By using a system with electric control valve and PID controller for inlet flow in the thermal power unit, the spray flow is automatically adjusted according to the boiler load, and the problems of boiler load fluctuations and system instability in the existing technology are solved, and thermal power is realized The bypass flue gas evaporator is automatically controlled in the unit's deep peak-shaving environment.
Patent Information
- Application Number
- CN202411193711.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing automatic spray control system for bypass flue gas evaporation cannot effectively deal with boiler load fluctuations and low load states under the background of deep peak shaving of thermal power units, resulting in the system being unable to be put into operation normally, with feedback parameters lag and water volume and flue gas flow mismatch. The problem.
The system adopts a system including electric regulating valve for inlet flow, PIDA and PIDB controllers, and control system switches. The inlet flow rate is adjusted through the flue gas flowmeter and outlet flue gas thermometer, and the controller is switched according to the boiler load to realize the bypass smoke. Automatic control of air evaporator spray.
Automatic spray control of bypass flue gas evaporator under deep peak condition of thermal power set is realized, which improves the stability and reliability of the system and solves the problem that the system cannot be put into operation when load fluctuates.
Smart Images

Figure CN119080121A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of zero terminal wastewater discharge, and relates to a reliable bypass flue gas evaporator automatic spray control system and method under the background of deep peak regulation of thermal power units. Background Art
[0002] In order to meet the new environmental protection requirements, more and more thermal power plants choose to put into operation the flue gas evaporation tower of desulfurization wastewater bypass to achieve zero emission treatment of high-salt wastewater at the end. However, under the background of large-scale grid-connected new energy, deep peak load regulation of thermal power units has become the new normal. In the non-heating season or for coal-fired units supplying steam to the outside, the boiler load not only needs to fluctuate greatly in a short period of time during peak load regulation, but also the boiler is in a low-load stable combustion state for more periods of time. At present, some bypass flue gas drying spray control systems only rely on reading the flue gas temperature at the outlet of the bypass flue gas evaporation system to achieve automatic regulation. Although it can play a regulatory role under high boiler load, this method has the disadvantages of feedback parameter lag and mismatch between water volume and flue gas flow under low load conditions or when the load fluctuates greatly, which affects the accuracy and reliability of the automatic control system, and is prone to cause internal slabs in the evaporator, ash silo pump, pipeline blockage and other phenomena, resulting in the system being unable to operate normally under low load conditions or frequent load fluctuations. In summary, the existing bypass flue gas evaporation automatic spray control system can no longer adapt to the operation environment under the background of deep peak regulation of thermal power units. It is urgent to develop a reliable bypass flue gas evaporator automatic spray control system and method under the background of deep peak regulation of thermal power units. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a reliable bypass flue gas evaporator automatic spray control system and method under the background of deep peak regulation of thermal power units. The system and method can realize automatic control of bypass flue gas evaporator spray under the deep peak regulation condition of thermal power units and maintain stable system operation.
[0004] In order to achieve the above object, the present invention adopts the following technical scheme:
[0005] The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units described in the present invention comprises an inlet flue, a bypass flue gas evaporator, an outlet flue, a wastewater inlet pipeline, a boiler load signal input terminal, an inlet water flow electric regulating valve control module, an inlet water flow electric regulating valve feedback control module, an inlet water flow electric regulating valve, a control system switch, a PID A Controller and PID B Controller;
[0006] The inlet flue is connected to the inlet of the bypass flue gas evaporator, the outlet of the bypass flue gas evaporator is connected to the outlet flue, the inlet flue is provided with a flue gas flow meter, the outlet flue is provided with an outlet flue gas thermometer, and the outlet of the wastewater inlet pipeline is connected to the wastewater inlet of the bypass flue gas evaporator via the electric water inlet flow regulating valve in turn;
[0007] The output end of the flue gas flow meter is connected to the input end of the water inlet flow electric regulating valve control module, the output end of the water inlet flow electric regulating valve control module is connected to the control end of the water inlet flow electric regulating valve, the output end of the outlet flue gas thermometer is connected to the input end of the water inlet flow electric regulating valve feedback control module, the boiler load signal input end is connected to the input end of the control system switcher, the first output end of the control system switcher is connected to the input end of the PIDA controller, the output end of the PIDA controller is connected to the input end of the water inlet flow electric regulating valve feedback control module, the second output end of the control system switcher is connected to the PID A The input of the controller is connected to the PID B The output end of the controller is connected to the input end of the water inlet flow electric regulating valve feedback control module.
[0008] The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units described in the present invention is further improved in that:
[0009] Furthermore, the output end of the flue gas flow meter is connected to the input end of the water inlet flow electric regulating valve control module via the flue gas flow signal transmission system.
