Resource processing method and device based on risk control, equipment and storage medium
By obtaining risk control conditions in the resource investment platform, displaying the resource combination investment page and dividing the investment amount, the problem of single resource investment methods in the existing technology is solved, diversified resource investment under risk control is achieved, and resource investment is improved. Freedom.
Patent Information
- Application Number
- CN202411063092.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-12-03
Smart Images

Figure CN119067782A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of Internet technology, specifically to the field of computer technology, and in particular to a resource processing method, device, equipment and storage medium based on risk control. Background Art
[0002] In the existing resource investment platform, resource investment is usually processed in a regularized restriction method based on the risk level of the object (i.e., the user); the processing logic is roughly as follows: based on the risk level of the object, an access threshold is set for the object in the resource investment link, and the object is prohibited from processing resource investment for resource investment products that exceed its risk level. It can be seen that such resource processing logic is relatively extensive, resulting in the object being able to only make electronic resource investments in a single resource investment product that is lower than or equal to its own risk level each time, and cannot meet the object's resource investment demands for resource investment products that are higher than its own risk level. Its resource investment method is relatively single and has great resource investment limitations. Summary of the invention
[0003] The embodiments of the present application provide a risk control-based resource processing method, device, equipment and storage medium, which can achieve risk control while meeting the resource investment demands of the object, enrich the resource investment methods, and thus improve the freedom of resource investment.
[0004] On the one hand, an embodiment of the present application provides a resource processing method based on risk control, the method comprising:
[0005] Obtain a resource investment trigger operation for the first resource investment product;
[0006] If the resource investment risk of the first resource investment product meets the risk control condition, in response to the resource investment trigger operation, a resource portfolio investment page of the target product portfolio is displayed; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product;
[0007] Displaying the total amount of resource investment configured for the target object on the resource combination investment page, and dividing the total amount of resource investment into a first resource investment amount and a second resource investment amount;
[0008] In response to the resource investment confirmation operation, electronic resource investment is performed on the first resource investment product based on the first resource investment amount, and electronic resource investment is performed on the second resource investment product based on the second resource investment amount.
[0009] On the other hand, an embodiment of the present application provides a resource processing device based on risk control, the device comprising:
[0010] An acquisition unit, configured to acquire a resource investment trigger operation for a first resource investment product;
[0011] a processing unit, configured to, if the resource investment risk of the first resource investment product meets the risk control condition, respond to the resource investment trigger operation and display a resource portfolio investment page of a target product portfolio; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product;
[0012] The processing unit is further configured to display the total resource investment amount configured for the target object in the resource combination investment page, and divide the total resource investment amount into a first resource investment amount and a second resource investment amount;
[0013] The processing unit is further configured to respond to a resource investment confirmation operation, make an electronic resource investment in the first resource investment product based on the first resource investment amount, and make an electronic resource investment in the second resource investment product based on the second resource investment amount.
[0014] In another aspect, an embodiment of the present application provides a computer device, the computer device comprising an input interface and an output interface, the computer device further comprising:
[0015] processor and computer storage media;
[0016] The processor is suitable for implementing one or more instructions, the computer storage medium stores one or more instructions, and the one or more instructions are suitable for being loaded by the processor and executing the above-mentioned risk control-based resource processing method.
[0017] On the other hand, an embodiment of the present application provides a computer storage medium, which stores one or more instructions, and the one or more instructions are suitable for being loaded by a processor and executing the above-mentioned risk control-based resource processing method.
[0018] On the other hand, an embodiment of the present application provides a computer program product, which includes one or more instructions; when one or more instructions in the computer program product are executed by a processor, the above-mentioned risk control-based resource processing method is implemented.
[0019] In an embodiment of the present application, when the resource investment risk of the first resource investment product in which the target object intends to make electronic resource investment meets the risk control condition, the first resource investment product and the second resource investment product can be combined to obtain a target product combination, and a resource combination investment page of the target product combination can be displayed, so that after the target object configures the total resource investment amount in the resource combination investment page, the total resource investment amount can be divided into a first resource investment amount and a second resource investment amount, so that electronic resource investment is made in the first resource investment product based on the first resource investment amount to meet the resource investment demand of the target object (i.e., the demand for electronic resource investment in the first resource investment product), and electronic resource investment is made in the second resource investment product based on the second resource investment amount to achieve risk control and enrich the resource investment methods, so that the object is no longer limited to only being able to make electronic resource investments in some resource investment products, thereby improving the freedom of resource investment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0021] Figure 1a is a system architecture diagram of a resource processing system provided in an embodiment of the present application;
[0022] Figure 1b It is a schematic diagram of the principle of a resource processing method based on risk control provided in an embodiment of the present application;
[0023] Figure 2 It is a flowchart of a resource processing method based on risk control provided in an embodiment of the present application;
[0024] Figure 3a It is a schematic diagram showing a product portfolio entry and risk warning provided by an embodiment of the present application;
[0025] Figure 3b This is a schematic diagram of displaying product prompt information provided by an embodiment of the present application;
[0026] Figure 3c is another schematic diagram of displaying product prompt information provided by an embodiment of the present application;
[0027] Figure 3d is a schematic diagram of a ratio adjustment provided in an embodiment of the present application;
[0028] Figure 3e is a schematic diagram of another ratio adjustment provided in an embodiment of the present application;
[0029] Figure 3f is a schematic diagram showing a risk enhancement prompt provided in an embodiment of the present application;
[0030] Figure 3g is a schematic diagram of an output ratio adjustment prompt provided in an embodiment of the present application;
[0031] Figure 3h It is a schematic diagram showing the total amount of resource input provided by an embodiment of the present application;
[0032] Figure 3i This is a schematic diagram of displaying payment prompt information provided by an embodiment of the present application;
[0033] Figure 3j is a schematic diagram of a resource extraction process provided in an embodiment of the present application;
[0034] Figure 4a It is a structural diagram of a resource processing system provided in an embodiment of the present application;
[0035] Figure 4b It is a schematic diagram of a workflow of a resource processing system provided in an embodiment of the present application;
[0036] Figure 5a This is a schematic diagram of a workflow of an object risk assessment module provided in an embodiment of the present application;
[0037] Figure 5b It is a schematic diagram of a workflow of a combination optimization module provided in an embodiment of the present application;
[0038] Figure 5c This is a schematic diagram of the workflow of a front-end display module provided in an embodiment of the present application;
[0039] Figure 5d It is a workflow diagram of a transaction execution module provided in an embodiment of the present application;
[0040] Figure 6 It is a structural diagram of a resource processing device based on risk control provided in an embodiment of the present application;
[0041] Figure 7 It is a structural diagram of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.
[0043] The embodiment of the present application proposes a resource processing method based on risk control and a corresponding resource processing system to better provide resource investment services (such as investment services) related to resource investment products. The resource processing system may at least include: a terminal device with a human-computer interaction function (hereinafter referred to as a terminal); optionally, the resource processing system may also include a server, and the server and the terminal may communicate through any network, such as Figure 1a As shown. Among them, the terminal mentioned here can be a smart phone, a computer (such as a tablet computer, a laptop computer, a desktop computer, etc.), a smart wearable device (such as a smart watch, smart glasses), an intelligent voice interaction device, a smart home appliance (such as a smart TV), a vehicle terminal or an aircraft, etc.; the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content Delivery Network), and big data and artificial intelligence platforms, etc. Further, the terminal and the server can be located inside or outside the blockchain network, without limitation; further, the terminal and the server can also upload any data stored inside to the blockchain network for storage to prevent the data stored inside from being tampered with and improve data security.
[0044] In a specific implementation, the resource processing system proposed in the embodiment of the present application can use a resource processing method based on risk control. When the resource investment risk of the first resource investment product that the target object (any user) intends to invest electronic resources in meets the risk control conditions, the first resource investment product and the second resource investment product are combined to obtain a target product combination, and a resource combination investment page of the target product combination is displayed, so that after the target object configures the total resource investment amount in the resource combination investment page, the total resource investment amount can be divided into a first resource investment amount and a second resource investment amount, thereby investing the first resource investment amount of electronic resources into the first resource investment product, and investing the second resource investment amount of electronic resources into the second resource investment product, such as Figure 1b As shown. In which, investing electronic resources into any resource investment product can be understood as: using the electronic resources in the resource account of the object to purchase (ie, purchase or obtain) the resource investment product.
[0045] It can be seen that the resource processing system proposed in the embodiment of the present application uses a resource processing method based on risk control. When the resource investment risk of the first resource investment product that the target object intends to invest electronic resources in meets the risk control conditions, the electronic resource investment can be realized for multiple resource investment products such as the first resource investment product intended by the target object and the additionally introduced second resource product through product combination and total resource investment division, thereby enriching the resource investment methods. In this way, while achieving risk control, the resource investment demands of the target object (i.e., the demand for electronic resource investment in the first resource investment product) can be met, so that the target object is no longer limited to electronic resource investment in only some resource investment products, thereby improving the freedom of resource investment.
[0046] For example, object A (user A) is an object who is interested in resource investment products but has limited tolerance for resource investment risks. When browsing resource investment products on the resource investment APP (Application), he sees that a resource investment product A has an eye-catching recent performance, with an annualized rate of return of up to 30%. Object A is very excited about this and decides to try to invest 10,000 electronic resources in this resource investment product A. However, when object A performs a resource investment trigger operation on the resource investment product A, the resource processing system finds that the resource investment risk of the resource investment product A is high, which exceeds the tolerance of the resource investment risk of object A. At this time, it can be considered that the resource investment risk of resource investment product A meets the risk control conditions, and thus recommends a personalized resource investment combination plan for object A: for the total resource investment of 10,000, 30% of the total resource investment is allocated to resource investment product A, and the remaining 70% is allocated to resource investment product B with a lower resource investment risk, so as to achieve the effect of risk dilution.
[0047] Based on the resource investment combination scheme, the resource processing system can combine resource investment product A and resource investment product B in a ratio of 3:7 to obtain a product combination, and can calculate that the expected annualized return of the corresponding product combination is 10%, and the resource investment risk is within 15%, which matches the risk tolerance of object A. Object A is satisfied with this resource investment combination scheme and product combination, enters the total resource investment amount of 10,000 and performs the resource investment confirmation operation to confirm the completion of resource investment; at this time, the resource processing system can divide 10,000 into the first resource investment amount of 3,000 and the second resource investment amount of 7,000 according to 3:7, thereby investing 3,000 electronic resources in resource investment product A and 7,000 electronic resources in resource investment product B. It can be seen that through the intelligent risk control of the system, object A can enjoy high-yield resource investment while limiting the overall risk exposure within an acceptable range, realizing personalized investment needs.
[0048] It is worth emphasizing that in the specific implementation of the virtual-real combined resource processing method embodiment proposed in the embodiment of the present application, relevant data such as user information (such as the total amount of resource input configured for the object, any operation performed by the object, etc.) is involved. When the above method embodiment is applied to a specific product or technology, these relevant data are collected with the user's permission or consent, and the collection, use and processing of the relevant data comply with the relevant laws, regulations and standards of the relevant regions.
[0049] Based on the above description, the following takes the terminal in the resource processing system as an example of the execution subject, and combines Figure 2 The method flow chart shown in the figure illustrates the specific implementation process of the resource processing method based on risk control proposed in the embodiment of the present application. Figure 2 As shown, the resource processing method based on risk control proposed in the embodiment of the present application may at least include the following steps S201-S204:
[0050] S201, obtaining a resource investment trigger operation for a first resource investment product.
[0051] Among them, the first resource investment product refers to the resource investment product that the target object (any object) wants to invest electronic resources in, that is, the resource investment product selected by the target object for electronic resource investment. The resource investment product can be called a resource investment object or a resource investment target (referred to as an investment target); it is a product that can support an object (i.e., a user) to use electronic resources for subscription (i.e., purchase or acquisition) and may bring benefits to the corresponding object. The benefits mentioned here can be understood as an increase in electronic resources, and electronic resources refer to resources that exist in electronic form. Exemplarily, the resource investment products mentioned in the embodiments of the present application can be, for example, financial products such as stock funds, money funds (Monetary Fund), futures, etc.; the so-called money fund is a fund variety with low resource investment risk and high liquidity, which mainly invests in short-term money market instruments.
[0052] In actual applications, the target object can open the product introduction page of the first resource investment product. The so-called product introduction page can also be called the product purchase page, which may include the introduction information of the first resource investment product (i.e., product description information), such as product identification (such as product code, product name, etc.), price fluctuation data, unit net value and other information. The unit net value mentioned here is the basis for subscribing and redeeming resource investment products, which specifically refers to: the total assets of the resource investment product minus the total liabilities, and then divided by the total number of product shares. Further, the target object can view the introduction information of the first resource investment product in the product introduction page, so as to decide whether to make electronic resource investment in it; when the target object wants to make electronic resource investment in the first resource investment product, it can enter the resource investment trigger operation for the first resource investment product.
