Defrosting structure, refrigerator and control method

By adopting multiple heat exchange fins and pipeline designs in the heat exchanger, combined with low-pressure DC heating and temperature sensor control, the problem of low defrost efficiency of heat exchanger is solved, and a more efficient refrigerator defrost process is achieved. Lower heat overflow.

CN118980217APending Publication Date: 2024-11-19GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411270862.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In the prior art, the heat exchanger has low defrost efficiency and has difficulty in transporting and spraying condensate and defrost water at low temperatures, which may generate additional heat and contaminate other items.

Method used

Adopt a defrost structure, including heat exchange pipes, heat exchange fins and power-on device, adjust the power-on power through the control module, heat the aluminum evaporator using a low-voltage DC device, and combine multiple heat exchange fins and pipes. The design of the heat dissipation tank is formed to improve heat exchange efficiency and optimize the power on through the temperature sensor and control module.

Benefits of technology

Improves the defrost efficiency of the heat exchanger, reduces hot air overflow, avoids the generation of additional heat, and reduces the risk of pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980217A_ABST
    Figure CN118980217A_ABST
Patent Text Reader

Abstract

The invention provides a defrosting structure, a refrigerator and a control method, and the defrosting structure comprises a heat exchange pipeline which is used for circulating fluid; the heat exchange fins are connected with the heat exchange pipeline; the electrifying device is connected with the heat exchange fins to electrify the heat exchange fins, so that the heat exchange fins generate heat; and the control module is used for adjusting the power of the energizing device for energizing the current according to the temperature of the frost on the defrosting structure. The defrosting structure solves the technical problem of low defrosting efficiency of the heat exchanger in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of defrosting, and in particular to a defrosting structure, a refrigerator and a control method. Background Art

[0002] The existing defrosting methods of the evaporator are as follows:

[0003] 1. On the basis of arranging a defrost heater at the bottom of the evaporator, an additional graphene heating film is set on the top of the evaporator to improve the defrosting efficiency of the top of the evaporator, shorten the defrosting time of the refrigerator, and ensure the refrigeration effect of the refrigerator. However, although this method solves the problem of slow defrosting speed at the top of the evaporator (defrosting time is too long), it has no effective control measures to suppress the overflow of hot air into the freezer.

[0004] 2. Install a spray device to spray condensed water and defrost water to the air outlet and return air outlet before defrosting to prevent hot air from overflowing into the freezing chamber during defrosting and causing the temperature to rise rapidly. However, although this method solves the problem of hot air overflow, it is difficult to transport, spray, form and eliminate ice film of condensed water and defrost water at low temperature, and requires additional heating devices to assist, resulting in additional heat release, and the circulating water may contaminate other items.

[0005] 3. Install a fan blade with permanent magnets on the shaft of the axial fan to act as a magnetic field source, and arrange a coil that can be opened and closed freely around the heat exchanger. When the outdoor heat exchanger needs to defrost, the coil is closed, and the fan blade magnetic field cuts the coil to generate current to melt the frost. However, the motional electromotive force has high requirements for the magnetic field density. When the air gap width between the fan blade and the closed coil is not small enough, the magnetic induction intensity in the coil will be greatly weakened, and the defrosting power will be difficult to increase.

[0006] Therefore, the prior art still has the problem of low defrosting efficiency of the heat exchanger. Summary of the invention

[0007] The purpose of the present invention is to overcome the above technical deficiencies and provide a defrosting structure, a refrigerator and a control method to solve the technical problem of low defrosting efficiency of the heat exchanger in the related art.

[0008] In order to achieve the above-mentioned technical objectives, the present invention adopts the following technical solutions: a defrost structure is provided, including: a heat exchange pipeline, which is used to circulate fluid; heat exchange fins, which are connected to the heat exchange pipeline; a power-on device, which is connected to the heat exchange fins to energize the heat exchange fins, thereby generating heat for the heat exchange fins; and a control module, which adjusts the power of the current passed into the power-on device according to the temperature of the frost on the defrost structure.

[0009] Furthermore, the heat exchange fins are provided with connection holes, and the heat exchange fins are inserted into the connection holes.

[0010] Furthermore, there are multiple heat exchange pipelines, which are arranged at intervals; and / or, there are multiple heat exchange fins.

