Device for quickly positioning and installing armor seam and construction method

By using the quick positioning and installation device of the portal brace and the lifting bracket, and using the height-adjusting screw and the width-adjusting screw to adjust the position of the armor joint, the problem of low efficiency in positioning and installation of the armor joints in construction joints is solved, and the construction quality and efficiency are improved. .

CN119332902APending Publication Date: 2025-01-21MCC TIANGONG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411492357.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2025-01-21

AI Technical Summary

Technical Problem

In construction projects, the armor joints of concrete floor construction joints are difficult to quickly and accurately locate and install during construction, resulting in low construction efficiency and poor quality.

Method used

The rapid positioning of the armor joints including door -type support and lifting brackets is used to adjust the height and position adjustment of armor seam by raising screws and broad screws to quickly and accurately set and calibrate the armor seam of armor.

Benefits of technology

It improves the laying efficiency of armor joints, reduces the disturbance to armor joints when installing diagonal support short bars, prevents position deviation, and improves construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119332902A_ABST
    Figure CN119332902A_ABST
Patent Text Reader

Abstract

The invention provides a device for quickly positioning and installing an armor seam and a construction method, the device comprises a gate-type supporting frame and a lifting bracket, the lifting bracket is located on the inner side of the gate-type supporting frame, and the lifting bracket is connected with the gate-type supporting frame through a height adjusting screw rod; two groups of width-direction stop levers are correspondingly arranged in the lifting bracket, width adjusting screw rods are respectively mounted on the two groups of width-direction stop levers, and the two groups of width adjusting screw rods can be close to each other or far away from each other. Vertical supporting and transverse clamping are generated for the armor seam through the lifting bracket and the width adjusting screw rod, the height of the armor seam and the position in the width direction can be adjusted through the arranged height adjusting screw rod and the width adjusting screw rod, the armor seam can be conveniently, rapidly and accurately arranged and calibrated, the arrangement efficiency is improved, and the labor intensity of workers is reduced. And disturbance to the armor seam can be reduced when the oblique supporting short rib is installed, and the situation that the position of the oblique supporting short rib deviates, and consequently the construction quality is affected is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering ground construction, and in particular to a device for quickly positioning and installing armor seams and a construction method. Background Art

[0002] Concrete floor construction joints are very common in the construction process. In the ground use environment of industrial workshops and heavy trucks, the edges of the construction joints are easily damaged by impact. In order to protect the edges of this template-type free-moving joint from damage, the construction joint uses a pre-buried finished armor joint. This armor joint combines edge protection, permanent templates and force transmission system in one, which can greatly improve the quality and service life of the construction joint.

[0003] The construction process of this construction joint generally includes: pre-embedding short vertical support bars on one side of the embedded position of the armor joint - positioning and arranging the armor joint - welding short oblique support bars on the short vertical support bars, so that the two ends of the short oblique support bars are respectively connected to the armor joint and the floor steel mesh (in the case of single-sided supported armor joint) - pouring the floor on the unsupported side of the armor joint - removing the short vertical support bars and the short oblique support bars, and pouring the floor on the other side of the armor joint.

[0004] During the above construction process, it is necessary to first position and arrange the armor joint in the air, which is difficult to position and calibrate and has low efficiency. In addition, welding the short inclined support bars may disturb the armor joint, resulting in inaccurate positioning, affecting the construction quality of the construction joint and reducing the service life of the floor. Summary of the invention

[0005] The object of the present invention is to provide a device and a construction method for quickly positioning and installing armor seams to solve the problems in the above background.

[0006] The technical solution adopted by the present invention is: a device for quickly positioning and installing armor seams, which includes a portal support and a lifting bracket, wherein the lifting bracket is located on the inner side of the portal support and is connected to the portal support via a height adjustment screw; two groups of width-direction baffles are correspondingly arranged in the lifting bracket, and width-adjusting screws are respectively installed on the two groups of width-direction baffles, and the two groups of width-adjusting screws can be close to or away from each other.

[0007] Preferably, the portal support frame comprises a top beam, a bottom plate and a triangular support frame, a group of the triangular support frames are respectively arranged at both ends of the top beam, and the bottom plate is fixedly arranged at the bottom of the triangular support frame.

[0008] Preferably, a first mounting hole is provided on the top beam, and a second mounting hole corresponding thereto is provided on the lifting bracket, and first rotary handles and limit blocks are provided at both ends of the height-adjusting screw respectively, and a middle portion is passed through the first mounting hole and the second mounting hole; one of the top beam and the lifting bracket is threadedly connected to the height-adjusting screw, and the other is slidably connected to the height-adjusting screw and limited by the limit block.

