Tunnel propelling trolley of integrated ventilation structure
By designing a tunnel propulsion trolley with integrated ventilation structure, the problems of insufficient flexibility and limited dust removal function of the traditional tunnel ventilation system are solved, and efficient ventilation and dust removal and highly adaptable construction equipment are achieved.
Patent Information
- Application Number
- CN202411535292.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-01-21
AI Technical Summary
Traditional tunnel ventilation systems have problems such as insufficient flexibility, complex equipment connections and limited dust removal functions during construction, resulting in poor ventilation results and deterioration of construction environment.
Design a tunnel propulsion trolley with an integrated ventilation structure, including supply fans, exhaust fans, air purifiers, exhaust fans and other equipment. By rationally arranging fans and ducts, efficient ventilation, dust removal and cleaning and contamination diversion can be achieved.
It achieves efficient ventilation and dust removal, improves the construction environment, improves construction efficiency, adapts to the needs of different construction scenarios, and enhances the flexibility and use efficiency of the equipment.
Smart Images

Figure CN119333193A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel engineering construction, in particular to a tunnel advancing trolley with an integrated ventilation structure, which is used for dust control and ventilation and dust removal during tunnel advancing. Background Art
[0002] In traditional tunnel advancement projects, a large amount of dust is generated due to the crushing and blasting of rock formations. Traditional tunnel ventilation structures are usually achieved by setting up independent fans and ducts. The fan is responsible for supplying or extracting air, and the duct guides the air into the tunnel or discharges it to the external environment. However, there are some defects in the traditional ventilation system. First, the layout of the traditional ventilation system is not flexible enough. Since the fan and duct are set up independently, their positions and quantities often cannot be flexibly adjusted according to the needs of the specific construction stage. This may lead to poor ventilation effect or waste of resources. Secondly, the traditional ventilation system is connected to other equipment. Usually, the ventilation system needs to be connected to other equipment such as lighting equipment and power lines, which may cause pipe blockage and difficulty in maintenance. Once one of the equipment fails, the entire ventilation system may be affected, and the traditional ventilation system has limited consideration for dust removal and ash removal functions. During the tunnel construction process, the generation of dust and particulate matter is inevitable, and the traditional ventilation system cannot effectively deal with these problems, which may lead to the deterioration of the construction environment and threats to the health of workers. In summary, the traditional tunnel ventilation method has certain limitations and shortcomings in the process of tunnel advancement. Therefore, an innovative technical solution is needed to solve these problems, improve work efficiency and protect the health of workers. Summary of the invention
[0003] In view of the defects in the prior art, the purpose of the present invention is to provide a tunnel propulsion trolley with an integrated ventilation structure during the construction process. To achieve this goal, the present invention proposes a technical solution, which is characterized in that the device has an integrated design. In addition, the design of the present invention can also efficiently ventilate, remove dust and separate sewage, improve work efficiency and meet the construction needs of special construction scenes.
[0004] On the basis of the above technical scheme, the present invention relates to a propulsion trolley of an integrated tunnel ventilation structure, including an air supply fan, an exhaust fan, an air supply duct, an exhaust duct, a trolley, an air purifier, an air purification external unit, an exhaust fan, an exhaust duct, and a universal wheel. Three fans are arranged outside the tunnel entrance, including two large fans and a small fan, for providing power for air flow. A large fan and a small fan are used to supply air to the inside of the tunnel, and the other large fan is used for exhaust. The air supply fan and the exhaust fan are arranged at a certain distance to achieve clean and dirty diversion and avoid air flow interference. The air supply duct connects the inside and outside of the tunnel construction channel, and one end of the air supply duct is connected to the air supply fan. The air supply fan directly delivers air to the construction position inside the tunnel through the air supply duct. The duct is designed to be straight-through and is not connected to other devices to ensure the efficiency and stability of air supply. The small fan is specifically responsible for supplying air to the confined space. Exhaust fans are installed on the two arched fans of the trolley. One fan is used for dust removal before entering the site, and the other fan is used for dust removal after leaving the site. These exhaust fans are connected to the exhaust duct through connecting pipes to ensure that dust can be discharged in time. An air purifier is also installed inside the trolley. The fan near one end of the face draws the air in the tunnel into the air treatment device through the pipe, and then exhausts it after dust removal and filtration. All air purification external units are connected to the exhaust duct through connecting pipes. The exhausted hot air is extracted through the exhaust duct to avoid heat accumulation in the construction area. The trolley is equipped with universal wheels as a whole, which is convenient for moving between different construction areas, improving the flexibility and use efficiency of the equipment.