[0011] Furthermore, there are multiple heat exchange fins, which are arranged at intervals; the defrost structure includes a connecting plate, one end of which is connected to one of two adjacent heat exchange fins, and the other end of the connecting plate is connected to the other of the two adjacent heat exchange fins; wherein, the multiple heat exchange fins are arranged along a preset direction, and the power-on device is respectively connected to two heat exchange fins located at both ends of the multiple heat exchange fins.

[0012] Furthermore, a plurality of connecting plates are arranged between two adjacent heat exchange fins; the plurality of connecting plates between two adjacent heat exchange fins are arranged at intervals to form a heat dissipation groove between the two adjacent connecting plates; the heat dissipation groove is connected to the gap between the two adjacent heat exchange fins.

[0013] Furthermore, there are a plurality of heat exchange fins, which are arranged at intervals; there are a plurality of power supply devices, which are connected to the plurality of heat exchange fins in a one-to-one correspondence.

[0014] Furthermore, the defrosting structure also includes an insulating component, which is sleeved on the heat exchange pipeline, and an insulating groove is provided on the insulating component. The insulating component is embedded in the heat exchange fin through the insulating groove.

[0015] Furthermore, the defrosting structure also includes: a temperature sensor, which is connected to the heat exchange fins; the temperature sensor is connected to the control module signal, and the control module adjusts the power of the current passed into the power supply device according to the temperature value detected by the temperature sensor.

[0016] A refrigerator comprises a defrost structure, wherein the defrost structure is the above-mentioned defrost structure.

[0017] A control method is applicable to the above-mentioned defrost structure, and the control method includes: controlling the power P of the current passed through the energizing device; wherein P is calculated as: P=Pb+Pc; wherein Pb is set according to the temperature of frost on the defrost structure, and Pc is set according to the energizing time of the energizing device and the temperature of frost on the defrost structure.

[0018] Furthermore, the control method includes: when the temperature of the frost is A, P=Pb1; when the temperature of the frost is B, P=Pb2; when the temperature of the frost is C, P=Pb3.

[0019] Further, A=0°C-Toff; B=0°C±Toff; C=0°C+Toff; wherein Toff is an offset value.

[0020] Furthermore, the calculation method of Pc is:

[0021]

[0022] Among them, Kp is the proportional coefficient; Te is the difference between the target temperature and the current frost temperature; Ti is the integration time constant; T is the sampling period; and t is the sampling sequence number.

[0023] Further, when the temperature T of the frost is lower than 0℃-Toff, and the time when the power-on device is powered on is less than Dmin, Pc=0; when the temperature T of the frost is lower than 0℃-Toff, and the time when the power-on device is powered on is greater than or equal to Dmin, Pc=Kp1[t(k)+Ki 1*∑[0,k]t(k)]; and / or, when the temperature T of the frost is at 0℃±Toff, and the time when the power-on device is powered on is less than Emin, Pc=0; when the temperature T of the frost is at 0℃±Toff, and the time when the power-on device is powered on is greater than or equal to Emin, Pc=Kp2[t(k)+Ki2*∑[0,k]t(k)]; and / or, when the temperature T of the frost is higher than 0℃+Toff, and the time when the power-on device is powered on is less than Fmin, Pc=0; when the temperature T of the frost is higher than 0℃+Toff, and the time when the power-on device is powered on is greater than or equal to Fmin, Kp3[t(k)+Ki 3*∑[0,k]t(k)].

[0024] Beneficial effects:

[0025] 1. The defrosting structure of the present invention uses a low-voltage DC device to directly heat the aluminum evaporator, which can melt the frost attached to the evaporator fins from the inside out;

[0026] 2. The control method of the present invention regulates the defrosting input power of the evaporator by temperature segmentation, and adapts the defrosting input power at each temperature point by collecting the temperature of the evaporator peripheral sensor. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a structural schematic diagram of a defrosting structure adopted in an embodiment of the present invention;

[0028] Figure 2 is a front view of the defrosting structure adopted in an embodiment of the present invention;

[0029] Figure 3 Schematic diagram of the structure of the heat exchange pipeline of the defrosting structure adopted in the embodiment of the present invention;

[0030] Figure 4 is a structural schematic diagram of an insulating component of a defrosting structure adopted in an embodiment of the present invention;

[0031] Figure 5 is a top view of an insulating component of a defrost structure provided by an embodiment of the present invention;

[0032] Figure 6 is a curve diagram showing the relationship between frost heat and temperature provided by an embodiment of the present invention;

[0033] Figure 7 is a curve diagram showing the relationship between the temperature of frost and the power of the defrosting structure provided by an embodiment of the present invention;

[0034] Figure 8 is a flow chart of a control method provided by an embodiment of the present invention.

