Integrated tool technology for building and transferring large overweight structure
Through integrated chemical equipment technology, including material selection, supporting equipment layout and SPMT coordination, the equipment shortage problem in the construction and transportation of large-scale overweight structures has been solved, and efficient production and transportation have been achieved.
Patent Information
- Application Number
- CN202411130132.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-19
AI Technical Summary
During the construction and transportation of large overweight structures, due to the lack of large riveting platforms and heavy lifting and driving equipment, the manufacturing plant is unable to complete production, resulting in wasted production.
Using integrated chemical engineering technology, the problem of construction and transportation is solved by analyzing product drawings, selecting and verifying materials, laying up supporting tools, using three-dimensional software for finite element analysis and total station detection, and combining SPMT for lifting and transport, solving the problem of construction and transport. .
It has realized high-precision construction and safe transportation of large overweight structures, solved the problem of shortage of heavy lifting equipment and large riveting platforms in the manufacturing plant, and improved production efficiency and capacity utilization.
Smart Images

Figure CN118977826A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of heavy equipment manufacturing, and in particular to the manufacturing and transportation technology of a precision floating foundation steel structure and its segments as well as large-scale marine engineering equipment. Background Art
[0002] The weight of precision floating foundation steel structures and their segments is mostly over 200 tons. This type of structure has high dimensional accuracy and strict requirements on the external environment during construction. Only the environment inside the factory can meet production needs. For issues such as dimensional accuracy control, large cast iron riveting platforms are required to ensure processing accuracy. However, some manufacturers are limited by the lifting and transportation capacity of cranes in the factory and are unable to lift the workpieces from the large riveting platforms to the transfer vehicles, resulting in the inability to produce many large and overweight structures, causing waste of production capacity. Summary of the invention
[0003] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a technology that integrates construction platforms and transfer tooling to solve the difficult problems of construction and transportation of large and heavy structures, and to provide a new solution for manufacturers that lack large riveting platforms and heavy lifting and traveling equipment.
[0004] In order to achieve the above object, the present invention is implemented through the following technical solution: a large-scale super-heavy structure construction and transfer integrated tooling technology, including the following steps:
[0005] Step 1: Analyze the super-heavy structure product drawings to obtain technical parameters and product features.
[0006] Step 2: Based on the obtained technical parameters, select and perform strength verification on the materials used for the integrated tooling.
[0007] Step 3: Based on the characteristics of large and heavy structural products, arrange the supporting tooling and leveling tooling, and build the qualified products on the tooling according to the manufacturing plan.
[0008] Step 4: After the product construction is completed, the product is transferred to the subsequent process.
[0009] Through the above technical solution:
[0010] Furthermore, the technical parameters include but are not limited to product weight, outer dimensions, construction accuracy, product center of gravity, and detailed location of internal and external structures.
[0011] Furthermore, the material selection used for the tooling includes but is not limited to rectangular tubes, channel steels, I-beams, and H-beams.
[0012] Furthermore, the strength verification of the materials used in the tooling includes using three-dimensional software to perform finite element analysis, verifying whether the tooling support is deformed, and issuing a load-bearing capacity verification report to determine whether the initially selected tooling meets the needs of the entire product construction process.
[0013] Furthermore, when the initially selected tooling needs to be replaced, the parameters are directly changed on the three-dimensional software, and the same type of profile with a larger cross-sectional area is used. After the profile is replaced, the calibration is continued until the strength meets the requirements.
[0014] Furthermore, the product features include but are not limited to shape and materials.
[0015] Furthermore, in the early stage of arranging the supporting tooling, a channel for the subsequent SPMT to enter the bottom of the workpiece needs to be reserved, or the SPMT can enter the bottom of the product for transportation after cutting off part of the supporting tooling, and the profiles that have passed the selection and verification are placed at the construction site in a form that meets the requirements of product production, including but not limited to laying steel plates and adding anchor bolts to fix the profiles.
[0016] Furthermore, the SPMT is composed of a large number of high-pressure tires and hydraulic cylinders, which can be spliced according to needs to meet various working conditions.