[0005] Compared with the prior art, the advantages of the present invention are:
[0006] 1. Integrated design: ventilation and dust removal equipment are integrated on one trolley, which reduces the space occupied by equipment and simplifies on-site layout and management.
[0007] 2. Efficient ventilation and dust removal: Through reasonable fan configuration and pipeline design, efficient ventilation and dust removal functions are achieved, ensuring the ventilation quality in the tunnel, improving the construction environment and improving construction efficiency.
[0008] 3. Clean and dirty flow separation: Through the reasonable arrangement of air supply fans and exhaust fans, clean and dirty flow separation is achieved to avoid air flow interference.
[0009] 4. Strong adaptability: The small fan supplies air to the confined space through an independent air supply duct, which can meet the needs of special construction scenarios.
[0010] 5. Flexible movement: The trolley is equipped with rollers to facilitate movement between different construction areas and improve the efficiency of equipment use. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0012] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0013] In the figure: 1 air supply fan 1, 2 air supply fan 2, 3 exhaust fan, 4 air supply duct 1, 5 air supply duct 2, 6 exhaust duct, 7 trolley, 8 air purifier, 9 air purifier outdoor unit, 10 connecting pipe, 11 filter, 12 brush, 13 sensor, 14 dust box, 15 outdoor unit filter, 16 outdoor unit brush, 17 outdoor unit sensor, 18 outdoor unit dust box, 19 exhaust fan, 20 exhaust duct, 21 universal wheel.
[0014] Figure 2 It is the front view of the present invention.
[0015] Figure 3 It is a top view of the present invention.
[0016] Figure 4 It is a left view of the present invention.
[0017] Figure 5 It is a schematic diagram of the three-dimensional structure of the air purifier of the present invention.
[0018] Figure 6 It is a schematic diagram of the three-dimensional structure of the air purification external unit of the present invention. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0020] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0021] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings.
[0022] like Figure 1 As shown, the present invention provides a design of a trolley with an integrated tunnel ventilation structure, comprising an air supply fan 1 (1), an air supply fan 2 (2), an exhaust fan (3), an air supply duct 1 (4), an air supply duct 2 (5), an exhaust duct (6), a trolley (7), an air purifier (8), an air purifier external unit (9), a connecting duct (10), a filter (11), a brush (12), a sensor (13), a dust cleaning box (14), an external unit filter (15), an external unit brush (16), an external unit sensor (17), an external unit dust cleaning box (18), an exhaust fan (19), an exhaust duct (20), and a universal wheel (21). Three fans are arranged outside the tunnel, two of which are air supply fans (1, 2) and one is an exhaust fan (3). The air supply fans (1, 2) directly deliver air to the construction position inside the tunnel through the air supply ducts (4, 5) without being connected to other devices, and the exhaust fan extracts the dirty air in the tunnel through the exhaust duct (6). The air purifier (8) inside the trolley has a built-in filter (11), a brush (12), a sensor (13) and a dust cleaning box (14) for filtering and purifying the air in the tunnel. The air purifier external unit (9) has a built-in external unit filter (15), an external unit brush (16), an external unit sensor (17) and an external unit dust cleaning box (18), and is connected to the air purifier (8) through a connecting pipe (10) to achieve air exchange and coordinated purification between the internal and external units. The trolley is respectively equipped with exhaust fans (19) on the side close to the face and the side close to the tunnel entrance. The exhaust fans (19) are connected to the exhaust duct (6) through an exhaust pipe (20) for dust removal when entering and leaving the site. The trolley is also equipped with an air purifier (8). All air purifier external units (9) are connected to the exhaust duct (6) through exhaust (20), and the exhausted hot air is extracted through the exhaust duct (6). The trolley is integrally mounted with universal wheels (21) and can be flexibly moved in a narrow tunnel to adapt to different construction environments and requirements.