[0053] It can be seen that in this case, the terminal can obtain a resource investment trigger operation for the first resource investment product by displaying the product introduction page of the first resource investment product and during the display of the product introduction page. The resource investment trigger operation mentioned here may include but is not limited to any of the following: a trigger operation (such as a click operation, a press operation, etc.) on a specified element (such as a buy button, a blank position, etc.) in the product introduction page, an operation of inputting a voice command or gesture for triggering electronic resource investment in the first resource investment product, and so on.
[0054] It is understandable that the above is only an example of the time point for obtaining the resource investment trigger operation for the first resource investment product, and it is not limited to this. For example, in other embodiments, the terminal can also obtain the resource investment trigger operation for the first resource investment product in the screen-off state (that is, the display screen is off) or in the process of displaying any other page. In this case, the resource investment trigger operation can be an operation of inputting a voice command or gesture for triggering electronic resource investment in the first resource investment product, etc.
[0055] S202: If the resource investment risk of the first resource investment product meets the risk control condition, respond to the resource investment trigger operation and display the resource portfolio investment page of the target product portfolio.
[0056] In a specific implementation, the terminal obtains the resource investment trigger operation of the first resource investment product through step S201, and can determine whether the resource investment risk of the first resource investment product meets the risk control condition. Wherein: (1) The risk control condition can be any of the following: ① The resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object; ② The resource investment risk of the first resource investment product is higher than the preset resource investment risk; ③ The resource investment risk of the first resource investment product is lower than the resource investment risk preferred by the target object; ④ The resource investment risk of the first resource investment product is lower than the preset resource investment risk. (2) The resource investment risk mentioned here may include at least one of the following: resource risk level and resource loss rate. The so-called resource risk level refers to the level divided by the risk of the resource investment product, such as R1 (low risk), R2 (medium-low risk), R3 (medium risk), R4 (medium-high risk), R5 (high risk), and so on. The so-called resource loss rate can also be called the maximum drawdown (MDD), which is used to indicate the maximum loss of a resource input product within a certain time range (i.e., the maximum drop from the highest point to the lowest point). For example, in the past week, the unit net value of a resource input product rose to 2.2 (i.e., the highest point) and fell to 1.2 (i.e., the lowest point). Then the resource loss rate (i.e., the maximum drawdown) of the resource input product is equal to (2.2-1.2) / 2.2×100%=45.5%. (3) The resource investment risk preferred by the target object can be set by the target object itself or calculated through a questionnaire survey, which is not limited to this.
[0057] If the resource investment risk of the first resource investment product does not meet the risk control conditions, the resource investment trigger operation can be responded to to display the resource investment page of the first resource investment product (i.e., the page that supports the target object to configure the total resource investment amount for the first resource investment product), so that the target object can configure the total resource investment amount in the resource investment page of the first resource investment product. If the resource investment risk of the first resource investment product meets the risk control conditions, the resource investment trigger operation can be responded to to display the resource combination investment page of the target product combination (i.e., the page that supports the target object to configure the total resource investment amount for the target product combination). The total resource investment amount mentioned here refers to: the total number of electronic resources that the target object wants to use when purchasing the resource investment product (i.e., when making electronic resource investment); for example, if the target object wants to use 1,000 electronic resources to purchase the resource investment product, the total resource investment amount is 1,000.
[0058] The target product portfolio includes a first resource input product and a second resource input product, and the second resource input product has a different resource input risk from the first resource input product, that is, the second resource input product is a resource input product with a different resource input risk from the first resource input product. It is understandable that;
[0059] When the risk control condition is the first or second type mentioned above, if the resource investment risk of the first resource investment product meets the risk control condition, then the first resource investment product can be considered to be a high-risk resource investment product. In this case, a resource investment product with a lower resource investment risk than the first resource investment product can be selected as the second resource investment product to be combined with the first resource investment product to obtain a target product combination, so that the resource investment risk of the first resource investment product can be diluted by the second resource investment product in the future, thereby achieving risk control and avoiding more losses of the target object's electronic resources; that is, in this case, the resource investment risk of the second resource investment product in the target product combination is lower than the resource investment risk of the first resource investment product. Optionally, in order to achieve that the overall resource investment risk after the combination is lower than the resource investment risk preferred by the target object, the resource investment risk of the second resource investment product can be further constrained to be lower than the resource investment risk preferred by the target object.
[0060] When the risk control condition is the third or fourth type mentioned above, if the resource input risk of the first resource input product meets the risk control condition, then the first resource input product can be considered to be a low-risk resource input product. In this case, considering that the expected return generated by the resource input product is usually positively correlated with the resource input risk (that is, the higher the resource input risk, the higher the expected return), a resource input product with a higher resource input risk than the first resource input product can be selected as the second resource input product to be combined with the first resource input product to obtain the target product combination, so that the overall expected return can be improved through the second resource input product in the future; that is to say, the resource input risk of the second resource input product in the target product combination in this case is higher than the resource input risk of the first resource input product. Optionally, in order to ensure that the overall resource input risk after the combination is lower than the resource input risk preferred by the target object, the resource input risk of the second resource input product can be further constrained to be lower than the resource input risk preferred by the target object.
[0061] Based on the above description, the following describes the specific implementation of the terminal responding to the resource investment trigger operation and displaying the resource portfolio investment page of the target product portfolio:
[0062] In a specific implementation, when the terminal responds to the resource investment trigger operation and displays the resource portfolio investment page of the target product portfolio, the terminal can respond to the resource investment trigger operation and directly display the resource portfolio investment page of the target product portfolio. For example, if the resource investment trigger operation is obtained during the display process of the product introduction page of the first resource investment product, the terminal can respond to the resource investment trigger operation and switch the display from the product introduction page to the resource portfolio investment page of the target product portfolio, or overlay the product prompt page on the product introduction page.
[0063] In another specific implementation, when the risk control condition is the aforementioned first condition, that is, when the risk control condition includes: the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object, the terminal can also respond to the resource investment trigger operation and output the product combination entry when displaying the resource combination investment page of the target product combination, so that the target object can decide whether to make a product combination based on its own needs. If it is determined to make a product combination, a trigger operation (such as a click operation or a press operation) can be performed on the product combination entry. At this time, the terminal can respond to the trigger operation on the product combination entry, determine the target product combination, and display the resource combination investment page of the target product combination. It can be seen that this method can support the target object to freely choose whether to make a product combination for electronic resource investment, which can increase the freedom of the target object to make electronic resource investment; it is understandable that when the risk control condition is the aforementioned second to fourth conditions, this method is also applicable. Among them:
[0064] (1) As an optional implementation, when outputting the product combination entrance, the terminal may also synchronously output risk warning information, and the risk warning information is used to prompt that the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object. The risk warning information may include: the resource investment risk of the first resource investment product, and the resource investment risk of the target object; or, the risk warning information may also be a text composed of multiple characters, such as "The resource investment risk of this product is higher than the resource investment risk you prefer". It can be seen that by synchronously outputting the product combination entrance and the risk warning information, the target object can fully understand that the resource investment risk of the first resource investment product exceeds the resource investment risk it can bear. This can effectively promote the target object to perform a trigger operation on the product combination entrance, thereby realizing the combination of the first resource investment product and the second resource investment product, reducing the overall resource investment risk through the electronic resource investment of the product combination, and improving the feasibility of the entire plan.
[0065] It is understandable that the embodiment of the present application does not limit the output method of the product combination entrance and risk warning information. For example, if the resource investment trigger operation is obtained during the display process of the product introduction page of the first resource investment product, the terminal outputs the product combination entrance and risk warning information in the following manner: output a risk warning window 30 on the product introduction page, and display the product combination entrance 301 and risk warning 302 in the risk warning window 30, such as Figure 3a Alternatively, the terminal may output a risk warning page (such as switching from a product introduction page to a risk warning page, or overlaying a risk warning page on a product warning page), and display a product portfolio entry and risk warning 302 on the risk warning page. Optionally, the terminal may also display a product viewing entry (such as a product viewer) in a risk warning window or risk warning page. Figure 3a The target object can perform a trigger operation on the product viewing entrance, so that the terminal responds to the trigger operation and outputs various resource investment products that are compatible with the resource investment risks preferred by the target object (that is, resource investment products whose resource investment risks are lower than the resource investment risks preferred by the target object), thereby allowing the target object to make electronic resource investments in at least one compatible resource investment product.
[0066] (2) In response to the trigger operation on the product combination entry, the specific implementation method of determining the target product combination can be any of the following:
[0067] Implementation method 1: In response to a trigger operation on a product combination entry, a preset resource input product is directly obtained as a second resource input product, and the first resource input product and the second resource input product are combined according to a first combination ratio to obtain a target product combination. The first combination ratio may be a combination ratio pre-set based on business requirements or experience values, or a combination ratio dynamically calculated based on a series of calculations, and this is not limited.
[0068] The so-called combination ratio refers to information that can be used to indicate the configuration ratio of each resource input product in the product combination. The configuration ratio refers to the proportion of the corresponding resource input product in the product combination (that is, the proportion of the resource input amount corresponding to the resource input product in the total resource input amount corresponding to the product combination); for example, if the total resource input amount corresponding to the product combination is 10,000, and the resource input amount corresponding to a resource input product in the product combination is 8,000, it can be indicated that the configuration ratio of the resource input product is 8,000 / 10,000×100%=80%. It can be understood that the combination ratio mentioned in the embodiment of the present application can specifically be a set composed of the configuration ratios of each resource input product in the product combination, so as to indicate the configuration ratio of each resource input product; or, the combination ratio can also be the ratio between the resource input amounts of each resource input product in the product combination, so as to indicate the configuration ratio of each resource input product. For example, the resource input amounts of the two resource input products in the product combination are 4000 and 6000 respectively, then the combination ratio can be 4000:6000=4:6. In this case, the configuration ratios of the two resource input products can be calculated based on the combination ratio to be 40% and 60% respectively.
[0069] The calculation method of the first combination ratio may be: the configuration ratio of the first resource input product is expressed as an unknown number (set as x), and the configuration ratio of the second resource input product is expressed as the difference between a reference value (such as value 1) and an unknown number (set as 1-x); the configuration ratio of the first resource input product and the configuration ratio of the second resource input product are used to perform weighted summation on the resource input risks of the corresponding resource input products (i.e., the resource input risk of the first resource input product (set as a) and the resource input risk of the second resource input product (set as b)), and obtain an expression of the resource input risk of the product combination (i.e., ax+b(1-x)); according to the principle that the resource input risk of the product combination is not greater than the resource input risk preferred by the target object (set as c), an inequality is constructed using the expression and the resource input risk preferred by the target object (i.e., ax+b(1-x)≤c); the maximum value of the unknown number is solved based on the inequality, the maximum value of the unknown number is used as the configuration ratio of the first resource input product, and the configuration ratio of the second resource input product is determined based on the reference value and the maximum value of the unknown number; the first combination ratio is calculated based on the configuration ratio of the first resource input product and the configuration ratio of the second resource input product. In this way, it can be ensured that the resource investment risk of the first product combination formed based on the first combination ratio does not exceed the resource investment risk preferred by the target object, thereby improving the reliability and security of electronic resource investment.
[0070] Alternatively, the calculation method of the first combination ratio can be: obtain the risk impact of the first resource input product on the product portfolio (set as A1), and the risk impact of the second resource input product on the product portfolio (set as A2); the risk impact of any resource input product on the product portfolio can be calculated based on at least one parameter such as the variance, beta coefficient and Sharpe ratio of the corresponding resource input product, the variance is used to measure the volatility of the return rate of the resource input product, the beta coefficient is used to measure the systematic risk of the resource input product to the market, and the Sharpe ratio is used to measure the excess return brought by each unit of risk. Further, the allocation ratio of the first resource input product is represented as an unknown number (set as x), and the allocation ratio of the second resource input product is represented as the difference between the benchmark value (such as value 1) and the unknown number (set as 1-x); and the allocation ratio of the first resource input product and the corresponding risk impact are respectively used to determine the risk contribution of the first resource input product (A1×x), and the allocation ratio of the second resource input product and the corresponding risk impact are used to determine the risk contribution of the second resource input product (A2×(1-x)). Let the risk contribution of the first resource input product (A1×x) be equal to the risk contribution of the second resource input product (A2×(1-x)), and obtain the equation (i.e., A1×x=A2×(1-x)); solve the value of the unknown number based on the equation, use the value of the unknown number as the configuration ratio of the first resource input product, and determine the configuration ratio of the second resource input product based on the benchmark value and the value of the unknown number; calculate the first combination ratio based on the configuration ratio of the first resource input product and the configuration ratio of the second resource input product. In this way, the risk contribution of the first resource input product and the second resource input product in the product portfolio can be the same, so that the risk hedging effect of each resource input product can be fully utilized to obtain a more stable investment effect.
