Artificial fish reef and installation test method thereof

Through the three-dimensional geometric structure design of dragon bamboo material and mortise and tenon connection, the stability and durability of artificial reefs in the sea are solved. The reef structure is optimized in combination with the installation and testing method, and the reef structure is realized. Long-term stability and ecological benefits.

CN119096923APending Publication Date: 2024-12-10SOUTHERN BRANCH OF CHINA COMM CONSTR CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411466851.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

The stability and durability of the splicing joints in the ocean are affected by the impact of water currents, and the impact of marine water flow on them is unknown, which may lead to damage or disintegration of the reef structure and affect the service life.

Method used

采用巨龙竹材质制成的圆柱竹筒结构,通过在主体内设置鱼巢孔和通孔,并利用第一组装件和第二组装件的榫卯连接形成立体几何结构,连接处隐蔽在主体内,减少水流冲击;同时,提供安装测试方法,通过模拟海洋环境载荷和剪切强度分析,优化鱼礁结构和投放位置。

Benefits of technology

It extends the service life of artificial reefs, improves their stability and durability in the ocean, and ensures that the reef structure can effectively promote the restoration and development of marine ecosystems in the long run.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119096923A_ABST
    Figure CN119096923A_ABST
Patent Text Reader

Abstract

The invention provides an artificial fish reef and an installation test method thereof, and the artificial fish reef comprises a plurality of main bodies, each main body is provided with a fish nest hole, and each main body is provided with a first through hole penetrating through the main body and a second through hole penetrating through the main body at the same outer ring height; a plurality of shaft sections are arranged on each first assembly part; a corresponding groove position is formed in the position, directly facing the corresponding shaft section, of each second assembly part, and the groove positions are matched with the shaft sections in shape; the main bodies are arranged transversely and longitudinally, the first assembly part penetrates through the first through holes of the main bodies, the second assembly part penetrates through the second through holes of the main bodies, the first assembly part and the second assembly part which are located in the same main body are meshed through the shaft section and the groove position, and the main bodies are arranged and spliced to form a solid geometric structure. The service life of the artificial fish reef can be prolonged, and it is ensured that the fish reef structure and the putting position are reasonable so as to ensure that the artificial fish reef can be used for a long time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of artificial fish reefs, and in particular to an artificial fish reef and an installation and testing method thereof. Background Art

[0002] Artificial reefs are structures artificially set up in the sea. Their purpose is to improve the ecological environment of the sea area, create a good environment for marine life to live, and provide fish with a place to reproduce, grow, forage and shelter from enemies, so as to achieve the purpose of protection, proliferation and increase of fish catch. Existing artificial reefs are generally composed of multiple main bodies spliced ​​together, but the splicing components between the multiple main bodies are usually exposed outside the main body. When artificial reefs are placed in the ocean, the water flow will impact the splicing components exposed outside the main body, affecting the stability and durability of the splicing connection; and the impact of ocean currents on artificial reefs is unknown. If artificial reefs are placed in a location with strong water flow, the reef structure may not be able to withstand the impact of the water flow, causing the reef to be damaged or even disintegrated in the ocean, affecting the service life of the artificial reefs. Summary of the invention

[0003] The embodiment of the present invention provides an artificial fish reef and an installation and testing method thereof to solve the problems existing in the related art. The technical solution is as follows:

[0004] In a first aspect, an embodiment of the present invention provides an artificial reef, comprising:

[0005] A plurality of main bodies, each of which is provided with a fish nest hole, and a first through hole penetrating the main body and a second through hole penetrating the main body are provided at the same outer circle height of each main body;

[0006] A plurality of first assemblies, each of which is provided with a plurality of shaft segments;

[0007] A plurality of second assemblies, each position on each second assemblies facing the shaft section is provided with a corresponding slot, and the slot and the shaft section are in conformity with each other in shape;

[0008] The main bodies are arranged horizontally and vertically, the first assembly penetrates the first through holes of the multiple main bodies, the second assembly penetrates the second through holes of the multiple main bodies, and the first assembly and the second assembly located in the same main body are engaged with each other through the shaft section and the groove, and the main bodies are arranged and spliced ​​to form a three-dimensional geometric structure.