[0023] The specific configuration is based on actual construction requirements and is not specifically limited in the present invention.
[0024] The present embodiment provides a trolley with an integrated tunnel ventilation structure, the device mainly comprising an air supply structure, an air extraction structure, an air purification structure and additional functional components. Preferably, the air supply structure of the device comprises an air supply fan (1, 2) and an air supply duct (4, 5). The two air supply fans respectively deliver fresh air into the tunnel through their respective air supply ducts to ensure that the construction area has sufficient oxygen supply, and also help to dilute and remove harmful gases in the tunnel.
[0025] Furthermore, the exhaust structure includes an exhaust fan (3) and an exhaust duct (6). The exhaust fan (3) extracts the dirty air in the tunnel through the exhaust duct (6), forms effective air convection with the air supply structure, and maintains air circulation in the tunnel. The exhaust fan (19) is installed on the side of the trolley close to the face and the opening, and is connected to the exhaust duct (6) through an exhaust duct (20), and is used to quickly remove dust and harmful gases in the tunnel when entering and leaving the site.
[0026] Preferably, the air purification structure is integrated inside the trolley, including an air purifier (8) and an air purification external unit (9). The air purifier (8) has a built-in filter (11) for filtering particulate matter and harmful substances in the air, a brush (12) for regularly cleaning the filter surface, and a sensor (13) for real-time monitoring of air quality and adjusting the operating status of the air purifier. The air purification external unit (9) is connected to the air purifier (8) through a connecting pipe (10) to jointly purify the air in the tunnel. The filter (11) and brush (12) of the air purifier (8) are designed to be detachable, which is convenient for regular cleaning and replacement, thereby reducing maintenance costs. At the same time, the design of the sensor (13) enables management personnel to promptly understand the air conditions in the tunnel and take corresponding measures.
[0027] Preferably, the trolley is integrally mounted with universal wheels (21) to facilitate its movement in the tunnel. When the trolley needs to be moved, the universal wheels (21) can be used to conveniently move the trolley from one position to another. The universal wheels (21) are made of high-strength wear-resistant materials, which can adapt to the complex ground conditions in the tunnel, ensuring that the trolley is stable and reliable during movement.
[0028] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A tunnel propulsion trolley with integrated ventilation structure, characterized in that include: The air supply structure includes two air supply fans and two air supply ducts, wherein one air supply fan and air supply duct are used to supply air to a main construction area inside the tunnel, and the other air supply fan and air supply duct are used to supply air to a confined space inside the tunnel; The exhaust structure includes an exhaust fan and an exhaust duct connected to the exhaust fan, and is used to extract the dirty air in the tunnel; The air purification structure is integrated inside the trolley, including an air purifier and an air purification external unit. The air purifier has a built-in filter, a brush and a sensor to filter and purify the air in the tunnel. The air purification external unit is connected to the air purifier through a connecting pipe to jointly purify the air in the tunnel. The mobile structure includes universal wheels installed at the bottom of the trolley, so that the trolley can move flexibly in the tunnel.
2. The tunnel propulsion trolley with integrated ventilation structure according to claim 1, characterized in that: The air supply fan and the exhaust fan are arranged at a certain distance to achieve clean and dirty flow separation and avoid air flow interference.
3. The tunnel propulsion trolley with integrated ventilation structure according to claim 1, characterized in that: The air supply duct is designed to be straight-through and not connected to other devices to ensure the efficiency and stability of air supply.
4. The tunnel propulsion trolley with integrated ventilation structure according to claim 1, characterized in that: Exhaust fans are respectively arranged on the two arched fans of the trolley. The exhaust fan on one side is used for dust removal when entering the site, and the exhaust fan on the other side is used for dust removal when leaving the site. The exhaust fans are connected to the exhaust duct through connecting pipes, and are used to quickly remove dust and harmful gases in the tunnel when entering and leaving the site.
5. The tunnel propulsion trolley with integrated ventilation structure according to claim 1, characterized in that: The filter and brush of the air purifier are designed to be detachable, which is convenient for regular cleaning and replacement.