Street sponge drainage system and construction method thereof

By designing a multi-layer structure reinforced street sponge drainage system, the problem of unstable structure in the existing system at high drainage volume is solved, and stable drainage treatment and green plant treatment are achieved, ensuring the normal operation of the system and environmental coordination.

CN119021056APending Publication Date: 2024-11-26CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411292740.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing street sponge drainage system is not firm enough when facing high drainage, which is difficult to deal with in a timely manner, and the green plants next to the road are unstable, affecting normal drainage work.

Method used

A street sponge drainage system including the sponge section body, soil layer reinforcement structure in the planting area, soil layer reinforcement structure in the water collection area and diversion trough sedimentation tank was designed. Multi-layer structure reinforcement and specific materials combinations were used to increase the system's Stability and drainage capacity achieve closer structural connection and drainage treatment through the combination of soil reinforcement structures in the planting and catchment areas and the diversion trough sedimentation tank.

Benefits of technology

It improves the overall structural stability and drainage capacity of the system, can provide stability at high drainage volume, alleviate the flood discharge pressure of the urban drainage pipeline network, ensure normal drainage work, and coexist in coordination with the surrounding environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021056A_ABST
    Figure CN119021056A_ABST
Patent Text Reader

Abstract

The invention discloses a street sponge drainage system and a construction method thereof.The street sponge drainage system comprises a sponge section body, a planting area soil layer reinforcing structure, a water collecting area soil layer reinforcing structure, a drainage structure and a diversion trench sedimentation tank. In addition, a plurality of construction reinforcing layer structures such as a planting area soil layer reinforcing structure, a water collecting area soil layer reinforcing structure and a diversion trench sedimentation tank are adopted in engineering work construction, so that construction between the structures can be more precise, stability can be provided when the water drainage amount is larger, water can be drained in time through the water drainage device, and the construction efficiency is improved. In this way, the flood discharge pressure of an urban drainage pipe network is relieved, and then the street sponge drainage system can conduct drainage work in time, and the drainage system and the surrounding environment can be coordinated and coexist.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of street sponge drainage, and specifically relates to a street sponge drainage system and a construction method thereof. Background Art

[0002] Drainage system refers to the overall combination of drainage collection, transportation, water quality treatment and discharge facilities in a certain way. It is a general term for drainage ditches (pipes) and buildings at all levels for waterlogging, waterlogging and salt prevention. It is mainly composed of field drainage regulation network, drainage ditches at all levels, waterlogging storage lakes, drainage gates, pumping stations and drainage discharge areas. The excess water in the drainage area is first collected in the field drainage regulation network, and then discharged to the discharge area through drainage ditches at all levels or lakes after being stored by drainage gates or pumping stations.

[0003] The existing street sponge drainage system has a relatively simple way of dealing with water discharge, and its building structure is not strong enough. Once the drainage volume is too large, it is difficult to deal with it in time, which may cause damage to the building structure. In actual drainage work, it is difficult to stabilize the green plants beside the road, making it difficult to ensure normal drainage work. Summary of the invention

[0004] The purpose of the present invention is to provide a street sponge drainage system and a construction method thereof in order to solve the above-mentioned problems, thereby solving the problems mentioned in the background technology.

[0005] In order to solve the above problems, the present invention provides a technical solution:

[0006] A street sponge drainage system comprises a sponge section body, a planting area soil layer reinforcement structure, a water collection area soil layer reinforcement structure, a drainage structure and a diversion trough sedimentation tank, wherein the planting area soil layer reinforcement structure is arranged inside the sponge section body, the water collection area soil layer reinforcement structure is arranged inside the sponge section body, a drainage structure is arranged inside the sponge section body and inside the planting area soil layer reinforcement structure, a diversion trough sedimentation tank is arranged inside the sponge section body, a carriageway is arranged on one side of the planting area soil layer reinforcement structure, and the carriageway is far away from the A motor vehicle lane is arranged on one side away from the soil layer reinforcement structure of the planting area, and concrete is arranged on the side of the soil layer reinforcement structure of the planting area away from the carriageway, and sesame white burnt granite is arranged above the concrete, and a sidewalk is arranged above the sesame white burnt granite, and galvanized steel pipes are arranged inside the sidewalk and the sesame white burnt granite, seedlings are arranged above the soil layer reinforcement structure of the water collection area, and plain concrete steel mesh is arranged inside the soil layer reinforcement structure of the water collection area, and wrought iron railings are installed above the sponge section body.