[0009] In one embodiment, the space where the shaft section and the groove in the main body engage with each other is filled with ecological filler.

[0010] In one embodiment, an internal passage communicating with the fish nest hole is provided in the main body.

[0011] In one embodiment, a plurality of designated positions of the first assembly are longitudinally recessed to form a plurality of shaft segments, and a diameter of each shaft segment is smaller than a diameter of the first assembly.

[0012] In one embodiment, the diameter of the fish nest holes is set to be at least larger than half of the average maximum body width of the target fish.

[0013] In one embodiment, the main body is a cylindrical bamboo tube structure made of giant dragon bamboo.

[0014] In one embodiment, the outer surface of the body is smooth and the inner wall thereof is rough.

[0015] In a second aspect, an embodiment of the present invention provides a method for installing and testing an artificial reef as described above, comprising:

[0016] Obtain the environmental load parameters of artificial fish reefs placed in the marine environment, and simulate the resistance of artificial fish reefs in the marine environment based on the environmental load parameters;

[0017] The angle between the load direction and the axis of the bamboo in the artificial reef is determined according to the angle of placement of the artificial reef, and the shear strength of the artificial reef is determined according to the angle and environmental load parameters;

[0018] When the resistance capacity does not meet the first test condition, and / or the shear strength does not meet the second test condition, a prompt instruction is generated, and the prompt instruction is used to remind to switch the placement position of the artificial fish reef and / or remind to update the arrangement structure of the artificial fish reef.

[0019] In one embodiment, simulating the resistance of artificial reefs in a marine environment according to environmental load parameters includes:

[0020] Conduct characteristic analysis on artificial reefs to obtain bamboo characteristics of artificial reefs;

[0021] Conduct mechanical analysis on artificial reefs to obtain the force distance between a designated fixed point and a designated force point on the artificial reef;

[0022] The bending moment caused by the load is calculated based on the environmental load parameters and the force distance;

[0023] The bending stress is calculated based on the bending moment and bamboo characteristics;

[0024] The resistance is determined based on the bending moment and bending stress.

[0025] In one embodiment, determining the shear strength of the artificial reef according to the angle and the environmental load parameters includes:

[0026] Calculate the environmental load according to the environmental load parameters;

[0027] Calculate the dynamic shear force of artificial reefs based on environmental loads and angles;

[0028] The shear stress is calculated based on the dynamic shear force and the mortise and tenon contact area of ​​the artificial reef;

[0029] The shear strength of artificial reefs is determined based on dynamic shear force and shear stress.

[0030] The advantages or beneficial effects of the above technical solution include at least:

[0031] The main bodies of the present invention are arranged horizontally and vertically, the first assembly penetrates the first through holes of the multiple main bodies, the second assembly penetrates the second through holes of the multiple main bodies, and the first assembly and the second assembly located in the same main body are engaged with each other through shaft sections and grooves. The main bodies are arranged and spliced ​​to form a three-dimensional geometric structure. The connection between the first assembly and the second assembly of the present invention is hidden in the main body, which can reduce the impact of water flow on the connection and extend the service life of the fish reef.

[0032] At the same time, the stress conditions of artificial fish reefs in the marine environment are analyzed through testing methods, and the impact of the periodic loads caused by the current ocean waves on the current structure of artificial fish reefs is predicted based on the resistance capacity and shear strength, ensuring that the reef structure and deployment location are reasonable to ensure the long-term use of artificial fish reefs.

[0033] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present invention will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present invention and should not be regarded as limiting the scope of the present invention.

[0035] Figure 1 It is a schematic diagram of the overall structure of the artificial fish reef of the present invention;

[0036] Figure 2 It is a schematic diagram of the cross-sectional structure of a single main body of the present invention;

[0037] Figure 3 It is a schematic structural diagram of the first assembly of the present invention;

[0038] Figure 4 is a schematic structural diagram of a second assembly of the present invention;

[0039] Figure 5 A schematic diagram of the engagement of the first assembly and the second assembly of the present invention;

[0040] Figure 6 The figure is a flow chart of the installation and testing method of artificial fish reefs of the present invention.

