Intelligent safety monitoring system and method for railway pantograph net

Through the combination of multi-level monitoring and judgment module and exception handling module, the false alarm and resource consumption problems of railway pantograph monitoring system during high-speed operation are solved, efficient and accurate safety monitoring is achieved, and the system intelligence and real-time are improved. sex.

CN119048996AActive Publication Date: 2024-11-29BEIJING LANTIAN DUOWEI TECH
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411537925.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2024-11-29
Estimated Expiration
2044-10-31

AI Technical Summary

Technical Problem

During high-speed operation, the existing railway pantograph monitoring system leads to unclear image shooting and inaccurate feature acquisition, which easily triggers false alarms and is difficult to achieve full real-time feedback, resulting in the lucidity of the electrical fault detection model. Not good enough.

Method used

Using multi-level monitoring and judgment module and exception processing module, through image cutting, preprocessing, edge detection and deep learning model analysis, combined with abnormality assessment and secondary evaluation scheme, the abnormality degree of pantograph is judged, and triggered when the warning standard is reached. System warning, reduce false alarms, rationally allocate resources, and improve the accuracy and efficiency of the monitoring system.

Benefits of technology

It has achieved timely detection and handling of potential safety hazards, reduced false alarms, rational allocation of resources, strengthened the collection of targeted endpoint data, improved the accuracy of deep learning models, improved the intelligence, precision and efficiency of monitoring systems, and overcomes the The difficulty in judging nonlinear complex situations reduces costs and improves the warning speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048996A_ABST
    Figure CN119048996A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent safety monitoring system and method for a railway pantograph net. The intelligent safety monitoring system comprises a monitoring data module, a monitoring scheme module, an abnormal degree evaluation module and an abnormity processing module. The monitoring data module comprises an acquisition module, a processing module and an analysis module; the abnormality judgment module can judge whether the image is abnormal or not according to the image evaluation value; the monitoring scheme module comprises a normal state monitoring scheme adopted when no image anomaly occurs and an anomaly degree evaluation monitoring scheme adopted when the image anomaly occurs; the abnormity degree evaluation module is provided with an abnormity degree evaluation time period, and when the abnormity judgment module judges that the image is abnormal, the abnormity degree evaluation module carries out monitoring in the abnormity degree evaluation time period according to the abnormity degree evaluation monitoring scheme and judges the abnormity degree; and the exception handling module is used for distributing a handling step corresponding to the exception degree according to the obtained exception degree. According to the invention, the monitoring safety and accuracy are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of safety monitoring of railway pantograph networks, and in particular to an intelligent safety monitoring system and method for railway pantograph networks. Background Art