[0007] Preferably, the soil layer reinforcement structure of the planting area includes a first rammed soil layer, a geomembrane layer, a regenerated drainage layer, a slit PVC drainage pipe, a regenerated aggregate soil medium layer, a regenerated aggregate covering layer and an aquifer, a geomembrane layer is arranged above the first rammed soil layer, a regenerated drainage layer is arranged above the geomembrane layer, a slit PVC drainage pipe is arranged inside the soil layer reinforcement structure of the planting area, and the slit PVC drainage pipe is connected to the drainage structure, a regenerated aggregate soil medium layer is arranged above the regenerated drainage layer, a regenerated aggregate covering layer is arranged above the regenerated aggregate soil medium layer, and an aquifer is arranged above the regenerated aggregate covering layer.

[0008] Preferably, the drainage structure includes a first blind pipe, a first vertical pipe and a pipe cap. The first blind pipe is arranged inside the soil reinforcement structure of the planting area, the first vertical pipe is installed above the first blind pipe, and the pipe cap is installed on the top of the first vertical pipe.

[0009] Preferably, the diversion trough sedimentation tank comprises a third machine-cut sesame gray granite whole stone, a fourth sesame gray machine-cut granite curb, a concrete diversion trough, an open curb, a diversion trough, a plain concrete steel mesh and a fifth sesame gray granite machine-cut granite curb. The interior of the diversion trough sedimentation tank is provided with a third machine-cut sesame gray granite whole stone, a fourth sesame gray machine-cut granite curb is provided on one side of the third machine-cut sesame gray granite whole stone, a concrete diversion trough is provided inside the diversion trough sedimentation tank and on one side of the third machine-cut sesame gray granite whole stone, an open curb is provided inside the concrete diversion trough, a diversion trough is provided inside the diversion trough sedimentation tank and on one side of the fourth sesame gray machine-cut granite curb, a plain concrete steel mesh is provided inside the diversion trough sedimentation tank and between the open curb and the fourth sesame gray machine-cut granite curb, and a fifth sesame gray granite machine-cut granite curb is provided inside the plain concrete steel mesh.

[0010] Preferably, the watershed soil layer reinforcement structure includes a second rammed soil layer, natural graded gravel, cement mortar, a first machine-cut sesame gray granite, a concrete cushion layer, cement mortar horizontal masonry and a second machine-cut sesame gray granite whole stone. The watershed soil layer reinforcement structure is provided with a second rammed soil layer inside, natural graded gravel is provided above the second rammed soil layer, a plurality of first machine-cut sesame gray granites are provided above the natural graded gravel, cement mortar is provided between the plurality of first machine-cut sesame gray granites, a concrete cushion layer is provided inside the watershed soil layer reinforcement structure, a cement mortar horizontal masonry is provided above the concrete cushion layer, and a second machine-cut sesame gray granite whole stone is provided above the cement mortar horizontal masonry.

[0011] Preferably, a water reservoir is provided inside the sponge section body and between the third machine-cut sesame gray granite whole stone and the fifth sesame gray granite machine-cut granite edge stone.

[0012] Preferably, the laying thickness of the recycled aggregate soil medium layer is 2.36-4.75 mm, the laying thickness of the recycled aggregate covering layer is 0-4.75 mm, the laying thickness of the recycled drainage layer is 0.5-4.75 mm, and the laying thickness of the geomembrane layer 202 is 1.5 mm.

[0013] Preferably, the usable size of the first machine-cut sesame gray granite is 100X100X200mm, the usable size of the second machine-cut sesame gray granite whole stone is 350X700X100mm, the usable size of the third machine-cut sesame gray granite whole stone is 500X900X100mm, the usable size of the fourth sesame gray machine-cut granite edge stone is 350X700X100mm, and the usable size of the fifth sesame gray granite machine-cut granite edge stone is 100X100X200mm.