[0035] The above drawings include the following reference numerals:

[0036] 1. Heat exchange pipeline; 2. Heat exchange fin; 21. Connection hole; 22. Connection piece; 3. Insulation component; 31. Insulation groove. DETAILED DESCRIPTION

[0037] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0038] See also Figures 1 to 7 According to an embodiment of the present invention, a defrost structure is provided, comprising: a heat exchange pipe 1, in which a fluid circulates; heat exchange fins 2, which are connected to the heat exchange pipe 1; an energizing device, which is connected to the heat exchange fins 2 to energize the heat exchange fins 2, so that the heat exchange fins 2 generate heat; and a control module, which adjusts the power of the current supplied by the energizing device according to the temperature of the frost on the defrost structure. With the above arrangement, a low-voltage DC device is used to directly heat the aluminum evaporator, which can melt the frost attached to the evaporator fins from the inside out, thereby solving the technical problem of low defrosting efficiency of the heat exchanger in the related art.

[0039] It should be noted that the frost in this embodiment exists in a solid state, a liquid state after the frost melts, or even a gaseous state, and the temperature of the frost includes the temperature of the frost in different states.

[0040] In the defrosting structure of this embodiment, see Figure 1 , Figure 2 The heat exchange fin 2 is provided with a connection hole 21, and the heat exchange fin 2 is inserted into the connection hole 21. In this way, the heat exchange pipeline 1 can be arranged in the middle position of the heat exchange fin 2, which can effectively improve the defrosting efficiency.

[0041] In the defrosting structure of this embodiment, see Figure 1 , Figure 2 There are multiple heat exchange pipelines 1, and the multiple heat exchange pipelines 1 are arranged at intervals; and / or there are multiple heat exchange fins 2. In this way, the heat exchange area can be increased and the defrosting efficiency can be effectively improved.

[0042] See also Figure 1 , Figure 2 In the defrost structure of the present embodiment, there are multiple heat exchange fins 2, and the multiple heat exchange fins 2 are arranged at intervals; the defrost structure includes a connecting piece 22, one end of the connecting piece 22 is connected to one of the two adjacent heat exchange fins 2, and the other end of the connecting piece 22 is connected to the other heat exchange fin 2 of the two adjacent heat exchange fins 2; wherein, the multiple heat exchange fins 2 are arranged along a preset direction, and the power-on device is respectively connected to two heat exchange fins 2 located at both ends of the multiple heat exchange fins 2.

[0043] See also Figure 1 In the defrosting structure of this embodiment, a plurality of connecting pieces 22 are arranged between two adjacent heat exchange fins 2; the plurality of connecting pieces 22 between two adjacent heat exchange fins 2 are arranged at intervals to form a heat dissipation groove 23 between two adjacent connecting pieces 22; the heat dissipation groove 23 is connected to the gap between two adjacent heat exchange fins 2. In this way, the airflow in the gap between two adjacent heat exchange fins 2 can flow out from the heat dissipation groove 23, thereby ensuring the heat dissipation efficiency.

[0044] Specifically, in order to ensure that the heat exchange fins 2 are electrically connected, a connecting piece 22 is provided between the plurality of heat exchange fins 2 so that the plurality of heat exchange fins 2 are connected in series.

[0045] In the defrosting structure of this embodiment, see Figure 1 , Figure 2 There are multiple heat exchange fins 2, and the multiple heat exchange fins 2 are arranged at intervals; there are multiple power-on devices, and the multiple power-on devices are connected to the multiple heat exchange fins 2 in a one-to-one correspondence.

[0046] With the above arrangement, the series connection of the heat sink fins 2 is changed to a parallel connection, and each heat sink fin 2 is independently controlled; the electrical wiring becomes very complicated, but the effect of independent control is better, and the failure of a local fin will not affect the overall effect too much.

[0047] See also Figure 4 , Figure 5 In the defrost structure of the present embodiment, the defrost structure further includes an insulating component 3, which is sleeved on the heat exchange pipeline 1, and an insulating groove 31 is provided on the insulating component 3. The insulating component 3 is embedded in the heat exchange fin 2 through the insulating groove 31.