[0002] The train pantograph is a device that the train uses to obtain current from the contact network. Its carbon slide bars are in direct contact with the contact network wires to obtain current for the train to use. During the high-speed operation of the train, due to factors such as vibration, changes in contact network height, contact pressure, and the quality of the pantograph material, the pantograph may have some safety problems, such as hooking foreign objects, deformation, missing bow angles, abnormal landing, or electric sparks, which will pose a threat to the safety of train operation. Therefore, in order to promptly discover and deal with possible safety hazards and ensure the normal operation of the train, it is necessary to monitor the operation of the pantograph in real time. The current method for monitoring the pantograph is to collect pantograph images in real time, process and analyze the collected images, determine whether the pantograph is abnormal in the image, and evaluate the safety status of the pantograph through the results of data monitoring. When processing and analyzing images, the collected images need to be processed first because of the comprehensive factors such as environmental reasons, light reasons and shooting reasons that affect the subsequent analysis and processing. Image processing methods generally include image cropping, preprocessing, edge detection, edge extraction, etc. Specifically, image cropping is to remove unnecessary parts such as surrounding scenery in the image, and only retain key areas for judgment. Cropping can be based on known shooting position and angle information; then the cropped image is preprocessed. The preprocessing includes grayscale (converting color images into grayscale images), filtering denoising (using Gaussian filtering, median filtering and other methods to remove noise in the image), and contrast enhancement (increasing the contrast of the image through methods such as histogram equalization) to improve the accuracy of edge detection. The edge detection can identify the areas with significant brightness changes in the pantograph image, such as the edges of the contact line and the pantograph slide. Among them, the commonly used edge detection algorithms include Sobel operator, Canny operator, etc. These algorithms detect the edge by calculating the gradient size and direction of each pixel in the image. In addition, based on edge detection, the detected edges can be further extracted and contour fitted, and the scattered edge points can be connected into a complete contour line to accurately locate the upper and lower edges of the contact line and the pantograph slide. The contour fitting can use Hough transform (map the edge points in the image space to the parameter space, and find the corresponding straight line or curve by detecting the peak value in the parameter space) to fit the straight edges of the contact line and the pantograph slide. After the image is processed and analyzed by the above method, the results of the processing and analysis are output as data for subsequent analysis and monitoring. However, since the image is easily affected by the train running environment, such as lighting changes, background noise, train speed, etc., it is easy to cause unclear shooting, inaccurate feature acquisition, and easy to trigger false alarms.In addition, since the train needs to be monitored in real time during its entire operation, computing resources such as GPU, memory, and data transmission speed also limit the number of image frames that can be processed per second. Specifically, the higher the number of acquired frames, the greater the consumption of computing resources. At the same time, the speed of railway vehicles will also affect the number of frames and recognition processing. When analyzing images, if the monitoring sampling is too frequent, the number of analysis and processing frames is too high, or even every frame is processed and analyzed, it will lead to excessive consumption of computing resources. Especially when the train is running at high speed, it is difficult to achieve completely real-time feedback and it is easy to trigger false alarms. If the sampling is insufficient, it is also impossible to provide a large amount of labeled data required for model training, making the basic data values ​​inaccurate and resulting in insufficient robustness of the electrical fault detection model. Summary of the invention

[0003] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the present invention defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the present invention.

[0004] In order to solve the technical problem, the present application provides an intelligent safety monitoring system for a railway pantograph network, characterized in that it includes a monitoring and judgment module and an abnormality handling module; Wherein, the monitoring and judging module includes a first judging module, a second judging module and a third judging module; The first judgment module monitors the pantograph in a normal state monitoring scheme to obtain a first image, and judges whether the first image is abnormal according to an evaluation value of the first image; When the first image is judged to be abnormal, the second judgment module monitors the pantograph in an abnormality assessment period according to an abnormality assessment monitoring scheme, obtains a second image, judges the abnormality classification of the second image, and judges the abnormality degree of the pantograph in the abnormality assessment period according to the evaluation value and abnormality classification of the second image; When the abnormality level of the pantograph during the abnormality level assessment period reaches the system warning standard, the abnormality processing module triggers the system abnormality warning and the monitoring ends; When the abnormality of the pantograph in the abnormality assessment period does not reach the system warning standard, the third judgment module obtains a third image in the secondary assessment period using a secondary assessment scheme, judges the abnormality classification of the third image, and judges the abnormality of the pantograph in the secondary assessment period according to the assessment value and abnormality classification of the third image; When the abnormality level of the secondary evaluation period reaches the system warning standard, the abnormality handling module triggers the system abnormality warning and the monitoring ends; when the abnormality level of the secondary evaluation period reaches the system normal standard, the first judgment module monitors the pantograph with the normal state monitoring scheme; when the abnormality level of the secondary evaluation period is between normal and warning, the second judgment module continues to monitor the pantograph with the abnormality level assessment monitoring scheme.

[0005] The abnormality classifications of the second image and the third image include: normal, slightly abnormal, and severely abnormal.

[0006] Among them, the second judgment module judges the abnormality classification according to the evaluation value of the second image, and then obtains the corresponding abnormality classification coefficient and abnormality distribution according to the abnormality classification of the second image, calculates the evaluation score of the abnormality degree assessment period, and judges the abnormality degree of the pantograph in the abnormality degree assessment period according to the evaluation score.

