method for determining the container placement position according to claim 8, characterized in that: Before using the second field crane to move each of the third containers to the third position, the method further includes: When the third container and the target container belong to the same plan group and cannot be placed in the same bay, or when the third container and the target container do not belong to the same plan group, a third position corresponding to the third container is determined from the yard where the second position is located.
10. A device for determining a container placement position, characterized in that: The device comprises: a division module, configured to divide the first container into plan groups according to attribute information of the first container to obtain at least one plan group, wherein the attribute information at least includes size, type and transportation information of the first container; The processing module is used to perform the following steps for each of the at least one plan group: Determining a first number of bays required for the plan group according to a first number of containers included in the plan group; Determine, from the reserved yards and the reserved bays in the reserved yards, the target reserved yards corresponding to the plan group and the number of target reserved bays in each of the target reserved yards according to the first number of bays and the first preset rule; According to the number of target reserved bays in each of the target reserved yards and a second preset rule, the target bays in the target yard corresponding to the containers included in the plan group are determined from the reserved bays in the target reserved yard.
