Unequal-strength double (multi) tower connected structure and construction method
By using rigid connection and joint coordination devices in unequal strong double (multi) tower structures, the stiffness and damping performance of the connecting body and the tower are adjusted, and the problem of tower vibration is not synchronized, achieving coordinated force and collision prevention The effect of falling simplifies design difficulty and optimizes the building shape.
Patent Information
- Application Number
- CN202411263992.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-26
AI Technical Summary
The unequal double (multi) tower structure vibrates from synchronization under horizontal force, resulting in the difficulty of coordinated deformation and stress between the connecting body and the tower, and the sliding connection affects the building facade shape and the difficulty of anti-collision and fall control. .
The connecting body is used to use rigid connection with the main tower, and supports the tower through limited rigid connection. A joint coordination device is installed to adjust the stiffness and damping performance, including lead-core rubber support, viscous dampers, etc., to achieve the coordinated work between the connecting body and the tower. , and the overall assembly of the structure is achieved through segmented construction and hydraulic lifting device.
Effectively coordinate the horizontal force deformation of unequal towers, reduce the internal force of the connecting body and tower components, improve the structure's anti-collision and fall resistance, simplify the design difficulty, and optimize the building facade shape.
Smart Images

Figure CN119021371A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering, and in particular to a unequal-strength double (multi) tower connected structure and a construction method. Background Art
[0002] The connected structure is increasingly favored by architects due to its diverse appearance and functions. As the requirements for building functions become increasingly complex, the floor plans, number of floors, and floor heights of the towers connected to the connector are often different, resulting in large differences in the tower structural stiffness and dynamic characteristics, forming a double (multi) tower connected structure of unequal strength. For the double (multi) tower structure of unequal strength, due to the differences in the tower's own structural stiffness and dynamic characteristics, the vibration of the tower under the action of horizontal force is asynchronous and uncoordinated.
[0003] At present, the traditional connection forms between the connector and the tower in the connected structure are mainly rigid connection and sliding connection. Rigid connection generally requires that the tower connected to the connector should have the same or similar body shape, plane and rigidity. The connector coordinates the deformation of the connected tower under the action of horizontal force and transmits the horizontal force; the sliding connection usually sets a corbel component on the outside of the tower facade, and sets a deformation joint between the connector and the tower along the vertical direction to form independent structural units to achieve sliding between the connector and the tower.
[0004] When a connector is set at a high position to form a double (multi) tower structure with unequal strength, if a rigid connection is used between the connector and the tower, the towers will vibrate asynchronously or even in the opposite direction due to different structural stiffness, and there will be mutual interference between the towers. At this time, it will be more difficult for the connector to coordinate the force and deformation of the tower under the action of horizontal force. The connector itself is subject to greater force, the connector rods are large in size, and the components connected to the connector in the tower are subject to complex forces within the height range of the connected layer and the upper and lower adjacent layers, which increases the difficulty of design; If a sliding connection is used between the connector and the tower, the asynchronous vibration of the tower will cause an increase in the amount of slip between the connector and the tower. In order to ensure sufficient slip, the width of the expansion joint is generally large, which seriously affects the shape of the building facade and also makes it more difficult to control the overall structure's anti-collision and anti-fall properties. Summary of the invention
[0005] The purpose of the present invention is to provide an unequal strength double (multi) tower connected structure and a construction method, which can effectively solve the problems of unequal strength connected structures (the stiffness ratio of the tower structures in two directions of the building plane reaches 2 to 3) in the prior art, the difficulty in coordinated work, the complex force of the components, the difficulty in controlling the mutual sliding, anti-collision and anti-falling control between the connector and the tower.
[0006] To achieve the above object, the present invention adopts the following technical solution: A double (multi) tower connected structure of unequal strength, including a connector, a main tower and a supporting tower. The main tower and the supporting tower are connected by the connector. The main tower and the supporting tower are completely different in plane layout, floor height, number of floors and structural dynamic characteristics. The structural stiffness of the main tower in two directions of the plane is 2 to 3 times that of the supporting tower. One end of the connector is arranged at the middle and upper part of the main tower, and the other end is arranged at the top of the supporting tower. The connector is rigidly connected to the main tower, and is rigidly connected to the supporting tower through a joint coordination device arranged at the connection position. The number of floors of the connector is 1 to 5. According to the position relationship in the plane, the connector includes a connector main tower side pre-installed section, a connector support tower side pre-installed section, a connector middle lifting section, a connector back-up section and a connector temporary reinforcement member; the connector back-up section and the connector temporary reinforcement member are arranged at the connection between the connector main tower side pre-installed section and the connector middle lifting section and at the connection between the connector support tower side pre-installed section and the connector middle lifting section; According to the components, the connector adopts a steel truss structure, including a connector steel truss, a connector steel beam welded on the connector steel truss, a connector floor slab welded on the top surface of the connector steel truss, a horizontal support member welded inside the connector steel truss for transmitting horizontal force, and an extension of the connector steel truss welded on the connector steel truss close to the main tower side; The rigidity and strength of the connector meet the use requirements under static load, and its vertical deformation is less than 1 / 400 of its span; the connector floor has an effective width in the direction perpendicular to the plane of the connected tower, and the effective width is greater than 40% of the plane size of the connector in this direction; The unequal-strength double (multi) tower connected structure also includes a connected coordination device, which is arranged between the connector and the supporting tower.
