Corner pile calculation auxiliary measuring and calculating system for electric power construction
By designing an auxiliary calculation system for corner piles for power construction, combined with geological survey and three-dimensional geological model, the problem of being unable to select corner pile positions according to soil layer changes in the existing technology is solved, the construction efficiency and accuracy are improved, and the quality and efficiency of power projects are ensured.
Patent Information
- Application Number
- CN202411905080.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-15
AI Technical Summary
The existing power construction planing system cannot conduct geological surveys during the construction process, resulting in the inability to select the corner pile position according to the changes in the soil layer, resulting in deviations in project volume and budget.
An auxiliary calculation calculation system for corner piles for power construction was designed, including geotechnical survey module, model generation module, parameter acquisition module, angle pile layout module, parameter calculation module and engineering management unit. The system helps determine the staking coordinates and pile length of the corner pile through geological survey, three-dimensional geological model establishment and corner pile parameter calculation, ensuring that the bottom of the corner pile has sufficient length to anchor into the rock formation.
The efficiency of lofting operations is improved, the construction error of corner piles caused by terrain factors is reduced, the quality and efficiency of corner pile construction is ensured, and the length of corner piles can be adjusted appropriately according to the geological conditions, improving the accuracy and efficiency of construction.
Smart Images

Figure CN119830413A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric power construction, and in particular to an auxiliary measurement system for calculating angle piles used in electric power construction. Background Art
[0002] As a medium for carrying and transmitting electric power resources, the power grid is the core infrastructure to ensure economic development and people's livelihood. With the rapid development of the economy and society, the construction of smart grids is being actively promoted, which puts higher requirements on power engineering. In the implementation of power engineering, layout is the basic work of power line tower construction (layout is to place the location of the structure designed in the drawing on the construction site). The traditional construction layout operation in power engineering has the characteristics of high precision and large workload.
[0003] In the layout work of overhead line construction of power engineering, the layout of the layout points is based on the tower base. The traditional layout method is to determine the layout direction of the tower leg piles by combining the pit divider with the front and rear sight piles, and then use the tape measure, theodolite, total station and other surveying instruments combined with the design data to locate and layout the coordinates of the layout points. When the coordinates of the center pile are known, each tower needs to be laid out with 4 tower leg piles and 16 tower leg corner piles. The traditional method of laying out the layout points requires manual use of surveying instruments to repeatedly find points, which takes a lot of time and manpower and material resources.
[0004] The invention with publication number CN118208053A discloses a power tower layout system and method based on drone laser guidance. After obtaining the coordinates of the center pile, the coordinates of the tower leg pile and the tower leg corner pile are automatically calculated, and the drone is controlled to fly to the specified position, and the coordinate difference is calibrated in real time. Then, the layout of the layout points is guided by the drone laser and verified.
[0005] As shown in the above invention, the existing layout system realizes accurate calculation, real-time accurate tracking and display of coordinates during the entire layout process. However, this method does not conduct geological surveys on the construction site, and is unclear about the specific conditions of the soil layer below the ground at the construction site. It is impossible to select the position of the corner piles according to the changes in the soil layer, thereby causing deviations in the project volume and budget. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides an auxiliary measurement system for calculating angle piles for electric power construction, which solves the existing problems.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: an angle pile calculation auxiliary measurement system for electric power construction, comprising:
[0008] Geotechnical survey module, used to conduct geological surveys at the construction site and collect relevant survey data;
[0009] Model generation module, used to establish a three-dimensional geological model of the construction site based on the survey data;
[0010] A parameter acquisition module is used to obtain the number of corner stakes and the range of spacing;
[0011] An angle stake arrangement module, used to arrange angle stakes on the three-dimensional geological model based on the number of angle stakes set and the set spacing range, and obtain the staked coordinates of the angle stakes;
[0012] A parameter calculation module is used to obtain the rock surface elevation of the corresponding construction site using the three-dimensional geological model, and calculate the pile bottom elevation of the corresponding angle pile in combination with the obtained rock penetration length;
[0013] The engineering management unit is used to receive design data, display and save layout coordinates, and cooperate with printing equipment to output drawings.
[0014] Preferably, the survey data include distribution characteristics of various soil layers at the construction site, water level, natural gravity, and floating gravity.
[0015] Preferably, the model generation module relies on Revit software to establish a three-dimensional geological model of various geological layer interfaces including the bearing layer interface and the natural ground after leveling, forming a geological contour interface of the construction area.
[0016] Preferably, the parameter acquisition module measures the construction site by using a total station and a laser rangefinder to obtain the setting quantity and setting spacing range data of the corner piles.