[0048] Since the DC power supply is directly connected to the heat exchange fin 2, it is necessary to do a good job of insulation between the heat exchange fin 2 and other parts of the refrigerator. Usually, the heat exchange fin 2 is placed behind the back plate of the freezer compartment, and the traditional evaporator heat exchange pipeline 1 is directly connected to the heat exchange fin 2. The above arrangement ensures that the heat exchange pipeline 1 and the heat exchange fin 2 are firmly connected while also ensuring insulation. The insulating component 3 is made of insulating material.

[0049] In the defrost structure of this embodiment, the defrost structure also includes: a temperature sensor, the temperature sensor is connected to the heat exchange fin 2; the temperature sensor is connected to the control module signal, and the control module adjusts the power of the current passed into the power supply device according to the temperature value detected by the temperature sensor.

[0050] Specifically, since most of the frost will condense on the heat exchange fins 2, by arranging a temperature sensor on the heat exchange fins 2, the temperature of the frost can be detected, thereby making the temperature detection easier.

[0051] The refrigerator of this embodiment includes a defrost structure, and the defrost structure is the above-mentioned defrost structure.

[0052] The control method of this embodiment is applicable to the above-mentioned defrost structure, and the control method includes: controlling the power P of the current passed through the energizing device; wherein P is calculated as: P=Pb+Pc; wherein Pb is set according to the temperature of the frost on the defrost structure, and Pc is set according to the energizing time of the energizing device and the temperature of the frost on the defrost structure.

[0053] By adopting the above setting, the input power of the evaporator defrosting is regulated, and the defrosting input power at each temperature point is calculated by collecting the temperature of the frost, so as to adjust the power in a targeted manner according to the characteristics of the frost under different phase changes, thereby improving the defrosting efficiency. In the control method of this embodiment, the control method includes: when the temperature of the frost is A, P=Pb1; when the temperature of the frost is B, P=Pb2; when the temperature of the frost is C, P=Pb3.

[0054] Since the states of frost are divided into three states: solid, liquid and gas, different basic power values ​​are set for frost in different states, so as to adjust the power in a targeted manner according to the characteristics of frost under different phase changes, thereby improving the defrosting efficiency.

[0055] In the control method of this embodiment, A=0°C-Toff; B=0°C±Toff; C=0°C+Toff; wherein Toff is an offset value.

[0056] Specifically, the Toff temperature range is the stage where frost melts into water, which is related to the distance between the sensor and the evaporator and the sensor accuracy. Generally, Toff=2°C.

[0057] In the control method of this embodiment, the calculation method of Pc is:

[0058] Among them, Kp is the proportional coefficient; Te is the difference between the target temperature and the current frost temperature; Ti is the integration time constant; T is the sampling period; and t is the sampling sequence number.

[0059] See also Figure 8 In the control method of this embodiment, when the temperature T of the frost is lower than 0°C-Toff and the power-on time of the power-on device is less than Dmin, Pc=0; when the temperature T of the frost is lower than 0°C-Toff and the power-on time of the power-on device is greater than or equal to Dmin, Pc=Kp1[t(k)+Ki 1*∑[0,k]t(k)]; and / or,

[0060] When the frost temperature T is at 0°C ± Toff and the power-on time of the power-on device is less than Emin, Pc = 0; when the frost temperature T is at 0°C ± Toff and the power-on time of the power-on device is greater than or equal to Emin, Pc = Kp2[t(k)+Ki2*∑[0,k]t(k)]; and / or,

[0061] When the temperature T of the frost is higher than 0℃+Toff and the power-on time of the powered device is less than Fmin, Pc=0; when the temperature T of the frost is higher than 0℃+Toff and the power-on time of the powered device is greater than or equal to Fmin, Kp3[t(k)+Ki 3*∑[0,k]t(k)].

[0062] The control method of the present invention is described as follows:

[0063] The traditional evaporator consists of a refrigerant pipe and fins. The refrigerant pipe passes through the cut and punched fins to form a complete evaporator. In order to ensure the heat transfer effect, the fins and the pipes maintain good contact.