[0007] The system further includes an acquisition module, a processing module and an analysis module; wherein the acquisition module is used to acquire images of the pantograph during train operation; the processing module can process the acquired images to obtain key areas for judging the state of the pantograph; the analysis module can analyze the processed images to obtain an evaluation value representing the state of the pantograph.

[0008] The processing module processes the collected images in the following ways: cutting, preprocessing, edge detection and edge extraction.

[0009] The analysis module uses a deep learning model or a traditional machine vision algorithm to perform data analysis on the image processed by the processing module, thereby obtaining an evaluation value of the image.

[0010] The present application also provides a monitoring method using the intelligent safety monitoring system of the railway pantograph network as described above, the steps comprising: S1, set at monitoring time T i Get the i-th image U i , get U i The evaluation value Q i ; According to the basic evaluation value Q of the image 0 ; When Q i ≥Q 0 When the image U i If it is judged as an abnormal image, the process goes to step S2; S2, in the abnormality evaluation period △T 1 Evaluate monitoring program E by abnormality level 1Monitor the pantograph and set a total of m1 images U, U=[U 1 , U 2 , U 3 ,…,U m1 ], where the jth image is U j , get image U j The evaluation value Q j ; According to the basic evaluation value Q 0 Get the evaluation interval threshold Q of the abnormality evaluation period max and Q min , where Q min ≤ln2 Q 0 ;Q max ≥2Q 0 -Q min ; When Q j ≥Q max When the image U j Judged as severe abnormality; When Q j ≤Q min When the image U j Judged as normal; When Q min <Q j <Q max When the image U j Judgement of mild abnormality; S3, in the abnormality evaluation period △T 1 The acquired m1 images include c1 severely abnormal images and c2 slightly abnormal images. Set the severe abnormality coefficient ω 1 , mild anomaly coefficient ω 2 , where ω 1 >ω 2 ; Get the abnormal distribution p of the abnormal degree evaluation period 1 = (c1+ c2) / m1; Among them, set the j1th severely abnormal image U j1 The evaluation value is Q j1 , j2nd slightly abnormal image U j2 The evaluation value is Q j2 ; Set the evaluation threshold score W 0 ; Obtain the abnormality evaluation period △T 1 Evaluation score ; When W 1 ≥W 0When the pantograph is judged to be seriously abnormal, the system will alarm and intervene; When W 1 <W 0 When , go to step S4; S4, in the second evaluation period △T 2 The pantograph is monitored using the secondary evaluation scheme, and the zth image among the m2 images obtained is set as U z , image U z The evaluation value is Q z ; Set m2 images to include d1 severely abnormal images and d2 slightly abnormal images, and obtain the abnormal distribution p of the second evaluation period 2 = (d1+ d2) / m2; Among them, set the z1th severely abnormal image U z1 The evaluation value is Q z1 , the z2nd slightly abnormal image U z2 The evaluation value is Q z2 ; Obtaining the assessment score for the second assessment period ; When W 2 ≥W 0 When the pantograph is judged to be seriously abnormal, the system will alarm and intervene; When W 2 ≤W 1 When the monitoring plan is restored to normal state; When W 1 <W 2 <W 0 When the secondary assessment plan is lifted, the monitoring plan will continue based on the abnormality level assessment.

[0011] The beneficial effects achieved by monitoring this application are as follows: By adopting appropriate monitoring methods and technical means, this application can timely discover and deal with potential safety hazards, ensure the normal operation of trains, reduce false alarms, rationally allocate resources, strengthen the collection of targeted endpoint data, improve the accuracy of deep learning models, and improve the intelligence, precision and efficiency of the monitoring system.

[0012] This application overcomes the problem that most mechanism models are only simplified linear systems, and can judge complex situations with nonlinearity, high degrees of freedom and multi-variable coupling. It has a fast triggering speed, low cost, and very rapid start and recovery of early warnings, and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For those skilled in the art, other drawings can also be obtained based on these drawings.