[0007] A further preferred technical solution is as follows: the main tower is connected to the connector through vertical components connected to the main tower and steel components arranged in the vertical components connected to the main tower; steel components are arranged within the height range of the connector and extend two layers upward and downward, and the cross-section of the steel components is H-shaped steel and / or rectangular steel pipes, round steel pipes; the connector steel truss extends into the interior of the main tower, and the extension part of the connector steel truss is at least one span, and a rigid connection is adopted between the extension part of the connector steel truss and the steel components.
[0008] A further preferred technical solution: the supporting tower bears the vertical action transmitted by the connector and the main tower; The structural stiffness K of the supporting tower 3 The structural stiffness K of the main tower 2 There is the following relationship between them: K 3 ∈[1 / 3,1 / 2]K 2The dynamic characteristics of the supporting tower and the main tower in two directions within the horizontal plane where the tower structure is located are completely different.
[0009] A further preferred technical solution: the connected coordination device is arranged between the top of the vertical components connected to the connector and the supporting tower; the connected coordination device includes a vertical supporting device, a horizontal elastic device, a horizontal damping device and a horizontal limiting device.
[0010] Further preferred technical solution: the vertical support device uses a polytetrafluoroethylene elastic slide plate support; The horizontal elastic device uses a steel spring or an elastic steel plate; The horizontal damping device uses a damping plate; The horizontal limit device uses a viscous damper.
[0011] A further preferred technical solution is: the vertical support device and the horizontal elastic device are combined into one component to form a combined component 1, and the combined component 1 uses a natural rubber bearing; The horizontal damping device uses a damping plate; The horizontal limit device uses a viscous damper.
[0012] A further preferred technical solution is: the vertical support device, the horizontal elastic device and the horizontal damping device are combined into one component to form a combined component 2, and the combined component 2 uses a lead rubber bearing; The horizontal limit device uses a viscous damper.
[0013] The construction method of the unequal strength double (multi) tower connected structure is taken as an example of an unequal strength double tower connected structure in which the connected coordination device adopts a lead rubber bearing, and the steps are as follows: Step 1: Construction of the main structure of the towers on both sides: According to the positional relationship between the connector and the main tower and the supporting tower in the plane of the unequal-strength double-tower connected structure, the connector is divided into the connector main tower side pre-installed section, the connector supporting tower side pre-installed section, the connector middle lifting section and the connector post-supplement section; The main structure of the main tower and supporting tower is constructed, where the main structure of the main tower includes the pre-assembled section of the main tower side of the connector, and the vertical components connected to the supporting tower are constructed to the elevation height connected to the connector; Step 2: Assembling the middle lifting section of the connector and the pre-installed section of the connector supporting the tower side: Install lead rubber bearings on the top of the vertical components connected to the supporting towers, and assemble the structure of the middle lifting section of the connector on the ground at the same time; construct the pre-installed section on the supporting tower side of the connector and connect it to the lead rubber bearings, and install the viscous damper and the temporary tensile device of the lead rubber bearing at the same time; the temporary tensile device can be made of tensile steel plates or tensile steel bars, and the specifications and quantity of the tensile steel plates or tensile steel bars are determined according to calculations, and finally pour the concrete floor slab of the pre-installed section on the supporting tower side of the connector; Step 3: Lifting of the middle lifting section of the connector: Install lifting brackets on the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector, use a lifting device and lift the middle lifting section of the connector to the designed elevation through lifting steel strands, and connect it with the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector; The lifting bracket adopts a cantilever triangular steel truss structure. The steel truss cross section can be H-shaped steel or rectangular steel pipe. Preferably, the steel truss cross section adopts H-shaped steel to facilitate connection with the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector. The cross section of the steel truss rod is determined according to the lifting load calculation; The lifting device adopts the hydraulic lifter commonly used in the construction technology of building component lifting and installation. It is mainly composed of an upper anchor mechanism, a main lifting hydraulic cylinder and a lower anchor mechanism. The load-bearing steel strand passes through the middle to achieve the overall synchronous lifting of large-tonnage, large-span and large-area components. The hydraulic lifter is determined according to the principle of meeting the requirements of the hydraulic lifting force of the middle lifting section of the connector and making each hydraulic device evenly loaded. One end of the lifting steel strand is connected to the lifting bracket, and the other end is connected to the middle lifting section of the connector. The cross section of the steel strand is determined based on the gravity load calculation of the middle lifting section of the connector. Step 5: Construction of the connector backfill section and removal of the temporary tensile device of the lead rubber bearing: After the middle lifting section of the connector is connected with the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector, the connector back-up section is constructed to make the connector a whole, and the hoisting and lifting device and temporary reinforcement components of the connector are removed; The remaining concrete slab of the connector is poured. After the connector slab reaches the designed strength and forms a whole, the temporary tensile device of the lead rubber bearing is removed.