[0064] In the defrosting structure of this embodiment, the aluminum fins are not cut during production. The complete long aluminum coil is punched and bent into the evaporator to ensure that the heat exchange fins 2 are electrically connected. When the evaporator needs to be defrosted, low-voltage direct current is passed to both ends of the heat exchange fins 2. The heat exchange fins 2 are structured as shown in FIG. Figure 1 shown.

[0065] Since the DC power supply is directly connected to the heat exchange fins 2, it is necessary to do a good job of insulation between the heat exchange fins 2 and other parts of the refrigerator. Usually, the heat exchange fins 2 are placed behind the back plate of the freezer compartment, and the traditional evaporator heat exchange pipeline 1 is directly connected to the heat exchange fins 2. Therefore, the heat exchange fins 2 of this embodiment need to maintain efficient heat transfer, high insulation, and stable properties with the heat exchange pipeline 1. The current solution is to put a thermally conductive silicone pad (i.e., insulating component 3) in the punched hole of the evaporator. The thermal conductivity and insulation effects are acceptable. The thermally conductive silicone pad has been widely used in voltage regulator tubes and radiators, CPUs and radiators, and will not burst directly in a transient environment like glass and ceramics.

[0066] When the refrigerator meets the defrosting conditions and enters the defrosting mode, low-voltage direct current needs to be supplied to the heat exchange fins 2. The parameters of the supplied direct current are power P, voltage U, and current I. To ensure safety, the direct current voltage U generally does not exceed 24 V. Input power P = basic power Pb + compensation power Pc.

[0067] See also Figure 6 , set the longest defrosting time Tmax = 40min, of which, the frost heating time T0 = 15min, the frost phase change time T1 = 20min, and the dripping time T2 = 5min. It is known that the specific heat capacity of aluminum is 0.88KJ / (Kg·℃), the specific heat capacity of ice is 2.1KJ / (Kg·℃), the specific heat capacity of water is 4.2KJ / (Kg·℃), the specific heat capacity of air is 1.40KJ / (Kg·℃), the specific latent heat of ice melting into water is 355KJ / Kg, and the air density is 1.41kg / m3. The mass of the evaporator of an ordinary refrigerator is generally 1 to 3Kg, and the volume of the refrigerator is positively correlated with the mass of the evaporator. Taking a certain brand of 456L refrigerator as an example, the volume of its freezer is about 170L. During the defrosting period of conventional steel pipe heater, the temperature of the freezer will rise by about 10-15℃. The heat required to absorb 170L air by 15℃ is Q0=0.17*1.41*15*1.40=5.0KJ. The 2Kg evaporator needs to absorb heat Q1=0.88*2*26=45.76KJ to heat up from -26℃ to 0℃. The mass of frost on the evaporator is generally between 0.2 and 0.6Kg. Taking the middle value of 0.4Kg, the heat required to absorb 0.4Kg frost from -26℃ to 0℃ is Q2=2.1*0.4*26=21.84KJ. The reference input power Pb1=(Q0*T0 / Tmax+Q1+Q2) / T0=(5.0*15 / 40+45.76+21.84)*1000 / 15 / 60≈77W.

[0068] The heat required for melting 0.4 kg of 0°C frost into water is Q3 = 355 * 0.4 = 142 kJ. Ignoring the rise in frost temperature, the reference input power Pb2 ​​= (Q0 * T1 / Tmax + Q2) / T1 = (5 * 20 / 40 + 142) * 1000 / 20 / 60 ≈ 120 W.

[0069] After the frost melts into water, the temperature starts to rise again. At this stage, the temperature of the evaporator heat exchange fin 2 is maintained at around 12°C.

[0070] The heat that needs to be absorbed by 0.4Kg, 0℃ water to rise to 5℃ is Q4=4.2*0.4*5=8.4KJ, and the heat absorbed by the temperature rise of the evaporator heat exchange fin 2 is Q5=0.88*2*12=21.12KJ. The reference input power Pb3=(Q0*T2 / Tmax+Q4+Q5) / T2=(5.0*5 / 40+8.4+21.12)*1000 / 5 / 60≈100.5W.

[0071] Based on the above theoretical calculation, the basic input power of the heat exchange fin 2 is as follows: Figure 7 shown.

[0072] Basic input power is a data analysis based on a common scenario. In real life, it is affected by the amount of frost on the evaporator (frost is related to the moisture content of food stored in the compartment, the number of door openings, door seal leakage, etc.), the amount of food stored, the defrost interval, etc., and the input power needs to be positively compensated to prevent incomplete defrosting.