[0071] Alternatively, the first combination ratio can be calculated by using a machine learning model to predict the combination ratio based on the resource input risk of the first resource input product and the resource input risk of the second resource input product to obtain the first combination ratio. In this way, it is possible to use machine learning algorithms (such as reinforcement learning, genetic algorithms, etc.) to automatically discover and learn the optimal investment portfolio strategy from massive historical data. This method does not rely on preset risk management rules, but allows the algorithm to explore and optimize autonomously, so that it can fully explore the complex patterns contained in the data and adaptively adjust the strategy according to market changes.
[0072] Implementation method 2: respond to a trigger operation on a product combination entry, and display product prompt information; wherein the product prompt information is used to prompt: combine the first resource input product and the second resource input product based on the first combination ratio. Detect a confirmation operation on the product prompt information. If a confirmation operation on the product prompt information is detected, the target product combination can be determined in response to the confirmation operation on the product prompt information. It can be seen that when the terminal obtains the trigger operation on the product combination entry by the target object, it triggers the determination of the target product combination by outputting product prompt information and responding to the confirmation operation on the product prompt information. The target object can first fully understand the combination of the target product combination (such as the combination ratio and the specific selection of the second resource input product in the combination) based on the product prompt information, and then decide whether to accept the target product combination. In this way, the target product combination finally determined can be agreed upon by the target object, thereby improving the recognition of the target product combination.
[0073] in:
[0074] 1) When the terminal responds to the trigger operation for the product combination entry and displays the product prompt information, the terminal can directly display the product prompt information in response to the trigger operation for the product combination entry. The method of displaying the product prompt information can be: outputting a product prompt window 31 on the current page, and displaying the product prompt information 311 in the product prompt window 31, such as Figure 3b As shown; or, output a product prompt page (such as switching from the current page to the product prompt page, or overlaying the product prompt page on the current page), and display the product prompt information in the product prompt page. In this case, the second resource investment product involved in the product prompt information can be a resource investment product pre-set based on business needs, or it can be a resource investment product dynamically selected from the product database based on the resource investment risk preferred by the target object. The specific selection logic can be: screen out each resource investment product whose resource investment risk is lower than the resource investment risk preferred by the target object from the product database, and randomly select a resource input product from the screened resource input products as the second resource input product; or, from the screened resource input products, select the resource input product with the highest historical return as the second resource input product, so as to ensure the return of the subsequent target product portfolio.
[0075] Alternatively, when the terminal displays product prompt information in response to a trigger operation for a product combination entry, it may display a product selection list in response to a trigger operation for a product combination entry; the product selection list includes product identifiers of multiple candidate resource investment products, and the resource investment risk of each candidate resource investment product is lower than the resource investment risk preferred by the target object; at least one product identifier is selected in the product selection list according to the product selection operation, and the candidate resource investment product corresponding to the selected product identifier is used as the second resource investment product; product prompt information is generated based on the second resource investment product, and the product prompt information is displayed. Specifically, the product prompt information can be displayed through a product prompt window or a product prompt page. Taking the display of product prompt information through a product prompt window as an example, the schematic diagram of displaying product prompt information in this case can be seen in Figure 3c In this case, the second resource investment product involved in the product prompt information may be a resource investment product selected by the target object based on its own preference, which can improve the target object's freedom in resource investment and the controllability of resource investment.
[0076] Among them, the confirmation operation for the product prompt information may include but is not limited to any of the following: trigger operations (such as click operations, press operations, etc.) on target elements (such as confirmation buttons, blank spaces, etc.) in the product prompt window or product prompt page, input of voice commands or gesture operations for confirming the product prompt information, and so on.
[0077] 2) When the terminal responds to the confirmation operation for the product prompt information and determines the target product combination, it can respond to the confirmation operation for the product prompt information and directly combine the first resource input product and the second resource input product according to the first combination ratio to obtain the target product combination. Alternatively, when the terminal responds to the confirmation operation for the product prompt information and determines the target product combination, it can respond to the confirmation operation for the product prompt information and display the ratio adjustment window; and in the display process of the ratio adjustment window, obtain the first ratio adjustment operation; adjust the first combination ratio according to the first ratio adjustment operation to obtain the second combination ratio, and then respond to the ratio confirmation operation entered in the ratio adjustment window, combine the first resource input product and the second resource input product according to the currently confirmed combination ratio to obtain the target product combination. It should be noted that in actual applications, the target object can first perform the first ratio adjustment operation and then perform the ratio confirmation operation. In this case, the currently confirmed combination ratio is the second combination ratio; but the target object can also directly perform the ratio confirmation operation without performing the first ratio adjustment operation. In this case, the currently confirmed combination ratio is the first combination ratio. It can be seen that this method can support the target object to dynamically adjust the first combination ratio based on actual needs, thereby dynamically adjusting the configuration ratio of the first resource input product and the configuration ratio of the second resource input product, so as to achieve flexible and free product combination and control of risk exposure, and enhance the freedom of electronic resource investment and the controllability of risk exposure.
[0078] Among them, the proportion adjustment window may include: a bar element and a sliding control located on the bar element, and the display position of the sliding control on the bar element is used to indicate: the configuration ratio of the first resource input product or the configuration ratio of the second resource input product; then, the specific implementation method of the above-mentioned step of "obtaining the first proportion adjustment operation during the display of the proportion adjustment window" may be: obtaining the sliding operation of the sliding control on the bar element as the first proportion adjustment operation during the display of the proportion adjustment window. That is, in this case, the above-mentioned first proportion adjustment operation may be: the sliding operation of the sliding control on the bar element; then the second combination ratio obtained by adjusting the first combination ratio according to the first proportion adjustment operation may be determined according to the configuration ratio indicated by the display position of the sliding control on the bar element after sliding.
[0079] For example, let the first combination ratio indicate that the allocation ratio of the first resource input product (set as product A) is 40%, and the allocation ratio of the second resource input product (set as product B) is 60%, and let the display position of the sliding control on the bar element be used to indicate the allocation ratio of the second resource input product, then refer to Figure 3dAs shown: the target object can click the confirmation button 312 in the product prompt window to implement the confirmation operation for the product prompt information, thereby triggering the terminal to display a ratio adjustment window 32, which may include a bar element and a sliding control 321 located on the bar element, and the current display position of the sliding control 321 on the bar element is used to indicate that the configuration ratio of the second resource input product is 60%. When the target object slides the sliding control 321 on the bar element, so that the configuration ratio indicated by the display position of the sliding control changes to 90%, the terminal can adjust the first combination ratio according to the changed configuration ratio of the second resource input product (i.e. 90%) to obtain a second combination ratio, which can indicate that the configuration ratio of the first resource input product is 10%, and the configuration ratio of the second resource input product is 90%.
[0080] Alternatively, the ratio adjustment window may include multiple candidate configuration ratios for the second resource input product; then, the specific implementation method of the above-mentioned step of "obtaining a first ratio adjustment operation during the display of the ratio adjustment window" may be: obtaining a selection operation for multiple candidate configuration ratios as the first ratio adjustment operation during the display of the ratio adjustment window. In this case, the above-mentioned first ratio adjustment operation may be: a selection operation for multiple candidate configuration ratios; then the second combination ratio obtained by adjusting the first combination ratio according to the first ratio adjustment operation may be determined according to the selected configuration ratio. For example, see Figure 3e As shown: when the first combination ratio indicates that the configuration ratio of the first resource input product (set as product A) is 40%, and the configuration ratio of the second resource input product (set as product B) is 60%, the ratio adjustment window may include candidate configuration ratios such as 10%, 20%, 30%...80% and 90%; if the target object selects 90% as a candidate configuration ratio, the second combination ratio can be determined by the selected candidate configuration ratio of 90%, and the second combination ratio may indicate that the configuration ratio of the first resource input product is 10%, and the configuration ratio of the second resource input product is 90%.
[0081] Alternatively, the specific implementation method of the above-mentioned step of "obtaining the first ratio adjustment operation during the display of the ratio adjustment window" may be: obtaining the operation of the target object inputting the target voice instruction during the display of the first ratio adjustment window as the first ratio adjustment operation. In this case, the above-mentioned first ratio adjustment operation may be: the operation of inputting the target voice instruction, where the target voice instruction refers to the voice instruction for instructing to adjust the first combination ratio; then the second combination ratio obtained by adjusting the first combination ratio through the first ratio adjustment operation may be the combination ratio determined based on the target voice instruction.
[0082] It should be noted that the above descriptions are merely exemplary of several product forms of the ratio adjustment window and several specific implementations of the first ratio adjustment operation, and are not exhaustive. For example, the ratio adjustment window may also include: the resource investment risk of the first product combination formed based on the first combination ratio (as described above); Figure 3d or Figure 3e The information identified by label 322 is used in the above). As can be seen from the above, any resource investment risk includes at least one of the resource loss rate (i.e., maximum drawdown or maximum loss) and the resource risk level; based on this, the resource loss rate in the resource investment risk of the first product combination is obtained by weighted summing the resource loss rate of the first resource investment product and the resource loss rate of the second resource investment product according to the first combination ratio. For example, suppose the first combination ratio indicates that the configuration ratio of the first resource investment product is 40%, and the configuration ratio of the second resource investment product is 60%. If the resource loss rate of the first resource input product is 40% and the resource loss rate of the first resource input product is 5%, then the resource loss rate in the resource investment risk of the first product combination formed based on the first combination ratio is: 40%×40%+60%×5%=22%. The resource risk level in the resource investment risk of the first product combination can be determined based on the resource loss rate of the first product combination according to the correspondence between the preset risk level and the resource loss rate.
[0083] In an optional implementation, when the proportion adjustment window includes: the resource investment risk of the first product combination formed based on the first combination ratio, the terminal can also dynamically update the resource investment risk of the first product combination in the proportion adjustment window based on the second combination ratio. Specifically, the terminal can determine the resource investment risk of the second product combination formed based on the second combination ratio, thereby updating the resource investment risk of the first product combination in the proportion adjustment window to the resource investment risk of the second product combination. It is understandable that the method for determining the resource investment risk of the second product combination is similar to the method for determining the resource investment risk of the first product combination mentioned above, and will not be repeated here.
[0084] In another optional implementation, in order to achieve risk control and prevent the resource investment risk of the second product combination formed based on the second combination ratio set for the target object from being too high, thereby causing the target object to have a greater risk of resource loss, the terminal can also determine the resource investment risk of the second product combination formed based on the second combination ratio after obtaining the second combination ratio; if the resource investment risk of the second product combination is higher than the resource investment risk preferred by the target object, a risk enhancement prompt can be output to prompt the target object in time. Among them, the risk enhancement prompt includes: prompt text displayed in a target display style; the target display style here can be a display style set based on actual needs, which may include at least one of the following: target color, target font, target font size (i.e. font size) and flashing display, etc.; and the prompt text is used to prompt: the resource investment risk of the second product combination formed based on the second combination ratio is higher than the resource investment risk preferred by the target object. For example, see Figure 3f As shown: the target object can adjust the first combination ratio by sliding the sliding control located on the bar element in the sliding ratio adjustment window. When the target object slides the sliding control on the bar element so that the configuration ratio indicated by the display position of the sliding control becomes 10%, the terminal can adjust the first combination ratio according to the changed configuration ratio of the second resource investment product (i.e., 10%) to obtain the second combination ratio. The second combination ratio can indicate that the configuration ratio of the first resource investment product is 90%, and the configuration ratio of the second resource investment product is 10%. At this time, it is calculated that the resource investment risk of the second product combination formed based on the second combination ratio is higher than the resource investment risk preferred by the target object, so the risk enhancement prompt 323 "Exceeds your risk tolerance" can be output.
