Auxiliary measuring and calculating system based on spanning frame for electric power construction and spanned object calculation

By designing an auxiliary calculation system that integrates environmental adaptability assessment and three-dimensional simulation functions, the existing system's problems of environmental data loss and data display difficulty are solved, and the scientificity of the construction plan and construction efficiency are improved.

CN119809365APending Publication Date: 2025-04-11HUADA TIANYUAN BEIJING ELECTRIC POWER TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411681656.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-04-11

AI Technical Summary

Technical Problem

The existing auxiliary calculation system based on the calculation of span frames and span objects for power construction lacks local environmental data during the calculation process, which affects the accuracy of the calculation data. The calculated data is difficult to display intuitively, and personnel need to calculate the materials used and construction steps themselves.

Method used

An auxiliary calculation system including a data acquisition unit, a data processing unit, a data calculation unit, an environmental adaptability evaluation unit, a three-dimensional simulation unit, a construction guidance unit, a user interface unit and a database unit is designed. The system provides detailed construction guidance and intuitive data by collecting parameters, meteorological conditions and topographical landform data of spanning frames and objects, and performing environmental adaptability assessment and three-dimensional simulation.

Benefits of technology

The system can more comprehensively consider the impact of the construction environment on the leap frame, improving the scientific nature of the construction plan and the adaptability of the leap frame. Through three-dimensional simulation and intuitive display, construction accuracy and efficiency are improved, and construction efficiency and resource prediction accuracy are improved through construction guidance units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119809365A_ABST
    Figure CN119809365A_ABST
Patent Text Reader

Abstract

The invention discloses an auxiliary measuring and calculating system based on a crossing frame for electric power construction and spanned object calculation, and relates to the technical field of electric power construction. The auxiliary measurement and calculation system comprises a data acquisition unit, a data processing unit, a data calculation unit, an environmental adaptability evaluation unit, a three-dimensional simulation unit, a construction guidance unit, a user interface unit and a database unit, and the output end of the data acquisition unit is connected with the input end of the data processing unit. The environment adaptability evaluation unit is arranged and can more comprehensively consider the influence of the construction environment on the crossing frame, the influence comprises temperature, humidity, chemical substances, mechanical stress, electromagnetic interference and the like, and the performance of the crossing frame is evaluated by evaluating the influence of the environmental factors on the performance of the crossing frame. Constructors can make a more scientific construction scheme, and the adaptability of the crossing frame to the complex environment is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power construction, and in particular to an auxiliary measurement system based on calculation of a spanning frame and a spanned object for electric power construction. Background Art

[0002] In the process of power construction, it is often necessary to cross existing power lines or other obstacles. To ensure construction safety, it is necessary to accurately calculate the minimum horizontal distance, vertical distance and other relevant safety parameters between the crossing frame and the object being crossed.

[0003] According to the patent name: A high-voltage power line crossing frame for overhead line relocation construction (patent publication number: CN112054464A, patent publication date: 2020-12-08), by setting a first connecting tube and a second connecting tube and a first clamping plate and a second clamping plate, and then fixing them together through a fixing part, it can not only lock the angle between the first connecting tube and the second connecting tube, but also fix the cross rod body in the connecting tube. Compared with the direct bolt connection, the operator's operation amount is basically the same, but it has a better fixing effect, which improves the overall stability and firmness of the crossing frame. Compared with the use of steel wire for bundling, the connection stability is basically the same, but the operator's operation amount is greatly reduced, which is convenient for the operator to install and disassemble, thereby improving work efficiency.

[0004] Based on the above-mentioned prior art, the existing auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction still has the following problems: the existing auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction mostly imports horizontal distance, vertical distance and other relevant safety parameters for calculation during the measurement process, and lacks local environmental data, which will affect the calculated data. At the same time, the calculated data are mostly displayed through plan views, which makes it difficult to display the data intuitively, and after the calculation, personnel are required to calculate the materials and construction steps used for their data by themselves. For this reason, the present invention provides an auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides an auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction, which solves the following problems existing in the existing auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction: the existing auxiliary measurement system based on the calculation of crossing frames and objects to be crossed for power construction mostly imports horizontal distances, vertical distances and other relevant safety parameters for calculation during the measurement process, and the lack of local environmental data will affect the calculated data. At the same time, the calculated data are mostly displayed through plan views, which makes it difficult to display the data intuitively, and after the calculation, personnel are required to calculate the materials and construction steps used for their data by themselves.