[0014] Further preferred technical solution: In step one, in order to ensure that the middle lifting section of the connector is lifted into place and can be smoothly connected with the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector, when the connector is divided into sections, it is arranged according to the principle of staggered rods of each layer in each section. The break of the topmost rod of the middle lifting section of the connector is farthest from the rods of the pre-installed section on the main tower side of the connector and the pre-installed section on the supporting tower side of the connector, and the minimum staggered distance of each layer of rods is 100 to 200 mm.
[0015] Further preferred technical solution: In step one, in some embodiments, in order to reduce the stress and deformation of the pre-installed section on the main tower side, the pre-installed section on the connector supporting the tower side, and the middle lifting section of the connector during the lifting and hoisting process, the connector also includes a temporary reinforcement member for the connector; the temporary reinforcement member for the connector is usually arranged on the main truss facade of the middle lifting section of the connector and the part that needs to be reinforced to ensure stability due to the lifting disconnection, and can be one or a group of diagonal braces, welded and supported between the chords and / or webs of the steel truss; the specific details need to be determined based on the results of the lifting simulation analysis.
[0016] Compared with the prior art, the present invention has the following characteristics and beneficial effects: the present invention proposes a double (multi) tower connected structure with unequal strength and a construction method. For the double (multi) tower connected structure with unequal strength, one end of the connector is arranged at the middle and upper part of the main tower, and the other end is arranged at the top of the supporting tower. According to the structural stiffness ratio and dynamic characteristic differences of the towers connected to the connector, the performance parameters of the connected coordination device arranged between the connector and the supporting tower are adjusted to achieve a limited rigid connection between the connector and the supporting tower, which not only achieves coordinated deformation and common force of the connector and the connected unequal strength towers under the action of horizontal force, but also greatly reduces the internal force of the connector itself and the components connected to the towers; the market prospect is broad, and there are good social and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a three-dimensional schematic diagram of the unequal strength double (multi) tower connected structure of the present invention. Figure 1 ; Figure 2 This is a three-dimensional schematic diagram of the unequal strength double (multi) tower connected structure of the present invention. Figure 2 ; Figure 3 This is a three-dimensional schematic diagram of the unequal strength double (multi) tower connected structure of the present invention. Figure 3 ; Figure 4 is an enlarged detailed view of the conjoined coordination device of the present invention; Figure 5 This is a schematic diagram of the construction of a double (multi) tower connected structure of unequal strength according to the present invention (I); Figure 6 This is a schematic diagram of the construction of the unequal strength double (multi) tower connected structure of the present invention (II); Figure 7 This is a schematic diagram of the construction of the unequal strength double (multi) tower connected structure of the present invention (III); Figure 8 This is a schematic diagram of the construction of the unequal strength double (multi) tower connected structure of the present invention (IV); Fig. 9 Schematic diagram of a temporary tensile device for a lead rubber bearing according to the present invention; Fig.10It is a cross-sectional schematic diagram of a temporary tensile device of a lead rubber bearing of the present invention; Reference numerals: 1-connector; 11-connector steel truss; 12-connector steel beam; 13-connector floor slab; 14-horizontal support member; 15-connector steel truss extension part; 111-pre-installed section on the main tower side of the connector; 112-pre-installed section on the supporting tower side of the connector; 113-middle lifting section of the connector; 114-rear supplementary section of the connector; 115-temporary reinforcement member of the connector; 2-main tower; 21-vertical components connected to the main tower; 22-steel components; 3-supporting tower; 31-vertical components connected to the supporting tower; 4-joint coordination device; 41-lead rubber bearing; 42-viscous damper; 43-temporary tensile device of lead rubber bearing; 5-Lifting bracket; 6-Lifting the steel strand. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] See also Figures 1 to 10 As shown, the present invention provides a unequal strength double (multi) tower connected structure and a construction method.