[0010] Furthermore, the output end of the outlet flue gas thermometer is connected to the input end of the water inlet flow electric regulating valve feedback control module via the outlet temperature signal transmission system.
[0011] Furthermore, the outlet of the wastewater inlet pipeline is connected to the wastewater inlet of the bypass flue gas evaporator via the water inlet flow electric regulating valve and the electromagnetic flowmeter in turn.
[0012] The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units described in the present invention comprises the following steps:
[0013] The water inlet flow electric regulating valve control module adjusts the opening L1 of the water inlet flow electric regulating valve according to the flue gas flow signal in the inlet flue measured by the flue gas flow meter;
[0014] The feedback control module of the water inlet flow electric regulating valve calculates the deviation between the measured flue gas temperature in the outlet flue and the set value Test according to the flue gas temperature in the outlet flue measured by the outlet flue gas thermometer, and uses PID A Controller or PIDB The proportional band value output by the controller is used for PID calculation to obtain the compensation opening L2 of the electric regulating valve for the water inlet flow;
[0015] The opening action threshold ΔL of the water inlet flow electric regulating valve is set. When L2<ΔL, the opening of the water inlet flow electric regulating valve is adjusted to L1; when L2≥ΔL, the opening of the water inlet flow electric regulating valve is adjusted to L=L1+L2.
[0016] The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units described in the present invention is further improved in that:
[0017] Furthermore, it also includes:
[0018] When the boiler load is greater than 35%, it is considered that the unit is in peak load regulation state, the unit load fluctuates frequently, and the control system switcher switches to PID A Controller, PID A The proportional band value δ of the controller output A To the water inlet flow electric regulating valve feedback control module; when the boiler load is ≤35%, it is considered that the unit is in a low-load stable combustion state, the system is relatively stable, and the control system switcher switches to PID B Controller, PID B The proportional band value δ of the controller output B To the water inlet flow electric regulating valve feedback control module, where the proportional band value δ A Less than the proportional band value δ B .
[0019] Furthermore, the value range of L1 is 0% to 100%.
[0020] Furthermore, the ratio of the value range of the spray flow rate W1 to the inlet flue gas flow rate F1 is not greater than 1:15000.
[0021] Furthermore, the output end of the flue gas flow meter is connected to the input end of the water inlet flow electric regulating valve control module via the flue gas flow signal transmission system.
[0022] Furthermore, the output end of the outlet flue gas thermometer is connected to the input end of the water inlet flow electric regulating valve feedback control module via the outlet temperature signal transmission system.
[0023] The present invention has the following beneficial effects:
[0024] In the specific operation of the reliable bypass flue gas evaporator automatic spray control system and method under the background of deep peak regulation of thermal power units described in the present invention, the water inlet flow electric regulating valve control module sets the water inlet flow according to the current evaporator inlet flue gas flow, and then the water inlet flow electric regulating valve feedback control module adjusts the opening of the water inlet flow electric regulating valve according to the temperature feedback of the flue gas in the current evaporator outlet flue, performs feedback compensation adjustment, and corrects the water inlet flow to realize automatic control of the bypass flue gas evaporator spray, so that the spray water volume of the bypass flue gas evaporator is within a reasonable range. It should be noted that the present invention sets two sets of PID controllers, which are automatically switched according to the boiler load through the control system switcher, and smoothly transitioned to realize the automatic adjustment of the bypass flue gas evaporation system under the deep peak regulation operation environment of the thermal power unit, improve the system stability, and solve the problem that the bypass flue gas evaporation system cannot be put into operation when the unit load fluctuates frequently. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a structural diagram of the present invention.
[0027] Among them, 1 is the inlet flue 1, 2 is the bypass flue gas evaporator, 3 is the outlet flue, 4 is the wastewater inlet pipeline, 5 is the boiler load signal input terminal, 6 is the water inlet flow electric regulating valve control module, 7 is the water inlet flow electric regulating valve feedback control module, 8 is the flue gas flow meter, 9 is the outlet flue gas thermometer, 10 is the electromagnetic flow meter, 11 is the water inlet flow electric regulating valve, 12 is the flue gas flow signal transmission system, 13 is the outlet temperature signal transmission system, 14 is the control system switch, 15 is the PID A Controller, 16 is PID B Controller. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In the description of the present invention, it should be understood that the terms “include” and “comprises” indicate the presence of described features, wholes, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof.
[0030] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0031] It should be further understood that the term "and / or" used in the present specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects are in an "or" relationship.