[0014] Figure 1 This is a flow chart of the steps of the monitoring method of the railway pantograph network in this application. DETAILED DESCRIPTION

[0015] Below in conjunction with the drawings in the embodiments of the present application, the technical solutions in the embodiments of the present application are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present application. It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and do not have to be used to describe a specific order or sequence. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0016] In order to reduce false alarms, allocate resources reasonably, strengthen the collection of targeted endpoint data, and improve the accuracy of deep learning models, the present application provides an intelligent safety monitoring system for a railway pantograph network, wherein the intelligent safety monitoring system includes a monitoring and judgment module and an abnormality handling module; wherein the monitoring and judgment module includes a first judgment module, a second judgment module and a third judgment module; wherein the first judgment module monitors the pantograph with a normal state monitoring scheme to obtain a first image, and judges whether the first image is abnormal according to the evaluation value of the first image; when the first image is judged to be abnormal, the second judgment module monitors the pantograph with an abnormality evaluation monitoring scheme during an abnormality evaluation period to obtain a second image, judge the abnormality classification of the second image, and judge the abnormality degree of the pantograph during the abnormality evaluation period according to the evaluation value and abnormality classification of the second image; When the abnormality of the pantograph during the abnormality assessment period reaches the system warning standard, the abnormality handling module triggers the system abnormality warning and the monitoring ends; when the abnormality of the pantograph during the abnormality assessment period does not reach the system warning standard, the third judgment module obtains the third image in the secondary assessment period with the secondary assessment scheme, judges the abnormality classification of the third image, and judges the abnormality of the pantograph during the secondary assessment period according to the evaluation value and abnormality classification of the third image; when the abnormality of the secondary assessment period reaches the system warning standard, the abnormality handling module triggers the system abnormality warning and the monitoring ends; when the abnormality of the secondary assessment period reaches the system normal standard, the first judgment module monitors the pantograph with the normal state monitoring scheme; when the abnormality of the secondary assessment period is between normal and warning, the second judgment module continues to monitor the pantograph with the abnormality assessment monitoring scheme. Wherein, the abnormality classification of the second image and the third image includes: normal, mild abnormality and severe abnormality. Wherein, the second judgment module judges the abnormal classification according to the evaluation value of the second image, and then obtains the corresponding abnormal classification coefficient and abnormal distribution according to the abnormal classification of the second image, calculates the evaluation score of the abnormal degree evaluation period, and judges the abnormal degree of the pantograph in the abnormal degree evaluation period according to the evaluation score. Wherein, the system also includes an acquisition module, a processing module and an analysis module; wherein, the acquisition module is used to acquire images of the pantograph during train operation; the processing module can process the acquired images to obtain key areas that can judge the state of the pantograph; the analysis module can analyze the processed images to obtain an evaluation value representing the state of the pantograph. Wherein, the processing module processes the acquired images including clipping, preprocessing, edge detection and edge extraction. Wherein, the analysis module uses a deep learning model or a traditional machine vision algorithm to perform data analysis on the images processed by the processing module to obtain the evaluation value of the image.

[0017] Specifically, in the intelligent safety monitoring system, the acquisition module acquires monitoring images through a camera or other shooting device, and the processing module processes the acquired monitoring images to obtain the brightness conditions of key areas (edge ​​areas of the pantograph and the contact line); the processed images are uploaded to the cloud processor, and the processed images are analyzed by the analysis module using a deep learning model or other machine vision algorithm to obtain an image evaluation value representing the state of the pantograph.

[0018] In one embodiment, the basic evaluation value Q of the pantograph is set according to the normal image data in the historical data (the brightness of the edge area of ​​the pantograph and the contact wire when no electricity occurs). 0 , when the evaluation value of the monitored image exceeds the basic evaluation value Q 0 When , the image is judged to be abnormal (i.e., an electric shock may occur). Since the brightness under different lighting conditions and different speeds is different, the basic evaluation value Q 0 It can be adjusted according to different shooting time, lighting and train speed.

[0019] When monitoring is performed under normal conditions, during the monitoring time T i The i-th image U obtained i The evaluation value is Q i , where the basic evaluation value Q in the normal state monitoring scheme is set 0 The characteristic μ 0 Including image sampling frequency, number of image processing items, image analysis algorithm complexity, train speed, computing resources and data transmission speed. When setting parameters, factors that need to be considered are: the higher the sampling frequency and the more processing items, the clearer the image processing and the more accurate the results, but the more processing time and computing resources are required, and the higher the data transmission speed requirements are.