[0085] In another optional implementation, after detecting that a proportion confirmation operation has been input in the proportion adjustment window, the terminal can also determine the resource investment risk of the current product combination formed based on the currently confirmed combination ratio. The determination method is the same as the determination method of the resource investment risk of the first product combination mentioned above, which will not be repeated here. If the resource investment risk of the current product combination is higher than the resource investment risk preferred by the target object, the risk difference between the resource investment risk of the current product combination and the resource investment risk preferred by the target object is calculated; if the risk difference is greater than the difference threshold, the response to the proportion confirmation operation input in the proportion adjustment window is prohibited, and a proportion adjustment prompt is output, which is used to prompt the target object to re-enter the first proportion adjustment operation. Among them, when the resource investment risk includes resource loss rate, the risk difference is the loss rate difference between the resource loss rates in two resource investment risks, and the difference threshold is the preset loss rate difference (maximum drawdown difference); when the resource investment risk includes resource risk level, the risk difference is the difference between the resource risk levels in the two resource investment risks, and the difference threshold is the preset difference (maximum drawdown difference); when the resource investment risk includes both resource loss rate and resource risk level, the risk difference and subsequent operations can be arbitrarily determined based on the resource loss rate or resource risk level.
[0086] Taking the determination of the risk difference and subsequent operations based on the resource loss rate as an example, assuming that the resource loss rate in the resource investment risk of the current product portfolio is 35%, and the resource loss rate in the resource investment risk preferred by the target object is 10%, then the risk difference can be calculated to be 25%. If the difference threshold preset based on the risk control strategy is 10%, then since the risk difference 25% is greater than the difference threshold 10%, after the target object enters the ratio confirmation operation (clicks the "Next" button 324), the terminal can prohibit responding to the ratio confirmation operation entered in the ratio adjustment window, and outputs a ratio adjustment prompt 325, such as Figure 3g As shown. It can be seen that the embodiment of the present application can prompt the target object to reset the combination ratio when the resource investment risk of the product combination formed based on the combination ratio set by the target object is high, so as to reduce the resource loss risk of the target object.
[0087] S203: Display the total resource investment amount configured for the target object in the resource combination investment page, and divide the total resource investment amount into a first resource investment amount and a second resource investment amount.
[0088] (1) The specific implementation method of displaying the total amount of resource investment configured for the target object in the resource combination investment page may be: obtaining the resource configuration operation input by the target object, and displaying the total amount of resource investment configured for the target object in the resource combination investment page according to the resource configuration operation.
[0089] In a specific implementation, when the terminal displays the resource portfolio investment page through step S202, the resource portfolio investment page may include a resource configuration area and the resource configuration area is empty; in this case, the resource configuration operation of the target object may include any of the following: an operation of inputting the total amount of resource investment in the resource portfolio investment page, an operation of inputting a voice instruction for indicating the total amount of resource investment, etc. Accordingly, a specific implementation method of displaying the total amount of resource investment configured by the target object in the resource portfolio investment page according to the resource configuration operation may be: determining the total amount of resource investment configured by the target object for the resource investment product according to the resource configuration operation of the target object, and displaying the total amount of resource investment in the resource configuration area in the resource portfolio investment page.
[0090] In another specific implementation, when the terminal displays the resource combination investment page through step S202, the resource combination investment page may include a resource configuration area and a default resource investment total amount is displayed in the resource configuration area. The default resource investment total amount may be a value pre-set based on business needs, or the number of electronic resources actually invested by the target object when investing resources last time (i.e., before the current resource investment and the most recent time), and there is no limitation on this; in this case, the resource configuration operation of the target object may include any of the following: deleting the currently displayed resource investment total amount and entering a new resource investment total amount, entering a voice command for indicating modification of the resource investment total amount, etc. Correspondingly, the specific implementation method of displaying the resource investment total amount configured by the target object in the resource combination investment page according to the resource configuration operation may be: updating the resource investment total amount currently displayed in the resource configuration area in the resource combination investment page according to the resource configuration operation of the target object.
[0091] In another specific implementation, when the terminal displays the resource combination investment page through step S202, the resource combination investment page may include a resource configuration area and the resource configuration area displays multiple (at least two) candidate resource investment total amounts, and the multiple candidate resource investment total amounts may be preset based on business needs, or may be determined based on the number of electronic resources invested by the target object when the target object has invested resources in the past, and there is no limitation on this; in this case, the resource configuration operation of the target object may include: an operation of selecting a resource amount option. Accordingly, the specific implementation method of displaying the resource investment total amount configured by the target object in the resource combination investment page according to the resource configuration operation may be: according to the resource configuration operation of the target object, a resource investment total amount is selected in the resource configuration area in the resource combination investment page, and the selected resource investment total amount is the resource investment total amount configured by the target object.
[0092] (2) The specific implementation method of dividing the total resource input into the first resource input and the second resource input can be: obtain the combination ratio corresponding to the target product combination, divide the total resource input based on the obtained combination ratio, and obtain the first resource input and the second resource input. Specifically, the configuration ratio of the first resource input product indicated by the obtained combination ratio can be multiplied by the total resource input to obtain the first resource input; the configuration ratio of the second resource input product indicated by the obtained combination ratio can be multiplied by the total resource input to obtain the second resource input. For example, assuming that the total resource input is 10,000, and the combination ratio corresponding to the target product combination indicates that the configuration ratio of the first resource input product is 60%, and the configuration ratio of the second resource input product is 40%; then, the first resource input can be calculated to be 10,000×60%=6,000, and the second resource input can be calculated to be 10,000×40%=4,000.
[0093] It is understandable that the first resource investment amount and the second resource investment amount obtained by dividing the total resource investment amount can be displayed in the resource combination investment page. That is, when the target object enters the total resource investment amount in the resource combination investment page, the terminal can automatically divide it into the first resource investment amount and the second resource investment amount, and display the first resource investment amount and the second resource investment amount in the resource combination investment page, such as Figure 3h shown.
[0094] S204 , in response to the resource investment confirmation operation, electronic resource investment is performed on the first resource investment product based on the first resource investment amount, and electronic resource investment is performed on the second resource investment product based on the second resource investment amount.
[0095] Among them, the resource investment confirmation operation may include but is not limited to any of the following: triggering operations (such as click operations, press operations, etc.) on target elements (such as resource acquisition components, blank areas, etc.) in the resource combination investment page, inputting voice instructions or gesture operations to instruct resource investment, etc.
[0096] In the specific implementation of step S204, the terminal may respond to the resource investment confirmation operation and display a resource payment page, which may include a payment prompt information, and the payment prompt information is used to prompt the target object to pay the total amount of electronic resources invested; for example, if the total amount of resource investment is 10,000, then refer to Figure 3iAs shown: the target object can click on the resource acquisition component 33 in the resource combination investment page to trigger the terminal to display the resource payment page. The payment prompt information 34 in the resource payment page can be "You need to pay 10,000 electronic resources". Further, in the process of displaying the resource payment page, the terminal can detect the resource payment operation of the target object. The resource payment operation can be, for example, a trigger operation (such as a click operation, a press operation, etc.) on the payment component 35 in the resource payment page, an operation of inputting a voice instruction or gesture to instruct resource payment, etc. If the resource payment operation is detected, the electronic resources of the total resource investment amount can be obtained from the resource account of the target object, and after the electronic resources are obtained, the electronic resources of the first resource investment amount are invested into the first resource investment product, and the electronic resources of the second resource investment amount are invested into the second resource investment product.
[0097] Wherein, investing electronic resources into any resource investment product (such as the first resource investment product, the second resource investment product, etc.) means: using electronic resources to purchase the corresponding resource investment product; specifically, the electronic resources can be sent to the issuer (or provider) of the corresponding resource investment product, so that the issuer can calculate the actual purchase quantity (also referred to as the actual acquisition quantity or the actual purchase share) of the target object with respect to the corresponding resource investment product based on the unit net value (i.e., the amount of electronic resources currently required to obtain a single resource investment product) of the corresponding resource investment product at the current moment (i.e., the moment of responding to the resource investment confirmation operation) and the amount of electronic resources received (here, the resource investment amount), thereby distributing the resource investment product of the actual purchase quantity to the product account of the target object. Wherein, the actual purchase quantity can be equal to the ratio between the amount of electronic resources received and the determined unit net value.
[0098] Optionally, after the terminal has invested electronic resources in the first resource investment product and the second resource investment product in step S204, it can perform revenue statistics and support the target object to view the revenue status of the target product combination and other information at any time. Specifically, when the target object wants to view the revenue status of the target product combination and other information, it can perform a holding status viewing operation for the target product combination, and the holding status viewing operation refers to an operation for triggering the terminal to display the holding page of the combination product, for example, it can be an operation of the target object clicking or pressing the holding status viewing component displayed in the terminal, or the target object inputting a voice or gesture operation for instructing to open the holding page of the combination product.
[0099] Correspondingly, the terminal can respond to the target object's holding status viewing operation for the target product combination and display the combination product holding page; in the combination product holding page, the resource holding information of the first resource input product and the resource holding information of the second resource input product are displayed; wherein, the resource holding information of any resource input product includes: the resource input amount of the corresponding resource input product, and the income generated based on the corresponding resource input amount of the corresponding resource input product. It should be noted that the embodiment of the present application does not limit the specific calculation method of the income generated by any resource input product based on the corresponding resource input amount. For example, the unit net value of the resource input product at the target time (i.e., the time of responding to the holding status viewing operation) can be obtained, and the obtained unit net value and the holding quantity of the corresponding resource input product are multiplied to obtain the resource holding amount of the resource input product at the target time, and the difference between the resource holding amount and the resource input amount is used as the income.
[0100] Optionally, after displaying the combination product holding page, the terminal may also detect a resource extraction trigger operation (such as clicking on a resource extraction component in the combination product holding page) during the display of the combination product holding page; if a resource extraction trigger operation is detected, the resource extraction page is output; the total resource extraction amount set for the target object is displayed on the resource extraction page, and based on the combination ratio corresponding to the target product combination, the total resource extraction amount is divided into a first resource extraction amount and a second resource extraction amount. The specific division method is similar to the division method of the total resource input amount mentioned above, which will not be repeated here; in response to the detected resource extraction confirmation operation, the first resource extraction amount of electronic resources is extracted from the first resource input product, and the second resource extraction amount of electronic resources is extracted from the second resource input product; all extracted electronic resources are transferred to the resource account of the target object. For example, see Figure 3j As shown, after the target object triggers the terminal to output the resource extraction page by clicking on the resource extraction component 36 in the combination product holding page (i.e., inputting the resource extraction trigger operation), the target object can set the total resource extraction amount to 1000 on the resource extraction page. At this time, the terminal can divide the total resource extraction amount 1000 into a first resource extraction amount of 400 and a second resource extraction amount of 600 based on the configuration ratio of the first resource input product (product A) of 40% and the configuration ratio of the second resource input product (product B) of 60% indicated by the combination ratio corresponding to the target product combination. Therefore, after the target object clicks on the confirmation extraction component 37 in the resource extraction page (i.e., inputting the resource extraction confirmation operation), 400 electronic resources are extracted from product A and 600 electronic resources are extracted from product B respectively, and the extracted 1000 electronic resources are transferred to the resource account of the target object.
[0101] In an embodiment of the present application, when the resource investment risk of the first resource investment product in which the target object intends to make electronic resource investment meets the risk control condition, the first resource investment product and the second resource investment product can be combined to obtain a target product combination, and a resource combination investment page of the target product combination can be displayed, so that after the target object configures the total resource investment amount in the resource combination investment page, the total resource investment amount can be divided into a first resource investment amount and a second resource investment amount, so that electronic resource investment is made in the first resource investment product based on the first resource investment amount to meet the resource investment demand of the target object (i.e., the demand for electronic resource investment in the first resource investment product), and electronic resource investment is made in the second resource investment product based on the second resource investment amount to achieve risk control and enrich the resource investment methods, so that the object is no longer limited to only being able to make electronic resource investments in some resource investment products, thereby improving the freedom of resource investment.
[0102] Based on the above Figure 2 The relevant description of the method embodiment shown, the embodiment of the present application proposes a resource processing system based on risk control. The system adopts a technical architecture including object risk assessment, product data processing, combination optimization calculation, display and interaction: First, the system obtains the risk preference (RiskPreference) information of the object. The risk preference refers to the degree of risk that the object is willing to bear, which can be divided into conservative, balanced, aggressive, etc., and matches the maximum drawdown (i.e., resource loss rate) that the target object can tolerate based on the risk preference of the object; secondly, the historical performance data of the relevant resource input products are extracted from the product database, and the historical performance data includes the maximum drawdown of the resource input products; thirdly, the optimal configuration weight between high-risk resource input products and low-risk resource input products is obtained by solving the optimization equation; finally, a personalized product portfolio configuration plan is presented to the object, and adjustments within a certain range are supported. This method not only improves the refinement of the risk management of the resource input portfolio, but also provides a simple and easy-to-use interactive experience for the object.