[0041] In the figure: 1, main body; 2, fish nest hole; 3, first assembly part; 31, shaft section; 4, second assembly part; 41, slot; 5, first through hole; 6, ecological filler. DETAILED DESCRIPTION

[0042] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0043] As global fishery resources are increasingly depleted, protecting and restoring marine ecosystems has become an important research topic. Artificial reefs have received widespread attention as an effective means of marine ecological restoration. Artificial reefs use artificial materials to simulate the structure and function of natural reefs, providing fish and other marine organisms with a place to live, forage, reproduce, and avoid enemies. By deploying artificial reefs in specific sea areas, the local marine ecological environment can be improved, biodiversity can be increased, and the recovery and sustainable development of fishery resources can be promoted.

[0044] The materials and structural design of artificial reefs directly affect their ecological benefits and durability. Traditional artificial reefs are mostly made of concrete, steel, etc. Although these materials are excellent in strength and durability, they are insufficient in environmental protection and ecological adaptability. In recent years, with the increase of environmental awareness, more and more researchers have begun to explore the use of natural materials and degradable materials to make artificial reefs to reduce the negative impact on the marine environment.

[0045] At the same time, existing artificial fish reefs are generally composed of multiple main bodies 1 spliced ​​together, but the splicing components between the multiple main bodies 1 are usually exposed outside the main body 1. When the artificial fish reefs are placed in the ocean, the water flow will impact the splicing components exposed outside the main body 1, affecting the stability and durability of the splicing connection; and the impact of ocean currents on artificial fish reefs is unknown. Placing artificial fish reefs in locations with strong water flow may cause the reef structure to be unable to withstand the impact of water flow, causing the reef to be damaged or even disintegrated in the ocean, affecting the service life of the artificial fish reefs.

[0046] In order to solve the above problems, an embodiment of the present invention proposes an artificial fish reef, which meets environmental protection requirements, is simple to assemble and has a stable structure, can be put into use in the ocean for a long time, and can effectively promote the recovery and development of the marine ecosystem.

[0047] like Figure 1 As shown, the artificial fish reef of this embodiment includes a plurality of main bodies 1 , a plurality of first assemblies 3 and a plurality of second assemblies 4 .

[0048] It should be noted that the number of the main body 1, the first assembly 3 and the second assembly 4 are set according to actual conditions. The number of assemblies required for splicing different numbers of main bodies 1 is different, and the specific number of the main body 1, the first assembly 3 and the second assembly 4 is not limited here.

[0049] In this embodiment, the main body 1 is made of appropriate giant dragon bamboo, and the appearance of the main body 1 presents a cylindrical structure of the giant dragon bamboo.

[0050] It should be noted that when making the main body 1, giant dragon bamboo without obvious cracks, damage or decay should be used as the raw material for making the main body 1; the bamboo material should be dried to reduce the moisture content to prevent structural problems caused by water absorption expansion or shrinkage during later installation; and the outer surface of the giant dragon bamboo should be polished to make the outer surface of the main body 1 smooth and without sharp protrusions to avoid causing harm to fish or other marine life.

[0051] The selection of giant dragon bamboo should take into account its strength, diameter and natural corrosion resistance. In this embodiment, the diameter of each giant dragon bamboo needs to be greater than 25 cm to meet the structural requirements; the height of the fish reef is five times the diameter of the giant dragon bamboo to ensure that the final fish reef is approximately a cube; the wall thickness should be greater than 1 / 6 of its diameter to ensure that drilling does not affect the overall strength of the giant dragon bamboo.

[0052] In addition, the inner wall of the giant dragon bamboo is rough. The inner wall of the giant dragon bamboo naturally has a certain degree of roughness and irregularity. This natural roughness can promote the smearing of algae and other marine organisms to a certain extent. By utilizing this natural characteristic, these natural rough structures can be retained and utilized as much as possible during the selection and processing of bamboo, thereby reducing the cost and complexity of additional processing.