[0009] Preferably, first nuts are respectively provided on the top and bottom sides of the top beam, and the first nut is coaxially distributed with the first mounting hole.

[0010] Preferably, the height-adjusting screw rods are provided in two groups, which are respectively located at the separated sides of the two groups of width-direction blocking rods.

[0011] Preferably, a third mounting hole is provided on the width-direction blocking rod, and the width-adjusting screw rod is passed through the third mounting hole and is threadedly connected to the width-direction blocking rod.

[0012] Preferably, the two groups of width-adjusting screw rods are respectively provided with a second rotary handle at the separated ends, and are respectively provided with abutment plates at the proximal ends, and the size of the abutment plates is larger than the radial size of the width-adjusting screw rods.

[0013] Preferably, second nuts are respectively provided on both sides of the width-wise blocking rod, and the second nuts are coaxially distributed with the third mounting hole.

[0014] The technical solution of the present invention also includes: a method for construction using the device for quickly positioning and installing armor seams as described above, which includes the steps of:

[0015] (1) Pre-embed multiple short vertical support bars on one side of the armor seam layout position, and perform positioning and laying out before the armor seam installation;

[0016] (2) two sets of devices for quickly positioning and installing armor seams are arranged at both ends of the length direction of the construction joint, and the armor seams are placed on two lifting brackets for preliminary positioning;

[0017] (3) Use measuring equipment to re-measure the elevation, center line and straightness of the armor seam, rotate the height adjustment screw to change the height of the lifting bracket and the armor seam, and rotate the width adjustment screw to press against the side of the armor seam;

[0018] (4) Weld the short oblique support bars to the short vertical support bars, weld the short oblique support bars to one side of the armor seam, remove the device for quickly positioning and installing the armor seam, and pour the floor.

[0019] The beneficial effects of the present invention are as follows: vertical support and lateral clamping are provided for the armor seam by means of a lifting bracket and a width-adjusting screw, and the height and the position of the armor seam along the width direction can be adjusted by means of the provided height-adjusting screw and the width-adjusting screw, so that the armor seam can be conveniently and quickly and accurately arranged and calibrated, the arrangement efficiency can be improved, and the disturbance to the armor seam caused by the installation of the oblique supporting short ribs can be reduced, so as to prevent the position from being offset and affecting the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a usage state diagram of an embodiment of the present invention;

[0021] Figure 2 is an overall structural diagram of an embodiment of the present invention;

[0022] Figure 3 is a structural diagram of a portal support frame in an embodiment of the present invention;

[0023] Figure 4 2 is a structural diagram of a lifting bracket in an embodiment of the present invention.

[0024] In the figure:

[0025] 1. Portal support; 1.1. Top beam; 1.2. First mounting hole; 1.3. Bottom plate; 1.4. Triangular support;

[0026] 2. Lifting bracket; 2.1. Second mounting hole;

[0027] 3. Adjust the screw height;

[0028] 4. Width stop bar; 4.1. Third mounting hole;

[0029] 5. Width adjustment screw;

[0030] 6. First rotary handle;

[0031] 7. Limit block;

[0032] 8. First nut;

[0033] 9. Second rotary handle;

[0034] 10. Abutment plate;

[0035] 11. Second nut;

[0036] 12. Armor seams. DETAILED DESCRIPTION

[0037] The technical solutions of the embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0038] In the description of the embodiments of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "top", "bottom", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "set" and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0039] Reference Figure 1-4 The present embodiment provides a device for quickly positioning and installing armor seams, which includes a portal support frame 1, a lifting bracket 2, a height adjustment screw 3, a width stopper 4 and a width adjustment screw 5. The lifting bracket 2 is located inside the portal support frame 1 and is connected to the portal support frame 1 through the height adjustment screw 3; two sets of width stoppers 4 are correspondingly arranged in the lifting bracket 2, and the two sets of width stoppers 4 are respectively installed with width adjustment screws 5, and the two sets of width adjustment screws 5 can be close to or away from each other.