[0032] It should be understood that, although the terms first, second, third, etc. may be used to describe preset ranges, etc. in the embodiments of the present invention, these preset ranges should not be limited to these terms. These terms are only used to distinguish preset ranges from each other. For example, without departing from the scope of the embodiments of the present invention, the first preset range may also be referred to as the second preset range, and similarly, the second preset range may also be referred to as the first preset range.
[0033] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0034] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only an embodiment of a part of the present invention, not all embodiments, and is not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concepts disclosed in the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.
[0035] The accompanying drawings show schematic diagrams of structures according to embodiments disclosed in the present invention. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0036] Embodiment 1
[0037] refer to Figure 1 The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units described in the present invention comprises an inlet flue 1, a bypass flue gas evaporator 2, an outlet flue 3, a wastewater inlet pipeline 4, a boiler load signal input terminal 5, an inlet water flow electric regulating valve control module 6, an inlet water flow electric regulating valve feedback control module 7, a flue gas flow meter 8, an outlet flue gas thermometer 9, an electromagnetic flow meter 10, an inlet water flow electric regulating valve 11, a flue gas flow signal transmission system 12, an outlet temperature signal transmission system 13, a control system switch 14, a PID A Controller 15 and PID B Controller 16;
[0038] The inlet flue 1 is connected to the inlet of the bypass flue gas evaporator 2, and the outlet of the bypass flue gas evaporator 2 is connected to the outlet flue 3. The inlet flue 1 is provided with a flue gas flow meter 8, and the outlet flue 3 is provided with an outlet flue gas thermometer 9. The outlet of the wastewater inlet pipeline 4 is connected to the wastewater inlet of the bypass flue gas evaporator 2 via the water inlet flow electric regulating valve 11 and the electromagnetic flow meter 10 in sequence.
[0039] The output end of the flue gas flow meter 8 is connected to the input end of the water inlet flow electric regulating valve control module 6 via the flue gas flow signal transmission system 12, the output end of the water inlet flow electric regulating valve control module 6 is connected to the control end of the water inlet flow electric regulating valve 11, the output end of the outlet flue gas thermometer 9 is connected to the input end of the water inlet flow electric regulating valve feedback control module 7 via the outlet temperature signal transmission system 13, the boiler load signal input end 5 is connected to the input end of the control system switch 14, the first output end of the control system switch 14 is connected to the input end of the PIDA controller 15, the output end of the PIDA controller 15 is connected to the input end of the water inlet flow electric regulating valve feedback control module 7, the second output end of the control system switch 14 is connected to the PID A The input terminal of the controller 15 is connected to the PID B The output end of the controller 16 is connected to the input end of the water inlet flow electric regulating valve feedback control module 7 .
[0040] Embodiment 2
[0041] The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units of the present invention comprises the following steps:
[0042] The water inlet flow electric regulating valve control module 6 adjusts the opening L1 of the water inlet flow electric regulating valve 11 according to the flue gas flow signal in the inlet flue 1 measured by the flue gas flow meter 8;
[0043] The water inlet flow electric regulating valve feedback control module 7 calculates the deviation between the measured flue gas temperature in the outlet flue 3 and the set value Test according to the flue gas temperature in the outlet flue 3 measured by the outlet flue gas thermometer 9, and uses PID A Controller 15 or PID B The proportional band value output by the controller 16 is subjected to PID calculation to obtain the compensation opening L2 of the water inlet flow electric regulating valve 11;
[0044] The opening action threshold ΔL of the water inlet flow electric regulating valve 11 is set. When L2<ΔL, the opening of the water inlet flow electric regulating valve 11 is adjusted to L1; when L2≥ΔL, the opening of the water inlet flow electric regulating valve 11 is adjusted to L=L1+L2.
[0045] In addition, according to the peak load characteristics of thermal power plant units, the present invention sets a control system switch 14, PID A Controller 15 and PID B Controller 16; When the boiler load is greater than 35%, it is considered that the unit is in peak load regulation state, the unit load fluctuates frequently, and the system switches to PID A Controller 15, PID A The proportional band value δ output by controller 15 A The system is relatively small, with high sensitivity and fast response, and a better transition process curve can be obtained, so that the water volume treated by the bypass flue gas evaporation system can adapt to the load fluctuation of the unit; when the boiler load is ≤35%, it is considered that the unit is in a low-load stable combustion state and the system is relatively stable, so the system switches to PID B Controller 16, PID B The proportional band value δ output by controller 16 B The larger the system, the more stable it is, the slower the feedback is, and the lower the sensitivity is, so that the bypass flue gas evaporation system can be put into stable operation at low load.
[0046] As an implementation manner of the present invention, the value range of L1 is 0% to 100%.