[0020] like Figures 1 to 4 As shown, the unequal strength double (multi) tower connected structure of the present invention mainly includes: a connector 1, a main tower 2, a supporting tower 3 and a connected coordination device 4.
[0021] One end of the connector 1 is arranged at the middle and upper part of the main tower 2, and the other end is arranged at the top of the supporting tower 3; the main tower 2 and the supporting tower 3 are completely different in plane layout, floor height, number of floors and structural dynamic characteristics, and the structural stiffness of the main tower 2 in two directions of the plane is 2 to 3 times that of the supporting tower 3; the connector 1 is rigidly connected to the main tower 2, and a limited rigid connection is achieved with the supporting tower 3 through a joint coordination device 4 arranged at the connection position.
[0022] The number of layers of the interconnect 1 is generally 1 to 5, and preferably, the number of layers of the interconnect 1 is 2 to 3.
[0023] The connector 1 includes a connector steel truss 11, and may also include a connector steel beam 12 arranged on the connector steel truss 11 and a connector floor 13 supported on the connector steel beam; the rigidity and strength of the connector steel truss 11 meet the use requirements under static load, and its vertical deformation is less than 1 / 400 of its span; the connector floor 13 has a certain effective width in the direction perpendicular to the plane of the connected tower, and preferably, the effective width of the connector floor 13 should be greater than 40% of the plane size of the connector 1 in this direction.
[0024] In addition, the connector 1 may further include a horizontal support member 14 disposed below the connector floor 13 for enhancing the rigidity of the connector 1 and transmitting horizontal force, and the horizontal support member is a steel structure.
[0025] It is understandable that the specific structure of the connector 1 is not limited thereto, and various changes may be made to the connector 1.
[0026] The main tower 2 has sufficient rigidity and strength, and its own structural performance, such as structural natural vibration period, inter-story displacement, etc., must meet the relevant requirements of the "Code for Seismic Design of Buildings (GB 50010)" and other regulations to ensure the stress safety under the action of horizontal forces such as earthquakes and wind loads; the main tower 2 can adopt a frame-core tube structure.
[0027] The main tower 2 is connected to the connector 1 in the main tower 2. A steel member 22 is arranged within the height range of the connector 1 and extends two layers upward and downward. The cross section of the steel member 22 can be H-shaped steel and / or rectangular steel pipe, round steel pipe.
[0028] The connecting steel truss extension part 15 of the connecting steel truss 11 extending into the main tower 2 has at least one span, preferably, the connecting steel truss extension part 15 has two spans; the connecting steel truss extension part 15 and the steel member 22 are rigidly connected.
[0029] The supporting tower 3 has sufficient rigidity and strength, and its own structural performance, such as structural natural vibration period, inter-story displacement, etc., must meet the relevant requirements of the Code for Seismic Design of Buildings (GB 50010) and other regulations to ensure the safety of force under horizontal forces such as earthquakes and wind loads, and can withstand the vertical forces transmitted by the connector 1 and the main tower 2; the structural rigidity K of the supporting tower 3 is 3 The structural stiffness K of the main tower 2 2 There is the following relationship between them: K 3 ∈[1 / 3,1 / 2]K 2 The dynamic characteristics of the supporting tower 3 and the main tower 2 in two directions within the horizontal plane where the tower structure is located are completely different; the supporting tower 3 can adopt a frame-shear wall structure.
[0030] The joint coordination device 4 is arranged between the joint body 1 and the top of the vertical member 31 connected to the supporting tower; The connected coordination device 4 is arranged at the top of the supporting tower connected vertical member 31 of the supporting tower 3 and is connected to the connector 1; the connected coordination device 4 includes but is not limited to: a lead rubber bearing 41 and a viscous damper 42; the lead rubber bearing and the viscous damper are elastic devices well known to those skilled in the art, and their specific structures are not described again.
[0031] By adjusting the performance parameters of the lead rubber bearing 41 and the viscous damper 42, a limited rigid connection between the connector 1 and the supporting tower 3 is achieved, and the coordinated work between the connector 1, the main tower 2 and the supporting tower 3 is achieved, which greatly reduces the internal forces of the connector steel truss 11, the vertical components 21 connected to the main tower and the vertical components 31 connected to the supporting tower under the action of horizontal forces.