[0006] To achieve the above purpose, the present invention is implemented by the following technical solutions: an auxiliary measurement system based on the calculation of the spanning frame and the spanned object for power construction, including an auxiliary measurement system, the auxiliary measurement system including a data acquisition unit, a data processing unit, a data calculation unit, an environmental adaptability assessment unit, a three-dimensional simulation unit, a construction guidance unit, a user interface unit and a database unit, the output end of the data acquisition unit is connected to the input end of the data processing unit, the output end of the data processing unit is connected to the input end of the data calculation unit, the data calculation unit and the environmental adaptability assessment unit are bidirectionally connected, the output end of the data calculation unit is connected to the input end of the three-dimensional simulation unit, the output end of the three-dimensional simulation unit is connected to the input end of the construction guidance unit, the output end of the construction guidance unit is connected to the input end of the user interface unit, the data acquisition unit, the data processing unit, the data calculation unit, the environmental adaptability assessment unit, the three-dimensional simulation unit, the construction guidance unit, the construction guidance unit and the database unit are bidirectionally connected:

[0007] The environmental adaptability assessment unit includes a temperature assessment module, a humidity assessment module, a precipitation assessment module and a wind assessment module. The output end of the temperature assessment module is connected to the input end of the humidity assessment module, the output end of the humidity assessment module is connected to the input end of the precipitation assessment module, and the output end of the precipitation assessment module is connected to the input end of the wind assessment module.

[0008] Preferably, the data acquisition unit includes a crossing frame parameter acquisition module, a crossed object parameter acquisition module, a meteorological condition acquisition module and a topography acquisition module, the output end of the crossing frame parameter acquisition module is connected to the input end of the crossed object parameter acquisition module, the output end of the crossed object parameter acquisition module is connected to the input end of the meteorological condition acquisition module, and the output end of the meteorological condition acquisition module is connected to the input end of the topography acquisition module.

[0009] Preferably, the data processing unit includes a data receiving module, a data preprocessing module and a data sending module, the output end of the data receiving module is connected to the input end of the data preprocessing module, and the output end of the data preprocessing module is connected to the input end of the data sending module.

[0010] Preferably, the data calculation unit includes a data collection module, a data calculation module, a data verification module and a data transmission module, the output end of the data collection module is connected to the input end of the data calculation module, the output end of the data calculation module is connected to the input end of the data verification module, and the output end of the data verification module is connected to the input end of the data transmission module.

[0011] Preferably, the three-dimensional simulation unit includes a data input module, a scene simulation module and a three-dimensional modeling module, the output end of the data input module is connected to the input end of the scene simulation module, and the output end of the scene simulation module is connected to the input end of the three-dimensional modeling module.

[0012] Preferably, the construction guidance unit comprises a step guidance module and a material guidance module, and the output end of the step guidance module is connected to the input end of the material guidance module.

[0013] Preferably, the user interface unit comprises a data display module, an interactive control module and a report generation module, the output end of the data display module is connected to the input end of the interactive control module, and the output end of the interactive control module is connected to the input end of the report generation module.

[0014] Preferably, the database unit includes a data storage module, a data backup and recovery module and a data management module, the output end of the data storage module is connected to the input end of the data backup and recovery module, and the output end of the data backup and recovery module is connected to the input end of the data management module.

[0015] The invention provides an auxiliary measurement system based on calculation of a spanning frame and a spanned object for electric power construction.

[0016] Compared with the prior art, it has the following beneficial effects:

[0017] 1. The auxiliary measurement system based on the calculation of the spanning frame and the spanned object for power construction is equipped with an environmental adaptability assessment unit. The environmental adaptability assessment unit can more comprehensively consider the impact of the construction environment on the spanning frame, including temperature, humidity, chemicals, mechanical stress, electromagnetic interference and other aspects. By evaluating the impact of these environmental factors on the performance of the spanning frame, construction personnel can formulate a more scientific construction plan and enhance the adaptability of the spanning frame to complex environments.

[0018] 2. This auxiliary measurement system based on the calculation of the spanning frame and the spanned object for power construction is equipped with a three-dimensional simulation unit. It can use advanced computer graphics and simulation technology to perform high-precision three-dimensional simulation of the construction process. Through simulation, construction personnel can intuitively see the spatial relationship between the spanning frame and the spanned object, as well as various details in the construction process. This intuitive display method helps construction personnel better understand the construction plan, thereby improving construction accuracy and efficiency.

