One-time pouring construction method for spherical storage tank foundation column
The one-time pouring construction method for spherical storage tank foundation columns addresses the inefficiencies of multi-stage pouring by integrating reinforcement and sliding steel plates, resulting in reduced construction time, enhanced structural integrity, and improved environmental performance.
Patent Information
- Application Number
- CN202411335180.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-03
AI Technical Summary
The existing construction method for spherical storage tank foundation columns involves multiple stages of pouring and anchor bolt embedding, leading to prolonged construction periods, compromised structural integrity due to temperature differences, increased complexity, and environmental impact.
A one-time pouring construction method that integrates column reinforcement, fixed steel sections, and sliding steel plates to ensure secure anchor bolt placement, eliminating the need for secondary pouring and simplifying the process.
This method reduces construction time, enhances structural integrity, minimizes environmental impact, and improves the overall strength and stability of the foundation column.
Smart Images

Figure FT_1 
Figure FT_2
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering construction, in particular to a one-time pouring construction method for a spherical storage tank foundation column. Background Art
[0002] At present, secondary pouring is commonly used in the construction of spherical storage tank foundation columns in my country, which means pouring concrete twice for the foundation column part and the reserved holes for anchor bolts. In short, before pouring the foundation column concrete, a reserved hole for pouring the anchor bolts is reserved through a mold (the mold is generally made of wood board). After the foundation column concrete reaches the design strength after one pouring, the anchor bolts are buried in the reserved holes for secondary pouring. The specific procedures are as follows: positioning, measuring and laying out → earth excavation → trench inspection → cushion construction → foundation laying out → foundation steel bar binding → foundation formwork support → foundation concrete pouring → foundation demolding → column reinforcement binding → installation of anchor bolt reserved hole mold → placement of sliding steel plate → column support mold → column pouring concrete → removal of anchor bolt reserved hole mold and outer mold → cleaning of anchor bolt reserved hole → installation and adjustment of anchor bolts → anchor bolt pouring concrete → earth backfilling.
[0003] Such a process has the following shortcomings: 1. The construction period is long. The construction process needs to be poured and maintained in stages, and after the anchor bolts are buried, it is necessary to wait for the concrete strength to reach the requirements; 2. The overall strength of the foundation and the tensile strength of the anchor bolts are greatly affected by the secondary pouring process (secondary pouring will affect the quality of the joint surface between the original concrete and the newly poured concrete. The temperature of the new and old concrete is different. This temperature difference is likely to cause cracks, which will reduce the bearing capacity and overall strength of the concrete; if the maintenance conditions after the secondary pouring are not appropriate, such as improper control of temperature and humidity, it will affect the hardening process of the concrete, thereby affecting its mechanical properties; during the construction process, if the secondary pouring process is improperly controlled, such as insufficient vibration and poor pouring quality, it will directly affect the bonding quality and overall strength of the new and old concrete); 3. The column reinforcement is subject to a large load from the steel plate. During the pouring of concrete, the sliding steel plate is prone to displacement on the steel bars tied below (hereinafter referred to as column reinforcement); 4. The process is complicated, and the anchor bolt positioning adjustment must be repeated when reserving anchor bolt holes and embedding anchor bolts. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and propose a one-time casting construction method for a spherical storage tank foundation column. Only one-time column casting is required, and there is no need for special casting of anchor bolts, which reduces the casting construction process and construction period, enhances the overall strength of the foundation column, and reduces the influence of the tensile strength of the anchor bolts.
[0005] The object of the present invention is achieved through the following technical scheme: a one-time pouring construction method for a spherical storage tank foundation column, comprising the following steps: S1. Install column reinforcement on the foundation column pier; S2. Install multiple fixed steel sections on the foundation column piers; S3. Install the mold around the foundation column pier; S4, install the sliding steel plate; S5. Install the anchor bolts; S6, pouring concrete into the column; S7, after the column concrete is formed, the column formwork is removed; S8. Backfill the earth.
[0006] In step S3, it also includes adjusting the upper elevation of the fixed steel support to the design requirements.