[0103] See also Figure 4aAs shown, the resource processing system based on risk control proposed in the embodiment of the present application may include but is not limited to the following modules: an object risk assessment module 41, a combination optimization module 42, a front-end display module 43, and a transaction execution module 44, etc. Among them, ① the object risk assessment module 41 is used to assess the risk tolerance of the object according to the risk assessment questionnaire filled out by the object, match the corresponding resource loss rate (i.e., maximum drawdown), and thus give the resource investment risk such as the resource risk level and resource loss rate (maximum drawdown) that the object can bear. ② The combination optimization module 42 is used to calculate the optimal configuration ratio between the first resource investment product and the second resource investment product based on the resource investment risk that the object can bear and the historical maximum drawdown of the first resource investment product that the object wants to invest, and generate a product combination plan. ③ The front-end display module 43 is used to graphically display the product combination plan recommended by the system to the object, and provide a visual adjustment function to support the object to manually adjust the combination ratio. ④ The transaction execution module 44 is used to form a target product combination according to the combination ratio confirmed by the object, generate and submit a product purchase instruction, connect with the transaction system of the product sales agency, and execute the product purchase order operation.
[0104] In the specific implementation, the overall architecture of the system is designed as follows: the object initiates a resource investment request for the first resource investment product through the front-end page, and the resource investment request first reaches the background service layer. The service layer obtains the risk tolerance data of the object (such as resource investment risk) from the object risk assessment module, and calls the external product data interface to obtain the historical performance of the first resource investment product (including resource investment risk). The combination optimization module uses this data to calculate the optimal product combination plan. The product combination plan is presented to the object through the front-end display module, and the object confirms or adjusts it. The transaction execution module is responsible for submitting the subscription instructions to the product provider's trading system for the confirmed product combination plan to complete the resource investment process.
[0105] See also Figure 4b As shown, the entire workflow of the above-mentioned system is as follows:
[0106] The starting point of the entire process is that the object selects the first resource investment product with high risk in the front-end page and enters the total amount of resource investment to be invested. At this time, the front-end page can generate a resource investment request based on a series of operations of the object and send the resource investment request to the background service layer. The background service layer can call the object risk assessment module to obtain the risk tolerance data of the object (that is, the resource investment risk it prefers, which may specifically include the resource risk level it prefers and the maximum drawdown it can bear (that is, resource loss rate)). Then, the background service layer can obtain the historical performance of the first resource investment product selected by the object through the external product data interface, with an emphasis on the resource investment risk including its maximum drawdown. After obtaining the two key parameters of the object's risk tolerance data and the resource investment risk of the first resource investment product, the background service layer sends an optimization request to the combination optimization module to request the combination optimization module to generate and optimize the product portfolio.
[0107] The portfolio optimization module determines whether it is necessary to introduce a low-risk second resource input product (such as a money fund) to reduce the resource input risk (such as maximum drawdown) of the overall product portfolio according to whether the resource input risk of the first resource input product exceeds the risk tolerance of the object. If necessary, the optimal configuration ratio of the first resource input product and the second resource input product is found by solving the optimization equation, and the configuration of the risk product is maximized while controlling the maximum drawdown of the overall product portfolio. Then, the portfolio optimization model can return the optimal product portfolio plan to the background service layer, so that the background server returns the product portfolio plan to the front-end page, and the front-end page displays the product portfolio plan to the object in a graphical manner, and allows the object to adjust it. Accordingly, the object can see the configuration ratio of each resource input product in the product portfolio plan recommended by the system, as well as the expected portfolio yield and maximum drawdown under the configuration. If the object is not satisfied with the product portfolio plan recommended by the system, the configuration ratio of each resource input product can be manually adjusted within a certain range to adjust the portfolio ratio. The upper limit of the adjustment can be determined by the risk tolerance of the object to prevent the overall risk of the portfolio from exceeding its tolerance range.
[0108] When the object finally confirms to accept the product combination plan, the front-end page can send the product combination plan confirmed by the object to the back-end service layer, so that the back-end server will issue a transaction instruction to the transaction execution module, and the transaction execution module will take over the subsequent product purchase process. Specifically, the transaction execution module determines the configuration amount (i.e., the amount of resource input) of each resource investment product in the product combination plan, connects with the transaction system of the product sales organization, and sends a series of product purchase instructions. The transaction system performs corresponding processing based on the product purchase instructions and returns the transaction results to the transaction execution module. Correspondingly, the transaction execution module can return the transaction results (success or failure) to the back-end service layer, so that the back-end server returns the transaction results to the front-end page for display.
[0109] Based on the above process, the working principle of each module in the system is explained below:
[0110] (I) Object risk assessment module starts:
[0111] See also Figure 5a As shown, when the subject uses the system for the first time, he / she needs to fill out a risk assessment questionnaire. The questionnaire comprehensively assesses the subject's risk tolerance from the following dimensions:
[0112] ① Age: Determine the investment time based on the target’s age. The older the target, the lower the score.
[0113] ② Assets: The target's risk-bearing capacity is judged based on the size of its investable assets (i.e. the amount of electronic resources available for resource investment). The higher the assets, the higher the score.
[0114] ③ Investment knowledge: The risk awareness of the target is judged based on the target’s understanding of the resource investment market and resource investment products. The more the target understands, the higher the score.
[0115] ④ Investment experience: Based on the historical resource investment experience of the target, especially its actual performance in the face of market fluctuations, its risk attitude is judged. The richer the experience, the higher the score.
[0116] ⑤Risk preference: directly ask the subject about the trade-off between pursuing returns and controlling risks. The higher the risk preference, the higher the score.
[0117] The object risk assessment module can obtain the risk assessment questionnaire filled out by the object, which includes the answer information filled out by the object under each dimension, so as to score the risk tolerance of the corresponding object according to the answer information under each dimension, so as to calculate the score of the object under each dimension (i.e., the risk tolerance score), and calculate the comprehensive score S of the object (i.e., the total risk tolerance score) according to the scores under each dimension, so as to determine the resource risk level and the maximum drawdown that the object can bear based on the comprehensive score S. Exemplarily, the corresponding relationship between the comprehensive score S and the resource risk level and the maximum drawdown can be as follows:
[0118] When S≥80, the resource risk level is aggressive, and the maximum drawdown MDD_a=25%;
[0119] When 60≤S<80, the resource risk level is aggressive, and the maximum drawdown MDD_p=20%;
[0120] When 40≤S<60, the resource risk level is stable, and the maximum drawdown MDD_s=15%;
[0121] When S<40, the resource risk level is conservative, and the maximum drawdown MDD_c=10%.
[0122] It can be seen that the calculation method of the resource investment risk preferred by any object (target object) can be as follows: obtain the risk assessment questionnaire filled out by the target object, and the risk assessment questionnaire includes: the answer information filled out by the target object in multiple dimensions. According to each answer information in the risk assessment questionnaire, the risk tolerance of the target object is scored in the corresponding dimension to obtain the risk tolerance score of the target object in each dimension; specifically, based on the preset scoring rules under each dimension, the answer information filled out by the target object in the corresponding dimension is used to score respectively to obtain the risk tolerance score of the target object in each dimension. Further, the risk tolerance score of the target object in each dimension can be integrated (for example, direct summation or weighted summation) to obtain the total risk tolerance score of the target object; based on the corresponding relationship between the preset score and the resource investment risk, the resource investment risk corresponding to the total risk tolerance score is used as the resource investment risk preferred by the target object. It can be seen that this method can realize multi-dimensional risk assessment of the target object, which can improve the accuracy of the resource investment risk preferred by the target object finally determined.
[0123] (II) Combination Optimization Module Startup:
[0124] The core of the portfolio optimization module is to calculate the optimal configuration ratio of the first resource investment product and the second resource investment product based on the risk tolerance of the object and the historical performance of the first resource investment product.
[0125] See also Figure 5b As shown, the optimization process is divided into two steps:
[0126] Step 1: Determine whether the resource investment risk of the first resource investment product matches the resource investment risk that the object can bear. Specifically, the historical maximum drawdown MDD_f of the first resource investment product f can be obtained, and the maximum drawdown MDD_u that the object u can bear can be obtained from the object risk assessment module to determine whether the maximum drawdown of the first resource investment product is less than or equal to the maximum drawdown that the object can bear. If so (that is, MDD_f≤MDD_u), it can be considered that the risk matches and the configuration ratio of the first resource investment product is determined to be 100%, that is, in this case, the object can configure the first resource investment product 100%. If not (that is, MDD_f>MDD_u), then it can be considered that the risk does not match, and a low-risk second resource investment product needs to be introduced for risk hedging.
[0127] Step 2: If risk hedging is required, calculate the optimal product configuration ratio. Specifically, let the configuration ratio of the first resource input product be the unknown number x, and the configuration ratio of the second resource input product be 1-x. When the maximum drawdown MDD_m of the second resource input product is 0, the expected maximum drawdown of the portfolio as a whole is: x×MDD_f+(1-x)×0=x×MDD_f. In order to control the maximum drawdown of the product portfolio within the acceptable range of the object, the inequality can be listed: x×MDD_f≤MDD_u; solve the maximum value of the unknown number x and obtain x≤MDD_u / MDD_f. Based on the maximum value of the unknown number x, it can be determined that under the premise of meeting the risk tolerance of the object, the product combination plan is as follows: the configuration ratio of the first resource input product is x_opt=MDD_u / MDD_f, and the configuration ratio of the second resource input product is 1-x_opt=1-MDD_u / MDD_f.
[0128] It can be understood that the above is explained using the example of the resource loss rate (maximum drawdown MDD_j) of the second resource input product being 0. When the resource loss rate (maximum drawdown MDD_j) of the second resource input product is not 0, the expected resource loss rate (i.e., maximum drawdown) of the combination as a whole is: x×MDD_f+(1-x)×MDD_j. In order to control the resource loss rate of the product combination within the tolerable range of the object, the inequality can be listed: x×MDD_f+(1-x)×MDD_j≤MDD_u. By solving the inequality, the value of the unknown number x is obtained, thereby obtaining the configuration ratio of the first resource input product and the configuration ratio of the second resource input product.
[0129] For example:
[0130] After the subject selects the first resource input product as the investment target and enters the total resource investment amount of 10,000, the system starts to execute the portfolio optimization process and matches the subject with an appropriate proportion of the second resource investment product to control the maximum drawdown of the overall portfolio within its tolerable range.
[0131] (1) Assumptions:
[0132] The maximum drawdown of the first resource investment product selected by the subject is 20%;
[0133] According to the risk assessment questionnaire, the risk tolerance level of the subject is determined to be "conservative", and the corresponding maximum drawdown is 10%;
[0134] The maximum drawdown of the second resource investment product selected by the system is 0 (i.e. the product is risk-free).
[0135] (2) Assume that the parameters are defined as follows:
[0136] MDD_u: Maximum drawdown corresponding to the risk tolerance of the object, here it is 10%;
[0137] MDD_f: Maximum drawdown of the first resource investment product selected by the object, here 20%;
[0138] MDD_m: Maximum drawdown of the alternative second resource investment product, which is 0 here;
[0139] M: The total amount of resource investment set by the user, here it is 10000;
[0140] x: the allocation ratio of the first resource input product;
[0141] 1-x: The allocation ratio of the second resource input product.
[0142] (3) Algorithm steps:
[0143] Step 1: Compare the maximum drawdown MDD_f of the first resource investment product and the maximum drawdown MDD_u that the user can bear. Here MDD_f (20%)>MDD_u (10%), so it is necessary to introduce a second resource investment product for risk hedging.
[0144] Step 2: Calculate the maximum configuration ratio x that the first resource input product can bear under the MDD_u constraint.
[0145] Since the maximum drawdown of the second resource investment product is 0, the maximum drawdown of the entire portfolio can be expressed as: x×MDD_f+(1-x)×0=x×MDD_f;
[0146] Let the maximum drawdown of the combination not exceed MDD_u, and set the inequality: x×MDD_f≤MDD_u;
[0147] Solve for the maximum value of x: x≤MDD_u / MDD_f=10% / 20%=50%.
[0148] Step 3: Determine the allocation ratio of the first resource input product and the second resource input product.
[0149] The allocation ratio of the first resource input product: x = 50%;
[0150] The configuration ratio of the second resource input product: 1-x=1-50%=50%.
[0151] Step 4: Calculate the resource input amount of each resource input product.
[0152] The resource input amount of the first resource input product = total resource input × corresponding allocation ratio = 10000 × 50% = 5000;
[0153] The resource input amount of the second resource input product = total resource input × corresponding configuration ratio = 10000 × 50% = 5000.