[0073] Through the above analysis, it is natural to divide defrost into three stages: frost heating, frost melting, and defrost water heating. These three stages are identified by reading the temperature of the sensor arranged at the edge of the evaporator. When the temperature T is lower than 0℃-Toff, it is regarded as the frost heating stage; when the temperature T is at 0℃±Toff, it is regarded as the frost phase change water stage; when the temperature T is higher than 0℃+Toff, it is regarded as the defrost water heating stage (to prevent the 0℃ water from refreezing and blocking the drain hole during the dripping process).

[0074] See also Figure 8 The input power compensation strategy adopts the classic position PI control model. As for why the differential link is not introduced and the incremental PID control algorithm is not used, the main reason is that the controlled object (the temperature near the evaporator) has a large thermal inertia and the signal fluctuation is small.

[0075] The theoretical formula is as follows:

[0076]

[0077] Pc: compensation input power;

[0078] Kp: proportionality coefficient;

[0079] Te: The difference between the target temperature and the current frost temperature. For example, the target temperature during the frost heating stage is T0.

[0080] Ti: integration time constant;

[0081] Since the classic position PI control model is suitable for continuous control signals, in digital controllers such as single-chip microcomputers, the continuous signal is divided into several subtle time points (one point and one point are a sampling period) for approximate fitting, that is, data discretization processing. T is used as the sampling period, k is used as the sampling sequence number, and the rectangular method data accumulation approximation is used to replace the integral. In this way, the integral becomes the cumulative sum of a finite number of data, and the differential becomes the first-order backward difference. The PI control model after data discretization is:

[0082]

[0083] Pc: compensation input power;

[0084] Kp: proportionality coefficient;

[0085] Te: The difference between the target temperature and the current frost temperature. For example, the target temperature during the frost heating stage is T0.

[0086] Ti: integration time constant;

[0087] T: sampling period;

[0088] Usually, we use Kp as the proportional coefficient and Ki as the integral coefficient

[0089] In this way, the compensation control rule of input power is as follows:

[0090] When the temperature T is lower than 0℃-Toff (Toff is the temperature offset value for determining the latent heat input power):

[0091] a. When the heater heating time is less than 10 minutes, P = P1;

[0092] b. When the heater maintains heating at this power for more than 10 minutes, the integral link is supplemented.

[0093] Pc1=Kp1[t(k)+Ki 1*∑[0,k]t(k)];

[0094] When the temperature T is at 0℃±Toff (Toff is the temperature offset value for determining the latent heat input power):

[0095] a. When the heater heating time is less than 20 minutes, P = P2;

[0096] b. When the heater maintains heating at this power for more than 20 minutes, the integral link is supplemented.

[0097] Pc2=Kp2[t(k)+Ki2*∑[0,k]t(k)];

[0098] When the temperature T is higher than 0℃+Toff (Toff is the temperature offset value for determining the latent heat input power):

[0099] a. When the heater heating time is less than 15 minutes, P = P3;

[0100] b. When the heater maintains heating at this power for more than 15 minutes, the integral link is supplemented.

[0101] Pc3=Kp3[t(k)+Ki3*∑[0,k]t(k)];

[0102] It is worth noting that if the original sampled data is not digitally filtered, abnormal sampled data may cause the integral to saturate suddenly. For signals with slow input changes, smoothing filtering algorithms are usually used to prevent signal noise from interfering with the controller. In addition, integral anti-saturation algorithms can also be introduced to accumulate only negative integrals when the maximum input is reached.

[0103] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0104] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments, and this embodiment will not be described in detail here.

[0105] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0106] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0107] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A defrosting structure, characterized in that: include: A heat exchange pipeline (1), wherein the heat exchange pipeline (1) is used for circulating a fluid; A heat exchange fin (2), the heat exchange fin (2) being connected to the heat exchange pipeline (1); an energizing device, the energizing device being connected to the heat exchange fin (2) to energize the heat exchange fin (2), thereby causing the heat exchange fin (2) to generate heat; A control module is provided, wherein the control module adjusts the power of the current passed through the power supply device according to the temperature of the frost on the defrosting structure.

2. The defrosting structure according to claim 1, characterized in that: The heat exchange fin (2) is provided with a connection hole (21), and the heat exchange fin (2) is inserted into the connection hole (21).