[0007] In step S4, it also includes adjusting the positioning size of the sliding steel plate.
[0008] In step S5, the anchor bolts are inserted into the reserved holes of the sliding steel plate, and auxiliary nuts are put on the anchor bolts. After the anchor bolts are adjusted to the designed height, the auxiliary nuts are spot-welded to the sliding steel plate.
[0009] In step S5, the verticality of the anchor bolts is also adjusted.
[0010] After step S6 is completed, the auxiliary nut is removed.
[0011] The horizontal elevation on the fixed steel support is determined by a level instrument, and then the horizontal elevation is made to meet the design requirements by trimming the length of the fixed steel support.
[0012] When the sliding steel plate is adjusted to the design requirements, multiple horizontal supporting steel bars are embedded around the sliding steel plate.
[0013] The beneficial effect of the present invention is that by adding fixed steel and horizontal supporting steel bars on the sliding steel plate, the tightness of the connection between the embedded anchor bolts and the foundation column is ensured, thereby ensuring that the foundation column and the bolts can reach the designed strength after pouring and curing. The present invention realizes the one-time pouring of the anchor bolts and has the following advantages: (1) Shorten construction period: Only one-time arrangement and management of the construction process such as concrete pouring and anchor bolt embedding is required, which reduces the complexity of project management and human resource investment.
[0014] (2) Reduce engineering risks: One-time pouring reduces engineering interface problems and risks caused by phased construction, and improves the stability and safety of the overall construction.
[0015] (3) Reduce cost expenditure: Single construction can reduce repeated investment in manpower, equipment and materials, thereby saving construction costs.
[0016] (4) Improving structural integrity: One-time pouring can ensure good bonding between concrete pouring layers and improve the integrity and stability of the anchor bolts and column structure.
[0017] (5) Reduce construction noise and pollution: Reduce construction site noise and environmental pollution caused by multiple construction projects, which is conducive to reducing the impact on the surrounding environment and residents.
[0018] (6) Simplified quality inspection: One-time pouring simplifies the quality inspection and acceptance process of concrete. It is easy to adjust, and the adjustment of fixed steel and horizontal support steel bars is more convenient. Only one comprehensive quality control is required, avoiding displacement and stirring.
[0019] (7) Reduce concrete temperature cracks: Avoid concrete shrinkage cracks caused by temperature changes during segmented pouring, and improve the durability and crack resistance of the structure.
[0020] (8) Improve construction efficiency: The elevation of the sliding steel plate can be determined by simply adjusting the elevation of the vertical support angle steel. Compared with the secondary casting method of adjusting the elevation of the sliding steel plate by hoisting, the one-time casting only needs to adjust the elevation of the vertical support angle steel to determine the elevation of the sliding steel plate, which greatly reduces the construction difficulty.
[0021] (9) Better overall structural stability: One-time pouring can avoid structural unevenness and deformation problems caused by multiple segmented construction, thereby improving the stability and bearing capacity of the overall structure.
[0022] (10) Improve the overall strength of the foundation column: The strength of the steel-concrete structure after forming is improved due to the support of the supporting steel. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a vertical view of the present invention; Figure 2 It is a plan view of the present invention; Figure numerals: 1. Sliding steel plate; 2. Column binding reinforcement; 3. Anchor bolt; 4. Shear plate; 5. Horizontal supporting steel bar; 6. Fixed steel; 7. Air vent; 8. Basic pier; 9. Mould. DETAILED DESCRIPTION
[0024] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0025] It is to be noted that the concepts of directions “left”, “right”, “up”, “down”, “front”, “back”, “inside” and “outside” in the following schemes are all relative directions and will not be listed one by one here.