[0017] Preferably, the corner pile placement module calculates the stakeout point coordinates based on the engineering design data and the three-dimensional geological model and in accordance with the electric power engineering standards to generate the stakeout point coordinates of the corner piles.
[0018] Preferably, the parameter calculation module calculates the length of the corner pile using the pile top elevation and pile bottom elevation at the coordinates of the corner pile layout point, and builds a three-dimensional model of the bored cast-in-place end corner pile and the cap in the three-dimensional geological model based on the Revit software, and calculates the shear bearing capacity of the rectangular cap under the corner pile and the shear bearing capacity of the non-rectangular cap under the corner pile respectively.
[0019] Preferably, the calculation formula for the shear bearing capacity of the rectangular cap corner pile is:
[0020]
[0021] Among them, α 1x , α 1y is the punching coefficient of the corner pile; Its value should meet the requirement of 0.25≤λ≤1.0; α 1x , α 1yIt is the horizontal distance from the intersection of the 45° punching line drawn from the inner edge of the top of the corner pile at the bottom of the cap and the top surface of the cap to the inner edge of the corner pile; when the column (wall) side or the cap step change is located within the 45° line, the line connecting the column (wall) side or the cap step change and the inner edge of the pile is taken as the cone line of the punching cone; c1 and c2 are the distances from the inner edge of the corner pile to the outer edge of the cap; f t is the design value of the tensile strength of the pedestal concrete; h is the effective height of the outer edge of the pedestal.
[0022] Preferably, the calculation formula for the punching bearing capacity of the corner piles of the non-rectangular cap is:
[0023] Bottom corner pile:
[0024]
[0025] Top corner stake:
[0026]
[0027] Among them, α 11 , α 12 is the punching coefficient of the corner pile; Its value should meet the requirement of 0.25≤λ≤1.0; α 11 , α 12 It is the horizontal distance from the intersection of the 45° punching line drawn from the inner edge of the top of the corner pile at the bottom of the cap and the top surface of the cap to the inner edge of the corner pile; when the column (wall) side or the cap step change is located within the 45° line, the line connecting the column (wall) side or the cap step change and the inner edge of the pile is taken as the cone line of the punching cone; c1 and c2 are the distances from the inner edge of the corner pile to the outer edge of the cap; Q1 and Q2 are the bottom angle and top angle of the triangular cap; f t is the design value of the tensile strength of the pedestal concrete; h is the effective height of the outer edge of the pedestal.
[0028] Preferably, the engineering management unit includes a data import module, a data display module, a data storage module and a data output module.
[0029] Preferably, the data import module is used to import the power engineering design data including the plane coordinates of the corner piles, the horizontal rotation angle, and the diagonal half-root opening distance;
[0030] The data display module is used to display the positions of the stakeout points;
[0031] The data storage module is used to store the generated angle stake setting coordinates and power engineering design data;
[0032] The data output module is used to output drawings of corner stake setting out coordinates in combination with a printing device.
[0033] Preferably, the engineering management unit further comprises an electronic compass for displaying the corresponding orientation while showing the position of the stakeout points.
[0034] Beneficial Effects
[0035] The present invention provides an auxiliary measurement system for calculating angle piles for electric power construction. Compared with the prior art, it has the following beneficial effects:
[0036] 1. The angle pile calculation auxiliary measurement system for power construction uses the geotechnical survey module to conduct geological surveys on the construction site and collect corresponding survey data. Then, the model generation module is used to establish a three-dimensional geological model of the construction site based on the survey data, which reduces the difficulty of angle pile construction, improves the efficiency of layout operations, reduces the errors in angle pile construction caused by factors such as terrain, and ensures the quality and efficiency of angle pile construction in power engineering.
[0037] 2. The calculation and auxiliary measurement system for corner piles used in power construction uses the principle of Dynamo parametric design to realize automatic analysis, automatic creation, and automatic addition of attribute information of components, and finally exports the corresponding data and drawings for use in on-site construction. At the same time, it can predict the geological conditions of the construction site in advance according to the three-dimensional geological model and appropriately lengthen or shorten the corner piles, so that the bottom of the corner pile has enough length to anchor into the rock layer, realizing batch acquisition of corner pile parameters, which is accurate and efficient, and can well guide the construction of corner piles and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of system connection of the present invention;
[0039] Figure 2 It is a schematic diagram of the internal connections of the engineering management unit of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] See Figure 1-2 The present invention provides an auxiliary measurement system for calculating angle piles for electric power construction, comprising:
[0042] The geotechnical survey module is used to conduct geological surveys at the construction site and collect corresponding survey data. The survey data include the distribution characteristics of each soil layer at the construction site, water level, natural gravity, and floating gravity. According to the survey data, survey drilling maps and geological cross- and vertical profiles are drawn. The geological cross- and vertical profiles clearly define the soil boundaries of each stratum. According to the geophysical data such as high-density seismic imaging detection, transient surface wave detection, geological radar detection and the drilling data of encrypted survey holes in the cave area, the geological data and geological cross- and vertical profiles are corrected to refine and improve the spatial information, boundary lines, directions and development trends of the caves.