[0053] like Figure 2 As shown, in this embodiment, each main body 1 is provided with a fish nest hole 2, and a first through hole 5 penetrating the main body 1 and a second through hole (not marked in the figure) penetrating the main body 1 are provided at the same outer circle height of each main body 1.

[0054] It should be noted that the fish nest holes 2 can be distributed at any position of the main body 1 to provide a passage for fish to enter, live and forage. The size and position of the fish nest holes 2 are designed according to the needs of different fish to ensure that various fish can find a suitable living space in the artificial reef.

[0055] Before the production and design of the main body 1, it is possible to determine in advance what fish exist in the marine environment where the artificial fish reef is placed, and design the artificial fish reef to a size suitable for the survival of the target fish in that marine environment. The aperture of the fish nest hole 2 is set to be at least larger than half of the average maximum body width of the target fish, and usually 75% of the maximum body width of the fish is taken as the aperture of the fish nest hole 2.

[0056] Furthermore, an internal passage connected to the fish nest hole 2 may be provided in the main body 1, so that the target fish can reach into the main body 1, providing a safe living space for the fish.

[0057] In addition, a first through hole 5 and a second through hole are provided at the same height on the outer wall of each main body 1. The first through hole 5 penetrates the main body 1 so that the first assembly 3 can penetrate the main body 1 through the first through hole 5; and the second through hole also penetrates the main body 1 so that the second assembly 4 can penetrate the main body 1 through the second through hole, thereby splicing multiple main bodies 1.

[0058] It should be noted that the first through hole 5 and the second through hole are evenly distributed on the main body 1 by drilling, and the distance between the first through hole 5 and the second through hole on each main body 1 is fixed. The drilling process should avoid excessive impact on the structural strength of the bamboo. A drill bit of appropriate size can be used for drilling. The drill bit should be slightly smaller than the hole diameter to reduce the risk of cracks; and a low-speed high-torque drill should be used to avoid cracking of the bamboo caused by drilling too quickly. After drilling, the edge of the hole needs to be polished to remove any sharp edges to prevent harm to fish.

[0059] In this embodiment, multiple main bodies 1 are arranged horizontally and vertically in advance, and during the arrangement process, the first through holes 5 of each main body 1 in the same row are aligned to form a channel for inserting the first assembly 3; the second channels of each main body 1 in the same column of the arranged multiple main bodies 1 are aligned to form a channel for inserting the second assembly 4.

[0060] The sizes of the first through hole 5 and the second through hole must be much larger than the diameters of the first assembly 3 and the second assembly 4, so as to provide sufficient space for the first assembly 3 and the second assembly 4 to be spliced ​​in the main body 1. After splicing, there is a certain gap between the first through hole 5 and the second through hole, and the ecological filler 6 can be filled in the gap, such as Figure 2 As shown, the first assembly part 3 and the second assembly part 4 are prevented from moving in the through hole, ensuring that the first assembly part 3 and the second assembly part 4 are stably engaged inside the main body 1 .

[0061] like Figure 3 As shown, in this embodiment, a plurality of shaft segments 31 are provided on the first assembly 3, and the shaft segments 31 can be longitudinally opened from a plurality of designated positions of the first assembly 3 by turning or other means to form a plurality of recessed positions, each recessed position forming a shaft segment 31 of the first assembly 3, so that the diameter of each shaft segment 31 is smaller than the diameter of the first assembly 3; and the distance between each shaft segment 31 of the first assembly 3 is the same, so as to facilitate the subsequent engagement and splicing with the second assembly 4.

[0062] like Figure 4As shown, the second assembly 4 is provided with a plurality of slots 41, and the distribution of the plurality of slots 41 on the second assembly 4 is the same as the arrangement of the shaft segments 31 on the first assembly 3. At the same time, the shape of the slots 41 matches the shape of the shaft segments 31, so that the shaft segments 31 can be precisely engaged with the slots 41 to achieve the effect of mortise and tenon fixing.