[0047] As an embodiment of the present invention, the ratio of the value range of the spray flow rate W1 to the inlet flue gas flow rate F1 should be no more than 1:15000, so that the sprayed water volume can roughly correspond to the extracted flue gas volume, the sprayed water volume is within a reasonable range, and the values of F1 and W1 can be flexibly adjusted and set according to the conditions of different units.
[0048] As an implementation mode of the present invention, the given value of the opening L1 of the water inlet flow electric regulating valve 11 is determined according to Table 1.
[0049] Table 1
[0050]
[0051]
[0052] Among them, the value range of F1 is 0(Nm 3 / h)-60000(Nm 3 / h), which can be adjusted according to the unit capacity; the ratio of the value range of W1 to the value of F1 is not greater than 1:15000, so that the amount of water sprayed roughly corresponds to the amount of smoke extracted, and the amount of water sprayed is within a reasonable range. The openings L01, L02, L03, L04... of the water inlet flow electric regulating valve 11 range from 0% to 100%, and the specific values are determined according to the opening corresponding to the value of W1 during the commissioning period. The above values can be flexibly adjusted according to the conditions of different units, and there is no overlap between them.
[0053] Embodiment 3
[0054] Taking the bypass flue gas evaporator of a 660MW unit in a power plant as an example, the control method of the present invention includes the following steps:
[0055] The water inlet flow electric regulating valve control module 6 adjusts the opening L1 of the water inlet flow electric regulating valve 11 according to the smoke flow signal measured by the smoke flow meter 8 and the preset smoke flow;
[0056] The boiler load signal input terminal 5 sends the current boiler operating load signal to the control system switch 14 for judgment. When the boiler load is greater than 35% and the delay is 60s, the unit is in a peak load regulation state and the unit load fluctuates frequently, so the system switches to PID A Controller 15, PID A The proportional band value δ output by controller 15 A The system is relatively small, with high sensitivity and fast response, and a better transition process curve can be obtained, so that the water volume treated by the bypass flue gas evaporation system can adapt to the load fluctuation of the unit; when the boiler load is ≤35% and the delay is 60s, the unit is in a low-load stable combustion state, and the system is relatively stable, so the system switches to PID BController 16, PID B The proportional band value δ output by controller 16 B The larger the system, the more stable it is, the slower the feedback is, and the lower the sensitivity is, so that the bypass flue gas evaporation system can be put into stable operation at low load.
[0057] The outlet flue gas temperature of the bypass flue gas evaporator 2 is set to 150°C. The water inlet flow electric regulating valve feedback control module 7 is based on the deviation between the outlet flue gas thermometer 9 and the set value 150°C, and then the current selected PID A Controller 15 or PID B The controller 16 outputs a proportional band numerical calculation to obtain the compensation opening L2 of the water inlet flow electric regulating valve 11; wherein, the given value of the opening L1 of the water inlet flow electric regulating valve 11 is determined according to Table 2.
[0058] Table 2
[0059]
[0060] The opening action threshold ΔL of the electric regulating valve 11 for the water inlet flow is set. When L2<ΔL, the opening of the electric regulating valve 11 for the water inlet flow is adjusted to L1; when L2≥ΔL, the opening of the electric regulating valve 11 for the water inlet flow is adjusted to L=L1+L2. Finally, within the spray flow range of Table 2, the spray water volume is calibrated and adjusted by fine-tuning the opening of the electric regulating valve 11 for the water inlet flow, so that the outlet flue gas temperature is stabilized at 150℃, and the spray water volume is in a reasonable range and the spray water volume is accurately matched with the extracted flue gas volume.
[0061] The value range of L1 is 0% to 100%.
[0062] The ratio of the value range of the spray flow rate W1 to the value of the inlet flue gas flow rate F1 is not greater than 1:15000, so that the sprayed water volume can roughly correspond to the extracted flue gas volume, the sprayed water volume is within a reasonable range, and the values of F1 and W1 can be flexibly adjusted according to the conditions of different units.
[0063] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.