[0019] 3. The auxiliary measurement system based on the calculation of the spanning frame and the spanned object for power construction is equipped with a construction guidance unit. It can provide detailed construction steps for construction personnel based on the calculation results and simulation analysis of the system. Through clear guidance, construction personnel can complete construction tasks more quickly and accurately, thereby improving construction efficiency. It can also predict the quantity of resources such as materials, equipment, and personnel required, and reasonably arrange construction time and progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a block diagram of the auxiliary calculation system of the present invention;

[0021] Figure 2 It is a block diagram of the data acquisition unit of the present invention;

[0022] Figure 3 is a block diagram of a data processing unit of the present invention;

[0023] Figure 4 It is a block diagram of a data calculation unit of the present invention;

[0024] Figure 5 It is a block diagram of the environmental adaptability assessment unit of the present invention;

[0025] Figure 6 It is a block diagram of a three-dimensional simulation unit of the present invention;

[0026] Figure 7 It is a block diagram of the construction guidance unit of the present invention;

[0027] Figure 8 A block diagram of a user interface unit of the present invention;

[0028] Fig. 9 This is a block diagram of the database unit of the present invention.

[0029] In the figure: 1- auxiliary measurement system, 11- data acquisition unit, 111- crossing frame parameter acquisition module, 112- crossed object parameter acquisition module, 113- meteorological condition acquisition module, 114- terrain acquisition module, 12- data processing unit, 121- data receiving module, 122- data preprocessing module, 123- data sending module, 13- data calculation unit, 131- data collection module, 132- data calculation module, 133- data verification module, 134- data transmission module, 14- environmental adaptability assessment unit, 141- temperature assessment module Block, 142-humidity assessment module, 143-precipitation assessment module, 144-wind assessment module, 15-three-dimensional simulation unit, 151-data input module, 152-scene simulation module, 153-three-dimensional modeling module, 16-construction guidance unit, 161-step guidance module, 162-material guidance module, 17-user interface unit, 171-data display module, 172-interactive control module, 173-report generation module, 18-database unit, 181-data storage module, 182-data backup and recovery module, 183-data management module. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] See also Figure 1-Figure 9 , the present invention provides a technical solution:

[0032] The auxiliary measurement system based on the calculation of the spanning frame and the spanned object for power construction includes an auxiliary measurement system 1, which includes a data acquisition unit 11, a data processing unit 12, a data calculation unit 13, an environmental adaptability assessment unit 14, a three-dimensional simulation unit 15, a construction guidance unit 16, a user interface unit 17 and a database unit 18. The output end of the data acquisition unit 11 is connected to the input end of the data processing unit 12, the output end of the data processing unit 12 is connected to the input end of the data calculation unit 13, the data calculation unit 13 and the environmental adaptability assessment unit 14 are bidirectionally connected, the output end of the data calculation unit 13 is connected to the input end of the three-dimensional simulation unit 15, the output end of the three-dimensional simulation unit 15 is connected to the input end of the construction guidance unit 16, the output end of the construction guidance unit 16 is connected to the input end of the user interface unit 17, the data acquisition unit 11, the data processing unit 12, the data calculation unit 13, the environmental adaptability assessment unit 14, the three-dimensional simulation unit 15, the construction guidance unit 16, and the construction guidance unit 16 and the database unit 18 are bidirectionally connected:

[0033] The environmental adaptability assessment unit 14 includes a temperature assessment module 141, a humidity assessment module 142, a precipitation assessment module 143 and a wind assessment module 144. The output end of the temperature assessment module 141 is connected to the input end of the humidity assessment module 142, the output end of the humidity assessment module 142 is connected to the input end of the precipitation assessment module 143, and the output end of the precipitation assessment module 143 is connected to the input end of the wind assessment module 144.

[0034] 24 can more comprehensively consider the impact of the construction environment on the span, including temperature, humidity, chemicals, mechanical stress, electromagnetic interference and other aspects. By evaluating the impact of these environmental factors on the performance of the span, construction personnel can develop a more scientific construction plan and enhance the span's ability to adapt to complex environments.

