Production and transportation collaborative scheduling method considering order delivery time based on VNS-H algorithm

CN119417366BActive Publication Date: 2025-10-17HEFEI UNIV OF TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411543043.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-10-17
Estimated Expiration
2044-10-31

Smart Images

  • Figure CN119417366B_ABST
    Figure CN119417366B_ABST
Patent Text Reader

Abstract

The application provides a production and transportation collaborative scheduling method and system based on a VNS-H algorithm and considering order delivery time, a storage medium and an electronic device, and relates to the technical field of production and transportation collaborative scheduling. In the application, firstly, an order set and production manufacturing resources are acquired; secondly, a loading deterioration rate and a production deterioration rate are introduced, and the total production and transportation time of all orders in each factory is acquired in combination with the basic processing time of each order and the transportation completion time of the factory to which the order is allocated; thirdly, based on the order set and the production manufacturing resources, a mathematical model is constructed with the objective of minimizing the sum of the total production and transportation time and the delay cost; and finally, the VNS-H algorithm is used to solve the mathematical model to acquire an optimal production and transportation collaborative scheduling scheme. The modeling process is closer to actual production by considering the influence of the total production and transportation time of the deterioration effect; and the VNS-H algorithm is designed to solve the model to make reasonable production and transportation collaborative scheduling decisions for enterprises within a limited time.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • VNS-based high-end equipment manufacturing robustness scheduling method and device

    CN114265380A

  • Chip manufacturing intelligent scheduling method considering deterioration effect and resource allocation

    CN114462191A