[0014] A construction method for a street sponge drainage system comprises the following steps:

[0015] S1. When constructing the street sponge drainage system during construction, the corresponding data measurement work shall be carried out in advance for the location where the street sponge drainage system needs to be constructed;

[0016] S2. Excavate the corresponding foundation of the street sponge drainage system according to the size of the construction to be carried out;

[0017] S3. Backfill water-shaken sand in the pipeline trench within the road red line of the constructed street sponge drainage system to the bottom of the road structure layer or the bottom of the road replacement layer. When the distance between the pipe epidermis and the bottom of the road replacement layer is less than 1m, the trench is backfilled with water-shaken sand to the bottom of the road structure layer. The compaction degree of water-shaken sand is not less than 95%, and the trench is backfilled with water-shaken sand to 0.5m above the pipe epidermis. The rest of the trench is backfilled with original soil;

[0018] S4. Based on the above, the soil reinforcement structure of the planting area, the soil reinforcement structure of the water collection area, the drainage structure and the diversion trough sedimentation tank are constructed in the main section of the sponge section according to the drawings;

[0019] S5. After the completion of the above drainage system construction, the diversion trough sedimentation tank, carriageway, motor vehicle lane, concrete, sesame white flamed granite, sidewalk, galvanized steel pipes, seedlings, plain concrete steel mesh and wrought iron railings are constructed on the surface of the sponge section body, and the green plants required for the road surface are planted in the soil reinforcement structure of the planting area.

[0020] The beneficial effects of the present invention are: the overall structural setting of the present invention is more diverse, and the coordination of each structure is more compact and firm. In addition, the engineering construction of the present invention includes a soil layer reinforcement structure in the planting area, a soil layer reinforcement structure in the water collection area, and a diversion trough sedimentation tank, and other multiple construction reinforcement layer structures, which can make the construction between the structures more precise. When the invention is subjected to a larger drainage volume, it can provide stability. The present invention can be used to drain water in time, thereby alleviating the flood discharge pressure of the urban drainage network, and thus the street sponge drainage system of the present invention can not only perform drainage work in time, but also make the drainage system and the surrounding environment able to coexist in coordination. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] For ease of explanation, the present invention is described in detail with reference to the following specific implementations and the accompanying drawings.

[0022] Figure 1 It is a plan view of the sponge section of the present invention;

[0023] Figure 2 is a cross-sectional view of a sponge section of the present invention;

[0024] Figure 3 It is a plan view of the diversion trough energy dissipation sludge tank of the present invention;

[0025] Figure 4 It is a schematic diagram of the soil reinforcement structure of the planting area of ​​the present invention;

[0026] Figure 5 It is a schematic structural diagram of the water catchment area soil layer reinforcement structure of the present invention;

[0027] Figure 6 It is an enlarged view of point A of the present invention;

[0028] Figure 7 It is a cross-sectional view of the diversion trough energy dissipation sludge tank of the present invention;

[0029] Figure 8 is an elevation view of an open curbstone of the present invention;

[0030] Fig. 9 is a cross-sectional view of an open curbstone of the present invention;

[0031] Fig.10 is a cross-sectional view of a concrete diversion trough of the present invention;

[0032] Fig.11 is a plan view of an open curbstone of the present invention;

[0033] Fig.12 It is a plan view of the concrete diversion trough of the present invention.

[0034] In the figure: 1. Sponge section body; 2. Soil reinforcement structure of planting area; 201. First soil ramming layer; 202. Geomembrane layer; 203. Regeneration drainage layer; 204. Slit PVC drainage pipe; 205. Regeneration aggregate soil medium layer; 206. Regeneration aggregate cover layer; 207. Aquifer; 3. Soil reinforcement structure of water collection area; 301. Second soil ramming layer; 302. Natural graded gravel; 303. Cement mortar; 304. First machine-cut sesame gray granite; 305. Concrete cushion layer; 306. Cement mortar horizontal masonry; 307. Second machine-cut sesame gray granite whole stone; 4. Drainage structure; 4 01. First blind pipe; 402. First vertical pipe; 403. Pipe cap; 5. Diversion trough sedimentation tank; 501. Third machine-cut sesame gray granite whole stone; 502. Fourth sesame gray machine-cut granite curbstone; 503. Concrete diversion trough; 504. Open curbstone; 505. Diversion trough; 506. Plain concrete steel mesh; 507. Fifth sesame gray granite machine-cut granite curbstone; 6. Concrete; 7. Sesame white flamed granite; 8. Galvanized steel pipe; 9. Sidewalk; 10. Driveway; 11. Motor vehicle lane; 12. Seedlings; 13. Plain concrete steel mesh; 14. Wrought iron railings; 15. Reservoir. DETAILED DESCRIPTION