[0035] Preferably, the data collection unit 11 includes a crossing frame parameter collection module 111, a crossed object parameter collection module 112, a meteorological condition collection module 113 and a topography collection module 114, the output end of the crossing frame parameter collection module 111 is connected to the input end of the crossed object parameter collection module 112, the output end of the crossed object parameter collection module 112 is connected to the input end of the meteorological condition collection module 113, and the output end of the meteorological condition collection module 113 is connected to the input end of the topography collection module 114.

[0036] The data acquisition unit 11 integrates a variety of high-precision sensors, such as laser rangefinders, angle sensors, etc., for real-time acquisition of key data such as the position, height, angle, etc. of the spanning frame and the spanned object.

[0037] Preferably, the data processing unit 12 includes a data receiving module 121, a data preprocessing module 122 and a data sending module 123, the output end of the data receiving module 121 is connected to the input end of the data preprocessing module 122, and the output end of the data preprocessing module 122 is connected to the input end of the data sending module 123.

[0038] The data processing unit 12 is used for removing duplicate data, processing missing values ​​and converting formats.

[0039] Preferably, the data calculation unit 13 includes a data collection module 131, a data calculation module 132, a data verification module 133 and a data transmission module 134, the output end of the data collection module 131 is connected to the input end of the data calculation module 132, the output end of the data calculation module 132 is connected to the input end of the data verification module 133, and the output end of the data verification module 133 is connected to the input end of the data transmission module 134.

[0040] Calculate the horizontal distance, vertical distance and other relevant safety parameters between the crossing frame and the object being crossed.

[0041] Preferably, the three-dimensional simulation unit 15 includes a data input module 151, a scene simulation module 152 and a three-dimensional modeling module 153, the output end of the data input module 151 is connected to the input end of the scene simulation module 152, and the output end of the scene simulation module 152 is connected to the input end of the three-dimensional modeling module 153.

[0042] It is able to use advanced computer graphics and simulation technology to perform high-precision three-dimensional simulation of the construction process. Through simulation, construction workers can intuitively see the spatial relationship between the spanning frame and the object being spanned, as well as various details of the construction process. This intuitive display method helps construction workers better understand the construction plan, thereby improving construction accuracy and efficiency.

[0043] Preferably, the construction guidance unit 16 includes a step guidance module 161 and a material guidance module 162 , and the output end of the step guidance module 161 is connected to the input end of the material guidance module 162 .

[0044] Based on the system's calculation results and simulation analysis, it can provide construction workers with detailed construction steps. Through clear guidance, construction workers can complete construction tasks more quickly and accurately, thereby improving construction efficiency. It can also predict the required quantity of materials, equipment, personnel and other resources, and reasonably arrange construction time and progress.

[0045] Preferably, the user interface unit 17 includes a data display module 171, an interactive control module 172 and a report generation module 173, wherein the output end of the data display module 171 is connected to the input end of the interactive control module 172, and the output end of the interactive control module 172 is connected to the input end of the report generation module 173.

[0046] The calculation results are displayed in a three-dimensional model to help users intuitively understand the relative position and distance relationship between the spanning frame and the spanned object. According to the calculation results and user needs, a detailed calculation report and construction suggestion report are automatically generated.

[0047] Preferably, the database unit 18 includes a data storage module 181, a data backup and recovery module 182 and a data management module 183, the output end of the data storage module 181 is connected to the input end of the data backup and recovery module 182, and the output end of the data backup and recovery module 182 is connected to the input end of the data management module 183.

[0048] Used to store collected raw data, calculation results, historical records and other information to ensure data integrity and traceability.

[0049] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0050] During operation, the parameters of the spanning frame, spanning object, weather and topography of the construction site are first collected through the spanning frame parameter collection module 111, spanning object parameter collection module 112, meteorological condition collection module 113 and topography collection module 114 in the auxiliary measurement system 1. The collected data are input into the data processing unit 12 to remove duplicate data, process missing values ​​and convert formats. After that, the data enters the data calculation unit 13 to calculate the horizontal distance, vertical distance and other relevant safety parameters between the spanning frame and the spanning object. At the same time, the meteorological and topography parameters enter the environmental adaptability evaluation unit 14 to be evaluated through the temperature evaluation module 141, humidity evaluation module 142, and reduction module 143. The water assessment module 143 and the wind assessment module 144 assess the temperature, humidity, precipitation and wind force one by one, and the assessment results are input into the data calculation unit 13 for unified data optimization and verification. The results are then input into the three-dimensional simulation unit 15 for three-dimensional modeling. At the same time, the data enters 165, the model is analyzed to provide step guidance and material guidance, and the data and model are displayed through the user interface unit 17. At the same time, each step of the data of the data acquisition unit 11, data processing unit 12, data calculation unit 13, environmental adaptability assessment unit 14, three-dimensional simulation unit 15, construction guidance unit 16 and user interface unit 17 enters the database unit 18 for storage and management.