[0154] (4) Return the result, and return the product combination plan, which includes:
[0155] The first resource input product configuration ratio is 50%, and the corresponding resource input amount is 5000;
[0156] The first resource input product configuration ratio is 50%, and the corresponding resource input amount is 5000;
[0157] The drawdown rate of the combination: 50%×20%=10% (in line with the risk tolerance of the subject).
[0158] (III) Front-end display module startup:
[0159] The front-end display module is responsible for presenting the personalized product portfolio configuration plan generated by the system to the object, and allows the object to manually adjust the configuration ratio of each resource input product within a certain range.
[0160] See also Figure 5c As shown, the exhibition content mainly includes:
[0161] ① The product name, configuration ratio and resource input amount of each resource input product. Specifically including: the product name, configuration ratio and resource input amount of the first resource input product; and the product name, configuration ratio and resource input amount of the second resource input product.
[0162] ② The expected return and maximum drawdown of the product portfolio. Specifically, the expected return of the product portfolio can be estimated based on the allocation ratio and the historical performance (historical return) of each resource input product. Specifically, the allocation ratio of each resource input product can be used to perform a weighted summation of the historical returns of the corresponding resource input products to obtain the expected return of the product portfolio; the maximum drawdown of the product portfolio can be estimated based on the allocation ratio and the maximum drawdown of each resource input product.
[0163] ③ The risk tolerance of the subject. The subject’s current risk tolerance level (such as conservative, stable) is displayed in a prominent position, and the corresponding maximum drawdown threshold (resource loss rate) is given for the subject’s reference.
[0164] ④ Manual adjustment function. The subject can manually adjust the allocation ratio of each resource investment product within a certain range (such as ±10%). The adjustment range should be limited to the subject's risk tolerance to prevent the overall resource investment risk of the portfolio from exceeding the limit. In addition, the expected return and maximum drawdown changes of the portfolio can be updated and displayed in real time according to the allocation ratio adjusted by the subject.
[0165] (IV) Transaction execution module startup:
[0166] After the object confirms to accept the product combination plan recommended by the system or manually adjusted, the transaction execution module is responsible for submitting the actual product purchase order to the product provider.
[0167] See also Figure 5d As shown, the execution steps are as follows:
[0168] Obtain the configuration details of the product combination confirmed by the object from the front-end display module, and the configuration details include the product name, product code and configuration ratio of each resource input product;
[0169] According to the total resource input of the object and the allocation ratio of each resource input product, the resource input of each resource input product is calculated as the total resource input × allocation ratio, and the calculation result is rounded according to the minimum unit of resource input involved in product purchase (such as 1);
[0170] Through the transaction interface of the product sales organization, assemble the message according to the requirements of the product provider, fill in the key elements such as account information, product code, resource input, etc., and obtain the product purchase instruction;
[0171] Establish communication with the server of the product sales organization and send product purchase instructions;
[0172] Receive transaction results and analyze them to determine whether the product purchase is successful;
[0173] If the transaction result indicates that the product subscription is successful, the object's position information can be updated. Specifically, the object account management module can be called to register the subscribed product shares under the object account; and the transaction result is returned to the front-end page to display the subscription confirmation information and update the object's total assets and position details.
[0174] If the transaction result indicates that the product purchase failed, the reason for the failure can be displayed to prompt the object to try again or contact customer service, and the transaction result can be returned.
[0175] Based on the above description, it can be seen that the risk control-based resource processing system proposed in the embodiment of the present application may have at least the following functions:
[0176] (1) Support personalized risk management: By obtaining the risk preference of the target and matching the personalized maximum drawdown, the risk management needs of different targets can be met more precisely.
[0177] (2) Achieve overall portfolio risk control: Dynamically calculate and strictly control portfolio drawdown risk based on the product portfolio to avoid overall risk loss caused by local adjustments.
[0178] (3) Provide intelligent and professional resource investment recommendations: Automatically generate and optimize personalized product portfolios based on target preferences and market data, and provide targets with intelligent and professional resource investment references.
[0179] Based on the above functions, the embodiment of the present application can realize that when the subject browses various resource investment product fund products on the front-end page of the resource investment platform, he sees that the historical rate of return of a high-risk first resource investment product fund is very high, and decides to try to invest in 10,000 electronic resources; but on the order confirmation page, the resource processing system based on risk control proposed in the embodiment of the present application prompts that the resource risk level of the first resource investment product may exceed the risk tolerance of the subject user himself, and recommends that the subject adopt a product investment portfolio plan that dilutes the risk. It can be seen that when the first resource investment product selected by the subject may exceed its risk tolerance, the resource processing system based on risk control proposed in the embodiment of the present application can automatically match it with a certain proportion of low-risk products (such as money market funds) and optimize the product portfolio to achieve the purpose of risk dilution; the entire optimization process is based on a quantitative model, which controls the overall risk of the product portfolio within the acceptable range of the subject while meeting the subject's return demands.
[0180] In addition, the product portfolio risk management method based on maximum drawdown control provided by the system can solve the problems of simple risk management rules, lack of personalization and dynamic optimization of existing resource investment platforms. It obtains the risk preference of the object, matches the corresponding maximum drawdown, and combines the maximum drawdown of the high-risk first resource investment product to dynamically solve the optimal configuration ratio of high-risk products (such as the first resource investment product) and low-risk products (such as the second resource investment product), thereby providing personalized and professional intelligent resource investment portfolio configuration suggestions for the object based on the solved configuration ratio, strictly controlling the overall risk exposure while meeting the resource investment demands. It can be seen that this method overcomes the problems of insufficient resource investment experience and weak risk control ability of the object, and respects the autonomous will of the object to the greatest extent. It is an investment auxiliary tool that takes into account both personalization and universality. The interface design is clear and beautiful. The object does not need to have professional knowledge. With simple operations, you can get a tailored product portfolio and monitor your own resource investment risks at any time.
[0181] In summary, the embodiments of the present application may have the following beneficial effects:
[0182] (1) Significantly improve the resource investment experience of the subject. By matching the corresponding maximum drawdown based on the risk preference of the subject, and combining the maximum drawdown of the high-risk first resource investment product, the optimal configuration ratio of the high-risk first resource investment product and the low-risk second resource investment product is dynamically solved, so as to provide the subject with personalized product portfolio configuration suggestions based on the solved configuration ratio, which can meet the needs of subjects with different risk preferences. In addition, after providing the subject with a product portfolio plan, the subject can also be supported to flexibly adjust the configuration ratio of the first resource investment product and the configuration ratio of the second resource investment product in the product portfolio plan, and update the expected return and maximum drawdown of the product portfolio displayed in the display interface in real time based on the adjusted configuration ratio of the subject, so that the subject can see the impact on the expected return and maximum drawdown in real time, enhancing the subject's sense of participation and control.
[0183] (2) It reduces the difficulty of resource investment decision-making for the subject. By automatically generating an optimized product portfolio based on the subject's risk preference and the market data of the first resource investment product that the subject intends to invest in (such as maximum drawdown), and recommending the product portfolio to the subject, the subject can obtain intelligent product configuration services without having to have professional resource investment knowledge, which is conducive to the development of inclusive resource investment.
[0184] (3) Introducing new risk control concepts and technical means into the field of resource investment. Taking the maximum drawdown as the core risk management indicator, when it is detected that the maximum drawdown of the first resource investment product that the subject intends to invest in is greater than the maximum drawdown that the subject can bear, the second resource investment product is introduced to carry out the combination investment of electronic resources to dilute the resource investment risk of the first resource investment product, which can better fit the actual situation of resource investment.
[0185] Based on the description of the above method embodiment, the embodiment of the present application also discloses a risk control-based resource processing device; the risk control-based resource processing device can be a computer program (including one or more instructions) running in a computer device, and the risk control-based resource processing device can execute each step in the above method flow. Figure 6 , the risk control-based resource processing device can run the following units:
[0186] An acquisition unit 601 is used to acquire a resource investment trigger operation for a first resource investment product;
[0187] The processing unit 602 is configured to, if the resource investment risk of the first resource investment product meets the risk control condition, respond to the resource investment trigger operation and display a resource portfolio investment page of a target product portfolio; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product;
[0188] The processing unit 602 is further configured to display the total resource investment amount configured for the target object in the resource combination investment page, and divide the total resource investment amount into a first resource investment amount and a second resource investment amount;
[0189] The processing unit 602 is further configured to respond to a resource investment confirmation operation, make an electronic resource investment in the first resource investment product based on the first resource investment amount, and make an electronic resource investment in the second resource investment product based on the second resource investment amount.
[0190] In a specific implementation, the risk control condition includes: the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object;
[0191] Accordingly, when the processing unit 602 is used to respond to the resource investment trigger operation and display the resource portfolio investment page of the target product portfolio, it can be specifically used to:
[0192] In response to the resource investment trigger operation, output a product portfolio entry;
[0193] In response to a trigger operation on the product combination entry, a target product combination is determined, and a resource combination investment page of the target product combination is displayed; wherein the resource investment risk of the second resource investment product in the target product combination is lower than the resource investment risk of the first resource investment product.
[0194] In another specific implementation, when outputting the product combination entry, the processing unit 602 may also be used to:
[0195] Synchronously outputting risk warning information, wherein the risk warning information is used to prompt that the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object;
[0196] The risk warning information includes: the resource investment risk of the first resource investment product and the resource investment risk of the target object.
[0197] In another specific implementation, when the processing unit 602 is used to respond to the trigger operation on the product combination entry and determine the target product combination, it can be specifically used to:
[0198] In response to a trigger operation on the product combination entry, product prompt information is displayed; wherein the product prompt information is used to prompt: combining the first resource input product and the second resource input product based on a first combination ratio;
[0199] In response to a confirmation operation on the product prompt information, a target product combination is determined.
[0200] In another specific implementation, when the processing unit 602 is used to respond to the triggering operation on the product combination entry and display the product prompt information, it can be specifically used to:
[0201] In response to a trigger operation on the product combination entry, a product selection list is displayed; the product selection list includes product identifiers of multiple candidate resource investment products, and the resource investment risk of each candidate resource investment product is lower than the resource investment risk preferred by the target object;
[0202] Selecting at least one product identifier in the product selection list according to the product selection operation, and putting the candidate resource corresponding to the selected product identifier into the product as the second resource into the product;
[0203] Product prompt information is generated based on the second resource input product, and the product prompt information is displayed.
[0204] In another specific implementation, the processing unit 602 may also be used to:
[0205] The configuration ratio of the first resource input product is expressed as an unknown number, and the configuration ratio of the second resource input product is expressed as the difference between the benchmark value and the unknown number; wherein the configuration ratio refers to: the proportion of the corresponding resource input product in the product portfolio;
[0206] Using the configuration ratio of the first resource input product and the configuration ratio of the second resource input product, weighted summing the resource input risks of the corresponding resource input products is performed to obtain an expression for the resource input risk of the product portfolio;
[0207] According to the principle that the resource input risk of the product portfolio is not greater than the resource input risk preferred by the target object, an inequality is constructed using the expression and the resource input risk preferred by the target object;
[0208] Solving the maximum value of the unknown number based on the inequality, taking the maximum value of the unknown number as the configuration ratio of the first resource input product, and determining the configuration ratio of the second resource input product based on the benchmark value and the maximum value of the unknown number;
[0209] A first combination ratio is calculated according to the configuration ratio of the first resource input product and the configuration ratio of the second resource input product.
[0210] In another specific implementation, when the processing unit 602 is used to respond to the confirmation operation on the product prompt information and determine the target product combination, it can be specifically used to:
[0211] In response to a confirmation operation on the product prompt information, a ratio adjustment window is displayed; and during the display of the ratio adjustment window, a first ratio adjustment operation is acquired;
[0212] Adjust the first combination ratio according to the first ratio adjustment operation to obtain a second combination ratio;
[0213] In response to a ratio confirmation operation input in the ratio adjustment window, the first resource input product and the second resource input product are combined according to the currently confirmed combination ratio to obtain a target product combination.
[0214] In another specific implementation, the ratio adjustment window includes: a resource investment risk of a first product combination formed based on the first combination ratio; any resource investment risk includes a resource loss rate, and the resource loss rate in the resource investment risk of the first product combination is obtained by weighted summing the resource loss rate of the first resource input product and the resource loss rate of the second resource input product according to the first combination ratio;
[0215] Accordingly, after obtaining the second combination ratio, the processing unit 602 may also be used to:
[0216] Based on the second combination ratio, the resource investment risk of the first product combination in the ratio adjustment window is dynamically updated.
[0217] In another specific implementation, after obtaining the second combination ratio, the processing unit 602 may also be used to:
[0218] Determining the resource investment risk of a second product combination formed based on the second combination ratio;
[0219] If the resource investment risk of the second product combination is higher than the resource investment risk preferred by the target object, a risk enhancement prompt is output;
[0220] Among them, the risk enhancement prompt includes: a prompt text displayed in a target display style; the prompt text is used to prompt: the resource investment risk of the second product combination formed based on the second combination ratio is higher than the resource investment risk preferred by the target object.