[0035] like Figure 1-12 As shown, this specific implementation adopts the following technical solutions:

[0036] Embodiment 1:

[0037] A street sponge drainage system comprises a sponge section body 1, a planting area soil layer reinforcement structure 2, a water collection area soil layer reinforcement structure 3, a drainage structure 4 and a diversion trough sedimentation tank 5, wherein the sponge section body 1 is provided with a planting area soil layer reinforcement structure 2, the sponge section body 1 is provided with a water collection area soil layer reinforcement structure 3, the sponge section body 1 is provided with a drainage structure 4 inside the planting area soil layer reinforcement structure 2, the sponge section body 1 is provided with a diversion trough sedimentation tank 5, a roadway 10 is provided on one side of the planting area soil layer reinforcement structure 2, and the roadway 10 is away from the planting area soil layer reinforcement structure 2. A motor vehicle lane 11 is arranged on one side of the planting area soil layer reinforcement structure 2, and concrete 6 is arranged on the side of the planting area soil layer reinforcement structure 2 away from the carriageway 10, and sesame white burnt granite 7 is arranged above the concrete 6, and a sidewalk 9 is arranged above the sesame white burnt granite 7, and galvanized steel pipes 8 are arranged inside the sidewalk 9 and the sesame white burnt granite 7, seedlings 12 are arranged above the water collection area soil layer reinforcement structure 3, and a plain concrete steel mesh 13 is arranged inside the water collection area soil layer reinforcement structure 3, and an iron railing 14 is installed above the sponge section body 1.

[0038] Among them, the planting area soil layer reinforcement structure 2 includes a first plain soil rammed layer 201, a geomembrane layer 202, a regenerated drainage layer 203, a slit PVC drainage pipe 204, a regenerated aggregate soil medium layer 205, a regenerated aggregate covering layer 206 and an aquifer 207. A geomembrane layer 202 is arranged above the first plain soil rammed layer 201, and a regenerated drainage layer 203 is arranged above the geomembrane layer 202. A slit PVC drainage pipe 204 is arranged inside the planting area soil layer reinforcement structure 2, and the slit PVC drainage pipe 204 is connected to the drainage structure 4. A recycled aggregate soil medium layer 205 is arranged above the regenerated drainage layer 203, a recycled aggregate covering layer 206 is arranged above the recycled aggregate soil medium layer 205, and an aquifer 207 is arranged above the recycled aggregate covering layer 206, which can make the construction structure of the planting area soil layer reinforcement structure 2 more solid and make the connection between the structures tighter.

[0039] Among them, the drainage structure 4 includes a first blind pipe 401, a first vertical pipe 402 and a pipe cap 403. The first blind pipe 401 is arranged inside the planting area soil reinforcement structure 2, and the first vertical pipe 402 is installed above the first blind pipe 401. The pipe cap 403 is installed on the top of the first vertical pipe 402, which can facilitate drainage work.

[0040] Among them, the diversion trough sedimentation tank 5 includes a third machine-cut sesame gray granite whole stone 501, a fourth sesame gray machine-cut granite edge stone 502, a concrete diversion trough 503, an open curb 504, a diversion trough 505, a plain concrete steel mesh 506 and a fifth sesame gray granite machine-cut granite edge stone 507, the interior of the diversion trough sedimentation tank 5 is provided with a third machine-cut sesame gray granite whole stone 501, a fourth sesame gray machine-cut granite edge stone 502 is provided on one side of the third machine-cut sesame gray granite whole stone 501, and the interior of the diversion trough sedimentation tank 5 and on one side of the third machine-cut sesame gray granite whole stone 501 A concrete diversion trough 503 is provided, an open curbstone 504 is provided inside the concrete diversion trough 503, a diversion trough 505 is provided inside the diversion trough sedimentation tank 5 and on one side of the fourth sesame ash machine-cut granite curbstone 502, a plain concrete steel mesh 506 is provided inside the diversion trough sedimentation tank 5 and between the open curbstone 504 and the fourth sesame ash machine-cut granite curbstone 502, and a fifth sesame ash granite machine-cut granite curbstone 507 is provided inside the plain concrete steel mesh 506, which can timely implement sedimentation work on the drainage, and then precipitate and filter the impurities carried by the drainage.