[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An auxiliary calculation system based on calculation of spanning frames and spanned objects for electric power construction, comprising an auxiliary calculation system (1), characterized in that: The auxiliary measurement and calculation system (1) comprises a data acquisition unit (11), a data processing unit (12), a data calculation unit (13), an environmental adaptability assessment unit (14), a three-dimensional simulation unit (15), a construction guidance unit (16), a user interface unit (17) and a database unit (18); the output end of the data acquisition unit (11) is connected to the input end of the data processing unit (12); the output end of the data processing unit (12) is connected to the input end of the data calculation unit (13); and a bidirectional communication is realized between the data calculation unit (13) and the environmental adaptability assessment unit (14). The output end of the data calculation unit (13) is connected to the input end of the three-dimensional simulation unit (15), the output end of the three-dimensional simulation unit (15) is connected to the input end of the construction guidance unit (16), the output end of the construction guidance unit (16) is connected to the input end of the user interface unit (17), and the data acquisition unit (11), the data processing unit (12), the data calculation unit (13), the environmental adaptability assessment unit (14), the three-dimensional simulation unit (15), the construction guidance unit (16), and the construction guidance unit (16) and the database unit (18) are bidirectionally connected: The environmental adaptability assessment unit (14) comprises a temperature assessment module (141), a humidity assessment module (142), a precipitation assessment module (143) and a wind assessment module (144); the output end of the temperature assessment module (141) is connected to the input end of the humidity assessment module (142); the output end of the humidity assessment module (142) is connected to the input end of the precipitation assessment module (143); and the output end of the precipitation assessment module (143) is connected to the input end of the wind assessment module (144).

2. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The data collection unit (11) comprises a spanning frame parameter collection module (111), a spanned object parameter collection module (112), a meteorological condition collection module (113) and a topography collection module (114); the output end of the spanning frame parameter collection module (111) is connected to the input end of the spanned object parameter collection module (112); the output end of the spanned object parameter collection module (112) is connected to the input end of the meteorological condition collection module (113); and the output end of the meteorological condition collection module (113) is connected to the input end of the topography collection module (114).

3. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The data processing unit (12) comprises a data receiving module (121), a data preprocessing module (122) and a data sending module (123); the output end of the data receiving module (121) is connected to the input end of the data preprocessing module (122), and the output end of the data preprocessing module (122) is connected to the input end of the data sending module (123).

4. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The data calculation unit (13) comprises a data collection module (131), a data calculation module (132), a data verification module (133) and a data transmission module (134); the output end of the data collection module (131) is connected to the input end of the data calculation module (132); the output end of the data calculation module (132) is connected to the input end of the data verification module (133); and the output end of the data verification module (133) is connected to the input end of the data transmission module (134).

5. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The three-dimensional simulation unit (15) comprises a data input module (151), a scene simulation module (152) and a three-dimensional modeling module (153); the output end of the data input module (151) is connected to the input end of the scene simulation module (152), and the output end of the scene simulation module (152) is connected to the input end of the three-dimensional modeling module (153).

6. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The construction guidance unit (16) comprises a step guidance module (161) and a material guidance module (162), and the output end of the step guidance module (161) is connected to the input end of the material guidance module (162).

7. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The user interface unit (17) comprises a data display module (171), an interactive control module (172) and a report generation module (173), wherein the output end of the data display module (171) is connected to the input end of the interactive control module (172), and the output end of the interactive control module (172) is connected to the input end of the report generation module (173).

8. The auxiliary measurement system based on calculation of spanning frames and spanned objects for electric power construction according to claim 1 is characterized in that: The database unit (18) comprises a data storage module (181), a data backup and recovery module (182) and a data management module (183); the output end of the data storage module (181) is connected to the input end of the data backup and recovery module (182), and the output end of the data backup and recovery module (182) is connected to the input end of the data management module (183).

Citation Information

Patent Citations

  • High-voltage power line crossing frame for overhead line relocation and modification construction

    CN112054464A