[0020] To ensure data accuracy, establish a basic evaluation value Q 0 Whether the network neural model is suitable for this monitoring and evaluation, the image sampling frequency, image processing project, visual algorithm complexity, train speed, computing resources and data transmission speed are put into the trained SVM model as features for analysis, so as to determine whether the basic evaluation value under the current train operation condition can be applied. The SVM algorithm is as follows: Objective function:

[0021] Where W and b are the plane coefficients, Represents the classification label of the sample, =[-1,1], is the training sample; W is the plane coefficient, when expanded to n-dimensional space, it is an n-dimensional vector such as: W=[W1,W2,...,Wn], is the transpose of W, ||W|| is the norm of the hyperplane; Since the SVM objective function assumes that the data is linearly separable, but in reality there will be noisy data, slack variables and penalty parameters are added to increase the model tolerance through slack variables:

[0022] in, is the penalty coefficient, is a slack variable, and the penalty term is determined by all outliers. The optimization problem is transformed into a dual problem using the Lagrange multiplier method and KKT conditions, and is solved using the SMO method; is the Lagrange multiplier; the dual problem obtained by mapping the model to a high dimension is:

[0023] The kernel function selected in this article is the Gaussian function: Among them, γ is the width function of the function; Use SVM classifier to analyze whether it is applicable, -1 for yes and 1 for no.

[0024] When Q i ≥Q 0 When , the i-th image is added as an abnormal image to the abnormal image list, and T i Set to the corresponding abnormal time point, Q i Set to the corresponding abnormal assessment value; Since an abnormal image is obtained, the abnormality evaluation period △T is entered at this time 1 , in the abnormal degree evaluation period △T 1 The monitoring is performed using an abnormality evaluation monitoring scheme, wherein the image processing coefficient of the abnormality evaluation monitoring scheme ; The monitoring scheme is evaluated by the abnormality degree in the abnormality degree evaluation period △T 1 We get m1 images U, U=[U 1 , U 2 , U 3 ,…,U m ], where the jth image is U j , get image U j The evaluation value Q j ; According to the basic evaluation value Q 0 Get the evaluation threshold Q of the abnormality evaluation periodmax and Q min , where Q min ≤ln2Q 0 ;Q max ≥2Q 0 -Q min ; When Q j ≥Q max When the image U j Judged as severe abnormality; When Q j ≤Q min When the image U j Judged as normal; When Q min <Q j <Q max When the image U j Judgement of mild abnormality; According to the above judgment results, the abnormality evaluation period △T is obtained 1 The m1 images include c1 severely abnormal images and c2 slightly abnormal images, and the abnormal distribution p of the abnormality evaluation period is obtained. 1 = (c1+ c2) / m1; Among them, set the j1th severely abnormal image U j1 The evaluation value is Q j1 , j2nd slightly abnormal image U j2 The evaluation value is Q j2 ; Set the severe anomaly coefficient ω 1 , mild anomaly coefficient ω 2 , where ω 1 >ω 2 ; Set the evaluation base score W 0 ; Obtain the abnormality evaluation period △T 1 Evaluation score ; When W 1 ≥W 0 When the pantograph network is judged to be abnormally large, an alarm is issued to relevant personnel; When W 1 <W 0 When the time comes, the second assessment period begins; In the second evaluation period △T 2 Monitoring is performed using a secondary assessment scheme, where the image processing coefficient of the secondary assessment scheme is ; The secondary evaluation scheme is used in the secondary evaluation period △T 2 (△T 2 <△T1 ) obtains m2 images, among which the zth image is U z , get image U z The evaluation value Q z ; In the second evaluation period △T 2 The m2 images obtained include d1 severely abnormal images and d2 slightly abnormal images, and the abnormal distribution p of the secondary evaluation period is obtained. 2 = (d1+ d2) / m2; Among them, set the z1th severely abnormal image U z1 The evaluation value is Q z1 , the z2nd slightly abnormal image U z2 The evaluation value is Q z2 ; Obtaining the assessment score for the second assessment period ; When W 2 ≥W 0 When the pantograph network is judged to be abnormally large, an alarm is issued to relevant personnel; When W 2 ≤W 1 When the time comes, restore to normal state for monitoring; When W 1 <W 2 <W 0 When the abnormality is detected, the secondary assessment plan will be cancelled and monitoring will continue based on the abnormality assessment monitoring plan.