[0041] The watershed soil reinforcement structure 3 includes a second rammed soil layer 301, natural graded gravel 302, cement mortar 303, a first machine-cut sesame gray granite 304, a concrete cushion layer 305, cement mortar horizontal masonry 306 and a second machine-cut sesame gray granite whole stone 307. The watershed soil reinforcement structure 3 is provided with a second rammed soil layer 301 inside, and a natural graded gravel 302 is provided above the second rammed soil layer 301, and a plurality of first machine-cut sesame gray granite are provided above the natural graded gravel 302. The sesame grey granite 304 is a plurality of first machine-cut sesame grey granite 304, and cement mortar 303 is arranged between the first machine-cut sesame grey granite 304. A concrete cushion layer 305 is arranged inside the water collection area soil layer reinforcement structure 3. A cement mortar horizontal masonry 306 is arranged above the concrete cushion layer 305. A second machine-cut sesame grey granite whole stone 307 is arranged above the cement mortar horizontal masonry 306. This can make the construction structure of the water collection area soil layer reinforcement structure 3 more solid, make the connection between the structures tighter, and increase the service life.

[0042] Among them, a water reservoir 15 is arranged inside the sponge section body 1 and between the third machine-cut sesame gray granite whole stone 501 and the fifth sesame gray granite machine-cut granite edge stone 507, which can play the role of storing water.

[0043] Among them, the laying thickness of the recycled aggregate soil medium layer 205 is 2.36-4.75mm, the laying thickness of the recycled aggregate covering layer 206 is 0-4.75mm, the laying thickness of the regenerated drainage layer 203 is 0.5-4.75mm, and the laying thickness of the geomembrane layer 202 is 1.5mm, which can ensure the stability of the structure and the service life.

[0044] Among them, the usable size of the first machine-cut sesame gray granite 304 is 100X100X200mm, the usable size of the second machine-cut sesame gray granite whole stone 307 is 350X700X100mm, the usable size of the third machine-cut sesame gray granite whole stone 501 is 500X900X100mm, the usable size of the fourth sesame gray machine-cut granite edge stone 502 is 350X700X100mm, and the usable size of the fifth sesame gray granite machine-cut granite edge stone 507 is 100X100X200mm, which can ensure the stability of the structure and the service life.

[0045] Embodiment 2:

[0046] A construction method for a street sponge drainage system comprises the following steps:

[0047] S1. When constructing the street sponge drainage system during construction, the corresponding data measurement work shall be carried out in advance for the location where the street sponge drainage system needs to be constructed;

[0048] S2. Excavate the corresponding foundation of the street sponge drainage system according to the size of the construction to be carried out;

[0049] S3. Backfill water-shaken sand in the pipeline trench within the road red line of the constructed street sponge drainage system to the bottom of the road structure layer or the bottom of the road replacement layer. When the distance between the pipe epidermis and the bottom of the road replacement layer is less than 1m, the trench is backfilled with water-shaken sand to the bottom of the road structure layer. The compaction degree of water-shaken sand is not less than 95%, and the trench is backfilled with water-shaken sand to 0.5m above the pipe epidermis. The rest of the trench is backfilled with original soil;

[0050] S4. Based on the above, the planting area soil reinforcement structure 2, the water collection area soil reinforcement structure 3, the drainage structure 4 and the diversion trough sedimentation tank 5 are constructed in the main body 1 of the sponge section according to the drawings;

[0051] S5. After the completion of the above drainage system construction, the diversion trough sedimentation tank 5, carriageway 10, motor vehicle lane 11, concrete 6, sesame white burnt granite 7, sidewalk 9, galvanized steel pipe 8, seedlings 12, plain concrete steel mesh 13 and wrought iron railings 14 are constructed on the surface of the sponge section body 1, and the green plants required for the road surface are planted in the soil layer reinforcement structure 2 of the planting area. In the subsequent use of the street sponge drainage system, regular maintenance work is required. In terms of sanitation, staff are required to perform regular cleaning work, and additional cleaning work is performed during the leaf-falling season and after rain. Plants planted in the street sponge drainage system need to be watered at least once every half a month within two years, and regular watering and fertilization are carried out according to the season and the growth needs of the plants. Staff are arranged to remove weeds in time, and the construction method adopts manual removal to reduce the use of herbicides, thereby ensuring safety. Plants with poor growth in the street sponge drainage system are replaced in time, and the plants are pruned regularly. In addition, safety staff conduct regular inspections to facilitate timely detection of conditions during flood season or daily life.