[0032] A construction method for a double (multiple) tower connected structure with unequal strength (taking a double tower connected structure with unequal strength whose connected coordination device adopts lead rubber bearings as an example), the steps are briefly described as follows: Step 1: According to the positional relationship between the connector and the main tower and the supporting tower in the plane of the unequal strength double-tower connected structure, the connector is divided into a pre-installed section on the main tower side of the connector, a pre-installed section on the supporting tower side of the connector, a middle lifting section of the connector, and a post-supplement section of the connector; Step 2: Construction of the main structure of the main tower and the supporting tower, wherein the main structure of the main tower includes the pre-assembled section of the main tower side of the connector, and the vertical components connected to the supporting tower are constructed to the elevation height connected to the connector; Step 3: Install the lead rubber bearings on the top of the vertical components connected to the supporting towers, and assemble the steel structure of the middle lifting section of the connector on the ground at the same time; Step 4: The steel structure of the pre-installed section on the tower side of the connector is constructed and connected to the lead rubber bearing. At the same time, the viscous damper and the temporary tensile device of the lead rubber bearing are installed. The temporary tensile device can be made of tensile steel plates or tensile steel bars; the concrete floor slab of the pre-installed section on the tower side of the connector is poured; Step 5: Lift the steel structure of the middle lifting section of the connector, install the lifting bracket on the pre-installed section on the main tower side and the pre-installed section on the supporting tower side, use the lifting device to lift the middle lifting section of the connector to the designed elevation, and weld it to the steel structure of the pre-installed section on the main tower side and the pre-installed section on the supporting tower side; Step 6: Carry out the construction of the connector's supplementary section, the connector is formed into a whole, the hoisting and lifting device is removed, and the remaining part of the connector is poured with concrete floor slab; Step 7: After the connector floor reaches the designed strength and forms a whole, the temporary tensile device of the lead rubber bearing is removed.
[0033] A construction method for a double (multiple) tower connected structure with unequal strength (taking a double tower connected structure with unequal strength whose connected coordination device adopts lead rubber bearings as an example), the detailed steps are as follows: Step 1: Construction of the main structure of the towers on both sides: According to the plane position relationship between the connector 1 and the main tower 2 and the supporting tower 3 in the unequal strength double-tower connected structure, the connector 1 is divided into a connector main tower side pre-installed section 111, a connector supporting tower side pre-installed section 112, a connector middle lifting section 113 and a connector supplementary section 114.
[0034] In order to ensure that the middle lifting section 113 of the connector can be lifted into place and can be smoothly connected with the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector, the connector 1 is divided into sections according to the principle of staggered rods of each layer in each section. The break of the topmost rod of the middle lifting section 113 of the connector is farthest from the rods of the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector, and the minimum staggered distance of each layer of rods is 100 to 200 mm.
[0035] In some embodiments, in order to reduce the stress and deformation of the main tower side pre-installed section 111, the connector supporting tower side pre-installed section 112, and the connector middle lifting section 113 during the lifting and hoisting process, a connector temporary reinforcement member 115 is also included; the connector temporary reinforcement member 115 is usually arranged on the main truss facade of the connector middle lifting section 113 and the part that needs to be reinforced to ensure stability due to lifting disconnection, and can be one or a group of diagonal braces, welded and supported between the chords and / or webs of the steel truss; the specific needs to be determined according to the lifting simulation analysis results.
[0036] The main structure of the main tower 2 and the supporting tower 3 is constructed, wherein the main structure of the main tower 2 includes the pre-assembled section 111 of the main tower side of the connector, and the vertical components 31 connected to the supporting tower are constructed to the elevation height connected to the connector 1; Step 2: Assembling the middle lifting section of the connector and the pre-installed section of the connector supporting the tower side: like Fig. 9 As shown, a lead rubber bearing 41 is installed on the top of the vertical member 31 connected to the supporting tower, and the ground assembly of the structure of the intermediate lifting section 113 of the connector is carried out at the same time; the preassembled section 112 on the supporting tower side of the connector is constructed and connected to the lead rubber bearing 41, and the viscous damper 42 and the temporary tensile device 43 of the lead rubber bearing are installed at the same time; the temporary tensile device 43 can be made of tensile steel plates or tensile steel bars, and the specifications and quantity of the tensile steel plates or tensile steel bars are determined according to calculations, and finally the concrete floor slab of the preassembled section 112 on the supporting tower side of the connector is poured.
[0037] Step 3: Lifting of the middle lifting section of the connector: like Fig.10 As shown, a lifting bracket 5 is installed on the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector, and a lifting device is used to lift the middle lifting section 113 of the connector to the designed elevation through the lifting steel strand 6, and the lifting section 113 is connected to the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector; The lifting bracket 5 adopts a cantilever triangular steel truss structure. The cross-section of the steel truss can be H-shaped steel or rectangular steel pipe. Preferably, the cross-section of the steel truss is H-shaped steel, which is convenient for connection with the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector. The cross-section of the steel truss rod is determined according to the lifting load calculation.