[0025] In addition, ultraviolet imaging technology can also be used to obtain images. Since a large amount of ultraviolet light with a wavelength lower than that of visible light (200-400nm) is emitted when the bow-catenary arc is generated, the occurrence of bow-catenary arcing can be determined by detecting the sudden change of ultraviolet data. However, the installation cost of ultraviolet sensors is high, and they are prone to missed detection and false detection of minor electrical faults. Therefore, a method combining ultraviolet imaging and image shooting can also be selected.

[0026] Furthermore, the present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored program, wherein the program executes the method described in the above method embodiment when it is run.

[0027] Furthermore, the present invention also provides an electronic device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to execute the method described in the above method embodiment through the computer program.

[0028] Further, it should be understood that since the setting of each module is only for illustrating the functional units of the device of the present invention, the physical devices corresponding to these modules can be the processor itself, or a part of the software in the processor, a part of the hardware, or a part of the combination of software and hardware. Therefore, the number of each module in the figure is only schematic.

[0029] It is understood by those skilled in the art that all or part of the processes in the method for implementing the above-mentioned embodiments of the present invention can also be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and when the computer program is executed by a processor, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable storage medium may include: any entity or device, medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electric carrier signal, telecommunication signal and software distribution medium, etc., which can carry the computer program code.

[0030] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface network of the computer device, NFC (near field communication) or other technical implementations. The display screen of the computer device may be a liquid crystal display or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a button, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.

[0031] Those skilled in the art will appreciate that the various modules in the device may be adaptively split or merged, and such splitting or merging of specific modules will not cause the technical solution to deviate from the principles of the present invention. Therefore, the technical solutions after splitting or merging will fall within the protection scope of the present invention.

Claims

1. An intelligent safety monitoring system for a railway pantograph network, characterized in that: Including monitoring and judgment module and exception handling module; Wherein, the monitoring and judging module includes a first judging module, a second judging module and a third judging module; The first judgment module monitors the pantograph in a normal state monitoring scheme to obtain a first image, and judges whether the first image is abnormal according to an evaluation value of the first image; When the first image is judged to be abnormal, the second judgment module monitors the pantograph in an abnormality assessment period according to an abnormality assessment monitoring scheme, obtains a second image, judges the abnormality classification of the second image, and judges the abnormality degree of the pantograph in the abnormality assessment period according to the evaluation value and abnormality classification of the second image; When the abnormality level of the pantograph during the abnormality level assessment period reaches the system warning standard, the abnormality processing module triggers the system abnormality warning and the monitoring ends; When the abnormality of the pantograph in the abnormality assessment period does not reach the system warning standard, the third judgment module obtains a third image in the secondary assessment period using a secondary assessment scheme, judges the abnormality classification of the third image, and judges the abnormality of the pantograph in the secondary assessment period according to the assessment value and abnormality classification of the third image; When the abnormality level of the secondary evaluation period reaches the system warning standard, the abnormality handling module triggers the system abnormality warning and the monitoring ends; when the abnormality level of the secondary evaluation period reaches the system normal standard, the first judgment module monitors the pantograph with the normal state monitoring scheme; when the abnormality level of the secondary evaluation period is between normal and warning, the second judgment module continues to monitor the pantograph with the abnormality level assessment monitoring scheme.

2. The intelligent safety monitoring system for railway pantograph network according to claim 1, characterized in that: The abnormality classifications of the second image and the third image include: normal, slightly abnormal, and severely abnormal.