[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A street sponge drainage system, characterized in that: The invention comprises a sponge section body (1), a planting area soil layer reinforcement structure (2), a water collection area soil layer reinforcement structure (3), a drainage structure (4) and a diversion trough sedimentation tank (5), wherein the planting area soil layer reinforcement structure (2) is arranged inside the sponge section body (1), the water collection area soil layer reinforcement structure (3) is arranged inside the sponge section body (1), a drainage structure (4) is arranged inside the sponge section body (1) and located inside the planting area soil layer reinforcement structure (2), a diversion trough sedimentation tank (5) is arranged inside the sponge section body (1), a roadway (10) is arranged on one side of the planting area soil layer reinforcement structure (2), and the roadway (10) is far away from the planting area soil layer reinforcement structure. A motor vehicle lane (11) is arranged on one side of the structure (2); concrete (6) is arranged on the side of the planting area soil layer reinforcement structure (2) away from the roadway (10); sesame white burnt surface granite (7) is arranged above the concrete (6); a sidewalk (9) is arranged above the sesame white burnt surface granite (7); galvanized steel pipes (8) are arranged inside the sidewalk (9) and the sesame white burnt surface granite (7); seedlings (12) are arranged above the water collection area soil layer reinforcement structure (3); a plain concrete steel mesh (13) is arranged inside the water collection area soil layer reinforcement structure (3); and an iron railing (14) is installed above the sponge section body (1).

2. A street sponge drainage system according to claim 1, characterized in that: The planting area soil layer reinforcement structure (2) comprises a first plain soil ramming layer (201), a geomembrane layer (202), a regenerated drainage layer (203), a slotted PVC drainage pipe (204), a regenerated aggregate soil medium layer (205), a regenerated aggregate covering layer (206) and an aquifer (207), wherein a geomembrane layer (202) is arranged above the first plain soil ramming layer (201), and a regenerated drainage layer (203) is arranged above the geomembrane layer (202). A slotted PVC drainage pipe (204) is arranged inside the planting area soil layer reinforcement structure (2), and the slotted PVC drainage pipe (204) is connected to the drainage structure (4); a recycled aggregate soil medium layer (205) is arranged above the recycled aggregate soil medium layer (205); a recycled aggregate covering layer (206) is arranged above the recycled aggregate covering layer (206); and an aquifer (207) is arranged above the recycled aggregate covering layer (206).

3. A street sponge drainage system according to claim 1, characterized in that: The drainage structure (4) comprises a first blind pipe (401), a first vertical pipe (402) and a pipe cap (403); the first blind pipe (401) is arranged inside the planting area soil layer reinforcement structure (2); the first vertical pipe (402) is installed above the first blind pipe (401); and the pipe cap (403) is installed on the top of the first vertical pipe (402).

4. A street sponge drainage system according to claim 1, characterized in that: The diversion trough sedimentation tank (5) comprises a third machine-cut sesame grey granite whole stone (501), a fourth sesame grey machine-cut granite curb stone (502), a concrete diversion trough (503), an open curb stone (504), a diversion trough (505), a plain concrete steel mesh (506) and a fifth sesame grey granite machine-cut granite curb stone (507), wherein the third machine-cut sesame grey granite whole stone (501) is arranged inside the diversion trough sedimentation tank (5), a fourth sesame grey machine-cut granite curb stone (502) is arranged on one side of the third machine-cut sesame grey granite whole stone (501), and the interior of the diversion trough sedimentation tank (5) and the third machine-cut sesame grey granite whole stone (501) are provided with a fourth sesame grey machine-cut granite curb stone (502). A concrete guide groove (503) is arranged on one side of the sesame grey granite whole stone (501), an open curbstone (504) is arranged inside the concrete guide groove (503), a guide groove (505) is arranged inside the guide groove sedimentation tank (5) and located on one side of the fourth sesame grey machine-cut granite curbstone (502), a plain concrete steel mesh (506) is arranged inside the guide groove sedimentation tank (5) and located between the open curbstone (504) and the fourth sesame grey machine-cut granite curbstone (502), and a fifth sesame grey granite machine-cut granite curbstone (507) is arranged inside the plain concrete steel mesh (506).