[0221] In another specific implementation, after detecting that a ratio confirmation operation is input in the ratio adjustment window, the processing unit 602 may further be used to:
[0222] Determine the resource investment risk of the current product portfolio based on the currently confirmed portfolio ratio;
[0223] If the resource investment risk of the current product portfolio is higher than the resource investment risk preferred by the target object, then the risk difference between the resource investment risk of the current product portfolio and the resource investment risk preferred by the target object is calculated;
[0224] If the risk difference is greater than the difference threshold, responding to the ratio confirmation operation input in the ratio adjustment window is prohibited, and a ratio adjustment prompt is output, wherein the ratio adjustment prompt is used to prompt the target object to re-input the first ratio adjustment operation.
[0225] In another specific implementation, the processing unit 602 may also be used to:
[0226] Obtaining a risk assessment questionnaire filled out by the target object, wherein the risk assessment questionnaire includes: answer information filled out by the target object in multiple dimensions;
[0227] According to each answer information in the risk assessment questionnaire, the risk tolerance of the target object is scored in the corresponding dimension to obtain the risk tolerance score of the target object in each dimension;
[0228] Integrate the risk tolerance scores of the target object in each dimension to obtain the total risk tolerance score of the target object;
[0229] Based on the correspondence between the preset scores and the resource investment risks, the resource investment risk corresponding to the total risk tolerance score is used as the resource investment risk preferred by the target object.
[0230] In another specific implementation, after electronic resource input is performed on the first resource input product and the second resource input product, the processing unit 602 may also be used to:
[0231] In response to the target object's operation of viewing the holding status of the target product combination, displaying a combination product holding page;
[0232] In the combined product holding page, resource holding information of the first resource input product and resource holding information of the second resource input product are displayed;
[0233] The resource holding information of any resource input product includes: the resource input amount of the corresponding resource input product, and the income generated based on the corresponding resource input amount of the corresponding resource input product.
[0234] In another specific implementation, after displaying the combination product holding page, the processing unit 602 may also be used to:
[0235] During the display of the combination product holding page, if a resource extraction trigger operation is detected, a resource extraction page is output;
[0236] Displaying the total amount of resource extraction set by the target object on the resource extraction page, and dividing the total amount of resource extraction into a first resource extraction amount and a second resource extraction amount based on the combination ratio corresponding to the target product combination;
[0237] In response to the detected resource extraction confirmation operation, extracting the first resource extraction amount of electronic resources from the first resource input product, and extracting the second resource extraction amount of electronic resources from the second resource input product;
[0238] Transfer all extracted electronic resources to the resource account of the target object.
[0239] According to another embodiment of the present application, Figure 6 The various units in the risk control-based resource processing device shown can be separately or completely combined into one or several other units to constitute, or one (some) of the units can also be split into multiple smaller units in function to constitute, which can achieve the same operation without affecting the realization of the technical effects of the embodiments of the present application. The above-mentioned units are divided based on logical functions. In practical applications, the functions of one unit can also be implemented by multiple units, or the functions of multiple units can be implemented by one unit. In other embodiments of the present application, other units can also be included based on the device. In practical applications, these functions can also be implemented with the assistance of other units, and can be implemented by the collaboration of multiple units.
[0240] According to another embodiment of the present application, a computer program (including one or more instructions) capable of executing each step involved in the above method can be constructed by running the computer program (including one or more instructions) on a general computing device such as a computer including processing elements such as a central processing unit (CPU), a random access memory medium (RAM), and a read-only memory medium (ROM) and storage elements. Figure 6 The resource processing device based on risk control shown in the embodiment of the present application is used to implement the various methods of the embodiment of the present application. The computer program can be recorded on a computer-readable storage medium, for example, and loaded into the above-mentioned computing device through the computer-readable storage medium and run therein.
[0241] It is worth noting that in the embodiments of the present application, the term "module" or "unit" refers to a computer program or a part of a computer program with a predetermined function, and works together with other related parts to achieve a predetermined goal, and can be implemented in whole or in part by using software, hardware (such as processing circuits or memories) or a combination thereof. Similarly, a processor (or multiple processors or memories) can be used to implement one or more modules or units. In addition, each module or unit can contain a part of the overall module or unit of the module or unit function.
[0242] In an embodiment of the present application, when the resource investment risk of the first resource investment product in which the target object intends to make electronic resource investment meets the risk control condition, the first resource investment product and the second resource investment product can be combined to obtain a target product combination, and a resource combination investment page of the target product combination can be displayed, so that after the target object configures the total resource investment amount in the resource combination investment page, the total resource investment amount can be divided into a first resource investment amount and a second resource investment amount, so that electronic resource investment is made in the first resource investment product based on the first resource investment amount to meet the resource investment demand of the target object (i.e., the demand for electronic resource investment in the first resource investment product), and electronic resource investment is made in the second resource investment product based on the second resource investment amount to achieve risk control and enrich the resource investment methods, so that the object is no longer limited to only being able to make electronic resource investments in some resource investment products, thereby improving the freedom of resource investment.
[0243] Based on the description of the above method embodiment and device embodiment, the present application embodiment also provides a computer device. Figure 7 , the computer device at least includes a processor 701, an input interface 702, an output interface 703 and a computer storage medium 704. Among them, the processor 701, the input interface 702, the output interface 703 and the computer storage medium 704 in the computer device can be connected via a bus or other means. The computer storage medium 704 can be stored in the memory of the computer device, the computer storage medium 704 is used to store a computer program, the computer program includes one or more instructions, and the processor 701 is used to execute one or more instructions in the computer program stored in the computer storage medium 704. The processor 701 (or CPU (Central Processing Unit)) is the computing core and control core of the computer device, which is suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions to realize the corresponding method flow or corresponding function.
[0244] In one embodiment, the processor 701 described in the embodiment of the present application can be used to perform a series of resource processing, specifically including: obtaining a resource investment trigger operation for a first resource investment product; if the resource investment risk of the first resource investment product meets the risk control condition, responding to the resource investment trigger operation, and displaying the resource combination investment page of the target product combination; the target product combination includes the first resource investment product and the second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product; displaying the total resource investment configured for the target object in the resource combination investment page, and dividing the total resource investment into a first resource investment amount and a second resource investment amount; responding to a resource investment confirmation operation, performing electronic resource investment on the first resource investment product based on the first resource investment amount, and performing electronic resource investment on the second resource investment product based on the second resource investment amount, and so on.
[0245] The embodiment of the present application also provides a computer storage medium (Memory), which is a memory device in a computer device for storing computer programs and data. It is understandable that the computer storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer storage medium provides a storage space, which stores the operating system of the computer device. In addition, a computer program is also stored in the storage space, which includes one or more instructions suitable for being loaded and executed by the processor 701, and these instructions can be one or more program codes. It should be noted that the computer storage medium here can be a high-speed RAM memory, or a non-volatile memory (non-volatile memory), such as at least one disk storage; optionally, it can also be at least one computer storage medium located away from the aforementioned processor.
[0246] In one embodiment, one or more instructions stored in a computer storage medium may be loaded and executed by a processor to implement the corresponding steps in the above method embodiment; in a specific implementation, one or more instructions in a computer storage medium may be loaded and executed by a processor as follows:
[0247] Obtain a resource investment trigger operation for the first resource investment product;
[0248] If the resource investment risk of the first resource investment product meets the risk control condition, in response to the resource investment trigger operation, a resource portfolio investment page of the target product portfolio is displayed; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product;
[0249] Displaying the total amount of resource investment configured for the target object on the resource combination investment page, and dividing the total amount of resource investment into a first resource investment amount and a second resource investment amount;
[0250] In response to the resource investment confirmation operation, electronic resource investment is performed on the first resource investment product based on the first resource investment amount, and electronic resource investment is performed on the second resource investment product based on the second resource investment amount.
[0251] In a specific implementation, the risk control condition includes: the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object;
[0252] Accordingly, in response to the resource investment triggering operation, when the resource portfolio investment page of the target product portfolio is displayed, the one or more instructions may be loaded and specifically executed by the processor:
[0253] In response to the resource investment trigger operation, output a product portfolio entry;
[0254] In response to a trigger operation on the product combination entry, a target product combination is determined, and a resource combination investment page of the target product combination is displayed; wherein the resource investment risk of the second resource investment product in the target product combination is lower than the resource investment risk of the first resource investment product.
[0255] In another specific implementation, when outputting the product combination entry, the one or more instructions may be loaded and specifically executed by the processor:
[0256] Synchronously outputting risk warning information, wherein the risk warning information is used to prompt that the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object;
[0257] The risk warning information includes: the resource investment risk of the first resource investment product and the resource investment risk of the target object.
[0258] In another specific implementation, in response to a trigger operation on the product combination entry, when determining a target product combination, the one or more instructions may be loaded and specifically executed by the processor:
[0259] In response to a trigger operation on the product combination entry, product prompt information is displayed; wherein the product prompt information is used to prompt: combining the first resource input product and the second resource input product based on a first combination ratio;
[0260] In response to a confirmation operation on the product prompt information, a target product combination is determined.
[0261] In another specific implementation, in response to a trigger operation for the product combination entry, when displaying product prompt information, the one or more instructions may be loaded and specifically executed by the processor:
[0262] In response to a trigger operation on the product combination entry, a product selection list is displayed; the product selection list includes product identifiers of multiple candidate resource investment products, and the resource investment risk of each candidate resource investment product is lower than the resource investment risk preferred by the target object;
[0263] Selecting at least one product identifier in the product selection list according to the product selection operation, and putting the candidate resource corresponding to the selected product identifier into the product as the second resource into the product;
[0264] Product prompt information is generated based on the second resource input product, and the product prompt information is displayed.
[0265] In another specific implementation, the one or more instructions may be loaded and specifically executed by a processor:
[0266] The configuration ratio of the first resource input product is expressed as an unknown number, and the configuration ratio of the second resource input product is expressed as the difference between the benchmark value and the unknown number; wherein the configuration ratio refers to: the proportion of the corresponding resource input product in the product portfolio;
[0267] Using the configuration ratio of the first resource input product and the configuration ratio of the second resource input product, weighted summing the resource input risks of the corresponding resource input products is performed to obtain an expression for the resource input risk of the product portfolio;
[0268] According to the principle that the resource input risk of the product portfolio is not greater than the resource input risk preferred by the target object, an inequality is constructed using the expression and the resource input risk preferred by the target object;
[0269] Solving the maximum value of the unknown number based on the inequality, taking the maximum value of the unknown number as the configuration ratio of the first resource input product, and determining the configuration ratio of the second resource input product based on the benchmark value and the maximum value of the unknown number;
[0270] A first combination ratio is calculated according to the configuration ratio of the first resource input product and the configuration ratio of the second resource input product.
[0271] In another specific implementation, in response to a confirmation operation on the product prompt information, when determining a target product combination, the one or more instructions may be loaded and specifically executed by the processor:
[0272] In response to a confirmation operation on the product prompt information, a ratio adjustment window is displayed; and during the display of the ratio adjustment window, a first ratio adjustment operation is acquired;
[0273] Adjust the first combination ratio according to the first ratio adjustment operation to obtain a second combination ratio;
[0274] In response to a ratio confirmation operation input in the ratio adjustment window, the first resource input product and the second resource input product are combined according to the currently confirmed combination ratio to obtain a target product combination.
[0275] In another specific implementation, the ratio adjustment window includes: a resource investment risk of a first product combination formed based on the first combination ratio; any resource investment risk includes a resource loss rate, and the resource loss rate in the resource investment risk of the first product combination is obtained by weighted summing the resource loss rate of the first resource input product and the resource loss rate of the second resource input product according to the first combination ratio;
[0276] Accordingly, after obtaining the second combination ratio, the one or more instructions may be loaded and specifically executed by the processor:
[0277] Based on the second combination ratio, the resource investment risk of the first product combination in the ratio adjustment window is dynamically updated.
[0278] In another specific implementation, after obtaining the second combination ratio, the one or more instructions may be loaded and specifically executed by the processor:
[0279] Determining the resource investment risk of a second product combination formed based on the second combination ratio;
[0280] If the resource investment risk of the second product combination is higher than the resource investment risk preferred by the target object, a risk enhancement prompt is output;
[0281] Among them, the risk enhancement prompt includes: a prompt text displayed in a target display style; the prompt text is used to prompt: the resource investment risk of the second product combination formed based on the second combination ratio is higher than the resource investment risk preferred by the target object.