[0063] Combination Figure 1 As shown, during the assembly of the artificial reef, the main bodies 1 are arranged horizontally and vertically, the first through holes 5 between the main bodies 1 arranged horizontally are connected, and the first assembly 3 passes through the first through hole 5 of each main body 1 arranged horizontally; and the second through holes between the main bodies 1 arranged vertically are connected, and the second assembly 4 passes through the second through hole of each main body 1 arranged vertically; at the same time, the shaft section 31 of the first assembly 3 and the slot 41 of the second assembly 4 located in the same main body 1 are spliced ​​by using the internal space of the first through hole 5 and the second through hole, as shown in FIG. Figure 5 As shown, Figure 5 A in the middle indicates the meshing and splicing position of the first assembly part 3 and the second assembly part 4. In the cross-sectional angle of the main body 1, the first assembly part 3 and the second assembly part 4 in the main body 1 mesh with each other and form a cross-shaped structure.

[0064] After the first assembly parts 3 and the second assembly parts 4 in each main body 1 are spliced ​​together, the mortise and tenon gaps in the main body 1 are filled with ecological fillers 6, which may be sand, concrete blocks or other environmentally friendly materials, so that the manufactured artificial fish reef can sink to the seabed under the action of gravity and increase the stability of the overall structure.

[0065] Each main body 1 is spliced ​​together by the first assembly 3 and the second assembly 4 to form an artificial fish reef with a three-dimensional geometric structure. The connection between the first assembly 3 and the second assembly 4 is hidden in the main body 1, and the gap in the connection in the main body 1 is filled with the ecological filler 6 to reduce the impact of water flow on the connection, which can extend the service life of the fish reef; the artificial fish reef is put into the ocean, and the fish in the ocean can survive in the artificial fish reef, which effectively promotes the recovery and development of the marine ecosystem.

[0066] In order to further improve the feasibility of placing artificial reefs in the ocean, the environmental load can be dynamically analyzed and its impact on artificial reefs can be simulated, so as to optimize the arrangement and placement of artificial reefs to ensure that the artificial reefs can achieve maximum ecological benefits.

[0067] Specifically, Figure 6 As shown, another embodiment of the present invention provides a method for installing and testing the artificial reef as described above, which specifically includes the following steps:

[0068] Step S1: Obtain environmental load parameters of the artificial fish reefs placed in the marine environment, and simulate the resistance of the artificial fish reefs in the marine environment according to the environmental load parameters.

[0069] The artificial fish reefs made of giant dragon bamboo are placed into the marine environment, and the placement location of the artificial fish reefs is recorded. The environmental loads such as waves and tides at the placement location are measured by Doppler current meters, wave buoys, wave sensors and other equipment and instruments, and the environmental load parameters that change over time are recorded in real time.

[0070] The bending moment caused by environmental loads is crucial to the structural integrity of artificial reefs. Therefore, the loads of the marine environment need to be quantified. Specifically, the expression of environmental loads is:

[0071] F(t)=F0·cos(ωt+φ);

[0072] Among them, F(t) represents a time-dependent dynamic load, F0 is the maximum load amplitude, ω is the angular frequency of the wave, φ is the phase difference, and t is time. Data such as the maximum load amplitude, angular frequency, and phase difference can all be measured by equipment and instruments.

[0073] The bending moment of the artificial reef over time is calculated based on the environmental load. The expression of the bending moment is:

[0074] M(t) = F(t)·L;

[0075] Among them, M(t) represents the bending moment that changes with time, F(t) represents a time-dependent dynamic load, and L represents the distance from the giant dragon bamboo fixing point to the force point.

[0076] The distance between the fixing point of the giant dragon bamboo and the stress point can be determined by simulating the stress conditions of the artificial reef under the current environmental load through simulation software, and conducting a mechanical analysis on the artificial reef, so as to determine the distance between the specified fixing point on the artificial reef and the specified stress point.

[0077] In this embodiment, through a large number of simulation tests, it is found that the distance between the fixing point of the giant dragon bamboo and the force-bearing point is close to half the length of the giant dragon bamboo. Therefore, in this embodiment, L is directly set to half the length of the bamboo.