5. A street sponge drainage system according to claim 1, characterized in that: The watershed soil layer reinforcement structure (3) comprises a second plain soil ramming layer (301), natural graded gravel (302), cement mortar (303), first machine-cut sesame grey granite (304), a concrete cushion layer (305), cement mortar horizontal masonry (306) and second machine-cut sesame grey granite whole stones (307). The watershed soil layer reinforcement structure (3) is provided with a second plain soil ramming layer (301) inside, and natural graded gravel (302) is provided above the second plain soil ramming layer (301). A plurality of first machine-cut sesame grey granites (304) are arranged above the natural graded gravel (302), cement mortar (303) is arranged between the plurality of first machine-cut sesame grey granites (304), a concrete cushion layer (305) is arranged inside the water catchment area soil layer reinforcement structure (3), a cement mortar horizontal masonry (306) is arranged above the concrete cushion layer (305), and a second machine-cut sesame grey granite whole stone (307) is arranged above the cement mortar horizontal masonry (306).

6. A street sponge drainage system according to claim 1, characterized in that: A water reservoir (15) is provided inside the sponge section body (1) and between the third machine-cut sesame grey granite whole stone (501) and the fifth machine-cut sesame grey granite granite edge stone (507).

7. A street sponge drainage system according to claim 1, characterized in that: The laying thickness of the recycled aggregate soil medium layer (205) is 2.36-4.75 mm, the laying thickness of the recycled aggregate covering layer (206) is 0-4.75 mm, the laying thickness of the recycled drainage layer (203) is 0.5-4.75 mm, and the laying thickness of the geomembrane layer (202) is 1.5 mm.

8. A street sponge drainage system according to claim 1, characterized in that: The use size of the first machine-cut sesame gray granite (304) is 100X100X200mm, the use size of the second machine-cut sesame gray granite whole stone (307) is 350X700X100mm, the use size of the third machine-cut sesame gray granite whole stone (501) is 500X900X100mm, the use size of the fourth sesame gray machine-cut granite edge stone (502) is 350X700X100mm, and the use size of the fifth sesame gray granite machine-cut granite edge stone (507) is 100X100X200mm.

9. A construction method for a street sponge drainage system, characterized in that: The following steps are involved: S1. When constructing the street sponge drainage system during construction, the corresponding data measurement work shall be carried out in advance for the location where the street sponge drainage system needs to be constructed; S2. Excavate the corresponding foundation of the street sponge drainage system according to the size of the construction to be carried out; S3. Backfill water-shaken sand in the pipeline trench within the road red line of the constructed street sponge drainage system to the bottom of the road structure layer or the bottom of the road replacement layer. When the distance between the pipe epidermis and the bottom of the road replacement layer is less than 1m, the trench is backfilled with water-shaken sand to the bottom of the road structure layer. The compaction degree of water-shaken sand is not less than 95%, and the trench is backfilled with water-shaken sand to 0.5m above the pipe epidermis. The rest of the trench is backfilled with original soil; S4. Based on the above, a soil reinforcement structure for the planting area (2), a soil reinforcement structure for the water collection area (3), a drainage structure (4) and a diversion trough sedimentation tank (5) are constructed in accordance with the drawings within the main body (1) of the sponge section; S5. After the above drainage system is constructed, a diversion trough sedimentation tank (5), a carriageway (10), a motor vehicle lane (11), concrete (6), sesame white burnt granite (7), a sidewalk (9), a galvanized steel pipe (8), seedlings (12), plain concrete steel mesh (13) and iron railings (14) are constructed on the surface of the sponge section body (1), and green plants required for the road surface are planted in the soil reinforcement structure (2) of the planting area.

Citation Information

Patent Citations

  • Road water storage and drainage system and road construction method

    CN113550397A

  • Sponge city ecological remediation drainage structures

    CN207484637U

  • Bioretention type ecological tree pool

    CN211571895U

  • Hard pavement surface runoff storage and seepage plant pit and storage and seepage system

    CN214530022U

  • Sponge city bioretention structure

    CN214994492U