[0038] The lifting device adopts the hydraulic lifter commonly used in the construction technology of building component lifting and installation. It is mainly composed of an upper anchor mechanism, a main lifting hydraulic cylinder and a lower anchor mechanism. The load-bearing steel strand passes through the middle to achieve the overall synchronous lifting of large-tonnage, large-span and large-area components. The hydraulic lifter is determined according to the principle of meeting the requirements of the hydraulic lifting force of the middle lifting section 113 of the connector and making each hydraulic device evenly loaded. One end of the lifting steel strand 6 is connected to the lifting bracket 5, and the other end is connected to the middle lifting section 113 of the connector. The cross section of the steel strand is determined by calculating the gravity load of the middle lifting section 113 of the connector.
[0039] Step 4: Construction of the connector backfill section and removal of the temporary tensile device of the lead rubber bearing: After the middle lifting section 113 of the connector is connected with the pre-installed section 111 on the main tower side of the connector and the pre-installed section 112 on the supporting tower side of the connector, the connector supplementary section 114 is constructed to make the connector 1 a whole, and the lifting device and the temporary reinforcement member 115 of the connector are removed.
[0040] The remaining concrete floor slab of the connector 1 is poured, and after the floor slab of the connector 1 reaches the designed strength and forms an integral body, the temporary tensile device 43 of the lead rubber bearing is removed.
[0041] The implementation method of the conjoined coordination device in the present invention comprises the following steps: Step 1: Establish separate calculation models for the main tower 2 and the supporting tower 3, use the elastic plate calculation assumption that truly reflects the floor stiffness and the load-related Ritz vector method (WYD-RITZ method) to perform calculations, analyze the structural stiffness and dynamic characteristics of the main tower 2 and the supporting tower 3, and determine the stiffness ratio γ and dynamic characteristic difference between the main tower 2 and the supporting tower 3; Step 2: Select a preliminary solution for the joint coordination device; use general finite element analysis software to establish an overall calculation model including the connector 1, the main tower 2 and the supporting tower 3, and use the calculation assumptions and analysis methods in step 1 to perform static calculation analysis of the overall structure. According to the axial force of the components at the connection between the connector 1 and the supporting tower 3 under static load conditions, and the stress of the connector steel truss 11, according to the support stress σ≤σ of the lead rubber bearing under static load conditions, the overall calculation model is established. lim The arrangement position, size and quantity of the lead rubber bearings 41 are initially selected based on the principle of avoiding tensile stress as much as possible; Step 3: dynamic calculation and analysis of the overall structure; based on the calculation result of the tower stiffness ratio γ in step 1 and the preliminary selection scheme of the lead rubber bearing 41 in step 2, the relevant parameters of the lead rubber bearing 41 are preliminarily selected: horizontal equivalent stiffness K eq , equivalent damping ratio ξ, yield strength Q d According to the above parameters, the dynamic calculation and analysis of the overall structure model is carried out to obtain the dynamic characteristics of the overall structure, such as the structural natural vibration period and inter-layer displacement, and the relative deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force. 1 wait; Step 4: Determine the design result of the joint coordination device; Based on the calculation results of step 3, determine whether the design result of the joint coordination device 4 is reasonable: if the dynamic characteristics of the overall structure meet the relevant regulations, the deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force is 1 ≤[U], then the design of the joint coordination device 4 is reasonable; if the deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force 1 》[U], return to step 3, adjust the horizontal equivalent stiffness K of the lead rubber bearing 41 eq , equivalent damping ratio ξ, yield strength Q d and other parameters, and re-calculate and analyze the dynamics of the overall structure; for example, the deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force 1 >[U], but the difference is average, go to step 5; Step 5: Add a viscous damper as a horizontal limit device in the joint coordination device; when the deformation U between the connector 1 and the supporting tower 3 is affected by the horizontal force, 1 >[U], but the difference is not big, according to the calculation result of step 3, the viscous damper 42 is set at the relevant position, the design parameters of the viscous damper 42 are considered in the overall structural dynamic calculation model, and the overall dynamic analysis is performed to obtain the new overall structural dynamic characteristic results, the deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force 1 ; If the dynamic characteristics of the overall structure meet the relevant regulations after the viscous damper 42 is installed, the deformation U between the connector 1 and the supporting tower 3 under the action of horizontal force 1 ≤[U], the design of the conjoined coordination device 4 is reasonable and the design of the conjoined coordination device is completed.