[0043] The model generation module is used to establish a three-dimensional geological model of the construction site based on the survey data. Revit software is used to establish the three-dimensional geological model of each geological layer interface including the bearing layer interface and the natural ground after leveling, forming a geological contour interface of the construction area. When establishing the three-dimensional geological model, a comprehensive exploration method of geophysical exploration (wave velocity, resistivity, geothermal testing, electrical depth sounding) and comprehensive geological analysis is used to verify the exploration data. The three-dimensional geological model is established based on the revit platform. A new volume family is created on the revit platform, and geological horizontal and vertical profiles are imported. The revit platform automatically picks up the geological profile boundary vector line, and the volume stretching function is applied to generate a three-dimensional geological model.
[0044] The three-dimensional geological model of the present invention combines the exploration data formed by various geological exploration methods. Various geological exploration methods use the data formed by drilling exploration as a reference and verify each other, so as to accurately supplement the geological data between the boreholes in the drilling exploration method, so that the address data can be obtained accurately and reliably, and the parameters of the actual complex geological conditions can be obtained. The geological cross-section map and the geological longitudinal section map are drawn using the accurate exploration data, and then a plurality of geological cross-section maps and a plurality of geological longitudinal sections are combined to form a three-dimensional geological model. Before forming the three-dimensional geological model, the geological cross-section and the geological longitudinal section can be corrected and refined, thereby improving the drawing accuracy of the geological cross-section and the geological longitudinal section.
[0045] The parameter acquisition module is used to obtain the number of corner stakes and the set spacing range. The construction site is measured by a total station and a laser rangefinder to obtain the number of corner stakes and the set spacing range data.
[0046] The corner pile arrangement module is used to arrange the corner piles on the three-dimensional geological model based on the number of corner piles and the set spacing range and obtain the layout coordinates of the corner piles. According to the engineering design data and the three-dimensional geological model, in accordance with the power engineering standards, the layout point coordinates are calculated to generate the layout point coordinates of the corner piles.
[0047] The parameter calculation module is used to use the three-dimensional geological model to obtain the rock surface elevation of the corresponding construction site, calculate the pile bottom elevation of the corresponding corner pile in combination with the obtained rock penetration length, calculate the pile length of the corner pile using the pile top elevation and pile bottom elevation at the coordinates of the corner pile setting out point, and build a three-dimensional model of the bored cast-in-place end corner pile and the cap in the three-dimensional geological model based on the Revit software, and calculate the shear bearing capacity of the rectangular cap under the corner pile and the non-rectangular cap under the corner pile.
[0048] The calculation formula for the punching bearing capacity of rectangular cap corner piles is:
[0049]
[0050] Among them, α 1x , α 1y is the punching coefficient of the corner pile; Its value should meet the requirement of 0.25≤λ≤1.0; α 1x , α 1y It is the horizontal distance from the intersection of the 45° punching line drawn from the inner edge of the top of the corner pile at the bottom of the cap and the top surface of the cap to the inner edge of the corner pile; when the column (wall) side or the cap step change is located within the 45° line, the line connecting the column (wall) side or the cap step change and the inner edge of the pile is taken as the cone line of the punching cone; c1 and c2 are the distances from the inner edge of the corner pile to the outer edge of the cap; f t is the design value of the tensile strength of the pedestal concrete; h is the effective height of the outer edge of the pedestal.
[0051] The calculation formula for the punching bearing capacity of the corner pile of a non-rectangular cap is:
[0052] Bottom corner pile:
[0053]
[0054] Top corner stake:
[0055]
[0056] Among them, α 11 , α 12 is the punching coefficient of the corner pile; Its value should meet the requirement of 0.25≤λ≤1.0; α 11 , α 12 It is the horizontal distance from the intersection of the 45° punching line drawn from the inner edge of the top of the corner pile at the bottom of the cap and the top surface of the cap to the inner edge of the corner pile; when the column (wall) side or the cap step change is located within the 45° line, the line connecting the column (wall) side or the cap step change and the inner edge of the pile is taken as the cone line of the punching cone; c1 and c2 are the distances from the inner edge of the corner pile to the outer edge of the cap; Q1 and Q2 are the bottom angle and top angle of the triangular cap; f tis the design value of the tensile strength of the pedestal concrete; h is the effective height of the outer edge of the pedestal.