[0026] A one-time pouring construction method for spherical tank foundation column, reference Figure 1 and Figure 2 The specific process flow is as follows: install column reinforcement 2 and four fixed steels 6 on the foundation pier 8; install molds on the sides of the foundation pier 8; determine the horizontal elevation of the four fixed steels 6 by using a level, and then trim the length of the fixed steels 6 to make the horizontal elevation meet the design requirements so that the elevation of the facade steel support meets the design requirements (the upper end elevation of the fixed steel 6 support + the thickness of the sliding steel plate 1 = the upper surface design elevation of the sliding steel plate 1); then install the sliding steel plate 1, and accurately adjust its positioning size. When the sliding steel plate 1 is adjusted to the design After the requirements are met, eight horizontal support steel bars 5 are pre-buried around the sliding steel plate 1 to further increase the stability of the sliding steel plate; and the anchor bolts 3 are inserted into the reserved holes of the sliding steel plate 1, and the auxiliary nuts are put on the anchor bolts 3. After adjusting the anchor bolts 3 to the designed height, the verticality of the anchor bolts 3 is carefully adjusted using a level and a plumb bob until it is qualified, and the auxiliary nuts are spot-welded to the sliding steel plate 1 (to prevent the anchor bolts 3 from shifting twice during the pouring process), thereby completing the installation of the anchor bolts 3 (first adjust the verticality, and ensure that the anchor bolts are fixed by spot welding). After completing these steps, the column is poured with concrete. After the column is poured with concrete, the auxiliary nuts are removed, and the column is demoulded after the column concrete is formed, and finally the earthwork is backfilled.
[0027] A plurality of shear plates 4 are arranged on the sliding steel plate 1 , and two air holes are opened on the sliding steel plate 1 .
[0028] The basic pier 8 is made by using a very common basic pier 8 construction method in this field. In this embodiment, the basic pier 8 construction process is advanced positioning measurement and layout to determine the precise position for subsequent construction. Then the earth excavation is carried out, and the trench is inspected after completion to ensure that the base meets the requirements. Then the cushion layer construction is carried out to provide a good bearing surface for the foundation. After the foundation is laid out, the foundation steel bar binding and foundation formwork support are carried out in turn, followed by the foundation concrete pouring. After the foundation concrete reaches a certain strength, the foundation formwork is removed to obtain the basic pier 8.
[0029] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above description or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.
Claims
1. A one-time pouring construction method for a spherical storage tank foundation column, characterized in that: The following steps are involved: S1. Install column reinforcement on the foundation column pier; S2. Install multiple fixed steel sections on the foundation column piers; S3. Install the mold around the foundation column pier; S4, install the sliding steel plate; S5. Install the anchor bolts; S6, pouring concrete into the column; S7, after the column concrete is formed, the column formwork is removed; S8. Backfill the earth.
2. A one-time pouring construction method for a spherical storage tank foundation column according to claim 1, characterized in that: In step S3, it also includes adjusting the upper elevation of the fixed steel support to the design requirements.
3. A one-time pouring construction method for a spherical storage tank foundation column according to claim 1, characterized in that: In step S4, it also includes adjusting the positioning size of the sliding steel plate.
4. A one-time pouring construction method for a spherical storage tank foundation column according to claim 1, characterized in that: In step S5, the anchor bolts are inserted into the reserved holes of the sliding steel plate, and auxiliary nuts are put on the anchor bolts. After the anchor bolts are adjusted to the designed height, the auxiliary nuts are spot-welded to the sliding steel plate.
5. A one-time pouring construction method for a spherical storage tank foundation column according to claim 1 or 4, characterized in that: In step S5, the verticality of the anchor bolts is also adjusted.
6. A one-time pouring construction method for a spherical storage tank foundation column according to claim 4, characterized in that: After step S6 is completed, the auxiliary nut is removed.
7. A one-time pouring construction method for a spherical storage tank foundation column according to claim 2, characterized in that: The horizontal elevation on the fixed steel support is determined by a level instrument, and then the horizontal elevation is made to meet the design requirements by trimming the length of the fixed steel support.
8. A one-time pouring construction method for a spherical storage tank foundation column according to claim 3, characterized in that: When the sliding steel plate is adjusted to the design requirements, multiple horizontal supporting steel bars are embedded around the sliding steel plate.