[0042] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0043] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A double (multiple) tower connected structure of unequal strength, comprising a connecting body (1), a main tower (2) and a supporting tower (3), wherein the main tower (2) and the supporting tower (3) are connected via the connecting body (1). Features: The main tower and the supporting tower are completely different in terms of plan layout, floor height, number of floors and structural dynamic characteristics. The structural stiffness of the main tower in both directions of the plane is 2 to 3 times that of the supporting tower. One end of the connector (1) is arranged at the middle and upper part of the main tower, and the other end is arranged at the top of the supporting tower. The connector is rigidly connected to the main tower, and is rigidly connected to the supporting tower via a connecting coordination device arranged at the connection position. The number of layers of the connector is 1 to 5. According to the positional relationship in the plane, the connector (1) comprises a connector main tower side pre-installed section (111), a connector support tower side pre-installed section (112), a connector middle lifting section (113), a connector back-up section (114) and a connector temporary reinforcement member (115); the connector back-up section (114) and the connector temporary reinforcement member (115) are arranged at the connection between the connector main tower side pre-installed section (111) and the connector middle lifting section (113) and at the connection between the connector support tower side pre-installed section (112) and the connector middle lifting section (113); In terms of component parts, the connector (1) adopts a steel truss structure, including a connector steel truss (11), a connector steel beam (12) welded to the connector steel truss (11), a connector floor (13) welded to the top surface of the connector steel truss (11), a horizontal support member (14) welded inside the connector steel truss (11) for transmitting horizontal force, and a connector steel truss extension part (15) welded to the connector steel truss (11) on one side close to the main tower (2); The rigidity and strength of the connector (1) meet the use requirements under static load, and its vertical deformation is less than 1 / 400 of its span; the connector floor (13) has an effective width in a direction perpendicular to the plane of the connected tower, and the effective width is greater than 40% of the plane size of the connector in this direction; The unequal-strength double (multiple) tower connected structure further comprises a connected coordination device (4), and the connected coordination device (4) is arranged between the connector (1) and the supporting tower (3).
2. The unequal strength double (multi) tower connected structure according to claim 1, Features: The main tower (2) is connected to the connector (1) via the main tower connecting vertical members (21) and the steel members (22) arranged in the main tower connecting vertical members (21); the steel members (22) are arranged within the height range of the connector and extend two layers upward and downward, and the cross-section of the steel members (22) is H-shaped steel and / or rectangular steel pipes or round steel pipes; the connector steel truss extension part (15) of the connector steel truss (11) extending into the main tower (2) is at least one span, and the connector steel truss extension part (15) and the steel members (22) are rigidly connected.
3. The unequal strength double (multi) tower connected structure according to claim 1, Features: The supporting tower (3) bears the vertical force transmitted by the connecting body (1) and the main tower (2); The structural stiffness K of the supporting tower (3) 3 The structural stiffness K of the main tower (2) 2 There is the following relationship between them: K 3 ∈[1 / 3,1 / 2]K 2 The dynamic characteristics of the supporting tower (3) and the main tower (2) in two directions within the horizontal plane where the tower structure is located are completely different.
4. The unequal strength double (multi) tower connected structure according to claim 3, Features: The connected coordination device (4) is arranged between the connector (1) and the top of the vertical component (31) connected to the supporting tower; the connected coordination device (4) comprises a vertical support device, a horizontal elastic device, a horizontal damping device and a horizontal limit device.
5. The unequal strength double (multi) tower connected structure according to claim 4, Features: The vertical support device uses polytetrafluoroethylene elastic slide plate bearings; The horizontal elastic device uses a steel spring or an elastic steel plate; The horizontal damping device uses a damping plate; The horizontal limit device uses a viscous damper.
6. The unequal strength double (multi) tower connected structure according to claim 4, Features: The vertical support device and the horizontal elastic device are combined into one component to form a combined component 1, and the combined component 1 uses a natural rubber bearing; The horizontal damping device uses a damping plate; The horizontal limit device uses a viscous damper.
7. The unequal strength double (multi) tower connected structure according to claim 4, Features: The vertical support device, the horizontal elastic device and the horizontal damping device are combined into one component to form a combined component 2, and the combined component 2 uses a lead rubber bearing; The horizontal limit device uses a viscous damper.