[0017] Furthermore, the leveling tooling includes reinforcing the tooling supports after they are arranged according to relevant drawings, performing flatness inspection on the top of the supports using inspection equipment including but not limited to a total station or a laser leveler, and grinding or welding and raising areas with unqualified dimensions until the flatness of all supports meets the technical requirements for product construction.
[0018] Furthermore, after the construction of the product is completed, a suitable vehicle allocation scheme is selected based on the parameters of the product obtained in the early stage, including but not limited to the number of axis lines, connection arrangement form, and number of power units. The vehicle is loaded according to the transportation route, and the transportation vehicle enters the bottom of the product. The SPMT jacking function is used to lift the large and overweight structure away from the tooling and transport it to the subsequent process.
[0019] Beneficial Effects
[0020] The present invention provides an integrated tooling technology for the construction and transfer of large-scale super-heavy structures. Profile supports are arranged in the plane area at the bottom of the workpiece. Finite element analysis, total station detection and control of the flatness of the top of the tooling, and SPMT cooperation with the workpiece transfer are used to transform the manufacture of large-scale super-heavy structures from large-scale cast iron riveting platforms to point-distributed pillar tooling, thereby solving the problem of shortage of heavy lifting equipment and large-scale riveting platforms in manufacturing plants. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the implementation of the present invention, the drawings used in the implementation process are briefly introduced below:
[0022] Figure 1 is a schematic diagram of the intermediate connecting member model of the present invention;
[0023] Figure 2 It is a top view schematic diagram of the bottom plane area and the upper rib plate of the present invention;
[0024] Figure 3 It is a schematic diagram of the arrangement position of the support tooling of the present invention;
[0025] Figure 4 is the finite element analysis result of the support structure of the present invention;
[0026] Figure 5 It is a diagram of the transportation vehicle cooperation of the present invention;
[0027] In the figure: 1. Connector; 2. SPMT; 3. Base plate; 4. Base plate reinforcement rib; 5. Tooling support. DETAILED DESCRIPTION
[0028] In order to make the technical means, creative features, objectives and effects of the invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0029] Taking the offshore floating foundation structure related parts with high precision requirements and heavy weight as an example, the intermediate connecting part has a structural weight of 420 tons, a maximum outer contour size of 14.4*12.7*6.3 meters, a triangular cross section, and an area of 123m at the bottom of the workpiece. 2 The hexagonal flat structure has three 12.3*6.3m waist-shaped flanges welded on its side, and the flange flatness is required to be within 1.5mm. Before the construction of the intermediate connector begins, 3D modeling is carried out according to the drawings to fully present the entire product structure, and the position of the support structure is arranged on the 3D software.
[0030] 1. Draw the detailed structure of the intermediate connector in 3D software. The completed intermediate connector structure is as follows: Figure 1 shown.
[0031] 2. Use 3D software to export the top view of the hexagonal area at the bottom of the intermediate connector and the rib plate welded to it, and convert it into a format that can be edited using CAD. The planar area structure is as follows: Figure 2 shown.
[0032] 3. According to the structural characteristics of the bottom plane area of the intermediate connector on the drawing, and in accordance with the principle of rib alignment, consider the deformation control of the free edge of the bottom hexagonal structure, draw the positions of all support structures on the CAD drawing, and confirm the support distribution as follows: Figure 3 As shown;
[0033] 4. Further, according to the support position confirmed on the CAD drawing, draw on the 3D model. The profile is a rectangular tube (specification: 400*300*12, material: Q235B). Use 3D software to perform finite element analysis. The analysis results are as follows: Figure 4 As shown, according to the stress-strain results, the maximum stress is 53.1MPa, which is far lower than the yield strength of the material, and the maximum deformation is 0.118mm, which meets the precision requirements during product construction. Therefore, it is concluded that the strength of the supporting structure meets the production requirements of the intermediate connecting parts.