[0282] In another specific implementation manner, after detecting that a ratio confirmation operation is input in the ratio adjustment window, the one or more instructions may be loaded and specifically executed by the processor:
[0283] Determine the resource investment risk of the current product portfolio based on the currently confirmed portfolio ratio;
[0284] If the resource investment risk of the current product portfolio is higher than the resource investment risk preferred by the target object, then the risk difference between the resource investment risk of the current product portfolio and the resource investment risk preferred by the target object is calculated;
[0285] If the risk difference is greater than the difference threshold, responding to the ratio confirmation operation input in the ratio adjustment window is prohibited, and a ratio adjustment prompt is output, wherein the ratio adjustment prompt is used to prompt the target object to re-input the first ratio adjustment operation.
[0286] In another specific implementation, the one or more instructions may be loaded and specifically executed by a processor:
[0287] Obtaining a risk assessment questionnaire filled out by the target object, wherein the risk assessment questionnaire includes: answer information filled out by the target object in multiple dimensions;
[0288] According to each answer information in the risk assessment questionnaire, the risk tolerance of the target object is scored in the corresponding dimension to obtain the risk tolerance score of the target object in each dimension;
[0289] Integrate the risk tolerance scores of the target object in each dimension to obtain the total risk tolerance score of the target object;
[0290] Based on the correspondence between the preset scores and the resource investment risks, the resource investment risk corresponding to the total risk tolerance score is used as the resource investment risk preferred by the target object.
[0291] In another specific implementation, after electronic resource investment is performed on the first resource investment product and the second resource investment product, the one or more instructions may be loaded and specifically executed by the processor:
[0292] In response to the target object's operation of viewing the holding status of the target product combination, displaying a combination product holding page;
[0293] In the combined product holding page, resource holding information of the first resource input product and resource holding information of the second resource input product are displayed;
[0294] The resource holding information of any resource input product includes: the resource input amount of the corresponding resource input product, and the income generated based on the corresponding resource input amount of the corresponding resource input product.
[0295] In another specific implementation, after displaying the combination product holding page, the one or more instructions may be loaded and specifically executed by the processor:
[0296] During the display of the combination product holding page, if a resource extraction trigger operation is detected, a resource extraction page is output;
[0297] Displaying the total amount of resource extraction set by the target object on the resource extraction page, and dividing the total amount of resource extraction into a first resource extraction amount and a second resource extraction amount based on the combination ratio corresponding to the target product combination;
[0298] In response to the detected resource extraction confirmation operation, extracting the first resource extraction amount of electronic resources from the first resource input product, and extracting the second resource extraction amount of electronic resources from the second resource input product;
[0299] Transfer all extracted electronic resources to the resource account of the target object.
[0300] In an embodiment of the present application, when the resource investment risk of the first resource investment product in which the target object intends to make electronic resource investment meets the risk control condition, the first resource investment product and the second resource investment product can be combined to obtain a target product combination, and a resource combination investment page of the target product combination can be displayed, so that after the target object configures the total resource investment amount in the resource combination investment page, the total resource investment amount can be divided into a first resource investment amount and a second resource investment amount, so that electronic resource investment is made in the first resource investment product based on the first resource investment amount to meet the resource investment demand of the target object (i.e., the demand for electronic resource investment in the first resource investment product), and electronic resource investment is made in the second resource investment product based on the second resource investment amount to achieve risk control and enrich the resource investment methods, so that the object is no longer limited to only being able to make electronic resource investments in some resource investment products, thereby improving the freedom of resource investment.
[0301] It should be noted that, according to one aspect of the present application, a computer program product or computer program is also provided, and the computer program product or computer program includes one or more instructions, and the one or more instructions are stored in a computer storage medium. The processor of the computer device reads one or more instructions from the computer storage medium, and the processor executes the one or more instructions, so that the computer device executes the method provided in various optional ways in any of the above-mentioned method embodiments. It should be understood that what is disclosed above is only a preferred embodiment of the present application, and of course it cannot be used to limit the scope of rights of the present application. Therefore, equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A resource processing method based on risk control, characterized in that: include: Obtain a resource investment trigger operation for the first resource investment product; If the resource investment risk of the first resource investment product meets the risk control condition, in response to the resource investment trigger operation, a resource portfolio investment page of the target product portfolio is displayed; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product; Displaying the total amount of resource investment configured for the target object on the resource combination investment page, and dividing the total amount of resource investment into a first resource investment amount and a second resource investment amount; In response to the resource investment confirmation operation, electronic resource investment is performed on the first resource investment product based on the first resource investment amount, and electronic resource investment is performed on the second resource investment product based on the second resource investment amount.
2. The method according to claim 1, characterized in that The risk control condition includes: the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object; the response to the resource investment trigger operation to display the resource portfolio investment page of the target product portfolio includes: In response to the resource investment trigger operation, output a product portfolio entry; In response to a trigger operation on the product combination entry, a target product combination is determined, and a resource combination investment page of the target product combination is displayed; wherein the resource investment risk of the second resource investment product in the target product combination is lower than the resource investment risk of the first resource investment product.
3. The method according to claim 2, characterized in that When outputting the product combination entry, the method further includes: Synchronously outputting risk warning information, wherein the risk warning information is used to prompt that the resource investment risk of the first resource investment product is higher than the resource investment risk preferred by the target object; The risk warning information includes: the resource investment risk of the first resource investment product and the resource investment risk of the target object.
4. The method according to claim 2, characterized in that The step of determining a target product combination in response to a triggering operation on the product combination entry includes: In response to a trigger operation on the product combination entry, product prompt information is displayed; wherein the product prompt information is used to prompt: combining the first resource input product and the second resource input product based on a first combination ratio; In response to a confirmation operation on the product prompt information, a target product combination is determined.
5. The method according to claim 4, characterized in that The responding to the triggering operation on the product combination entry to display product prompt information includes: In response to a trigger operation on the product combination entry, a product selection list is displayed; the product selection list includes product identifiers of multiple candidate resource investment products, and the resource investment risk of each candidate resource investment product is lower than the resource investment risk preferred by the target object; Selecting at least one product identifier in the product selection list according to the product selection operation, and putting the candidate resource corresponding to the selected product identifier into the product as the second resource into the product; Product prompt information is generated based on the second resource input product, and the product prompt information is displayed.
6. The method according to claim 4, characterized in that The calculation method of the first combination ratio includes: The configuration ratio of the first resource input product is expressed as an unknown number, and the configuration ratio of the second resource input product is expressed as the difference between the benchmark value and the unknown number; wherein the configuration ratio refers to: the proportion of the corresponding resource input product in the product portfolio; Using the configuration ratio of the first resource input product and the configuration ratio of the second resource input product, weighted summing the resource input risks of the corresponding resource input products is performed to obtain an expression for the resource input risk of the product portfolio; According to the principle that the resource input risk of the product portfolio is not greater than the resource input risk preferred by the target object, an inequality is constructed using the expression and the resource input risk preferred by the target object; Solving the maximum value of the unknown number based on the inequality, taking the maximum value of the unknown number as the configuration ratio of the first resource input product, and determining the configuration ratio of the second resource input product based on the benchmark value and the maximum value of the unknown number; A first combination ratio is calculated according to the configuration ratio of the first resource input product and the configuration ratio of the second resource input product.
7. The method according to claim 4, characterized in that The step of determining a target product combination in response to a confirmation operation on the product prompt information includes: In response to a confirmation operation on the product prompt information, a ratio adjustment window is displayed; and during the display of the ratio adjustment window, a first ratio adjustment operation is acquired; Adjust the first combination ratio according to the first ratio adjustment operation to obtain a second combination ratio; In response to a ratio confirmation operation input in the ratio adjustment window, the first resource input product and the second resource input product are combined according to the currently confirmed combination ratio to obtain a target product combination.
8. The method according to claim 7, characterized in that The ratio adjustment window includes: the resource input risk of the first product combination formed based on the first combination ratio; any resource input risk includes a resource loss rate, and the resource loss rate in the resource input risk of the first product combination is obtained by weighted summing the resource loss rate of the first resource input product and the resource loss rate of the second resource input product according to the first combination ratio; After obtaining the second combination ratio, the method further includes: Based on the second combination ratio, the resource investment risk of the first product combination in the ratio adjustment window is dynamically updated.
9. The method according to claim 8, characterized in that After obtaining the second combination ratio, the method further includes: Determining the resource investment risk of a second product combination formed based on the second combination ratio; If the resource investment risk of the second product combination is higher than the resource investment risk preferred by the target object, a risk enhancement prompt is output; Among them, the risk enhancement prompt includes: a prompt text displayed in a target display style; the prompt text is used to prompt: the resource investment risk of the second product combination formed based on the second combination ratio is higher than the resource investment risk preferred by the target object.
10. The method according to claim 7, characterized in that After detecting that a ratio confirmation operation is input in the ratio adjustment window, the method further includes: Determine the resource investment risk of the current product portfolio based on the currently confirmed portfolio ratio; If the resource investment risk of the current product portfolio is higher than the resource investment risk preferred by the target object, then the risk difference between the resource investment risk of the current product portfolio and the resource investment risk preferred by the target object is calculated; If the risk difference is greater than the difference threshold, responding to the ratio confirmation operation input in the ratio adjustment window is prohibited, and a ratio adjustment prompt is output, wherein the ratio adjustment prompt is used to prompt the target object to re-input the first ratio adjustment operation.
11. The method according to any one of claims 2 to 10, characterized in that: The calculation method of the resource investment risk preferred by the target object includes: Obtaining a risk assessment questionnaire filled out by the target object, wherein the risk assessment questionnaire includes: answer information filled out by the target object in multiple dimensions; According to each answer information in the risk assessment questionnaire, the risk tolerance of the target object is scored in the corresponding dimension to obtain the risk tolerance score of the target object in each dimension; Integrate the risk tolerance scores of the target object in each dimension to obtain the total risk tolerance score of the target object; Based on the correspondence between the preset scores and the resource investment risks, the resource investment risk corresponding to the total risk tolerance score is used as the resource investment risk preferred by the target object.
12. The method according to claim 1, characterized in that After electronic resource input is performed on the first resource input product and the second resource input product, the method further includes: In response to the target object's operation of viewing the holding status of the target product combination, displaying a combination product holding page; In the combined product holding page, resource holding information of the first resource input product and resource holding information of the second resource input product are displayed; The resource holding information of any resource input product includes: the resource input amount of the corresponding resource input product, and the income generated based on the corresponding resource input amount of the corresponding resource input product.
13. The method according to claim 12, characterized in that After displaying the combined product holding page, the method further includes: During the display of the combination product holding page, if a resource extraction trigger operation is detected, a resource extraction page is output; Displaying the total amount of resource extraction set by the target object on the resource extraction page, and dividing the total amount of resource extraction into a first resource extraction amount and a second resource extraction amount based on the combination ratio corresponding to the target product combination; In response to the detected resource extraction confirmation operation, extracting the first resource extraction amount of electronic resources from the first resource input product, and extracting the second resource extraction amount of electronic resources from the second resource input product; Transfer all extracted electronic resources to the resource account of the target object.
14. A resource processing device based on risk control, characterized in that: include: An acquisition unit, configured to acquire a resource investment trigger operation for a first resource investment product; a processing unit, configured to, if the resource investment risk of the first resource investment product meets the risk control condition, respond to the resource investment trigger operation and display a resource portfolio investment page of a target product portfolio; the target product portfolio includes the first resource investment product and a second resource investment product, and the second resource investment product has a different resource investment risk from the first resource investment product; The processing unit is further configured to display the total resource investment amount configured for the target object in the resource combination investment page, and divide the total resource investment amount into a first resource investment amount and a second resource investment amount; The processing unit is further configured to respond to a resource investment confirmation operation, make an electronic resource investment in the first resource investment product based on the first resource investment amount, and make an electronic resource investment in the second resource investment product based on the second resource investment amount.
15. A computer device comprising an input interface and an output interface, characterized in that: Also includes: processor and computer storage media; The processor is suitable for implementing one or more instructions, the computer storage medium stores one or more instructions, and the one or more instructions are suitable for being loaded by the processor and executing the risk control-based resource processing method as described in any one of claims 1-13.
16. A computer storage medium, characterized in that: The computer storage medium stores one or more instructions, and the one or more instructions are suitable for being loaded by a processor and executing the risk control-based resource processing method as described in any one of claims 1-13.
17. A computer program product, characterized in that The computer program product includes one or more instructions; when one or more instructions in the computer program are executed by a processor, the risk control-based resource processing method as described in any one of claims 1 to 13 is implemented.