[0078] It should be noted that the technology of simulating stress conditions using simulation software has been disclosed in the prior art and will not be described again here.

[0079] Furthermore, the characteristics of artificial reefs are analyzed to obtain the bamboo characteristics of artificial reefs, which include bamboo length, bamboo diameter, etc. The bending stress is calculated based on the bending moment and bamboo characteristics, and the expression of bending stress is:

[0080]

[0081] Among them, σ(t) represents the bending stress that changes with time t; y is the farthest distance from the point where the stress is calculated to the neutral axis of the cross section, which is usually taken as half of the radius of the bamboo; I is the moment of inertia of the section, which is used to measure the ability of the section to resist bending; D is the diameter of the bamboo.

[0082] After calculating the bending moments of each bamboo in the artificial reef at different positions, a bending moment diagram can be drawn to show the magnitude and direction of the bending moment at any point on each bamboo. Find the location of the maximum bending moment along the entire length of the bamboo, and then determine the maximum bending stress of the bamboo.

[0083] Step S2: determining the angle between the load direction and the axis of the bamboo in the artificial reef according to the angle of placement of the artificial reef, and determining the shear strength of the artificial reef according to the angle and environmental load parameters.

[0084] When artificial fish reefs are placed in the marine environment, their placement angles are different, and the bamboo axis of each giant dragon bamboo in the artificial fish reef will be different from the load direction of ocean waves. Therefore, simulation software is used to simulate the angle between the axis of each bamboo and the current load direction when the artificial fish reef is placed in the marine environment at a fixed time point or under a stable environmental condition. Tools such as compasses or goniometers can even be used to manually measure the angle between the load direction and the bamboo column axis at a fixed time point or under a stable environmental condition during the installation and layout process.

[0085] Subsequently, the dynamic shear force of the artificial reef is calculated according to the angle and the environmental load, the shear stress is calculated according to the dynamic shear force and the mortise and tenon contact area of ​​the artificial reef, and the shear strength of the artificial reef is determined according to the dynamic shear force and the shear stress.

[0086] Among them, the environmental load is calculated based on the environmental load parameters, and its expression formula is:

[0087] F(t)=F0·cos(ωt+φ);

[0088] Among them, F(t) represents a time-dependent dynamic load, F0 is the maximum load amplitude, ω is the angular frequency of the wave, φ is the phase difference, and t is time.

[0089] The calculation formula of dynamic shear force is:

[0090] V(t) = F(t)·cos(θ);

[0091]

[0092] Where V(t) represents the time-dependent shear force, θ represents the angle between the load and the axis of the bamboo column, τ(t) is the time-dependent shear stress, and A jointIt is the contact area of ​​the mortise and tenon connection structure between the first assembly part 3 and the second assembly part 4.

[0093] Step S3: When the resistance capacity does not meet the first test condition and / or the shear strength does not meet the second test condition, a prompt instruction is generated, where the prompt instruction is used to remind the user to switch the placement position of the artificial reef and / or to remind the user to update the arrangement structure of the artificial reef.

[0094] The specific method for judging whether the resistance meets the first test condition is as follows:

[0095] The calculated bending stress is compared with the allowable bending stress of the material, where the allowable bending stress is usually obtained by dividing the yield strength or ultimate strength of the material by a safety factor. If the calculated bending stress is less than or equal to the allowable bending stress, the cross-section of the artificial reef giant dragon bamboo is considered to be sufficient to resist the stress caused by the bending moment.

[0096] If the bending moment stress is greater than the allowable bending stress, it is considered that the artificial reef with the current structure cannot resist the stress caused by the bending moment. At this time, a prompt instruction is generated to remind the user to switch the placement of the artificial reef to change the environmental load faced by the artificial reef and / or update the arrangement structure of the artificial reef to optimize the impact of the environmental load on the artificial reef.

[0097] The specific method for judging whether the shear strength meets the second test condition is:

[0098] Determine whether the shear stress is less than the allowable shear stress of the material. The allowable shear stress is usually determined by dividing the limiting shear stress obtained through material testing by a safety factor. When the calculated shear stress is less than or equal to the allowable shear stress, it means that the material is stable and will not be damaged. If the calculated shear stress is greater than the allowable shear stress, it means that the material is unstable and the artificial reef will be sheared off at the shear surface.