Claims
1. A reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units, characterized in that: The invention comprises an inlet flue (1), a bypass flue gas evaporator (2), an outlet flue (3), a wastewater inlet pipeline (4), a boiler load signal input terminal (5), an inlet water flow electric regulating valve control module (6), an inlet water flow electric regulating valve feedback control module (7), an inlet water flow electric regulating valve (11), a control system switch (14), a PID A Controller (15) and PID B Controller (16); The inlet flue (1) is connected to the inlet of the bypass flue gas evaporator (2), the outlet of the bypass flue gas evaporator (2) is connected to the outlet flue (3), the inlet flue (1) is provided with a flue gas flow meter (8), the outlet flue (3) is provided with an outlet flue gas thermometer (9), and the outlet of the wastewater inlet pipeline (4) is connected to the wastewater inlet of the bypass flue gas evaporator (2) via an electric water inlet flow regulating valve (11); The output end of the flue gas flow meter (8) is connected to the input end of the water inlet flow electric regulating valve control module (6), the output end of the water inlet flow electric regulating valve control module (6) is connected to the control end of the water inlet flow electric regulating valve (11), the output end of the outlet flue gas thermometer (9) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7), the boiler load signal input end (5) is connected to the input end of the control system switch (14), the first output end of the control system switch (14) is connected to the input end of the PIDA controller (15), the output end of the PIDA controller (15) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7), the second output end of the control system switch (14) is connected to the PIDA controller (15), the output end of the PIDA controller (15) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7), and the second output end of the control system switch (14) is connected to the PIDA controller (15). A The input terminal of the controller (15) is connected to the PID B The output end of the controller (16) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7).
2. The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units according to claim 1 is characterized in that: The output end of the flue gas flow meter (8) is connected to the input end of the water inlet flow electric regulating valve control module (6) via the flue gas flow signal transmission system (12).
3. The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units according to claim 1 is characterized in that: The output end of the outlet flue gas thermometer (9) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7) via the outlet temperature signal transmission system (13).
4. The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units according to claim 1 is characterized in that: The outlet of the wastewater inlet pipeline (4) is connected to the wastewater inlet of the bypass flue gas evaporator (2) via the water inlet flow electric regulating valve (11) and the electromagnetic flow meter (10) in sequence.
5. A reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units, characterized in that: The reliable bypass flue gas evaporator automatic spray control system under the background of deep peak regulation of thermal power units according to claim 1 comprises the following steps: The water inlet flow electric regulating valve control module (6) adjusts the opening L1 of the water inlet flow electric regulating valve (11) according to the flue gas flow signal in the inlet flue (1) measured by the flue gas flow meter (8); The water inlet flow electric regulating valve feedback control module (7) calculates the deviation between the measured smoke temperature in the outlet flue (3) and the set value Test according to the smoke temperature in the outlet flue (3) measured by the outlet smoke thermometer (9), and uses PID A Controller (15) or PID B The proportional band value output by the controller (16) is subjected to PID operation to obtain the compensation opening L2 of the water inlet flow electric regulating valve (11); The opening action threshold ΔL of the water inlet flow electric regulating valve (11) is set. When L2<ΔL, the opening of the water inlet flow electric regulating valve (11) is adjusted to L1; when L2≥ΔL, the opening of the water inlet flow electric regulating valve (11) is adjusted to L=L1+L2.
6. The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units according to claim 5 is characterized in that: Also includes: When the boiler load is greater than 35%, it is considered that the unit is in peak load regulation state, and the unit load fluctuates frequently. The control system switch (14) switches to PID A Controller (15), PID A The proportional band value δ output by the controller (15) A To the water inlet flow electric regulating valve feedback control module (7); when the boiler load is ≤35%, it is considered that the unit is in a low-load stable combustion state and the system is relatively stable. The control system switch (14) switches to PID B Controller (16), PID B The proportional band value δ output by the controller (16) B To the water inlet flow electric regulating valve feedback control module (7), wherein the proportional band value δ A Less than the proportional band value δ B .
7. The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units according to claim 5 is characterized in that: The value range of L1 is 0% to 100%.
8. The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units according to claim 5 is characterized in that: The ratio of the spray flow rate W1 to the inlet flue gas flow rate F1 is not greater than 1:15000.
9. The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units according to claim 5 is characterized in that: The output end of the flue gas flow meter (8) is connected to the input end of the water inlet flow electric regulating valve control module (6) via the flue gas flow signal transmission system (12).
10. The reliable bypass flue gas evaporator automatic spray control method under the background of deep peak regulation of thermal power units according to claim 5 is characterized in that: The output end of the outlet flue gas thermometer (9) is connected to the input end of the water inlet flow electric regulating valve feedback control module (7) via the outlet temperature signal transmission system (13).
Citation Information
Patent Citations
Utilization method and device for wet flue gas desulfurization wastewater
CN102500208A
System and method for softening treatment of desulfurization wastewater of coal-fired power plant
CN105060545A
Device for adjusting desulfurization slurry supply flow through single PID loop and feedforward and control method
CN110479053A
Full-load denitrification system for boiler deep peak load regulation and operation method thereof
CN111649349A
Reliable and efficient bypass flue gas drying tower automatic spraying control system and method
CN112370933A