8. The construction method of the unequal strength double (multi) tower connected structure according to any one of claims 1 to 7, It is characterized in that Taking the unequal strength double-tower structure with lead rubber bearings as an example, the steps are as follows: Step 1: Construction of the main structure of the towers on both sides: According to the positional relationship between the connector (1) and the main tower (2) and the supporting tower (3) in the unequal-strength double-tower connected structure in a plane, the connector (1) is divided into a connector main tower side pre-installed section (111), a connector supporting tower side pre-installed section (112), a connector middle lifting section (113), and a connector back-up section (114); The main structures of the main tower (2) and the supporting tower (3) are constructed, wherein the main structure of the main tower (2) includes a pre-assembled section (111) on the main tower side of the connector, and the vertical components (31) connected to the supporting tower are constructed to the elevation height connected to the connector (1); Step 2: Assembling the middle lifting section of the connector and the pre-installed section of the connector supporting the tower side: A lead rubber bearing (41) is installed on the top of the vertical member (31) connected to the supporting tower, and the ground assembly of the intermediate lifting section (113) of the connector is performed at the same time; the pre-assembled section (112) on the supporting tower side of the connector is constructed and connected to the lead rubber bearing (41), and the viscous damper (42) and the temporary tensile device (43) of the lead rubber bearing are installed at the same time; the temporary tensile device (43) can be made of tensile steel plates or tensile steel bars, and the specifications and quantity of the tensile steel plates or tensile steel bars are determined according to calculations, and finally the concrete floor slab of the pre-assembled section (112) on the supporting tower side of the connector is poured; Step 3: Lifting of the middle lifting section of the connector: Installing a lifting bracket (5) on the pre-assembled section (111) on the main tower side of the connector and the pre-assembled section (112) on the supporting tower side of the connector, using a lifting device and lifting steel strands (6) to lift the middle lifting section (113) of the connector to the designed elevation, and connecting it to the pre-assembled section (111) on the main tower side of the connector and the pre-assembled section (112) on the supporting tower side of the connector; The lifting bracket (5) adopts a cantilever triangular steel truss structure. The cross section of the steel truss can be made of H-shaped steel or rectangular steel pipe. Preferably, the cross section of the steel truss adopts H-shaped steel to facilitate connection with the pre-assembled section (111) on the main tower side of the connector and the pre-assembled section (112) on the supporting tower side of the connector. The cross section of the steel truss rod is determined according to the lifting load calculation. The lifting device adopts a hydraulic lifter commonly used in the construction technology of lifting and installing building components, which is mainly composed of an upper anchor mechanism, a main lifting hydraulic cylinder and a lower anchor mechanism, and a load-bearing steel strand passes through the middle to achieve the overall synchronous lifting of large-tonnage, large-span and large-area components; the hydraulic lifter is determined according to the principle of meeting the requirements of the hydraulic lifting force of the middle lifting section (113) of the connector and making each hydraulic device evenly loaded; One end of the lifting steel strand (6) is connected to the lifting bracket (5), and the other end is connected to the middle lifting section (113) of the connector. The cross section of the steel strand is determined by calculation based on the gravity load of the middle lifting section (113) of the connector. Step 5: Construction of the connector backfill section and removal of the temporary tensile device of the lead rubber bearing: After the connector middle lifting section (113) is connected to the connector main tower side pre-installed section (111) and the connector support tower side pre-installed section (112), the connector back-up section (114) is constructed to form the connector (1) as a whole, and the hoisting and lifting device and the connector temporary reinforcement member (115) are removed; The remaining concrete floor slab of the connector (1) is poured, and after the floor slab of the connector (1) reaches the designed strength and forms an integral body, the temporary tensile device (43) of the lead rubber bearing is removed.
9. The construction method of the unequal strength double (multi) tower connected structure according to claim 8, Features: In step 1, in order to ensure that the intermediate lifting section (113) of the connector is lifted into place and can be smoothly connected with the pre-installed section (111) on the main tower side of the connector and the pre-installed section (112) on the supporting tower side of the connector, the connector (1) is divided into sections according to the principle of staggered rods of each layer of each section, and the uppermost rod fracture of the intermediate lifting section (113) of the connector is farthest from the rods of the pre-installed section (111) on the main tower side of the connector and the pre-installed section (112) on the supporting tower side of the connector, and the minimum staggered distance of the rods of each layer is 100 to 200 mm.
10. The construction method of the unequal strength double (multi) tower connected structure according to claim 8, Features: In step one, in some embodiments, in order to reduce the stress and deformation of the main tower side pre-installed section (111), the connector supporting tower side pre-installed section (112), and the connector middle lifting section (113) during the lifting and hoisting process, the connector (1) also includes a connector temporary reinforcement member (115); the connector temporary reinforcement member (115) is usually arranged on the main truss facade of the connector middle lifting section (113) and the part that needs to be reinforced to ensure stability due to lifting disconnection, and can be one or a group of diagonal braces, welded and supported between the chords and / or webs of the steel truss; the specific needs to be determined based on the lifting simulation analysis results.