[0040] When in use, this device can be arranged in two groups along the length direction of the armor seam 12, respectively used to support and fix the two ends of the armor seam 12. After the foundation construction is completed, lay the floor steel mesh, and on one side of the layout position of the armor seam 12, embed multiple vertical supporting short bars along the length direction of the armor seam 12; use the theodolite, infrared level and wire marking to position and lay out the armor seam 12 before installation. The nylon (or steel wire) wire used for positioning must be fixed and tightened, and the elevation of the wire must be adjusted to about 10mm above the surface of the armor seam 12, as the control line for positioning and measuring the straightness and horizontality of the armor seam 12; place two sets of this device above the positioned nylon wire, and the gantry frame crosses the nylon wire, with the center basically aligned with the nylon wire. Place the armor seam 12 on two lifting brackets 2, align with the center of the lifting bracket 2, and use a tape measure, a ruler, etc. for reference. The armor seam 12 is initially positioned by the nylon line elevation and the center line of the armor seam 12; the elevation, center line and straightness are remeasured using a level, an infrared level and a nylon line, and the height of the lifting bracket 2 and the armor seam 12 is adjusted by adjusting the height of the screw 3, and the side of the armor seam 12 is pressed against the width-adjusting screw 5 to fine-tune and fix its position; after accurate positioning, ensure that the height-adjusting screw 3 and the width-adjusting screw 5 are locked, weld the oblique support short bars on the vertical support short bars, weld the two ends of the oblique support short bars to the floor steel mesh and the armor seam 12 respectively, and remove the device; after pouring the floor on the side where the oblique support short bars are not set, remove the vertical support short bars and the oblique support short bars, and pour the floor on the other side.

[0041] Before installing the short oblique support bars, the device can provide vertical support and lateral clamping for the armor seam 12. The height and position of the armor seam 12 along the width direction can be adjusted by the height adjustment screw 3 and the width adjustment screw 5, so as to facilitate the rapid and accurate arrangement and calibration of the armor seam 12 and improve the arrangement efficiency. The device can also reduce the disturbance of the armor seam 12 when installing the short oblique support bars, and prevent the position from being offset and affecting the construction quality.

[0042] Reference Figure 2-3 The portal support frame 1 includes a top beam 1.1, a bottom plate 1.3 and a triangular support frame 1.4. A set of triangular supports 1.4 is provided at each end of the top beam 1.1. The bottom plate 1.3 is fixedly arranged at the bottom of the triangular support frame 1.4 to increase the contact area with the ground and improve the support stability. The triangular support frame 1.4 is provided with two diagonal supports and one vertical support. The top ends of the three are connected and the bottom ends are respectively connected to the bottom plate 1.3 to form a triangular stable support structure with the bottom plate 1.3, further improving the support stability.

[0043] Among them, the top beam 1.1 is provided with a first mounting hole 1.2, the lifting bracket 2 is provided with a second mounting hole 2.1 corresponding thereto, the two ends of the height adjustment screw 3 are provided with a first rotary handle 6 and a limit block 7 respectively, and the middle part is inserted into the first mounting hole 1.2 and the second mounting hole 2.1; one of the top beam 1.1 and the lifting bracket 2 is threadedly connected with the height adjustment screw 3, and the other is slidably connected with the height adjustment screw 3 and limited by the limit block 7. For example, the top beam 1.1 can be threadedly connected with the height adjustment screw 3, and the first rotary handle 6 can be set at the top end of the height adjustment screw 3, and the bottom end of the height adjustment screw 3 can be slid through the lifting bracket 2 and then connected to the limit block 7, the outer diameter of the limit block 7 is larger than the inner diameter of the second mounting hole 2.1, so as to prevent the lifting bracket 2 from falling, and when the first rotary handle 6 is rotated, the height adjustment screw 3 and the limit block 7 are raised and lowered, so that the lifting bracket 2 is moved along the height direction.

[0044] In the above technical solution, the first mounting hole 1.2 on the top beam 1.1 can be a threaded hole or a smooth hole. When set as a smooth hole, the first nut 8 can be respectively set on the top and bottom sides of the top beam 1.1, and the first nut 8 is coaxially distributed with the first mounting hole 1.2 and welded and fixed on the top beam 1.1.

[0045] In this embodiment, two groups of height-adjusting screw rods 3 are provided, which are respectively located at the separated sides of the two groups of width-direction blocking rods 4 to ensure the stability of the suspension of the lifting bracket 2 .

[0046] Reference Figure 4The width stopper 4 is provided with a third mounting hole 4.1, and the width adjustment screw 5 is passed through the third mounting hole 4.1 and is threadedly connected to the width stopper 4. When in use, the armor seam 12 is placed between the two sets of width adjustment screws 5, and after the position of the armor seam 12 is accurately adjusted, the width adjustment screw 5 is rotated to gradually approach the armor seam 12, and finally pressed against the armor seam 12 to fix the armor seam 12; when fine-tuning the position of the armor seam 12, the width adjustment screw 5 on one side can be loosened first, and after the armor seam 12 is moved, the width adjustment screw 5 on the other side can be tightened.