[0034] 5. Draw the ground sample line on the workshop foundation in advance, and refer to the relevant dimensions. Figure 2 After the bottom hexagonal plane structure and the upper rib plate position are confirmed, Figure 3 According to the support position diagram shown, the profiles are cut and arranged. The profile roots are fixed by adding anchor bolts to prevent the support from moving. After all the support structures are completed according to the requirements of the drawings, the top surface of the rectangular tube is tested for flatness using a total station. The unevenness of the plane composed of the top of all support structures is controlled within 2mm.
[0035] 6. Place the hexagonal structure at the bottom of the intermediate connecting piece assembled on site on the upper part of the tooling, and fix the tooling to the bottom by spot welding to ensure that the contact point between the base plate and the tooling is firm and reliable during the construction process.
[0036] 7. The upper structure of the intermediate connecting piece is welded upwards based on the hexagonal bottom plate until all parts are welded.
[0037] 8. After all the welding processes of the intermediate connecting parts are completed, the transport vehicle SPMT is assembled and used. According to the vehicle transportation load parameters, a power unit is selected to cooperate with a double-row 12-axle modular vehicle to form a transport vehicle with a total load capacity of more than 600 tons. After adding high-strength tooling piers (single load capacity of 200 tons) outside the transport vehicle walking area, the lower profile of the transport vehicle walking area is removed, and the modular vehicle enters the bottom of the workpiece for jacking and transportation. Figure 5 shown.
[0038] 9. SPMT transfers the intermediate connectors to the sandblasting and painting process for anti-corrosion treatment.
[0039] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.
Claims
1. An integrated tooling technology for the construction and transfer of large-scale super-heavy structures, characterized in that: The following steps are involved: Step 1: Analyze the super-heavy structure product drawings to obtain technical parameters and product features. Step 2: Based on the obtained technical parameters, select and perform strength verification on the materials used for the integrated tooling. Step 3: Based on the characteristics of large and heavy structural products, arrange the supporting tooling and leveling tooling, and build the qualified products on the tooling according to the manufacturing plan. Step 4: After the product construction is completed, the product is transferred to the subsequent process.
2. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized by: The technical parameters include but are not limited to product weight, outer dimensions, construction accuracy, product center of gravity, and detailed location of internal and external structures.
3. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized by: The material selection used for the tooling includes but is not limited to rectangular tubes, channel steels, I-beams, and H-beams.
4. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized by: The strength verification of the materials used in the tooling includes using three-dimensional software to perform finite element analysis, verifying whether the tooling supports are deformed, and issuing a load-bearing capacity verification report to determine whether the initially selected tooling meets the construction needs of the entire product process.
5. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 4 is characterized by: When the initial selected tooling needs to be replaced, the parameters are directly changed on the 3D software, and the same type of profile with a larger cross-sectional area is used. After the profile is replaced, the calibration is continued until the strength meets the requirements.
6. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized by: The product features include but are not limited to shape and materials.
7. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized in that In the early stage of arranging the supporting tooling, a channel for the subsequent SPMT to enter the bottom of the workpiece needs to be reserved, or after cutting off part of the supporting tooling, the SPMT can enter the bottom of the product for transportation, and the profiles that have passed the selection and verification are placed at the construction site in a form that meets the requirements of product production, including but not limited to laying steel plates and adding anchor bolts to fix the profiles.
8. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 7 is characterized in that The SPMT is composed of a large number of high-pressure tires and hydraulic cylinders, which can be spliced according to needs to meet various working conditions.
9. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized in that The leveling tooling includes reinforcing the tooling supports after they are arranged according to relevant drawings, using, but not limited to, a total station or laser leveling instrument to check the flatness of the top of the supports, grinding or welding to increase the height of areas with unqualified dimensions, until the flatness of all supports meets the technical requirements for product construction.
10. The large-scale super-heavy structure construction and transfer integrated tooling technology according to claim 1 is characterized by: After the construction of the product is completed, a suitable vehicle allocation plan is selected based on the parameters of the product obtained in the early stage, including but not limited to the number of axis lines, connection arrangement form, and number of power units. The vehicle is loaded according to the transportation route, and the transportation vehicle enters the bottom of the product. The SPMT jacking function is used to lift the large and overweight structure away from the tooling and transport it to the subsequent process.