[0057] The engineering management unit is used to receive design data, display and save the layout coordinates, and cooperate with the printing device to output drawings. The engineering management unit includes a data import module, a data display module, a data storage module and a data output module. The data import module is used to import the plane coordinates of the corner piles, the horizontal rotation angle, and the diagonal half-root opening distance of the power engineering design data; the data display module is used to display the layout point position of the corner piles; the data storage module is used to store the generated corner pile layout coordinates and the power engineering design data; the data output module is used to output the drawings of the corner pile layout coordinates in combination with the printing device. The engineering management unit also includes an electronic compass for displaying the corresponding direction while displaying the layout point position of the corner piles.
[0058] It is further explained that in order to ensure the reliability of program operation and avoid errors in the identification of intersection points, a manual inspection link is also set up in this embodiment, namely: programming is performed using the Dynamo visual programming tool. By running the program, an auxiliary component is added at each identified intersection point of the corner pile and the bearing layer interface to mark the position of the intersection point, which is convenient for inspectors to observe with the naked eye. During the inspection, the position of the auxiliary component on each corner pile in the construction model is observed from the three-dimensional view to determine whether the auxiliary component is located on the cutting cross section where the upper interface of the bearing layer in the construction model intersects the corner pile.
[0059] The system of the present invention adopts Dynamo programming, can realize batch design of engineering piles, and export detailed lists at one time, which is accurate and efficient.
[0060] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art, and the model parameters of each electrical appliance are not specifically limited, and conventional equipment can be used.
[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An auxiliary calculation system for angle piles used in power construction, characterized in that: include: Geotechnical survey module, used to conduct geological surveys at the construction site and collect relevant survey data; Model generation module, used to establish a three-dimensional geological model of the construction site based on the survey data; A parameter acquisition module is used to obtain the number of corner stakes and the range of spacing; An angle stake arrangement module, used to arrange angle stakes on the three-dimensional geological model based on the number of angle stakes set and the set spacing range, and obtain the staked coordinates of the angle stakes; A parameter calculation module is used to obtain the rock surface elevation of the corresponding construction site using the three-dimensional geological model, and calculate the pile bottom elevation of the corresponding angle pile in combination with the obtained rock penetration length; The engineering management unit is used to receive design data, display and save layout coordinates, and cooperate with printing equipment to output drawings.
2. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The survey data include the distribution characteristics of each soil layer at the construction site, water level, natural gravity, and floating gravity.
3. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The model generation module relies on Revit software to establish the three-dimensional geological model of various geological layer interfaces including the bearing layer interface and the natural ground after leveling, forming the geological contour interface of the construction area.
4. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The parameter acquisition module measures the construction site by using a total station and a laser rangefinder to obtain the setting quantity and setting spacing range data of the corner stakes.
5. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The corner pile layout module calculates the stakeout point coordinates based on the engineering design data and the three-dimensional geological model and in accordance with the power engineering standards to generate the stakeout point coordinates.
6. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The parameter calculation module calculates the length of the corner pile using the pile top elevation and pile bottom elevation at the coordinates of the corner pile setting-out point, and builds a three-dimensional model of the bored cast-in-place end corner pile and the cap in the three-dimensional geological model based on the Revit software, and calculates the shear bearing capacity of the rectangular cap under the corner pile and the non-rectangular cap under the corner pile respectively.
7. The angle pile calculation auxiliary measurement system for electric power construction according to claim 1 is characterized by: The engineering management unit includes a data import module, a data display module, a data storage module and a data output module.
8. The angle pile calculation auxiliary measurement system for electric power construction according to claim 7 is characterized in that: The data import module is used to import the power engineering design data including the plane coordinates of the corner piles, the horizontal rotation angle, and the diagonal half-root opening distance; The data display module is used to display the positions of the stakeout points; The data storage module is used to store the generated angle stake setting coordinates and power engineering design data; The data output module is used to output drawings of corner stake setting out coordinates in combination with a printing device.
9. The angle pile calculation auxiliary measurement system for electric power construction according to claim 7, characterized in that: The engineering management unit also includes an electronic compass for displaying the corresponding orientation while displaying the position of the staked points.
Citation Information
Patent Citations
Power tower pole lofting system and method based on unmanned aerial vehicle laser guidance
CN118208053A