[0099] During the process of judging the resistance capacity and shear strength, trigger reminder rules can be set, that is, the trigger reminder rules include immediately executing a reminder operation when the resistance capacity does not meet the first test condition, or immediately executing a reminder operation when the shear strength does not meet the second test condition, or executing the reminder operation only when both the resistance capacity does not meet the first test condition and the shear strength does not meet the second test condition, so as to improve the flexibility of the reminder.

[0100] During the installation and placement stage of the artificial reef, the rationality of the artificial reef of the current structure in the current placement position is evaluated in real time through the dynamic analysis of the resistance capacity and shear strength. If the resistance capacity and / or shear strength are not up to standard, the placement position of the artificial reef is adjusted to change the environmental load, and / or the arrangement layout of each main body 1 in the artificial reef is changed. The load distribution and the stress and deformation of the structure under different installation positions and layouts are recorded through experiments, and finally the optimal installation position and structural layout are determined to minimize the stress and deformation of the structure under various environmental loads, thereby determining the optimal installation position and the optimal structural layout.

[0101] This embodiment ensures the stability and safety of the reef in a dynamic environment by regularly monitoring the structural response of the reef. Incorporating dynamic environmental load analysis into the design and testing phase of the reef can significantly improve the predictability and reliability of the reef structure. This not only contributes to the long-term stability of the reef, but also ensures the maximization of its ecological function.

[0102] The embodiment of the present invention manufactures a giant dragon bamboo fish reef by means of the mortise and tenon joints of the first assembly 3 and the second assembly 4, forming a stable and environmentally friendly artificial fish reef structure, providing an innovative and environmentally friendly solution, and effectively solving the problems of environmental pollution, structural instability, and low ecological benefits existing in traditional artificial fish reefs; giant dragon bamboo is used as the main material, which is low in cost and easy to obtain, reducing the manufacturing and maintenance costs of artificial fish reefs, and the corrosion-resistant giant dragon bamboo and stable mortise and tenon structure extend the service life of the fish reef and reduce the frequency of replacement and maintenance. The present invention significantly improves the environmental performance, structural stability, and ecological benefits of artificial fish reefs through scientific technical solutions and innovative designs, has good social, economic, and technical benefits, and provides an effective solution for marine ecological protection and the sustainable development of fishery resources.

[0103] Another embodiment of the present invention provides an electronic device, the electronic device comprising: a memory and a processor, wherein the memory stores a computer program that can be run on the processor. When the processor executes the computer program, the installation test method of the artificial reef in the above embodiment is implemented. The number of the memory and the processor can be one or more.

[0104] The electronic device also includes:

[0105] Communication interface, used to communicate with external devices and perform data exchange transmission.

[0106] If the memory, processor and communication interface are implemented independently, the memory, processor and communication interface can be connected to each other through a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc.

[0107] Optionally, in a specific implementation, if the memory, processor, and communication interface are integrated on a chip, the memory, processor, and communication interface can communicate with each other through an internal interface.

[0108] An embodiment of the present invention provides a computer-readable storage medium storing a computer program, which implements the method provided in the embodiment of the present invention when executed by a processor.

[0109] An embodiment of the present invention further provides a chip, which includes a processor for calling and executing instructions stored in the memory from the memory, so that a communication device equipped with the chip executes the method provided by the embodiment of the present invention.

[0110] An embodiment of the present invention also provides a chip, including: an input interface, an output interface, a processor and a memory, wherein the input interface, the output interface, the processor and the memory are connected via an internal connection path, and the processor is used to execute the code in the memory. When the code is executed, the processor is used to execute the method provided by the embodiment of the invention.

[0111] It should be understood that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. It is worth noting that the processor may be a processor supporting the advanced RISC machines (ARM) architecture.