[0047] For ease of use, in this embodiment, second rotary handles 9 are respectively provided at the separated ends of the two sets of width-adjusting screws 5; and abutment plates 10 are respectively provided at the proximal ends of the two sets. The size of the abutment plates 10 is larger than the radial size of the width-adjusting screws 5, so as to increase the contact area with the armor gap 12 and reduce the pressure.

[0048] Similar to the configuration of the first mounting hole 1.2, the third mounting hole 4.1 can be a threaded hole or a smooth hole. When set as a smooth hole, a second nut 11 can be respectively set on both sides of the wide-axis baffle rod 4, and the second nut 11 is coaxially distributed with the third mounting hole 4.1 and welded and fixed on the wide-axis baffle rod 4.

[0049] Compared with the prior art, the beneficial effects of the present invention are as follows: the lifting bracket 2 and the width-adjusting screw 5 are used to provide vertical support and lateral clamping for the armor seam 12, and the height and the position of the armor seam 12 along the width direction can be adjusted by the provided height-adjusting screw 3 and the width-adjusting screw 5, so that the armor seam 12 can be arranged and calibrated quickly and accurately, the arrangement efficiency can be improved, and the disturbance to the armor seam 12 caused by the installation of the oblique supporting short ribs can be reduced, so as to prevent the position from being offset and affecting the construction quality.

[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

[0051] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A device for quickly positioning and installing armor seams, characterized in that: It includes a portal support and a lifting bracket, wherein the lifting bracket is located inside the portal support and is connected to the portal support via a height adjustment screw; two sets of width-direction baffles are correspondingly arranged in the lifting bracket, and width-adjusting screws are respectively installed on the two sets of width-direction baffles, and the two sets of width-adjusting screws can be close to or away from each other.

2. The device for quickly positioning and installing armor seams according to claim 1, characterized in that: The portal support frame comprises a top beam, a bottom plate and a triangular support frame. A group of triangular support frames are respectively arranged at two ends of the top beam, and the bottom plate is fixedly arranged at the bottom of the triangular support frame.

3. The device for quickly positioning and installing armor seams according to claim 2, characterized in that: The top beam is provided with a first mounting hole, the lifting bracket is provided with a second mounting hole corresponding thereto, the two ends of the height-adjusting screw are respectively provided with a first rotary handle and a limit block, and the middle portion is passed through the first mounting hole and the second mounting hole; one of the top beam and the lifting bracket is threadedly connected to the height-adjusting screw, and the other is slidably connected to the height-adjusting screw and limited by the limit block.

4. The device for quickly positioning and installing armor seams according to claim 3, characterized in that: First nuts are respectively arranged on the top and bottom sides of the top beam, and the first nuts are coaxially distributed with the first mounting holes.

5. The device for quickly positioning and installing armor seams according to any one of claims 1 to 4, characterized in that: The height adjustment screw rods are provided in two groups, and are respectively located at the separated sides of the two groups of width-direction blocking rods.

6. The device for quickly positioning and installing armor seams according to claim 1, characterized in that: The width-direction blocking rod is provided with a third mounting hole, and the width-adjusting screw rod is passed through the third mounting hole and is threadedly connected with the width-direction blocking rod.

7. The device for quickly positioning and installing armor seams according to claim 6, characterized in that: The two groups of width-adjusting screw rods are respectively provided with second rotating handles at the separated ends and with abutment plates at the adjacent ends. The size of the abutment plates is larger than the radial size of the width-adjusting screw rods.

8. The device for quickly positioning and installing armor seams according to claim 6, characterized in that: Second nuts are respectively arranged on both sides of the width-direction blocking rod, and the second nuts are coaxially distributed with the third mounting hole.

9. A method for construction using the device for quickly positioning and installing armor seams according to any one of claims 1 to 8, characterized in that: Includes steps: (1) Pre-embed multiple short vertical support bars on one side of the armor seam layout position, and perform positioning and laying out before the armor seam installation; (2) two sets of devices for quickly positioning and installing armor seams are arranged at both ends of the length direction of the construction joint, and the armor seams are placed on two lifting brackets for preliminary positioning; (3) Use measuring equipment to re-measure the elevation, center line and straightness of the armor seam, rotate the height adjustment screw to change the height of the lifting bracket and the armor seam, and rotate the width adjustment screw to press against the side of the armor seam; (4) Weld the short oblique support bars to the short vertical support bars, weld the short oblique support bars to one side of the armor seam, remove the device for quickly positioning and installing the armor seam, and pour the floor.