3. The intelligent safety monitoring system for railway pantograph network according to claim 1, characterized in that: The second judgment module judges the abnormality classification according to the evaluation value of the second image, and then obtains the corresponding abnormality classification coefficient and abnormality distribution according to the abnormality classification of the second image, calculates the evaluation score of the abnormality degree evaluation period, and judges the abnormality degree of the pantograph in the abnormality degree evaluation period according to the evaluation score.

4. The intelligent safety monitoring system for railway pantograph network according to claim 1, characterized in that: It also includes an acquisition module, a processing module and an analysis module; wherein the acquisition module is used to acquire images of the pantograph during train operation; the processing module can process the acquired images to obtain key areas for judging the state of the pantograph; the analysis module can analyze the processed images to obtain an evaluation value representing the state of the pantograph.

5. The intelligent safety monitoring system for railway pantograph network according to claim 4, characterized in that: The processing module processes the collected image in the following items: cutting, preprocessing, edge detection and edge extraction.

6. The intelligent safety monitoring system for railway pantograph network according to claim 4, characterized in that: The analysis module uses a deep learning model or a traditional machine vision algorithm to perform data analysis on the image processed by the processing module, thereby obtaining an evaluation value of the image.

7. A monitoring method using the intelligent safety monitoring system of a railway pantograph network according to any one of claims 1 to 6, characterized in that the steps include: S1, set at monitoring time T i Get the i-th image U i , get U i The evaluation value Q i ; According to the basic evaluation value Q0 of the image; When Q i ≥Q0, the image U i If it is judged as an abnormal image, the process goes to step S2; S2, monitor the pantograph with the abnormality assessment monitoring scheme E1 during the abnormality assessment period △T1, and set a total of m1 images U, U=[U1, U2, U3, …, U m1 ], where the jth image is U j , get image U j The evaluation value Q j ; According to the basic evaluation value Q0, the evaluation interval threshold Q of the abnormal degree evaluation period is obtained max and Q min , where Q min ≤ln2Q0;Q max ≥2Q0-Q min ; When Q j ≥Q max When the image U j Judged as severe abnormality; When Q j ≤Q min When the image U j Judged as normal; When Q min <Q j <Q max When the image U j Judgement of mild abnormality; S3, among the m1 images acquired during the abnormality assessment period △T1, including c1 images with severe abnormality and c2 images with mild abnormality, set a severe abnormality coefficient ω1 and a mild abnormality coefficient ω2, wherein ω1>ω2; The abnormal distribution of the abnormal degree evaluation period is obtained as p1 = (c1 + c2) / m1; Among them, set the j1th severely abnormal image U j1 The evaluation value is Q j1 , the j2nd slightly abnormal image U j2 The evaluation value is Q j2 ; Set the evaluation threshold score W0; Obtain the evaluation score of the abnormality evaluation period △T1 ; When W1≥W0, the pantograph is judged to be severely abnormal, the system alarms and intervenes; When W1<W0, go to step S4; S4, monitor the pantograph with the secondary evaluation scheme during the secondary evaluation period △T2, and set the zth image among the m2 images obtained as U z , image U z The evaluation value is Q z ; Set m2 images to include d1 severely abnormal images and d2 slightly abnormal images, and obtain the abnormal distribution p2= (d1+ d2) / m2 during the second evaluation period; Among them, set the z1th severely abnormal image U z1 The evaluation value is Q z1 , the z2nd slightly abnormal image U z2 The evaluation value is Q z2 ; Obtaining the assessment score for the second assessment period ; When W2≥W0, the pantograph is judged to be severely abnormal, the system alarms and intervenes; When W2≤W1, the normal state monitoring scheme is restored; When W1<W2<W0, the secondary assessment plan is cancelled and monitoring is continued with the abnormality assessment monitoring plan.

Citation Information

Patent Citations

  • Pantograph monitoring method and system

    CN104316782A

  • Pantograph state monitoring method and device

    CN110458126A

  • Safety monitoring method and safety monitoring system

    CN112002102A

  • Road landslide early warning method, device, equipment and medium

    CN114973605A

  • Abnormality checking system, abnormality checking method, and program

    CN115700749A