[0112] Further, optionally, the above-mentioned memory may include a read-only memory and a random access memory, and may also include a non-volatile random access memory. The memory may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may include a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may include a random access memory (RAM), which is used as an external cache. By way of example but not limitation, many forms of RAM are available. For example, static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM) and direct rambus RAM (DR RAM).

[0113] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function according to the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium.

[0114] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0115] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0116] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of various changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An artificial reef, characterized in that: include: A plurality of main bodies, each of which is provided with a fish nest hole, and a first through hole penetrating the main body and a second through hole penetrating the main body are provided at the same outer circle height of each main body; A plurality of first assemblies, each of which is provided with a plurality of shaft segments; A plurality of second assemblies, each of the second assemblies having a corresponding slot at each position facing the shaft segment, the slot being in conformity with the shaft segment in shape; The main bodies are arranged horizontally and vertically, the first assembly penetrates through the first through holes of the plurality of main bodies, the second assembly penetrates through the second through holes of the plurality of main bodies, and the first assembly and the second assembly located in the same main body are engaged with the groove through the shaft segment, and the main bodies are arranged and spliced ​​to form a three-dimensional geometric structure.

2. The artificial reef according to claim 1, characterized in that: The space in which the shaft section and the slot in the main body are engaged with each other is filled with ecological filler.

3. The artificial reef according to claim 1, characterized in that: An internal passage communicating with the fish nest hole is arranged in the main body.

4. The artificial reef according to claim 1, characterized in that: A plurality of designated positions of the first assembly are longitudinally recessed to form a plurality of shaft segments, and a diameter of each of the shaft segments is smaller than a diameter of the first assembly.

5. The artificial reef according to claim 1, characterized in that: The hole diameter of the fish nest is set to be at least larger than half of the average maximum body width of the target fish.

6. The artificial reef according to claim 1, characterized in that: The main body is a cylindrical bamboo tube structure made of giant dragon bamboo.

7. The artificial reef according to claim 1, characterized in that: The outer surface of the main body is smooth, and the inner wall thereof is rough.

8. A method for installing and testing an artificial reef as claimed in any one of claims 1 to 7, characterized in that: include: Acquire environmental load parameters of artificial fish reefs placed in a marine environment, and simulate the resistance of the artificial fish reefs in the marine environment according to the environmental load parameters; Determine the angle between the load direction and the axis of the bamboo in the artificial fish reef according to the angle of placement of the artificial fish reef, and determine the shear strength of the artificial fish reef according to the angle and the environmental load parameter; When the resistance capacity does not meet the first test condition, and / or the shear strength does not meet the second test condition, a prompt instruction is generated, wherein the prompt instruction is used to remind to switch the placement position of the artificial fish reef and / or remind to update the arrangement structure of the artificial fish reef.

9. The installation test method according to claim 8, characterized in that: The simulating the resistance of the artificial fish reef in the marine environment according to the environmental load parameters comprises: Performing characteristic analysis on the artificial fish reef to obtain bamboo material characteristics of the artificial fish reef; Performing mechanical analysis on the artificial fish reef to obtain a force distance between a designated fixed point and a designated force point on the artificial fish reef; Calculate the bending moment caused by the load according to the environmental load parameter and the force distance; Calculate the bending stress according to the bending moment and the characteristics of the bamboo material; The resistance is determined based on the bending moment and the bending stress.

10. The installation test method according to claim 8, characterized in that: The determining the shear strength of the artificial reef according to the angle and the environmental load parameter comprises: Calculating the environmental load according to the environmental load parameter; Calculating the dynamic shear force of the artificial reef according to the environmental load and the angle; Calculating shear stress according to the dynamic shear force and the mortise and tenon contact area of ​​the artificial reef; The shear strength of the artificial reef is determined according to the dynamic shear force and the shear stress.

Citation Information

Patent Citations

  • Assembled artificial fish reef and fish reef putting method

    CN115644108A

  • Songjiang perch cave formula laying nest

    CN206525347U

  • Fish-multiplying bank

    JP1996037991A

  • Underwater net, and seaweed bed reef

    JP2021007308A

  • The method of forming the ceramic fishing reef

    KR1020090096570A