3. The defrosting structure according to claim 2, characterized in that: There are a plurality of heat exchange pipelines (1), and the plurality of heat exchange pipelines (1) are arranged at intervals; and / or, The heat exchange fins (2) are multiple.

4. The defrosting structure according to claim 1, characterized in that: There are a plurality of heat exchange fins (2), and the plurality of heat exchange fins (2) are arranged at intervals; the defrosting structure comprises a connecting plate (22), one end of the connecting plate (22) is connected to one of the two adjacent heat exchange fins (2), and the other end of the connecting plate (22) is connected to the other of the two adjacent heat exchange fins (2); wherein the plurality of heat exchange fins (2) are arranged along a preset direction, and the power supply device is respectively connected to two of the heat exchange fins (2) located at both ends of the plurality of heat exchange fins (2).

5. The defrosting structure according to claim 4, characterized in that: A plurality of connecting pieces (22) are arranged between two adjacent heat exchange fins (2); the plurality of connecting pieces (22) between two adjacent heat exchange fins (2) are arranged at intervals to form a heat dissipation groove (23) between the two adjacent connecting pieces (22); and the heat dissipation groove (23) is connected to the gap between the two adjacent heat exchange fins (2).

6. The defrosting structure according to claim 1, characterized in that: There are a plurality of heat exchange fins (2), and the plurality of heat exchange fins (2) are arranged at intervals; there are a plurality of power supply devices, and the plurality of power supply devices are connected to the plurality of heat exchange fins (2) in a one-to-one correspondence.

7. The defrosting structure according to claim 1, characterized in that: The defrosting structure further comprises an insulating component (3), wherein the insulating component (3) is sleeved on the heat exchange pipeline (1), an insulating groove (31) is provided on the insulating component (3), and the insulating component (3) is embedded in the heat exchange fin (2) through the insulating groove (31).

8. The defrosting structure according to claim 1, characterized in that: The defrosting structure also includes: A temperature sensor is connected to the heat exchange fin (2); the temperature sensor is signal-connected to the control module, and the control module adjusts the power of the current passed through the power supply device according to the temperature value detected by the temperature sensor.

9. A refrigerator, comprising a defrosting structure, characterized in that: The defrost structure is the defrost structure according to any one of claims 1 to 8.

10. A control method, applicable to the defrosting structure according to any one of claims 1 to 8, characterized in that: The control method comprises: Control the power P of the current passed through the energizing device; wherein P is calculated as: P=Pb+Pc; wherein Pb is set according to the temperature of the frost on the defrost structure, and Pc is set according to the energizing time of the energizing device and the temperature of the frost on the defrost structure.

11. The control method according to claim 10, characterized in that: The control method comprises: When the temperature of the frost is A, P=Pb1; When the temperature of the frost is B, P=Pb2; When the temperature of the frost is C, P=Pb3.

12. The control method according to claim 11, characterized in that: A=0℃-Toff;B=0℃±Toff;C=0℃+Toff;wherein, Toff is the offset value.

13. The control method according to claim 12, characterized in that: The calculation method of Pc is: Among them, Kp is the proportional coefficient; Te is the difference between the target temperature and the current frost temperature; Ti is the integral time constant; T is the sampling period; and t is the sampling sequence number.

14. The control method according to claim 13, characterized in that: When the temperature T of the frost is lower than 0°C - Toff, and the power-on time of the power-on device is less than Dmin, Pc = 0; when the temperature T of the frost is lower than 0°C - Toff, and the power-on time of the power-on device is greater than or equal to Dmin, Pc = Kp1 [t (k) + Ki 1 * ∑ [0, k] t (k)]; and / or, When the temperature T of the frost is at 0°C ± Toff and the power-on time of the power-on device is less than Emin, Pc = 0; when the temperature T of the frost is at 0°C ± Toff and the power-on time of the power-on device is greater than or equal to Emin, Pc = Kp2[t(k)+Ki2*∑[0,k]t(k)]; and / or, When the temperature T of the frost is higher than 0℃+Toff and the power-on time of the power-on device is less than Fmin, Pc=0; when the temperature T of the frost is higher than 0℃+Toff and the power-on time of the power-on device is greater than or equal to Fmin, Kp3[t(k)+Ki 3*∑[0,k]t(k)].